CSHP) DOLE-Regional Office No

Total Page:16

File Type:pdf, Size:1020Kb

CSHP) DOLE-Regional Office No REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 March 2018 Date No. Company Name and Address Project Name Project Owner Approved 18FL0007: Construction of Flood Control Structure ALRO CONSTRUCTION & DPWH Sorsogon 2nd District 1 Including Cross-Drainage, Brgy. Salvacion, 01-Mar-18 DEVELOPMENT CORPORATION Engineering Office Bulusan, Sorsogon Peñaranda Extension, Bonot, Legazpi City 18FB0038: Preventive Maintenance of Secondary SUNWEST CONSTRUCTION AND DPWH Albay 2nd District 2 Roads along Lakandula Drive K0531+-058 – 01-Mar-18 DEVELOPMENT CORPORATION Engineering Office K0532+792, Camalig, Albay Diversion Road, Bogtong, Legazpi City 18FB0104: Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including SUNWEST CONSTRUCTION AND DPWH Albay 2nd District 3 Local Projects – Flood Control Structures/ 01-Mar-18 DEVELOPMENT CORPORATION Engineering Office Facilities: Construction of Morocborocan Shore Protection/ Causeway, Rapu-Rapu, Albay Diversion Road, Bogtong, Legazpi City 18FB0061: Construction/ Maintenance of Flood NEXT GENERATION CONSTRUCTION Mitigation Structures and Drainage Systems – DPWH Albay 2nd District 4 AND SUPPLY CORPORATION/ 3RB 01-Mar-18 Construction of Flood Control Dike Along Cawayan Engineering Office CONSTRUCTION & SUPPLY (JV) River, Manito, Albay Orogo, Pioduran, Albay 18FB0085: Construction/ Improvement of Access Roads leading to Declared Tourism Destinations – NUMERICAL GATE CONSTRUCTION & DPWH Albay 2nd District 5 Roads to Quituinan 67 Japanese Tunnels, Tinagao 01-Mar-18 SUPPLY CORPORATION Engineering Office – Quituinan – Mina – Tagoytog Road, Camalig, Albay #25 San Juan St., Centro Oriental, Polangui, Albay Page 1 of 70 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 March 2018 Date No. Company Name and Address Project Name Project Owner Approved 18FB0060: LIP-Flood Control Structures/ Facilities HI-TONE CONSTRUCTION & DPWH Albay 2nd District 6 Construction of Flood Mitigation Structures at 01-Mar-18 DEVELOPMENT CORPORATION Engineering Office Lacag-Gapo River, Daraga, Albay Diversion Road, Bogtong, Legazpi City 18FB0037: Network Development Program: Off- HI-TONE CONSTRUCTION & Carriageway Improvement Legazpi City-Punta de DPWH Albay 2nd District 7 01-Mar-18 DEVELOPMENT CORPORATION Jesus Road – K0538+563 – K0539+242, Engineering Office K0552+000 – K0554+844, Manito, Albay Diversion Road, Bogtong, Legazpi City 18FB0083: Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and HI-TONE CONSTRUCTION & DPWH Albay 2nd District 8 Principal Rivers – Construction/ Rehabilitation of 01-Mar-18 DEVELOPMENT CORPORATION Engineering Office Flood Control Dike at Yawa River, Bonot, Legazpi City Diversion Road, Bogtong, Legazpi City 17FF0096: Construction of One (1) Storey Two (2) Classroom with Toilet attached School Building, DPWH Camarines Sur 3rd District 9 HONEYVILLE CONSTRUCTION 01-Mar-18 Cagaycay Elementary School, Goa, Camarines Engineering Office Sur #007 Brgy. San Isidro, Magarao, Camarines Sur 17FF0121: Construction of One (1) Storey Two (2) DONLEE CONSTRUCTION AND Classroom with Toilet Attached School Building, DPWH Camarines Sur 3rd District 10 01-Mar-18 SUPPLY Burabod Elementary School, Lagonoy, Camarines Engineering Office Sur #007 Bgy. San Isidro, Magarao, Camarines Sur Page 2 of 70 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 March 2018 Date No. Company Name and Address Project Name Project Owner Approved Three Storey Dormitory, Barriada Road, Cruzada, 11 LAW-AN BUILDERS AND SUPPLY Yashano Corporation 01-Mar-18 Legazpi City Lot 13, Block 6, our Lady’s Village, Bitano, Legazpi City 18FB0077: Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including HI-TONE CONSTRUCTION & DPWH Albay 2nd District 12 Local Projects – Flood Control Structure/ Facilities: 01-Mar-18 DEVELOPMENT CORPORATION Engineering Office Construction of Bagacay Shore Protection/ Causeway, Legazpi City Diversion Road, Bogtong, Legazpi City 18FB0096: Local Infrastructure Program: Construction of Multi-Purpose Building, Daraga DPWH Albay 2nd District 13 CBC CONSTRUCTION & SUPPLY 01-Mar-18 National High School (New Site), Doña Maria Engineering Office Subdivision, Daraga, Albay Brgy. 40, P-7, Cruzada, Legazpi City 18FB0011: Local Infrastructure Program: DPWH Albay 2nd District 14 CBC CONSTRUCTION & SUPPLY Construction of Multi-Purpose Building, Brgy. 01-Mar-18 Engineering Office Tamaoyan, Legazpi City Brgy. 40, P-7, Cruzada, Legazpi City 18FN0024: Rehabilitation of Multi-Purpose Building DPWH Camarines Sur 5th District 15 AE BELLEZA BUILDERS Municipal Police Station, Brgy. South Centro, 01-Mar-18 Engineering Office Sipocot, Camarines Sur #102 Sto. Tomas, Magarao, Cam. Sur 18FG0004: Preventive Maintenance Along Bato- DPWH Camarines Sur 4th District 16 CISCO KVF CONSTRUCTION Poblacion Road, Bato, Cmarines Sur – K0 01-Mar-18 Engineering Office 476+482 – K0 476+739, Bato, Camarines Sur Page 3 of 70 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 March 2018 Date No. Company Name and Address Project Name Project Owner Approved Parkview Executive Townhomes, San Felipe, Naga City 17FC0336 – Construction of Two (2) Storey Three DPWH Camarines Norte District 17 EUS Construction (3) Regular Workshop and Two (2) Classroom San 01-Mar-18 Engineering Office Felipe NHS, Basud, Camarines Norte Purok 5, Poblacion 1, Basud, Camarines Norte 18FE0037: Construction of Spillway, Tinagis, Pili, DPWH Camarines Sur 2nd District 18 AE BELLEZA BUILDERS 01-Mar-18 Camarines Sur Engineering Office #102 Sto. Tomas, Magarao, Cam. Sur 17FC0337 – Construction of Two (2) Storey Four DPWH Camarines Norte District 19 EUS Construction (4) Classroom (Science and ICT Laboratory), 01-Mar-18 Engineering Office Tuaca High School, Basud, Camarines Norte Purok 5, Poblacion 1, Basud, Camarines Norte 18FF0066: FY-2018 Convergence and Special Support Program – Construction/ Improvement of Access Road Leading to Seaport Along Junction DPWH Camarines Sur 3rd District 20 PARTIDO CONSTRUCTION & SUPPLY 01-Mar-18 Guijalo – San Vicente Road Leading to Caramoan Engineering Office Port, Sta. 1+200.00 – Sta.3+450.00, San Vicente, Caramoan, Camarines Sur Mactala , Goa, Camnarines Sur 18FF0061: FY-2018 Convergence and Special Support Program – Construction/ Improvement of Access Roads Leading to Declared Tourism Destination, Construction/ Improvement of DPWH Camarines Sur 3rd District 21 PARTIDO CONSTRUCTION & SUPPLY 01-Mar-18 Presentacion to Caramoan Road Leading to Islets, Engineering Office Beaches, Rock Formation, Caves, Lagoons and Caramoan Natural Park Sta. 0+875.80-Sta. 1+675.80, Mampirao-Gibgos Section, Caramoan, Page 4 of 70 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 March 2018 Date No. Company Name and Address Project Name Project Owner Approved Camarines Sur Mactala , Goa, Camnarines Sur 17FC0257: Construction of One (1) Storey Two (2) DPWH Camarines Norte District 22 P.R. HIZO CONSTRUCTION & SUPPLY Classroom School Building, Labnig Elementary 05-Mar-18 Engineering Office School, Paracale, Camarines Norte Cadlan, Pili, Camarines Sur 17FC0241 – Construction of Two (2) Storey Six (6) 128 DRAGON CONSTRUCTION AND DPWH Camarines Norte District 23 Classroom School Building, Basud Central School, 05-Mar-18 SUPPLIES Engineering Office Basud, Camarines Norte F. Pimentel Ave., Brgy. VIII, Daet, Camarines Norte One (1) Lot Repainting of Building Façade and Perimeter Fence and Various Repair Works of 24 NGP CONSTRUCTION Bangko Sentral ng PIlipinas 05-Mar-18 Bangko Sentral ng Pilipinas (BSP) Naga Branch Office, Naga City, Camarines Sur No. 1 Dona Rosa Adou St., Toril, Davao City 005839-2017-01: Construction of Drainage at Naga BELJUN CONSTRUCTION AND 25 City School of Arts and Trades, Bgy. Sabang, LGU Naga 05-Mar-18 ENGINEERING Naga City Zone 6, Sto. Niño St., Abella, Naga City 26 ENGR. ALVIN P. BRIZUELA Proposed CHB Plant, Del Rosario, Naga City Besmark Commodities, Inc. 05-Mar-18 Palistina, Pili, Camarines Sur Proposed 2-Storey Commercial Building with 27 ENGR. ALVIN P. BRIZUELA Besmark Commodities, Inc. 05-Mar-18 Mezzanine, Del Rosario, Naga City Page 5 of 70 REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 March 2018 Date No. Company Name and Address Project Name Project Owner Approved Palistina, Pili, Camarines Sur 28 DEVEX INC. SM Hypermarket – Xentro Mall, Polangui, Albay Super Shopping Market Inc. 05-Mar-18 #29 Pilar St., Brgy. Addition Hills, 17FI0045: A.) Completion of One I Unit 1 Storey (7.00m x 22.50m) Technical-Vocational Multipurpose Workshop Building at Bayombon High School; B.) Completion of 1 Unit 1 Storey (7.00m x 22.50m) Technical-Vocational Multipurpose Workshop Building at Bantigue High DPWH Masbate 1st District 29 HKP CONSTRUCTION AND SUPPLY School; C.) Completion of 1 Unit 1 Storey (7.00m x 05-Mar-18 Engineering Office 22.50m) Technical-Vocational Multipurpose Workshop Building at Capitolina O. Legaspi MHS; D.) Completion of 1 Unit 1 Storey (7.00m x 22.50m) Technical-Vocational Multipurpose Workshop Building at A. Delos Reyes Integrated School, Masbate City 1199 Our Lady’s Village, Bitano, Legazpi City SUNWEST CONSTRUCTION AND Installation of Crusher Plant with the Specification Sunwest Construction and 30 05-Mar-18 DEVELOPMENT CORPORATION of 200-250 Tons per Hour, Mabinit,
Recommended publications
  • Disaster Risk Reduction Management Assessment of Coastal Communities of San Jose, Camarines Sur, Philippines
    International Journal of Development and Sustainability ISSN: 2186-8662 – www.isdsnet.com/ijds Volume 8 Number 7 (2019): Pages 434-451 ISDS Article ID: IJDS17101508 Disaster risk reduction management assessment of coastal communities of San Jose, Camarines Sur, Philippines Agnes R. Pesimo *, Rico D. Saballegue, Elijah D. Medina, Nikki P. Bolalin Partido State University, Goa, Camarines Sur, Philippines Abstract The study aims to identify the disasters affecting the coastal communities of San Jose Camarines Sur, Philippines and evaluate the extent of implementation of the disaster risk reduction management program before, during and after the occurrence of disaster. Findings revealed that the coastal communities of San Jose are at risks to disasters like landslide in Adiangao, flooding in Kinalansan, Dolo and Sabang and tsunami in Sabang, Dolo, Minoro, Kinalansan, Manzana, Telegrafo, Calalahan and Tagas. These coastal communities are also prone to storm surges which are experienced during typhoon. The provisions for disaster risk reduction management programs particularly on disaster prevention and mitigation, preparedness and rehabilitation and recovery have not been or poorly implemented while the provisions on disaster response were partially implemented. This places the lives and properties of the community still at high risk and vulnerability during the occurrence of disaster caused by climate change. Keywords: Disaster; Risk Reduction Management; Assessment; Coastal Communities Published by ISDS LLC, Japan | Copyright © 2019 by the Author(s) | This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Cite this article as: Pesimo, A.R., Saballegue, R.D., Medina, E.D.
    [Show full text]
  • Actual Census Pop. 2015 2017 2018 2019 2020 2021 REGION V
    Total Population by Province, City, Municipality and Barangay: Actual Census Pop. 2015 2017 2018 2019 2020 2021 REGION V - BICOL REGION 5,796,989 6,266,652 6,387,680 6,511,148 6,637,047 6,766,622 ALBAY 1,314,826 1,404,477 1,428,207 1,452,261 1,476,639 1,501,348 0.033530 0.027955 0.025166 0.023484 0.022356 BACACAY 68,906 73,604 74,848 76,109 77,386 78,681 Baclayon 2,703 2,887 2,936 2,986 3,036 3,086 Banao 1,491 1,593 1,620 1,647 1,674 1,703 Bariw 625 668 679 690 702 714 Basud 1,746 1,865 1,897 1,929 1,961 1,994 Bayandong 1,650 1,763 1,792 1,822 1,853 1,884 Bonga (Upper) 7,649 8,171 8,309 8,449 8,590 8,734 Buang 1,337 1,428 1,452 1,477 1,502 1,527 Cabasan 2,028 2,166 2,203 2,240 2,278 2,316 Cagbulacao 862 921 936 952 968 984 Cagraray 703 751 764 776 790 803 Cajogutan 1,130 1,207 1,227 1,248 1,269 1,290 Cawayan 1,247 1,332 1,355 1,377 1,400 1,424 Damacan 431 460 468 476 484 492 Gubat Ilawod 1,080 1,154 1,173 1,193 1,213 1,233 Gubat Iraya 1,159 1,238 1,259 1,280 1,302 1,323 Hindi 3,800 4,059 4,128 4,197 4,268 4,339 Igang 2,332 2,491 2,533 2,576 2,619 2,663 Langaton 765 817 831 845 859 874 Manaet 836 893 908 923 939 955 Mapulang Daga 453 484 492 500 509 517 Mataas 518 553 563 572 582 591 Misibis 1,007 1,076 1,094 1,112 1,131 1,150 Nahapunan 402 429 437 444 451 459 Namanday 1,482 1,583 1,610 1,637 1,664 1,692 Namantao 778 831 845 859 874 888 Napao 1,883 2,011 2,045 2,080 2,115 2,150 Panarayon 1,848 1,974 2,007 2,041 2,075 2,110 Pigcobohan 817 873 887 902 918 933 Pili Ilawod 1,522 1,626 1,653 1,681 1,709 1,738 Pili Iraya 997 1,065 1,083 1,101
    [Show full text]
  • Lidar Surveys and Flood Mapping of Lagonoy River
    LiDAR Surveys and Flood Mapping of Lagonoy River 1 Hazard Mapping of the Philippines Using LIDAR (Phil-LIDAR 1) 2 LiDAR Surveys and Flood Mapping of Lagonoy River © University of the Philippines Diliman and Ateneo de Naga University Published by the UP Training Center for Applied Geodesy and Photogrammetry (TCAGP) College of Engineering University of the Philippines – Diliman Quezon City 1101 PHILIPPINES This research project is supported by the Department of Science and Technology (DOST) as part of its Grants-in-Aid Program and is to be cited as: E.C. Paringit and J.C. Plopenio (Eds.) (2017), LiDAR Surveys and Flood Mapping of Lagonoy River, Quezon City: University of the Philippines Training Center for Applied Geodesy and Photogrammetry-148 pp. The text of this information may be copied and distributed for research and educational purposes with proper acknowledgement. While every care is taken to ensure the accuracy of this publication, the UP TCAGP disclaims all responsibility and all liability (including without limitation, liability in negligence) and costs which might incur as a result of the materials in this publication being inaccurate or incomplete in any way and for any reason. For questions/queries regarding this report, contact: Ms. Joanaviva Plopenio Project Leader, Phil-LiDAR 1 Program Ateneo de Naga University Naga City, Philippines 4400 E-mail: [email protected] Enrico C. Paringit, Dr. Eng. Program Leader, Phil-LiDAR 1 Program University of the Philippines Diliman Quezon City, Philippines 1101 E-mail: [email protected]
    [Show full text]
  • Province, City, Municipality Total and Barangay Population ALBAY
    2010 Census of Population and Housing Albay Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population ALBAY 1,233,432 BACACAY 65,724 Baclayon 2,397 Banao 1,379 Bariw 601 Basud 1,523 Bayandong 1,615 Bonga (Upper) 7,468 Buang 1,267 Cabasan 2,004 Cagbulacao 842 Cagraray 767 Cajogutan 1,090 Cawayan 1,116 Damacan 466 Gubat Ilawod 1,043 Gubat Iraya 1,138 Hindi 3,458 Igang 2,128 Langaton 757 Manaet 764 Mapulang Daga 529 Mataas 478 Misibis 934 Nahapunan 406 Namanday 1,440 Namantao 901 Napao 1,690 Panarayon 1,658 Pigcobohan 838 Pili Ilawod 1,284 Pili Iraya 924 Barangay 1 (Pob.) 1,078 Barangay 10 (Pob.) 652 Barangay 11 (Pob.) 194 Barangay 12 (Pob.) 305 National Statistics Office 1 2010 Census of Population and Housing Albay Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Barangay 13 (Pob.) 1,249 Barangay 14 (Pob.) 1,176 Barangay 2 (Pob.) 282 Barangay 3 (Pob.) 543 Barangay 4 (Pob.) 277 Barangay 5 (Pob.) 279 Barangay 6 (Pob.) 266 Barangay 7 (Pob.) 262 Barangay 8 (Pob.) 122 Barangay 9 (Pob.) 631 Pongco (Lower Bonga) 960 Busdac (San Jose) 1,082 San Pablo 1,240 San Pedro 1,516 Sogod 4,433 Sula 960 Tambilagao (Tambognon) 920 Tambongon (Tambilagao) 748 Tanagan 1,486 Uson 625 Vinisitahan-Basud (Mainland) 607 Vinisitahan-Napao (lsland) 926 CAMALIG 63,585 Anoling 968 Baligang a 3,286 Bantonan 596 Bariw 1,870 Binanderahan 554 Binitayan 564 Bongabong 917 Cabagñan 2,682 Cabraran Pequeño
    [Show full text]
  • 1 7/9 Installation of Lateral Pipe Lines Camagong P 38,000.00 by Administration 20% EDF 2 7/9 Rehabilitation of Comfort Rooms 2Nd Floor, Municipal Bldg
    ACCOMPLISHMENT REPORT INFRASTRUCTURE PROJECTS, CY 2010 (July - December 2010) NO. DATE NAME OF PROJECT LOCATION PROJECT COST MODE OF IMPLEMENTATION SOURCE OF FUND 1 7/9 Installation of Lateral Pipe Lines Camagong P 38,000.00 By Administration 20% EDF 2 7/9 Rehabilitation of Comfort Rooms 2nd Floor, Municipal Bldg. 120,000.00 By Administration 20% EDF 3 7/15 Repair/Maintenance of SB Bldg. & Fixtures San Antonio 100,000.00 By Administration 20% EDF 4 7/19 Repair/Maintenance of Port Buildings San Jose Port, Dolo 605,000.00 By Contract-Partido Const. 20% EDF 5 7/20 Levelling of Proposed Terminal Grounds San Jose Port, Dolo 310,000.00 By Contract-Partido Const. 20% EDF 6 7/20 Rehabilitation of Steel Fence & Water Pipelines San Jose Port, Dolo 480,000.00 By Contract-Partido Const. 20% EDF 7 7/20 Installation of 5-units Road Lights San Jose Port, Dolo 100,000.00 By Contract-Partido Const. 20% EDF 8 8/2 Construction of Nursery Bldg. & Barbed Wire Fence Boclod 120,000.00 By Administration 20% EDF 9 8/5 Construction of Pathwalk Capilihan, Pugay 100,000.00 By Administration 20% EDF 10 8/6 Construction of Footbridge Camagong 60,000.00 By Administration 20& EDF 11 8/6 Rehabilitation of Irrigation Facilities Pugay 168,000.00 By Administration 20% EDF 12 8/10 Construction of Material Recovery Facilities (MRF) Bldg. Boclod 120,000.00 By Administration 20% EDF 13 8/12 Levelling of Proposed Terminal Grounds Municipal Compound 52,600.00 By Administration 20% EDF 14 8/12 Repainting/Lettering of Municipal Boundary Boclod 12,700.00 By Administration 20% EDF 15 8/12 Dissilting/Clearing of Covered Drainage Canal Poblacion 8,295.00 By Administration 20% EDF 16 8/27 Construction of Lined Canal Calawit 100,000.00 By Administration 20% EDF 17 9/1 Installation of Water Pipelines Camagong 16,500.00 By Administration 20% EDF 18 9/20 Regravelling of Road Tambangan - Danlog 100,000.00 By Administration 20% EDF 19 9/21 Beautification of Municipal Hall Frontage (X-mas Décor) Municipal Compound 68,600.00 By Administration 20% EDF 20 10/4 Repair/Imprvt.
    [Show full text]
  • 6 State of the Municipality Address
    6th STATE OF THE MUNICIPALITY ADDRESS By HONORABLE ANTONIO B. CHAVEZ 20 JULY 2015 To the honorable members of the Sangguniang Bayan of San Jose headed by Honorable Vice Mayor Evelio C. Peña, Honorable Barangay Officials, Public Schools District Superintendent, School Principals, Municipal Heads of Offices and Employees, honored guests, ladies and gentlemen, a pleasant morning to one and all. I have the honor to present my State of the Municipality Address during the period covered from July 2014 to June 2015. First of all, I would like to express my deep appreciation to the different heads of offices for their wholehearted cooperation and very satisfactory performance during the period covered. For the past five years, my administration has been advocating the following core principles in local governance: TRANSPARENCY (SILAG) ACCOUNTABILITY (PANINIMBAGAN) PARTICIPATION (PARTISIPASYON) PERFORMANCE (NAGINIBOHAN O KAGGIBOHAN) and I assure you, the same principles have always been the apparent guidepost of my administration until now. Allow me to present to you again my revised and re-aligned, and an institutionalized Developmental Tasks & Programs, in the following order: 1. Finances & Local Governance Program 2. Health & Healthcare Development Program 3. Agriculture & Fishery Development Program 4. Education Development Program 5. Employment Development Program 6. Social, Economic & Livelihood Development Program 7. Housing Development Program 8. Infrastructure Development Program 9. Environment & Disasters Risk Reduction Program 10. Tourism Cultural Development and Promotions Program Page 1 of 23 From these developmental tasks and programs, we subsequently formulated and designed the different developmental projects that we intended to get implemented at the different barangays of the municipality.
    [Show full text]
  • DPWH Camarines Sur 4Th District Engineering Office (Formerly Camarines Sur 3Rd District Engineering Office)Procurement Monitoring Report January-June, 2020
    DPWH Camarines Sur 4th District Engineering Office (formerly Camarines Sur 3rd District Engineering Office)Procurement Monitoring Report January-June, 2020 Actual Procurement Activity ABC (PhP) Contract Cost (PhP) Date of Receipt of Invitation List of Is this Early Delivery Remarks Date of BAC Code PMO/ Mode of Invited Completion/ (Explaining Procurement Project Procuremen Pre-Proc Ads/Post of Pre-bid Eligibility Sub/Open Bid Resolution Notice of Contract Notice to Delivery/ Inspection & Source of Funds Pre-bid Eligibility Sub/Open Bid (UACS/PAP) End-User Procurement Post Qual Total MOOE CO Total MOOE CO Observer Post Qual Acceptance changes from t? Recommendi the APP) Conference IAEB Conf Check of Bids Evaluation Award Signing Proceed Completion Acceptance s Conf Check of Bids Evaluation (if ng Award applicable) COMPLETED PROCUREMENT ACTIVITIES FUND: 01101101- 20FG0001-Rehabilitation/ REGULAR Reconstruction/ Ugrading of AGENCY FUND- Damaged Paved Road along GENERAL FUND- 310106100461000 10/28- 11/20- 12/02- 11/20- 12/02- Jct. Teres-Garchitorena Road DPWH YES Public Bidding 10/24/2019 11/5/2019 11/19/2019 11/19/2019 1/3/2020 2/3/2020 2/11/2020 2/13/2020 -- NEW HENERAL 10,683,960.00 - 10,683,960.00 10,140,755.32 - 10,140,755.32 1,2,3,4 11/5/2019 11/19/2019 11/19/2019 -- .PC 11/03/2019 22/2019 03/2019 22/2019 05/2019 K0545+(-905) – K0545+(- APPROPRIATION 616)Garchitorena, Camarines S-SPECIFIC Sur BUDGETS OF NGAS 20FG0004-Rehabilitation/ FUND: 01101101- Reconstruction/ Upgrading REGULAR of damaged Paved Roads AGENCY FUND- along Presentacion- GENERAL FUND- 310105100408000 Maligaya Road 10/28- 11/20- 12/02- 11/20- 12/02- DPWH YES Public Bidding 10/24/2019 11/5/2019 11/19/2019 11/19/2019 1/3/2020 2/3/2020 2/11/2020 2/13/2020 -- NEW HENERAL 37,412,480.00 - 37,412,480.00 35,540,115.86 - 35,540,115.86 1,2,3,4 11/5/2019 11/19/2019 11/19/2019 -- .PC P00401420LZ 11/03/2019 22/2019 03/2019 22/2019 05/2019 APPROPRIATION K0531+045 – K0532+000 S-SPECIFIC Sta.
    [Show full text]
  • Community-Based Approach in Developing Farm Tourism
    Open Access Library Journal 2020, Volume 7, e7043 ISSN Online: 2333-9721 ISSN Print: 2333-9705 Community-Based Approach in Developing Farm Tourism Nerisa Paladan Agribusiness Department, Partido State University, Goa, Philippines How to cite this paper: Paladan, N. (2020) Abstract Community-Based Approach in Developing Farm Tourism. Open Access Library Jour- The sustainability of agriculture and tourism are always challenged and their nal, 7: e7043. impact on rural development. The called for community-based approach is https://doi.org/10.4236/oalib.1107043 needed to make agriculture and tourism sustainable and thriving. The study Received: November 26, 2020 aims to develop farm tourism through community-based approach towards Accepted: December 25, 2020 sustainability of agriculture and its rural development. Specifically, it consi- Published: December 28, 2020 dered the steps in developing community-based farm tourism in two selected communities, evaluates its feasibility, documented its benefits and challenges, Copyright © 2020 by author(s) and Open Access Library Inc. and determined the lesson learned from its process. It uses qualitative re- This work is licensed under the Creative search design where it highlights and documents the process of establishing Commons Attribution International farm tourism through community-based approach and its feasibility. Two se- License (CC BY 4.0). lected communities are the respondent of this study. Survey-interview and http://creativecommons.org/licenses/by/4.0/ focus group discussion was utilized. Focus group discussion in the two com- Open Access munities was used during the orientation and process of establishing farm tourism. Findings reveal that establishing farm tourism through communi- ty-based approach requires preliminary actions before its actual process.
    [Show full text]
  • Umasenso July – September 2019
    July - September 2019 Vol. 28 No. 3 Bicol is free from African Swine Fever (ASF) RCEF to benefit rice farmers in 59 Bicol pork is safe to eat LGUs in Bicol DA Bicol OIC Regional by Annielyn L. Baleza Executive Director Rodel P. Tornilla led the swine industry stakeholders to a “boodle fight” Rice farmers in 59 of lechon and other pork dishes municipal and city local to assure the public that it is safe government units (LGUs) to eat pork as the Bicol Region is in Bicol will benefit from free from African Swine Fever the P3 billion-worth Rice (ASF). Heads of DA attached Competitiveness Enhancement agencies such as the National Fund (RCEF) Seed Program Meat Inspection Service to be implemented by the (Please turn to page 11) Department of Agriculture Philippine Rice Research Institute (PhilRice) beginning DA Bicol engages LGUs to buy this dry season 2020. At the Social Mobilization palay from local farmers by Lovella P. Guarin cum Consultation Among LGUs on RCEF-Seed Program NAGA CITY – To engage the Implementation for Camarines support and involvement of Sur Province held in DA the Local Government Units Regional Field Office on August (LGUs) in addressing the dip in 23, 2019, PhilRICE-Bicol prices of palay, DA Bicol OIC Project Development Officer II Regional Executive Director (Please turn to page 15) Rodel P. Tornilla invited the governors and the provincial Francis Bichara expressed his agriculturists for a meeting on support and shared his vision to Tornilla is new OIC RED of DA 5 last September. put up rice milling and drying by Lovella P.
    [Show full text]