PRE FEASIBILITY REPORT Brick Earth (Soil)
Total Page:16
File Type:pdf, Size:1020Kb
PRE FEASIBILITY REPORT Brick Earth (Soil) Excavation Project At Gata no. 375, 374, 412, 492, 542, 518, 291 Village: Gohani, Tehsil: Sadar District: Pratapgarh, Uttar Pradesh. Submitted by M/s Barnwal Brick Clin Smt. Renu Barnwal W/o Sh. Ramakant Barnwal R/O- Village: Katra Raja Himmat Singh, Tehsil: Amethi District: Amethi, Uttar Pradesh . Prepared by Environmental Research and Analysis™ Lucknow An ISO 9001:2008 Certified Organization QCI-NABET Accredited Organization (Certificate No. - NABET/EIA/1619/1A 0019) Phone No: 0522-4078000, 7080999935 E-mail:[email protected] www.eraconsultancy.org.in www.eraconsultancy.org.in Project: Brick Earth (Soil) Excavation Category: B2 PRE-FEASIBILITY REPORT Proponent: M/s Barnwal Brick Clin Area: 2.96Ha Project Site: Village: Gohani Gata No. 375, 374, 412, 492, 542, 518, 291 Tehsil: Sadar District: Pratapgarh UttarPradesh Executive Summary S. No Information Details 1. Project Name Mining of Minor Mineral Brick Earth (Soil) M/s Barnwal Brick Clin 2. Project Proponent Prop. Smt. Renu Barnwal w/o Sh. Ramakant Barnwal Latitude Longitude Brick kiln 26° 3.286’N 81° 45.036’E GataNo.375 26° 3.040'N 81° 45.295'E GataNo. 374 26° 3.082'N 81° 45.325'E 3. Project Coordinates GataNo. 412 26° 3.079'N 81° 45.073'E GataNo. 492 26° 3.056'N 81° 45.050'E GataNo.542 26° 2.901'N 81° 45.277'E GataNo.518 26° 2.983'N 81° 45.188'E GataNo.291 26° 3.171'N 81° 45.266'E 4. Toposheet No. 63F16 The highest point lies at Gata no. 291, elevation is 5. Altitude of the Area at 356ft and lowest point lies at Gata no.518, elevation is at 343 ft. Location Gohani/Sadar/Pratapgarh Lease Hold Area 2.96Ha Village Gohani 6. Tehsil Sadar District Pratapgarh State Uttar Pradesh 7. Topography of Mine lease area Undulated, Barren Land, Currently not in use 8. Name of the Mineral Mining Brick Earth (Soil) 9. Mode of Mining Manual 10. Capacity of Production 37,888 m3(45,465.6 Tons) in 5 Years 11. Drilling / Blasting No 12. Man Power Used 27 Brick Earth (Soil) excavation from the proposed 13. Land utilization Pattern site is required for the formation of bricks. 1.0 KLD(Ground water) Water tanks will be 14. Water requirements and source procured from the nearby villages out of total water requirement of 3.5KLD 15. Solid waste Negligible belonging to biodegradable category Signatory………………………………… Page | 2 Project: Brick Earth (Soil) Excavation Category: B2 PRE-FEASIBILITY REPORT Proponent: M/s Barnwal Brick Clin Area: 2.96Ha Project Site: Village: Gohani Gata No. 375, 374, 412, 492, 542, 518, 291 Tehsil: Sadar District: Pratapgarh UttarPradesh 1.0 INTRODUCTION OF THE PROJECT / PROJECT BACKGROUND 1.1 Introduction of the Project Name of Project: Minor Mineral Brick Earth (Soil) Location of Project: Gata No. 375, 374, 412, 492, 542, 518, 291 Village: Gohani Tehsil: Sadar District: Pratapgarh State: Uttar Pradesh Production: 37,888 m3 Total ML Area 2.96Ha Name and address of the project proponent: Smt. Renu Barnwal w/o Sh. Ramakant Barnwal Katra Raja Village: Tehsil: Sadar Himmat Singh Uttar District: Pratapgarh State: Pradesh 1.2 Brief description of the nature of project The project has been proposed by M/s Barnwal Brick Clin owned by Smt. Renu Barnwal w/o Sh. Ramakant Barnwal as per agreement who is resident of Katra Raja Himmat Singh in Tehsil Sadar of District Pratapgarh, Uttar Pradesh and is responsible for every governmental procedures for Environmental Clearance. The Project is proposed for mining of minor mineral Brick Earth (Soil) within 37,888 m3capacity in 5Years from the non-forested, non-arable, rugged land within the mining area. Need of the project and its importance to the country and or the region Brick Earth (Soil) will be used as the raw material for the processing of Bricks which are required for various infrastructural projects going around the region. Abundant resource is available and excavation under permissible limits from the non-forested and non-arable land is the most preferable land use. Signatory………………………………… Page | 3 Project: Brick Earth (Soil) Excavation Category: B2 PRE-FEASIBILITY REPORT Proponent: M/s Barnwal Brick Clin Area: 2.96Ha Project Site: Village: Gohani Gata No. 375, 374, 412, 492, 542, 518, 291 Tehsil: Sadar District: Pratapgarh UttarPradesh 1.3 Demand supply gap Bricks as the building blocks for various construction projects are in high demand these days because of the ongoing rapid infrastructural development all around the state of Uttar Pradesh. Current excavation project is particularly for meeting the requirement of regional demands seeking soil for processing of bricks. Moreover; the current demand is 60% as high as the current supply. 2.0 Export possibility No there is no room for export. Domestic / Export Markets: Domestic demands of Bricksare much higher than what is available today. Employment Generation (Direct and Indirect) due to project: Manual mining will require 27 local heads to be employed. 3.0 Project description 3.1 Type of project including interlinked and interdependent projects, if any The project involves brick earth (soil) excavation and it is not interlinked with any existing project. 3.2 Location of project The proposed project site located Gata No. 375, 374, 412, 492, 542, 518, 291 located in Village Gohani of Tehsil Sadar in District Pratapgarh, Uttar Pradesh. The excavation site can be approached by following NH-931 upto village- saraiyan turinig west direction. The major highway links to a major road that eventually leads to the village- Gohani. The excavation site is located about 0.50 km in south from the Village itself.. Nearest Railway Station is chibila junction located at about 28.0km in South-east direction and nearest Airport is at Fursatganj which is approximately 42.0km towards north-west direction away from the project area. 3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly the environment considerations gone into should be highlighted No other site is considered for the proposed project. The project siteis on agreement between the owner of the land and the Company (M/s Barnwal Brick Clin) for the removal of Brick Earth (Soil). 3.4 Size or magnitude of operation The total mineable reserve in the project area is 37,888 m3 in 5Years.The project site is on agreement between the owner of the land and the Company (M/s Barnwal Brick Clin) for the removal of Brick Earth (Soil). The miningarea is 2.96 Ha. 3.5 Raw material required along with estimated quantity, likely source, marketing area of final product(s), mode of transport of raw material and finished product Signatory………………………………… Page | 4 Project: Brick Earth (Soil) Excavation Category: B2 PRE-FEASIBILITY REPORT Proponent: M/s Barnwal Brick Clin Area: 2.96Ha Project Site: Village: Gohani Gata No. 375, 374, 412, 492, 542, 518, 291 Tehsil: Sadar District: Pratapgarh UttarPradesh No raw material is required during the operation. LOCATION MAP 3.6 Availability of water & its source S. No. Purpose Water Requirement (KLD) 1. Dust Suppression 1.0KLD (Surface water) 2. Irrigation 0.5KLD(surface water) 3. Domestic(drinking) 1.0KLD(ground water) 4. Brick Processing 1.0KLD(surface water) Toatal Water Required 3.5 KLD Energy Power Source 8 hrs. of working, need no temporary shelter however; single temporary shelter has been proposed here as tents for one or two persons to be used in case of any minor medical problems in the working hour. Signatory………………………………… Page | 5 Project: Brick Earth (Soil) Excavation Category: B2 PRE-FEASIBILITY REPORT Proponent: M/s Barnwal Brick Clin Area: 2.96Ha Project Site: Village: Gohani Gata No. 375, 374, 412, 492, 542, 518, 291 Tehsil: Sadar District: Pratapgarh UttarPradesh 3.7 Quantity of waste to be generated (liquid or solid) and scheme for their management / disposal No solid waste generation is expected from the mining procedure. 27 persons including the works man and the administrative staff are supposed to produce negligible waste like guthka pouches, smoking litter, and newspapers etc. belonging to biodegradable category waste. 3.7.1 Waste generation and disposal of waste No significant waste is expected to be generated from the site. 3.7.2 Generation of waste water There is no waste water generation during the process. 4.0 Site analysis The proposed project site located Gata No. 375, 374, 412, 492, 542, 518, 291 located in Village Gohani of Tehsil Sadar in District Pratapgarh, Uttar Pradesh. The excavation site can be approached by following NH-931 upto village- saraiyan turinig west direction. The major highway links to a major road that eventually leads to the village- Gohani. The excavation site is located about 0.50 km in south from the Village itself.. Nearest Railway Station is chibila junction located at about 28.0km in South- east direction and nearest Airport is at Fursatganj which is approximately 42.0km towards north-west direction away from the project area. (i)Land form, land use and land ownership The land of Pratapgarh district is generally plane except some regions around the Gomti River which drains almost the whole district. It may be called an agrarian area as agriculture is the main occupation of the people.The proposed site is non-arable, undulated (rugged) and non-forested. This land is good for mining of minor minerals like soil. Such excavations up to a depth of 1.6meter are required for the restoration fertility to the land as it exposes underneath fertile soil. (ii) Land ownership The project site is on Agreement. (iii)Topography along with map and Soil type : The land of Pratapgarh district is generally plane except some regions around the Gomti River which drains almost the whole district.