Sydney Metro Northwest – Community feedback in response to the Parking Management Strategy Overview Report Table of Contents

1. Introduction 3 3.2.8. What about bus access to the stations? 10 1.1. ’s new metro railway 3 3.2.9. Can residents have more 1.1.1. Northwest 4 all-day parking? 10 1.1.2. Customer access to new 3.2.10. How will the parking restrictions Sydney Metro interchanges 4 be enforced? 10

1.2. Sydney Metro Northwest 3.2.11. What restrictions and zones Parking Management Strategy 5 will be in or around the station precinct? 10 3.2.12. How will the scale of 2. Consultation 6 development be managed? 10 2.1. Community and stakeholder 3.2.13. What about the consultation 6 consultation process? 11 3.2.14. Will the parking provisions 3. Submissions review 7 be reviewed in the future? 11 3.2.15. What about issues other 3.1. Submissions overview than parking? 11 by category 7

3.2. Sydney Metro response to submissions 8 4. Submissions overview by station 12 3.2.1. Can a resident parking scheme be implemented? 8 4.1. Cherrybrook 12

3.2.2. Can the area of proposed parking 4.2. Castle Hill 15 restrictions be extended? 8 4.3. Hills Showground 17 3.2.3. Will changes be made due to safety concerns raised? 9 4.4. Norwest 18 3.2.4. How will commuter impact on 4.5. Bella Vista 20 residential amenity be managed? 9 3.2.5. Can the proposed hours of 4.6. Kellyville 22 restriction or length of stay 4.7. Rouse Hill 24 be amended? 9 3.2.6. Can there be additional or 4.8. Tallawong 25 larger commuter car parks? 9 3.2.7. Can the proposed restrictions 5. Next steps 26 be changed? 10

Cover image: Artist’s impression of the new multi-story car park at Cherrybrook Station, looking south east

Artist’s impression of Rouse Hill Station Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 1 1.1. Sydney’s new metro railway Sydney Metro is a new world-class railway for Sydney. Services start in the city’s North West region in mid-2019 on Australia’s first fully-automated railway, with 13 metro stations and 4000 new commuter car parking spaces. A new generation of metro trains will run every four minutes in the peak in each direction. Customers won’t need a timetable, they’ll just turn up and go. Sydney’s fast, safe and reliable metro trains are fully-air conditioned with new customer benefits like multi-purpose spaces for luggage and parents with prams, as well as wheelchair spaces and priority seating in each carriage. Technology like – used for the first time in Australia – will keep people and objects away from the tracks, also allowing trains to get in and out of stations much faster. All metro stations will be fully accessible with lifts and level access between platforms and trains, making it easier for more customers to use public transport. From the north west, metro rail is being extended under Sydney Harbour, through new underground city stations and beyond to the south west. In 2024, Sydney will have 31 metro railway stations and a 66-kilometre stand-alone metro railway system. There will be capacity for a metro train every two minutes in each direction under the Sydney city centre. Sydney’s new metro, together with signalling and infrastructure upgrades across the existing Sydney suburban rail network, will increase the capacity of train services entering the Sydney central business district (CBD) – from about 120 an hour currently to up to 200 services beyond 2024. That’s an increase of up to 60 per cent capacity across the network to meet demand.

2 1. Introduction

1.1. Sydney’s new New metro rail will be extended to Western Sydney in the second half of the 2020s – the metro railway project will link the Sydney Sydney Metro is a new world-class railway city centre with Greater Parramatta, doubling for Sydney. rail capacity between these centres and linking communities along the way with a new Services start in the city’s North West region underground railway. in mid-2019 on Australia’s first fully-automated railway, with 13 metro stations and 4000 new Sydney’s new world-class metro system is commuter car parking spaces. the biggest program of public transport infrastructure currently under construction A new generation of metro trains will run every in Australia and the largest urban rail four minutes in the peak in each direction. infrastructure investment in the nation’s history. Customers won’t need a timetable, they’ll just turn up and go. Sydney Metro’s projects (see Figure 1.1) are: Sydney’s fast, safe and reliable metro trains Ÿ Sydney Metro Northwest – formerly the are fully-air conditioned with new customer 36‑kilometre North West Rail Link. This benefits like multi-purpose spaces for luggage $8.3 billion project will open in mid-2019 and parents with prams, as well as wheelchair with 13 stations and 4000 commuter spaces and priority seating in each carriage. car spaces. Technology like platform screen doors – used Ÿ Sydney Metro City & Southwest – a new 30- for the first time in Australia – will keep people kilometre metro line extending metro rail and objects away from the tracks, also allowing from the north west under Sydney Harbour, trains to get in and out of stations much faster. through new CBD stations and south west to Bankstown. It is due to open in 2024 with the All metro stations will be fully accessible with ultimate future capacity to run a metro train lifts and level access between platforms and every two minutes each way through the trains, making it easier for more customers to centre of Sydney. use public transport. Ÿ Sydney Metro West – a new underground From the north west, metro rail is being railway linking the Sydney CBD with Greater extended under Sydney Harbour, through new Parramatta by the second half of the underground city stations and beyond to the 2020s. Key areas identified to be serviced south west. by Sydney Metro West are Westmead, Parramatta, Sydney Olympic Park, The Bays In 2024, Sydney will have 31 metro railway Precinct and the Sydney CBD. stations and a 66-kilometre stand-alone metro railway system. Ÿ Servicing and – the railway There will be capacity for a metro train every servicing the new Western Sydney Airport two minutes in each direction under the Sydney will be developed and delivered by Sydney city centre. Metro. The project will become the spine Sydney’s new metro, together with signalling for the region’s growth for generations and infrastructure upgrades across the existing to come, connecting communities and Sydney suburban rail network, will increase the travellers within Western Sydney and the capacity of train services entering the Sydney rest of Sydney with a fast, easy and reliable central business district (CBD) – from about metro service. 120 an hour currently to up to 200 services beyond 2024. That’s an increase of up to 60 per cent capacity across the network to meet demand.

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 3 1. Introduction continued

Figure 1.1: Sydney Metro projects 1.1.1. Sydney Metro Northwest made between catering for car access demand Sydney Metro Northwest will deliver for the and the encouragement of alternative, more first time a reliable public transport service to a sustainable public transport modes, given cars region that has the highest car ownership levels are the least efficient transport mode. per household in Australia. Over the coming The new Sydney Metro stations – Tallawong, decades, an extra 200,000 people are forecast Rouse Hill, Kellyville, Bella Vista, Norwest, Hills to move into Sydney’s North West Growth Showground, Castle Hill and Cherrybrook – Centre, taking its population above 600,000. have been designed as multi-modal transport The project will deliver: interchanges. Customers will be able to access the new interchanges using a variety Ÿ eight new railway stations and 4000 of transport modes including walking, cycling, commuter car parking spaces to Sydney’s buses, taxi, and kiss and ride bays, with 4000 growing north west commuter car parking spaces (off-street) Ÿ 23 kilometres of new metro line between provided at the stations of Tallawong, Kellyville, Rouse Hill and Epping, including 15 Bella Vista, Hills Showground and Cherrybrook. kilometres of tunnels and a four-kilometre The number of commuter car parking spaces skytrain viaduct is determined by a range of factors including Ÿ conversion of the existing Epping to demand (current and forecast), site location Chatswood railway to metro standards, and constraints, land use planning, station including new platform safety screen doors catchment profile (for example, a strategic Ÿ a train every four minutes during peak centre or employment centre), public transport periods, or 15 trains an hour. With metro provision, proximity to other car parks, road there will be no need for a timetable as network access and traffic impacts. customers can turn up and go. Commuter car parking will not be provided at Rouse Hill, Norwest and Castle Hill, as these 1.1.2. Customer access to new are strategic centres. The approach for these Sydney Metro interchanges centres broadly reflects planning for commuter It is widely recognised that the North West car parks across Sydney, which focuses on region of Sydney remains one of the most providing parking outside of busy town centres highly car dependent regions in Australia. As a and major employment centres. Customers major piece of transport infrastructure, Sydney wanting to park at Castle Hill, Norwest and Metro Northwest will change the way people Rouse Hill will be able to access car parking get around across Sydney’s entire North West at the nearby stations of Cherrybrook, region as well as locally. Hills Showground, Bella Vista, Kellyville and Tallawong. Interchange planning at each of the new stations recognises that a balance must be

4 1.2. Sydney Metro Northwest The overarching purpose of the Sydney Metro Northwest Parking Management Strategy is to Parking Management Strategy demonstrate how changes to travel and parking As part of the planning approval under behaviour can be accommodated for the Environmental Impact Statement 2 (EIS 2), operation of Sydney Metro Northwest as well as Sydney Metro is required to prepare a Parking meeting planning approval condition C11. Management Strategy that addresses key Sydney Metro has been consulting with parking considerations across the project, such Blacktown, The Hills and Hornsby councils, as commuter parking, impacts to on-street as well as Roads and Maritime Services parking and appropriate responses to parking (RMS), bus operators and other Transport issues. Condition C11 states: for NSW divisions such as the Sydney ‘The Proponent shall prepare a Parking Coordination Office, in the development of Management Strategy in consultation with the Parking Management Strategy. Parking the Roads and Maritime Services (RMS), management initiatives have been identified bus operators and Councils to manage car and recommended, considering both regional parking impacts at stations and adjoining and local impacts, with greater focus on local areas as a result of the operation of the implications around each interchange. SSI (State Significant Infrastructure). The The Sydney Metro Northwest Parking Parking Management Strategy shall include, Management Strategy covers commuter car but not be limited to: parks, as well as providing recommendations a. the provision of parking spaces consistent for on-street parking changes in the wider with those identified in EIS documentation, precincts surrounding the stations. The Sydney except as required by this approval; Metro Northwest – Parking Management Strategy Overview Report was developed b. the replacement of lost on street car for the purpose of public consultation of the parking in the vicinity of stations, where proposed on-street parking changes. feasible and reasonable; The Sydney Metro Northwest – Parking c. the safe placement, access to (including Management Strategy Overview Report is safe pedestrian and cycle access) and available at: management of parking; www.sydneymetro.info/sites/default/files/ d. a monitoring and reporting methodology document-library/Parking_management_ for the utilisation of park and ride spaces strategy_overview_report.pdf and impacts on parking supply and turnover This current report summarises the submissions on adjoining streets at each station; received in response to the on-street changes e. the identification of measures to address proposed in the overview report. on street parking impacts, such as resident parking schemes, should monitoring identify a significantly detrimental impact on local parking supply. The Proponent shall be responsible for the coordination of measures in consultation with the relevant Council. The Strategy shall be submitted to the Director-General and the reporting of monitoring incorporated into the Compliance Tracking Program. The monitoring shall be undertaken in conjunction with the monitoring under condition F3 and apply for a minimum of one year following commencement of operation.’

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 5 2. Consultation

2.1. Community and Letters advising of the proposed changes were delivered to letterboxes in the affected areas stakeholder consultation surrounding the station precincts. During December 2018, Sydney Metro Email notifications were sent to all stakeholders undertook public consultation on the proposed on the Sydney Metro Northwest subscribers parking changes around the wider interchange list. Stakeholders include community members, precincts for the Parking Management Strategy. community groups, local councils, land owners The Sydney Metro Northwest – Parking and strata representatives. Management Strategy Overview Report was produced to summarise all of the proposed Community members and stakeholders were changes to on-street parking on residential able to direct their enquiries to: streets surrounding the immediate station Ÿ T: 1800 019 989 precincts. This document was published on the Ÿ E: [email protected] Sydney Metro website and the community was invited to comment over a two-week period Ÿ Mail: Sydney Metro, PO Box 588, North from 3–17 December 2018. However, in order Ryde, BC 1670. to capture as much feedback as possible, submissions were accepted until 7 January 2019 and are included in this report.

Figure 2.1: Artist’s impression of Kellyville Station

6 3. Submissions review

3.1. Submissions overview Most submissions supported the proposed changes, although often with the proviso of a by category resident parking scheme, with a small number As a result of the community and stakeholder of submissions being strongly opposed. consultation process outlined above, 251 Figure 3.1 shows the submissions received submissions were received, with some grouped by categories across Blacktown submissions being signed by multiple people. City Council, Hornsby Shire Council and Hills Most submissions received were requests Shire Council local government areas (LGAs). to implement resident parking schemes or Please note that many submissions raised more to extend the area of the proposed parking than one issue, resulting in a total number of restrictions, followed by a variety of safety submissions on issues greater than the total concerns and concerns about commuters number of submissions. impacting the amenity of residential areas. However, the types of community concerns varied by station location, as outlined in the sections below.

120 Blacktown LGA

100 Hornsby LGA

The Hills LGA

80

60

40

20

0 Bus access Sta parking Sta Enforcement of Enforcement parking scheme Safety concerns Safety Overdevelopment residential amenity residential parking restrictions parking restrictions Implement resident Additional or larger Additional commuter car parks commuter Consultation process Consultation of parking provisions Commuter impacts on Commuter Submissions outside the Submissions Ability for future reviews future Ability for the proposed restrictions the proposed scope of this consultation scope Extend the area of proposed the area Extend Change, reduce or not implement reduce Change, Increase or decrease the proposed or decrease Increase Lack of all-day parking available to parking available Lack of all-day hours of restriction or length of stay hours of restriction within or around the station precinct the station within or around Already approved parking restrictions approved Already residents due to proposed restrictions proposed due to residents

Figure 3.1: Submission issues raised by category

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 7 3. Submissions review continued

3.2. Sydney Metro response 3.2.1. Can a resident parking scheme to submissions be implemented? Any decision on the implementation of a Sydney Metro has assessed the feedback on the resident parking scheme is the responsibility of proposed parking changes received during the the Councils with consideration of the relevant public consultation period and has grouped the guidelines and legislation. feedback into three categories: Within the Sydney metropolitan area, Ÿ Changes made to proposed parking implementation of resident parking schemes restrictions – As a result of feedback that have been put in place solely due to public received, some amendments have been transport interchange operations are rare and made to the parking changes, based on have generally only occurred where residential the key principles outlined in the Parking properties have no off-street parking available. Management Strategy Overview Report. As such, resident parking schemes were not These have been included in the final considered an appropriate recommendation recommendations to the relevant council to Council for the on-street parking changes for assessment. The final approved parking in the Sydney Metro Northwest wider changes will be available on each council’s interchange precincts. website following assessment and will be summarised in the Parking Management 3.2.2. Can the area of proposed Strategy Report, which will be publicly parking restrictions be extended? available prior to the opening of Sydney Metro Northwest in mid-2019. Requests to extend the areas included in the proposed parking restrictions have been Ÿ Parking changes to be reviewed at a future assessed and amendments made are outlined date – Some of the feedback about parking for each area in Chapter 4. changes has identified items that will be monitored during the 12-month period These proposed changes have been included in following the Sydney Metro Northwest the final recommendations made to the relevant opening, as part of the project’s Traffic and council, as each council is the authority for Parking Monitoring program. on-street parking changes. The final decision on these proposed changes will be made by Ÿ Parking changes assessed but with no each council and the local traffic committee. further action – In some cases, issues raised have been assessed and have not been The final approved parking changes will be submitted to council for consideration as available on each council’s website following these items generally sit outside the scope assessment and will be summarised in the of the Parking Management Strategy or Parking Management Strategy Report, which cannot be accommodated from a technical will be publicly available prior to the opening of or legislative perspective. Sydney Metro Northwest in mid-2019. Sydney Metro notes that while some concerns Sydney Metro will also continue to monitor about the parking changes were raised, the traffic and parking, as required under the feedback received also demonstrated support planning approval condition, in the 12 for the parking changes and in some cases months following the opening of Sydney requested that they be extended. Metro Northwest. The following sections (3.2.1 – 3.2.15) outline Sydney Metro’s response to the broad categories of questions raised by the submissions, as per the issues raised in Section 3.1.

8 3.2.3. Will changes be made due to 3.2.5. Can the proposed hours safety concerns raised? of restriction or length of stay be Sydney Metro considered key safety issues in amended? determining the proposed parking measures (as Requests to reduce the proposed hours of described in the Parking Management Strategy restriction from four-hour parking zones to Overview Report). These include: three- or two-hour zones were not considered necessary, as four-hour parking zones are Ÿ maintaining sight lines and allowing for sufficient to prevent all-day parking. In areas topography, preserving adequate sight lines of commercial activity, a combination of two- for both vehicles and pedestrians and four-hour parking zones are proposed. Ÿ providing No Stopping zones on approach Sydney Metro will monitor the performance to intersections and crossings to support of the four-hour parking zones during the 12 pedestrian safety months following the opening of Sydney Metro Ÿ retaining safe access for emergency and Northwest to determine the effectiveness of service vehicles by restricting parking on this restriction. narrow streets Requests to extend the hours to which parking Ÿ supporting safe and easy vehicle access by restrictions apply, such as from 9am–3pm to taking into account the spatial dimensions 8am–6pm, were also not considered necessary, for parked vehicles and through traffic in as the time window proposed will prevent accordance with regulatory requirements. all-day parking. A number of other safety issues were raised in the community feedback that were outside the 3.2.6. Can there be additional or scope this consultation, including: larger commuter car parks? Ÿ sight lines from individual resident The number of commuter car parking spaces driveways, including statutory parking at new Sydney Metro stations has been distances from driveways determined by a range of factors including current and forecast demand, constraints at Ÿ driver behaviour, including breaches of road each location, planned land use, the station rules for speeding and parking catchment profile (for example, whether Ÿ speed limits for existing roads and requests a strategic or employment centre), public for traffic calming transport connections, other car parks in the Ÿ concerns about potential collisions. area, road network access and traffic impacts. 3.2.4. How will commuter impact on Commuter car parking is not provided at residential amenity be managed? Rouse Hill, Norwest and Castle Hill as these are strategic centres. The approach for these Unrestricted parking in narrow or busy centres broadly reflects planning for commuter residential streets can create issues with car parks across Sydney, which focuses on motorists parking partially on lawns, restricting providing parking outside of busy town centres access to driveways and generally impacting and major employment centres. Customers amenity. The Parking Management Strategy wanting to park at Castle Hill, Norwest and Overview Report’s proposed parking Rouse Hill will be able to access car parking restrictions seek to minimise this. at the nearby stations of Cherrybrook, Enforcement of the parking restrictions remains Hills Showground, Bella Vista, Kellyville the responsibility of councils and NSW Police. and Tallawong. Sydney Metro will work with these authorities to ensure parking restrictions are enforced where required. Sydney Metro will also monitor traffic and parking in the 12 months following the opening of Sydney Metro Northwest and will work with each council, as the roads authority, to implement any changes that may be required.

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 9 3. Submissions review continued

3.2.7. Can the proposed restrictions While most properties surrounding stations be changed? have driveways and garages, a number of areas that are close to the station in residential Requests to reduce the areas included in areas have remained unrestricted, which allows the proposed parking restrictions have been residents to park on the street all day if need assessed and the amendments made are be. In some instances where the streets are outlined for each area in Chapter 4. In some narrow, parking restrictions on both sides were instances, feedback received around changing, considered appropriate. reducing or not implementing parking restrictions could not be accommodated due to technical or legislative reasons. 3.2.10. How will the parking restrictions be enforced? While a number of proposed restricted, Enforcement of the parking restrictions is the on-street parking spaces may be currently used responsibility of the relevant council and NSW by people working near stations, the opening of Police. Sydney Metro will work with these Sydney Metro Northwest will provide workers authorities to ensure parking restrictions are with an alternative mode of transport to travel enforced where required. to and from work. 3.2.11. What restrictions and zones 3.2.8. What about bus access to will be in or around the station the stations? precinct? The new Sydney Metro interchanges have On-street parking changes in the station been designed as multi-modal transport precincts (such as kiss and ride bays, taxi ranks interchanges to maximise public transport and loading zones) and other services (such as access. Customers will be able to access the bicycle parking at stations) were not included stations using a variety of modes including in the Parking Management Strategy Overview buses, taxis, kiss and ride bays, cycling and Report as they were already approved by the walking, with park and ride facilities provided relevant local council as part of the station at Tallawong, Kellyville, Bella Vista, Hills planning process. Supporting documentation Showground and Cherrybrook. While changes is publicly available on each council’s website to local bus services are outside the scope of or in the Sydney Metro Northwest Interchange this consultation, any changes to bus services Access Plan, which is available at: will be made public closer to the opening of www.sydneymetro.info/sites/default/files/ Sydney Metro Northwest in mid-2019. document-library/Sydney_Metro_Northwest_ At Cherrybrook, Sydney Metro can confirm that Interchange_Access_plan.pdf buses will not travel via Robert Road to access Cherrybrook Station, but will instead use the 3.2.12. How will the scale of new Bradfield Parade outside the new station, development be managed? along with existing routes along Castle Hill The scale and nature of the development in Road, County Drive, Franklin Road, John Road the North West region of Sydney is outside and Neale Avenue. the scope of this consultation. However, the proposed parking strategy aims to address 3.2.9. Can residents have more some of the traffic and parking impacts all-day parking? associated with development around the new Parking restrictions are required for a stations, to encourage customers to use public number of reasons, as outlined in the Parking transport while maintaining local amenity Management Strategy Overview Report. The for residents. four-hour parking zone restrictions have been provided to prevent all-day parking while retaining parking for visitors.

10 3.2.13. What about the 3.2.15. What about issues other consultation process? than parking? There was a consultation period on the Parking All feedback received on the Parking Management Strategy Overview Report from Management Strategy Overview Report 3–17 December 2018. However, Sydney Metro has been reviewed; however several items took into consideration further community of feedback were outside the scope of feedback until 7 January 2019. All feedback this consultation. received up to and including 7 January 2019 is included in this report.

3.2.14. Will the parking provisions be reviewed in the future? Sydney Metro will monitor traffic and parking in the 12 months following the opening of Sydney Metro Northwest and will work with each local council, as the roads authority, to implement any changes that may be required.

Figure 3.2: Artist’s impression of Bella Vista Station car park

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 11 4. Submissions overview by station

An overview of the submissions received by station location, as proposed in the Sydney Metro Northwest – Parking Management Strategy Overview Report, is outlined below. Maps showing the changes proposed in the Parking Management Strategy Overview Report have been included. Any changes to the proposed parking as a result of community feedback are also outlined in each section below.

4.1. Cherrybrook Ÿ requests to increase or decrease the proposed hours of restriction or length Seventy-five submissions were received of stay (8) regarding the proposed parking changes Ÿ requests to change, reduce or not around Cherrybrook Station. implement the proposed restrictions (6) The key issues raised by the community Ÿ concerns about the consultation (5) feedback were: Ÿ commuter impacts on residential amenity (5) Ÿ requests for resident parking schemes Ÿ requests for the provision of additional or (raised by 38 submissions) larger commuter car parks (3) Ÿ enquiries or concerns regarding bus Ÿ lack of all-day parking available to residents access (16) as a result of the proposed restrictions (1) Ÿ enquiries or misunderstanding regarding the Ÿ concerns regarding staff parking (1) already approved parking restrictions within Ÿ concerns about over-development (1) or around the station precinct (16) Ÿ ability for parking provisions to be reviewed Ÿ requests to extend the area of the proposed again in the future (1). parking restrictions (15) Ÿ safety concerns (14) Below are the proposed parking changes as shown in the Parking Management Ÿ requests or comments outside the scope of Overview report. this consultation (13)

12 Castle Hill Road Hill Castle

Cherrybrook Station Claridge Close

Fernleigh Close

Ridgemont Close

B ra d f ie ld P a r a d e Total 400 Parking spaces Neale Avenue

Franklin Road

Key Restricted Parking (4P 9am–3pm Monday–Friday) No Parking (9am–3pm Monday–Friday) No Stopping Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

Figure 4.1: Focus area – Franklin Road (Cherrybrook) parking conditions, early 2019

Clifton Place

Ashford Road

Barkley Close

John Road

Dalkeith Road Castle Hill Road Hill Castle

Robert Road Bradfield Parade Bradfield

Key Restricted Parking (4P 9am–3pm Monday–Friday) No Parking (9am–3pm Monday–Friday) No Stopping No Parking Pedestrian Only Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved Cherrybrook Station and installed as part of the immediate station construction works.

Figure 4.2: Focus area – Robert Road (Cherrybrook) parking conditions, early 2019

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 13 4. Submissions overview by station continued

radfield Pa Cherrybrook Station B rade Castle Hill Road

Total 400 Parking spaces Franklin Road

Glenayr Grove

Glenhope Road Key Restricted Parking (4P 9am–3pm Monday–Friday) No Parking (9am–3pm Monday–Friday) No Stopping Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works. Glenridge Avenue

Figure 4.3: Focus area – Glenhope Road (West Pennant Hills) parking conditions, early 2019

Changes proposed by Sydney Metro Ÿ Extending the No Stopping restriction on following consultation the western side of Franklin Road beyond Following consultation, Sydney Metro reviewed the Neale Avenue intersection (in the the community feedback and proposed some northern direction). additional changes and altered some of the Ÿ Rezoning a No Parking zone in front of parking measures originally proposed. These Tangara School for Girls to become a No additional changes have been included in the Stopping zone. final recommendations to the relevant local Ÿ Rezoning an area opposite Tangara School councils for assessment and include: for Girls, initially proposed to be No Ÿ Replacing No Stopping zones with No Stopping, now proposed to be ‘No Parking Parking zones in the cul-de-sac ends of 8–9.30am/2.30–4pm Monday to Friday’ Ridgemont Close, Claridge Close and to allow for pick-up and drop-off activity Fernleigh Close to allow for short-term pick during school hours and residents parking at up and drop off. other times. Ÿ Moving the No Parking zone on Ghisla Close Ÿ Adding four-hour parking, No Parking and from the northern side to the southern side. No Stopping zones along Robert Road between Oliver Way and Dalkeith Road. This Ÿ Adding No Parking zones to the western side area is in the 200–400 metre radius from the of Staley Court and on the local road in front station and was not captured in the initial of 111–113 Castle Hill Road. parking restriction assessment.

14 4.2. Castle Hill Ÿ concerns about over-development (3) Ÿ enquiries around the enforcement of Twenty-one submissions were received parking restrictions (3) regarding the proposed parking changes around Castle Hill Station. Ÿ requests for the provision of additional or larger commuter car parks (2) The key issues raised by the community Ÿ lack of all-day parking available to residents feedback were: as a result of the proposed restrictions (2) Ÿ requests for resident parking schemes Ÿ requests or comments outside the scope of (raised by 12 submissions) this consultation (2) Ÿ requests to extend the area of the proposed Ÿ enquiries or concerns regarding parking restrictions (9) bus access (1) Ÿ safety concerns (8) Ÿ requests to change, reduce or not Ÿ requests to increase or decrease the implement the proposed restrictions (1). proposed hours of restriction or length Below are the proposed parking changes of stay (4) as shown in the Parking Management Ÿ commuter impacts on residential amenity (3) Overview report.

Old Castle Hill Road

Winchcombe Place

Garthowen Crescent

Pennant Street

McMullen Avenue

Key Castle Towers Restricted Parking (4P 9am–3pm Monday–Friday) Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved Castle Hill Station and installed as part of the immediate station construction works. Old Northern Road Brisbane Road

Old Castle Hill Road

Figure 4.4: Focus area – Garthowen Crescent and Old Castle Hill Road parking conditions, early 2019

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 15 4. Submissions overview by station continued

McMullen Avenue

Castle Street

Castle Towers

Old Northern Road

Old Castle Hill Road Castle Hill Station Castle Street

Old Northern Road

Pennant Street

Crane Road Brisbane Road Crane Road

Terminus Street

Castle Mall Mercer Street Showground Road

McDougall Lane

Mercer Street

Old Castle Hill Road

Crane Road Terminus Street Brisbane Road Key Restricted Parking (2P 9am–3pm Monday–Friday) Terminus Street Restricted Parking (4P 9am–3pm Monday–Friday) No Stopping Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works. Olola Avenue

Figure 4.5: Focus area – Brisbane Road, Crane Raod, Mercer Street, Castle Street parking conditions, early 2019

Changes proposed by Sydney Metro following consultation No further changes are currently proposed for the streets surrounding Castle Hill Station. Sydney Metro will monitor the performance of parking restrictions implemented for a year after the station opens.

16 4.3. Hills Showground Ÿ safety concerns (1) Ÿ requests for the provision of additional or Seven submissions were received regarding larger commuter car parks (1) the proposed parking changes around Hills Showground Station. Ÿ concerns about over-development (1) Ÿ requests or comments outside the scope of The key issues raised by the community this consultation (1). feedback were: Below are the proposed parking changes Ÿ requests to extend the area of the proposed as shown in the Parking Management parking restrictions (raised by 4 submissions) Overview report. Ÿ requests for resident parking schemes (3)

Hills Showground Station

Total 600 Parking spaces

Sexton Avenue

Carrington Road Fishburn Crescent

Chapman Avenue Fishburn Crescent

Middleton Avenue

Hughes Avenue Partridge Avenue Dawes Avenue Key Restricted Parking (4P 9am–3pm Monday–Friday) No Parking (9am–3pm Monday–Friday) Ashford Avenue No Stopping Bus Zone Sydney Metro Station

Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

Figure 4.6: Focus area – Middleton Avenue parking conditions, early 2019

Changes proposed by Sydney Metro following consultation Following consultation, Sydney Metro proposes the extension of the four-hour parking zones from 200–400 metres from the station entrance, on one side of Ashford Avenue, Partridge Avenue, Middleton Avenue, Dawes Avenue, Fishburne Crescent and Sexton Avenue.

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 17 4. Submissions overview by station continued

4.4. Norwest Ÿ requests for the provision of additional or larger commuter car parks (3) Twenty-eight submissions were received Ÿ requests or comments outside the scope of regarding the proposed parking changes this consultation (3) around Norwest Station. Ÿ commuter impacts on residential amenity (3) The key issues raised by the community Ÿ enquiries or concerns regarding feedback were: bus access (2) Ÿ requests to extend the area of the Ÿ concerns regarding staff parking (2) proposed parking restrictions (raised by Ÿ concerns about over-development (1) 16 submissions) Ÿ lack of all-day parking available to residents Ÿ requests for resident parking schemes (10) as a result of the proposed restrictions (1) Ÿ safety concerns (9) Ÿ concerns about the consultation (1). Ÿ requests to increase or decrease the proposed hours of restriction or length Below are the proposed parking changes of stay (3) as shown in the Parking Management Overview report. Ÿ requests to change, reduce or not implement the proposed restrictions (3)

Inglewood Place

Hillsong Church Brookhollow Avenue

Norwest Station

Inglewood Place

Solent Circuit

Cameron Avenue Evesham Court Norwest Boulevard Jacqui Circuit

Cameron Avenue Ridgehaven Place Valadon Place

Reston Grange

Key Coorumbene Court Restricted Parking (4P 9am–3pm Monday–Friday) Norwest Boulevard Restricted Parking (4P 9am–3pm Monday–Friday) Goldfinch Crescent Barina Downs Road and No Stopping (7am–8pm Sundays) No Parking (9am–3pm Monday–Friday) Ibis Place No Stopping Skylark Circuit Pedestrian Only Sydney Metro Station

Note: Diagram not to scale, indicative only

Longreach Place These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

StockAvenue Farm

Figure 4.7: Focus area – Barina Downs Road and linking streets parking conditions, early 2019

18 Key Restricted Parking Norwest Boulevard (2P 9am–3pm Monday–Friday) Restricted Parking (4P 9am–3pm Monday–Friday) No Parking (9am–3pm Monday–Friday) No Stopping Pedestrian Only Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes Norwest Boulevard that have been approved and installed as part of the immediate station construction works. Brookhollow Avenue

Century Circuit

Brookhollow Avenue Hillsborough Way Norwest Station Fairmont Avenue

Lakeview Close

Figure 4.8: Focus area – Brookhollow Avenue and Fairmont Avenue parking conditions, early 2019

Changes proposed by Sydney Metro no-stopping zone to include the complete cul- following consultation de-sac of Lakeview Close. Following consultation, Sydney Metro Due to a drafting error, the Parking proposes the extension of the No Parking zone Management Strategy Overview Report and (9am–3pm) on the eastern (footpath side) of consultation letters were distributed with Ridgehaven Place to up to 10 metres from the diagrams proposing a No Parking restriction intersection with Barina Downs Road. It also on the eastern side of Evesham Court. This proposes to extend the four-hour parking zones restriction was intended to be four-hour to 600 metres from the station entrance on parking from 9am–3pm Monday–Friday. one side of Fairmont Avenue, Bethany Court Sydney Metro is proposing this restriction for and Hillsborough Way; and to extend the council approval.

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 19 4. Submissions overview by station continued

4.5. Bella Vista Ÿ requests to increase or decrease the proposed hours of restriction or length Twenty-nine submissions were received of stay (4) regarding the proposed parking changes Ÿ requests to change, reduce or not around Bella Vista Station. implement the proposed restrictions (3) The key issues raised by the community Ÿ commuter impacts on residential amenity (3) feedback were: Ÿ concerns regarding staff parking (2) Ÿ requests for resident parking schemes Ÿ requests or comments outside the scope of (raised by 16 submissions) this consultation (2) Ÿ requests to extend the area of the proposed Ÿ enquiries around the enforcement of parking restrictions (8) parking restrictions (1). Ÿ safety concerns (6) Below are the proposed parking changes Ÿ lack of all-day parking available to residents as shown in the Parking Management as a result of the proposed restrictions (5) Overview report.

Craigend Place

Ravenswood Rise Total 800 Parking spaces

Florey Avenue Celebration Drive Millhouse Place

Bella Vista Northern Gateline Kentridge Place

Mawson Avenue

Edgewater Drive

Bridgeview Circuit

Brighton Drive

Bridgeview Circuit

Woodbridge Place

Bella Vista Bimbadgen Place Southern Gateline

Bella Vista Northbridge Avenue

Stonybrook Terrace

Key Restricted Parking (4P 9am–3pm Monday–Friday) No Stopping Sydney MetroBraeburn Station Crescent

Lexington Avenue Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

Figure 4.10: Focus area – Brighton Drive, Edgewater Drive and linking streets parking conditions, early 2019

20 Mawson Avenue

Bella Vista Station

Trades Norwest Anglican Senior College

Celebration Northbound

Glenwood Lexington Drive High School T-Way Stop Emmanuel Baptist Celebration Drive Church

Glenwood Park Drive Shaun Street

Old

Vanessa Court Essington Way

Maley Grove

Watkiss Street

Bagala Street

Celebration Southbound

Darren Court T-Way Stop Key Restricted Parking (4P 9am–3pm Monday–Friday) John Warren Avenue Schaefer Terrace No Parking (9am–3pm Monday–Friday) Kosmina Street No Stopping Tann-DarbyCourt Baartz Terrace Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes Lord Way that have been approved and installed as part of the immediate station construction works. Arnold Place

Figure 4.11: Focus area – Shaun Street and linking streets (Bella Vista) parking conditions,

early 2019 Brighton Drive Brighton

Meridian Place

C

e l e

b

r a

t

i o

n

D

r

i

v e

Mawson Avenue

Bella Vista Station Lexington Drive

Total 800 Parking spaces

Old Windsor Road

Key Restricted Parking (4P 9am–3pm Monday–Friday) Sydney Metro Station Celebration Northbound T-Way Stop Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works. Celebration Southbound Maley Grove T-Way Stop

Figure 4.12: Focus area – Lexington Drive and linking streets (Bella Vista) parking conditions, early 2019

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 21 4. Submissions overview by station continued

Changes proposed by Sydney Metro following consultation Following consultation, Sydney Metro proposes parking restrictions be implemented on the east side of Shaun Street only.

4.6. Kellyville Ÿ requests to change, reduce or not implement the proposed restrictions (6) Thirty-two submissions were received Ÿ requests or comments outside the scope of regarding the proposed parking changes this consultation (5) around Kellyville Station. Ÿ concerns about over-development (3) The key issues raised by the community Ÿ requests to increase or decrease the feedback were: proposed hours of restriction or length Ÿ requests for resident parking schemes of stay (2) (raised by 14 submissions) Ÿ concerns about the consultation (2) Ÿ requests to extend the area of the proposed Ÿ concerns regarding staff parking (1). parking restrictions (11) Below are the proposed parking changes Ÿ commuter impacts on as shown in the Parking Management residential amenity (11) Overview report. Ÿ safety concerns (9) Ÿ lack of all-day parking available to residents as a result of the proposed restrictions (8)

Kingdom Place

Bridget Place Macquarie Avenue Lucas Circuit

Gould Avenue

Samantha Riley Drive

Housman Avenue

Perkins Drive

Fraser Avenue Perkins Drive

Gainsford Drive

Samantha Riley Drive Cuthbert Avenue

Decora Drive Neiwand Avenue

Guragura Street Landy Place

Key Wenden Avenue Restricted Parking (4P 9am–3pm Monday–Friday) Darani Avenue Daffodil Crescent Kellyville Station No Parking (9am–3pm Monday–Friday) No Stopping

Lewis Jones Drive Sydney Metro Station Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

Figure 4.13: Focus area – Kellyville Station East (Kellyville) parking conditions, early 2019

22 Old Windsor Road

Seaton Street Derrobarry Street

Keele Street

Samantha Riley Drive

Decora Drive

Kellyville Station Landy Place

Riley T-way

Wenden Avenue

Darani Avenue

Newbury Avenue

Ascot Glen Hanley Street

Northwest Transitway

Ludlow Street Perfection Avenue Croyde Street Combined Total of 1360 Parking Spaces Guragura Street

Old Windsor Road

Roxburgh Crescent

Rothbury Terrace Newbury Avenue Esher Street

Leyburn Street

Dover Way Somerset Street

Midlands Terrace Key Wuban Avenue No Parking (9am–3pm Monday–Friday) No Stopping Wigan Street Sydney Metro Station Note: Diagram not to scale, indicative only Fletcher Street These diagrams exclude the parking changes that have been approved Leyburn Street and installed as part of the immediate station construction works.

Figure 4.14: Focus area – Kellyville Station West (Stanhope Gardens) parking conditions, early 2019

Changes proposed by Sydney Metro following consultation No further changes are currently proposed for the streets surrounding Kellyville Station. Sydney Metro will monitor the performance of parking restrictions implemented for a year after the station opens.

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 23 4. Submissions overview by station continued

4.7. Rouse Hill Ÿ enquiries around the enforcement of parking restrictions (13) Forty-four submissions were received regarding Ÿ requests to increase or decrease the the proposed parking changes around Rouse proposed hours of restriction or length Hill Station. of stay (6) The key issues raised by the community Ÿ lack of all-day parking available to residents feedback were: as a result of the proposed restrictions (3) Ÿ requests to extend the area of the Ÿ enquiries or concerns regarding proposed parking restrictions (raised by bus access (2) 29 submissions) Ÿ requests to change, reduce or not Ÿ requests for resident parking schemes (21) implement the proposed restrictions (1) Ÿ safety concerns (20) Ÿ concerns regarding staff parking (1) Ÿ commuter impacts on Ÿ concerns about the consultation (1). residential amenity (18) Below are the proposed parking changes Ÿ requests for the provision of additional or as shown in the Parking Management larger commuter car parks (15) Overview report. Ÿ requests or comments outside the scope of this consultation (13)

Caddies Boulevard

Windsor Road

Grazier Road Rouse Hill Town Centre Bascule Street

Rouse Hill Station Stirrup Lane

Narawang Street

Grazier Road Civic Way

White Hart Drive

Galara Street Saxon Lane Jumbuck Lane Bunda Street Peppin Street

Merino Lane

Romney Street

Holly Street Galara Street

Castlebrook Memorial Park Bellcast Road

Key Windsor Road Restricted Parking (4P 9am–3pm Monday–Friday) No Stopping Freshwater Road No Parking

Sydney Metro Station Hedge Street Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

Picket Place

Figure 4.16: Focus area – Rouse Hill South parking conditions, early 2019

Changes proposed by Sydney Metro following consultation No further changes are currently proposed for the streets surrounding Rouse Hill Station. Sydney Metro will monitor the performance of parking restrictions implemented for a year after the station opens.

24 4.8. Tallawong Ÿ safety concerns (3) Ÿ requests to extend the area of the proposed Four submissions were received regarding parking restrictions (2) the proposed parking changes around Tallawong Station. Ÿ requests for the provision of additional or larger commuter car parks (1) The key issues raised by the community Ÿ commuter impacts on feedback were: residential amenity (1). Ÿ requests for resident parking schemes Below are the proposed parking changes (raised by 2 submissions) as shown in the Parking Management Ÿ requests to increase or decrease the Overview report. proposed hours of restriction or length of stay (1)

Tallawong Station

Themeda Avenue Cudgegong Road Aristida Street

Tallawong Road Conferta Avenue

Total 1000 Parking spaces

Amarco Circuit

Amarco Circuit

Schofields Road

Palara Street

Amarco Circuit

Tanunda Drive

Allambie Street

Paringa Drive Key Bakala Street Monet Place Restricted Parking (4P 9am–3pm Monday–Friday) Adelong Parade No Stopping

Ulmara Avenue Sydney Metro Station Ridgeline Drive Note: Diagram not to scale, indicative only These diagrams exclude the parking changes that have been approved and installed as part of the immediate station construction works.

Keriba Street

Ferndell Street

Figure 4.17: Focus area – The Ponds parking conditions, early 2019

Changes proposed by Sydney Metro following consultation No further changes are currently proposed for the streets surrounding Tallawong Station. Sydney Metro will monitor the performance of parking restrictions implemented for a year after the station opens.

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 25 5. Next steps

The final approved parking changes will be Traffic and parking monitoring will be available on each council’s website following undertaken on local roads, around each assessment and will be summarised in the station, for a period of 12 months following Parking Management Strategy Report, which Metro opening. The outcomes of the traffic will be publicly available prior to the opening of and parking monitoring will be shared with Sydney Metro Northwest in mid-2019. councils and RMS and will inform any potential future changes to parking in and around the Approved parking signage changes will be station precincts. implemented prior to Metro opening, in line with council guidleines.

Figure 5.1: Artist’s impression of Tallawong Station

26 Artist’s impression of Tallawong Station

Sydney Metro Northwest | Parking Management Strategy Overview Report community feedback 27 sydneymetro.info/northwest facebook.com/sydneymetro © Sydney Metro 2019. 19029-NW 03.19​