OFFICE OF THE EXECUTIVE ENGINEER LSGD DIVISON,

THEVALLY, KOLLAM PIN 691009 e mail [email protected] e-Government Procurement (e-GP) NOTICE INVITING TENDER No Date 21.6.2018

The Deputy Executive Engineer, LSGD Division,Kollam jilla Panchayat, invites competative online bids from the registered bidders of state P.W.D ,LSGD and Irrigation Department for the following works.

Last date and time of Earnest Tender receipt of relevant Date and time of Estimate Money Period of Classification of Online bid submission Sl.No Name of work Submissio document as opening of online Amount Deposit completion Bidder closing date and time n Fee mentioned (NIT) by tender bid (EMD) speed post

KOTTUVANKONAM (COLONY) TO ERATHU ELA 06.07.2018 1 1230516 30800 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm RAOD CONSTRUCTION IN G.P. 11am

CHIRAKKARA PARAYIL JN. PARK JN. KARADI MUKKU 06.07.2018 2 999908 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD 11am

CHIRAKKARA NEDUNJOLAM HS JN. POST OFFICE 06.07.2018 3 999861 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD 11am

06.07.2018 4 CHIRAKKARA SAUBHAGYA JN. SN SADANAM ROAD 999981 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

SIDE WALL CONSTRUCTION AND CONCERTING OF 06.07.2018 5 VALIYODU MUKKAVALA PURAMBIL ROAD IN 996188 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am ELAMADU G.P.

CHIRAKKARA VILLAGE OFFICE VAYALIKKADA ROAD 06.07.2018 6 993924 24900 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE IN WARD NO.3 OF CHIRAKKARA G.P. 11am

POOTHAKKUALM MUKKADA PRIYADERSINI ROAD 06.07.2018 7 2466649 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE 11am

Page 1 of 10 Block office Kulamudi Chalil road in Ward Ni.1 of 06.07.2018 8 998805 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm Chirakkara G.P 11am

ITTIVA MANJAPPARA VADAKKEKKONAM ROAD 06.07.2018 9 999556 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE 11am

Pump house Manalumukku road Concreting and 06.07.2018 10 999342 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm Construction ofCulvert in Chirakkara G.P. 11am

ADICHANALLOOR TOURIST HOME YMI 06.07.2018 11 RAOD MAINTENANCE IN WARD 15 OF 999989 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am GP

CONCRETING OF KANNANKARA CASHEW FACTORY 06.07.2018 12 1299123 32500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD IN G.P. 11am

CONCRETING OF SREE RAMAPURAM JN. TEMPLE 06.07.2018 13 999484 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD IN KALLUVATHUKKAL G.P. 11am

KALLUVATHUKKAL PULIKUZHI SREERAMAPURAM 06.07.2018 14 VAYALIL THRIKKOVIL ROAD RETARRING AND IRISH 2366575 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am DRAIN

CHADAYAMANGALAM PALLIMUKKU KAITHAKKUTTI 06.07.2018 15 995633 24900 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD 11am

ITTIVA SHED MUKKU VELLARAM KULAM ROAD 06.07.2018 16 999829 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE 11am

POOTHAKKUALM VAYALKKARA PALODU KAVU 06.07.2018 17 1147564 28700 2705 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm THODU SIDE WALL CONSTRUCTION 11am

KLM JP 2018-19: KALAVAYAL KAITHAKKAL ROAD IN 06.07.2018 18 1799554 45000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm G.P. 11am

CONSTRUCTION OF SAKTHI KULANGARA DRAIN IN 06.07.2018 19 1964732 49200 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm K.S.PURAM G.P. 11am

KOTTAKKADU PULIYILA ELA ROAD IN 06.07.2018 20 2496456 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm G.P. 11am

CONSTRCUTION OF PAKAL VEEDU IN WARD NO.7 06.07.2018 21 999990 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm OF OCHIRA G.P. 11am

Page 2 of 10 CONSTRUCTION OF DRAIN AND RE-TARRING OF 06.07.2018 22 ROAD FROM SADUPURATHUMUKKU TO 999619 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am NEELIKULANGARA IN K.S.PURAM G.P.

AYIRAM THENGU MUKKU TO CHULOOR MUKKU 06.07.2018 23 3999280 50000 2940 120 Days C and above 02.07.2018 5pm 05.07.2018 5pm ROAD IN G.P. 11am

ELAMPALLOOR VARTHAMUKKU PUTHEN CHANTHA 06.07.2018 24 484403 12200 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm RAOD RE- TARRING 11am

MAINTENANCE OF MANNADISSER SASTHAMPOIKA 06.07.2018 25 573058 14400 1412 180 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD IN K.S.PURAM G.P. 11am

THEVAKKARA PALATHARA ARIKKAVU GROUND 06.07.2018 26 783070 19600 1882 180 Days D and above 02.07.2018 5pm 05.07.2018 5pm RAOD MAINTENANCE 11am

CONSTRUCTION OF DRAIN IN VALIYA MADAM 06.07.2018 27 999119 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm COLONY IN G.P. 11am

MAINTENANCE OF VATTAPPARAMBU LORD 06.07.2018 28 KRISHNA JN. MADHAVATHIL JN. ROAD IN 1499229 37500 2940 180 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am G.P.

MAINTENANCE OF AMBALAMUKKU KARUTHERI 06.07.2018 29 1797427 45000 2940 180 Days D and above 02.07.2018 5pm 05.07.2018 5pm MUKKU ROAD IN THAZHAVA G.P. 11am

MAYYANADU MAINTENANCE OF PEEDIKAMUKKU 06.07.2018 30 4904452 50000 2940 120 Days C and above 02.07.2018 5pm 05.07.2018 5pm VELLAPPILMUKKU KAKKAKADAVU ROAD 11am

maintenance of vellamkolli thaikavu to arattukulangara 06.07.2018 31 762518 19100 1882 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm road in thevalakara g.p 11am

CONSTRUCTION OF DRAIN AND COVERING SLAB AT 06.07.2018 32 999625 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm KACHU VAZHA PADAM IN G.P. 11am

MAINTENANCE OF TEMPLE 06.07.2018 33 SUDARSANALAYAM MARKET AMBEKAR COLONY 2135272 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am ROAD IN THAZHAVA G.P.

THEKKUMBHAGOM DELAVAPURAM AKG ROAD 06.07.2018 34 997089 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm CONSTRUCTION OF DRAIN AND SLAB 11am

CONSTRUCTION OF DRAIN FROM VARIKKOLI 06.07.2018 35 970842 24300 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm COLONY TO MURTHIRA THARA IN K.S.PURAM G.P. 11am

Page 3 of 10 MAYYANADU MAINTENANCE OF MUNDICHIRA 06.07.2018 36 994304 24900 2000 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm AKMHS ROAD(BALANCE WORK) 11am

THEKKUMBHAGOM NADAKKAVU VALLAKKADAVU 06.07.2018 37 997534 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD MAINTENACE 11am

ADICHANALLOR VADAKKE MAILAKKADU SIVAN 06.07.2018 38 999936 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm NADA KRISHN KOVIL ELA ROAD 11am

POOTHAKKUALM KOTTUVAN KONAM TEMPLE 06.07.2018 39 1633075 40900 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm NELPURAYIDATHUVILA ROAD MAINTENANCE 11am

POOTHAKKUALM UNNINMOODU THEATRE JN. ROAD 06.07.2018 40 552617 13900 1412 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE 11am

06.07.2018 41 Uliyanad G.H.School maintenance in Chirakkara G.P 499373 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

Improvements to CHERUVAKKAL 06.07.2018 42 2996712 50000 2940 120 Days C and above 02.07.2018 5pm 05.07.2018 5pm ROAD IN ELAMADU G.P. 11am

CHATAHNNOOR SREE BOOTHANATHA TEMPLE TO 06.07.2018 43 999238 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm CHALIL ROAD 11am

06.07.2018 44 VAYALIKKADA MARAKUALM ROAD 999165 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

KALLUVATHUKKAL VATTAVILA CHUVADUTANGI 06.07.2018 45 548024 13800 1294 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD AND IRISH DRAIN 11am

EZHIYAM KANJIRAM KUZHI ROAD CONCRETING IN 06.07.2018 46 1497097 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ITTIVA G.P. 11am

MAINTENANCE OF Adichanalloor Vadakarayogam 06.07.2018 47 chira road(THAKARAMUKKU TO PULIMOODU (NEAR 799853 20000 1882 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm CHIRA) ROAD IN WARD NO: 7 OF ADICHANALLOOR 11am G.P. 06.07.2018 48 PULIPPARA ANAPPADU ROAD IN G.P. 999465 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

06.07.2018 49 maintenance of roof for adichanalloor ghs school 699998 17500 1647 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

Page 4 of 10 06.07.2018 50 ghss school maintenance 499914 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

06.07.2018 51 NELLIVILA MUTHAYIL ROAD IN G.P. 999792 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

AARAYANKAVE CHARAPUZHA MELE AANACHADI 06.07.2018 52 997427 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm AMBANADE ROAD RETARRING IN G.P. 11am

06.07.2018 53 KummilGp Kokkatukunnu Kumbalam Road 1997473 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

KALLUMALA COLONY ROAD IN 06.07.2018 54 994882 24900 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm GRAMA PANCHAYATH. 11am

06.07.2018 55 kadakkal ghs school maintenance 499560 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

KANNAM KKODU ENTHAL ROAD CONCRETING IN 06.07.2018 56 996262 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm G.P. 11am

06.07.2018 57 karukone G.H.S.S maintenance in g.p. 499775 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

06.07.2018 58 Pothanpara Elavur road Re-Taring in alayamon g.p. 499118 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

CONCRETING OF AGASTHAKODU KISAN MUKKU 06.07.2018 59 996360 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAHADEVA TEMPLE ROAD IN G.P. 11am

06.07.2018 60 MAVILA KACHANI ROAD IN ANCHAL G.P. 996773 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

06.07.2018 61 CHATHANNOOR NH JN.CANAL ROAD 999793 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

ALUMMOODU MOTORKUNNU ROAD RETARRING IN 06.07.2018 62 999467 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm VELINALLOOR G.P. 11am

RE TARRING OF PEEDIKA BHAGAVATHY 06.07.2018 63 999894 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm NEELAMMAL ROAD IN G.P. 11am

Page 5 of 10 RE TARRING OF VATTAMON MARUTHUKODU ROAD 06.07.2018 64 985829 24700 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm IN KARAVALOOR G.P. 11am

MAINTENANCE OF ROAD FROM MANIYAN MUKKU 06.07.2018 65 1499498 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm TO GOVINDA MANGALAM IN KADAKKAL G.P. 11am

KADAKKAL VARAYARA ARTHINKAL RAOD 06.07.2018 66 999386 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE 11am

CHADAYAMANGALM POREDAM KINATTUMUKKU 06.07.2018 67 996489 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm KARODU ROAD MAINTENANCE 11am

CHADAYAMANGALAM PANNAVILA FACTORY ROAD 06.07.2018 68 996358 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm MAINTENANCE 11am

06.07.2018 69 anchal market tazhamel road 1496957 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

CHITHARA THUMBAMON THODI KARARA ROAD RE- 06.07.2018 70 999652 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm TARING AND BERM CONCRETE 11am

06.07.2018 71 MUKKADA ANAPPADU ROAD IN ITTIVA G.P. 1499668 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

KIZHAKKUBHAGOM THALAVARAMBU ROAD IN 06.07.2018 72 1499837 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm CHITHARA G.P. 11am

06.07.2018 73 post office eruvelikkal road Re-Taring in alayamon g.p. 998140 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

CONCRETING OF KURAVAN TAVALAM 06.07.2018 74 993505 24900 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm AMBATHEKAR ROAD IN G.P. 11am

CONSTRUCTION OF DRAIN AND COVERING SLAB 06.07.2018 75 FROM VALIYATH THEKKE VEEDU JN. TO PUTHU 999055 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am VEETTIL JN. IN THEVALAKKARA G.P.

MAINTENANCE OF ANANDAMUKKU MANNADISSERI 06.07.2018 76 498442 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm THERUMBIL MUKKU ROAD IN K.S.PURAM G.P. 11am

MAINTENANCE OF MAMIMUKKU 06.07.2018 77 1499472 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm KUZHUMBILKKADAVU ROAD IN THODIYOOR G.P. 11am

Page 6 of 10 AMBADI JN TO KUTHIRAVEENA VILA 06.07.2018 78 1468038 36800 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD 11am

MAINTENANCE OF VAROOTH MUKKU 06.07.2018 79 799529 20000 1882 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm PUTHENCHANTHA ROAD IN NEDUMPANA G.P. 11am

CHAMAVILA PORKKULAM ROAD MAINTENANCE IN 06.07.2018 80 1199458 30000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm NEDUMPANA G.P. 11am

CONSTRUCTION OF DRAIN AND COVERING SLAB 06.07.2018 81 2498595 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm AT PARANTHIYIL IN MAYYANADU G.P. 11am

GHANDAKARNAN KAVU SOCIETY MUKKU ROAD IN 06.07.2018 82 995627 24900 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm K.S.PURAM G.P. 11am

KULAPPADAM SOUTH WARD MARATHADI VILA SKV 06.07.2018 83 999985 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm ROAD IN NEDUMPANA G.P. 11am

06.07.2018 84 madathimukku vazhathilkadavu drain in k.s puram g.p. 995114 24900 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

06.07.2018 85 roof maintenance of ghss azheekal in alappadu g.p 339491 8500 824 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

CONSTRUCTION OF COMPOUND WALL FOR 06.07.2018 86 999515 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm PUTHUKADU SCHOOL IN G.P. 11am

06.07.2018 87 chavara kallu colony side wall 999869 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

MAYYANAD- MAINTENANCE OF ESI JN.KIP 06.07.2018 88 1968861 49300 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm DONBOSCO ROAD 11am

THANDANTE THARA - PEROOR THARA DRAIN IN 06.07.2018 89 999721 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm THODIYOOR G.P. 11am

06.07.2018 90 nedumpana muttakavu valiyavila colony samrakshanam 999342 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

TAZHUTHALA NEEROZHUKKIL ELA ROAD 06.07.2018 91 999336 25000 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm CONCRETING IN G.P. 11am

Page 7 of 10 06.07.2018 92 GHSS THAZHAVA SCHOOL MAINTENANCE 749813 18800 1764 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

CONSTRUCTION OF DRAIN FROM C.M.S LP 06.07.2018 93 SCHOOL NJAKKANAL JN. TO VETTUKULANJIYIL 973968 24400 2352 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am PALAM IN OACHIRA G.P.

06.07.2018 94 GHSS OCHIRA SCHOOL MAINTENANCE 749841 18800 1764 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

office roof maintenance of ghss cheriyazheekal in 06.07.2018 95 498959 12500 1176 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm alappadu g.p. 11am

Retarring of Vattavila - Health Center Road in 06.07.2018 96 799254 20000 1882 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm Nedumpana GP 11am

thazha vengottu pallimadam ottathengil mukku drain 06.07.2018 97 1999662 50000 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm construction 11am

maintenance of compound wall and well at GHS 06.07.2018 98 1499897 37500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm keralapuram 11am

06.07.2018 99 THAZHAVA AVBHS SCHOOL MAINTENANCE 749751 18800 1764 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm 11am

MAINTENANCE OF KALUVILAKKADA 06.07.2018 100 1459476 36500 2940 120 Days D and above 02.07.2018 5pm 05.07.2018 5pm KALLUPALAKADA ROAD IN ELAMPALLOOR G.P. 11am

Tender documents and tender schedule may be downloaded free of cost from the e-GP Website www.etenders..gov.in. A bid submission fee shall be remitted online during the time of 1 bid submission.

All bid/ tender documents are to be submitted online only and in the designated cover(s)/ envelope(s) on the e-GP website. Tenders/ bids shall be accepted only through online mode on the e- 2 GP website and no manual submission of the same shall be entertained. Late tenders will not be accepted

The scanned copies registration certificate duly attested by an Engineer not below the rank of Assistant Engineer. Scanned copy of Preliminary Agreement , Scanned copy of Contractors Registration ,and EMD exemption certificate (if any) shall be submitted online and subsequently in a separate cover physically before the time fixed for tender opening. More details on EMD & 3 Cost of Tender documents/ bid submission fee are mentioned in this document.The Preliminary agreement and Tender documents should be in the same format uploaded in the e tender notification.

Page 8 of 10 The bids shall be opened online at the office of The Deputy Executive Engineer, LSGD Division,Kollam jilla Panchayat on 06.07.2018 11am by theThe Deputy Executive Engineer, LSGD 4 Division,Kollam jilla Panchayat in the presence of the Bidders / their representatives who wish to attend at the above address. If the tender opening date happens to be on a holiday or non- working day due to any other valid reason, the tender opening process will be done on the next working day at same time and place.

Online Tenders/ bids are to be accompanied with a preliminary agreement executed in Kerala stamp paper worth as per prevailing stamp paper rules in force. Tenders/ bids received online 5 without scanned copy of contractor's license, preliminary agreement, e-payment form and filled tender documents in physical form will not be considered and shall be summarily rejected and the EMD will be forfieted to Govt.. Further details can be had from the NIT or Office of The Deputy Executive Engineer, LSGD Division,Kollam jilla Panchayat during working hours.

Contractors should download the BOQ , Preliminary agreement, NIT and Tender documents from e - tender website. In the downloaded Item rate BOQ record the agreed rate itemwise and 6 upload the same back to the e tender site.

7 Rate of quantity of any item executed excess of agreed quantity will be paid such that estimate rate or rate quoted by the contractor whichever is less

Original bitumen bill should be submitted on the completion of tarring works. Bill is insisted only to ensure that the contractor has purchased bitumen. The rate of bitumen in the estimate will 8 be paid to contractor irrespective of the bill produced by the contractor. No departmental supply of any materials required for the work and the contractor should collect and use the materials for the work with hisown cost and as per the directions of site Engineer in 9 Charge. NOTICE THE CONTRACTOR MUST PRODUCE THE FOLLOWING DOCUMENTS IN THIS OFFICE BOTH PHYSICALLY AND ONLINE (SCANNED COPY) BEFORE THE OPENING OF THE TENDER OTHERWISE TENDER WILL BE STRICTLY REJECTED WITHOUT ANY NOTICE AND THE EMD WILL BE FORFIETED TO GOVT. DOCUMENTS IN PHYSICAL FORM SHOULD BE SUBMITTED ONLY THROUGH REGISTERED POST/SPEED POST. A). ATTESTED COPY OF BIDDER’S REGISTRATION CERTIFICATE B). PRELIMINARY AGREEMENT IN THE SAME FORMAT UPLOADED IN E TENDER SITE ON STAMP PAPER WORTH AS PER PREVAILING STAMP PAPER RULES IN FORCE C). EMD EXEMPTION CERTIFICATE, IF ANY D). FILLED UP E-PAYMENT REQUISITION FORM IN THE SAME FORMAT UPLOADED IN E TENDER SITE E). PAN CARD and GST REGISTRATION CERTIFICATES IF REQUIRED.

3) THE TENDERS OF CONTRACTORS WHICH DO NOT QUOTE THEIR ACCOUNT IN ANY OF THE BANKS HAVING CORE BANKING SOLUTIONS IN THE REQUISITION FOR E- PAYMENT FORM ATTACHED WITH THE TENDER DOCUMENTS FOR MAKING THE E-PAYMENT WOULD BE REJECTED – VIDE PARA3 OF GO(P) NO. 06/2012/PWD DATED 10/01/2012.

The Deputy Executive Engineer, LSGD Division,Kollam jilla Panchayat (for and on behalf of kollam Jilla Panchayat)

I. AMENDMENT OF CLAUSE 7 OF CONDITIONS OF CONTRACT ATTACHED TO G.W.D. FORM. NO.132 ASPER G.O.(M.S) NO. 2/ 2005 PWD. DATED 7.1.2005

Page 9 of 10 Bills shall be submitted by the Bidder for part payment while the work is in progress or final bill on completion of the work as per the specification, terms and conditions of the contract and the Divisional officer shall take the requisite measures for having the same checked and the claim as far as admissible settled according to the availability of budget provision and allotment of funds made with the divisional officer under the respective heads of account under which the work is sanctioned and arranged and also subject to the seniority of such bills. The Bidder shall not make any claim for interest or for damages for any delay in settling the bills. No such claims shall be admitted by the Government. If the Bidder be unable to prepare the bill for himself, the Divisional officer shall depute a subordinate to measure the work performed in the presence of the Bidder, whose counter signature to the measurement list will he a sufficient warrant to the Divisional officer to prepare the bill for him that list.

The Deputy Executive Engineer, LSGD Division,Kollam jilla Panchayat

E - Documents Creator Ver.10 Powered By Pradeepen Thulika

Page 10 of 10