WASH Cluster Meeting - Sulaimanyah Venue: Sulaimanyah - WFP office Chair: WASH Sub cluster coordinator – (arche noVa) Participants: (arche-nova, UNHCR, PWJ, UNICEF, JCC, Qandil, GIZ) Date: August. 12th2018 Agenda Meeting Note Action Point

1- Action Points Surdash camp: (192 Families – 927 individuals) UNICEF will funding WASH activities and supporting partner JCC JCC to follow up the fix of two Review and updates to continue up to end of December 2018. elevated water tanks and digging 03 camps Updates:- cesspools inside the camp. 1. Provide water by trucking 65m3 on daily basis in the camp. 2. The two elevated water tanks started to repair and connecting with new borehole, also digging 03 cesspools inside the camp. 3. JCC coordinate with municipality to collect garbage from the camp.

Barzinja camp: (27 families, 126 individuals) Updates:- 1. Barzinja branch of DSSW is operating water system of the camp. 2. Camp management are repairing water and sanitation system. 3. Barzinja municipality are collecting garbage from the camp 3 days in a week.

Ashti camp :( 2405 families, 11,590 individuals) UNICEF will funding WASH activities and supporting the partner JCC to continue up to end of 2018. Updates:- 1. DSSW as a partner of UNICEF operating the water network on daily basis and providing drinking water with average 1080 m3/day (93 litre/person) for the camp, the water tanks cleaned in the camp. 2. Arbat municipality collecting garbage from the camp three times per a week. 3. One of the water pump booster was repaired and now in operation.

Arbat IDP’s Camp: (374 families 1792 individuals) UNICEF will funding WASH activities and supporting the partner JCC to continue up to end of 2018. Updates:- 1. DSSW as a partner of UNICEF operating the water network on daily basis and providing drinking water with average 175 m3/day,(98 litre/ person)and maintenance of sanitation , Cleaning campaigns are continue. 2. Arbat municipality collecting garbage from the camp three times per a week.

WASH Cluster Page 1 of 4

Arbat Refugee Camp: (2208 Families – 8811 Individuals) – UNHCR with partner( Qandil & DSSW) continue provide WASH services to the refugee from mid of February up to end of Dec. 2018. Updates:- 1. DSSW continue operating water system to provide 125L/P/D drinking water with testing it to refugees. 2. Arbat municipality collect waste management 3 times per a week and cleaning campaign in the camp in the day of environment in Jun. 3. Hygiene promotion conducted by Qandil about water preservation, 1600 IDPs targeted. Tazade Camp: (368 Families 1689 individuals) UNICEF funding WASH activities and supporting his partners JCC JCC / To follow up the repair of & DOGSW to continue up to end of 2018. 2pumps of 2boreholes were broken. Updates:- 1. Operating water system service and provide amount of water 450m3/day. 2. Maintenance of water and sanitation system outside the caravans are continue. 3. The 2pumps of boreholes which provide water to the camp were broken. 4. Collecting the solid waste management’s and one cleaning campaign in each month. 5. The water tanks are not clean, need cleaning. Qurato Camp: (252 Families 1171 individuals) arche nova is funding and providing full WASH package in the UNHCR will follow up the Camp up to end of December 2018. repair generator of the pumps which not working. Updates:-

1. Provide drinking water with average of 120 L/P/D, and maintenance of water and sanitation system continue.

2. Collect waste garbage on daily basis and monthly two cleaning campaign in the camp. 3. Hygiene promotion session 1 per each week.

1. Off camps updates PWJ : 1. Two New Boreholes each 300m deep connected main Pipeline to the 8000m3 Tank in Shorish sub-district, District, progress %100 handover done. GIZ: (Qudra – Local partner) 1- Drilling of deep well and construction of Pump house and Guardroom Location: / Raparin Administration/ District/ Nawroz Neighborhood Implemented partner: Raparin Directorate of Water Duration: 5 months / Target groups: HCs and IDPs Beneficiaries: 660 HHs, 3960 Individuals, of which 10 HHs are IDPs, Progress: 70%. Short Summary: A deep well of 150m depth will be drilled with supplying of pump set, construction of Pump house and Guardroom. The population are suffering from lack of water, however, There are at least 3 existed deep wells in this neighborhood, but the need is greater, therefore by implementing this project, hopefully the gap will be covered. 2- Extension of Water pipeline Location: Sulaymaniyah/ Bakhteary 111 Implemented partner: Suli DOW / Duration: 5 months Target Groups: HCs, IDPs and Refugees Beneficiaries: 300 HHs, 1800 Individuals, of which 10% are IDPs and Refugees , Progress: 70%. WASH Cluster Page 2 of 4

Short Summary: The main 150mm existed feeder does not meet the demand of the population, therefore it will be replaced by new 250mm Polyethylene pipe, to cover their needs. 3- Installation of Sewerage system /Location: Sulaymaniyah/ Said Sadiq District/ Raparin Neighborhood Implemented Partners: Suli General Directorate of Municipalities, Said Sadiq Directorate of Municipality Duration: 5 months / Target Groups: HCs, IDPs and Refugees Beneficiaries: 196 HHs, 1176 Individuals, of which 36HHs are IDPs and Refugees. 100% handover done. Short Summary: There is no sewerage system in this Neighborhood, this issue causes public health risks to the population, especially children. Most of the families are depending on private pits made by themselves to dispose their wastes, this could mix with the water supply and causes diseases. By implementing 900ML of sewerage system with diameter of 40cm Polyethylene pipe, this problem will be solved in 4 blocks of this neighbourhood. 4- Extension of Water network - Location: Governorate/ Darwaza and Goran Neighborhoods Implemented Partner: Halabja DOW / Duration: 3 months Target Groups: HCs, IDPs and Refugees /Beneficiaries: 700 HHs, 4200 Individuals, of which 11% are IDPs and Refugees .Progress: 80%. Short Summary: This project consist of 2 parts. First part is connecting existed deep well to the existed elevated tank in Goran Neighborhood, the other part is connected the existed pipelines of 4” to 8” diameters.

UNDP: 1. Construct of water tank & water distribution network in the village of Sadubest (In contract process). 2. Renovation of steel water tank in . 3. Plan to cleaning manholes and inlets of wastewater network in Suliaimanyah (In contract process). 4. Plan to drill deep water well & construction of pump house in Ranya city. 5. Plan to construct of sewerage network and manholes in Qaladize sub district. UNICEF: 1- Procurement process is in progress by UNICEF for provision of two booster pumps with Q=200 m3/hr for water system based on the request letter and specifications were received from Directorate of Sulaimaniyah surrounding water. ICRC: Provideding 5 water pumps (3 booster and 2 submersible) to Darbandikhan district. 3.Coordination / Sharing To get WASH documentation go for link below:- Information https://drive.google.com/open?id=0B1wO8-XZwdRVclBUZWtQOEVkd2s To get Hygiene documentation go for link below:- https://drive.google.com/folderview?id=0Bwi--MUv1DdeOGE4ZVZZQU9RVm8&usp=sharing

WASH Cluster Page 3 of 4

4. Gaps& needs 1. WHO’s fund finished at 31 July 2018 to support DOH for monitoring water quality in the camps and out of the camps in Suli. 2. Dargala village in Zhrawa subdistrict contain 60 familes they are facing lack of water and they need new borehole to be dig. 3. The concrete box of rain drain in the Ashti camp was blocked, needs cleaning. 4. Repair and maintenance needs for the Water Project that provides water to the Sarwchawa and Shkarta sub districts in Raapreen administration. 5. Deep water well in Rapareen quarter - Rizgary sub district. 6. Water network need to Rizgary sub district. 7. Water pipe conveyor to Pebaz sub district. 8. Water tank need to Qurato sub district. AOB - Activity info report have to be reported in 05th of each month, Next WASH Cluster Next WASH cluster meeting TBC Meeting Scheduled

WASH Cluster Page 4 of 4