Programmatic Biological Assessment of Bureau of Reclamation's Water and River Maintenance Operations, Army Corps of Engineers

Total Page:16

File Type:pdf, Size:1020Kb

Programmatic Biological Assessment of Bureau of Reclamation's Water and River Maintenance Operations, Army Corps of Engineers PROGRAMMATIC BIOLOGICAL ASSESSMENT OF BUREAU OF RECLAMATION’S WATER AND RIVER MAINTENANCE OPERATIONS, ARMY CORPS OF ENGINEERS’ FLOOD CONTROL OPERATION, AND NON-FEDERAL ACTIONS ON THE MIDDLE RIO GRANDE, NEW MEXICO March 1, 2003 – February 28, 2013 Partially incorporating the 2001 Biological Assessment Submitted to the U. S. Fish and Wildlife Service RIO GRANDE SILVERY MINNOW SOUTHWESTERN WILLOW FLYCATCHER BALD EAGLE INTERIOR LEAST TERN February 19, 2003 U. S. Department of the Interior U. S. Army Corps of Engineers Bureau of Reclamation Albuquerque District Albuquerque Area Office Albuquerque, New Mexico Albuquerque, New Mexico TABLE OF CONTENTS 1 INTRODUCTION.................................................................................................................................................1 1.1 Biological Assessment Content and Scope................................................................................1 1.2 Summary of Recent Consultation Activities..............................................................................1 1.3 Summary of Minnow v. Keys Litigation and 2003 Consultation Approach..............................1 2 AREA OF ACTION ..............................................................................................................................................3 3 DESCRIPTION OF PROPOSED ACTIONS........................................................................................................5 3.1 Introduction................................................................................................................................5 3.2 Non-Federal Actions..................................................................................................................5 3.2.1.1 State of New Mexico .................................................................................................................6 3.2.1.2 Counties .....................................................................................................................................6 3.2.1.3 Villages, Towns, and Cities .......................................................................................................6 3.2.1.4 Irrigation Interests......................................................................................................................6 3.3 Federal Actions..........................................................................................................................7 3.3.1 Corps of Engineers.....................................................................................................................7 3.3.2 Bureau of Reclamation ..............................................................................................................8 3.3.2.1 Closed Basin Division, San Luis Valley Project........................................................................8 3.3.2.2 San Juan-Chama Project ............................................................................................................8 3.3.2.3 Middle Rio Grande Project ......................................................................................................10 3.3.2.4 Annual Operating Plan.............................................................................................................12 3.3.2.5 Adaptive Management and Monitoring ...................................................................................13 4 SPECIES STATUS AND LIFE HISTORY ........................................................................................................14 4.1 Rio Grande Silvery Minnow....................................................................................................14 4.1.1 Status and Distribution.............................................................................................................14 4.1.2 Life History and Ecology.........................................................................................................14 4.1.3 Reasons for Decline .................................................................................................................16 4.2 Southwestern Willow Flycatcher.............................................................................................18 4.2.1 Status and Distribution.............................................................................................................18 4.2.2 Life History and Ecology.........................................................................................................20 4.2.3 Reasons for Decline .................................................................................................................21 4.3 Bald Eagle................................................................................................................................22 4.3.1 Status and Distribution.............................................................................................................22 4.3.2 Life History and Ecology.........................................................................................................25 4.3.3 Reasons for Decline .................................................................................................................25 4.4 Interior Least Tern ...................................................................................................................25 4.4.1 Status and Distribution.............................................................................................................25 4.4.2 Life History and Ecology.........................................................................................................25 4.4.3 Reasons for Decline .................................................................................................................25 5 ENVIRONMENTAL BASELINE ......................................................................................................................26 5.1 Introduction..............................................................................................................................26 5.2 Corps of Engineers...................................................................................................................26 5.3 Proposed Federal Actions with Early or Completed Consultation...........................................26 5.3.1 Rio Grande and Low Flow Conveyance Channel Modifications.............................................26 5.3.2 Low Flow Conveyance Channel Experimental Operations .....................................................26 5.3.3 Low Flow Conveyance Channel Mowing................................................................................27 5.3.4 Elephant Butte Temporary Channel Project ............................................................................27 5.3.5 Los Lunas Habitat Restoration Project ....................................................................................27 5.3.6 City of Albuquerque Drinking Water Project ..........................................................................28 5.3.7 Elephant Butte and Caballo Reservoirs Resource Management Plan EIS ...............................28 5.3.8 General Environmental Commitments from Early or Completed Consultations.....................28 5.3.8.1 Southwestern Willow Flycatcher.............................................................................................28 5.3.8.2 Rio Grande Silvery Minnow....................................................................................................29 5.3.8.3 Bald Eagle and Interior Least Tern..........................................................................................29 5.4 Contemporary Non-Federal Actions........................................................................................29 5.5 Geomorphology .......................................................................................................................29 5.6 Hydrology................................................................................................................................30 5.6.1 Article VII of the Rio Grande Compact - Historic Duration of Storage Restrictions ..............31 5.6.2 Recent Water Operations .........................................................................................................31 5.6.3 Environmental Baseline Hydrology.........................................................................................34 5.7 Biology ....................................................................................................................................38 ii 5.7.1 Ichthyofauna ............................................................................................................................38 5.7.1.1 Regional, Community-based Perspectives of Diversity and Faunal Change ...........................38 5.7.1.1.1 Species Diversity as a Predictive Function of Watershed Area ...............................................39 5.7.1.1.2 Species Diversity as a Predictive Function of Phylogeny........................................................40 5.7.1.1.3 Species Diversity as a Predictive Function of Reproductive Guilds........................................42 5.7.1.2 Site-specific, Community-based Perspective of Diversity and Faunal Change .......................43 5.7.1.2.1 Index of Diversity ....................................................................................................................43 5.7.1.3 Population Level Perspectives .................................................................................................44
Recommended publications
  • Hydraulic Modeling Analysis of the Middle Rio Grande River from Cochiti Dam to Galisteo Creek, New Mexico
    THESIS HYDRAULIC MODELING ANALYSIS OF THE MIDDLE RIO GRANDE RIVER FROM COCHITI DAM TO GALISTEO CREEK, NEW MEXICO Submitted by Susan J. Novak Department of Civil Engineering In partial fulfillment of the requirements For the degree of Master of Science Colorado State University Fort Collins, Colorado Spring 2006 COLORADO STATE UNIVERSITY October 24, 2005 WE HEREBY RECOMMEND THAT THE THESIS PREPARED UNDER OUR SUPERVISION BY SUSAN JOY NOVAK ENTITLED HYDRAULIC MODELING ANALYSIS OF THE MIDDLE RIO GRANDE RIVER FROM COCHITI DAM TO GALISTEO CREEK, NEW MEXICO BE ACCEPTED AS FULFILLING IN PART REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE. Committee on Graduate Work ______________________________________________ ______________________________________________ ______________________________________________ Adviser ______________________________________________ Department Head ii AB ST R A CT O F TH E SI S HYDRAULIC MODELING ANALYSIS OF THE MIDDLE RIO GRANDE FROM COCHITI DAM TO GALISTEO CREEK, NEW MEXICO Sedimentation problems with the Middle Rio Grande have made it a subject of study for several decades for many government agencies involved in its management and maintenance. Since severe bed aggradation in the river began in the late 1800’s, causing severe flooding and destroying farmland, several programs have been developed to restore the river while maintaining water quantity and quality for use downstream. Channelization works, levees, and dams were built in the early 1900’s to reduce flooding, to control sediment concentrations in the river and to promote degradation of the bed. Cochiti Dam, which began operation in 1973, was constructed primarily for flood control and sediment detention. The implementation of these channel structures also had negative effects, including the deterioration of the critical habitats of some endangered species.
    [Show full text]
  • ELEPHANT BUTTE RESERVOIR 1980 Sedimentation Survey
    ELEPHANT BUTTE RESERVOIR 1980 Sedimentation Survey U. S. Department of the Interior Bureau of Reclamation As the Nation's principal conservation agency, the Department of the Interior has responsibility for most of our nationally owned public lands and natural resources. This includes fostering the wisest use of our land and water resources, protecting our fish and wildlife, preserv- ing the environmental and cultural values of our national parks and historical places, and providing for the enjoyment of life through out- door recreation. The Department assesses our energy and mineral resources and works to assure that their development is in the best interests of all our people. The Department also has a major respon- sibility for American Indian reservation communities and for people who live in Island Territories under U.S. Administration. The information contained in this report regarding commercial prod- ucts or firms may not be used for advertising or promotional purposes and is not to be construed as an endorsement of any product or firm by the Bureau of Reclamation. The information contained in this report was developed for the Bureau of Reclamation; no warranty as to the accuracy, usefulness, or com- pleteness is expressed or implied. ELEPHANT BUTTE RESERVOIR 1980 SEDIMENTATION SURVEY by Joe M. Lara DIVISION OF PLANNING TECHNICAL SERVICES HYDROLOGY BRANCH SEDIMENTATION AND RIVER HYDRAULICS SECTION ENGINEERING AND RESEARCH CENTER DENVER, COLORADO July 1983 ACKNOWLEDGEMENTS The Bureau of Reclamation prepared and published this report. The hydro- graphic survey was done by dames 0. Blanton, Hydraulic Engineer, Engineering and Research Center, Bureau of Reclamation, Denver, Colorado. Personnel of the Rio Grande Project Office, El Paso, Texas, the Pecos River/Brantley Projects Office, Carlsbad, New Mexico, and the Power and Storage Division Office, Truth or Consequences, New Mexico, completed the land survey and assisted in the hydrographic survey.
    [Show full text]
  • The History of the Rio Grande Compact of 1938
    The Rio Grande Compact: Douglas R. Littlefield received his bache- Its the Law! lors degree from Brown University, a masters degree from the University of Maryland and a Ph.D. from the University of California, Los Angeles in 1987. His doc- toral dissertation was entitled, Interstate The History of the Water Conflicts, Compromises, and Com- Rio Grande pacts: The Rio Grande, 1880-1938. Doug Compact heads Littlefield Historical Research in of 1938 Oakland, California. He is a research histo- rian and consultant for many projects throughout the nation. Currently he also is providing consulting services to the U.S. Department of Justice, Salt River Project in Arizona, Nebraska Department of Water Resources, and the City of Las Cruces. From 1984-1986, Doug consulted for the Legal Counsel, New Mexico Office of the State Engineer, on the history of Rio Grande water rights and interstate apportionment disputes between New Mexico and Texas for use in El Paso v. Reynolds. account for its extraordinary irrelevancy, Boyd charged, by concluding that it was written by a The History of the congenital idiot, borrowed for such purpose from the nearest asylum for the insane. Rio Grande Compact Boyds remarks may have been intemperate, but nevertheless, they amply illustrate how heated of 1938 the struggle for the rivers water supplies had become even as early as the turn of the century. And Boyds outrage stemmed only from battles Good morning. I thought Id start this off on over water on the limited reach of the Rio Grande an upbeat note with the following historical extending just from southern New Mexicos commentary: Mesilla Valley to areas further downstream near Mentally and morally depraved.
    [Show full text]
  • Leasburg Diversion Dam Flows Along the Rio Grande River About a Mile and a Half Northwest of Fort Selden Historic Site
    H. Davis with the U.S. military was Explore History, Where It Happened surveying the area for use as a military Visit New Mexico Historic Sites and explore the state’s most important places. post. These seven historic sites and one historic property highlight the traditions and Today, the Diversion Dam is part of culture of New Mexico. It is an experience LEASBURG Leasburg Dam State Park, designated a you won’t forget. state park in 1971. DIVERSION DAM Help Preserve Fort Selden Help us preserve Fort Selden by becoming a site volunteer or by making a designated gift to the Museum of NM Foundation for the Fort’s preservation and interpretation. 100% of your gifts will be used to support Fort Selden. Become a Friend of Fort Selden Join other community members as we work to form a non-profit group to support the Fort. Call us for more information at 575-202-1638. The Leasburg Diversion Dam flows along the Rio Grande River about a mile and a half northwest of Fort Selden Historic Site. This diversion dam is vitally important to the region because water is one of New Mexico’s most important commodities. For thousands of years the Rio Grande has been a source of water for travelers, settlers, and livestock and provided water for crop irrigation. Fort Selden Historic Site However, the Rio Grande is an extremely powerful force of nature. It 1280 Ft. Selden Rd. Radium Springs, NM 88054 is a naturally moving river whose path changes on an almost yearly basis. Phone (575) 526-8911 Regional Office: (575) 202-1638 nmhistoricsites.org In the mid-19th century, settlers in the two flood controls in Picacho North and through to the Juarez Valley can have Upper Mesilla Valley were looking for Picacho South; and diversion dams access to water when needed.
    [Show full text]
  • Chapter 4: the Hydrologic System of the Middle Rio Grande Basin
    Chapter 4: The hydrologic system of the Middle Rio Grande Basin In discussions of the water resources of an area, the hydrologic system is commonly split into two components for convenience: surface water and ground water. However, in the Middle Rio Grande Basin, as in most other locales, the surface- and ground-water systems are intimately linked through a series of complex interactions. These interactions often make it difficult to recognize the boundary between the two systems. In The Rio Grande is the only river I ever this report, the surface- and ground-water systems are described separately, saw that needed irrigation. –attributed to though one of the goals of the report is to show that they are both parts of Will Rogers the hydrologic system of the Middle Rio Grande Basin and that changes in one often affect the other. As defined earlier, in this report “Middle Rio Grande Basin” refers to the geologic basin defined by the extent of deposits of Cenozoic age along the Rio Grande from about Cochiti Dam to about San Acacia. This definition includes nearly the entire ground-water basin; however, the extent of the surface-water basin is delimited topographically by drainage divides and is consequently somewhat larger than the ground-water basin. Surface-water system The most prominent hydrologic feature in the Middle Rio Grande Basin is the Rio Grande, which flows through the entire length of the basin, generally from north to south. The fifth longest river in the United States, its headwaters are in the mountains of southern Colorado. The Rio Grande is the largest river in New Mexico, with a drainage area of 14,900 square miles where it enters the Middle Rio Grande Basin.
    [Show full text]
  • Environmental Contaminants and Their Effects on Fish in the Rio Grande Basin
    Biomonitoring of Environmental Status and Trends (BEST) Program: Environmental Contaminants and their Effects on Fish in the Rio Grande Basin S# S# S# S# S#S#S# S#S#S#S# S# S# # S S# S# # S S# S# S# S# # S# S# S S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# S# # S# S# # S S#S# S S# S# S# S# #S# S# S# S# S#S S# # S# SS# S# S# S#S# Scientific Investigations Report 2004—5108 U.S. Department of the Interior U.S. Geological Survey Front cover. The U.S. map shows the Rio Grande Basin (green) and stations sampled in this study (orange). Shown in gray are major river basins and stations in the conterminous U.S. sampled during other Biomonitoring of Environmental Status and Trends Program (BEST) investigations. Biomonitoring of Environmental Status and Trends (BEST) Program: Environmental Contaminants and their Effects on Fish in the Rio Grande Basin By Christopher J. Schmitt, Gail M. Dethloff, Jo Ellen Hinck, Timothy M. Bartish, Vicki S. Blazer, James J. Coyle, Nancy D. Denslow, and Donald E. Tillitt Scientific Investigations Report 2004—5108 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior Gale A. Norton, Secretary U.S. Geological Survey Charles G. Groat, Director U.S. Geological Survey, Reston, Virginia: 2004 For more information about the USGS and its products: Telephone: 1-888-ASK-USGS World Wide Web: http://www.usgs.gov/ Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S.
    [Show full text]
  • Dick Polich in Art History
    ww 12 DICK POLICH THE CONDUCTOR: DICK POLICH IN ART HISTORY BY DANIEL BELASCO > Louise Bourgeois’ 25 x 35 x 17 foot bronze Fountain at Polich Art Works, in collaboration with Bob Spring and Modern Art Foundry, 1999, Courtesy Dick Polich © Louise Bourgeois Estate / Licensed by VAGA, New York (cat. 40) ww TRANSFORMING METAL INTO ART 13 THE CONDUCTOR: DICK POLICH IN ART HISTORY 14 DICK POLICH Art foundry owner and metallurgist Dick Polich is one of those rare skeleton keys that unlocks the doors of modern and contemporary art. Since opening his first art foundry in the late 1960s, Polich has worked closely with the most significant artists of the late 20th and early 21st centuries. His foundries—Tallix (1970–2006), Polich of Polich’s energy and invention, Art Works (1995–2006), and Polich dedication to craft, and Tallix (2006–present)—have produced entrepreneurial acumen on the renowned artworks like Jeff Koons’ work of artists. As an art fabricator, gleaming stainless steel Rabbit (1986) and Polich remains behind the scenes, Louise Bourgeois’ imposing 30-foot tall his work subsumed into the careers spider Maman (2003), to name just two. of the artists. In recent years, They have also produced major public however, postmodernist artistic monuments, like the Korean War practices have discredited the myth Veterans Memorial in Washington, DC of the artist as solitary creator, and (1995), and the Leonardo da Vinci horse the public is increasingly curious in Milan (1999). His current business, to know how elaborately crafted Polich Tallix, is one of the largest and works of art are made.2 The best-regarded art foundries in the following essay, which corresponds world, a leader in the integration to the exhibition, interweaves a of technological and metallurgical history of Polich’s foundry know-how with the highest quality leadership with analysis of craftsmanship.
    [Show full text]
  • History of the Rio Grande Reservoirs in New Mexico: Legislation and Litigation
    University of New Mexico UNM Digital Repository Law of the Rio Chama The Utton Transboundary Resources Center 2007 History of the Rio Grande Reservoirs in New Mexico: Legislation and Litigation Susan Kelly UNM School of Law, Utton Center Iris Augusten Joshua Mann Lara Katz Follow this and additional works at: https://digitalrepository.unm.edu/uc_rio_chama Recommended Citation Kelly, Susan; Iris Augusten; Joshua Mann; and Lara Katz. "History of the Rio Grande Reservoirs in New Mexico: Legislation and Litigation." (2007). https://digitalrepository.unm.edu/uc_rio_chama/28 This Article is brought to you for free and open access by the The Utton Transboundary Resources Center at UNM Digital Repository. It has been accepted for inclusion in Law of the Rio Chama by an authorized administrator of UNM Digital Repository. For more information, please contact [email protected], [email protected], [email protected]. SUSAN KELLY, IRIS AUGUSTEN, JOSHUA MANN & LARA KATZ* History of the Rio Grande Reservoirs in New Mexico: Legislation and Litigation" ABSTRACT Nearly all of the dams and reservoirson the Rio Grandeand its tributaries in New Mexico were constructed by the federal government and were therefore authorized by acts of Congress. These congressionalauthorizations determine what and how much water can be stored, the purposesfor which water can be stored, and when and how it must be released. Water may be storedfor a variety of purposes such as flood control, conservation storage (storing the natural flow of the river for later use, usually municipal or agricultural),power production, sediment controlfish and wildlife benefits, or recreation. The effect of reservoir operations derived from acts of Congress is to control and manage theflow of rivers.
    [Show full text]
  • 1 Written Testimony Submitted to the United States Senate Committee On
    Written Testimony Submitted to the United States Senate Committee on Energy and Natural Resources on S. 1012 New Mexico Drought Preparedness Act of 2017 Respectfully Submitted By Mike A. Hamman, PE Chief Executive Officer Middle Rio Grande Conservancy District Rio Grande Water Development in New Mexico The Upper Rio Grande originates in the San Juan and Sangre de Cristo mountain ranges in southern Colorado and northern New Mexico. It bisects the San Luis Valley in Colorado and the entire state of New Mexico with this reach culminating at Fort Quitman, Texas. This portion of the Rio Grande is administered under the Rio Grande Compact by a federal appointee and three Commissioners from Colorado, New Mexico and Texas with support from the United States Geological Survey, the Bureau of Reclamation, and the Army Corps of Engineers. The annual mean flow as measured at the Otowi gage in New Mexico is 1 million acre-feet with wide variation, ranging from 250,000 to 2.5 million acre-feet. Irrigated agriculture consists of approximately 600,000 acres in Colorado, 200,000 acres in New Mexico, 100,000 acres in Texas. Additionally, up to 60,000 acre-feet is delivered to lands within the Republic of Mexico via the Rio Grande Project under the 1906 Convention between the United States and Mexico. The predominate crop due to climate, water supplies and labor considerations is alfalfa. Other crops include potatoes, chilé, corn, fruit, onions and pecans. There is an improving ‘farm to table’ market serving a demand for locally produced agricultural products ranging from lettuces to melons as well as organically grown products particularly near and in municipalities.
    [Show full text]
  • Rio Chama Flow Project Hough Short in Length, the Rio Chama Is Among the Most Regulated Tstretches of River in the West
    Improving River Management for People & Wildlife he Rio Chama is a river of both beauty and significance that rises in the San TJuan Mountains and flows 130 miles to its confluence with the Rio Grande. It runs through spruce and pine-clad slopes, colorful sandstone mesas and rich farming valleys. As the largest tributary in the upper Rio Grande basin, its flows have long supplied water to ancient pueblo people, traditional acequias and modern users, here and throughout the Rio Grande Valley. During the past century, the river became the subject of intensive water development. El Vado (1935), Abiquiu (1963) and Heron (1974) reservoirs captured the abundance of spring runoff to regulate water supplies throughout the year. Legal regimes have thus grown up to govern the division of the Chama’s water, transforming the river from dependency on local and natural forces to one whose flows now respond to a complex of distant administrative mandates. These institutions enforce the on-going alteration of the river’s basic, life-sustaining processes. river’s natural flow regime – its seasonality, Avolume and duration of its rise and fall over time – sustains native biodiversity and the integrity of aquatic and riparian ecosystems. Flow is the key serve to maintain today’s socio-economic benefits? process that supports a healthy river, enabling a river Could they fulfill some of the river’s unrealized to provide valuable services – clean water, flood potential, while also recovering a measure of its lost storage, groundwater recharge, abundant wildlife, values in the El Vado to Abiquiu reach? healthy riparian forests and recreation.
    [Show full text]
  • Water, Natural Resources, and the Urban Landscape 42 Chapter Two
    CHAPTER TWO WATER: A LIMITING FACTOR D E C I S I O N - M A K E R S FIELD CONFERENCE 2009 The Albuquerque Region 40 CHAPTER TWO The diversion dam on the Rio Grande just south of the Alameda bridge. EISEY H DRIEL © A DECISION-MAKERS FIELD GUIDE 2009 WATER: A LIMITING FACTOR 41 Water Supply Limitations in the Albuquerque Area Deborah L. Hathaway, S. S. Papadopulos & Associates, Inc. ater: the limiting factor. Albuquerque residents This water supply is highly variable from year to year Wand their political leaders are familiar with but in part can be stored by the Middle Rio Grande this concept, as are urban planners and developers. Conservancy District (MRGCD) at El Vado Reservoir. Water is a high-profile hurdle that confronts urban Native surface water represented by upstream inflow at development and attracts uncountable legal and the Otowi gage (with adjustment for upstream storage engineering efforts. Legions of attorneys and engineers and imported water) is subject to apportionment under make careers of developing “innovative” schemes the Rio Grande Compact, which caps native surface to surmount the water supply hurdle, and although water inflow available for depletion in New Mexico. these may be time-consuming and expensive, seldom Native surface water comprises the bulk of water used does lack of water impede a strongly motivated and for agriculture in the Albuquerque area and is diverted well-financed development plan. “Finding water” often into MRGCD canals at Angostura. Further north and results in a water transfer, for example, a shift of water south within the Albuquerque Basin, water for irriga- from agricultural to urban uses.
    [Show full text]
  • 2. Action Area: Overview of Project Components and Water Operations 2.1 Action Area
    Joint Biological Assessment Part I – Water Management 2. Action Area: Overview of Project Components and Water Operations 2.1 Action Area The project area is the area where Reclamation’s and the non-Federal entities’ proposed actions occur, while the action area is defined as “all areas to be affected directly or indirectly by the Federal action and not merely the immediate area involved in the action” (50 Code of Federal Regulations [CFR] 402.02). For this BA, the project area and action area are considered to be the same. The action area for this consultation includes Heron Reservoir and Willow Creek downstream from Heron Dam, the Rio Chama downstream from the confluence with Willow Creek, and in the Rio Grande from the Velarde downstream to San Marcial above the full reservoir pool of Elephant Butte Reservoir (figure 1). The lateral extent of the action area generally is defined by the riverside drains and associated levees located to the east and west of the main stem of the river. In situations where levees do not exist on either or both sides, the lateral extents are confined by the historical flood plain (geological constraints, such as terraces and rock outcroppings or anthropogenic constraints, such as irrigation facilities). The river mile (RM) designations used in this document are those included in the 2002 controlled aerial photography. Caballo Dam is considered RM 0, and mile designations increase in an upstream direction. 2.2 Overview of Project Components This section provides background on the SJC Project and the MRG Project, which is necessary to identify the nature and limitations of both Reclamation’s discretionary actions and non-Federal actions.
    [Show full text]