Facility Resource Assessment
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Akhuryan Basin Management Area KEY WATER ISSUES
ARMENIA Akhuryan Basin Management Area KEY WATER ISSUES EEnvi ronmenPt al Pr otectioIn of IntRe rnati onal RivBe r Basin s The project is funded This project is implemented by a consortium by the European Union led by Hulla & Co. Human Dynamics KG The Environmental Protection of International River Basins (EPIRB) project aims to improve the quality of water in transboundary river basins in the wider Black Sea region and Belarus, including Armenia. One of the specific objectives is to improve technical capacities by developing river basin management plans (RBMPs) in selected pilot river basins, according to the requirements of the EU Water Framework Directive (WFD). One of the selected pilot basins is the Akhuryan basin management area, which includes the Akhuryan River basin, located in the western part of the Republic of Armenia, and the Metsamor River basin, which is adjacent to the Akhuryan River basin. 2 Good water status The Water Framework Directive is achieved when pollution is and river basin management plans controlled and there is One of the requirements of the WFD is the achievement and sufficient flow for ecosystems preservation of good water status by managing waters in natural to function and survive. units — that is, in river basins. River basin planning follows a structured approach: finding out facts, deciding on necessary actions, making a management plan, and putting the plan into practice. An important first step is to identify significant water management issues so that appropriate solutions and measures can be developed. The impacts of human activities Human activities can lead to serious problems in terms of both water quality and quantity. -
Agricultural Value-Chains Assessment Report April 2020.Pdf
1 2 ABOUT THE EUROPEAN UNION The Member States of the European Union have decided to link together their know-how, resources and destinies. Together, they have built a zone of stability, democracy and sustainable development whilst maintaining cultural diversity, tolerance and individual freedoms. The European Union is committed to sharing its achievements and its values with countries and peoples beyond its borders. ABOUT THE PUBLICATION: This publication was produced within the framework of the EU Green Agriculture Initiative in Armenia (EU-GAIA) project, which is funded by the European Union (EU) and the Austrian Development Cooperation (ADC), and implemented by the Austrian Development Agency (ADA) and the United Nations Development Programme (UNDP) in Armenia. In the framework of the European Union-funded EU-GAIA project, the Austrian Development Agency (ADA) hereby agrees that the reader uses this manual solely for non-commercial purposes. Prepared by: EV Consulting CJSC © 2020 Austrian Development Agency. All rights reserved. Licensed to the European Union under conditions. Yerevan, 2020 3 CONTENTS LIST OF ABBREVIATIONS ................................................................................................................................ 5 1. INTRODUCTION AND BACKGROUND ..................................................................................................... 6 2. OVERVIEW OF DEVELOPMENT DYNAMICS OF AGRICULTURE IN ARMENIA AND GOVERNMENT PRIORITIES..................................................................................................................................................... -
Environmental Assessment Report Armenia: North-South Road
Environmental Assessment Report Environmental Impact Assessment (EIA) Document Stage: Draft Sub-project Number: 42145 August 2010 Armenia: North-South Road Corridor Investment Program Tranches 2 & 3 Prepared by Ministry of Transport and Communications (MOTC) of Armenia for Asian Development Bank The environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Armenia: North-South Road Corridor Investment Program Tranches 2 & 3 – Environmental Impact Assessment Report ABBREVIATIONS ADB Asian Development Bank AARM ADB Armenian Resident Mission CO2 carbon dioxide EA executing agency EARF environmental assessment and review framework EIA environmental impact assessment EMP environmental management and monitoring plan IUCN International Union for Conservation of Nature LARP Land Acquisition and Resettlement Plan MFF multi-tranche financing facility MNP Ministry of Nature Protection MOC Ministry of Culture MOH Ministry of Health MOTC Ministry of Transport and Communication NGO nongovernment organization NO2 nitrogen dioxide NO nitrogen oxide MPC maximum permissible concentration NPE Nature Protection Expertise NSS National Statistical Service PAHs polycyclic aromatic hydrocarbons PMU Project Management Unit PPTA Project Preparatory Technical Assistance RA Republic of Armenia RAMSAR Ramsar Convention on Wetlands REA Rapid Environmental Assessment (checklist) SEI State Environmental Inspectorate -
World Bank Document
ARMENIA E2061 TRANSPORT PIU Public Disclosure Authorized LIFELINE ROADS IMPROVEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized EENNVVIIRROONNMMEENNTTAALL FFRRAAMMEEWWOORRKK for rehabilitation of selected sections of Lifeline Roads Network Public Disclosure Authorized Yerevan 2009 TABLE OF CONTENTS LIST OF ACRONYMS ..................................................................................................... 3 INTRODUCTION ............................................................................................................. 4 WORLD BANK SAFEGUARD POLICIES ...................................................................... 5 NATIONAL LEGISLATION ............................................................................................. 6 INSTITUTIONAL SETTING ............................................................................................ 9 PROPOSED PROJECT DESCRIPTION ....................................................................... 11 ENVIRONMENTAL SCREENING ................................................................................. 12 POTENTIAL IMPACTS AND RISKS ............................................................................ 12 MITIGATION MEASURES ............................................................................................ 14 STAKEHOLDER CONSULTATION .............................................................................. 15 ENVIRONMENTAL MANAGEMENT PLANS ............................................................... 15 2 LIST OF ACRONYMS -
Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk
Ministry of Territorial Administration and Development of the Republic of Armenia DEVELOPMENT PROJECT IDEAS GORIS, TEGH, GORHAYK, MEGHRI, VAYK, JERMUK, ZARITAP, URTSADZOR, NOYEMBERYAN, KOGHB, AYRUM, SARAPAT, AMASIA, ASHOTSK, ARPI Expert Team Varazdat Karapetyan Artyom Grigoryan Artak Dadoyan Gagik Muradyan GIZ Coordinator Armen Keshishyan September 2016 List of Acronyms MTAD Ministry of Territorial Administration and Development ATDF Armenian Territorial Development Fund GIZ German Technical Cooperation LoGoPro GIZ Local Government Programme LSG Local Self-government (bodies) (FY)MDP Five-year Municipal Development Plan PACA Participatory Assessment of Competitive Advantages RDF «Regional Development Foundation» Company LED Local economic development 2 Contents List of Acronyms ........................................................................................................................ 2 Contents ..................................................................................................................................... 3 Structure of the Report .............................................................................................................. 5 Preamble ..................................................................................................................................... 7 Introduction ................................................................................................................................ 9 Approaches to Project Implementation .................................................................................. -
Shirak Guidebook
Wuthering Heights of Shirak -the Land of Steppe and Sky YYerevanerevan 22013013 1 Facts About Shirak FOREWORD Mix up the vast open spaces of the Shirak steppe, the wuthering wind that sweeps through its heights, the snowcapped tops of Mt. Aragats and the dramatic gorges and sparkling lakes of Akhurian River. Sprinkle in the white sheep fl ocks and the cry of an eagle. Add churches, mysterious Urartian ruins, abundant wildlife and unique architecture. Th en top it all off with a turbulent history, Gyumri’s joi de vivre and Gurdjieff ’s mystical teaching, revealing a truly magnifi cent region fi lled with experi- ences to last you a lifetime. However, don’t be deceived that merely seeing all these highlights will give you a complete picture of what Shirak really is. Dig deeper and you’ll be surprised to fi nd that your fondest memories will most likely lie with the locals themselves. You’ll eas- ily be touched by these proud, witt y, and legendarily hospitable people, even if you cannot speak their language. Only when you meet its remarkable people will you understand this land and its powerful energy which emanates from their sculptures, paintings, music and poetry. Visiting the province takes creativity and imagination, as the tourist industry is at best ‘nascent’. A great deal of the current tourist fl ow consists of Diasporan Armenians seeking the opportunity to make personal contributions to their historic homeland, along with a few scatt ered independent travelers. Although there are some rural “rest- places” and picnic areas, they cater mainly to locals who want to unwind with hearty feasts and family chats, thus rarely providing any activities. -
Ra Shirak Marz
RA SHIRAK MARZ 251 RA SHIRAK MARZ Marz center – Gyumri town Territories - Artik, Akhuryan, Ani, Amasia and Ashotsk Towns - Gyumri, Artik, Maralik RA Shirak marz is situated in the north-west of the republic. In the West it borders with Turkey, in the North it borders with Georgia, in the East – RA Lori marz and in the South – RA Aragatsotn marz. Territory 2681 square km. Territory share of the marz in the territory of RA 9 % Urban communities 3 Rural communities 116 Towns 3 Villages 128 Population number as of January 1, 2006 281.4 ths. persons including urban 171.4 ths. persons rural 110.0 ths. persons Share of urban population size 60.9 % Share of marz population size in RA population size, 2005 39.1 % Agricultural land 165737 ha including - arable land 84530 ha Being at the height of 1500-2000 m above sea level (52 villages of the marz are at the height of 1500-1700 m above sea level and 55 villages - 2000 m), the marz is the coldest region 0 of Armenia, where the air temperature sometimes reaches -46 C in winter. The main railway and automobile highway connecting Armenia with Georgia pass through the marz territory. The railway and motor-road networks of Armenia and Turkey are connected here. On the Akhuryan river frontier with Turkey the Akhuryan reservoir was built that is the biggest in the country by its volume of 526 mln. m3. Marzes of the Republic of Armenia in figures, 1998-2002 252 The leading branches of industry of RA Shirak marz are production of food, including beverages and production of other non-metal mineral products. -
Marzer 2019 32 Shirak.Docx
ՇԻՐԱԿԻ ՄԱՐԶ SHIRAK MARZ Մարզկենտրոնը` Marz centre ԼՈՌԻ ք. Գյումրի Gyumri town LORI ՏԱՎՈՒՇ TAVUSH ՇԻՐԱԿ Տարածաշրջանները` Territories SHIRAK Արթիկ Artik ԱՐԱԳԱԾՈՏՆ ԿՈՏԱՅՔ Ախուրյան Akhuryan ARAGATSOTN KOTAYK Անի Ani ԱՐՄԱՎԻՐ Ամասիա Amasia ARMAVIR ø. ԵՐԵՎԱՆ ԳԵՂԱՐՔՈՒՆԻՔ Աշոցք Ashotsk YEREVAN CITY GEGHARKUNIK ԱՐԱՐԱՏ ARARAT Քաղաքները` Towns ՎԱՅՈՑ ՁՈՐ VAYOTS DZOR Գյումրի Gyumri Արթիկ Artik Մարալիկ Maral ՍՅՈՒՆԻՔ SYUNIK Տարածքը 2 680 քառ.կմ/ Territory sq. km Հայաստանի Հանրապետության տարածքում մարզի տարածքի տեսակարար կշիռը,% 9.0 Territory share of the marz in the territory of the Republic of Armenia, % Համայնքներ, 2020 թ. տարեսկզբի դրությամբ 42 Communities, as of the beginning of 2020 Քաղաքներ 3 Towns Գյուղեր 127 Villages Բնակչության թվաքանակը 2020թ. տարեսկզբի դրությամբ 231.4 հազ.մարդ/ Population number as of the beginning of the year, 2020 ths. person այդ թվում` including: քաղաքային 135.6 հազ. մարդ/ urban ths. person գյուղական 95.8 հազ.մարդ rural ths. person Հայաստանի Հանրապետության բնակչության ընդհանուր թվաքանակում մարզի բնակչության թվաքանակի տեսակարար կշիռը 2019 թ.,% 7.8 Share of marz population in the total population of the Republic of Armenia 2019, % Քաղաքային բնակչության թվաքանակի տեսակարար կշիռը 2019 թ.,% 58.6 Share of urban population size 2019, % Գյուղատնտեսական նշանակության հողեր 210 876.8 հա/ Agricultural land ha այդ թվում`վարելահողեր 78 143.0 հա/ including: arable land ha 370 ՀԱՅԱՍՏԱՆԻ ՀԱՆՐԱՊԵՏՈՒԹՅԱՆ ՄԱՐԶԵՐԸ ԵՎ ԵՐԵՎԱՆ ՔԱՂԱՔԸ ԹՎԵՐՈՎ, 2020 MARZES AND YEREVAN CITY OF THE REPUBLIC OF ARMENIA IN FIGURES, 2020 Շիրակի մարզը գտնվում է հանրապետության Shirak marz is situated in the north-west of the Republic, հյուսիս-արևմուտքում՝ ք. Գյումրի մարզկենտրոնով: with Gyumri marz centre. Պետական սահմանով արևմուտքից սահմանակից է In the West it borders with Turkey, in the North it borders Թուրքիային, հյուսիսից` Վրաստանին, արևելքից սահ- with Georgia, in the East –Lori marz and in the South – մանակից է Լոռու մարզին և հարավից` Արագածոտնի Aragatsotn marz. -
The Choice We Made
THE CHOICE WE MADE: THE CHOICE WE MADE: PRACTICE OF WORK WITH THE PAST, PRESENT AND FUTURE IN THE EASTERN NEIGHBORHOOD COUNTRIES ISBN 978-617-7263-56-1 «Trek LTD» Publishing House Drogobych town, Ukraine T. Poshevalova THE CHOICE U. Matskevich I. Rakhanski WE MADE: A. Yahorau V. Vialichka PRACTICE OF WORK K. Ramanchyk R. Ter-Martirosyan WITH THE PAST, V. Suruceanu PRESENT AND FUTURE I. Savchak IN THE EASTERN NEIGHBORHOOD COUNTRIES Authors: Tatsiana Poshevalova, Uladzimir Matskevich, Ihar Rakhanski, Andrey Yahorau, Ulad Vialichka, The book was prepared within the framework Katsiaryna Ramanchyk, Roubina Ter-Martirosyan, of the project CHOICE — Cultural Heritage: Valeria Suruceanu, Ihor Savchak Opportunity for Civic Engagement, implemented with the support of the European Union Editors: in Armenia, Belarus, Moldova and Ukraine Katsiaryna Ramanchyk, Tatiana Poshevalova Translated by: Alies Karciel, Alisa Matavilava Designed by: The project Nastassia Zenovich is co-financed by the European Union Photo credits by the participants of CHOICE project © 2017 IC «EuroBelarus» choiceproject.eu 2 3 CONTENTS ABOUT THE CHOICE PROJECT 4 MOLDOVA 112 HERITAGE. The contents of this notion Trajan Walls — cultural resource for the sustainable and the meaning of our work with it 10 cross-border development and collaboration 114 Museum — space for the community PROJECT STORIES 42 and intercultural dialogue 118 ARMENIA 42 History revival — Integration of Duruitoarea Cave in European tourist space 122 Traditional cuisine as cultural heritage 44 Historical site -
Small Scale Mitigation Projects
Small Scale Mitigation Projects Case Study Regional Programme for Building Resilient Local Communities in Georgia & Armenia Integral to the Red Cross community based disaster risk reduction model is the support to small scale mitigation projects (SSMP) in Armenian and Georgia. This case study highlights the approach and impact of SSMPs. Based on the findings of the Vulnerability and Capacity Assessments (VCAs) and subsequent community action plans, 176,882 SSMPs are jointly implemented with local authorities and community members in target communities. The type of needs identified, the capacity of the local Direct stakeholders and commitment of co-funding by local and/or regional authorities all determines the type of SSMP Beneficiaries implemented. To ensure quality and relevance of the SSMPs, the examples listed below build on the experiences from the previous two phases of action. An internal review was also conducted in 2014 to provide recommendations for improving the impact of the SSMP. All SSMPs take into account climate change considerations and are signposted with donor and implementing partners' logos. Armenia Within the third phase of the Project, SSMPs in Shirakavan, Jajur, Dzorashen and Aregnadem communities will be undertaken. The priority need identified in communities is establishment of a proper drinking water system, particularly the damaged and inefficient water pipes. SSMP Process Pre-discussions are held with the community leaders and local/regional authorities to determine a commitment to co-fund and implement the SSMP in the target locations; the final commitment is detailed and formalized during the VCA and subsequent planning processes. An evaluation commission consisting of representatives from Red Cross, local and regional authorities and Rescue Services prioritize appropriate SSMP to be implemented jointly. -
Genocide and Deportation of Azerbaijanis
GENOCIDE AND DEPORTATION OF AZERBAIJANIS C O N T E N T S General information........................................................................................................................... 3 Resettlement of Armenians to Azerbaijani lands and its grave consequences ................................ 5 Resettlement of Armenians from Iran ........................................................................................ 5 Resettlement of Armenians from Turkey ................................................................................... 8 Massacre and deportation of Azerbaijanis at the beginning of the 20th century .......................... 10 The massacres of 1905-1906. ..................................................................................................... 10 General information ................................................................................................................... 10 Genocide of Moslem Turks through 1905-1906 in Karabagh ...................................................... 13 Genocide of 1918-1920 ............................................................................................................... 15 Genocide over Azerbaijani nation in March of 1918 ................................................................... 15 Massacres in Baku. March 1918................................................................................................. 20 Massacres in Erivan Province (1918-1920) ............................................................................... -
World Bank Document
INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 01/29/2009 Report No.: AC4166 Public Disclosure Authorized 1. Basic Project Data Country: Armenia Project ID: P115486 Project Name: LIFELINE ROADS IMPROVEMENT PROJECT Task Team Leader: Christopher R. Bennett Estimated Appraisal Date: January 14, Estimated Board Date: February 24, 2009 2009 Managing Unit: ECSSD Lending Instrument: Emergency Recovery Loan Sector: Roads and highways (100%) Theme: Rural services and infrastructure (P);Other rural development (S) IBRD Amount (US$m.): 0.00 IDA Amount (US$m.): 25.00 Public Disclosure Authorized GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: BORROWER/RECIPIENT 5.20 5.20 Environmental Category: B - Partial Assessment Simplified Processing Simple [] Repeater [] Is this project processed under OP 8.50 (Emergency Recovery) Yes [X] No [ ] or OP 8.00 (Rapid Response to Crises and Emergencies) 2. Project Objectives Public Disclosure Authorized The project objective is to upgrade selected sections of the lifeline road network and create temporary employment in road construction. 3. Project Description The Project has two components: Component 1: Rehabilitation of the Lifeline Road Network (US$ 27.9million including contingencies): Rehabilitation of approximately 100 km of the lifeline road network. These road sections are located in the seven different Marzes of the country and their lengths vary between 1 and 14 km. The component includes: (i) civil works for road rehabilitation; (ii) consultancy services for the supervision and technical auditing of rehabilitation works; (iii) updating of the original MCA financed 2007 designs and environmental documents to meet the requirements of the project; and, (iv) project implementation expenses including but not limited to funding project audits, incremental Public Disclosure Authorized operational implementation costs and additional costs for intensified project supervision.