How Prefabrication and Modularization Can Improve Safety

Total Page:16

File Type:pdf, Size:1020Kb

How Prefabrication and Modularization Can Improve Safety How Prefabrication and Modularization Can Improve Safety solution for thousands of families ‘bombed out’ during A World War II, offsite construction is becoming more popular today. The benefits of offsite construction include saving time, money and the number of workers required. The Safety The safety benefits involved are the most important reason why the usage of offsite construction should be encouraged. Some of the causes of accidents (falling from heights, perhaps) can be reduced, others like flooding from heavy rainfall can be completely prevented. Benefits Most construction companies are found to use some method of prefabricated construction. The modular construction of an entire property offsite is now becoming more popular. of Offsite Prefabricated vs Modular Construction Any building can be referred to as a prefab if one or more of its’ sections are constructed offsite and carried onsite as part of the building. For a prefab to be described as a modular building, the main components used to create the complete building are Construction made offsite. Unlike panelized or component levels of prefabrication, in modular construction most of the interior and exterior finishes are put into place in the factory. They are up to 80-95% complete when they leave the factory. For example, a plumbing system may be assembled offsite through prefabrication. Through modular construction, a Request a Demo 2 complete bathroom pod could be put together, including an professionals in the US were surveyed online, some involved in installed plumbing system. or introducing offsite construction. Between 2010 and 2016, figures from a survey taken by the FMI/ • 58% who were already involved in offsite construction, BIM (Building Information Modeling) Forum show that project and said safety was the number one reason for its’ work using prefabrication has almost tripled during this time. importance. Also, contractors are now spending 20% of their working hours • 49% of those not involved, said safety was the main in prefabrication, compared to 12% in 2010. reason that they wished to introduce offsite construction. Reasons why offsite construction has become more popular, Looking at the number of worker fatalities in the construction include: industry, it is easy to see why safety is such an important issue. • Time saved In 2015, 4,379 worker fatalities were recorded in the US. 1 in 5 of • Money saved these were in construction. The Fatal Four are recorded as the most common causes of death. • Lower waste levels • Ability for deconstruction and rebuilding The Risk of Constructions’ Fatal Four • Higher quality In 2015, 937 or 21.4% of all American worker fatalities occurred • Safety in the construction industry. 602 of these were caused by one of the Fatal Four: The Importance of Safety 1. Falls 2. Struck by an Object The improvement of safety conditions, working in a controlled, 3. Electrocution permanent environment is an important reason why offsite 4. Caught in Between Objects construction is becoming more popular in the US. Offsite modular construction is important in the UK, since modular construction accounts for 15-20% of the houses built there”. In 2011, 100s of AEC (Architecture, Engineering, Construction) Request a Demo 3 The risk of these hazards causing injury or worse, is significantly • Struck by a falling object reduced through offsite construction. • Hit by a construction vehicle Prevention of the Fatal Four Through Offsite Construction • Crushed or caught in a cave-in of heavy material • Caught in-between cramped machinery 1. Falling From Heights Being provided with a lot more space, a job will be easier to When modular buildings are transported onsite, up to 90% carry out safely in a cooler location, usually with more available of the building could already be constructed. Through offsite oxygen. A cluttered workspace could also obstruct a workers’ construction, more work takes place at ground level. This could view onsite, maybe not even hearing nearby construction reduce the need to work at heights by as much as 80%. vehicles or machinery. Of the hospitalized accidents and fatalities occurring in the 3. Electrocution construction industry, the most common cause of death is falling from heights. These falls are usually the result of The three most common causes of death through electrocution falling from a roof, as well as unstable scaffolding or ladders. are: Permanent scaffolding remains in place offsite, without the need for scaffolding or ladders onsite. • Contact with overhead power lines The danger of falling from heights is even greater in unsafe • Contact with an energized source weather conditions, like a strong wind or thunderstorm. Falling from heights due to weather conditions can be completely • Incorrect use of extension cords prevented through offsite construction. In offsite construction, there is less danger of workers hitting 2. Struck by or Caught in Between Objects an overhead powerline. Most of their onsite construction will take place at a low, safe level. Power tools are more likely to With less machinery, construction vehicles, heavy materials, have a permanent location, without extension cords being and construction workers onsite at any time, there is a lower accidently left across a walking space. They should be kept risk of workers being: in a dry area without exposure to moisture. This could be the cause of wet weather conditions. Request a Demo 4 The Risk of Unsafe Weather Conditions • Delays, if areas need to be pumped dry • Washing away important equipment Weather conditions can often be the reason for losing time onsite, on a day when it could be too dangerous to work in: Ice on a cold construction site can be a dangerous trip hazard, • Strong winds sometimes damaging pipes and other equipment. Fog and heavy rain are two weather conditions that can make visibility poor. A • High or low temperature direct lightning strike could even result in fire. • Lightening • Heavy rain • Fog Strong winds can make it more dangerous to work at heights. The winds have the chance of blowing away important tools or damaging moveable scaffolding. They can also make hearing difficult, even if a large vehicle is moving close by. If construction occurs during times of high temperature; dehydration and tiredness are two common effects. Important Personal Protective Equipment (PPE) such as gloves could feel too warm to wear. Too much rain can cause problems, such as: • Contaminating certain material • Collapsing of earth moving jobs • Blocking roads and pathways Request a Demo 5 Prevention of Other Safety Risks Local Community disruption There are other safety risks in construction that could be the With less noise and heavy vehicles around, modular construction cause of a minor, sometimes serious injury. causes less disruption for onsite workers, as well as local residents or workplaces. This is more important when extensions Manual handling injuries are being made for schools, hospitals, or active businesses that are still in use and is one of the reasons why the NHS has With repeated jobs taking place in a modern and permanent welcomed modular construction. factory setting; lifting, arranging, and securing different sections of a building can be done using light machinery. Concrete is one Case Study: NHS Adopting Modular Construction of the biggest causes of carbon emission. Materials used such as wood and steel are more popular in modular construction, much The UK National Health Service (NHS) began modular building lighter to carry and easier to recycle. framework in January 2017, when studies showed modular construction could occur 50% faster and cost 30% less. Slips, Trips, and Falls Sometimes extensions are required for buildings that are decades old and needed as soon as possible. Months of onsite Cleaner working conditions, more likely to be maintained in work could cause disruption, especially for hospitals that are in a factory setting, make it less likely for common accidents to use. occur. For example, slipping on a surface where water has been For example, at Croydon hospital a temporary ward space spilled or maybe tripping over objects such as buckets or other was required. ‘Elite Systems’, one of the companies within equipment left outside. Weather conditions could also be the this building framework, craned each constructed single-story reason for slipping on a wet or frozen surface. modular unit over the top of the hospital and into a courtyard. A Comparing offsite to onsite construction areas, studies have week later, the ward was ready for use. shown that the safety of the workstation is considered more important offsite. Designated storage areas are provided for Mike Twizell, the sales director at Elite ‘Systems’ states: equipment and other materials. Also, color coding walkways prevents workers from walking in an unsafe space or leaving any “One of the big bonuses of working with us is that we have equipment on the walkways. used the same subcontractors for many years. They know what is expected of them in terms of performance and workmanship. Request a Demo 6 We have formed a strong bond of trust.” the same time, 30-50% is a common amount of time recorded Benefits for the NHS include: to be saved. Work will not have to be postponed in unsafe weather conditions. • One point of contact for the project involved • Costs are unlikely to change While buildings are constructed offsite, work occurring onsite at • Less onsite work, which could cause disruption in the same time could include: occupied
Recommended publications
  • Guide to Natural Gas/Oil Regulations & Development Projects in Mesa
    Guide to Natural Gas/Oil Regulations & Development Projects in Mesa County I. Purpose This document is a guide to the Mesa County Land Development Code, as amended (Code), adopted plans and policies, and County permitting agencies related to natural gas and oil development. This guide categorizes typical natural gas/oil development activities pursued in Mesa County and maps them to the appropriate land uses defined by the Code as well as outlines the level of review required. This is an overview, and the specific and required regulations are contained in the Code that are identified in the Guide. The Code and additional information on natural gas/oil development can be found at the Mesa County Website: http://www.mesacounty.us/planning/ II. Land Uses & Where they are permitted in Mesa County All land in Mesa County is zoned, and certain uses are allowed to occur in each zoning district subject to Land Use Table 5.1. The Table details the land uses allowed in each zoning district and the review process applicable to each use. Note: if a use is not listed in these matrices, it is prohibited. If the land use has an “A” in the zoning district column, it is an Allowed use and requires Site Plan review. If the land use has a “C” in the zoning district column, it is a Conditional Use and requires a Conditional Use application. These uses, as applicable to the natural gas/oil industry, are summarized in the table on Page 3 of this Guide. The majority of natural gas/oil activity currently occurs in the AFT zoning district.
    [Show full text]
  • PREFABRICATION: the CHANGING FACE of ENGINEERING and CONSTRUCTION 2017 FMI/Bimforum Prefabrication Survey Table of Contents
    PREFABRICATION: THE CHANGING FACE OF ENGINEERING AND CONSTRUCTION 2017 FMI/BIMForum Prefabrication Survey Table of Contents 1 3 25 29 Executive Summary Key Findings Business Implications Looking Ahead TODAY’S PREFAB ENVIRONMENT IS DIFFERENT 77% of respondents think today’s prefab The amount of project work using prefab has environment is different than in 2013. almost tripled between 2010 and 2016. 35% 13% YES NO 77% 23% 2010 2016 Most contractors perform single-trade Project inefficiencies and improved technologies prefabrication. are driving prefabrication. 32% 47% 21% Provide Provide Provide Multitrade Single-Trade Kitting Prefabrication Prefabrication Services THE BIG STRUGGLE TO MAKE IT WORK Contractors struggle to make Contractors using prefab on more than 50% prefabrication effective. of their projects are more effective compared to those who do less prefab. 14% 40% 46% Effective Needs Not Improvement Effective Three key challenges for making prefabrication 48% of respondents see less than 5% in effective: savings on total annual labor hours related to prefabrication. Culture Lack of Outdated Commitment Control Mindset he construction industry is back on track since the Great Recession, andT total construction employment has re- bounded to almost 6.7 million workers (still a far cry from its peak of 8 million workers in 2006). “Construction spending in November 2016 hit a 10-year high, with one-month and year-over-year increases in all major segments,” says Ken Simonson, chief economist at Associ- ated General Contractors of America. “Looking ahead, contractors say they expect more work in every category in 2017 than in 2016.” Executive Summary However, despite being about 16% below its 2006 employment peak, the industry is still struggling to find qualified labor.
    [Show full text]
  • A Review of Modular Construction Shipbuilding in Malaysian Shipyard
    Proceeding of Ocean, Mechanical and Aerospace November 7, 2016 -Science and Engineering-, Vol.3 A Review of Modular Construction Shipbuilding in Malaysian Shipyard Ahmad Alliff Anuar Mokhtar ,a, Mohamad Abu Ubaidah Amir Bin Abu Zarim, Kdr Halim bin Abdul Aziz TLDM (Bersara) * and Ainnur Hafizah Anuar Mokhtar ,b a) Faculty of Science and Defence Technology, National Defence University, Malaysia, Kem Perdana Sungai Besi, 57000 Kuala Lumpur, Malaysia. b) Faculty of Computing and Informatics, Universiti Malaysia Sabah, 87000 F.T. Labuan, Malaysia *Corresponding author: [email protected], [email protected], [email protected], [email protected] Paper History 1.0 INTRODUCTION Received: 25-September-2016 The maritime industry consumes a role play in associate for Received in revised form: 30-October-2016 Malaysia’s economic development . This is regard to the statement Accepted: 7-November-2016 which shipbuilding/ ship repair (SBSR) industry has been precisely recognized in the Third Industrial Master Plan (IMP3) in place of an industry that can gives something to the country’s wealth from the transportation area [1]. The shipbuilding industry ABSTRACT of Malaysia is getting larger and ship builders are adapting with the latest technology. For each project to achieve successfully, it The shipbuilding and ship repair industry in Malaysia comprises is important to manage a project within the constraint. The major of designing, building and assembling, repairing and maintaining, constraint that should be considered is cost, duration time to transforming and advancement of vessels as well as marine complete the project, safety aspect for workers and the quality of equipment . It is getting larger and always evolve in line with the the project.
    [Show full text]
  • Unions Electrical Workers Are Not Against Prefabrication
    Unions Electrical Workers are not Against Prefabrication Adanegn G. Woldemichael, MSCM (Student) and Khalid M. Siddiqi, Ph.D. Kennesaw State University Kennesaw, Georgia Unions are vital part of growing and expanding construction industry. What union electrical workers get out of the industry depends on their readiness and competitiveness to advance the existing work methods. Prefabrication is one of these methods and many researches indicate its benefits in terms of time, cost, quality and safety. But, electrical union workers have not fully utilized these benefits & there are limited information available on the prevailing best practices of prefabrication specific to different local unions jurisdictions. Accordingly, this paper identifies the prevailing best practices of prefabrication feasible to union electrical workers. The intended audiences are union electrical workers and union electrical contractors. The study is performed by conducting survey to collect the necessary data from union electrical workers who are working under local union 613. The questions are designed to evaluate union workers attitude towards prefabrication and mainly focus on listing and comparing most useful prefabrication practices. The study helps to bring a common understanding among union electrical workers on implementation of prefabrication and it open doors for continual improvement on prevailing best practices. Ultimately, these may significantly alter union electrical workers competitive position and make them more sustainable. Keywords: Unions, Union workers, Prefabrication, Best practice, Electrical Introduction Prefabrication is a manufacturing process, generally taking place at a specialized facility, in which various materials are joined to form a component part of final installation. Prefabricated components often involve the work of single craft. The actual prefabrication can occur any place (on- site or off-site), where there is space to complete the work.
    [Show full text]
  • Measuring Productivity and the Impact of Prefabrication on Productivity
    ELECTRI International—The Foundation for Electrical Construction, Inc. PRODUCTIVITY ENHANCEMENT Measuring Productivity and the Impact of Prefabrication on Productivity Marquette University Mark O. Federle ELECTRI International The Foundation for Electrical Construction, Inc. Measuring Productivity and the Impact of Prefabrication on Productivity Marquette University Mark O. Federle ELECTRI Council ELECTRI International—The Foundation for Electrical Construction, Inc. As of December 2015 PRESIDENT’S COUNSEL REGENT $1,000,000 or more $250,000 or more Contractors Contractors The Hugh D. ‘Buz’ and Irene E. ‘Betty’ Allison Trust, Hugh D. ‘Buz’ Cannon & Wendt Electric Company, David E. Fagan Allison, d. Capital Electric Construction, Robert E. and Sharon Doran* - In The Richard W. and Darlene Y. McBride Trust, Richard W. McBride* memory of Robert E. Doran, Jr. The Al and Margaret Wendt Trust, Albert G. Wendt*, d. John R. Colson, TX NECA Chapters and Affiliates Maron Electric Co., Jerold H. Nixon, d., and Eric F. Nixon National Electrical Contractors Association*, John M. Grau Miller Electric Company, H. E. “Buck” Autrey* **, David Long and Henry Brown Manufacturers, Distributors, Utilities and Affiliates Robert L. Pfeil, d., IN Schneider Electric / Square D, Neal Lyons NECA Chapters and Affiliates PROGRAM GUARANTOR Chicago & Cook County Chapter NECA $500,000 or more New York City Chapter NECA*, Ciro J. Lupo Contractors Northeastern Illinois Chapter NECA, Craig Martin McCormick Systems, Jack McCormick Northern California Chapter NECA, Greg A.
    [Show full text]
  • Prefabrication for Lean Building Services Distribution
    PREFABRICATION FOR LEAN BUILDING SERVICES DISTRIBUTION M. J. Mawdesley1 and G. Long2 ABSTRACT This paper is concerned with the use of prefabrication for the distribution of building services (HVAC), concentrating mainly on the construction of office facilities. This is a good example of an application of lean construction methods. It assures reliable workflow and predictability in the project, it minimises waste and increases performance; it enables concurrent engineering to occur and delivers value throughout the project’s life. An analysis of the use of off-site fabricated building services as a method of lean construction is given with reference to features of its use such as design freezes, Just-in-Time (JIT) deliveries and predictable processes. However, it requires different procurement processes to be totally effective. The paper compares two procurement routes both theoretically and by the use of two real examples of construction projects. It illustrates some potential problems and shows that the solutions lie not in the technical aspects but in better communication and planning throughout the life of the project. KEY WORDS Prefabrication, Building Services, Lean Construction, Procurement 1 Dr, School of Civil Engineering, University of Nottingham UK 2 Mr, School of Civil Engineering, University of Nottingham UK Proceedings IGLC-10, Aug. 2002, Gramado, Brazil M. J. Mawdesley and G. Long 2 INTRODUCTION Lean construction is concerned with providing a better service for the client through consideration of the whole construction process. It has its roots in the concepts of lean production developed in Japan. As such, many construction practitioners may be sceptical of its applicability to their industry in the belief that construction is different.
    [Show full text]
  • Overview of Prefabrication in Residential Construction (With an Addendum on “MEP Prefabrication” by Mark Daniels, Graduate Student) Summary
    Overview of Prefabrication in Residential Construction (With an addendum on “MEP Prefabrication” by Mark Daniels, Graduate student) Summary Harsh Bakliwal, Graduate Student Cameron Kostiz, Former Undergraduate Student Dr. Matt Syal, Professor Mark Daniels, Graduate Student Housing Education and Research Initiative Construction Management Program School of Planning, Design and Construction Michigan State University October 2020 Abstract The rapid growth in the automation in the construction industry is driving towards the adoption of prefabrication in construction. The construction market, especially the residential construction, is shifting towards prefabricated construction practices due to the skilled labor shortage and the need to improve the construction quality. The objective of this report is to describe different levels of prefabrication in residential construction along with their advantages and disadvantages. This report initially provides a brief overview of the residential construction industry along with statistics related to the present construction market and labor trends. It then describes different levels of prefabrication in detail. These include material prefabrication, panelization, pre-manufactured building units or modules, and factory-built homes, including the manufactured and the modular homes. In the end, it provides the advantages and disadvantages of factory-built construction based on factors such as, cost, completion time, and the type of construction methods used for factory-built 0 versus site-built construction. Finally, it provides the state of prefabrication in residential construction across the world including, the USA, China, India, Japan, Sweden, UK, and Australia. After this study was completed, additional work was done by Mark Daniels, CM graduate student, on MEP prefabrication for multi-family and commercial buildings.
    [Show full text]
  • Prefabrication (“Prefab”) § Prefabrication Is the Construction of Some Parts of a Building Off- Site and Then Transporting Them to the Job Site for Final Installation
    Changing the Way We Think of Prefabrication: New Solutions for Your Building Envelope Integrated sheathing is a key component 1 Changing the Way We Think of Prefabrication: New Solutions for Your Building Envelope AIA Continuing Education System (AIA/CES) § BNP Media is a Registered § Credit earned on completion of this Provider with AIA/CES. program will be reported to AIA/CES § This program is registered with Records for AIA members. Certificates of Completion for non- the AIA/CES for continuing professional education. As such, AIA members are available on request. it does not include content that may be deemed or construed to § This presentation is protected by be an approval or endorsement U.S. and international copyright by the AIA of any material of laws. Reproduction, distribution, construction or any method or display, and use of the presentation manner of handling, using, without written permission of the distributing, or dealing in any presenters is prohibited. material or product. § Completing a quiz at the end of this presentation is required in order to receive continuing education credit. Credit Designation: 1.0 LU|HSW 2 Learning Objectives Upon completion of this course, you should be able to: § 1. Discover how prefabrication offers productivity and management advantages for the building envelope. § 2. Discuss how prefabrication can address common project management issues at the job site, including weather delays, crew safety, quality control, labor shortages, and scheduling. § 3. Explore how traditionally applied WRB-AB and integrated WRB- AB sheathing solutions are impacting lean manufacturing productivity goals. § 4. Compare WRB-AB integrated sheathing solutions transportability from prefabrication factory to the job site.
    [Show full text]
  • Designing Sustainable, Prefabricated Wood Buildings
    CONTINUING EDUCATION DESIGNING SUSTAINABLE, Presented by: PREFABRICATED WOOD BUILDINGS LEARNING OBJECTIVES 1. Demonstrate why prefabrication is an efficient and sustainable building practice 2. Evaluate the use of wood components in sustainable prefabricated buildings as well as design and engineering challenges that wood can solve 3. Discuss the advantages of building with prefabricated wood components in terms of speed and efficiency of construction, design flexibility, waste reduction, environmental performance and improved life safety 4. Analyze, through case studies, the different stages of wood building prefabrication from design to installation CONTINUING EDUCATION AIA CREDIT: 1 LU/HSW GBCI CREDIT: 1 CE HOUR AIA COURSE NUMBER: AR072018-3 GBCI COURSE NUMBER: 0920016493 Use the learning objectives above to focus your study as you read this article. To earn credit and obtain a certificate of completion, visit http://go.hw.net/AR072018-3 and complete the quiz for free as you read this article. If you are new to Hanley Wood University, create a free learner account; returning users log in as usual. Image courtesy of Lawrence Anderson PREFABRICATION THEN AND NOW a boom in kit-of-parts building post-World TERMS War II. Consumers were enthralled with Prefabricated wood buildings should be industrial production and replication, aka mass Off-Site Manufacture (OSM) considered when designing and building both production, and prefabricated buildings helped Off-site manufacture is the manufacture of multi-family and commercial buildings, such fulfill the need for affordable, quality housing construction components or systems in a factory as multi-family housing, education, retail, environment to be transported and assembled post-war.
    [Show full text]
  • Prefabrication Potential: on the Edge Between Academia and Industry
    Prefabrication potential: On the edge between academia and industry Pamela Bell PrefabNZ Incorporated and Victoria University of Wellington, New Zealand ABSTRACT: A recent Master of Architecture thesis on prefabricated housing in New Zealand found that research and development (R&D) are key areas for future emphasis. R&D can potentially benefit from tertiary institutions working in collaboration with the design and construction industry. This edge between academia and industry is where prefab’s potential lies. This paper aims to identify, investigate and highlight attempts at collaborative relationships between tertiary institutions and the design and construction industry in New Zealand. It begins by looking at international precedents of design-and-build studios teaching through the medium of prefabrication, before it looks at New Zealand case studies of research: industry collaborations. Case studies from New Zealand’s three architecture schools at Auckland University, Unitec and Victoria University of Wellington are documented. Issues and opportunities around these collaborative relationships between tertiary and industry sectors are summarised. The role of communication is discussed, leading to the introduction of the industry organisation PrefabNZ and the national prefab exhibition. The paper concludes by encouraging an increase in collaboration between academia and industry. Keywords: Prefabrication, Offsite, Design-and-build, Collaboration INTRODUCTION ‘Kiwi Prefab’, a recent Master of Architecture thesis on prefabricated housing in New Zealand, found that the two key areas for further development are research and development (R&D) and marketing and communication. (It should be noted that prefabrication, known also as prefab, is sometimes referred to as offsite construction, literally means any part of the building constructed away from the final site.) A specific recommendation to improve prefabrication R&D is for tertiary institutions to work in collaboration with the design and construction industry in integrated programmes.
    [Show full text]
  • Mckinsey & Company
    The next normal in construction How disruption is reshaping the world’s largest ecosystem June 2020 Cover image: © Dong Wenjie/Getty Images Copyright © 2020 McKinsey & Company. All rights reserved. This publication is not intended to be used as the basis for trading in the shares of any company or for undertaking any other complex or significant financial transaction without consulting appropriate professional advisers. No part of this publication may be copied or redistributed in any form without the prior written consent of McKinsey & Company. The next normal in construction How disruption is reshaping the world’s largest ecosystem June 2020 This article was a collaborative, global effort among Maria João Ribeirinho, Jan Mischke, Gernot Strube, Erik Sjödin, Jose Luis Blanco, Rob Palter, Jonas Biörck, David Rockhill, and Timmy Andersson. questions for executives in the ecosystem: how their Preface part of the value chain will be affected, by how much, and what they should consider doing to prepare for a future that will differ radically from the present. June 2020 Countervailing factors are reshaping the global Our hope is that these insights will help accelerate a economy, and no industry is immune to their impact. transformation that we believe will and must happen Grounded in the built, physical world, construction and provide executives around the world with a map to may seem less vulnerable to the impact of digital help navigate the rough water ahead. technologies and Silicon Valley disrupters. Indeed, the cranes accenting fast-rising urban centers and the This research was led by Jan Mischke, partner at the workers on commercial and residential projects might McKinsey Global Institute (MGI) in McKinsey’s Zurich lead some executives to believe that as it has been, so office; Jonas Biörck, associate partner based in it shall be.
    [Show full text]
  • The Use of Prefabrication Technique in Microvascular Reconstructive Surgery 547
    Wspolczesna Onkol 2012; 16 (6): 546 –550 DOI: 10.5114/wo.2012.32488 Original paper Aim of the study: The aim of the study was to develop standards for the pre - The use of prefabrication technique fabrication of free microvascular flaps in an animal model, followed by their in microvascular reconstructive surgery application in clinical practice, and quan - titative/qualitative microscopic assess - ment of the extent of development of a new microvascular network. Material and methods: The study was carried out in 10 experimental pigs. As Łukasz Krakowczyk, Adam Maciejewski, Cezary Szymczyk, Janusz Wierzgoń, the first stage, a total of 20 prefabricated Ryszard Szumniak, Piotr Jędrzejewski, Maciej Grajek, Mirosław Dobrut, flaps were created using polytetrafluo - Rafał Ulczok, Stanisław Półtorak roethylene (PTFE) as a support materi - al, placed horizontally over an isolated Department of Oncological and Reconstructive Surgery, Center of Oncology – and distally closed vascular pedicle ba - Maria Sklodowska-Curie Institute of Oncology, Branch Gliwice, Poland sed on superficial abdominal vessels. After completing the animal model study, one patient was selected for the grafting of the prefabricated free flap. Results: All 20 free flaps prefabricated in Introduction the animal model were analyzed micro - scopically, exhibiting connective tissue Oncologic reconstructive and microvascular surgery involves a range of com - rich in fibroblasts and small blood ves - plex and often multi-stage techniques aimed at restoring the structure of soft sels in the porous areas across the tissues, bones, blood vessels and nerves previously removed along with the entire thickness of the PTFE element. cancerous tumour. The aim of reconstructive surgical procedures is to achieve Conclusions: Flap prefabrication is a new anatomical, topographical, functional and aesthetic effects which approximate and fast developing reconstruction tech - as closely as possible normal physiological conditions.
    [Show full text]