East Anglia THREE Chapter 13 Offshore Ornithology Figures

Total Page:16

File Type:pdf, Size:1020Kb

East Anglia THREE Chapter 13 Offshore Ornithology Figures East Anglia THREE Chapter 13 Offshore Ornithology Figures Environmental Statement Volume 2 Document Reference – 6.2.13 Author – MacArthur Green East Anglia THREE Limited Date – November 2015 Revision History – Revision A Environmental Statement East Anglia THREE Offshore Windfarm Chapter 13 Figures November 2015 360000 380000 400000 420000 440000 460000 480000 500000 520000 540000 560000 580000 600000 0 Legend 0 0 0 0 0 0 0 0 0 9 East Anglia Z one 9 5 F 5 East Anglia O NE site East Anglia THREE site East Anglia THREE site 4km buffe r East Anglia THREE Inte rc onne c tor Cable Corrid or 0 0 0 East Anglia THREE Export Cable Corrid or 0 0 0 0 0 8 8 8 8 5 5 0 0 0 0 0 0 0 0 6 6 8 8 5 5 0 0 0 0 0 0 0 0 4 4 8 8 5 5 0 0 0 0 0 0 0 0 2 2 8 8 5 5 0 0 0 0 0 0 0 0 0 0 8 8 5 5 0 0 0 0 0 0 0 0 8 8 7 7 5 5 Datum : WGS84 Proje c tion: UTM31N 0 0 0 0 0 0 0 0 6 6 7 7 5 5 360000 380000 400000 420000 440000 460000 480000 500000 520000 540000 560000 580000 600000 C xx/xx/xx xx Third issue O riginal A3 0 5 10 km Drg No Plot Sc ale 0 2.5 5 nm East Anglia THREE Limited 0B1 0x7x/x1x0//x1x5 BxJxF Se c ond issue 1:650,000 Re v 01 © O pe nStre e tMap (and ) c ontributors, CC-BY -SA East Anglia THREE offshore wind farm site FFiigguurree 0 15/07/15 BJF First issue © British Crown and Se aZ one Solutions Lim ite d . All rights re se rve d . Prod uc ts Lic e nc e No. 082010.001. This prod uc t Date 07/10/15 has be e n d e rive d in part from m ate rial obtaine d from the UK Hyd rographic O ffic e with the pe rm ission of the 163.1.1 Controlle r of He r Maje sty’s Statione ry O ffic e and the UK Hyd rographic O ffic e (www.ukho.gov.uk). plus 4km buffe r Rev Date By Comment NO T TO BE USED FO R NAVIGATIO N. © East Anglia O ffshore Wind Lim ite d 2015 Layout N/A Re f: 12°0'0"W 11°0'0"W 10°0'0"W 9°0'0"W 8°0'0"W 7°0'0"W 6°0'0"W 5°0'0"W 4°0'0"W 3°0'0"W 2°0'0"W 1°0'0"W 0°0'0" 1°0'0"E 2°0'0"E 3°0'0"E 4°0'0"E 5°0'0"E 6°0'0"E 7°0'0"E 8°0'0"E 9°0'0"E 10°0'0"E 11°0'0"E 12°0'0"E 13°0'0"E 14°0'0"E 15°0'0"E 16°0'0"E 17°0'0"E 18°0'0"E 19°0'0"E 20°0'0"E 21°0'0"E 22°0'0"E N " N " 0 ' 0 ' 0 0 34 3 ° Legend ° 0 9 6 23 5 N East Anglia Zone 33 Hamford Water N " " 0 0 ' F ' 0 53 0 3 ° ° East Anglia ONE site 34 Hermaness Saxa Vord and Valla Field 9 9 28 5 5 51 East Anglia THREE site 35 Hornsea Mere 47 N N " " 0 ' 0 ' 61 0 0 East Anglia THREE site 4km buffer 36 Hoy 3 ° ° 9 8 5 5 54 21 East Anglia THREE Interconnector Cable Corridor 37 Humber Estuary N 68 " N " 0 ' 0 East Anglia THREE Export Cable Corridor 38 Imperial Dock Lock Leith ' 0 42 0 3 8 ° ° 57 8 8 5 5 1 Abberton Reservoir 39 Inner Moray Firth 36 N N " " 12 2 Alde-Ore Estuary 40 Lindisfarne 0 0 ' ' 0 0 ° 55 3 ° 8 48 7 5 3 Benfleet and Southend Marshes 41 Loch of Strathbeg 5 N " 19 4 Blackwater Estuary (Mid-Essex Coast Phase 4) 42 Marwick Head N 0 " ' 0 0 ' 3 0 ° 5 Breydon Water 43 Medway Estuary and Marshes ° 7 7 5 18 5 6 Broadland 44 Minsmere-Walberswick N 14 N " 67 " 0 0 ' 39 46 ' 0 0 ° 7 Buchan Ness to Collieston Coast 45 Montrose Basin 41 3 7 ° 5 6 7 8 Calf of Eday 46 Moray and Nairn Coast 5 N " N 0 69 ' " 0 0 9 Chesil Beach and The Fleet 47 Mousa ' 3 0 ° ° 6 6 5 30 10 Chichester and Langstone Harbours 48 North Caithness Cliffs 5 N N " " 0 45 ' 11 Colne Estuary (Mid-Essex Coast Phase 2) 49 North Norfolk Coast 0 ' 0 0 ° 3 6 ° 5 25 12 Copinsay 50 Northumbria Coast 5 5 N " 0 13 Coquet Island 51 Noss N ' 24 " 0 0 ' 3 27 0 ° ° 5 14 Cromarty Firth 52 Outer Thames Estuary 5 5 38 59 5 N 15 Crouch and Roach Estuaries (Mid-Essex Coast Phase 3) 53 Papa Stour " 40 N " 0 ' 22 0 ' 0 ° 0 5 16 Deben Estuary 54 Papa Westray (North Hill and Holm) 3 ° 5 4 13 5 N 17 Dengie (Mid-Essex Coast Phase 1) 55 Pentland Firth Islands " 0 N ' 50 " 0 0 ' 3 18 Dornoch Firth and Loch Fleet 56 Portsmouth Harbour ° 0 ° 4 5 4 19 East Caithness Cliffs 57 Rousay 5 N " N 0 " ' 0 0 62 20 Exe Estuary 58 Solent and Southampton Water ' ° 0 4 3 5 ° 21 Fair Isle 59 St Abb`s Head to Fast Castle 3 5 N " 0 ' N " 0 22 Farne Islands 60 Stour and Orwell Estuaries 0 3 26 ' ° 0 3 ° 5 23 Fetlar 61 Sumburgh Head 3 35 5 N " N 0 24 Firth of Forth 62 Teesmouth and Cleveland Coast ' " 0 0 ' ° 37 0 3 3 5 25 Firth of Tay & Eden Estuary 63 Thames Estuary and Marshes ° 2 5 N " 26 Flamborough Head and Bempton Cliffs 64 Thanet Coast and Sandwich Bay 0 ' N 0 " 3 31 0 ' ° 27 Forth Islands 65 The Swale 0 2 ° 5 49 66 2 5 N 28 Foula 66 The Wash " 0 6 N ' 32 " 0 0 ' ° 29 Foulness (Mid-Essex Coast Phase 5) 67 Troup Pennan and Lion`s Heads 0 2 5 5 3 ° 1 30 Fowlsheugh 68 West Westray 5 N " 44 0 ' N 0 16 " 3 2 31 Gibraltar Point 69 Ythan Estuary Sands of Forvie and Meikle loch 0 ° 60 ' 1 0 ° 5 1 52 1 32 Great Yarmouth North Denes 5 4 N 33 " 15 11 0 N ' 17 " 0 3 0 ° ' 1 63 29 0 5 3 ° 0 43 5 N " 65 64 0 ' 0 N " 3 0 ° ' 0 56 0 5 ° 0 20 5 N 58 10 " 9 0 ' N " 0 ° 0 ' 0 0 5 3 ° 9 Datum: WGS84 4 Projection: UTM31N 8°30'0"W 7°30'0"W 6°30'0"W 5°30'0"W 4°30'0"W 3°30'0"W 2°30'0"W 1°30'0"W 0°30'0"W 0°30'0"E 1°30'0"E 2°30'0"E 3°30'0"E 4°30'0"E 5°30'0"E 6°30'0"E 7°30'0"E 8°30'0"E 9°30'0"E 10°30'0"E 11°30'0"E 12°30'0"E 13°30'0"E 14°30'0"E 15°30'0"E 16°30'0"E 17°30'0"E C xx/xx/xx xx Third issue Original A3 0 30 60 km Drg No Plot Scale 0 20 40 nm East Anglia THREE Limited 0B1 0x7x/x1x0//x1x5 BJF Second issue xx Second issue 1:5,000,000 SPAs in Relation to East Anglia THREE Site Rev 01 0 15/07/15 BJF First issue © OpenStreetMap (and) contributors, CC-BY-SA FFiigguurree © Crown copyright. All rights reserved. Natural England 2015. Date 07/10/15 © Crown copyright. All rights reserved. Scottish Natural Heritage 2015. 163.1.2 Rev Date By Comment © East Anglia Offshore Wind Limited 2015 Layout N/A Ref: SPAs (Subset) 5°30'0"W 5°0'0"W 4°30'0"W 4°0'0"W 3°30'0"W 3°0'0"W 2°30'0"W 2°0'0"W 1°30'0"W 1°0'0"W 0°30'0"W 0°0'0" 0°30'0"E 1°0'0"E 1°30'0"E 2°0'0"E 2°30'0"E 3°0'0"E 3°30'0"E 4°0'0"E 4°30'0"E 5°0'0"E 5°30'0"E 6°0'0"E 6°30'0"E N " 0 Legend ' 0 3 ° 5 F East Anglia Zone 5 N " East Anglia ONE site 0 ' 14 0 ° 5 East Anglia THREE site 5 East Anglia THREE site 4km buffer N " 0 East Anglia THREE Interconnector Cable Corridor ' 0 ° 5 East Anglia THREE Export Cable Corridor 5 N " 1 Abberton Reservoir 0 ' 0 3 ° 2 Alde-Ore Estuary 4 5 16 3 Benfleet and Southend Marshes N " 0 4 Blackwater Estuary (Mid-Essex Co ' 0 3 ° 4 5 Breydon Water 5 6 Colne Estuary (Mid-Essex Coast P N " 0 ' 0 ° 7 Deben Estuary 4 5 8 Dengie (Mid-Essex Coast Phase 1) N 9 Foulness (Mid-Essex Coast Phase " 0 ' 0 ° 4 10 Gibraltar Point 5 11 Humber Estuary N " 0 ' 0 12 Lindisfarne 3 ° 3 5 13 Minsmere-Walberswick N 11 14 Northumbria Coast " 0 ' 0 3 ° 15 Stour and Orwell Estuar 3 5 16 Teesmouth & Cleveland Coast N " 0 ' 17 Thames Estuary & Marshes 0 ° 3 5 18 Thanet Coast & Sandwich Bay 10 N " 0 ' 0 ° 3 5 N " 0 ' 0 3 ° 2 5 N " 0 5 ' 0 3 ° 2 5 N " 0 ' 0 ° 13 2 5 N " 2 0 ' 0 7 ° 2 15 5 Datum: WGS84 Projection: UTM31N N " 0 1 ' 6 0 3 ° 4 1 5 8 N " 0 9 ' 0 3 3 ° 1 17 5 N " 0 18 ' 0 ° 1 5 5°0'0"W 4°30'0"W 4°0'0"W 3°30'0"W 3°0'0"W 2°30'0"W 2°0'0"W 1°30'0"W 1°0'0"W 0°30'0"W 0°0'0" 0°30'0"E 1°0'0"E 1°30'0"E 2°0'0"E 2°30'0"E 3°0'0"E 3°30'0"E 4°0'0"E 4°30'0"E 5°0'0"E 5°30'0"E 6°0'0"E C xx/xx/xx xx Third issue Original A3 0 15 30 km Drg No Plot Scale 0 10 20 nm East Anglia THREE Limited 0B1 0x7x/x1x0//x1x5 BxJxF Second issue 1:2,100,000 Rev 01 Ramsar Sites in Relation to East Anglia THREE Site FFiigguurree 0 15/07/15 BJF First issue © OpenStreetMap (and) contributors, CC-BY-SA Date 07/10/15 © Crown copyright.
Recommended publications
  • RSPB Scotland
    RSPB Scotland Letter Writing Briefing Last Chance for Scotland’s Seabirds Our seabirds are the fastest declining group of bird species globally. In Scotland, coastal cliff-tops that were once immense seabird 'cities' have been left like eerily silent ghost towns. The problem will continue to worsen unless the Scottish Government takes action now. The Government is proposing 33 Marine Protected Areas (MPAs) that will protect some of Scotland’s most amazing marine wildlife, but unfortunately they ignore those most in need of protection - Scotland’s seabirds. MPAs have been proposed in different locations around Scotland’s coast and out at sea. These areas will protect important species and habitats from marine activities that could harm them. MPAs will do a lot to help Scotland’s seas, and the many creatures within them, but unfortunately, they will do nothing for the majority of Scotland’s seabirds. The Scottish Government argue that seabirds are already adequately protected, but this is not the case. We have seen terrible declines in many seabird populations over the last ten years and scientists predict that we could see seabirds go extinct from some parts of the country within the next ten years. We need MPAs that protect areas of national importance for our iconic seabirds, not just areas of European importance, which is currently the case. The proposals for MPAs must be improved. The Scottish Government must designate all the proposed MPAs but also add seabirds to the list of species to be protected. In addition, the Firth of Forth Banks Complex proposed MPA must have sandeels added to the list of species to be protected.
    [Show full text]
  • Caithness and Sutherland Proposed Local Development Plan Committee Version November, 2015
    Caithness and Sutherland Proposed Local Development Plan Committee Version November, 2015 Proposed CaSPlan The Highland Council Foreword Foreword Foreword to be added after PDI committee meeting The Highland Council Proposed CaSPlan About this Proposed Plan About this Proposed Plan The Caithness and Sutherland Local Development Plan (CaSPlan) is the second of three new area local development plans that, along with the Highland-wide Local Development Plan (HwLDP) and Supplementary Guidance, will form the Highland Council’s Development Plan that guides future development in Highland. The Plan covers the area shown on the Strategy Map on page 3). CaSPlan focuses on where development should and should not occur in the Caithness and Sutherland area over the next 10-20 years. Along the north coast the Pilot Marine Spatial Plan for the Pentland Firth and Orkney Waters will also influence what happens in the area. This Proposed Plan is the third stage in the plan preparation process. It has been approved by the Council as its settled view on where and how growth should be delivered in Caithness and Sutherland. However, it is a consultation document which means you can tell us what you think about it. It will be of particular interest to people who live, work or invest in the Caithness and Sutherland area. In preparing this Proposed Plan, the Highland Council have held various consultations. These included the development of a North Highland Onshore Vision to support growth of the marine renewables sector, Charrettes in Wick and Thurso to prepare whole-town visions and a Call for Sites and Ideas, all followed by a Main Issues Report and Additional Sites and Issues consultation.
    [Show full text]
  • South Essex Outline Water Cycle Study Technical Report
    South Essex Outline Water Cycle Study Technical Report Final September 2011 Prepared for South Essex: Outline Water Cycle Study Revision Schedule South Essex Water Cycle Study September 2011 Rev Date Details Prepared by Reviewed by Approved by 01 April 2011 D132233: S. Clare Postlethwaite Carl Pelling Carl Pelling Essex Outline Senior Consultant Principal Consultant Principal Consultant WCS – First Draft_v1 02 August 2011 Final Draft Clare Postlethwaite Rob Sweet Carl Pelling Senior Consultant Senior Consultant Principal Consultant 03 September Final Clare Postlethwaite Rob Sweet Jon Robinson 2011 Senior Consultant Senior Consultant Technical Director URS/Scott Wilson Scott House Alençon Link Basingstoke RG21 7PP Tel 01256 310200 Fax 01256 310201 www.urs-scottwilson.com South Essex Water Cycle Study Limitations URS Scott Wilson Ltd (“URS Scott Wilson”) has prepared this Report for the sole use of Basildon Borough Council, Castle Point Borough Council and Rochford District Council (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS Scott Wilson. This Report is confidential and may not be disclosed by the Client or relied upon by any other party without the prior and express written agreement of URS Scott Wilson. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by URS Scott Wilson has not been independently verified by URS Scott Wilson, unless otherwise stated in the Report.
    [Show full text]
  • Basildon Council
    Basildon Borough Council Local Plan Authority Monitoring Report 2016 -2017 Contents 1. Introduction .........................................................................................................................6 2. Authority Monitoring Report 2016/17 ..................................................................................7 3. Contextual Indicators ..........................................................................................................8 4. Local Development Scheme (LDS)...................................................................................17 5. Duty to Co-operate............................................................................................................20 6. Neighbourhood Plans .......................................................................................................22 7. SO1: Protecting and Enhancing the Quality of the Local Environment.............................24 8. SO2: Improve the Quality and Value of the Green Belt ....................................................28 9. SO3: Minimise our Impact on the Environment ................................................................30 10. SO4: Creating Vibrant and Thriving Town Centres...........................................................34 11. SO5: Strengthening the Competitiveness of the Local Economy .....................................38 12. SO6: Delivering New Homes ............................................................................................42 13. SO7: Capitalising on Local Tourism
    [Show full text]
  • Caithness and Sutherland Local Development Plan Report by Director of Development and Infrastructure
    1 The Highland Council Agenda 9. Item Sutherland County Committee Report CC/ Caithness Committee No 16/16 30 August 2016 31 August 2016 Caithness and Sutherland Local Development Plan Report by Director of Development and Infrastructure Summary This report presents a summary of issues raised in comments received on the Proposed Caithness and Sutherland Local Development Plan (CaSPlan) and seeks approval for the Council’s response to these issues and next steps. In accordance with the Council’s Scheme of Delegation, the two Local Committees are asked to consider the report and decide on these matters. The recommended Council position is to defend the Proposed Plan, subject to only minor modifications, which would mean that the next stage would be submission to Ministers and progression to Examination. Other options would involve further consultation on a Modified Plan. The report explains the implications of each way forward. 1. Background 1.1 The Caithness and Sutherland Local Development Plan (CaSPlan) is the second of three area local development plans to be prepared by the Highland Council. Together with the Highland-wide Local Development Plan (HwLDP) and more detailed Supplementary Guidance, CaSPlan will form part of the Council’s Development Plan against which planning decisions will be made in the Caithness and Sutherland area. 1.2 The Proposed Plan consultation for CaSPlan ran from 22 January to 18 March 2016. Around 201 organisations or individuals responded, raising around 636 comments. This includes a few comments received on the associated Proposed Action Programme. All these comments have been published on the development plans consultation portal consult.highland.gov.uk.
    [Show full text]
  • Related Black Guillemot Surveys 2014
    Scottish Natural Heritage Commissioned Report No. 792 Marine Protected Area - related black guillemot surveys 2014 COMMISSIONED REPORT Commissioned Report No. 792 Marine Protected Area - related black guillemot surveys 2014 For further information on this report please contact: Laura Steel Scottish Natural Heritage Great Glen House INVERNESS IV3 8NW Telephone: 01463 725236 E-mail: [email protected] This report should be quoted as: Swann, R. 2014. Marine Protected Area – related black guillemot surveys 2014. Scottish Natural Heritage Commissioned Report No. 792. This report, or any part of it, should not be reproduced without the permission of Scottish Natural Heritage. This permission will not be withheld unreasonably. The views expressed by the author(s) of this report should not be taken as the views and policies of Scottish Natural Heritage. © Scottish Natural Heritage 2014. COMMISSIONED REPORT Summary Marine Protected Area – related black guillemot surveys 2014 Commissioned Report No. 792 Project No: 15115 Contractor: Bob Swann, North of Scotland Ornithological Services Year of publication: 2014 Keywords Marine Protected Areas; MPA; black guillemots; East Caithness Cliffs; Clyde Sea Sill; Sanda; tysties. Background In order to obtain information to support work on Marine Protected Areas (MPAs), black guillemots were surveyed at two sites in Scotland, East Caithness Cliffs and Clyde Sea Sill MPAs, from late March to April 2014. The data from these counts was then compared with counts collected in a similar manner for Seabird 2000. Main findings 1,589 birds were counted in the East Caithness Cliffs MPA. Of these 1,569 birds were in summer plumage, this was a 67% increase on the 939 counted in the same sections for Seabird 2000.
    [Show full text]
  • The Essex Biodiversity Action Plan
    THE ESSEX BIODIVERSITY ACTION PLAN In much of Essex we can still enjoy a great richness of wildlife. Bluebell woods , open meadows with butterflies, birds in our urban gardens, river valleys winding through farmland, and a spectacular coastline .Wild animals and plants surrounding us in our countryside and gardens enhance our quality of life and, together with the habitats and communities they form, help us define what we mean by Essex. This is the biodiversity of Essex ; we so easily take this for granted but action is required if it is to be maintained and enhanced. What is BIODIVERSITY? “Biodiversity : the variety of life.- Biodiversity is all living things, from the tiny garden ant to the giant redwood tree. You will find biodiversity everywhere, in window boxes and wild woods, roadsides and rainforests, snow fields and seashore .” ( Biodiversity : The UK Steering Group Report 1995) Biological Diversity, or biodiversity, is the variety of life that is all around us and all over the world. It encompasses all living things from microscopic organisms to the largest trees. Not just exotic, rare and endangered plants and animals are included, but also those that are found in back gardens, parks and ponds. Biodiversity is also the assemblages of species and their surroundings that we call habitats. Biodiversity is everywhere and we rely on it for our survival. Global Biodiversity and the Rio Challenge In June 1992 leaders of over 150 countries gathered together in Rio de Janeiro for the ‘Earth Summit’. At this conference environmental issues and concerns were addressed, including the loss of the world’s biodiversity.
    [Show full text]
  • Internal Draft Version June 2006)
    (Internal Draft Version June 2006) THURROCK LOCAL DEVELOPMENT FRAMEWORK (LDF) SITE SPECIFIC ALLOCATIONS AND POLICIES “ISSUES AND OPTIONS” DEVELOPMENT PLAN DOCUMENT [DPD] INFORMAL CONSULTATION DRAFT CONTENTS Page 1. INTRODUCTION 1 2. STRATEGIC & POLICY CONTEXT 4 3. CHARACTERISTICS OF THE BOROUGH 6 4. KEY PRINCIPLES 7 5. RELATIONSHIP WITH CORE STRATEGY VISION, 7 OBJECTIVES & ISSUES 6. SITE SPECIFIC PROVISIONS 8 7. MONITORING & IMPLEMENTATION 19 8. NEXT STEPS 19 APPENDICES 20 GLOSSARY OF TERMS REFERENCE LIST INTERNAL DRAFT VERSION JUNE 2006 1. INTRODUCTION 1.1 We would like to get your views on future development and planning of Thurrock to 2021. A new system of “Spatial Planning” has been introduced that goes beyond traditional land-use planning and seeks to integrate the various uses of land with the various activities that people use land for. The new spatial plans must involve wider community consultation and involvement and be based on principles of sustainable development. 1.2 The main over-arching document within the LDF portfolio is the Core Strategy. This sets out the vision, objectives and strategy for the development of the whole area of the borough. The Site Specific Allocations and Policies is very important as it underpins the delivery of the Core Strategy. It enables the public to be consulted on the various specific site proposals that will guide development in accordance with the Core Strategy. 1.3 Many policies in the plans will be implemented through the day-to-day control of development through consideration of planning applications. This document also looks at the range of such Development Control policies that might be needed.
    [Show full text]
  • Site Improvement Plan Essex Estuaries
    Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan Essex Estuaries Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in England as part of the Improvement Programme for England's Natura 2000 sites (IPENS). Natura 2000 sites is the combined term for sites designated as Special Areas of Conservation (SAC) and Special Protected Areas (SPA). This work has been financially supported by LIFE, a financial instrument of the European Community. The plan provides a high level overview of the issues (both current and predicted) affecting the condition of the Natura 2000 features on the site(s) and outlines the priority measures required to improve the condition of the features. It does not cover issues where remedial actions are already in place or ongoing management activities which are required for maintenance. The SIP consists of three parts: a Summary table, which sets out the priority Issues and Measures; a detailed Actions table, which sets out who needs to do what, when and how much it is estimated to cost; and a set of tables containing contextual information and links. Once this current programme ends, it is anticipated that Natural England and others, working with landowners and managers, will all play a role in delivering the priority measures to improve the condition of the features on these sites. The SIPs are based on Natural England's current evidence and knowledge. The SIPs are not legal documents, they are live documents that will be updated to reflect changes in our evidence/knowledge and as actions get underway.
    [Show full text]
  • A Review of the Ornithological Interest of Sssis in England
    Natural England Research Report NERR015 A review of the ornithological interest of SSSIs in England www.naturalengland.org.uk Natural England Research Report NERR015 A review of the ornithological interest of SSSIs in England Allan Drewitt, Tristan Evans and Phil Grice Natural England Published on 31 July 2008 The views in this report are those of the authors and do not necessarily represent those of Natural England. You may reproduce as many individual copies of this report as you like, provided such copies stipulate that copyright remains with Natural England, 1 East Parade, Sheffield, S1 2ET ISSN 1754-1956 © Copyright Natural England 2008 Project details This report results from research commissioned by Natural England. A summary of the findings covered by this report, as well as Natural England's views on this research, can be found within Natural England Research Information Note RIN015 – A review of bird SSSIs in England. Project manager Allan Drewitt - Ornithological Specialist Natural England Northminster House Peterborough PE1 1UA [email protected] Contractor Natural England 1 East Parade Sheffield S1 2ET Tel: 0114 241 8920 Fax: 0114 241 8921 Acknowledgments This report could not have been produced without the data collected by the many thousands of dedicated volunteer ornithologists who contribute information annually to schemes such as the Wetland Bird Survey and to their county bird recorders. We are extremely grateful to these volunteers and to the organisations responsible for collating and reporting bird population data, including the British Trust for Ornithology, the Royal Society for the Protection of Birds, the Joint Nature Conservancy Council seabird team, the Rare Breeding Birds Panel and the Game and Wildlife Conservancy Trust.
    [Show full text]
  • Anglian River Basin District Flood Risk Management Plan 2015 - 2021 PART B – Sub Areas in the Anglian River Basin District
    Anglian River Basin District Flood Risk Management Plan 2015 - 2021 PART B – Sub Areas in the Anglian River Basin District March 2016 1 of 161 Published by: Environment Agency Further copies of this report are available Horizon house, Deanery Road, from our publications catalogue: Bristol BS1 5AH www.gov.uk/government/publications Email: [email protected] Or the Environment Agency’s National www.gov.uk/environment-agency Customer Contact Centre: T: 03708 506506 © Environment Agency 2016 Email: [email protected]. All rights reserved. This document may be reproduced with prior permission of the Environment Agency. 2 of 161 Contents Glossary and abbreviations ......................................................................................................... 5 The layout of this document ........................................................................................................ 7 1. Sub-areas in the Anglian River Basin District ...................................................................... 9 Introduction ................................................................................................................................... 9 Flood Risk Areas ........................................................................................................................ 10 Management Catchments ........................................................................................................... 10 2. Conclusions, objectives and measures to manage risk in the South Essex
    [Show full text]
  • Hywind Scotland Pilot Park
    Hywind Scotland Pilot Park Environmental Statement Habitats Regulations Assessment March 2015 COS_140158/01.2015 Table of Contents 1 INTRODUCTION 4 1.1 Background 4 1.2 Legislative framework 4 1.3 Approach to HRA 6 1.3.1 HRA screening 6 1.3.2 Appropriate Assessment 7 1.4 Types of European site included in the HRA based on qualifying features 7 1.5 Summary of studies / surveys carried out to inform the EIA and HRA 7 1.5.1 Seabird and marine mammal surveys 8 1.5.2 Migratory fish 8 2 HRA SCREENING – SPECIAL PROTECTION AREAS (SPAS) 9 2.1 Seabird populations in the Project study area 9 2.2 Long list of SPAs requiring consideration in the HRA 12 2.2.1 Identification of relevant SPAs 12 2.2.2 Long list of SPAs 13 2.3 Potential impacts on seabirds (impact pathways) 15 2.4 Assessment of LSE 16 2.5 Assessment of impacts on site integrity 17 2.5.1 Conservation objectives for SPAs 18 2.5.2 Collision risk 19 2.5.3 Disturbance / displacement 22 2.5.4 Conclusions with respect to SPA site integrity 24 3 HRA SCREENING – SPECIAL AREAS OF CONSERVATION (SACS) FOR MARINE MAMMALS 29 3.1 Marine mammals in the Project study area 29 3.2 Long list of SACs requiring consideration in the HRA 30 3.3 Potential impacts on marine mammals (impact pathways) 33 3.4 Assessment of Likely Significant Effects (LSE) 33 3.5 Conclusion from assessment of LSE 36 4 HRA SCREENING – SPECIAL AREAS OF CONSERVATION (SACS) FOR MIGRATORY FISH 37 4.1 Migratory fish in the Project study area 37 4.2 Long list of SACs requiring consideration in HRA 37 4.3 Potential impacts on migratory fish
    [Show full text]