Applications for Planning and Development Committee
Total Page:16
File Type:pdf, Size:1020Kb
North Lanarkshire Council Planning Applications for consideration of Planning Sub-Committee Committee Date: 26-09-2019 Ordnance Survey maps reproduced from Ordnance Survey with permission of HMSO Crown Copyright reserved APPLICATIONS FOR PLANNING COMMITTEE 26th September 2019 Page Application No Applicant Development/Site Recommendation No 8-16 18/00409/FUL Deans Civil Demolition of Structures, Importation Grant Engineering and Recycling of Inert Waste Materials Ltd and Associated Works to restore Derelict Site Old Gartliston Works Gartgill Road Gartsherrie Coatbridge 17-24 18/00643/FUL P McKernan Proposed Development of 23 no. Grant (P) Construction Detached 2-Storey Residential Units, Ltd 4 no. House Types Harrison Field Ltd Martyn Street Cairnhill Airdrie 25-35 18/01440/FUL NLC Residential development (8 Dwellings Grant Enterprise And and 8 flatted dwellings) Housing New Site At Bon Accord Crescent Supply Dykehead Shotts 36-49 18/01458/MIN Advance Sand Quarry - Extraction of Sand with Refuse Construction Site Restored by Infilling (Including Scotland Ltd Creation of Access Road and New Vehicular Entrance to the Site, Development of a Compound/Holding Area and Erection of Temporary Buildings) Land North Of Burnbrae Road Auchinloch 50-59 18/01786/PPP Hamcap Cinema and Restaurant Development, Grant (Cumbernauld) alterations to car park and associated LLP works (In Principle) Site At St Mungo's Road Cumbernauld 60-73 18/01851/FUL Dawn Homes 146 Dwellings Comprising Detached, Grant Ltd Semi & Terraced dwellinghouses with Associated Roads and Landscaping Site At Windsor Drive Glenmavis 74-79 19/00013/FUL Mr Colin Rerouting of Access to Existing Plot by Grant Stewart Closing Existing Vehicular Access from The Lane to Forming New Access from Antonine Road, Dullatur Through Existing Landscaped Area Lismore The Lane Dullatur Cumbernauld G68 0AU 80-92 19/00909/FUL Ogilvie Homes Construction of 9 Dwellinghouses Refuse (P) Ltd Site To The East & West Of King's Drive & North Of Dullatur Road Westerwood Cumbernauld (P) 18/00643/FUL - If minded to grant, legal agreement required for education contributions. 19/00909/FUL - If minded to grant, legal agreement is required for Affordable Housing contribution Application No: Proposed Development: 18/00409/FUL Demolition of Structures, Importation and Recycling of Inert Waste Materials and Associated Works to restore Derelict Site Site Address: Old Gartliston Works Gartgill Road Gartsherrie Coatbridge Date Registered: 30th May 2018 Applicant: Agent: Deans Civil Engineering Ltd Albion Environmental Ltd The Bakery Albion House 10 Greenlees Road 1 Damside Cambuslang Ayr UK KA8 8ER G72 8JH Application Level: Contrary to Development Plan: Major Application No Ward: Representations: 06 Gartcosh, Glenboig And Moodiesburn No letters of representation received. Willie Doolan, Greg Lennon, Michael McPake, Recommendation: Approve Subject to Conditions Reasoned Justification: The development proposed is considered to be in accordance with the North Lanarkshire Local Plan 2012 as it would restore a derelict site and could be suitably accommodated without detriment to the character and amenity of the surrounding area. Reproduced by permission of Planning Application: 18/00409/FUL the Ordnance Survey on behalf of HMSO. © Crown Copyright and database right Name (of applicant): Deans Civil 2009. All rights reserved. Engineering Ltd Ordnance Survey Licence Site Address: Old Gartliston Works, Gartgill number 100023396. Road, Gartsherrie, Coatbridge, Development: Demolition of Structures, Importation and Recycling of Inert Waste Materials and Associated Works to restore Derelict Site Proposed Conditions:- 1. That the permission for the importation of inert waste works hereby permitted is for a temporary period only and shall expire on 26th September 2022 and thereafter the agreed restoration works (as per the Restoration Scheme approved under condition 11 below) shall be completed no later than 1st of March 2023 or within 6 month of the completion of the infilling works whichever is the sooner Reason: To comply with the terms of the application and protect local amenity. 2. That except as otherwise be agreed in writing by the Planning Authority or as required by planning condition, the development shall be implemented in accordance with the drawings stamped approved as part of this permission. Reason: To clarify the drawings on which this approval of permission is founded. 3. That BEFORE any works of any description start on the application site, a scheme of intrusive site investigations in relation to the mineral stability shall be submitted to and approved in writing by the Planning Authority. Depending on the results of the investigations, a detailed Remediation Strategy may be required and this shall be submitted to and approved in writing by the Planning Authority prior to any works being undertaken. Reason: To ensure the mineral stability of the site. 4. That on completion of any remedial works identified by the intrusive site investigation required under the terms of Condition (3) and before the site is occupied, a certificate (signed by a Chartered Environmental Engineer) shall be submitted to the Planning Authority confirming that any such remediation works have been carried out in accordance with the submitted details. Reason: To ensure the site is free of contamination. 5. That the operations hereby permitted shall be carried out in accordance with the documents approved as part of this permission by Deans Civil Engineering Ltd (dated 18th January 2018) titled ‘Working Plan’ and ‘Old Gartliston Brick Works, Coatbridge Screen and Crusher Working Plan’ unless otherwise agreed in writing by the Planning Authority. Reason: To define the permission in the interests of the amenity of neighbouring properties. TRANSPORTATION 6. That BEFORE the development hereby permitted starts; a traffic management plan shall be submitted to, and approved in writing by, the Planning Authority. The plan shall cover HGV movements to and from the site, in terms of routes, timing and frequency of movements including safeguards designed to mitigate the impact of the development on residential amenity, traffic congestion and road safety in the area. For the avoidance of doubt the plan shall include a maximum limit on the number of HGVs in and out of the site per hour. The traffic management plan shall be implemented before works start and adhered to thereafter at all time to the satisfaction of the Planning Authority. Reason: In the interests of the safety and amenity of properties in close proximity to the vehicular routes. 7. That the passing places along the access track as shown on the plans hereby approved shall be in place before any inert waste importation works commence on site and retained as passing places thereafter to the satisfaction of the Planning Authority. Reason: To ensure that the necessary road improvements are in place in the interests of road safety. 8. That before the development starts the site access visibility splays shall be formed and thereafter maintained for the life of the development in accordance with the Arup Technical Report dated 9th December 2018 and Drawing ATR-02-I2. Reason: In the interests of road safety. 9. That BEFORE works start on site a scheme shall be submitted to and agreed in writing by the Planning Authority, including any modifications as may be required, detailing the measures to be taken to ensure that the public road and footways in the vicinity of the site access are kept free of mud and other debris. For the avoidance of doubt this shall include a wheel wash facility. Reason: In the interests of road safety and the amenity of local residents and road users. 10. That the scheme of measures approved under the terms of condition 9 above shall be implemented upon the commencement of the operations on site and thereafter maintained during the material importation and restoration operations. Reason: In the interests of road safety and amenity. RESTORATION AND AFTERCARE 11. Before development begins a detailed restoration scheme (including a programme for implementation) shall be submitted for the written approval of the planning authority. The restoration scheme shall be consistent with the guidance in PAN 64: Reclamation of Surface Mineral Workings (2002). The schemes shall: a) include details of new habitat creation, to include information about location and size of new habitat areas, species, proposed density of planting, and protection and replacement measures; b) include habitat enhancements for priority species; c) include details of all landscape planting, including the location, size, number and species of trees and shrubs; d) include details of site drainage e) include details of grass seed mixes to be used; and f) include details of phasing and provide that restoration of the site is, so far as reasonably practicable, undertaken concurrently with the phased infilling works. All planting shall comprise of native plants that support local biodiversity and habitat provision. Restoration of the site shall be implemented in accordance with the approved restoration scheme. All planting shall comprise of native plants that support local biodiversity and habitat provision. Restoration of the site shall be implemented in accordance with the approved restoration scheme. Reason: To ensure that comprehensive and appropriate restoration of the site is secured. 12. Before development begins a detailed five year aftercare scheme shall be submitted for the written approval of the