Design Commission Meeting Agenda Monday, June 29, 2009
Public Meeting
10:50 a.m. Consent Items
23563: Reconstruction of Pier 15 as part of Phase II, East River Waterfront, Wall Street to Rutgers Slip, Manhattan. (Final) (CC 1 & 2, CB 1 & 3) DCP/EDC/SBS
23564: Construction of a dog run as part of Phase I, East River Waterfront, Wall Street to Maiden Lane, Manhattan. (Final) (CC 1 & 2, CB 1 & 3) DCP/EDC/SBS
23565: Installation of signage, East River Science Park, 485 First Avenue, Bellevue Hospital campus, First Avenue, the FDR Drive, East 28th Street and East 30th Street, Manhattan. (Preliminary and Final) (CC 4, CB 6) EDC
23566: Rehabilitation of a residential building, Tenant Interim Lease Program, 847 Fox Street, Bronx. (Preliminary and Final) (CC 17, CB 2) HPD
23567: Rehabilitation of a residential building, Tenant Interim Lease Program, 615 West 150th Street, Manhattan. (Preliminary and Final) (CC 7, CB 9) HPD
23568: Repainting of the Grand Concourse Bridge over East 175th Street, Bronx. (Preliminary and Final) (CC 14, CB 5) DOT
23569: Repainting of the Queens Boulevard Bridge over the Jackie Robinson Parkway, Queens. (Preliminary and Final) (CC 24 & 29, CB 6 & 9) DOT
23570: Construction of two electrical building additions as a part of a Biological Nitrogen Removal Facility, Jamaica Water Pollution Control Plant, 150-20 134th Street, Queens. (Preliminary and Final) (CC 31, CB 10) DEP
23571: Construction of a security guardhouse, west entrance, Hillview Reservoir, 100 Central Park Avenue, Yonkers, Westchester County. (Preliminary and Final) DEP
23572: Construction of an environmental learning center (Solar 2) as Phase III of the construction of Stuyvesant Cove, 2420 FDR Drive at Peter Cooper Road, Manhattan. (Preliminary) (CC 4, CB 6) DDC
Design Commission Meeting/ Monday, June 29, 2009/ Page 2
23573: Replacement of doors, NYPD Headquarters Joint Operations Center, 109 Park Row, Manhattan. (Preliminary and Final) (CC 1, CB 1) DDC
23574: Renovation of Washington Heights Branch Library, 1000 St. Nicholas Avenue at West 160th Street, Manhattan. (Preliminary and Final) (CC 7, CB 12) DDC
23575: Installation of City Windows by Lane Twitchell, DHS Family Center, 151 East 151st Street, Bronx. (Preliminary) (CC 17, CB 4) DCulA%/DDC
23576: Rehabilitation of the Guggenheim Bandshell, Damrosch Park, West 62nd Street and Amsterdam Avenue, Lincoln Center for the Performing Arts, Manhattan. (Preliminary and Final) (CC 6, CB 7) DPR/DCulA
23577: Reconstruction of an entrance, Central Park, 102nd Street and Fifth Avenue, Manhattan. (Final) (CC 9, CB 5, 7, 8, 10 & 11) CPC/DPR
23578: Design of a prototypical drinking fountain for installation citywide. (Preliminary) DPR
23579: Construction of a foundation and platform for the track and field house and adjacent site work as Phase IA of the reconstruction of Ocean Breeze Park, Quintard Street, Mason Avenue and Father Capodanno Boulevard, Staten Island. (Final) (CC 50, CB 2) DPR
23580: Rehabilitation of a recreation center, Owen Dolen Park, East Tremont Avenue, Lane Avenue and Westchester Avenue, Bronx. (Preliminary and Final) (CC 13, CB 9) DPR
23581: Construction of a tot lot, Silver Lake Park, Victory Boulevard, Forest Avenue and Silver Lake Park Road, Staten Island. (Final) (CC 49, CB 2) DPR
23582: Rehabilitation of a comfort station, Devoe Park, University Avenue, Sedwick Avenue, West Fordham Road and Father Zeiger Place, Bronx. (Preliminary and Final) (CC 14, CB 7) DPR
23583: Rehabilitation of the district headquarters, Van Cortlandt Park, Broadway and West 242nd Street, Bronx. (Preliminary and Final) (CC 11, CB 8) DPR
23584: Rehabilitation of a recreation center as Phase IV of the reconstruction of Williamsbridge Oval, Van Cortlandt Avenue East and Reservoir Oval, Bronx. (Preliminary and Final) (CC 11, CB 7) DPR
23585: Installation of an artificial turf athletic field as part of PlaNYC’s Asphalt- to-Turf initiative, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place and Broadway, Staten Island. (Preliminary and Final) (CC 49, CB 1) DPR
Design Commission Meeting/ Monday, June 29, 2009/ Page 3
23586: Installation of an artificial turf athletic field as part of PlaNYC’s Asphalt- to-Turf initiative, Police Officer Hilario Serrano Playground (formerly Castle Hill Playground), Olmsted Avenue, Turnbull Avenue, Castle Hill Avenue, and Lafayette Avenue, Bronx. (Preliminary and Final) (CC 18, CB 9) DPR
23587: Installation of a prototypical newsstand, northeast corner of Varick Street and Vandam Street, Manhattan. (Preliminary and Final) (CC 3, CB 2) DConA/DOT
Public Hearing
10:55 a.m. 23588: Construction a comfort station and concession as a part of the construction of a waterfront park, Ferry Point Park, south of the golf course, Whitestone Bridge approach, Emerson Avenue, the East River, Bronx. (Preliminary) (CC 13, CB 10) DPR
11:20 a.m. 23589: Installation of a prototypical newsstand, 919-933 Seventh Avenue, southeast corner of Seventh Avenue and Central Park South, Manhattan. (Preliminary and Final) (CC 8, CB 5) DConA/DOT
11:35 a.m. 23590: Construction of a siphon chlorination station and adjacent site work, 2 Front Street, Staten Island. (Preliminary) (CC 49, CB 1) EDC/DEP
Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated. Please note that all times are approximate and subject to change without notice.
Members of the public who plan to attend are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing at least three (3) business days in advance of the meeting date.
Any person requiring reasonable accommodation in order to participate should contact the Design Commission at least three (3) business days in advance of the meeting date.
Design Commission City Hall, Third Floor New York, NY 10007 Phone: (212) 788-3071 Fax: (212) 788-3086