Prefeasibility Report

Total Page:16

File Type:pdf, Size:1020Kb

Load more

PREFEASIBILITY REPORT FOR “REVAMP OF DIESEL HYDRO DE – SULPHURISATION UNIT” BY CHENNAI PETROLEUM CORPORATION LIMITED AT VILLAGE: MANALI TALUK: AMBATTUR DISTRICT: THIRVALLUR STATE: TAMIL NADU Prepared by HUBERT ENVIRO CARE SYSTEMS PRIVATE LIMITED DECEMBER 2015 1 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY............................................................................................................. 5 2. INTRODUCTION OF THE PROJECT .......................................................................................... 6 2.1 ABOUT THE PROJECT PROPONENT ................................................................................ 6 2.2 MAJOR PRODUCTS OF CPCL ............................................................................................ 6 2.3 ABOUT THE PROJECT ........................................................................................................ 7 2.4 PROJECT BENEFITS ............................................................................................................ 8 3. PROJECT DESCRIPTION ............................................................................................................. 9 3.1 TYPE OF PROJECT ............................................................................................................... 9 3.2 PROJECT LOCATION .......................................................................................................... 9 3.3 MAJOR PROJECTS OF CPCL ............................................................................................ 10 3.4 DESCRIPTION OF THE PROJECT .................................................................................... 11 3.5 PROJECT NEED .................................................................................................................. 11 3.6 MANUFACTURING PROCESS DESCRIPTION .............................................................. 12 3.6.1 REACTION SECTION ..................................................................................................... 12 3.6.1.1 FIRST HDS REACTOR 77-C102 .................................................................................... 16 3.6.1.2 SECOND HDS REACTOR 77-C3 ................................................................................... 16 3.6.2 CATALYST INVENTORY ............................................................................................. 18 3.6.3 STRIPPING AND STABILIZING SECTION ................................................................. 20 3.6.4 DRYER SECTION ........................................................................................................... 27 3.6.5 POWER AND FUELS ...................................................................................................... 30 3.6.6 LAND USE ....................................................................................................................... 30 3.6.7 MANPOWER ................................................................................................................... 30 3.6.8 WATER REQUIREMENT ............................................................................................... 31 3.6.9 UTILITIES ........................................................................................................................ 31 3.7 LIQUID WASTE MANAGEMENT .................................................................................... 32 3.7.1 DURING NORMAL OPERATION ................................................................................. 32 3.7.2 DURING START – UP .................................................................................................... 33 3.7.3 DURING SHUT-DOWN .................................................................................................. 33 3.8 AIR POLLUTION CONTROL MEASURES ...................................................................... 33 3.9 HAZARDOUS AND SOLID WASTE MANAGEMENT ................................................... 34 3.10 GREEN BELT DEVELOPMENT ........................................................................................ 35 3.11 ENVIRONMENT, SAFETY AND HEALTH MONITORING ........................................... 35 4. SITE ANALYSIS ......................................................................................................................... 37 4.1 CONNECTIVITY ................................................................................................................. 37 2 4.2 LAND FORM, LAND USE, LAND OWNERSHIP ............................................................ 37 4.3 EXISTING LAND USE PATTERN ..................................................................................... 37 4.4 CLIMATIC CONDITIONS .................................................................................................. 37 5. CONCLUSION ............................................................................................................................. 39 LIST OF TABLES Table 2.1 BS IV Specifications for Diesel ................................................................................. 7 Table 2.2 BS V Specifications for diesel ................................................................................... 8 Table 3.1 Capacity of major units of CPCL ............................................................................ 11 Table 3.2 BS Specifications ..................................................................................................... 12 Table 3.3 Specifications of Diesel and VGO Case .................................................................. 13 Table 3.4 Catalyst Details ........................................................................................................ 16 Table 3.5 Catalyst loading details of Second HDS Reactor .................................................... 16 Table 3.6 Catalyst Inventory details ........................................................................................ 19 Table 3.7 Power and fuel requirement ..................................................................................... 30 Table 3.8 List of Utilities ......................................................................................................... 31 Table 3.9 Liquid Effluent details ............................................................................................. 32 Table 3.10 Waste water details during DHDS Catalyst Presulphiding ................................... 33 Table 3.11 Waste water details of Reactor Heater Decoking .................................................. 33 Table 3.12 Air pollution emissions .......................................................................................... 33 Table 3.13 Municipal Solid Waste details ............................................................................... 34 Table 4.1 Water bodies in the study area ................................................................................. 37 Table 4.2 Meteorological Observations ................................................................................... 38 LIST OF FIGURES Figure 3.1 Project Site................................................................................................................ 9 Figure 3.2 10 km Radius around project site ........................................................................... 10 Figure 3.3 Reaction Section for Diesel Case ........................................................................... 14 Figure 3.4 Reaction Section for VGO Case ............................................................................. 15 Figure 3.5 Reactor (77 – C102) Loading diagram ................................................................... 17 Figure 3.6 Reactor (77 – C3) loading ...................................................................................... 18 Figure 3.7 Stripping Section Diesel Case ................................................................................ 22 Figure 3.8 Stripping Section VGO Case .................................................................................. 23 Figure 3.9 Stablilisation Section Diesel Case .......................................................................... 24 Figure 3.10 Stabilisation Section VGO Case ........................................................................... 25 Figure 3.11 Dryer Section Diesel Case .................................................................................... 28 Figure 3.12 Dryer Section for VGO Case ................................................................................ 29 3 LIST OF ABBREVIATIONS BS Bharath Stage CBR Cauvery Basin Refinery CDU Crude Distillation Unit CPCL Chennai Petroleum Corporation Limited CRU Catalytic Reforming Unit DCU Delayed Coker Unit DHDS Diesel Hydro De-Sulphurisation DHDT Diesel Hydro Treating EOR End of Run FCCU Fluidized Catalytic Cracking Unit HCO Heavy Cycle Oil ISOM Isomerisation Unit LABFS Linear Alkyl Benzene Feed Stock LCO Light Cycle Oil LOBS Heavy Cycle Oil LPG Lube Oil Base Stock LVGO Liquefied Petroleum Gas MDEA Light Vacuum Gas Oil MEK Methyl Di-Ethanol Amine MMT Methyl Ethyl Ketone MMTPA Million Metric Tonnes MP Million Metric Tonnes Per Annum OHCU Medium Pressure SOR Once-through Hydro Cracker Unit SRGO Start of Run SRU Straight Run Gas Oil VBU Sulphur Recovery Unit VGO Visbreaker Unit 4 1. EXECUTIVE SUMMARY Chennai Petroleum Corporation Limited (CPCL) is the oldest refinery in Southern part of India and the most complex public sector refinery within India in a spread of 800 acres land.
Recommended publications
  • Zooplankton Diversity of Freshwater Lakes of Chennai, Tamil Nadu with Reference to Ecosystem Attributes

    Zooplankton Diversity of Freshwater Lakes of Chennai, Tamil Nadu with Reference to Ecosystem Attributes

    International Journal of Int. J. of Life Science, 2019; 7 (2):236-248 Life Science ISSN:2320-7817(p) | 2320-964X(o) International Peer Reviewed Open Access Refereed Journal Original Article Open Access Zooplankton diversity of freshwater lakes of Chennai, Tamil Nadu with reference to ecosystem attributes K. Altaff* Department of Marine Biotechnology, AMET University, Chennai, India *Corresponding Author: [email protected] Manuscript details: ABSTRACT Received: 18.04.2019 Zooplankton diversity of twelve water bodies of Chennai with reference to Accepted: 05.05.2019 variation during pre-monsoon, monsoon, post-monsoon and summer Published: 20.06.2019 seasons is investigated and reported. Out of 49 zooplankton species recorded, 27 species belonged to Rotifera, 10 species to Cladocera, 9 Editor: Dr. Arvind Chavhan species to Copepoda and 3 species to Ostracoda. The Rotifers dominated compared to all other zooplankton groups in all the seasons. However, the Cite this article as: diversity of zooplankton varied from season to season and the maximum Altaff K (2019) Zooplankton diversity was recorded in pre- monsoon season while minimum was diversity of freshwater lakes of observed in monsoon season. The common and abundant zooplankton in Chennai, Tamil Nadu with reference these water bodies were Brachionus calyciflorus, Brchionus falcatus, to ecosystem attributes, Int. J. of. Life Brachionus rubens, Asplancna brightwelli and Lecane papuana (Rotifers), Science, Volume 7(2): 236-248. Macrothrix spinosa, Ceriodaphnia cornuta, Diaphnosoma sarsi and Moina micrura (Cladocerans), Mesocyclops aspericornis Thermocyclops decipiens Copyright: © Author, This is an and Sinodiaptomus (Rhinediaptomus) indicus (Copepods) and Stenocypris open access article under the terms major (Ostracod). The density of the zooplankton was high during pre- of the Creative Commons Attribution-Non-Commercial - No monsoon and post-monsoon period than monsoon and summer seasons.
  • Thiruvallur District

    Thiruvallur District

    DISTRICT DISASTER MANAGEMENT PLAN FOR 2017 TIRUVALLUR DISTRICT tmt.E.sundaravalli, I.A.S., DISTRICT COLLECTOR TIRUVALLUR DISTRICT TAMIL NADU 2 COLLECTORATE, TIRUVALLUR 3 tiruvallur district 4 DISTRICT DISASTER MANAGEMENT PLAN TIRUVALLUR DISTRICT - 2017 INDEX Sl. DETAILS No PAGE NO. 1 List of abbreviations present in the plan 5-6 2 Introduction 7-13 3 District Profile 14-21 4 Disaster Management Goals (2017-2030) 22-28 Hazard, Risk and Vulnerability analysis with sample maps & link to 5 29-68 all vulnerable maps 6 Institutional Machanism 69-74 7 Preparedness 75-78 Prevention & Mitigation Plan (2015-2030) 8 (What Major & Minor Disaster will be addressed through mitigation 79-108 measures) Response Plan - Including Incident Response System (Covering 9 109-112 Rescue, Evacuation and Relief) 10 Recovery and Reconstruction Plan 113-124 11 Mainstreaming of Disaster Management in Developmental Plans 125-147 12 Community & other Stakeholder participation 148-156 Linkages / Co-oridnation with other agencies for Disaster 13 157-165 Management 14 Budget and Other Financial allocation - Outlays of major schemes 166-169 15 Monitoring and Evaluation 170-198 Risk Communications Strategies (Telecommunication /VHF/ Media 16 199 / CDRRP etc.,) Important contact Numbers and provision for link to detailed 17 200-267 information 18 Dos and Don’ts during all possible Hazards including Heat Wave 268-278 19 Important G.Os 279-320 20 Linkages with IDRN 321 21 Specific issues on various Vulnerable Groups have been addressed 322-324 22 Mock Drill Schedules 325-336
  • Tamil Nadu H2

    Tamil Nadu H2

    Annexure – H 2 Notice for appointment of Regular / Rural Retail Outlet Dealerships IOCL proposes to appoint Retail Outlet dealers in the State of Tamil Nadu as per following details: Name of location Estimated Minimum Dimension (in Finance to be Fixed Fee / monthly Type of Mode of Security Sl. No Revenue District Type of RO Category M.)/Area of the site (in Sq. arranged by the Minimum Sales Site* Selection Deposit M.). * applicant Bid amount Potential # 1 2 3 4 5 6 7 8 9a 9b 10 11 12 (Regular/Rural) (SC/SC CC (CC/DC/CFS) Frontage Depth Area Estimated Estimated (Draw of Rs. in Lakhs Rs. in 1/SC PH/ST/ST working fund Lots/Bidding) Lakhs CC 1/ST capital required PH/OBC/OBC requireme for CC 1/OBC nt for developme PH/OPEN/OPE operation nt of N CC 1/OPEN of RO Rs. in infrastruct CC 2/OPEN Lakhs ure at RO PH) Rs. in Lakhs 1 Alwarpet Chennai Regular 150 SC CFS 20 20 400 0 0 Draw of Lots 0 3 2 Andavar Nagar to Choolaimedu, Periyar Pathai Chennai Regular 150 SC CFS 20 20 400 0 0 Draw of Lots 0 3 3 Anna Nagar Chennai Regular 200 Open CC 20 20 400 25 10 Bidding 30 5 4 Anna Nagar 2nd Avenue Main Road Chennai Regular 200 SC CFS 20 20 400 0 0 Draw of Lots 0 3 5 Anna Salai, Teynampet Chennai Regular 250 SC CFS 20 20 400 0 0 Draw of Lots 0 3 6 Arunachalapuram to Besant nagar, Besant ave Road Chennai Regular 150 SC CFS 20 20 400 0 0 Draw of Lots 0 3 7 Ashok Nagar to Kodambakam power house Chennai Regular 150 SC CFS 20 20 400 0 0 Draw of Lots 0 3 8 Ashok Pillar to Arumbakkam Metro Chennai Regular 200 Open DC 13 14 182 25 60 Draw of Lots 15 5 9 Ayanavaram
  • Action Plan Manali12092016.Pdf

    Action Plan Manali12092016.Pdf

    Sl. PAGE No No CONTENTS 1 INTRODUCTION 1.1 Area Details 1 1.2 Location 1 1.3 Digitized map with Demarcation of Geographical Boundaries and Impact Zones 1.4 CEPI Score 2 1.5 Total Population and Sensitive Receptors 2 1.6 Eco-geological features 4 1.6.1 Major Water bodies 4 1.6.2 Ecological parks , Sanctuaries , flora and fauna or any 4 ecosystem 1.6.3 Buildings or Monuments of Historical / 4 archaeological / religious importance 1.7 Industry Classification 5 1.7.1 Highly Polluting Industries 5 1.7.2 Red category industries 6 1.7.3 Orange and Green category industries 6 1.7.4 Grossly Polluting Industries 6 2 WATER ENVIRONMENT 2.1 Present status of water environment 7 2.1.1 Water bodies 7 2.1.2 Present level of pollutants 7 2.1.3 Predominant sources contributing to various 8 pollutant 2.2 Source of Water Pollution 8 2.2.1 Industrial 9 2.2.2 Domestic 9 2.2.3 Others 11 2.2.4 Impact on surrounding area 11 2.3 Details of water polluting industries in the area 11 cluster 2.4 Effluent Disposal Methods- Recipient water bodies 14 2.5 Quantification of wastewater pollution load and relative 17 contribution by different sources viz industrial/ domestic 2.6 Action Plan for compliance and control of Pollution 25 2.6.1 Existing infrastructure facilities 25 2.6.2 Pollution control measures installed by the units 26 2.6.3 Technological Intervention 36 2.6.4 Infrastructural Renewal 37 2.6.5 Managerial and financial aspects 37 2.6.6 Self monitoring system in industries 37 2.6.7 Data linkages to SPCB (of monitoring devices) 37 3 AIR ENVIRONMENT 3.1 Present
  • Ec Queries for Proceed Meeting Held on 2

    Ec Queries for Proceed Meeting Held on 2

    EC QUERIES FOR PROCEEDINGS OF THE 18th EAC MEETING HELD ON 25th JANUARY 2017 for PROPOSED REVAMP OF DIESEL HYDRO DE – SULPHURISATION (DHDS) UNIT FROM 1.8 MMTPA to 2.34 MMTPA And BS-VI FUEL QUALITY UPGRADATION PROJECT (Revamp of DHDT Unit, New FCC GDS Unit and SRU Block for MS quality upgradation & increased BS VI Diesel production) AT Village: Manali Taluk: Ambattur District: Thiruvallur State: Tamil Nadu Submitted by CHENNAI PETROLEUM CORPORATION LIMITED (A group company of Indian Oil) [Project termed under Schedule (4a) Category ‘A’ – Petroleum Refining Industry as per EIA Notification 2006 and its Amendments] REPORT PREPARED BY (NABET Accredited vide Certificate No. NABET/EIA/1618/SA0015 & MoEF Recognized Lab vide F. No. Q-15018/29/2007-CPW) HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI MARCH 2017 EC Queries Index Annexure Description Page Number Number - EC Queries 1 1 Certified compliance report from RO, MoEF&CC of existing 2 2 EC 3 Measurement of the SO2 emissions from the existing and 23 proposed unit. 4 List of existing and proposed utilities 26 5 Revised green belt plan 29 6 Existing and proposed water balance chart 32 7 CSR plan 34 EC Queries and Point Wise response on additional details sought by MoEF&CC based on minutes of 18th EAC (Industry-2) meeting held during 23rd-25th January, 2017 Title of the Project : Proposed Revamp of Diesel Hydro De-Sulphurisation (DHDS) unit from 1.8 MMTPA to 2.34 MMTPA and BS-VI Fuel quality upgradation project (Revamp of DHDT unit, New FCC GDS unit and SRU Block for MS quality by M/s CHENNAI PETROLEUM CORPORATION LIMITED, Manali, Chennai- [IA/TN/IND2/60940/2016, J- 11011/42/2016-IA II(I)]- Environmental Clearance S.No EC Queries (S.No 18.9.4) Status/Action taken 1 Certified compliance report from RO, Enclosed in Annexure 1 & 2 MoEF&CC of existing EC to be submitted 2 Measure the SO2 emissions from the existing Enclosed in Annexure 3 unit.
  • Tamil Nadu Government Gazette

    Tamil Nadu Government Gazette

    © [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2013 [Price: Rs. 54.80 Paise. TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 41] CHENNAI, WEDNESDAY, OCTOBER 23, 2013 Aippasi 6, Vijaya, Thiruvalluvar Aandu–2044 Part VI—Section 4 Advertisements by private individuals and private institutions CONTENTS PRIVATE ADVERTISEMENTS Pages Change of Names .. 2893-3026 Notice .. 3026-3028 NOTICE NO LEGAL RESPONSIBILITY IS ACCEPTED FOR THE PUBLICATION OF ADVERTISEMENTS REGARDING CHANGE OF NAME IN THE TAMIL NADU GOVERNMENT GAZETTE. PERSONS NOTIFYING THE CHANGES WILL REMAIN SOLELY RESPONSIBLE FOR THE LEGAL CONSEQUENCES AND ALSO FOR ANY OTHER MISREPRESENTATION, ETC. (By Order) Director of Stationery and Printing. CHANGE OF NAMES 43888. My son, D. Ramkumar, born on 21st October 1997 43891. My son, S. Antony Thommai Anslam, born on (native district: Madurai), residing at No. 4/81C, Lakshmi 20th March 1999 (native district: Thoothukkudi), residing at Mill, West Colony, Kovilpatti, Thoothukkudi-628 502, shall Old No. 91/2, New No. 122, S.S. Manickapuram, Thoothukkudi henceforth be known as D. RAAMKUMAR. Town and Taluk, Thoothukkudi-628 001, shall henceforth be G. DHAMODARACHAMY. known as S. ANSLAM. Thoothukkudi, 7th October 2013. (Father.) M. v¯ð¡. Thoothukkudi, 7th October 2013. (Father.) 43889. I, S. Salma Banu, wife of Thiru S. Shahul Hameed, born on 13th September 1975 (native district: Mumbai), 43892. My son, G. Sanjay Somasundaram, born residing at No. 184/16, North Car Street, on 4th July 1997 (native district: Theni), residing Vickiramasingapuram, Tirunelveli-627 425, shall henceforth at No. 1/190-1, Vasu Nagar 1st Street, Bank be known as S SALMA.
  • Cost Effective Method to Reduce Turbidity and Ph Level of Korattur Lake Water Situated in Chennai Metropolitan City S

    Cost Effective Method to Reduce Turbidity and Ph Level of Korattur Lake Water Situated in Chennai Metropolitan City S

    International Journal of Scientific & Engineering Research, Volume 7, Issue 12, December-2016 229 ISSN 2229-5518 Cost Effective Method to Reduce Turbidity and pH level of Korattur Lake water situated in Chennai Metropolitan city S. Anantha Narayanan, Jeppiar Maamallan Engineering College, Sriperumbudur [Shinto Kuriyan, Jeppiar Maamallan Engineering College, Sriperumbudur A.Subhasri , Sathyabama University, Shollinganallur A.Jayasri, Sathyabama University, Shollinganallur Abstract - Clean water is absolutely essential for human survival. Changes coupled with increasing population in urban areas have the potential to impact the design and operation of future water treatment plants. It is necessary to provide clean potable water at low cost with high reliability in such areas. To accomplish these objectives. There is a great need to supply environmentally sound technology for the provision of potable water. We have developed an effective water filtration system using the coagulants such as moringa, alum, ferric alum and lime, charcoal as adsorption media. The main focus is to get the pH and turbidity levels within the permissible limits and the colour and odour are taken care such that it doesn’t affect the water quality Keywords: pH – power of hydrogen concentration, NTU – Nephelometric turbidity unit, Alum – Aluminium sulphate Al2(SO4)3, Acidity – pH level lessthan 7, Basicity – pH level greater than 7 —————————— —————————— I. INTRODUCTION corporation and located along the Chennai – Mumbai railroad about 12 km from the Chennai Central. The Lakes are the important part of urban ecosystem. Water in Korattur lake is one of the chain of three water bodies lakes is an easily available source of water for the needs of including the Ambattur lake and Madhavaram lake many sectors of economy such as agriculture, domestic and where surplus water from one is transported to the industrial.
  • Natco Pharma Limited

    Natco Pharma Limited

    Pre-Feasibility Report Natco Pharma Limited CHAPTER–1 EXECUTIVE SUMMARY Executive S.No. Description Summary 1. Identification of NATCO PHARMA LIMITED (NATCO) head quartered at Project Banjara Hills-Hyderabad in Telangana State is a vertically integrated and R&D focused pharmaceutical company engaged in developing, manufacturing and marketing of finished dosage formulations (“FDF”) and active pharmaceutical ingredients (“APIs”). Our focus is primarily on niche therapeutic areas and complex products . Natco has established an API manufacturing unit as Natco Pharma Limited, Chemical Division – Chennai (earlier known as “Natco organics Limited”) at S.No. 74/7B, Vaikkadu Village, Ambattur Taluk, Tiruvallur District in the year 2007 to manufacture Active Pharmaceutical Ingredients (APIs). Natco Pharma Limited proposed to expand its manufacturing facility and product quantity located at S.No. 74/7B, Vaikkadu TPP Salai, Manali, Chennai The proposed project is categorized as ‘B’ of 5(f) (as per the Gazette Notificationdated 14 th September, 2006. 2. Project M/s. Natco Pharma Limited, Chemical Division – Chennai. Proponent 3. Brief Description The current report deals with increase in expansion of product of Project quantity from 46.26 TPA to 66.24 TPA also there will be increase in built-up area from 18,130 Sq.m to 22,946 Sq.m at Vaikkadu Village, Ambattur Taluk, Tiruvallur district in the state of Tamil Nadu. In the increased threat of the human life in our country with the suffering of Cancer and the affordability of the medicine cost and the easily availability of the medicine, it is planned to increase the product portfolio. In order to satisfy this need, variety of products is the need of our country.
  • Amid Military Talks, Reports of Chinese Buildup at Pangong

    Amid Military Talks, Reports of Chinese Buildup at Pangong

    follow us: tuesday, june 23, 2020 Chennai City Edition thehindu.com 14 pages ț ₹5.00 facebook.com/thehindu twitter.com/the_hindu Supreme Court allows Soldier dies in fresh Mizoram experiences Exports down by about Puri Jagannath Rath ceasefire violation by two earthquakes, many 10­12% so far in June, Yatra, with conditions Pakistan along LoC buildings damaged but improving: Goyal page 10 page 10 page 11 page 13 Printed at . Chennai . Coimbatore . Bengaluru . Hyderabad . Madurai . Noida . Visakhapatnam . Thiruvananthapuram . Kochi . Vijayawada . Mangaluru . Tiruchirapalli . Kolkata . Hubballi . Mohali . Malappuram . Mumbai . Tirupati . lucknow . cuttack . patna NEARBY Amid military talks, reports of Chinese build­up at Pangong Corps Commanders meet at Moldo; lake area remains most contentious issue 2,710 fresh cases reported in Tamil Nadu Dinakar Peri CHENNAI NEW DELHI Manmohan It was another all­time high As the second round of talks for Tamil Nadu as it reported at the Corps Commander­le­ cautions PM 2,710 new cases of COVID­19 vel were held on Monday to on Monday. Of this, Chennai on remarks accounted for 1,487 cases. resolve differences on the Monday’s numbers took the disputed India­China boun­ Former Prime Minister State’s overall tally past dary, there were reports of a Manmohan Singh has 60,000, while its recovery Chinese troop build­up at urged PM Narendra Modi rate was nearly 55% and Pangong Tso in eastern La­ to be “mindful” of the mortality rate 1.27%. dakh. The meeting, which implications his remarks TAMIL NADU Ī PAGE 2 began around 11.30 a.m., will have on national DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD continued late into the night.
  • 119] 000033 CHENNAI, FRIDAY, APRIL 1, 2011 Panguni 18, Thiruvalluvar Aandu–2042 Part V—Section 2

    119] 000033 CHENNAI, FRIDAY, APRIL 1, 2011 Panguni 18, Thiruvalluvar Aandu–2042 Part V—Section 2

    © [Regd. No. TN/CCN/467/2009-11. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2011 [Price: Rs. 96.80 Paise. TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No. 119] 000033 CHENNAI, FRIDAY, APRIL 1, 2011 Panguni 18, Thiruvalluvar Aandu–2042 Part V—Section 2 Notifications relating to list of contesting candidates from Collectors and Returning Officers, other Heads of Departments, Election Tribunals, etc. GENERAL ELECTIONS TO TAMIL NADU LEGISLATIVE ASSEMBLY, 2011 No. SRO E-1/2011. Dated 1st April 2011. In pursuance of sub-rule (2) of rule 11 of the Conduct of Elections Rules, 1961, the following is published for general information:— FORM 7-A LIST OF CONTESTING CANDIDATES [See rule 10(1) of the Conduct of Elections Rules, 1961.] Election to the Tamil Nadu Legislative Assembly from the 1. GUMMIDIPOONDI CONSTITUENCY Serial Name of Candidate. Address of Candidate. Party Affiliation. Symbol Allotted. Number. (1) (2) (3) (4) (5) 1 Chakravarthi Old No. 321, New No. 396, Bharatiya Lotus Sriraman, B. Sengalamman Kandigai, Janata Party Uthukottai Taluk, Tiruvallur District. 2 Srinivasan, D. No. 209/D, C.V. Road, 1st Lane, Bahujan Elephant Tiruvallur-602 001. Samaj Party 3 Sekar, K.N. 16/25, Anna Street, Pattali Mango Kallikuppam, Makkal Katchi Ambattur, Chennai-600 053. DTP—V-2 Ex. (119)—1 [1] 2 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY Serial Name of Candidate. Address of Candidate. Party Affiliation. Symbol Allotted. Number. (1) (2) (3) (4) (5) 4 Asokan, G. 1/344, Perumal Koil Street, Puratchi Brush Bammudhukulam Village, Bharatham Ambathur Taluk, Tiruvallur District. 5 Sudhakar, M. No. 98, Karakkambakkam, Republican Party of Television Devandavakkam, India (A) Uthukkottai Taluk, Tiruvallur District.
  • Commissionerate of Urban Land Ceiling and Urban Land Tax

    Commissionerate of Urban Land Ceiling and Urban Land Tax

    1 Commissionerate of Urban Land Ceiling and Urban Land Tax Chepauk, Chennai 600 005. ADMINISTRATIVE SET UP PRINCIPAL COMMISSIONER & COMMISSIONER OF LAND REFORMS SPECIALCOMMISSIONER & COMMISSIONER (ULC & ULT) PERSONAL ASSISTANT TO SPECIAL COMMISSIONER & COMMISSIONER (ULC & ULT) ASST COMMR ASST COMMR ASST COMMR ASST COMMR ASST COMMR (ULT) (ULT) (ULT) (ULT) (ULT) MYLAPORE TONDIARPET POONAMALLEE ALANDUR COIMBATORE T.NAGAR EGMORE AMBATHUR TAMBARAM MADHAVARAM KUNRATHUR (TIRUVALLUR (KANCHEEPURAM DISTRICT) DISTRICT) SUPPORTING STAFF (i) Urban Land Ceiling work and Urban Land Tax Assessment work in spect of Madurai, Trichy, Salem, Tirunelveli areas are being done by the Assistant Commissioners (Land Reforms) as the ULT offices in these areas were disbanded w.e.f.31.12.99. (ii) Personal Assistant (Urban Land Tax) to Collector, Chennai, Urban Land Tax Officers, Chennai (5 offices), Coimbatore (1 office) and other collection staff are working under the direct control of Collectors concerned. 2 The progress in the collection of the urban land tax (ULT) are being reviewed periodically by the Principal Commissioner and Commissioner of Land Reforms and the Special Commissioner & Commissioner of ULC & ULT. THE TAMIL NADU URBAN LAND TAX ACT With the twin object of securing the State revenue in respect of urban lands put to non-agricultural uses and acting as a disincentive to concentration of urban lands in the hands of a few rich persons, the levy of urban land tax was introduced in Madras City for the first time in 1963 by Tamil Nadu urban Land Tax Act, 1963. The Tamil Nadu Urban Land Tax Act, 1966 was introduced in Chennai City from1.7.1963, to levy tax on urban lands except the lands which are under agricultural operations.
  • Sl. No. Pp No. Sbc No. Date of Submission Name Of

    Sl. No. Pp No. Sbc No. Date of Submission Name Of

    NAME OF THE CHANNEL : B - CHANNEL - SPECIAL BUILDINGS (2009) NAME OF THE SL. P.P. SBC DATE OF PROPOSED DATE OF APPLICANT SITE ADDRESS VILLAGE FILE NO. NO. NO. NO. SUBMISSION CONSTRUCTION APPROVAL (Thiruvalargal) 1 4845 889 8/31/2007 Gokul R. Bathija S.No.61/2, Block No.1, Koyambedu Village, Plot Koyambedu BF(pt) + GF + 3 Floors Shop BC1/20301/07 1/6/2009 No. 4, "E" Road, K.W.M.C. Market, Koyambedu, cum Office Commercial Chennai - 107. Building 2 4846 1365 27/12/2007 K. Rajendran D.No.49, Venkatarathinam Nagar, Adyar, Pallipattu Stilt + 4 Floors Residential BC1/29398/07 1/7/1909 Chennai, T.S.No.56, Block No.12. Building - 8 dwelling units 3 4847 1118 2/11/2007 A.R. Prakash & Others Block No .314, Belly Area, Anna Nagar in Koyambedu GF + 2 Floor B3/25684/2007 13/01/2009 S.No.207 part of Koyambedu village, Chennai 4 4848 1227 21/11/2007 Door No.144, Santhome High Road in Mylapore Stilt + 4 Floor - Office use B2/26857/2007 20/01/2009 R.S.No.2593/1 and 2593/2, B.No.52 of Mylapore Village of Chennai-4 5 4849 1975 22/12/2007 K.R. Aniruthan Plot No.9, Ramappah Nagar Main Road, Old Perungudi Stilt + 4 Floors - 4 dwelling B1/21745/2008 1/22/2009 S.No.56, New S.No.56/26 of Perungudi units 6 4850 1692 11/11/2008 Sundar Bharatwaj New Door No.14/1, Old Door No.37/1, 5th Trust Mylapore Stilt + 3 Floors - 5 dwelling B2/19610/2008 1/22/2009 cross street, Mandavellipakkam in units R.S.No.4436/172, Block No.98 of Mylapore, Chennai 7 4851 2018 12/26/2008 Deepak Kumar Jain & T.S.No.2749/1, Block No.40, Purasawakkam Kosapet GF + Stilt + 3 F + 4 F - 7 B3/21733/2008 1/22/2009 Others village, Old No.30, New No.85, Chellappa Stret, dwelling units Kosapet, Chennai - 7.