REPUBLIC OF

COMPOSITE BUDGET

FOR 2020-2023

PROGRAMME BASED BUDGET ESTIMATES

FOR 2020

SAGNERIGU MUNICIPAL ASSEMBLY

1

Table of Contents PART A: STRATEGIC OVERVIEW ...... 4 1. ESTABLISHMENT OF THE DISTRICT ...... 4 2. VISION ...... 5 3. MISSION ...... 5 4. GOALS ...... 5 5. CORE FUNCTIONS ...... 5 6. DISTRICT ECONOMY ...... 6 a. AGRICULTURE ...... 6 b. MARKET CENTER ...... 6 e. HEALTH ...... 7 f. WATER AND SANITATION ...... 7 g. ENERGY ...... 8 7. KEY ACHIEVEMENTS IN 2019 ...... 8 8. REVENUE AND EXPENDITURE PERFORMANCE ...... 13 a. REVENUE ...... 13 b. EXPENDITURE ...... 15 1. NMTDF POLICY OBJECTIVES IN LINE WITH SDGs AND TARGETS AND COST ...... 16 2. POLICY OUTCOME INDICATORS AND TARGETS ...... 20 3. REVENUE MOBILIZATION STRATEGIES FOR KEY REVENUE SOURCES ...... 22 PART B: BUDGET PROGRAMME/SUB-PROGRAMME SUMMARY ...... 22 PROGRAMME 1: MANAGEMENT AND ADMINISTRATION...... 22 SUB- PROGRAMME 1.1 General Administration ...... 24 SUB- PROGRAMME 1.2 Finance and Revenue Mobilization ...... 28 SUB- PROGRAMME 1.3 Planning, Budgeting and Coordination...... 31 SUB- PROGRAMME 1.3 Legislative Oversights ...... 34 SUB- PROGRAMME 1.5 Human Resource Management ...... 36 PROGRAMME 2: INFRASTRUCTURE DELIVERY AND MANAGEMENT ...... 39 SUB- PROGRAMME 2.1 Physical and Spatial Planning...... 40 SUB- PROGRAMME 2.2 Infrastructure Development ...... 44 PROGRAMME 3: SOCIAL SERVICES DELIVERY...... 47 SUB- PROGRAMME 3.1 Education and Youth Development ...... 48

2

SUB- PROGRAMME 3.2 Health Delivery ...... 52 SUB- PROGRAMME 3.3 Social Welfare and Community Development ...... 58 SUB- PROGRAMME 3.4 Birth and Death Registration Services ...... 62 PROGRAMME 4: ECONOMIC DEVELOPMENT ...... 64 SUB- PROGRAMME 4.1 Trade, Tourism and Industrial Development ...... 66 SUB- PROGRAMME 4.2 Agricultural Development ...... 70 PROGRAMME 5: ENVIRONMENTAL MANAGEMENT ...... 73 SUB- PROGRAMME 5.1 Disaster Prevention and Management ...... 75 SUB- PROGRAMME 5.2 Natural Resource Conservation and Management ...... 78

3

PART A: STRATEGIC OVERVIEW

1. ESTABLISHMENT OF THE DISTRICT 1.1 Location and Size The Sagnerigu Municipal Assembly was re-created by a legislative instrument, LI 2272 in 2018 as a Municipality.

Figure1.1 Map of the Sagnarigu Municipal Assembly

4

The Sagnarigu Municipality is located in the central part of the of Ghana. It falls between Longitudes 0057” N and 00 57” W and Latitudes 9016” N and 9034” N. The Municipality has an estimated total land size of 114. 29km2. It shares boundaries to the North with municipality, to the East with Assembly to the South and East with Tamale Metropolitan Assembly, to the West with , and to North-West with .

1. POPULATION STRUCTURE It has a total population of 148,099 (PHC, 2010). Expressed in percentage as 51% males and 49% females.

2. VISION A safe Healthy Environment with Equal Opportunities and Range of Choices for Citizens

3. MISSION The Municipal Assembly exists to mobilise physical and financial resources towards the Provision of Quality Socio-Economic Services in a safe Lawful Environment to Enhance the Quality of Life of the Citizens.

4. GOALS A safe Healthy Environment with Equal Opportunities and Range of Choices for Citizens

5. CORE FUNCTIONS

The core functions of the Sagnarigu Municipal Assembly are outlined below

 Execute approved development plans for the municipality.  Guide, encourage and support sub-district local government bodies, public agencies and local communities to perform their roles in the execution of approved development plans;  Initiate and encourage joint participation with other persons or bodies to execute approved development plans 5

 Promote or encourage other persons or bodies to undertake projects under approved development plans  Monitor the execution of projects under approved development plans and assess and evaluate their impact on the people's development, the local, and district and national economy.  Co-ordinate, integrate and harmonize the execution of programmes and projects under approved development plans for the district and other development programmes promoted or carried out by ministries, departments, public corporations and other statutory bodies and non-governmental organisations in the Municipality

6. DISTRICT ECONOMY

a. AGRICULTURE More than 50% of the working population in the Municipality are into agriculture and its related activities. Significant populations are also engaged in manufacturing, commercial, and service sectors.

The people practice subsistence farming with only a few engaged in commercial agriculture, usually in mango and rice cultivation. The main crops are cereals such as millet, maize, sorghum, groundnuts, vegetables, cassava, potatoes and rice. The rest are groundnut, cowpea, yam and cotton. Animal rearing plays a secondary role to crop farming in the district. Types of animals reared include; cattle, sheep, goat and poultry.

b. MARKET CENTER The Municipality has no well development market. It has only satellite markets with the biggest markets found in the Tamale Metropolis

c. ROAD NETWORK The major passenger transport services in the Municipality are taxi cabs and Tricycle popularly called Yellow Yellow while goods are mainly conveyed by tricycles commonly called ‘motor kings.’ With the relative proximity to Tamale, long-distance transport services, even though not found in the Municipality are not far from the people. The major problem with regard to transportation in the Municipality is poor road network. 6

Many roads in the Municipality are highly deplorable and therefore need improvements. Also, there is the need to open up more roads and culverts to improve the stock of good roads in the Municipality. There is no traffic congestion and most of the farming and peri-urban communities are linked to the marketing centres by feeder roads. The availability of access roads linking farming communities is an incentive to farmers since it reduces post-harvest losses.

d. EDUCATION The Municipality is the hub of educational institutions in the region. It has a total of 205 basic schools, 4 SHS, 2 Colleges of Education, 1 Technical University, Graduate Schools of UDS and 2 Health Institutions.

e. HEALTH The Municipality has a good health system with 20 functional facilities.

f. WATER AND SANITATION The sanitation situation in the Municipality is appalling. Regarding solid Waste management, many households do not have temporal Waste collection containers. Houses are also far from available dump sites. As a result, many houses have small damp sites where solid Waste is dumped and burnt periodically. Liquid Waste is indiscriminately disposed. The Waste Water drainage system in the district is mainly of natural gutters created by running Water. Sewer from bath houses and domestic chores is mainly disposed indiscriminately. This practice breeds mosquitoes in the community.

Many communities in the Municipality enjoy good Water supply from the Dalun and the Nawuni Water Treatment Plants. The main Water system in the urban neighborhoods is pipe borne Water which is rationed and managed by the Ghana Water Company Limited in Tamale. The distribution of pipe borne Water is challenged with old pipelines and high elevations. The availability of clean/treated Water presents an opportunity for Water bottling companies to take advantage of the stable Water supply and ready market in the Municipality and neighboring Tamale Metropolis. This is evidenced by the large number of sachet Water producing firms in the Municipality.

7

Water sources in the rural communities are mainly mechanised and pump boreholes, wells, dams and dug-outs. Some of the point sources in the rural communities are dysfunctional whilst others have low yields. Moreover, in the dry season, livestock usually compete with human at the non-point sources.

g. ENERGY

The Sagnarigu Municipality enjoys electricity supply from the national grid with about 82% of the communities being connected to it. Supply of electricity has been fairly stable, except that there have been periods of intermittent supply and power fluctuations due to faulty lines, natural or other human practices. The stable electricity supply is a potential for large scale industrial development.

7. KEY ACHIEVEMENTS IN 2019 In fulfilment of part of the mandate of the Sagnerigu Municipal Assembly as expressed in the Local Governance Act 2016 (Act, 936). The Municipality has provided the following to its citizens to improve their socio-economic lives:

 Constructed 3no. 3units Classroom Blocks and Ancillary facilities to the people of Gbalahi, Kpene and Kanvilli.  Constructed 2no. Clinic at Kogni and Sheshigu to serve over Five Thousand people in and around the facility  Distributed 1800 small ruminants to vulnerable women of reproductive age in  Distributed 200 and 400 Dual and Mono- Desks to schools in the Municipality respectively  Furnished Municipal Fire and Ambulance office  Provided walls to three public laterines at Kanvilli, Choggu and Kalpohini to enhance sanitation

8

KPENE - IGF

GBF

 Constructed Pavilion for Kanvilli Chief palace  Distributed 6no. Tricycles (Motor King) and 2No. Tricycle (Yellow) to women groups and Persons with Disabilities  Supported 120 PWD’s economically  Supported 120 groups with VSLA

9

PWD’s SUPPORT

10

11

12

8. REVENUE AND EXPENDITURE PERFORMANCE

a. REVENUE

REVENUE PERFORMANCE- IGF ONLY

% performance as at ITEM 2017 2018 2019 Jul,2019

Actual as at Budget Actual Budget Actual Budget July

Property Rate 114,168.86 69,865.27 92,750.00 82,560.00 309,475.00 183,823.62 59.40

Fees 83,680.00 36,230.00 36,855.37 56,407.37 90,000.66 20,100.00 22.33

Fines 2,048.00 0.00 0.00

Licenses 96,182.59 70,882.52 190,953.35 185,206.00 74,930.00 79,546.16 109.16

Land 83,120.00 38,316.60 83, 500.00 79,099.30 81,988.00 55,394.98 67.56

Rent 9,130.00 768.60 100.00 397.33 1,000.00 1,035.27 103.53

Investment - - - - -

Miscellaneou s 9,584.00 8,260.96 11,500.00 10,500.00 2,000.00 2,200.00 110.00

Total 395,865.45 224,323.95 415,658.72 414,170.00 561,441.66 342,100.03 60.93

13

REVENUE PERFORMANCE- ALL REVENUE SOURCES

% performance ITEM 2017 2018 2019 at Jul,2019

Actual as at Budget Actual Budget Actual Budget July

IGF 395,865.45 224,323.95 415,658.72 414,170.00 561,441.66 342,100.03 60.93

Compensation Transfer 1,881,375.00 1,881,375.00 2,245,169.00 2,669,944.95 3,239,574.38 1,861,830.22 57.47

Goods and Services Transfer 150,421.00 92,660.00 150,421.00 36,298.49 83,884.71 0.00 0.00

Assets Transfer 0.00 0.00 0.00 0.00 0.00 0.00

DACF 3,356,879.00 1,706,190.32 4,190,473.76 1,334,566.55 3,274,704.48 1,003,337.93 30.64

MP’S –DACF 637,395.72 800,000.00 388,391.96 48.55

DDF/DPAT 884,000.00 0.00 905,070.00 765,257.00 771,500.00 1,515,691.56 196.46

CIDA/MAG - - - - 161,267.46 84,514.00 52.41

RING 1,615,000.00 1,535,215.43 2,052,596.97 972,221.31 723,240.32 834,648.65 115.40

UNICEF - - - - 100,000.00 16,065.00 16.06

14

GSCSP - - - - 4,400,000.00 257,002.27 5.84

PWD’S – FUND 204,682.75 65,000.00 124,091.48 190.91

TOTAL 8,283,540.45 5,439,764.70 9,959,389.45 7,034,536.77 14,180,613.01 6,427,672.12 45.33

b. EXPENDITURE

EXPENDITURE PERFORMANCE (ALL DEPARTMENTS) – ALL SOURCES

Expenditure 2017 2018 2019 % age Performance Actual as at (as at Jul Budget Actual Budget Actual Budget July 2019)

Compensation 2,093,696.00 1,637,839.54 2,311,461.45 2,669,944.95 3,324,473.83 1,933,938.20 58.17 Goods and Services 1,881,375.00 942,255.14 3,085,242.00 1,967,063.68 2,640,505.70 1,297,341.06 49.13

Assets 4,308,559.45 1,369,931.44 4,562,682.00 1,932,558.70 8,215,633.18 2,147,656.75 26.14

Total 8,283,540.45 4,486,052.67 9,959,389.45 6,569,567.33 14,180,613.01 5,373,936.01 37.93

15

1. NMTDF POLICY OBJECTIVES IN LINE WITH SDGs AND TARGETS AND COST

FOCUS AREA POLICY OBJECTIVE SDG’S SDG TARGETS BUDGET

ECONOMIC Improve production Goal 1: End poverty in 1.2, Reduce the proportion 1,474,582.00 DEVELOPMENT efficiency and yield all its forms of men, women and

everywhere Children living in poverty

1.4 By 2030, ensure that

all men and women, in particular the poor and the Goal: 2 Zero Hunger vulnerable, have equal Diversified and expand rights to economic the tourism industry for resources, as well as economic development access to basic services, Support entrepreneurs ownership and control and SME development over land and other forms of property, inheritance,

natural resources, appropriate new technology and financial services, including

16

microfinance

2.1 End Hunger and ensure access to sufficient food

SOCIAL Enhance inclusive and Goal 4: Ensure 4.1 By 2030, ensure that 1,705,950.00 DEVELOPMENT equitable access to, and inclusive and all girls and boys complete participation in quality equitable quality free, equitable and quality education at all levels education and primary and secondary promote lifelong education leading to

learning opportunities relevant and effective for all learning outcomes

Goal 3: Ensure 3.8 Achieve Universal 2,728,003.00 Ensure affordable, healthy lives and Health Coverage, equitable, easily promote well-being for including financing, risk accessible and Universal all at all ages protection and access to Health Coverage (UHC ) equal health care services

17

6.2 Sanitation for all and no open defecation by 2030

Strengthen social Goal 5. Gender 1.3: Implement 530,078.00 protection, especially for Equality Appropriate Social children, women, Protection System persons with disability and the elderly

GOVERNANCE, Ensure improved fiscal Goal 16: Peace, 16.7 Ensure responsible 3,705,033.00 CORRUPTION AND performance and Justice and Strong inclusion and participatory PUBLIC sustainability Institutions representative Decision ACCOUNTABILITY Goal 17: Partnership making for Goals 17.3 Strengthen Domestic Resource Mobilisation

18

ENVIRONMENT, Combat deforestation, Goal 13. Climate 1.5 Reduce Vulnerability to 16,932,540.00 INFRASTRUCTURE desertification and soil Action climate –related events AND HUMAN erosion and disasters SETTLEMENTS Improve efficiency and Goal 15. Protect, effectiveness of road restore and promote transport infrastructure sustainable use of terrestrial ecosystems, 11.3 Enhance inclusive sustainably manage urbanization & Capacity forests, for Settlement Planning combat desertification, Promote sustainable, and halt and reverse spatially integrated, land degradation and balanced and orderly halt biodiversity loss development of human settlements Goal11. Make cities and human settlements inclusive, safe, resilient and sustainable

19

2. POLICY OUTCOME INDICATORS AND TARGETS

Outcome Baseline Latest status Target Unit of Indicator Measurem Descriptio ent Year Value Year Value Year Value n 2017 2017 2019 2019 2020 2020

Citizens participate effectively 4 town hall Decentrali 2 in the meeting 4 Citizens sation 2017 citizen 2019 2020 developme and 2 fora Deepened fora nt process citizens of the Municipality

Standard of BECE 2017 70% 2019 80% 2020 90% education pass rate improved

Number Functional Health care Functi Hospitals, Services onal Clinics and 2017 2020 22 2022 24 Delivery faciliti CHPS Improved es 18 Compound

s

20

% change in Maternal and Neo- 2017 18% 2019 30% 2020 32%

natal mortality

Number of Sanitation Open improved in Defaecatio 2017 1 2019 15 2020 20 the n Free

Municipality Communiti es

Number of Children rescued Child Right from all Promotion forms of and child abuse Protection (Child 2017 0 2019 0 2020 20 in the Marriage, Municipality Child Enhanced Trafficking, Child Labour etc.)

21

3. REVENUE MOBILIZATION STRATEGIES FOR KEY REVENUE SOURCES The Sagnerigu Municipal Assembly intend to realize the Total IGF projection of GH₡768,203.66 by employing the following Strategies;

 Identification of Economic activities in the Municipality  Organize refresher training for Revenue and Commission Collectors on modern Techniques of revenue Mobilisation  Provide Logistics for revenue Mobilisation  Set aside five days in every month for outing to mobilise revenue (Taskforce activities)  Physical Planning Department and Building Inspectorate to set aside at least five days in every month to monitor new developers in order to mobilise building permits  Identification and health screening of Hotels/Guest houses, Restaurants and Chop bars in Municipality  Structure the monitoring of revenue mobilization in the Municipality  Targeting of task force operation in the municipality (Concentration on one item at a time  Outsource difficult to collect revenue items

PART B: BUDGET PROGRAMME/SUB-PROGRAMME SUMMARY

PROGRAMME 1: MANAGEMENT AND ADMINISTRATION

1. Budget Programme Objectives  To provide support services, effective and efficient general administration and organization of the Municipal Assembly.  To insure sound financial management of the Assembly's resources.  To coordinate the development planning and budgeting functions of the Assembly.  To provide human resource planning and development of the Municipal Assembly.

22

2. Budget Programme Description The program seeks to perform the core functions of ensuring good governance and balanced development of the Municipality through the formulation and implementation of policies, planning, coordination, monitoring and evaluation in the area of local governance.

The Program is being implemented and delivered through the offices of the Central Administration and Finance Departments. The various units involved in the delivery of the program include; General Administration Unit, Budget Unit, Planning Unit, Accounts Office, Procurement Unit, Human Resource, Internal Audit and Records Unit.

A total staff strength of Forty-Eight (48) is involved in the delivery of the programme. They include Administrators, Budget Analysts, Accountants, Planning Officers, Revenue Officers, and other support staff (i.e. Executive officers, and drivers). The Program is being funded through the Assembly’s Composite Budget with Internally Generated Fund (IGF) and Government of Ghana transfer such as the District Assemblies’ Common Fund (DACF) and District Development Facility/District Assemblies’ Responsive Factor Grand (DACF-Responsive Factor Grant). In all, the programme seeks to:  Coordinate the programmes, projects and activities of the departments of the assembly.  Manage the administrative and financial activities of the Assembly.  Facilitate the integration of departmental plans and budget into the Programme Based Budget plans and budget  Acquire the various logistics needed by the Municipality for effective operation  Monitor and Evaluate development programmes, projects and activities of the Municipality.  Identify and build the necessary human resource capacity needed by the Municipality for effective functioning.

23

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 1: Management and Administration

SUB-PROGRAMME 1.1 General Administration

1. Budget Sub-Programme Objective

 To provide administrative support and ensure effective coordination of the activities of the various departments and quasi institutions under the Municipal Assembly.  To ensure the effective functioning of all the sub-structures to deepen the decentralization process. 2. Budget Sub-Programme Description The General Administration sub-programme looks at the provision of administrative support and effective coordination of the activities of the various departments through the Office of the Municipal Co-ordinating Director. The sub- programme is responsible for all activities and programmes relating to general services, internal controls, procurement/stores, transport, public relation and security.

The core function of the General Administration unit is to facilitate the Assembly’s activities with the various departments, quasi institution, and traditional authorities and also mandated to carry out regular maintenance of the Assembly’s properties. In addition, the Municipal Security Committee (MUSEC) is mandated to initiate and implement programmes and strategies to improve public security in the Municipality.

The Internal Audit Unit is authorized to spearhead the implementation of internal audit control procedures and processes to manage audit risks, detection and prevention of misstatement of facts that could lead to fraud, waste and abuse to the Assembly.

24

Under the sub-programme the procurement processes of Goods and Services and Assets for the Assembly and the duty of ensuring inventory and stores management is being led by the Procurement/Stores Unit.

The number of staff delivering the sub-programme is Sixteen (16). The main sources of funding for the sub-programme is from Internally Generated Funds (IGF), GoG and the District Assembly Common Fund (DACF).

Beneficiaries of this sub-program are the departments, Regional Coordinating Council, quasi institutions, traditional authorities, non-governmental organizations, civil society organizations and the general public.

The main challenges this sub programme encounter are inadequate internally Generated funds, delay and untimely release of funds such as DACF and DACF- Responsive Factor Grant, inadequate office space, and non-decentralization of some key departments.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

25

Main Output Past Years Projections Outputs Indicato r

2018 2018 2019 2019 Indica Indica Indica Indica budg actua budg actua tive tive tive tive et l et l Year Year Year Year 2020 2021 2022 2023 Meeting Number 4 4 4 2 4 4 4 4 s of the of meeti meeti General General ngs ng Assembl Assembl held y y organise Meeting d s held

Meeting Number 15 15 15 15 15 15 15 15 s of the of meeti meeti meeti meeti meetin meetin meetin meetin Executiv Executiv ngs ngs ngs ngs gs gs gs gs e e and Committ Sub- ee and committ sub- ee committ meeting ee s held organise d

Manage Number 12 12 12 12 12 12 12 12 ment of meeting Manage s ment

26 organise Meeting d s held

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme

Operations Projects Internal Management of Organization Procurement of Office Equipment Procurement of Office Supplies and Procurement of Office Furniture and Consumables Fitting Maintenance, Rehab. Refurb. & Upgrading Of Existing Assets Construction of Office Annex, Protocol Services Administrative and Technical Meetings Security Management Construction of Police Quarters Citizens Participation in Local Governance

27

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 1: Management and Administration

SUB-PROGRAMME 1.2 Finance and Revenue Mobilization

1. Budget Sub-Programme Objective  To insure sound financial management of the Assembly's resources.  To ensure timely disbursement of funds and submission of financial reports.  To ensure the mobilization of all available revenues for effective service delivery. 2. Budget Sub-Programme Description

This sub-programme provides effective and efficient management of financial resources and timely reporting of the Assembly finances as contained in the Public Financial Management Act, 2016 (Act 921). It also ensures that financial transactions and controls are consistent with prevailing financial and accounting policies, rules, regulations, and best practices.

The sub-program operations and major services delivered include: undertaking revenue mobilization activities of the Assembly; keep, render and publish statements on Public Accounts; keep receipts and custody of all public and trust monies payable into the Assembly’s Fund; and facilitates the disbursement of legitimate and authorized funds.

The sub-programme is manned by Nine (9) officers comprising of Accountants, Revenue Officers and Commission collectors with funding from GoG transfers, DACF and Internally Generated Fund (IGF).

The beneficiaries of this sub- program are the departments, allied institutions and the general public. This sub-programme in delivering its objectives is confronted by inadequate office space for accounts officers, inadequate data on ratable items and inadequate logistics for revenue mobilization and public sensitization. 28

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the District Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Indicat Main Output Budge Indicativ ive Indicative Outputs Indicator 2018 2019 t Year e Year Year Year 2020 2021 2022 2022 Annual and Annual 31st Monthly Statement of 31st March 31st 31st 31st 31st March Financial Accounts March March March March Statement of submitted by Accounts Number of submitted. monthly Financial 12 7 12 12 12 12 Reports submitted Achieve Annual average percentage annual growth 10% 12% 15% 18% 20% growth of 22% IGF by at least 10%

29

Revenue Improvemen Percentage t Action Plan of Activities Prepared 92% 70% 100% 100% 100% Implemented and 100% from the plan implemente d

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme

Operations Projects Preparation and Submission of Treasury and Accounting Activities Monthly Financial Statements Capacity Building of Revenue and Revenue Mobilisation Commission Collectors

30

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 1: Management and Administration

SUB-PROGRAMME 1.3 Planning, Budgeting and Coordination

1. Budget Sub-Programme Objective To facilitate, formulate and co-ordinate the development planning and budget management functions as well as the monitoring and evaluation systems of the Assembly.

2. Budget Sub-Programme Description The sub-programmes coordinate policy formulation, preparation and implementation of the District Medium Term Development Plan, Monitoring and Evaluation Plan as well as the Composite Budget of the District Assembly. The two (2) main unit for the delivery is the Planning and Budget Unit. The main sub- program operations include;

 Preparing and reviewing District Medium Term Development Plans, M& E Plans, and Annual Budgets.  Managing the budget approved by the General Assembly and ensuring that each program/project uses the budget resources allocated in accordance with their mandate.  Co-ordinate and develop annual action plans, monitor and evaluate programmes and projects  Periodic monitoring and evaluation of entire operations and projects of the Assembly to ensure compliance of rules, value for money and enhance performance.  Organizing stakeholder meetings, public forum and town hall meeting.

Ten (10) officers are responsible for the delivering of the sub-programme comprising of Budget Analysts and Planning Officers. The main funding source of this sub-programme is GoG transfer, DACF, DACF-Responsive Factor Grant,

31

Ghana Secondary Cities Support Programme (GSCSP) and Internally Generated Funds. Beneficiaries of this sub- program are the departments, allied institutions and the general public.

Challenges hindering the efforts of this sub-programme include, inadequate office space and logistics, lack of coordinated indicators for tracking performance in all the sectors, inadequate data on ratable items and inadequate logistics for public education and sensitization in the municipality.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Main Output Budge Indicative Indicative Indicative 201 Outputs Indicator 2018 t Year Year Year Year 9 2020 2021 2022 2022 Composite Composite 30th 30th Budget Action Plan September Septe 27th 30th 30th prepared and Budget mber SeptembSeptember September 30th based on approved by er October Composite General Annual Assembly Action Plan Social Number of Accountabil Town Hall 4 2 4 4 4 4 ity meetings meetings organized held

32

Compliance % with expenditure 100 100 100 100 100 100 budgetary kept within provision budget Monitoring Number of & quarterly 4 2 4 4 4 4 Evaluation monitoring reports submitted Annual Progress 15th March 15 th 15th 15th March 15th March 15th March Reports March March submitted to NDPC by

4. Budget Sub-Programme Operations and Projects

The table lists the main Operations and projects to be undertaken by the sub- programme

Operations Projects Plan and Budget Preparation Monitoring and Evaluation of Programmes and Projects

33

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 1: Management and Administration

SUB-PROGRAMME 1.3 Legislative Oversights

1. Budget Sub-Programme Objective To ensure full implementation of the political, administrative and fiscal decentralization reforms.

2. Budget Sub-Programme Description This sub-programme formulates appropriate specific Municipal policies and implement them in the context of national policies. These policies are deliberated upon by its Zonal/Town/Area Councils, Sub-Committees and the Executive Committee. The report of the Executive Committee is eventually considered, approved and passed by the General Assembly into lawful policies and objectives for the growth and development of the Municipality.

The office of the Honourable Presiding Member spearheads the work of the Legislative Oversight role and ably assisted by the Office of the Municipal Coordinating Director. The main unit of this sub-programme is the Zonal Councils Offices, the Office of the Presiding Member and the Office of the Municipal Coordinating Director.

The activities of this sub-programme are financed through the IGF, and DACF funding sources available to the Assembly. The beneficiaries of this sub- programme are the Zonal Councils, communities and the general public.

Efforts of this sub-programme are however constrained and challenged by the inadequate logistics to the Zonal Councils of the Assembly.

Budget Sub-Programme Results Statement

34

The table indicates the main outputs, its indicators and projections by which the Municipality measures the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Municipality’s estimate of future performance.

Past Years Projections Main Output Budget Indicative Indicative Indicative Outputs Indicator 2018 2019 Year Year Year Year 2020 2021 2022 2023 Organise Number of Municipal MUSEC Security meeting held 4 2 4 4 4 4 Committee meetings Build Number of capacity of training 1 2 2 2 2 2 Town/Area workshop Council organized annually Number of area council - 3 3 3 3 3 supplied with furniture

3. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects

Security Management

35

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 1: Management and Administration

SUB-PROGRAMME 1.5 Human Resource Management

1. Budget Sub-Programme Objective  To achieve institutional performance goals that are linked to the individual and team performance objectives, as the basis for measuring performance results and merit.  To provide Human Resource Planning and Development of the Assembly.  To develop capacity of staff to deliver quality services.

2. Budget Sub-Programme Description

The Human Resource Management seeks to improve the departments, division and unit’s decision making and build capacity of the manpower which will ultimately improve the workforce and organizational effectiveness. In carrying out this sub-programme it is expected that productivity would be enhanced at the Assembly as well as decision making in the management of Human Resource.

Major services and operations delivered by the sub-program include human resource auditing, performance management, service delivery improvement, upgrading and promotion of staff. It also includes Human Resource Management Information System which ensures frequent update of staff records through electronic means, guaranteeing efficient and good salary administration, facilitation of recruitment and selection as well as postings of competent staff to fill available vacancies at the Municipality.

Under this, two (2) staff carry out the implementation of the sub-programme with main funding from GoG transfer and Internally Generated Fund. The work of the human resource management is challenged with inadequate office space and 36

logistics. The sub-programme is beneficial to staff of the Departments of the Assembly, Local Government Service Secretariat and the general public.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly’s measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections

Main Output Budge Indicativ Indicativ Indicative Outputs Indicator 2018 2019 t Year e Year e Year Year 2020 2021 2022 2023 Appraisal Number of of Staff Staff 170 175 175 175 175 175 Conducted appraised Number of Capacity Capacity Building Building Plan Plans 1 1 1 1 1 1 Prepared prepared and and Submitted Submitted Capacity Number of Building Capacity Programm Building 2 1 4 4 4 4 es Programme organised organised

37

Promotion Number of and promotions Upgrading and inputs filled Upgrading 7 9 9 9 9 9 and inputs submitted submitted to LGS/CAGD Number of names on 170 E-Payment the 175 175 175 175 Voucher 175 Payment Validated vouchers validated Monthly Number updates of HRMIS 12 9 12 12 12 12 HRMIS updated Conducted

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme

Operations Projects Personnel and Staff Management Validation of payment vouchers Training of Staff

38

BUDGET PROGRAMME SUMMARY

PROGRAMME 2: INFRASTRUCTURE DELIVERY AND MANAGEMENT 1. Budget Programme Objectives  To assist in providing quality road transport systems for the safe mobility of goods and people.  To plan, manage and promote harmonious, sustainable and cost effective development of human settlements in accordance with sound environmental and planning principles.  To implement development programmes to enhance rural transport through improved feeder and farm to market road network.  To improve service delivery and ensure quality of life in rural areas.

2. Budget Programme Description The two main organization tasked with the responsibility of delivering the program are Physical Planning and Works Departments.

The Spatial Planning sub-programme seeks to advise the Municipality Assembly on national policies on physical planning, land use and development. It basically focuses on human settlement development and ensuring that human activities within the district are undertaken in a more planned, orderly and spatially organized manner.

The Department of Works is a merger of the former Public Works Department, Department of Feeder Roads and Water and Sanitation Unit, of the Assembly and assist the Assembly to formulate policies on works within the framework of national policies.

The programme is manned by five (5) officers with support and oversight responsibilities from Physical Planning Department. The programme is implemented with funding from GoG, DACF, DACF-Responsive Factor Grant, GSCSP transfers and Internally Generated Funds (IGF). The beneficiaries of the program include urban and rural dwellers in the Municipality.

39

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 2: INFRASTRUCTURE DELIVERY AND MANAGEMENT

SUB-PROGRAMME 2.1 Physical and Spatial Planning 1. Budget Sub-Programme Objective To plan, manage and promote harmonious, sustainable and cost effective development of human settlements in accordance with sound environmental and planning principles.

2. Budget Sub-Programme Description The sub-programme seeks to co-ordinate activities and projects of departments and other agencies including non-governmental organizations to ensure compliance with planning standards. It also focuses on the landscaping and beautification of the urban communities in the Municipality. The Physical and Spatial Planning sub-programme is delivered through the Department of Physical Planning and tasked to manage the activities of the former department of Town and Country Planning and the department of Parks and Gardens in the Municipality.

Major services delivered by the sub-program include;  Assist in the preparation of physical plans as a guide for the formulation of development policies and decisions and to design projects in the Municipality.  Advise on setting out approved plans for future development of land in the Municipality.  Assist to provide the layout for buildings for improved housing layout and settlement.  Advise the Assembly on the siting of bill boards, masts and ensure compliance with the decisions of the Assembly.  Undertake street naming, numbering of house and related issues.

40

This sub programme is funded from the Central Government transfers, DACF, GSCSP and Internally Generated Funds (IGF). The sub-programme render services to the entire citizenry in the Municipality. The sub-programme is manned by Two (2) staff and are faced with the operational challenges which include inadequate staffing levels, inadequate office space and untimely releases of funds.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the District Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Main Output Budge Indicative Indicati Indicative Outputs Indicator 2018 2019 t Year Year ve Year Year 2020 2021 2022 2023 Number of Planning planning Schemes/ schemes Local 2 3 5 5 and Local 5 5 Plans plans prepared prepared Reviewed Number of Local local Plans 4 0 1 1 1 1 Plans reviewed

41

Sensitised chiefs and community Number of members Sensitisatio on proper 2 2 4 4 4 n meetings procedure held for developme 4 nt Number of Technical technical committee committee 4 3 4 4 4 meetings meetings 4 held held Number of Number of Street Street Signage’s 0 100 100 100 named planted 0 100

Prepare a One spatial spatial developme developme nt - 0 1 - nt framework 0 - framework developed

42

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects Land Use & Spatial Planning

Street Naming and Property Addressing System Procurement of street signage

43

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 2: INFRASTRUCTURE DELIVERY AND MANAGEMEN

SUB-PROGRAMME 2.2 Infrastructure Development

1. Budget Sub-Programme Objective  To implement development programmes to enhance urban and rural transport through improved urban feeder road network.  To improve service delivery to ensure quality of life in Municipality.  To accelerate the provision of affordable and safe water

2. Budget Sub-Programme Description

The sub-programme is tasked with the responsibility of developing and implementing appropriate strategies and programmes that aims to improve the living conditions of urban and rural dwellers. Under this sub-programme reforms including feeder road construction and rehabilitation as well as rural housing and water programmes are adequately addressed. The Works department comprises former Public Works, Feeder Roads, and Rural Housing which collectively deliver the sub-programme. The sub-program operations include;  Facilitating the implementation of policies on works and report to the Assembly  Assisting to prepare tender documents for all civil works projects to be undertaken by the Assembly through contracts or community initiated projects.  Facilitating the construction, repair and maintenance of public buildings, roads including feeder roads and drains along any streets in the major settlements in the District.  Facilitating the provision of adequate and wholesome supply of potable water for the Municipality.

44

 Assist in the inspection of projects undertaken by the Municipality with relevant Departments of the Assembly.  Provide technical and engineering assistance on works undertaken by the Assembly.

The sub-programme is funded by IGF, DACF, DACF-Responsive Factor Grant, GoG, and other Development Partners (GSCSP). The sub-programme services benefits the entire citizenry in the Municipality. The sub-programme is managed by five staff. Key challenges encountered in delivering this sub- programme include inadequate staffing levels, inadequate office space and lack of vehicle for proper supervision of projects.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Indicat Indicative Main Output Budget Indicati ive Year Outputs Indicator 2018 2019 Year ve Year Year 2022 2020 2021 2022 Number of Road urban 2 2 2 0 1 2 network in Roads the improved Municipalit Number of y feeder 2 2 2 1 2 2 Improved roads spot improved

45

Water & Number of Sanitation refuse Facilities 33 22 40 40 40 40 heaps constructe cleared d Number of Boreholes 0 0 10 10 10 10 Drilled

4. Budget Sub-Programme Operations and Projects

The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects Supervision and regulation of Construction of Assembly Office infrastructure development Annex Drilling of 10 No. boreholes

46

BUDGET PROGRAMME SUMMARY PROGRAMME 3: SOCIAL SERVICES DELIVERY 1. Budget Programme Objectives  To formulate and implement policies on Education in the Municipality within the framework of National Policies and guidelines.  To formulate, plan and implement Municipal health policies within the framework of national health policies and guidelines provided by the Minister of Health.  To accelerate the provision of improved environmental sanitation service.  To assist the Assembly to formulate and implement social welfare and community development policies within the framework of national policy.  To attain universal births and deaths registration in the Municipality.

2. Budget Programme Description The social services programme is geared towards the provision of social infrastructure and services to the general public. It seeks to reduce disparity between rural and urban areas in terms of quality of life and the provision and access to social infrastructure and services.

The programme has five sub-programmes including education, youth & sports and library services; Public Health and Sanitation Services; Environmental Health and Sanitation Services; Birth and Death Registration Services; and Social Welfare and Community Development. The programme benefits urban and rural dwellers in the Sagnarigu Municipal Assembly.

The programme is implemented by the Assembly in collaboration with stakeholders with funding from Government of Ghana (GoG), Internally Generated Fund (IGF), DACF- Responsive factor Grant, GSCSP and Development Partners Grants.

The challenges militating against this programme among others are inadequate personnel and logistics as well as low case detection rate by volunteers in the health sector.

47

BUDGET SUB-PROGRAMME SUMMARY BUDGET

PROGRAMME 3 : SOCIAL SERVICES DELIVERY

SUB-PROGRAMME 3.1 Education and Youth Development 1. Budget Sub-Programme Objective  To formulate and implement policies on Education in the Municipality within the framework of National Policies and guidelines.  Increase access to education through school improvement.  To improve the quality of teaching and learning in the Municipality.  Ensuring teacher development, deployment and supervision at the basic level.  Promoting entrepreneurship among the youth.

2. Budget Sub-Programme Description The Education and Youth Development sub-programme is responsible for pre- school, special school, basic education, youth and sports development or organization and library services at the Municipality level. Key sub-program operations include;

 Advising the Municipal Assembly on matters relating to preschool, primary, junior high schools in the Municipality and other matters that may be referred to it by the Municipal Assembly.  Facilitate the supervision of pre-school, primary and junior high schools in the Municipality.  Co-ordinate the organization and supervision of training programmes for youth in the Municipality to develop leadership qualities, personal initiatives, patriotism and community spirit.  Advise on the provision and management of public libraries and library services in the Municipality in consultation with the Ghana Library Board.  Advise the Assembly on all matters relating to sports development in the Municipality.

48

The sub-programme focuses on the provision of education infrastructure, support to needy students, supply of educational logistics, monitoring and supervision of schools, build the capacity of the youth as well as provide the needed infrastructure to enhance youth development.

The sub-programme is managed by staff strength of over three thousand (3000) performing teaching and administrative functions. It is funded by the Government of Ghana (GoG), DACF, DDF, IGF and Development Partners Grants. The beneficiaries of the sub-programme are children of school going age and the society at large.

The key challenges to the sub-programme are as follows;

 Ineffective governance structures – DEOC, SMCs, PTA, COHBS etc  In accurate data for reliable planning  Poor monitoring and supervision of teaching and learning  Inadequate logistics  Ineffective SMCs/PTAs

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipality Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance. Past Years Projections Output Budge Indicative Indicativ Indicative Main Indicator 2018 2019 t Year Year e Year Year Outputs 2020 2021 2022 2023 Education Number of infrastructur 2 3 4 2 2 2 Schools e provided Blocks build

49

Number of furniture 600 1200 1300 1600 1000 500 supply to schools Teaching Pupil 60:1 40:1 35:1 35:1 35.1 35.1 and Teacher Learning Ratio enhanced

School Number and Supervision % of 207 150(60 211 104(100% 207 209 and Schools (100%) %) (100%) ) (100%) (100%) Inspection Inspected enhanced annually

Organize Number of quarterly meetings 4 4 4 4 4 4 DEOC organized meetings

50

4. Budget Sub-Programme Operations and Projects

The table lists the main Operations and projects to be undertaken by the sub- programme

Operations Projects Construct 4No. 3 Unit Classroom Supervision and inspection of education Block with Ancillary facilities at Kalgu, Service delivery Nyeshegu, Kalpohini and Kpalsi Supply of 1500 duel desk for Schools

51

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 3 : SOCIAL SERVICES DELIVERY

SUB-PROGRAMME 3.2 Health Delivery

1. Budget Sub-Programme Objective The main objective of this sub-programme is to formulate, plan and implement Municipal health policies within the framework of national health policies and guidelines provided by the Minister of Health.

2. Budget Sub-Programme Description The sub-programme aims at providing facilities, infrastructural services and programmes for effective and efficient promotion of public and environmental health in the Municipality. The Public Health is delivering public, family and child health services directed at preventing diseases and promoting the health of all people living in the Municipality. It also seeks to coordinate the works of health centers or posts or community based health workers and facilitates collection and analysis of data on health. In addition, emphasis will be placed on supporting high-risk groups to prevent the spread of HIV/AIDS, TB, and Malaria among others.

The Environmental Health Unit is facilitating improved environmental sanitation and good hygiene practices in both rural and urban dwellers in the Municipality aimed at achieving total sanitation devoid of Open Defaecation. It supervises and monitors the execution of environmental health and environmental sanitation services. It also aims at empowering individuals and communities to analyse their sanitation conditions and take collective action to change their environmental sanitation situation. The sub-program operations include;  Advising the Assembly on all matters relating to health including diseases control and prevention.  Undertaking health education and family immunization and nutrition programmes.

52

 Preventing new transmission, including awareness creation, direct service delivery and supporting high risk groups.  Providing support for people living with HIV/AIDS (PLWHA) and their families.  Inspection of meat, fish, vegetables and other foodstuff and liquids of whatever kind or nature, whether intended for sale or not and to seize, destroy and otherwise deal with such foodstuff or liquids as are unfit for human consumption.  Supervise and control slaughter houses and pounds and all such matters and things as may be necessary for the convenient use of such slaughter houses.  Advise and encourage the keeping of animals in the Municipality including horses, cattle, sheep and goats, domestic pets and poultry.

The sub-programme is delivered through the offices of the District Health Directorate and the Environmental Health Unit with a total staff strength of One Hundred (100) and funded by Government of Ghana, DACF, DDF, and Development Partners Grants (UNICEF). The beneficiaries of the sub-program are the various health facilities and entire citizenry and in particular women and children and the vulnerable in the Municipality.

The Key challenges militating against the sub-programme are inadequate logistics such as motorbikes and vehicles to conduct outreach activities, inadequate number of trained personnel, inadequate budgetary allocation and released of funds for smooth operations, lack of commitment to work on the part of the staff, inadequate office space, equipment and logistics to health facilities.

Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly’s measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

53

Main Output Indicator Past Years Projections Outputs 2018 2019 Budge Indicati Indicativ Indicativ t Year ve Year e Year e Year 2020 2021 2022 2023 Number of Clinics Health care and CHPS 2 2 2 2 2 2 delivery compounds infrastructure constructed and improved operational Capacities of Number of health staff capacity 3 2 4 4 4 4 build on workshops nutrition organized related activities Improved Number of ANC ANC registrants 100% 80% 100% 100% 100% 100% registrants

3. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects District Response Initiative (DRI) on HIV/AIDS and Malaria Procurement of Health Equipment Procure Comfortable Items for Clinics Public Health Services and CHPS Compounds

Environmental Sanitation Management Complete the construction of Clinics Clinical Services at Sheshigu and Naaluro Estate

54

BUDGET SUB-PROGRAMME SUMMARY

P RO GR AMME 3 : SOCIAL SERVICES DELIVERY

SUB-PROGRAMME 3.4 Environmental Health and Sanitation Services

1. Budget Programme Objectives To ensure effective and efficient waste management and Sanitation for all and no open defecation by 2030.

2. Budget Programme Description The sub-programme seeks to ensure effective and efficient waste management and improved environmental conditions for the promotion of public health. It’s tailored at providing facilities, infrastructural services and programmes for management of waste towards improved environmental condition, protection of the environment and promotion of public safety. The sub-programme mainly deals with servicing of toilets and disposal of human waste collected from public and private sanitary facilities, provision of technical support on sanitation to the assembly, supervise and control the operation of cesspool empties and allied equipment, supervise the cleansing of drains, streets and markets, car parks and provide licences to food vendors and ensure that they provide services under hygienic conditions.

The sub-programme is carried out by staff strength of 73 and funded from internally Generated Fund (IGF), DACF and Development partners grants (UNICEF, USAID). The beneficiaries of the sub-programme are the Municipal Assembly, institutions and the communities. The Key challenges to the performance of this sub-programme are  Inadequate resources limiting the capacity of the sub-programme to effectively manage wastes.  Open defecation due to ignorance and inadequate sanitation facilities

55

 Poor enforcement of hygiene and sanitation bye-laws 3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the MMDAs measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the MMDA’s estimate of future performance.

Output Main Outputs Past Years Projections Indicator Budget Indicativ Indicative 2018 2019 Year e Year Year 2019 2020 202 Refuse heaps Number of and containers refuse heaps 40 33 50 50 50 50 evacuated evacuated Environmental Management Number of Committee meetings 4 3 4 4 4 4 Meetings organized Organized Communities Number of educated using communities the community assisted to led total 5 4 10 10 10 10 construct sanitation domestic (CLTS) latrines CLTS approach Water, sanitation and Number of hygiene WASH 4 2 5 5 5 (WASH) programmes programme organized organized

56

Premises Number of inspections premises 90 60 100 100 100 100 intensified inspected Number food Screening of vendors tested 0 food vendors 250 300 350 400 450 and certified Capacity of Number of environmental training 3 2 4 4 4 health staff workshops built Household Number of provided with households 2000 300 100 1000 1500 2000 household litter supplied with bins litter bins

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects

Solid Waste Management Organize clean up exercise & Support National Sanitation Day activities Public Education and Sensitisation Conduct CLTS activities

Solid Waste Management

Evacuation of Refuse containers Acquire sanitary tools, protective

Environmental Sanitation Management clothing & Chemical disinfectants

57

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 3 : SOCIAL SERVICES DELIVERY

SUB-PROGRAMME 3.3 Social Welfare and Community Development

1. Budget Sub-Programme Objective The objective of the sub-programme is to assist the Assembly to formulate and implement social welfare and community development policies within the framework of national policy.

2. Budget Sub-Programme Description The Social Welfare and Community Development department is responsible for this sub-programme. Basically, Social Welfare aims at promoting and protection of rights of children, seek justices and administration of child related issues and provide community care for disabled and needy adults.

Community Development is also tasked with the responsibility of promoting social and economic growth in the rural communities through popular participation and initiatives of community members in activities of poverty alleviation, employment creation and illiteracy eradication among the adult and youth population in the rural and urban poor areas in the Municipality. Major services to be delivered include;  Facilitating community-based rehabilitation of persons with disabilities.  Assist and facilitate provision of community care services including registration of persons with disabilities, assistance to the aged, personal social welfare services, and assistance to street children, child survival and development, socio-economic and emotional stability in families.  Assist to organize community development programmes to improve and enrich rural life through literacy and adult education classes, voluntary contribution and communal labour for the provision of facilities and services

58

such as water, schools, library, community centres and public places of convenience.

This sub programme is undertaken with a total staff strength of Twenty-Seven (27) with funds from GoG transfers (PWD Fund), DACF, UNICEF and Assembly’s Internally Generated Funds. Challenges facing this sub-programme include untimely release of funds, inadequate office space and logistics for public education.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the District Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Output Budge Indicati Indicative Indicativ Main Outputs 201 Indicator 2018 t Year ve Year Year e Year 9 2020 2021 2022 2023 Increased Number of assistance to beneficiari 150 50 50 50 50 50 PWDs annually es Schools Children Number of Sensitised on Schools 30 5 15 20 25 30 the dangers of sensitised child labour

59

Number of Child Right School Clubs Formed in with Child 0 0 15 20 25 30 Schools Right Clubs Number of Social Communiti Protection es with Committees Social 0 0 15 20 25 30 Established in Protection communities Committee s Number of Communities Communiti 25 sensitised on 0 0 15 20 es 30 Child Marriage sensitised Number of Vulnerable Vulnerable Household persons 0 0 20 25 registered with Linked to 30 30 NHIS NHIS Cards Women groups Number of trained in women’s leadership skills 10 5 20 20 20 20 group and financial trained management No. Communities communiti 6 animated on 6 3 6 6 es 6 child trafficking animated

60

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects Support PWD’s with livelihood Social Intervention Programs activities Community mobilization Sensitisation of Communities Child Right Promotion and Protection

61

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 3 : SOCIAL SERVICES DELIVERY

SUB-PROGRAMME 3.4 Birth and Death Registration Services

1. Budget Sub-Programme Objective The objective of this sub-programme is to attain universal births and deaths registration in the Municipality.

2. Budget Sub-Programme Description The sub-programme seeks to provide accurate, reliable and timely information of all births and deaths occurring within the Municipality for socio-economic development through their registration and certification. The sub-program operations include;  Legalization of registered Births and Deaths  Storage and management of births and deaths records/register.  Issuance of Certified Copies of Entries in the Registers of Birth and Deaths upon request.  Preparation of documents for exportation of the remains of deceased persons.  Processing of documents for the exhumation and reburial of the remains of persons already buried.  Verification and authentication of births and deaths certificates for institutions.

The sub programme is delivered by staffs of Birth and Death Registry who has oversight responsibilities with funds from GoG transfers. The sub-programmes are beneficial to the entire citizenry in the Municipality. Challenges facing this

62

sub-programme include inadequate staffing levels, inadequate Office Space inadequate logistics and untimely release of funds.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Bud Indicative Main Output Indicative Indicative get Year Outputs Indicator 2018 2019 Year Year Year 2023 2021 2022 2020 Timely Number of issuing of days it true takes to 20 18 15 15 15 15 certified issue copy of certify Births and certificate Deaths in the certificates

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme

63

Operations Projects

BUDGET PROGRAMME SUMMARY

PROGRAMME 4: ECONOMIC DEVELOPMENT

1. Budget Programme Objectives  To provide extension services in the areas of natural resources management, and rural infrastructural and small scale irrigation.  To facilitate the implementation of policies on trade, industry and tourism in the Municipality. 2. Budget Programme Description The program aims at making efforts that seeks to improve the economic well- being and quality of life for the District by creating and retaining jobs and supporting or growing incomes. It also seeks to empower small and medium scale business both in the agricultural and services sector through various capacity building modules to increase their income levels

The Program is being delivered through the offices of the departments of Agriculture, Business Advisory Center and Co-operatives.

The program is being implemented with the total support of all staff of the Agriculture department and the Business Advisory Center. Total staff strength of Twenty-Six (26) are involved in the delivery of the programme. The Program is being funded through the Government of Ghana transfers with support from the Assembly’s Internally Generated Fund and other Development Partners Grants (AFAD and Afdb). Beneficiaries of the programme are business entrepreneurs, farmers, traders and the general public.

64

65

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 4 : ECONOMIC DEVELOPMENT

SUB-PROGRAMME 4.1 Trade, Tourism and Industrial Development

1. Budget Sub-Programme Objective To facilitate the implementation of policies on trade, industry and tourism in the Municipality.

2. Budget Sub-Programme Description The Department of Trade, Industry and Tourism under the guidance of the Assembly would deal with issues related to trade, cottage industry and tourism in the district. The Business Advisory Centre and Co-operatives are the main organizational units spearheading the sub-programme which seeks to facilitate the implementation of policies on trade, industry and tourism in the District. It also takes actions to reduce poverty by providing training in technical and business skills, assisting in the access of low-income people to capital and bank services and assisting the creation of new jobs. The sub-programme again seeks to improve on existing SMEs through financial assistance and managerial skill training as well as helping identify new avenues for jobs, value addition, access to market and adoption of new and improved technologies. The main sub- program operations include;  Advising on the provision of credit for micro, small-scale and medium scale enterprises.  Assisting to design, develop and implement a plan of action to meet the needs and expectations of organized groups.  Assisting in the establishment and management of rural and small-scale industries on commercial basis.  Promoting the formation of associations, co-operative groups and other organizations which are beneficial to the development of small-scale industries.

66

 Offering business and trading advisory information services.  Facilitating the promotion of tourism in the Municipality.

Officers of the Business Advisory Centre and Co-operatives are tasked with the responsibility of managing this sub-programme with funding from GoG transfers and donor support which would inure to the benefit of the unemployed youth, SME’s and the general public. The service delivery efforts of the department are constrained and challenged by inadequate office equipment, low interest in technical apprenticeship, transport difficulty and inadequate funding, among others.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipality Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Main Output Budget Indicativ Indicative Indicative Outputs Indicator 2018 2019 Year e Year Year Year 2020 2021 2022 2023 Train Number of artisans groups and 4 3 5 10 15 20 groups to people sharpen trained skills annually

67

Legal Number of registration small 20 10 20 25 30 35 of small businesses businesse registered s facilitated annually Financial / Number of Technical beneficiarie 20 30 50 70 100 120 support s provided to businesse s annually SMEs Number of access to enterprises Business with access Developm 200 200 to business 150 200 200 200 ent developme Services nt services Improved

Business Counsellin Number of g Services clients 50 20 120 130 140 150 Provided counselled to clients

68

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects

Skills Development Training of SMES

Skills Development Training of SMES

69

BUDGET SUB-PROGRAMME SUMMARY

PROGRAMME 4: ECONOMIC DEVELOPMENT

SUB-PROGRAMME 4.2 Agricultural Development

1. Budget Sub-Programme Objective

 To assist in the formulation and implementation of agricultural policy for the Municipality Assembly within the framework of national policies.  To provide extension services in the areas of natural resources management, and rural infrastructural and small scale irrigation in the Municipality.

1. Budget Sub-Programme Description The department of Agriculture is responsible for delivering the Agricultural Service and Management sub-programme. It seeks to provide effective extension and other support services to farmers, processors and traders for improved livelihood in the Municipality. Moreover, the sub-programme deals with identifying and disseminating improved up-to-date technological packages to assist farmers engage in good agricultural practices. Basically, it seeks to transfer improved agricultural technologies through the use of effective and efficient agricultural extension delivery methods.

The sub-program operations include;  Promoting extension services to farmers.  Assisting and participating in on-farm adaptive research.  Lead the collection of data for analysis on cost effective farming enterprises.  Advising and encouraging crop development through nursery propagation.  Assisting in the development, rehabilitation and maintenance of small scale irrigation schemes.

70

 The sub-programme is undertaken by Twenty-Four (24) officers with the division such as Crops, Livestock, extension and Women in Agriculture Development (WIAD). The sub-programme is funded by government of Ghana (GoG), DACF, CIDA/MAG, DACF-Responsive Factor Grant and JICA aims at benefiting the general public especially the rural farmers and dwellers. Limited access to processing facilities; The key challenges of the sub-programme are as follows:  Limited access to market information  Poor adoption of standardized measures and marketing qualities standards for agricultural commodities  Poor road network affecting the transportation of agriculture products from the farms to the market canters  Inadequate agriculture machinery & equipment (tractor services)  Unpredictable weather conditions, among others.  Inadequate financial support

2. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Projections Main Output Years Budget Indicative Indicative Indicative Outputs Indicator 2018 2019 Year Year Year Year 2020 2021 2022 2023 Farmer Number of groups farmers 50 60 50 50 50 50 supported supported with inputs with inputs

71

Small ruminants Number of distributed small 630 1200 100 100 to ruminants 100 vulnerable distributed 100 women Weekly and Number of Monthly weekly Market and information monthly 48 36 48 48 48 48 provided to market farmers informatio n Provided Training and Number of Awareness awareness 12 7 12 12 12 12 programmes programm on SLEM es conducted organized SLEM Number of 4 10 15 20 25 30 practices farmers adopted by adopting farmers SLEM (percentage s) New Number technologies of new 2 2 4 5 6 8 demonstrate technologi d es adopted

72

Adoption of Rate of technologies adoption 40% 60% 70% 80% 90% improved 30% along the value chain

3. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme

Operations Projects Establish 4 acre land demonstration Extension services for maize, maize and soyabeans

BUDGET PROGRAMME SUMMARY PROGRAMME 5: ENVIRONMENTAL MANAGEMENT 5. Budget Programme Objectives  To ensure that ecosystem services are protected and maintained for future human generations.  To manage disasters by co-ordinating resources and developing the capacity of communities to respond effectively to disasters and improve their livelihood through social mobilization, employment generation and poverty reduction projects.

73

6. Budget Programme Description The Environmental Management offers research and opinions on use and conservation of natural resources, protection of habitats and control of hazards. It also seeks to promote sustainable forest, wildlife and mineral resource management and utilization.

Disaster Prevention and Management programme is also responsible for the management of disasters as well as other emergencies in the Municipality. It seeks to enhance the capacity of society to prevent and manage disasters and to improve the livelihood of the poor and vulnerable in the rural communities through effective disaster management, social mobilization and employment generation.

Staffs from NADMO and Forestry and Game Life Section of the Forestry Commission in the District is undertaking the programme with funding from GoG transfers and Internally Generated Funds of the Assembly. The beneficiaries of the program include urban and rural dwellers in the Municipality.

74

BUDGET SUB-PROGRAMME SUMMARY

P RO GR AMME 5 : ENVIRONMENTAL MANAGEMENT

SUB-PROGRAMME 5.1 Disaster Prevention and Management

1. Budget Sub-Programme Objective To manage disasters by co-ordinating resources and developing the capacity of communities to respond effectively to disasters and improve their livelihood through social mobilization, employment generation and poverty reduction projects.

2. Budget Sub-Programme Description The National Disaster Management Organization (NADMO) section under the Assembly is responsible for delivering the sub-programme. It seeks to assist in planning and implementation of programmes to prevent and/or mitigate disaster in the Municipality within the framework of national policies.

The sub-program operations include;  To facilitate the organization of public disaster education campaign programmes to create and sustain awareness of hazards of disaster and emphasize the role of the individual in the prevention of disaster.  To assist and facilitate education and training of volunteers to fight fires including bush fires or take measures to manage the after effects of natural disasters.  Prepare and review disaster prevention and management plans to prevent or control disasters arising from floods, bush fires, and human settlement fire, earthquakes and other natural disasters.  To participate in post disaster assessment to determine the extent of damage and needs of the disaster area.  Co-ordinate the receiving, management and supervision of the distribution of relief items in the Municipality.

75

 Facilitate collection, collation and preservation of data on disasters in the Municipality.

The programme is implemented by staff strength of 40 comprising 37 NADMO staff and 3 forestry officer funding mainly from Government of Ghana (GoG), DACF and development Partners grants. The sub-programme goes to the benefit of the entire citizenry within the Municipality. Some challenges facing the sub- programme include inadequate office space, untimely releases of funds and inadequate logistics for public education and sensitization.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipal Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Bud Indica Indicative Year Main Output Indicative get tive 2023 Outputs Indicator 2018 2019 Year Year Year 2022 2020 2021 No. of Disaster Disaster Victims victims 30 30 30 30 30 Provided 30 supported with Relief Items

76

Communiti es sensitised Number of on the 10 communitie 10 10 10 10 10 dangers of s sensitised domestic and bush fire Quarterly reports Number of prepared reports 4 4 4 4 4 4 and submitted submitted

4. Budget Sub-Programme Operations and Projects The table lists the main Operations and projects to be undertaken by the sub- programme Operations Projects Sensitisation of communities on the Public Education and Sensitisation dangers of bush fires Delivering of Relief items to disaster victim Tree Planting

77

BUDGET SUB-PROGRAMME SUMMARY

P RO GR AMME 5 : ENVIRONMENTAL MANAGEMENT

SUB-PROGRAMME 5.2 Natural Resource Conservation and Management

1. Budget Sub-Programme Objective  To ensure that ecosystem services are protected and maintained for future human generations.  To implement existing laws and regulations and programmes on natural resources utilisation and environmental protection.  Increase environmental protection through re-afforestation.

2. Budget Sub-Programme Description The Natural Resource Conservation and Management refers to the management of natural resources such as land, water, soil, plants and animals, with a particular focus on how management affects the quality of life for both present and future generations.

Natural Resource Conservation and Management seek to protect, rehabilitate and sustainably manage the land, forest and wildlife resources through collaborative management and increased incomes of rural communities who own these resources.

The sub-programme brings together land use planning, water management, biodiversity conservation, and the future sustainability of industries like agriculture, mining, tourism, fisheries and forestry. It also recognises that people and their livelihoods rely on the health and productivity of our landscapes, and their actions as steward of the land plays a critical role in maintaining this health and productivity. The sub-programme is spearheaded by Forestry Section and Game Life Section under the Forestry Commission.

78

The funding for the sub-programme is from Central Government transfers. The sub-programme would be beneficial to the entire residents in the Municipality. Some challenges facing the sub-programme include inadequate office space, untimely releases of funds and inadequate logistics for public education and sensitization.

3. Budget Sub-Programme Results Statement The table indicates the main outputs, its indicators and projections by which the Municipality Assembly measure the performance of this sub-programme. The past data indicates actual performance whilst the projections are the Assembly’s estimate of future performance.

Past Years Projections Main Output Budge Indicative Indicative Indicative 201 Outputs Indicator 2018 t Year Year Year Year 9 2020 2021 2022 2023 Firefighting Number of Officers trainings 4 2 1 4 4 4 trained and conducted equipped Re- Number of afforestatio seedlings 2000 3000 5000 6000 7000 8000 n developed and distributed

PART C. FINANCIAL INFORMATION

79