Stan Musial Veterans Memorial Bridge 2009 to 2012

Total Page:16

File Type:pdf, Size:1020Kb

Stan Musial Veterans Memorial Bridge 2009 to 2012 Westbound bridge exit options It’s not just the bridge ACTUAL SIZE Coming from Illinois, drivers will either Even though the new bridge is the crowning STAN MUSIAL Market 70 continue west on I-70 or exit into downtown on jewel, the project of the rerouting of I-70 is Tucker. There is no exit heading south onto the about three miles long from the I-64 The cables new stretch of I-44. Likewise, there is no exit interchange to the Missouri side, where it hooks Gateway Speedway This is a piece of to the bridge from the new stretch of I-44. up with the existing route of I-70 westbound. cable used to VETERANS 70 support the bridge. 203 These cables are N. Florissant 10th inside the large 70 white conduits Archaeological significance stretching from the MEMORIAL The bridge project in Illinois produced the 1,500 FEET Third-longest bridge of its kind 3 towers to the Brooklyn BETWEEN With a main span of 1,500 feet, the largest archaeological dig in the U.S. from roadway of the TOWERS Stan Musial Veterans Memorial Bridge 2009 to 2012. Over 6,000 features were bridge. Each conduit will be the third-longest cable-stayed investigated during this eort. The Illinois contains bundles of Department of Transportation received the BRIDGE Broadway bridge in the U.S. Only the John J. 31 (for the shortest Audubon Bridge in Louisiana and the Exchange Environmental Excellence Award in 2011 from conduits) to 73 (for 14th Arthur Ravenel Bridge in South the Federal Highway Administration. the longest ones) of Cass M Carolina are longer. these cables. There I In February 2008, Missouri and KEY S are 136 conduits, Illinois agreed on a plan to fund S containing about New bridges I 600 miles of cable. S 55 construction of a new bridge and New roads Tucker Collinsville S 70 1st Approximate 10th 9th I 70 the rerouting of Interstate 70. St. Clair area of P archaeological dig 2nd This weekend, six years later, the P Navigation systems Access to and from Tucker I project is being unveiled to Your GPS system should recognize the new bridge 3rd Although there is a ramp to Tucker from R and changes to the roads very soon. MoDOT pedestrians and then vehicles. eastbound I-70, there is no ramp from Tucker to I westbound I-70. From Tucker, take Cass to V engineers say TomTom representatives already Biddle E Eventually, the bridge is expected Broadway north to Brooklyn. Signs direct you to have mapped out the new bridge and interchanges. 44 R to carry 40,000 cars and trucks 10th, where you can access westbound I-70. If you pull up a Garmin map, the new I-70 bridge is already reflected. The timing of when the changes every day, relieving trac on Cole are reflected on GPS may vary. Miles of new roads in Illinois other downtown bridges. Here Renamed I-44 Edward The Illinois side of the project The interstate highway south of the Stan Musial Jones are some of the facts and figures Dome involved the vast majority of new Veterans Memorial Bridge that was previously I-70 Martin Luther road construction for the rerouting of the massive construction leading to the Poplar Street Bridge and I-55 to the King Bridge of Interstate 70. In all, 32 dierent project, and some information I-44 junction will now simply be I-44. The switch projects were completed in Illinois. will occur when the new bridge opens. The new Washington Laclede’s By comparison, Missouri completed about how to get around on the stretch of I-44 will dead end at the new bridge. Landing 5 projects. Baugh new roads. Through trac will continue on westbound I-70. Eads Bridge 6th St. Clair ILLINOIS 7th 8th Olive 9th Peabody MISSOURI Collinsville Pennsylvania Opera House 10th City Pine Martin Luther King Hall Summit Scottrade Tucker Chestnut Center Trac relief on bridges 10th Market St. Louis College 9th The opening of the new bridge 64 8th 15 7th Memorial should mean less trac on the 15th Broadway Arch existing downtown bridges. 55 Old Missouri 4th grounds Spruce Leonor K. Sullivan Transportation ocials expect 64 Clark the new bridge to siphon o State 44 roughly 20 percent of Poplar Gateway Broadway Busch Street Bridge trac, which is now Geyser 64 Stadium Tallest structures in St. Louis compared with the new bridge towers 40 about 120,000 vehicles a day. It should divert about half of the 630 ft. 600 ft. trac now using the Martin 580 ft. 567 ft. Access to the Poplar Street Bridge Luther King Bridge. Eventually, To go from Lambert Airport to Sauget, you should still use the Poplar Street Bridge. Take the new bridge is expected to carry about 40,000 cars a day. eastbound I-70 to newly designated I-44 just south of the Stan Musial Veterans Memorial Poplar Street Bridge 400 ft. Bridge. Take I-44 to the Poplar Street Bridge to get to Route 3 and Sauget. Sometime next year, the Missouri Department of Transportation will remove the ramp from I-44 to the Poplar Street Bridge. At that point, you should take the Stan Musial Veterans Memorial Bridge to Illinois, exit at Illinois Route 3, then follow Route 3 to the south. That will change 55 when a new connection is built from the Martin Luther King Bridge to Route 3. But that is 64 still more than a year away. 44 55 GATEWAY METROPOLITAN SOUTHWESTERN FEDERAL STAN MUSIAL ARCH SQUARE BELL COURTHOUSE VETERANS MEMORIAL 1/2 MILE Graphic by Tom Borgman and Ken Leiser | Post-Dispatch (One Bell Center) BRIDGE TOWERS.
Recommended publications
  • Top 10 Bridges by State.Xlsx
    Top 10 Most Traveled U.S. Structurally Deficient Bridges by State, 2015 2015 Year Daily State State County Type of Bridge Location Status in 2014 Status in 2013 Built Crossings Rank 1 Alabama Jefferson 1970 136,580 Urban Interstate I65 over U.S.11,RR&City Streets at I65 2nd Ave. to 2nd Ave.No Structurally Deficient Structurally Deficient 2 Alabama Mobile 1964 87,610 Urban Interstate I-10 WB & EB over Halls Mill Creek at 2.2 mi E US 90 Structurally Deficient Structurally Deficient 3 Alabama Jefferson 1972 77,385 Urban Interstate I-59/20 over US 31,RRs&City Streets at Bham Civic Center Structurally Deficient Structurally Deficient 4 Alabama Mobile 1966 73,630 Urban Interstate I-10 WB & EB over Southern Drain Canal at 3.3 mi E Jct SR 163 Structurally Deficient Structurally Deficient 5 Alabama Baldwin 1969 53,560 Rural Interstate I-10 over D Olive Stream at 1.5 mi E Jct US 90 & I-10 Structurally Deficient Structurally Deficient 6 Alabama Baldwin 1969 53,560 Rural Interstate I-10 over Joe S Branch at 0.2 mi E US 90 Not Deficient Not Deficient 7 Alabama Jefferson 1968 41,990 Urban Interstate I 59/20 over Arron Aronov Drive at I 59 & Arron Aronov Dr. Structurally Deficient Structurally Deficient 8 Alabama Mobile 1964 41,490 Rural Interstate I-10 over Warren Creek at 3.2 mi E Miss St Line Structurally Deficient Structurally Deficient 9 Alabama Jefferson 1936 39,620 Urban other principal arterial US 78 over Village Ck & Frisco RR at US 78 & Village Creek Structurally Deficient Structurally Deficient 10 Alabama Mobile 1967 37,980 Urban Interstate
    [Show full text]
  • CHAPTER I Purpose and Need
    I - 1 CHAPTER I Purpose and Need A. Introduction On June 29, 1956, President Dwight D. Eisenhower signed the Federal Aid Highway Act of 1956. The Interstate Highway System, also known as the Eisenhower System of Interstate and Defense Highways, is an interconnected system of 45,500 miles (73,225.2 km) of limited-access highways across the United States. One of the most important of these highways is Interstate 70 (I-70), providing for east-west transcontinental interstate access across much of the United States. In August 1956, shortly after President Eisenhower signed the legislation creating the Interstate Highway System, the Missouri State Highway Commission awarded the first contract toward the construction of I-70. Construction continued for another nine years and I-70 now spans a distance of more than 250 miles across the state. Other than short reconstructed portions, the newest sections of I-70 are 39 years old. With maintenance provided by the Missouri Department of Transportation (MoDOT), the facility has outlasted its original design life of 20 years and has carried traffic volumes of both cars and heavy trucks that have far exceeded the expectations of the original designers. The Missouri Department of Transportation and the Federal Highway Administration (FHWA) propose improving a portion of the I-70 corridor between just west of Route 19 (milepost 174) and Lake St. Louis Boulevard to meet the current and future needs of this extremely important transportation facility. To facilitate this action, MoDOT has completed a First Tier Environmental Impact Statement and initiated this Second Tier Environmental Impact Statement (STEIS) to fulfill this goal.
    [Show full text]
  • Group Tour Manual
    Group Tour GUIDE 1 5 17 33 36 what's inside 1 WELCOME 13 FUN FACTS – (ESCORT NOTES) 2 WEATHER INFORMATION 17 ATTRACTIONS 3 GROUP TOUR SERVICES 30 SIGHTSEEING 5 TRANSPORTATION INFORMATION 32 TECHNICAL TOURS Airport 35 PARADES Motorcoach Parking – Policies 36 ANNUAL EVENTS Car Rental Metro & Trolley 37 SAMPLE ITINERARIES 7 MAPS Central Corridor Metro Forest Park Downtown welcome St. Louis is a place where history and imagination collide, and the result is a Midwestern destination like no other. In addition to a revitalized downtown, a vibrant, new hospitality district continues to grow in downtown St. Louis. More than $5 billion worth of development has been invested in the region, and more exciting projects are currently underway. The Gateway to the West offers exceptional music, arts and cultural options, as well as such renowned – and free – attractions as the Saint Louis Art Museum, Zoo, Science Center, Missouri History Museum, Citygarden, Grant’s Farm, Laumeier Sculpture Park, and the Anheuser-Busch brewery tours. Plus, St. Louis is easy to get to and even easier to get around in. St. Louis is within approximately 500 miles of one-third of the U.S. population. Each and every new year brings exciting additions to the St. Louis scene – improved attractions, expanded attractions, and new attractions. Must See Attractions There’s so much to see and do in St. Louis, here are a few options to get you started: • Ride to the top of the Gateway Arch, towering 630-feet over the Mississippi River. • Visit an artistic oasis in the heart of downtown.
    [Show full text]
  • Ide to I-70 Through Southeastern Utah – Discovermoab.Com - 6/22/07 Page 1
    A Guide to I-70 Through Southeastern Utah – discovermoab.com - 6/22/07 Page 1 and increase to Milepost 227 near the Colorado border. Mileage marker posts 2W - Thompson Springs A Guide to I-70 Through (or Mileposts) and Exit numbers Welcome Center Southeastern Utah correspond, and both are used in the Milepost 189 descriptive text which follows. This rest area welcomes westbound Although the scenery is spectacular as visitors with free brochures and maps. viewed from the highway, you are The center, operated by the State of Utah, encouraged to stop at the sites described is open all year. From Memorial Day Moab Area Travel Council below to see even more. Other nearby through Labor Day, personnel are on duty Internet Brochure Series points of interest accessible from 1-70 are from 8 a.m. to 8 p.m. to answer your Available from: briefly noted and located on the map. questions. The rest of the year the center More detailed information on these sights is operated from 9 a.m. to 5 p.m. Indoor discovermoab.com can be obtained by contacting the rest rooms, water, picnic shelters, and a appropriate agencies listed in this public phone are available at all times. brochure. INTRODUCTION Food and fuel are available at Thompson 1W - Harley Dome View Area Springs (Exit 187), which provides access Interstate 70 (1-70) through southeastern Milepost 228 to a panel of Native American rock art in Utah is a journey through fascinating Sego Canyon. To visit this site, follow the landscapes. The route reveals vast deserts, The Harley Dome View Area is located signs from the north side of town.
    [Show full text]
  • Construction Suspended Where Possible for July 4
    State of Illinois JB Pritzker, Governor Illinois Department of Transportation Omer Osman, Acting Secretary FOR IMMEDIATE RELEASE: CONTACT: July 1, 2020 Paul Wappel 217.685.0082 Maria Castaneda 312.447.1919 Construction suspended where possible for July 4 Non-emergency closures called off, but motorists should still expect work zones SPRINGFIELD – The Illinois Department of Transportation announced today that lanes that have been closed for construction will reopen, where possible, for the Fourth of July holiday to minimize travel disruption. Non-emergency closures will be suspended from 3 p.m. July 2 to 11:59 p.m. July 5. The following lane closures will remain in place during the holiday weekend. Work zone speed limits will remain in effect where posted. Please buckle up, put your phone down and drive sober. District 1 City of Chicago: • The following ramps in the Jane Byrne Interchange work zone will remain closed: • o Inbound Kennedy (Interstate 90/94) Expressway exit to inbound Ida B. Wells Drive. o Outbound Dan Ryan Expressway exit to Taylor Street and Roosevelt Road. o Outbound Ida B. Wells Drive entrance from Canal Street. o Outbound Ida B. Wells Drive exit to outbound Dan Ryan. o Outbound Ida B. Wells Drive exit to outbound Kennedy. o Inbound Eisenhower Expressway (Interstate -290) to outbound Kennedy; detour with U-turn posted. o Inbound Eisenhower; lane reductions continue. o Inbound Ida B. Wells Drive; lane reductions continue. • Outbound Kennedy exit at Canfield Road; closed. • Westbound Bryn Mawr Avenue between Harlem and Oriole avenues; lane reductions continue. • Westbound Higgins Avenue between Oriole and Canfield avenues; lane reductions continue.
    [Show full text]
  • Mississippi River Bridge Project, I-70, St. Louis, Missouri
    MISSISSIPPI RIVER BRIDGE ST. LOUIS, INTERSTATE 70 St.Louis,Missouri Missouri Department of Transportation (MoDOT) Illinois Department of Transportation (IDOT) Design completed 2003 Project Type: Urban Freeway; Reconstruct PURPOSE The New Mississippi River Bridge Project (MRB) is a group of major transportation improvements designed to enhance the region’s infrastructure. The economic future of the St. Louis urban core on both sides of the Mississippi River depends on the efficient movement of goods and services and the ability of people to simply get to work. Transportation paralysis will force businesses, jobs, andnewgrowthoutoftheurbancore.Animprovedhighwaysystemwillhelp to revitalize downtown St. Louis, the north riverfront, and the Metro East area, notably East St. Louis and the National Stockyards redevelopment area. The number of motorists wanting to cross the Mississippi River will continue to increase.Theregioncannotcontinuetorelyonasingleinterstatecrossingatthe heartofdowntown DESCRIPTION The proposed $700 million structure will feature an estimated 12,000 foot bridge, potentially creating the widest Mississippi River Crossing in the United States. The bridge will carry eight lanes of traffic. The bridge is a critical structure tothe area in order to open economic opportunities to isolated communities on either side of the river. The project includes multi-lane roadways on new alignments, new interchanges, land acquisition on both sides of the river, utility coordination, and the relocation of several railroads. Improvements include 4.2 miles of relocated Interstate 70, 2.7 miles of connector between the Interstate 70 relocation and Interstate 64, and 5.5 miles of relocated Illinois Route 3. A major public engagement program involved the St. Louis community in the project through participation on several aesthetic issues, such as urban design treatments and bridge architecture.
    [Show full text]
  • Jefferson National Expansion Memorial______AND/OR COMMON the Gateway Arch, the Old Courthouse, and the Old Cathedral LOCATION
    Form No. 10-306 (Rev. 10-74) UNlTtDSTATtS DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE NATIONAL REGISTER OF HISTORIC PLACES INVENTORY -- NOMINATION FORM FOR FEDERAL PROPERTIES SEE INSTRUCTIONS IN HOW TO COMPLETE NATIONAL REGISTER FORMS __________TYPE ALL ENTRIES - COMPLETE APPLICABLE SECTIONS_________ | NAME HISTORIC Jefferson National Expansion Memorial____________________ AND/OR COMMON The Gateway Arch, The Old Courthouse, and The Old Cathedral LOCATION _NOT FOR PUBLICATION CITY. TOWN CONGRESSIONAL DISTRICT St. Louis t _ VICINITY OF Third STATE CODE COUNTY CODE Missouri 29 St. Louis 510 HCLASSIFICATION CATEGORY OWNERSHIP STATUS PRESENT USE ^-DISTRICT X-PUBLIC X-OCCUPIED —AGRICULTURE. XJVIUSEUM _ BUILDING(S) X-PRIVATE —UNOCCUPIED —COMMERCIAL X-PARK _ STRUCTURE —BOTH X_WORK IN PROGRESS —EDUCATIONAL —PRIVATE RESIDENCE —SITE PUBLIC ACQUISITION ACCESSIBLE —ENTERTAINMENT X.RELIGIOUS —OBJECT —IN PROCESS —YES: RESTRICTED —GOVERNMENT —SCIENTIFIC —BEING CONSIDERED X-YES: UNRESTRICTED —INDUSTRIAL —TRANSPORTATION —NO —MILITARY —OTHER: AGENCY REGIONAL HEADQUARTERS (If applicable) U.S. National Park Service, Midwest Regional Office STREET & NUMBER 1709 Jackson Street CITY. TOWN STATE Omaha VICINITY OF Nebraska LOCATION OF LEGAL DESCRIPTION COURTHOUSE, REGISTRY OF DEEDS'. u>s> National Park Service. MWRO STREET & NUMBER 1709 Jackson Street CITY, TOWN STATE Omaha Nebraska 1 REPRESENTATION IN EXISTING SURVEYS TITLE .Historic American Buildings Survey DATE X 1936 ^FEDERAL —STATE —COUNTY —LOCAL DEPOSITORY FOR SURVEY RECORDS Library of Congress CITY. TOWN STATE Washington B.C. (See Continuation Sheet, page l) CONDITION CHECK ONE CHECK ONE —EXCELLENT —DETERIORATED —UNALTERED X-QRIGINAL SITE X_GOOD —RUINS X_ALTERED —MOVED DATE_______ X-FAIR _UNEXPOSED DESCRIBE THE PRESENT AND ORIGINAL (IFKNOWN) PHYSICAL APPEARANCE The "business center of old St. Louis grew up along the levee, where the riverfront was the jumping-off place for journeys westward.
    [Show full text]
  • EHP-Appendix-Q
    Electrify Heartland Plan Appendix Q: EVSE Corridor Analysis Project title: Kansas – Missouri Community Readiness for EV and EVSE Funded by: US DOE DE-EE0005551 By: Metropolitan Energy Center and Kansas City Regional Clean Cities Coalition With: Black & Veatch Electrify Heartland Plan: Appendices Electrify Heartland Plan © 2012 by Metropolitan Energy Center. The material in this report was created and compiled from the work of U.S. DOE award DE- EE0005551: Kansas–Missouri Community Readiness for EV and EVSE. Government agencies, private entities and individuals may use, reproduce or transmit pages from this report for reasonable purposes of planning and implementing electric vehicle and electric vehicle charging station projects, provided that it maintains all copyright, trademark, and other proprietary rights or notices. Users may not otherwise use, reproduce, download, store, post, broadcast, transmit, modify, sell or make available to the public content from the report without the prior written approval of Metropolitan Energy Center. Write to MEC c/o Clean Cities, 3810 Paseo Blvd, Kansas City, MO, or visit www.metroenergy.org. U.S. Department of Energy Acknowledgement and Disclaimer: This material is based upon work supported by the Department of Energy under Award Number DE-EE0005551. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.
    [Show full text]
  • The Designing of the Eads Bridge John A. Kouwenhoven Technology
    The Designing of the Eads Bridge John A. Kouwenhoven Technology and Culture, Vol. 23, No. 4. (Oct., 1982), pp. 535-568. Stable URL: http://links.jstor.org/sici?sici=0040-165X%28198210%2923%3A4%3C535%3ATDOTEB%3E2.0.CO%3B2-0 Technology and Culture is currently published by The Johns Hopkins University Press. Your use of the JSTOR archive indicates your acceptance of JSTOR's Terms and Conditions of Use, available at http://www.jstor.org/about/terms.html. JSTOR's Terms and Conditions of Use provides, in part, that unless you have obtained prior permission, you may not download an entire issue of a journal or multiple copies of articles, and you may use content in the JSTOR archive only for your personal, non-commercial use. Please contact the publisher regarding any further use of this work. Publisher contact information may be obtained at http://www.jstor.org/journals/jhup.html. Each copy of any part of a JSTOR transmission must contain the same copyright notice that appears on the screen or printed page of such transmission. The JSTOR Archive is a trusted digital repository providing for long-term preservation and access to leading academic journals and scholarly literature from around the world. The Archive is supported by libraries, scholarly societies, publishers, and foundations. It is an initiative of JSTOR, a not-for-profit organization with a mission to help the scholarly community take advantage of advances in technology. For more information regarding JSTOR, please contact [email protected]. http://www.jstor.org Thu Sep 13 11:00:37 2007 The Designing of the Eads Bridge JOHN A.
    [Show full text]
  • Lanes Opening Where Possible for Labor Day Travel
    State of Illinois JB Pritzker, Governor Illinois Department of Transportation Omer Osman, Secretary FOR IMMEDIATE RELEASE: CONTACT: Sept. 2, 2021 Paul Wappel 217.685.0082 Maria Castaneda 312.447.1919 Lanes opening where possible for Labor Day travel Non-emergency closures suspended, though active work zones across state SPRINGFIELD – The Illinois Department of Transportation announced today that lanes that have been closed for construction will reopen, where possible, for the Labor Day holiday to minimize travel disruption. Non-emergency closures will be suspended from 3 p.m. Friday, Sept. 3, to 12:01 a.m. Tuesday, Sept. 7. The following lane closures will remain in place during the holiday weekend. Motorists can expect delays and should allow extra time for trips through these areas. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and stay alert for workers and equipment. At all times, please buckle up, put your phone down and drive sober District 1 Chicago • Northbound Pulaski Road between 76th and 77th streets; lane reductions continue. • Cicero Avenue (Illinois 50) between 67th and 71st streets; lane reductions continue. • The following ramps in the Jane Byrne Interchange work zone will remain closed: o Outbound Ida B. Wells Drive to outbound Dan Ryan Expressway (Interstate 90/94); detour posted. o Inbound Kennedy (I-90/94) to Jackson Street. o Inbound Kennedy to Adams Street. o Outbound Kennedy from Adams Street. o Outbound Kennedy from Jackson Street. o Outbound Kennedy to Randolph Street. o Outbound Kennedy to Washington Street.
    [Show full text]
  • Bridging the Mississippi: a History of the Rivalry Between Suspension and Arch Modes of Engineering Kurt Timmerman University of Missouri-St
    University of Missouri, St. Louis IRL @ UMSL Theses Graduate Works 10-31-2014 Bridging the Mississippi: A History of the Rivalry between Suspension and Arch Modes of Engineering Kurt Timmerman University of Missouri-St. Louis Follow this and additional works at: http://irl.umsl.edu/thesis Recommended Citation Timmerman, Kurt, "Bridging the Mississippi: A History of the Rivalry between Suspension and Arch Modes of Engineering" (2014). Theses. 166. http://irl.umsl.edu/thesis/166 This Thesis is brought to you for free and open access by the Graduate Works at IRL @ UMSL. It has been accepted for inclusion in Theses by an authorized administrator of IRL @ UMSL. For more information, please contact [email protected]. Bridging the Mississippi: A History of the Rivalry between Suspension and Arch Modes of Engineering Kurt J. Timmerman M.A., History, University of Missouri-St. Louis, 2014 B.S., Systems and Data Processing, Washington University, 1991 A Thesis submitted to The Graduate School at the University of Missouri-St. Louis in partial fulfillment of the requirements for the degree Master of Arts in History December 2014 Advisory Committee Louis S. Gerties, Ph.D. Chairperson Steven Rowan, Ph. D. Carlos A. Schwantes, Ph.D. Copyright, Kurt J. Timmerman, 2014 Acknowledgements Thanks to Dr. Steven Rowan and Dr. Carlos Schwantes, who provided valuable insight, knowledge, perspective, and a fresh review of my manuscript. Both were very helpful in reviewing my manuscript and offering improvements that made it a much better document. Dr. Gerteis, my thesis advisor, was very helpful and patient during my research and never hesitated to give answers to my questions in a calm, instructive manner.
    [Show full text]
  • New Mississippi River Bridge
    MEMORANDUM OF AGREEMENT FOR RECOVERY OF SIGNIFICANT INFORMATION FROM HISTORIC PROPERTIES: Gateway Refrigeration, Sang Fah Wholesale, and M&L Foods in St. Louis, Missouri, and yet to be identified archaeological sites in Missouri and Illinois UNDERTAKING: Construct new bridge over Mississippi River in St. Louis; relocate 1-70 in Illinois and build a new 1-70 interchange in Missouri to the new bridge STATES: Missouri and Illinois AGENCY: Federal Highway Administration Whereas, the Federal Highway Administration (FHWA) has determined that the proposed New Mississippi River Bridge Project in the Saint Louis metropolitan area may have an adverse effect upon previously identified and yet unidentified cultural resources eligible for inclusion in the National Register of Historic Places (National Register), and has consulted with the Missouri State Historic Preservation Office (Missouri SHPO) and the Illinois State Historic Preservation Officer (Illinois SHPO) pursuant to 36 CFR Part 800, Protection of Historic Properties, regulations implementing Section 106 of the National Historic Preservation Act (NHPA); and, Whereas, the original project was defined, and coordination with interested parties and the public discussed, in the documents Mississippi River Crossing Relocated 1-70 and 1-64 Connector: Draft Environmental Impact Statement / Section 4@ Evaluation (April 2000) and Mississippi River Crossing Relocated 1-70 and 1-64 Connector: Final Environmental Impact Statement /Section 4@ Evaluation (March 2001); and, Whereas, the Advisory Council
    [Show full text]