MONTHLY PROGRESS REPORT UPTO 30.06.2017 DEVELOPMENT PROGRAMME 2016-17

Sector WATER SUPPLY & SANITATION Rs.in Million

Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

ON-GOING SCHEMES 1 1223 Bulk Water Supply Project from River Jhelum to Rawalpindi Approved 1013.048 5.000 1.135 1.135 0.000 0% 1013.048 24% Summary submitted to Chief Minister on 13.10.2016. Murree 2 1224 Water Supply Scheme Fazaiyia Housing Colony Rawalpindi Approved 50.000 25.808 265.336 265.336 266.536 100% 316.536 85% A.A cost:-373.073M dt: 01-01-2016 Turnol Tehsil & District Rawalpindi T.S cost:-373.663M dt:04-02-2016. Date of Start:-15-04-16 Date of Completion:-30-06-2018 Work in progress. 3 1225 Installation of Water supply scheme for residents Attock Approved 156.871 10.000 96.000 96.000 95.992 100% 252.863 52% of Fateh Jang Attock ● A.A Date 21.10.2014. ● T.S Date 10.11.2014. ● Date of Start of Scheme 22.01.2015. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. (The work on the Treatment Plant, Infiltration Galleries is in progress.

4 1226 Water Supply Scheme Based on Khai Chakwal Approved 128.085 10.000 135.465 135.465 135.437 100% 263.522 46% Date of A.A 03.04.2014 Date of Dam T.S 16.04.2014 Date of Sart 30.05.2014 Date of completion 30.06.2019 Work is in progress. Full efforts are being made to supply 2.00 Cusec water from Khai Dam to Chakwal city in July 2017. 5 1227 Est. of W.S. Scheme Chakwal Approved 41.000 10.000 20.000 20.000 20.000 100% 61.000 66% Date of A.A 17.09.2015 Date of T.S 07.10.2015 Date of Sart 26.01.2016 Date of completion 25.01.2018 Work is in progress. 6 1228 Reh: of W.S. Scheme Chakwal Approved 10.000 10.000 42.000 42.000 42.000 100% 52.000 68% Date of A.A 17.09.2015 Date of T.S Date of Sart 11.02.2016 Date of completion 30.06.2018 Work is in progress. 7 1229 W/S/S based on Naroomi Dhan Spring Phase-II Jhelum Approved 265.980 10.000 15.900 15.900 15.900 100% 281.880 98% A.A: 10-04-14 T.S: 16-4-14 Date of Commencement 24-10-2014 Work is in Progress. Scheme is partially operational.

8 1230 Comp: Urban Water Supply & sewerage Sargodha Approved 184.308 11.129 11.129 11.129 11.129 100% 195.437 100% Date of A.A 06.05.2010, Revised Date of A.A Drainage Scheme Phullarwan (Revised) 29.11.2012, Date of T.S 21.09.2010, Date of Award 31.01.2011, Scheduled date of Completion on 30.01.2012, Revised date of Completion 30.06.2017, Date of Commencement, 31.01.2011, Funds released on 02-08-2016, Funds on-lined on 02-08-2016.

Water supply portion completed & handed over to TMA Bhalwal. As far as Sewerage Portion is concernd, 01- No. portion completed and operative. work on missing links for 2nd No. is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

9 1231 Urban Water Supply Scheme Kot Momin Sargodha Approved 152.282 10.000 15.000 15.000 15.000 100% 167.282 91% (Revised) Date of A.A 11.08.2009, Date of T.S 03.11.2009, Date of Award 24.11.2009 & 02.12.2009, Scheduled date of Completion on 12.2010, Revised date of Completion 30.06.2016, Date of Commencement, 24.11.2009 & 02.12.2009, Funds released on 02-08-2016, Funds on- lined on 02-08-2016.

Aquifer study completed through WAPDA. 12-No. tube wells & pump house completed. 04-No. Staff Quarter completed out of 04-No. 16-sets of machinery arranged. R/Main / D-system 161200-Rft laid out of provision 185704-Rft. 2-No. GST & 2-No. OHR 90% completed. Approval for road cuts received from Highway Department and missing links are being completed for operation of scheme. 25-No. total road cuts, 07-No. road cuts have been completed and work on balance 18-No. is in progress.

10 1232 Aug: of Water Supply Scheme, Sargodha based Sargodha Approved 150.127 10.000 25.000 25.000 25.000 100% 175.127 69% on Canal Water Supply Sargodha. Phase-I Date of A.A 28.02.2014, Date of T.S 30.04.2014, Date of Award 28.06.2014, Scheduled date of Completion is 30.06.2017, Date of Commencement, 28.06.2014, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

20-No. tube wells completed out of provision 22-No. 09- No. Pump Houses 90% completed out of provision 22- No. 31-Sets of Pumping machinery arranged. R/Main / D-System 75307-Rft laid & 13839-Rft arranged out of provision 125047-Rft. 4-No. GSTs 85% completed out of 05-No. Work in progress.

11 1233 Water Supply Scheme 49-NB (Tail) & Adjoining Sargodha Approved 123.300 10.000 11.760 11.760 11.760 100% 135.060 97% Date of A.A 26.02.2014, Date of T.S 07.03.2014, Date Abadies in with improved material & better of Award 24.04.2014, Scheduled date of Completion on sustainability Sargodha City 30.06.2017, Date of Commencement, 28.06.2014, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

Electric Resistivity Survey completed. 07-No. tube wells installed. 07-No. Pump Houses completed. 09- sets of Pumping machinery arranged at site. R/Main / D- System 177783-Rft laid out of provision 181534-Rft. G.S Tank 95% completed. Rising main has been tested. G.S. Tanks have been filled with potable water. Distribution network will be put into test operation after energization at G.S.Ts by Wapda 12 1234 Water Supply Scheme for Farooq Colony, Sargodha Approved 31.000 10.000 25.042 25.042 25.042 100% 56.042 57% Date of A.A 11.08.2015, Date of T.S 14.10.2015, Date Imtiazabad Abad Sargodha City of Award 16.01.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 16.01.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

06-No. trial bore and tube well bore completed out of provision 06-No. 06-No. Pump Houses 90% completed out of provision 06-No. 08-Sets of Pumping machinery arranged. R/Main / D-System 7781-Rft laid & 15890-Rft arranged out of provision 112510-Rft. Work in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

13 1235 PC-II Conducting Study for Designing of Water Sargodha Approved 4.964 1.536 0.000 0.000 0.000 0% 4.964 62% Date of A.A 22.02.2010, Date of Award 09.12.2009, Supply Scheme & Sewerage System along with Scheduled date of Completion on 30.06.2017, Date of Treatment Solution Sargodha City Commencement, 09.12.2009, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

M/s G3 Engineering Consultants (Pvt.) Ltd Lahore have been appointed for designing / planning & they have been directed to prepare rough cost estimates / PC-I for Water Supply Zone II & III, Sewerage System & Treatment Plant. They have submitted estimate / PC-I of water Supply Zone-I & II along with sewerage system. The work on water supply Zone-III and treatment plant is under process. The payment will be made after submission of estimates. Funds re- appropriated. 14 1236 Water Supply Scheme Canal Park Sargodha city Sargodha Approved 3.507 0.613 0.387 0.387 0.387 100% 3.894 95% Date of A.A 18.03.2010, Date of T.S 25.03.2010, Date of Award 31.05.2010, Scheduled date of Completion on 31.08.2016, Date of Commencement, 31.05.2010, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed, put into operation and handed over to User Committee. 15 1237 Comprehensive Water Supply & Sewerage Khushab Approved 320.280 8.467 8.467 8.467 8.467 100% 328.747 92% Date of A.A 08.10.2009 Date of T.S Scheme Khushab 05.11.2009 Date of award 06.01.2010. Date of completion 30.06.2017 Scheme is functional and handed over to Municipal Committee Khushab. 16 1238 Comp. U/W/S & Sew: Scheme Jauharabad Khushab Approved 412.319 10.000 35.322 35.322 35.322 100% 447.641 89%

Date of A.A 08.10.2009 Date of T.S 05.11.2009 Date of award 11.08.2010 Date of completion 30.6.2018 All 10 No. Tubewell with pump house, pumping machinary and GST 800000 Gln completed. 2 out of 3 disposal works completed and functional. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

17 1239 Comprehensive Water Supply & Sewerage Mianwali Approved 474.444 19.402 22.402 22.402 22.292 100% 496.736 101% Revised Date of A.A 16.01.2014 Scheme Mianwali Date of Revised T.S 08.08.2014 Date of 2nd Revised A.A 04.11.2015 Date of 2nd Revised T.S 10.12.2015. Date of Start of Work 03.12.2009 Date of Completion 30.06.2018. Bottlenecks / Remarks Tube-Well=8/8, Pump House=8/8, Pumping Machinery=9/9, Rising Feeding Main=12"i/d A.C= 921/940, 10" i/d A.C= 11959/11960, 8" i/d PVC=26535/26541, 6"i/d PVC= 30244/30591,4"i/d PVC=40592/40583, 3"i/d PVC=137262/137106, OHR = 3/3, Chlorinator = 8/8, T/Line 5/8, RCC Sewer=42"i/d= 480/488, 36"i/d =8385/8598, 30"i/d =2159/2280, 27"i/d=8694/8939, 24"i/d=12415/12856, 21"i/d=14020/14805, 18"i/d= 21793/23631, 15"i/d=27837/30108, 12"i/d=135418/144123, 9"i/d=31456/32142, Sullage Carrier= 8050/8500, Oxidation Pond= 1/2. Work is in Progress. 18 1240 Urban Water Supply T.T.Singh (Revised) T.T.Singh Approved 765.476 20.000 119.000 119.000 119.000 100% 884.476 100% 1-Date of A.A (Revised) 10.04.2014 2-Date of T.S (Revised) 15-04-2014 3-Date of Prequalification 15.01.2011 4-Date of invitation of tenders 01.02.2011 5- Date of Receipt of tenders 07.02.2011 6- Date of work order 14.02.2011 7-Date of completion as per PC-I 08.12.2012 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 129271 Person 10-Funds Released by F.D 15.07.2016 &22.02.2017 11-Re-appropriation of funds (+/-) Nil Scheme is completied.

19 1241 Urban Water Supply Scheme for Pir Mahal Tehsil T.T.Singh Approved 335.806 8.463 30.463 30.463 30.463 100% 366.269 106% 1-Date of A.A (Revised) 22.01.2013 Kamalia, District T.T. Singh 2- Date of T.S (Revised) 28.01.2013 3-Date of Prequalification 11.09.2012 4-Date of invitation of tenders 01.02.2013 5- Date of Receipt of tenders 16.02.2013 6- Date of work order 21.02.2013 7-Date of completion as per PC-I 13.05.2014 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 69380 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds (+/-) +28.04.2017 Scheme is completied. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

20 1242 Extension / Improvement of Urban Water Supply T.T.Singh Approved 140.262 14.179 9.179 9.179 9.179 100% 149.441 97% 1-Date of A.A 17.01.2014 Scheme Gojra City (Phase-I) District T.T. Singh. 2- Date of T.S 23.01.2014 3-Date of Prequalification 23.01.2014 4-Date of invitation of tenders 22.01.2014 5- Date of Receipt of tenders 30.01.2014 6- Date of work order 08.02.2014 7- Date of completion as per PC-I 16.07.2016 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 268756 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds (+/-) -28.04.2017 Scheme is completed and under test operation.

21 1243 Comprehensive Water Supply Scheme Kamalia T.T.Singh Approved 139.725 38.000 88.000 88.000 88.000 100% 227.725 50% 1-Date of A.A 16.10.2014 City 2- Date of T.S 28.11.2014 3-Date of Prequalification 08.12.2014 4-Date of invitation of tenders 07.12.2014 5- Date of Receipt of tenders 23.12.2014 6- Date of work order 31.12.2014 7- Date of completion as per PC-I 15.10.2017 8- Anticipated date of completion 30.12.2017 9- No. of Beneficiary - 298364 Person 10-Funds Released by F.D 15.07.2016 & 22.02.2017 11-Re-appropriation of funds (+/-) Work is in progress.

22 1244 Urban Water Supply Scheme Gojra (Phase-II) - T.T.Singh Approved 30.000 20.000 75.000 75.000 75.000 100% 105.000 20% 1-Date of A.A 01.01.2016 ADP 2015-16 2- Date of T.S 30.03.2016 3-Date of Prequalification -31.03.2016 4-Date of invitation of tenders 17.04.2016 5- Date of Receipt of tenders 25.04.2016 6- Date of work order - 18.05.2016 7- Date of completion as per PC-I 11.11.2018 8- Anticipated date of completion 11.11.2018 9- No. of Beneficiary - 393651 Person 10-Funds Released by F.D 15.07.2016 & 22.02.2017 11-Re-appropriation of funds(+/-) Work is in progress.

23 1245 Rural Drainage/PCC Scheme Kot Nisar Gujranwala Approved 12.000 10.000 20.000 20.000 20.000 100% 32.000 29% A.A. dated 11.04.2016. Shah,Boopara Khurd,Dhairr Virkan,Bhirri Shah T.S. dated 03.05.2016. Rehman,Dharoke,Sadu Pagala,Sadu *Start Date 04.06.2016. Goraya,Dhillam Dogran,Gajar Gola and ratta *Completion date 30.06.2018. Dhothran,Tehsil Nowshera Virkan,district Work in progress. Full funds utilized. Gujranwala 24 1246 Rural Drainage/PCC Scheme, UC Shamsa Gujranwala Approved 12.000 10.000 20.000 20.000 20.000 100% 32.000 19% Dada,UC Majju Chak,UC Bhoopra Kalan,UC A.A. dated 11.04.2016. Argan,UC Philloke and UC Abidabad,Tehsil T.S. dated 03.05.2016. Nowshera Virkan,district Gujranwala *Start Date 04.06.2016. *Completion date 30.06.2018. Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

25 1247 Provision of Drains & PCC in the Streets at UC Gujranwala Approved 5.000 4.997 5.297 5.297 5.285 100% 10.285 100% Mandiala Tega & UC Nangal Dona Singh,Tehsil A.A. dated 09.04.2016. kamoke & District Gujranwala. T.S. dated 12.04.2016. *Start Date 14.05.2016. *Completion date 30.06.2017. Scheme completed. 26 1248 Provision of Drains & PCC in the Streets at UC Gujranwala Approved 5.000 10.000 10.300 10.300 10.299 100% 15.299 100% A.A. dated 09.04.2016. Machrala & UC Kali Suba Tehsil Kamoke,District T.S. dated 12.04.2016. Gujranwala. *Start Date 14.05.2016. *Completion date 30.06.2017. Scheme completed. 27 1249 Construction of Water Supply System Gujrat Gujrat Approved 451.192 30.000 40.000 40.000 40.000 100% 491.192 75% *Start Date 28.06.2009 *Completion date 30.06.2018. A.A Date =10.02.2009 T.S date=6.5.2009 Work in progress of laying of pipe line. 17 Nos Tube wells installed 14 Nos out of 17 Nos are functional and 14 Nos T/W Handed over to TMA Gujrat and 3 Nos OHR's are functional. Work is in progress.

28 1250 Provision of water supply and Drainage Scheme Gujrat Approved 100.616 10.000 20.000 20.000 20.000 100% 120.616 60% A.A Date =5.9.2014 for Dinga City Distt: Gujrat. T.S date=15.10.2014 Start date 17.11.14. Completion date 30.06.2018 Work in progress. Full funds utilized.

29 1251 Extension of Urban Water Supply and drainage Gujrat Approved 79.697 10.000 30.000 30.000 30.000 100% 109.697 69% A.A Date =23.9.2014 scheme Sarai Alamgir City. T.S date=15.10.2014 Start date 17.11.14. Completion date 30.06.2018 Work in progress. Full funds utilized.

30 1252 Extension of Urban Water Supply and drainage Gujrat Approved 50.000 10.000 20.000 20.000 20.000 100% 70.000 59% A.A Date =23.9.2014 scheme Azafi Abadies in Kharian City T.S date=15.10.2014 Start date 17.11.14. Completion date 30.06.2018 Work in porgress. Full funds utilized.

31 1253 Improvement / Extension Urban Water Supply M.B.Din Approved 40.000 20.000 40.000 40.000 39.987 100% 79.987 41% * A.A Date. 07.01.2016 Sewerage & Drainage Scheme Malikwal City * T.S Date. 15.01.2016. * Start Date 01.03.2016 * Completion date 28.02.2019. * Work in progress. Full funds utilized.

32 1254 Improvement / Extension Urban Water Supply M.B.Din Approved 30.000 10.000 30.000 30.000 29.999 100% 59.999 17% * A.A Date. 25.03.2016 Sewerage & Drainage Scheme M.B.Din City * T.S Date. 29.03.2016 * Start Date 24.04.2016 * Completion date 23.04.2019. * Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

33 1255 Rehabilitation / Augmentation of Urban Water Narowal Approved 100.409 10.000 5.000 5.000 4.999 100% 105.408 55% A.A Date.30.9.2014 Supply Scheme Narowal City T.S Date.10.11.2014 *Start Date 23.12.2014 *Completion date 30.06.2017. The work for construction of OHR 30000 glns at Old Disctrict Head Quarter Hospital is in progress.The work on OHR 50000 gallons & 2 No pump house at Muslim High School is suspended due to stay order in Highe Court dated 30.12.2016. The installation of house connections of TMA Zone is taken in hand and 1200 connections are installed in TMA Zone. The connections in DHQ Zone has been started & 350 connections are installed. Work in progress. Laying of PVC Pipe in Mohallah Abbas Nagar is in Progress.

34 1256 Urban Water Supply Scheme Kahna (Phase-I & Lahore Approved 98.405 20.000 25.000 25.000 25.000 100% 123.405 62% ● Revised A.A by Secretary vide No.SO(PH-S)8-8/2015, Dated:05- II) 04-2016. ● Revised T.S by the C.E (N) vide No.1301/P&D-I. Dated: 26-05- 16. Date of Start. 1.10.2014. Date of completion 30.6.17 Scope of Work T.W =4 No. 100% P.H =4 No. 100% P.M =4 No. 0% Distribution =1 Job. 95% E.Connection 4/DN paid. OHR =1 No.95% OHR =2 No.60% OHR =3 No.75% ●Work is in progress ● Work on OHR is in progress. 35 1257 Urban Water Supply Scheme Muridkey Sheikhupura Approved 20.000 10.000 289.467 289.467 289.467 100% 309.467 69% Work in progress 36 1258 Provision of Open Water Supply Scheme Sheikhupura Approved 25.000 20.000 60.000 60.000 60.000 100% 85.000 48% Work in progress Ferozwala Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

37 1259 Urban Extension Water Supply and Sewerage Nankana Approved 210.140 10.000 29.286 29.286 29.286 100% 239.426 100% quifer test Electric Survey and Trial Boring 1/1 Scheme Nankana Sahib Sahib Installation of Tube Wells. 14/14 Pump House 12x12. 14/14 Pumping Machinery 14/14 (V.T) Dis 0.5 Cusec Head 300’. External Electrification 17/17 Paid to WAPDA. 20”i/d AC B Class Pipe 3275/3275 Rft 20”i/d GRP B Class Pipe 28164/28995 Rft A.C 20”i/d AC C- Class Pipe 2075/2075 Rft 20”i/d GRPC-Class Pipe 2988/3025 Rft 16”i/d A.C B-Class Pipe 929/929 Rft 16”i/d GRP B-Class Pipe 70/571 Rft 14”i/d A.C B-Class Pipe 1312/1312 Rft 14”i/d PVC B-Class Pipe 3800/4588 Rft 14”i/d PVC C-Class Pip 1477/1500 Rft 12”i/d PVC B-Class Pipe 4800/5350 12”i/d PVC C-Class Pipe 1210/1000 Rft A.C 10”i/d B -Class Pipe 5373/5373 Rft PVC 10”i/d B - Class Pipe 1300/1477 Rft PVC 10”i/d C - Class Pipe 1758/2000 Rft A.C 8”i/d B-Class Pipe 1432/1432 PVC 8”i/d B-Class Pipe 1900/2818 Rft PVC 8”i/d C-Class Pipe 1081/1000 Rft PVC 6”i/d C-Class Pipe 844/1000 Rft PVC 3” I/d Pipe 50000/72287 arranged PVC 4” I/d Pipe 4600/8903 Rft Staff Quarter 0/6 Nos. Generating Set 200 KVA. 0/3 Nos. Const: of G.S.Tank. 400000 Glns Capacity 1/1 No. 200000 Glns Capacity 0/1 No. Hypochlorinator 0/6 Pumping Machinery for G.S.T (V.T) Dis 2.0 Cusec Head 38 1260 Urban Water Supply & Sewerage/ Drainage Kasur Approved 456.965 15.935 8.735 8.735 8.666 99% 465.631 98% Date120’. of6/6 A.A :14-04-2009 Scheme Phool Nagar Revised Date of A.A : Nil Date of T.S :18-04-2009 Date of Award :28-05-2009 Scheduled date of Completion on :04/12/2010 Revised date of Completion :30/06/2017 Date of Commencement :28-05-2009 Trail Bore & Investigation = 1/1 Job, Tubewell Boring & Conversion = 16/16 Nos., Pump House 12x12= 16/16 Nos, Pumping Machinery= 16/16 Nos, Electric Connection= (6 DN Paid) 16/16 Nos., Distribution System 3"i/d 258843/259643 Rft, 4"i/d =46395/48150 Rft, 6"i/d= 28790/28790 rft, 8"i/d = 31535/31539 Rft, 10"i/d= 17897/18147 Rft, 12"i/d= 9904/9904 Rft,14"i/d= 4969/4969Rft, 16"i/d= 4096/4096 Rft, OHR= 3/3 Nos., Screening Chamber= 3/3 No, Collecting Tank= 6/6 Nos, Pumping Chamber= 3/3 Nos., Pumping Machinery= 8/8 Nos., Inter Connection= 3/3 Nos., Electric Connection= 3/3 Nos., Discharge Sump= 3/3 Nos, Boundary Wall= 1575/1697 Rft, Staff Quarter= 1/1 No., Force Main= 1008/1008 Rft, Sullage Carrier= 12149/16800 Rft, Generator & Generator Room= 3/3 Nos, RCC Sewer 9"i/d= 110141/101522Rft, 12"i/d= 32271/30020 Rft, 15"i/d= 17704/17707 Rft, 18"i/d= 21974/21609 Rft, 21"i/d= 1459/1459 Rft, 24"i/d= 4012/4013 Rft, 27"i/d= 5319/5323 Rft, 30"i/d= 1803/1803 Rft, 36"i/d= 2863/2862 Rft, 42"i/d= 1214/1214 Rft Major component of the scheme has been completed and handed over to Town Comittee Phool Nagar.Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

39 1261 Water Supply Scheme Chunian (Amended) Kasur Approved 210.161 13.034 11.234 11.234 11.125 99% 221.286 99% Date of A.A :21/08/2008 Revised Date of A.A :Nil Date of T.S :21/02/2009 Date of Award :04/03/2009 Scheduled date of Completion on :18/04/2010 Revised date of Completion :30/06/2016 Date of Commencement :04/03/2009 Tube-Wells Boring & Conversion= 8/8, Pump House 12x12 = 8/ 8 No., Pumping Machinery = 13/13No., Electrict Connection= 8 Complete 3 Awaited/ 11Job, Distribution System 12" A.C GRP 'C' Class pipe = 11191/12500 Rft, 20" AC/ GRP Pipe = 400/500 Rft, 18"i/d AC/ GRP= 1022/1000 Rft, 16"i/d AC/ GRP= 1483/1500 Rft, 14"i/d AC/ GRP= 1963/2000 Rft, 10"i/d AC/ GRP= 2249/2000 Rft, 24"i/d AC/ GRP 'B' Class = 13936/16500 Rft, 18"i/d AC/ GRP= 4060/3700 Rft, 16"i/d AC/ GRP= 2712/2600 Rft, 12"i/d AC/ GRP/PVC= 3885/4700 Rft, 10"i/d AC/ GRP/PVC= 1836/3650 Rft, 8"i/d AC/ GRP/ PVC= 12458/7275 Rft, 6" AC/ GRP Pipe 6402/5100 Rft, 4" PVC pipe = 24163/20145 Rft, 3" PVC pipe= 166667/156995 Rft , GST= 3/3, OHR 1,00,000 Glns= 1/1, OHR 50000 Glns= 1/1, Staff Quarter = 1/4 No., Boundary Wall= 500/700 Rft, Pump House= 1/1 No.

40 1262 Water Supply Scheme in Pattoki Kasur Approved 199.343 7.480 7.480 7.480 7.480 100% 206.823 100% Date of A.A :21/08/2008 Revised Date of A.A :30/12/2014 Date of T.S :27/08/2008 Date of Award :29/09/2008 Scheduled date of Completion on :18/03/2010 Revised date of Completion :30/06/2016 Date of Commencement :29/09/2008 Tube-Wells Boring & Conversion= 7/7, Pump House 12x12 = 95% Complete/ 8 No., Pumping Machinery = 7No. /7No., Pumping Machinery for GST =7/7, Electrict Connection= 03 coplete 7 D.N Paid/ 10Job, Rising Main 8"i/d AC Pipe = 1473/1630 Rft , 12"i/d AC Pipe= 416/500 Rft 16"i/d AC Pipe= 500/ 500 Rft, 18"i/d A.C Pipe 'D' Class 1320 Rft/ 1320Rft, 18"i/d AC "B" Pipe = 2716/2750Rf/0 Rft, 24"i/d A.C pipe (GRP) 'B" Class pipe= 28200/28300 Rft/ 24"i/d A.C pipe (GRP) 'C' Class= 14993/15000 Rft/ 0 Rft, Staff Quarter & B. Wall= 0/ 04 No.., Boundary Wall = 500/ 700 Rft, 0/ OHR 50000 Gallons,0/1 Const of Generator Room= 25%/ 2 No., Distribution System 3"i/d A.C Pipe = 0/300 Rft, 4"i/d A.C Pipe = 1024/3300 Rft, 6"i/d A.C Pipe =9875/18309Rft, 8"i/d PVC Pipe = 1520/3742 Rft, 10"i/d PVC Pipe = 3048/3648 Rft, 12"i/d PVC Pipe = 1000/1590 Rft, 14"i/d PVC Pipe = 700/2383 Rft, Diesel Generator Set 75 KVA 0/1 No., Hypo Chlorinator 3/3 Set. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

41 1263 Water Supply, Drainage & PCC Scheme Outside Kasur Approved 131.897 10.000 36.000 36.000 36.000 100% 167.897 95% Date of A.A :25-08-2014 Khudian District Kasur Revised Date of A.A :Nil Date of T.S :27-08-2014 Date of Award :22-10-2014 Scheduled date of Completion on :02-10-2016 Revised date of Completion :30/06/2017 Date of Commencement :22-10-2014 Tube-Wells 0.75 Cusec = 3/3 , Pump House 12x16 = 95%/ 3 No., PM 03 No/03 E/C 03/03 No./ Demand Notice Paid Distribution System 3"i/d PVC Pipe = 40397/ 40565 Rft,4"i/d PVC Pipe = 5000/ 5200 Rft, 6"i/d PVC Pipe = 11107/ 5170Rft, 8"i/d PVC Pipe = 9200 Rft/3955, Surface Drains= 9758 /47610Rft, PCC Flooring= 93802 Cft/313105, Brick Pavement= 174505/20748Cft, Sullage Carrier 1.5x1.5= 1928/4280 Rf, RCC Sewer Pipe 9"i/d =11670/37900 RFt, 12"i/d =9954/7800 RFt, 18"i/d =3994/1900 RFt, 24"i/d =1703/5520 RFt, 30"i/d =7570/6600 33" i/d 818/800 36" 2516/3200 Rft 42" 193/200 Rft 48" i/d 2559/4000 Work in Progress

42 1264 Extension / Improvement of Water Supply Okara Approved 573.330 10.000 110.000 110.000 110.000 100% 683.330 76% Date of A.A (Revised) 22.01.2013 Scheme Southern City, Okara. Date of T.S (Revised) 28.01.2013 Date of Prequalification 11.09.2012 Date of invitation of tenders 16.02.2013 Date of Receipt of tenders 16.02.2013 Date of work order 21.02.2013 Date of completion as per PC-I 13.05.2015 Anticipated date of completion 30.06.2018 No. of Beneficiary - 69380 Person Release of Funds 27.07.2016. Work is in progress.

43 1265 Reh.Urban Water Supply Scheme Hujra Shah Okara Approved 97.108 5.040 5.040 5.040 5.040 100% 102.148 100% Date of AA- 23.05.2014 Muqeem Date of TS- 15.10.2014 Date of Pre-qualification.17.04.2014 Date of Invitation of Tender,30.06.2014 Date of Receipt of Tenders.30.06.2014. Date of work Order. 05.11.2014 Date of completion As per PC-I. 30.06.2016 Anticipated date of completion.30.06.2017. TPV awarded to Engineering Services consultant Projected Population. 200051 Person Release of Funds 27.07.2016. Electric connection are pending by LESCO otherwise maximum scheme will be made functional of energized by WAPDA.

44 1266 Water Supply Scheme Shergarh Renala Khurd Okara Approved 36.889 20.000 58.400 58.400 58.400 100% 95.289 90% Date of AA-20.03.2015. Okara Date of TS-28.04.2015 Date of Pre-qualification.12.05.2015 Date of Invitation of Tender.29.05.2015 Date of Receipt of Tenders.30.05.2015 Date of work Order.13.06.2015 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion. 30.06.2018 TPV awarded to Engineering Services consultant Re-appropriation of funds (+) 5.400 dt: 31.10.2016 Projected Population 24422 Persons. Release of Funds 27.07.2016. (Demand Notice Paid to WAPDA) (6) Tuff Tiles 0/ 201175 Sft.Work in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

45 1267 Urban Water Supply & Sewerage Scheme Pakpattan Approved 662.396 10.000 0.150 0.150 0.150 100% 662.546 97% Date of AA = 17.01.09 Pakpattan & Arifwala District Pakpattan Date of T.S = 07.02.09 Date of invitation tenders = 14.02.09 Date of receipt tenders = 16.02.09 Date of work order = 20.03.2009 Date of completion as per PC-I = 20.03.2011 Anticipated ate of completation = 30.06.2017 Re-appropriation of funds = -(Rs.9.850 million) Projected Population= 224167 Pakpattan = Sewerage = Sewerage Zones(A+B+C) handed over to TMA Pakpattan. Water Supply = 15/15 No. tubewells and Distribuation System handed over to TMA Pakpattan. Ariwala = Sewerage = Sewerage Zones(A+B) handed over to TMA Arifwala Water Supply = 06 No. tubewells handed over to TMA Arifwala and 03 No. tubewells require completion of D/System . Complaince of observations raised by P&D department Lahore on Revised Rough Cost/PC-I is under process.

46 1268 Urban Water Supply & Sewerage Scheme Abdul Khanewal Approved 123.703 9.613 8.913 8.913 8.889 100% 132.592 99% 1.Date of A.A. 17.01.2014 (03.12.2016) Hakeem City Phase-I, District Khanewal. 2.Date of T.S. 02.02.2014 3.Date of Prequalification. 14-02-2014 4.Date of invitation of tender. 18-02-2014 5.Date of Receipt of tender. 01-03-2014 6.Date of work Order 05.03.2014 7.Date of Completion as per PC-I. 16.01.2016 8.Anticipated date of Completion. 30.06.2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of Beneficiaries 143414 persons. Work is in progress.

47 1269 Urban Water Supply & Sewerage Scheme Khanewal Approved 107.997 10.000 50.000 50.000 32.376 65% 140.373 72% 1. Date of A.A. 05.09.2014 Khanewal City 2. Date of T.S. 28.10.2014 3. Date of Pre-Qualification. 18.12.2014 4. Date of invitation of tender. 19-01-2015 5. Date of Receipt of tender. 20-01-2015 6. Date of Work Order 18.02.2015 7. Date of Completion as per PC-I. 04.09.2016 8. Anticipated date of Completion. 30.06.2017 9. Date of released of funds 27.07.2016 / 22.02.2017. 10. No. of Beneficiaries 358569 persons. Contractor stoped the work at site in May, 2017.

48 1270 Rehabilitation of Water Supply and Sewerage Khanewal Approved 10.000 10.000 35.000 35.000 34.842 100% 44.842 42% 1. Date of A.A = 17.09.2015. Schemes in Tulamba City. 2. Date of T.S = 09-11-2015. 3. Date of Pre-qualification 18-01-2016 4. Date of invitation of tender. 16-02-2016 5. Date of Receipt of tender. 17-02-2016 6. Date of Work order. 05-03-2016 7. Date of Completion as per PC-I. 16.09.2017 8. Anticipated date of Completion. 30-09-2017 9. Date of released of funds 27.07.2016 10. No. of Beneficiaries 53394 persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

49 1271 Comprehensive Water Supply & Sewerage Vehari Approved 30.000 10.000 50.000 50.000 49.999 100% 79.999 79% 1. Date of A.A: 11.01.2016. Scheme for Luddan City District Vehari. 2. Date of T.S: 25.02.2016 3. Date of Pre-Qualification: 11.04.2015 4. Date of Invitation of Tender: 24.03.2016 5. Date of Receipt of Tender: 02.04.2016 6. Date of Work order. 14.04.2016 7. Date of Completion as per PC-I: 10.01.2018 8. Anticipated Date of completion: 30.06.2017 9. Date of released of funds 27.07.2016 Work is in progress.

50 1272 Comprehensive Water Supply & Sewerage Vehari Approved 2.000 10.000 148.346 148.346 148.296 100% 150.296 49% 1. Date of A.A: 11.04.2016. Scheme for vehari city. 2. Date of T.S: 29.04.2016. 3. Date of Pre-Qualification: 11.04.2015. 4. Date of Invitation of Tender: 18.05.2016. 5. Date of Receipt of Tender: 28.05.2016. 6. Date of Award: 15.06.2016 G-I. 17.06.2016 G-II 7. Date of Completion as per PC-I: 14.06.2018 8. Anticipated Date of completion: 30.06.2018 9. Date of released of funds 27.07.2016 10. No. of Beneficiary= 140193 Persons Work is in progress.

51 1273 Rehabilitaion of Urban Water Supply Scheme Dera Ghazi Approved 80.382 20.000 120.963 120.963 120.963 100% 201.345 79% • Date of A.A =01.04.2015 Fort Minroe Khan • Date of TS =04.05.2015 • No. of Beneficiaries = 100000 • Date of Prequalification = 14.05.2015 • Date of invitation of tenders = 14.05.2015 • Date of receipt of tenders = 28.05.2015 • Date of work order = 12.06.2015 • Date of completion as per PC-I = 31.03.2017 • Anticipated date of completion = 30.06.2018 Re-Appropirate Funds Date = +Rs. 20.063 M(15.11.2016) & + Rs. 0.9 M. • Funds Released by F.D = 15.07.2016 • Supplementry Grant = 80 M (Rs.40 M dt: 22.02.2017 & Rs.40 M dt: 23.05.2017)

• Funds utilized 100% 52 1274 Comprehensive Water Supply Scheme Taunsa Dera Ghazi Approved 85.972 10.000 50.000 50.000 50.000 100% 135.972 74% • Date of A.A = 12.12.2014 Sharif Khan • Date of TS = 11.03.2015 • No. of Beneficiaries = 148052 • Date of Prequalification = 03.04.2015 • Date of invitation of tenders = 03.04.2015 • Date of receipt of tenders = 18.04.2015 • Date of work order = 07.05.2015 • Date of completion as per PC-I = 11.12.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016. • Supplementry Grant = 40 M (22.02.2017)

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

53 1275 Extension & Augmentation of Water Supply Dera Ghazi Approved 60.806 10.000 25.000 25.000 25.000 100% 85.806 99% • Date of A.A = 16.12.2014 Scheme Sakhi Sarwar Khan • Date of TS = 26.02.2015 • No. of Beneficiaries =78031 • Date of invitation of tenders = 16.04.2015 • Date of receipt of tenders = 09.05.2015 • Date of work order = 11.06.2015 • Date of completion as per PC-I = 15.12.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016 • Supplementry Grant = 15 M (22.02.2017)

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

54 1276 Construction of Drain ,Soling Tuff Dera Ghazi Approved 15.000 10.000 35.000 35.000 33.128 95% 48.128 97% • Date of A.A = 14.04.2016 tiles,Pavement,sewer line & water Supply line Khan • Date of TS = 09.06.2016 Qasba Kot Kaisrani,Tehsil Taunsa Sharif,Ditsrict • No. of Beneficiaries = 37420 • Date of receipt of tenders = 11.06.2016 D.G .Khan • Date of work order = 11.06.2016. • Date of completion as per PC-I = 13.04.2018. • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016 Re-appropration =Rs.15.00 M (14.12.2016) Supplymentry Grant = 10 M (22.02.2017)

• Funds utilized 100% • Scheme Completed.

55 1277 Urban Water Supply Muzaffargarh Approved 379.054 10.000 20.000 20.000 19.200 96% 398.254 89% • Date of A.A 10.11.2008 Scheme,Muzaffargarh(Ammended) (PSDP) • Date of TS 04.02.2009 • No. of Benificiaries = 277175 • Date of invitation of tenders 18.2.2009 • Date of receipt of tenders 07.3.2009 • Date of work order 27.03.2009 • Date of completion as per PC-I =09.11.2011 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016 • Supplementary Grant = (+) 20 M (16.02.2017) • Reappropriation of funds = (-) 15 M (07.03.2017)

• Municipal committee Muzaffargarh is ready to take over the scheme NOC for railway crossing recevied on dated 1/7/2017

56 1278 Rehabilitation and Agumentation of Water Supply Bahawalpur Approved 256.300 10.000 1.400 1.400 1.361 97% 257.661 89% Date of AA :29-11-2006 Scheme, Bahawalpur Date of TS :08-01-2007 Date of RAA: 17-04-2014. Date of RTS. 17-04-2014 Date of prequalification. -NIL Date of receipt of tender.14-02-2007. Date of work order:17-03-2007. Date of completion as per PC-1=28-11-2007 Date of completion as per agreement=16-03-2008. Anticipated date of completion 30-06-2018. No. of beneficiaries=256059 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (-Rs.8.60 million) dated 28.10.2016 , 20-1-2017 & 15-5-17.Three out of four portions are completed and handed over to TMA on 30-04-2014. Balance one portion at trust colony, Model Town-B is under test operation. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

57 1279 Water Supply Scheme/ Replacement of old Bahawalnagar Approved 163.031 2.933 0.033 0.033 0.031 94% 163.062 98% Date of AA :21.03.2009 Date of TS :03.06.2009 damaged Pipelines, Tehsil Chishtian, Dsitt: Date of RAA: 11.08.2009. Date of RTS: 13.08.2010 Bahawalnagar (Revised). Date of receipt of tenders = 23-06-2009 Date of work order=13.07.2009. Date of completion as per PC-1= 20-08-2009 Date of completion as per agreement=31.12.09. Anticipated date of completion= 30-06-2017. No. of beneficiaries=229367 persons Funds released by FD : 15-07-2016 Reappropriation of excess Funds (-2.900 Million dated on 25.11.2016) Scheme is partially functional since 15.04.2017. The work of single room staff quarter is to be completed. The estimate is to be revised due to price variation and consultancy charges which is under process of approval. The liability of firm is yet to be paid.

58 1280 Water Supply Scheme Sadiqabad, Tehsil Rahim Yar Approved 271.067 10.000 121.704 121.704 113.124 93% 384.191 55% A.A issued on 12-05-2014. Sadiqabad, District R.Y. Khan. Khan Date of T.S. 26-05-2014. Stay order granted by M/S Jam Brothers against prequalification of the contractor. Stay vacated on 03-12- 2014. Date of prequalification=21-07-2014 Date of invitation of tenders=04-12-2014 Date of receipt of tenders = 22-12-2014. Date of work order= 03-01-2015. Date of completion as per PC-1=11-11-2016 Date of completion as per agreement= 30.06.2017. Anticipated date of completion 30.06.2018 No. of beneficiaries=405864 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (+ Rs.24.204 million) dated 28.10.2016 & 19-04-17. Work is in progress. Additional funds Rs.80.00 million provided by Govt. dated 16-02-2017.

59 1281 Urban sewerage / drainage scheme for Hassan Attock Approved 86.107 20.000 30.000 30.000 29.991 100% 116.098 57% ● A.A Date 28.08.2014. Abdal City, Hassan Abdal, District Attock ● T.S Date 01.09.2014. ● Date of Start of Scheme 26.01.2015. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. (The work on the RCC Sewer 21", Water Channel and PCC is in progress. 60 1282 Urban Sewerage / Drainage & PCC for Fateh Attock Approved 30.000 10.000 24.000 24.000 23.978 100% 53.978 52% ● A.A Date 09.01.2016. Jang City, Tehsil Fateh Jhang, District Attock. ● T.S Date 22.01.2016. ● Date of Start of Scheme 09.03.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. 61 1283 Urban Sewerage Scheme, Talagang City. Chakwal Approved 59.037 10.000 17.500 17.500 17.475 100% 76.512 73% Date of A.A 22.01.2015 (3rd Rev) Date of T.S 06.02.2015 Date of Sart 13.04.2015 Date of completion 30.06.2018 Work is in progress. 62 1284 Providing / laying of Sewerage System / Chakwal Approved 145.787 10.000 77.297 77.297 77.297 100% 223.084 96% Date of A.A 29.03.2016 (2nd Rev) construction / rehabilitation of storm water Date of T.S 07.04.2016 (Rev) channel in Choa Saiden Shah District Chakwal Date of Sart 21.02.2014 Date of completion 31.12.2017 Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

63 1285 Urban Sewerage Scheme Jhelum with Treatment Jhelum Approved 351.910 20.000 24.500 24.500 24.500 100% 376.410 70% Date of A.A .14-09-2009. Plant Date of Revise A.A 29-03-2016 Date of T.S 24-10-2009 Date of Revis T.S 31-05-2016 Date of Commencement 17-08-2016 Date of Completion 15-08-2018 Scheme has been Revised and Administratively approved vide. No.SO(PH-S)9-16/2015 (Jhelum) dt: 29.03.2016. • Work awarded in 2009 to 4 (Four) Groups. They have gone in litigation against recovery effected on the recommendations of CMIT. Work is held up by them since July 2014. • Work to be done as per revised scope of work Revised Estimate allotted on 17-08-2016 • The contractor has started the work at site of lift station. • Manufacture of 12" i/d R.C.C pipe in progress. • Contractor has laid RCC pipe of 66" i/d at site. • Pumping machinery (2sets) arranged. • DCI pipe 800 Rft arranged.

64 1286 Comprehensive Sewerage Scheme Bhalwal Sargodha Approved 219.504 13.137 10.487 10.487 10.447 100% 229.951 100% Colonies Date of A.A 25.06.2009, Revised Date of A.A 31.01.2014, 2nd Revised Date of A.A 19.09.2016, Date of T.S 29.06.2009, Date of Award 24.11.2009 & 04.12.2009, Scheduled date of Completion on 12.2010, Revised date of Completion 30.06.2017, Date of Commencement, 24.11.2009 & 04.12.2009, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

The scheme was divided in to three zones. Zone II & III handed over to TMA. Sewer lines for Zone I are under test operation for handing over to Municipal Committee Bhalwal.

65 1287 Urban Sewerage Scheme for (Islam Pura, Zafar Sargodha Approved 75.000 10.000 50.000 50.000 50.000 100% 125.000 32% Date of A.A 09.06.2015, Date of T.S 17.06.2015, Date of Colony, Qartaba Town, Jauhar Colony, Sultan Award 31.07.2015, Scheduled date of Completion is Town, Shirazi park, Mujhid Colony, Ali Town, 30.07.2017, Date of Commencement, 31.07.2015, Funds Gilwala Including Adjacent Colonies) & Abadies released on 02.08.2016, Funds on-lined on 02.08.2016. of (Yousaf park, Aziz Colony, Bashir Colony, 01-No. screening chamber, collecting tank, pumping Nawab Colony chamber 90% completed. 08-Sets Pumping Machinery arranged at site out of 14-Sets. RCC Sewer 200-Rft arranged at site. RCC Box Channel 1150-Rft constructed. NOC applied to Pak: Railway. Work in progress.

66 1288 Rehabilitation of Sewerage Scheme Kot Momin Sargodha Approved 5.000 20.000 20.000 20.000 19.901 100% 24.901 41% Date of A.A 27.08.2016, Date of T.S 10.10.2016, Date of District Sargodha Award 16.11.2016, Scheduled date of Completion is 15.11.2017, Date of Commencement, 16.11.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

Construction of sullage carrier has been commenced at site and 5970-Rft completed. Land acquisition is in progress with Board of Revenue.

67 1289 Sewerage and Drainage Scheme at Chak No.60 Sargodha Approved 10.000 10.000 25.000 25.000 25.000 100% 35.000 58% Date of A.A 25.08.2015, Date of T.S 14.10.2015, Date of Shamali Khizarabad – Ghosia Mehria Colony Award 15.01.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 15.01.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

Drain 5740-Rft & Sullage carrier 3750-Rft constructed, Soling 1662-Cft & PCC Slab 10816-Cft laid. work in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

68 1290 Urban Drainage, Sullage Carrier & PCC Slabs in Khushab Approved 20.000 21.395 19.295 19.295 19.295 100% 39.295 95% Date of AA 11-082015 Date of TS 31- Khushab City 08-2015 Date of award 31.10.2015 Date of completion 30.06.2017 Full funds utilized. 69 1291 Urban Sewerage / Drainag Scheme, Kamar Mianwali Approved 79.775 25.000 28.500 28.500 28.497 100% 108.272 59% Date of A.A 05.09.2014. Mushani, Mianwali. Date of T.S 03.10.2014. Date of Start of work 08-11-2014. Date of Completion 30.06.2018. Bottlenecks / Remarks RCC Sewer=9" i/d=3439-Rft Laid & 5561-Arrange/15205, 12"i/d= 3336-Laid & 1644-Arrange/4960, 15"i/d= 3548-Rft Laid & 5147-Arrange/8695, 18"i/d=1610-Rft Laid & 1974- Arrange/3675, 21"i/d= 192-Arrange/200, 24"i/d=335-Rft laid & 165- Rft Arrange/500, 27"i/d=585-Arrange/600, 30"i/d=1136-Arrange/1250, 33"i/d=2444-Laid & 803- Arrange/3330, Screening Chamber=1/1, Collecting Tank 25'dia= 2/2, P/Machinery=0/4, Suction Delivery=0/1, Discharge Sump=0/1, Generator Room=90% Complete/1, Staff Quarter=1/1, Generator Set=0/1, Boundary Wall=1/1, S/Carrier=1405/4675, Out fall Structure=0/1, S/Drain= 9660/51760, PCC Slab= 92394/294164, Electric T/Line=0/1. Work is in Progress.

70 1292 Sewerage, Drainage, PCC Slab at Kallur Kot Bhakkar Approved 10.000 20.000 30.100 30.100 29.372 98% 39.372 99% Date of A.A 25.08.2015 City, Tehsil Kallur Kot, Distt: Bhakkar. Date of T.S 14.09.2015 Date of Commencement 23.12.2015 Date of completion 23.12.2017 Scheme almost completed. 71 1293 Sewerage, Drainage, PCC Slab at Maibel, Tehsil Bhakkar Approved 3.000 7.000 5.400 5.400 5.350 99% 8.350 84% Date of A.A 25.08.2015 Kallur Kot, Distt: Bhakkar. Date of T.S 29.08.2015 Date of Commencement 24.11.2015 Date of completion 24.08.2016 Scheme completed in saving. 72 1294 Urban Sewerage & Drainage Scheme Pir Mehal. T.T.Singh Approved 70.000 20.000 75.000 75.000 75.000 100% 145.000 45% 1-Date of A.A 16.10.2014 2- Date of T.S 03.12.2014 3-Date of Prequalification 08.12.2014 4-Date of invitation of tenders 08.12.2014 5- Date of Receipt of tenders 23.12.2014 6- Date of work order 31.12.2014 7- Date of Completion as per PC-I 15.10.2017 8- Anticipated date of completion 30.12.2018 9- No. of Beneficiary - 139496 Person 10-Funds Released by F.D 15.07.2016 & 22.02.2017 11-Re-appropriation of funds(+/-) Work is in progress.

73 1295 Ext./ Rehabilitation of Urban Sewerage Scheme T.T.Singh Approved 30.000 20.000 97.400 97.400 97.400 100% 127.400 27% 1-Date of A.A 12.11.2015 Gojra, T.T.Singh - ADP 2015-16 2- Date of T.S 26.02.2016 3-Date of Prequalification -07.03.2015 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work odder -18.04.2016 7- Date of completion as per PC-I 11.11.2018 8- Anticipated date of completion 11.11.2018 9- No. of Beneficiary -393651 Person 10-Funds Released by F.D 15.07.2016 & 22.02.2017 11-Re-appropriation of funds(+/-) + 17.04.2017 & 28.04.2017 Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

74 1296 Extension / Rehabilitation of Urban Sewerage T.T.Singh Approved 15.000 40.000 122.000 122.000 122.000 100% 137.000 34% 1-Date of A.A 12.11.2015 Scheme Karnalia City (Phase-II) 2- Date of T.S 25.02.2016 3-Date of Prequalification -07.03.2016 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work odder -29.04.2016 7- Date of completion as per PC-I 11.11.2018 8- Anticipated date of completion 11.11.2018 9- No. of Beneficiary - 306625 Person 10-Funds Released by F.D 15.07.2016 & 22.02.2017 11-Re-appropriation of funds(+/-) (+)14.11.2016 Work is in progress.

75 1297 Urban Sewerage Drainage Scheme Kamoke, Gujranwala Approved 312.483 10.000 7.310 7.310 7.310 100% 319.793 100% District Gujranwala (3rd Revised). Scheme completed . 76 1298 Urban Sewerage Drainage Scheme Wazirabad Gujranwala Approved 159.849 10.504 0.000 0.000 0.000 0% 159.849 94% A.A. dated 24.05.2016. T.S. dated 08.6.2016. Start Date 14.04.2009 Completion date 30.06.2017 Scheme completed in saving and in operation. 77 1299 Provision of Sewerage & Water Supply Scheme Gujranwala Approved 57.312 20.000 52.500 52.500 52.492 100% 109.804 92% at Ghakhar & Ladhaywala, District Gujranwala. A.A. dated 12.12.2014. T.S. dated 09.01.2015. *Start Date 28.02.2015. *Completion date 30.06.2018. Scheme completed. 78 1300 Const: of Sewerage / Drainage / PCC Scheme Gujranwala Approved 26.500 10.000 38.000 38.000 37.985 100% 64.485 54% A.A. dated 05.05.2015 Sodhra Talwara Tehsil Wazirabad T.S. dated 11.05.2015. *Start Date 17.06.2015. *Completion date 30.06.2018. Work in progress. Full funds utilized.

79 1301 PCC and Drainage Facility at , Gujranwala Approved 25.000 10.000 40.000 40.000 40.000 100% 65.000 41% Sadoki,Dargahapur and others in Tahsil Kamoki A.A. dated 15.10.201. T.S. dated 30.12.2015. *Start Date 24.02.2016. *Completion date 30.06.2018. Work in progress. Work in progress. Full funds utilized.

80 1302 Urban Sewerage Scheme / Drainage Scheme Hafizabad Approved 131.081 10.000 55.000 55.000 55.000 100% 186.081 85% Date of A.A 09.04.14 Eastern Side, (Ghari Awan & Allied Abadies). Date of T.S 10.04.14. Hafizabad City Revised T.S Date 05.03.2015. Date of start 08.05.2014 Date of completion 30.06.17 Scheme completed.

81 1303 Urban Drainage Scheme Jalapur Bhattian Hafizabad Approved 35.000 20.000 35.000 35.000 35.000 100% 70.000 72% Date of A.A 19.12.2015 Date of T.S 30.12.2015 Date of Start 12-3-2016 , date of completion 11- 3-2018 Work in progress. Full funds utilized.

82 1304 Provision of Sanitation / Drainage in City Pindi Hafizabad Approved 10.000 10.000 60.000 60.000 60.000 100% 70.000 42% Date of A.A 04.04.2016 Bhattian Date of T.S 16.05.2016 Date of Start 12-3-2016 , Date of completion 03- 04-2019 Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

83 1305 Urban Drainage Scheme, Kaleke Mandi. Hafizabad Approved 8.500 1.500 1.500 1.500 1.500 100% 10.000 100% Scheme completed. 84 1306 Urban Drainage Scheme Ramkey Chatha i/c Hafizabad Approved 8.500 1.500 1.500 1.500 1.500 100% 10.000 100% Scheme completed. Allied Abadies. 85 1307 Provision of Sewerage System Lala Musa Distt: Gujrat Approved 157.913 9.556 3.556 3.556 3.556 100% 161.469 96% A.A Date =11.8.2009 Gujrat T.S date=23.10.2009 Start date 06.11.2009. Completion date 30.06.2017 Work in progress. Full funds utilized.

86 1308 Construction of Two Pumps Station at Old Gujrat Approved 30.000 18.350 18.350 18.350 18.350 100% 48.350 100% A.A Date =7.9.2015 G.T.Road Drain Gujrat. T.S date=7.9.2015 Start date 25.11.2015. Completion date 30.06.2017 Work in progress. Full funds utilized.

87 1309 Sewerage & Water Supply Tank for Bhiki Sharif M.B.Din Approved 48.284 20.000 20.000 20.000 19.985 100% 68.269 59% * A.A Date. 09.10.2014 * T.S Date. 22.12.2014 * Start Date 16.02.2015 * Completion date 30.06.2017. * Work in progress. Full funds utilized.

88 1310 Sewerage & drainage Scheme for Qadirabad, M.B.Din Approved 59.835 12.156 12.156 12.156 12.154 100% 71.989 100% * A.A Date. 09.10.2014 M.B.Din. * T.S Date. 09.10.2014 * Start Date 20.12.2014 * Completion date 30.06.2017. * Work in progress. Full funds utilized.

89 1311 Sewerage / Drainage Scheme Malikwal City, M.B.Din Approved 50.000 20.000 34.300 34.300 34.300 100% 84.300 34% * A.A Date. 06.01.2016 Distt.M.B.Din * T.S Date. 15.01.2016 * Start Date 11.03.2016 * Completion date 10.03.2019. Work in progress.

90 1312 Urban Drainage and Sewerage Scheme Sialkot Approved 49.814 8.639 3.139 3.139 1.287 41% 51.101 87% *A.A Date =06.01.14 Chawinda *T.S date=18.01.14 Scheme completed in saving. 91 1313 Desilting of Nullah Bhed Restoration of Sialkot Approved 150.567 1.000 13.345 13.345 9.245 69% 159.812 93% *A.A Date =12.03.15 Embankment & Construction of Bridges of Nullah *T.S date=17.03.15 Bhed Sialkot City *Start Date 31.03.15 *Completion date 30.06.2017. Scheme completed in saving.

92 1314 Const. of PCC Drainage / Sewerage for PP- Sialkot Approved 10.000 10.000 30.000 30.000 30.000 100% 40.000 100% *A.A Date =07.09.15 125(Villages Lodhery, Bahoo Bhatti, *T.S date=12.09.15 Chacharwali, Langerwali, Sahowali, Nanowali, *Start Date 15.10.15 Maryyam Colony Sahowali, Kot Mana, Bagwal *Completion date 30.06.2018 Scheme completed. Awan, Harar & Bhooni)

93 1315 Const. of PCC, Brick Pavement and Drains, in Sialkot Approved 17.000 13.000 13.000 13.000 13.000 100% 30.000 100% *A.A Date =07.09.15 villages Kotli Bawa, Faqeerchand, Kalkenagra *T.S date=14.09.15 *Start Date 07.11.15 *Completion date 30.06.2017 Scheme completed. 94 1316 Construction of Streets (Drains, PCC) Mohallah Sialkot Approved 10.000 20.000 30.000 30.000 30.000 100% 40.000 80% *A.A Date =07.09.15 Sharif Pur, Habib Pura, Bashir Pura, Nazir Abad *T.S date=14.09.15 Colony and others. *Start Date 07.11.15 *Completion date 31.12.2018 Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

95 1317 Construction of Street PCC/Tuff Tiles Drains & Sialkot Approved 15.000 10.000 15.000 15.000 15.000 100% 30.000 100% *A.A Date =07.09.15 Nullah in Mohallah Rasoolpur & More Sambrial, *T.S date=11.09.15 Tehsil Sambrial *Start Date 04.02.16 *Completion date 30.06.2018 Work in porgress. Full funds utilized.

96 1318 Construction of Street PCC / Tufff Tiles Drains & Sialkot Approved 15.000 10.000 15.000 15.000 15.000 100% 30.000 100% *A.A Date =07.09.15 Nullah in Mandi Samrial and old Sambrial Tehsil *T.S date=11.09.15 Sambrial *Start Date 04.02.16 *Completion date 30.06.2018 Work in porgress. Full funds utilized.

97 1319 Construction of Street PCC / Tufff Tiles Drains Sialkot Approved 10.000 7.500 32.500 32.500 32.500 100% 42.500 100% *A.A Date =07.09.15 Nullah in Mohallah Kareem Pura and old *T.S date=11.09.15 Allaywali Tehsil Sambrial. *Start Date 04.02.16 *Completion date 30.06.2018 Scheme completed.

98 1320 Construction of Street PCC / Tufff Tiles Drains Sialkot Approved 10.000 10.000 30.000 30.000 29.951 100% 39.951 100% *A.A Date =07.09.15 Nullah Teleli Phone wala Bazar *T.S date=11.09.15 *Start Date 04.02.16 *Completion date 30.06.2018 Scheme completed.

99 1321 Construction of Street PCC / Tufff Tiles Drains & Sialkot Approved 10.000 20.000 25.000 25.000 25.000 100% 35.000 100% *A.A Date =07.09.15 Nullah Fazal Pura & adjoining Streets Sambrial *T.S date=11.09.15 City *Start Date 04.02.16 *Completion date 30.06.2018 Work in porgress. Full funds utilized.

100 1322 Sewerage scheme for Talwandi Bhindran, Narowal Approved 74.432 10.000 10.000 10.000 9.952 100% 84.384 82% A.A Date.3.5.2014 Narowal. T.S Date.23.5.2014 *Start Date 25.08.2014 *Completion date 30.06.2017. Work of PCC is in prgress. Construction of gully grating for strees connection is in progress. Disposal is founcting satisfactorly. 101 1323 Drainage / PCC with safe drinking water facilities Narowal Approved 15.000 14.404 14.404 14.404 14.383 100% 29.383 100% A.A Date.10.2.2016 in UC Chamrial, Rambri, Sakror, Dinga & narowal T.S Date.13.2.2016 Ferozpur, Dhampthal Tehsil Zafarwal *Start Date 7.5.2016 *Completion date 6.5.2017 Scheme completed. 102 1324 Comprehensive Sewerage Drainage, PCC Narowal Approved 50.000 10.000 0.700 0.700 0.700 100% 50.700 32% (Org)A.A Date.19.11.2013 Scheme Zafarwal, District Narowal (RevisedA.A Date.9.11.2016 (Revised T.S Under process *Start Date 1.4.2014 *Completion date 30.06.2017 Scheme completed. 103 1325 Const: of PCC / Tuff tiles of City Package Narowal Approved 10.000 10.000 19.300 19.300 18.999 98% 28.999 41% *Date of A.A 9.4.2016 Zafarwal City *Date of T.S 19.4.2016 *Start Date 6.6.2016 *Completion date 5.12.2017. Work in progress.

104 1326 Disposal of waste water of M/S Pakistan Kidney Lahore Approved 39.000 10.000 0.000 0.000 0.000 0% 39.000 49% & Liver Institute & Research Centre(Pkli&Re) Scheme has been scraped by Chief Secretary Punjab due to Upto Hadiara Drain Along Bedian Road (External widening of Bedian Road. Works) 105 1327 PCC, Water filtration plant and sewerage Lahore Approved 25.000 20.000 4.300 4.300 4.300 100% 29.300 59% drainage at Bilal Town, ferozpur road lahore ●Scheme completed Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

106 1328 Const: of PCC/Sewerage, Link street Sadar Park, Lahore Approved 5.000 5.000 3.900 3.900 3.881 100% 8.881 89% Haji pura, Dubai Park, Ghausia Salamatpura & ●Scheme completed Karoom Nagar 107 1329 Const: of PCC/Sewerage, Links Kalanderpura, Lahore Approved 5.000 5.000 4.850 4.850 4.830 100% 9.830 98% Bagh Mahala, Harbanspura & Nawabpura, NA- ●Scheme completed 124 108 1330 Const: of PCC/Sewerage, Mehmood Booti, Lahore Approved 5.000 5.000 4.850 4.850 4.846 100% 9.846 98% Mahal Ghausia & Shahgohar, Sirajpura & ●Scheme completed Naseerabad 109 1331 Const: of PCC/Sewerage Links streets Wali Park Lahore Approved 5.000 5.000 3.649 3.649 3.648 100% 8.648 86% Gulshan park, Hameed pura, Toheed Park ●Scheme completed

110 1332 Const: of PCC/Sewerage Links streets Chaman Lahore Approved 5.000 5.000 9.700 9.700 9.698 100% 14.698 100% Park, Yahya Park & Shahdin Park ●Scheme completed 111 1333 Const: of PCC/Sewerage Links streets Fateh Lahore Approved 5.000 5.000 4.950 4.950 4.949 100% 9.949 99% Garh, Mahar Faiz Colony, Canal Park Ghausia ●Scheme completed 112 1334 Const: of PCC/Sewerage Links streets Faisal Lahore Approved 5.000 5.000 4.550 4.550 4.547 100% 9.547 95% Park, Maskeen pura, Jora Peer ●Scheme completed 113 1335 Const: of PCC/Sewerage Links streets Lahore Approved 5.000 5.000 4.350 4.350 4.346 100% 9.346 93% Rasheedpura, Kotli Peer, Angori Bagh & ●Scheme completed Pakistan Mint 114 1336 Const: of PCC/Sewerage Links streets Sauware, Lahore Approved 5.000 5.000 7.000 7.000 7.000 100% 12.000 100% Mujhaidabad, Sukh Nahar & Toheed Park ●Scheme completed

115 1337 Const: of PCC/Sewerage Links streets, Fiaz Lahore Approved 5.000 5.000 2.504 2.504 2.504 100% 7.504 75% Park, Shah Kamal Road & Gunj Bazr ●Scheme completed 116 1338 Urban Sewerage / Drainage Scheme Sheikhupura Approved 118.000 22.000 47.000 47.000 47.000 100% 165.000 118% Work in progress SharqpurApproved Sheikhupura , Sharqpur 117 1339 Provision of Sewerage system in mohllah Sheikhupura Approved 65.000 25.000 70.000 70.000 70.000 100% 135.000 86% Work in progress ghareeb abad etc City Sheikhupura 118 1340 Provision of Sewerage Scheme Burjwala, Sheikhupura Approved 32.034 20.000 155.000 155.000 155.000 100% 187.034 107% Work in progress Saleem Kot, Housing Colony, City Sheikhupura 119 1341 Urban Drainage / Sewerage Scheme Sheikhupura Approved 5.000 5.000 5.000 5.000 5.000 100% 10.000 100% Work in progress Farooqabad UC No. 88 Sheikhupura 120 1342 Urban Drainage / Sewerage Scheme Sheikhupura Approved 5.000 5.000 5.000 5.000 5.000 100% 10.000 100% Work in progress Farooqabad UC No. 85 Sheikhupura 121 1343 Urban Sewerage Scheme Ferozwala (New Sheikhupura Approved 111.700 20.000 112.630 112.630 112.630 100% 224.330 113% Work in progress Sewer Lines) District Sheikhupura (1st Revised)

122 1344 Katcha Storm / Sullage Water Channel in District Sheikhupura Approved 85.000 20.000 57.000 57.000 57.000 100% 142.000 71% Work in progress Sheikhupura 123 1345 Const: of Storm Water Channel / Ext. & Nankana Approved 43.916 20.000 29.400 29.400 29.400 100% 73.316 61% i) Surface Drain 23256/62010 Rft Improvement Urban Sewerage / Drainage Sahib ii) Brick Pavement 22927/223889 Cft Scheme Shahkot Phase-II iii) PCC 168952/121940 Cft Storm Water Channel/sullage Carrier 2.5'x2' = 750/700 Rft 2'x2' = 1600/3200 Rft 1.5'x1.5' = 4415/12350 1.5'.1.5' = 1330/7250Rft RCC Sewer 9" i/d 759/1500 Rft 12" i/d 700/1550 Rft . Work is in progress. 124 1346 Execution of Sanitation Sector Development Nankana Approved 15.798 20.000 2.600 2.600 2.600 100% 18.398 37% Work allotted on 09.05.2017 scheme Shah Kot City District Nankana Sahib Sahib Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

125 1347 Const: of Sewerage and PCC at Bucheki Town. Nankana Approved 100.000 20.000 46.000 46.000 46.000 100% 146.000 75% RCC Sewer Sahib 9” i/d 9716/19239 Rft 12” i/d 6396/7999 Rft 15” i/d 672/822 Rft Surface Drain 22176/54154 Rft PCC Pavement 106737/396014 Cft Sullage Carrier 1.0’ x1.0’ 1733/607 Rft 1.0’ x 1.5’ 0/1285 1.5’ x 1.5’ 3036/785 " 1.5’ x 1.75’ 0/5914 " 1.5’ x 2.50’ 0/6945 " 2.0’ x 2.75’ 0/400 " 3.0’ x 3.0’ 1505/700 " 3.0’ x 4.0’ 1505/2497 " 3.0’ x 5.0’ 0/1000 " 2.0’ x 2.0’ 0/1000 " RCC Road 1200/1200" Culverts 100/100 " Brick Pavement / Solling 2803/2803 Cft if bulance funds Rs.83.585 million provided scheme will be completed in current financial year. Work is in progress.

126 1348 Kasur Environmental Improvement Project, Kasur Approved 1528.890 10.000 0.000 0.000 0.000 0% 1528.890 67% Date of A.A :04/02/2009 Disrtict Kasur Revised Date of A.A :Nil Date of T.S :20/05/2009 Date of Award :29/06/2009 Scheduled date of Completion on :28-06-2011 Revised date of Completion :30/06/2017 Date of Commencement :29/06/2009 Sewerage Systeme 9" to 60" i/d 70702/68459 Rft Const:of Remodling of Rohi Nullah 33914/33914Rft Improvement of Existing Drains 107040/150058 Rft Land Acquisition 50%/01Job (Scheme is caped by the order of Chief Minster Punjab) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

127 1349 Urban Sewerage Drainage Scheme, Pattoki Kasur Approved 551.312 20.000 48.000 48.000 47.998 100% 599.310 88% Date of A.A :14/09/2009 Revised Date of A.A :Nil Date of T.S :29/10/2009 Date of Award :30-12-2009 Scheduled date of Completion on :29-06-2011 Revised date of Completion :30/06/2016 Date of Commencement :29/10/2009 Screenign Chamber= 1 No./ 1 No., Collecting Tank= 2 Nos./ 2 Nos., Pumping Chamber= 1 No./1 No., Generator & Generator Room = 1 No./ 1 No., Electric Connection =1 No/ 1 No., Staff Quarter= 2 Nos./ 2 Nos., Discharge Sump= 1 No/1No., Boundary Wall=864/864., Sullage Carrier 8x4 =30700 Rft/ 50500 Rft, Land Acquisition Tehsil Pattoki= 1 Job/ 1 Job, Land Acquistion Tehsil Chunian= 1Job/1 Job, RCC Sewer 12"i/d= 126045 Rft/147760 Rft, 15"i/d= 11218 Rft/ 11370 Rft, 18"i/d= 7675 Rft/ 8175Rft , 21"i/d= 5778Rft/ 9605Rft, 24"i/d= 5423 Rft/ 6000Rft, 27"i/d= 5750 RftRft/6000Rft, 30"i/d= 899Rft/ 975Rft, 33"i/d= 1165Rft/ 1250Rft, 36"i/d= 15488 Rft/ 16050Rft, 42"i/d= 5183Rft/ 5050Rft, 48"i/d= 3072 Rft/ 3140Rft, 60"i/d= 1563Rft/ 1627Rft, Sullage Carrer 1.5x1.5= 0/ 200Rft/7220, Drains Typr-I= 0/41270 Rft, Brick Pavement= 15000 Cft/ 114223 Cft Work in Progress

128 1350 Urban Sewerage Drainage Scheme & PCC Kasur Approved 136.867 15.979 32.829 32.829 32.829 100% 169.696 106% Date of A.A :24/01/2013 Khudian Phase-I Revised Date of A.A :Nil Date of T.S :21/02/2013 Date of Award :22/03/2013 Scheduled date of Completion on :23-03-2015 Revised date of Completion :30/06/2017 Date of Commencement :22/03/2013 Screenign Chamber= 100%/ 1 No., Collecting Tank= 100%/ 2 Nos., Pumping Chamber= 100%/1 No., Pumping Machiner 5 Cusec = 100 %/5 Set, , Boundary Wall=400 Rft./ 400 Rft, Sullage Carrier =4900 Rft/ 4900 Rft, Electric Connection= Complete/ 1 Job, Inter Connection of S.C & CT= 100%/1 Job, Suction & Delivery Pipes= 400/400 Rft, Discharge Sump 10'x6' = 01/1No., Double Room Staff Quarter = 100%/1No., Generator 200 KVA= 1/1 No, Generator Room 16x12 = 1/1 No. RCC Sewer 9"i/d = 11670/37900 Rft, 12"i/d= 9954Rft/ 7800Rft, 18"i/d= 3994/ 1900Rft , 24"i/d= 1703/ 5520Rft, 30"i/d= 7570Rft/6600 Rft, 33"i/d= 818 Rft/800 Rft, 36"i/d= 2516/3200 Rft, 42"i/d= 193/200 Rft, 48"i/d= 2559/4000 Rft Work in Progress

129 1351 Drainage, PCC & Brick Pavement in Mustafabad Kasur Approved 203.923 20.037 22.537 22.537 22.537 100% 226.460 101% Date of A.A :04/05/2012 Revised Date of A.A :Nil Date of T.S :05/05/2012 Date of Award :04/06/2012 Scheduled date of Completion on :30/11/2013 Revised date of Completion :30/06/2016 Date of Commencement :04/06/2012 Surface Drains= 131757/200810 Rft, PCC Flooring = 180764/179940 Cft, Brick Pavement = 181958/ 196791 Cft, Sullage Carrier= 33784 Rft/45135 Rft Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

130 1352 Drainage, PCC & Brick Pavement in Raja Jang Kasur Approved 184.470 11.857 0.057 0.057 0.057 100% 184.527 94% Date of A.A :04/05/2012 Revised Date of A.A :Nil Date of T.S :05/05/2012 Date of Award :02/06/2012 Scheduled date of Completion on :01/12/2013 Revised date of Completion :30/06/2016 Date of Commencement :02/06/2012 Surface Drains= 112510/115225 Rft, PCC Flooring = 221101/229352 Cft, Brick Pavement = 251214/ 298455 Cft, Sullage Carrier= 44956/45615 Rft

131 1353 Sewerage Scheme Changa Manga, Kasur Approved 91.498 7.120 11.420 11.420 11.370 100% 102.868 104% Date of A.A :14/12/2011 Revised Date of A.A :05/11/2014 Date of T.S :13/01/2012 Date of Award :24/03/2012 Scheduled date of Completion on :24/03/2013 Revised date of Completion :30/06/2016 Date of Commencement :29/02/2012 Screenign Chamber= 1/1 No., Collecting Tank= 2/2 No., Pumping Chamber= 1/1 No., Pumping Machinery= 4/4 No., Boundary Wall= 390/390Rft, Sullage Carrier = 4000/4000 Rft, Electric Connection= 1/1 No., Inter Connection= 2/2 Job, Force Main/ Suction Delivery= 1/1 Job, Discharge Sump= 1/1 No, Staff Quarter=2/2 No, RCC Sewer 9"i/d= 39374/ 36571 Rft, 12"i/d= 1791/ 2100 Rft, 15"i/d= 1884/ 2033 Rft, 18"i/d= 3946/4190 Rft , 21"i/d= 644/ 700Rft, 24"i/d= 3842/4260Rft, 33"i/d= 3180/3180 Rft, Work In Progress

132 1354 Sewerage Drainage Scheme Kangan Pur District Kasur Approved 64.999 25.000 47.400 47.400 47.391 100% 112.390 67% Date of A.A :25/08/2014 Kasur. Revised Date of A.A :Nil Date of T.S :27/08/2014 Date of Award :22/10/2014 Scheduled date of Completion on :02/10/2016 Revised date of Completion :02/10/2016 Date of Commencement :22/10/2014 Screenign Chamber= 95%/2 No., Collecting Tank= 95%/2 No., Pumping Chamber= 85%/2 No., Pumping Machinery= 4/4 No., Electric Connection = 0 / 2 No , Staff Quarter= 90%/ 2 No., Sullage Carrier = 7800/7800 Rft, Discharge Sump= 02/02 Nos. RCC Sewer 9"i/d= 5278/ 37125 Rft, 12"i/d= 4196/ 11290 Rft, 15"i/d= 1234/3000 Rft, 18"i/d= 4078/6000 Rft , 21"i/d= 4701/ 4800 Rft, 24"i/d= 1835/2300 Rft, 27"i/d= 125/100 Rft, Surface Drains = 1927/5490 Rft, BP 23143/114500 1.5x1.5=2600/7400 Rft, Sullage Carrier 1.5x2= 0/900 Rft workin progress

133 1355 Urban Drainage, PCC & Brick Pavement scheme Kasur Approved 139.989 20.000 162.900 162.900 162.879 100% 302.868 63% Date of A.A :09.02.2015 Kasur city District Kasur Revised Date of A.A :Nil Date of T.S :10.03.2015 Date of Award :04.04.2015 Scheduled date of Completion on :09-02-2017 Revised date of Completion :09-02-2017 Date of Commencement :04.04.2015 Const. of Drains = 86276/332609 Rft, PCC Flooring & Brick Pavement= 305839/ 892715 Cft, Sullage Carrier = 7762/ 44825 Rft, Shifting of Existing Services= 0/1 Job RCC Sewer Pipe 60" i/d 1040/1040 Rft Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

134 1356 Urban PCC & Drainage Scheme Kot Radha Kasur Approved 25.000 15.000 49.350 49.350 49.313 100% 74.313 71% Date of A.A :17.08.2015 Kishan District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :02.10.2015 Scheduled date of Completion on :01.10.2017 Revised date of Completion : :01.10.2017 Date of Commencement :02.10.2015 Surface Drains =12062/66394Rft, PCC Flooring= 65702/167614 Cft, Brick Pavement 0/596 Cft Sullage Carrier1.5 x 1.5= 6775/10300, RCC Sewer 15" 145/250 Desilting of Rohi Nullah 70%/01 Job Work in Progress

135 1357 Complete repair and renovation of sewerage Okara Approved 109.993 15.000 44.091 44.091 44.091 100% 154.084 84% Date of AA- 03.03.2014 system including PCC, drains, water channels, Date of TS- 05.03.2014 soling, tuff tiles etc. in M.C. Mandi Ahmed Abad, Date of Pre-qualification.05.05.2014 Date of Receipt of Tenders,20.05.2014 District Okara. Date of work Order. 30.05.2014 Date of completion As per PC-I. 30.06.2016 Anticipated date of completion.30.06.2018 Projected Population 66950 Person Release of Funds 27.07.2016. :(1) Screening Chamber 1/1, (2) Collecting Tank 20' dia 2/2 ,(3) Pumping Chamber 25'dia 1/1, (4)Pumping Machinery 3 cusec 3/3, (5) R.C.C Sewer 9"& 30“i/d 32515/43036,(6)External Electrification 1/1, (Payment made to WAPDA) (7)Storm Water Channel 9750/12500, (8)Boundary wall 410/800, (9)Staff Quarter 1/1, (10)Tuff Tile 0/536442 Sft, (11) Surface Drain 0/2615 (12) Brick Pavement 0/13000 Cft (13) P.C.C 0/6197 Cft (14) Street Lights 190/190 (Pole 190/190)(15) Sullage Carrier 569/1400. Work in Progress

136 1358 Improvement & Extension of Sewerage Scheme Okara Approved 162.839 11.726 11.726 11.726 11.726 100% 174.565 100% Date of AA-07.10.2011 Hujra Shah Muqeem. Date of TS-10.03.2012 Date of Pre-qualification.31.10.2011 Date of Invitation of Tender,23.04.2012 Date of Receipt of Tenders,24.04.2012 Date of work Order.04.05.2012 Date of completion As per PC-I. 30.06.2014 Anticipated date of completion.30.06.2017 Projected Population 216708 Person Release of Funds 27.07.2016. (1)Screen Chamber 2/2, (2)Collecting Tank 20' dia 4/4,(3)Pumping Chamber 25'dia 2/2, (4)Pumping Machinery 4 cusec 8/8, (5) R.C.C Sewer 9"& 42“ 76403/78969(6)External Electrification 2/2 (Electric Connetion Installed by WAPDA, (7) Sullage Carrier 0/1500, (8) Boundary wall 1485/1485, Scheme has been put to operation since September 2016 and being run by the Department while the Handing over/ taking over process is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

137 1359 Improvement of Sewerage Scheme Haveli Lakha Okara Approved 199.789 6.628 8.628 8.628 8.628 100% 208.417 101% Date of AA-14.05.2011 Date of TS-02.06.2011 Date of Pre-qualification.06.06.2011 Date of Invitation of Tender,14.06.2011 Date of Receipt of Tenders,14.06.2011 Date of work Order.20.06.2011 Date of completion As per PC-I. 30.06.2013 Anticipated date of completion.30.06.2017 Projected Population 216181 Person Release of Funds 27.07.2016. Re- Appropriation of funds (+) 2.000 dt: 28-04-2017 (1)Screen Chamber 3/3, (2)Collecting Tank 20' dia 6/6,(3)Pumping Chamber 25'dia 3/3, (4)Pumping Machinery 4 cusec 10/10, (5)R.C.C Sewer 9" to 48" 100135/108513(6)External Electrification is installed 20.01.2016. (7) Sullage Carrier 2700/3000, (8)Boundary wall 1400/1400, (9)staff Quarter 1/1. The Scheme is operational and handed over to TMA Depalpur since September 2016.

138 1360 Construction of Sewerage Scheme Renala Khurd Okara Approved 231.841 15.000 45.000 45.000 45.000 100% 276.841 84% Date of AA-02.04.2014 City, District Okara Ammended. Date of TS-14.04.2014 Date of Pre-qualification.10.04.2014 Date of Invitation of Tender,05.05.2014 Date of Receipt of Tenders,05.05.2014 Date of work Order.13.05.2014 Date of completion As per PC-I. 30.06.2016. Anticipated date of completion,30.06.2018 Projected Population 119573 Person Release of Funds 27.07.2016. Additional funds amounitng to Rs.30.00 Million released on 22.02.2017. The Desired progress will be achieved in next month. (1)R.C.C Sewer 48"i/d (Trunk) 33100/33100 (ii) R.C.C Sewer 9"to 42"i/d= 8800/39825 , (2) Sullage Carrier 105/800 (3) Protection Wall for Seepage Drain 250/250, Work in Progress

139 1361 Sewerage Scheme Shergarh Renala Khurd Okara Approved 55.984 20.000 22.500 22.500 22.500 100% 78.484 81% Date of AA-16.05.2014 Okara Date of TS-28.06.2014 Date of Pre-qualification,17.06.2014 Date of Invitation of Tender,30.06.2014 Date of Receipt of Tenders,30.06.2014 Date of work Order.17.09.2014 Date of completion As per PC-I.14.09.2016 Anticipated date of completion,30.06.2017 Projected Population 26497 Person (1)Screening Chamber 1/1, 100% (2) Collecting Tank 25' dia 1/1, (100%) (3)Pumping Chamber 25'dia 1/1, (95%) (4) Pumping Machinery 5 cusec 2/2, (5) R.C.C Sewer 9"& 24“ 48235/52156, (6)External Electrification 1/1 (Payment made to WAPDA,) (7)Sullage Carrier 3800/4200, (8)Boundry wall 900/900, (9) Surface Drain 16000/16725. Work in Progress. Completed portion commissioned by gragvity through byepass sewer. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

140 1362 Complete Repair and renovation of Sewerage Okara Approved 102.624 10.000 95.673 95.673 95.673 100% 198.297 91% Date of AA-11.04.2014 system including pcc, drains, water channels, Date of TS-20.06.2014 solling, tough tiles in Basir Pur District Okara Date of Pre-qualification,05.05.2014 Date of Invitation of Tender,28.06.2014 Date of Receipt of Tenders,30.06.2014 Date of work Order.17.07.2014 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion,30.06.2018 Re-appropriation of funds (+) 20.00 dt: 31.10.2016 (+) 5.00 dt: 31.01.2017 Projected Population 101210 Person Release of Funds 27.07.2016. Additional funds amounitng to Rs.30.00 Million released on 22.02.2017. The Desired progress will be achieved in next month. (1)Screening Chamber 1/1, (2)Collecting Tank 20' dia 2/2, (3)Pumping Chamber 25'dia 1/1, (4)Pumping Machinery 3 & 2 cusec 4/4 (5) R.C.C Sewer 9"& 30“ i/d 43569/44024, (6)External Electrification 1/1, (7)Sullage Carrier 3645/3400, (8)Boundary wall 400/400, (9)Staff Quarter 1/1, (10)Tuff Tile 0/517814Sft, (11) Surface Drain 1200/2615 (12) Brick Pavement 0/12999 Cft (13) P.C.C 5429/6197 Cft (14) Storm Water Channal 14665/15372 .Work in Progress . The scheme has been made operational since March 2016 and has been handed over to TMA Depalpur for its O&M.

141 1363 Sewerage Scheme Depal Pur City District Okara Okara Approved 69.521 10.000 74.000 74.000 74.000 100% 143.521 42% Date of AA-09.04.2010 ( Original) Date of Revised AA 31.10.2014 Date of TS-18.08.2010 (Phase -I) Date of Revised TS 05.03.2015 Date of Pre-qualification,20.03.2015 Date of Invitation of Tender,09.05.2015 Date of Receipt of Tenders,10.05.2015 Date of work Order.20.06.2011 & 03.09.2015 Date of completion As per Revised PC-I. 31.12.2017 Anticipated date of completion,30.06.2018 Re-appropriation of funds (+) 14.0000 dt: 30.11.2016 Projected Population 229210 Person Release of Funds 27.07.2016. Additional funds amounitng to Rs.50.00 Million released on 22.02.2017. The Desired progress will be achieved in next month. (1)Screening Chamber 2/2,(90%) (2)Collecting Tank 4/4 (95%) ,(3)Pumping Chamber 2/2, (85%) (4)Pumping Machinery 8/8 ,(5) R.C.C Sewer 9" to 48" i/d 29308/ 99899 (6)External Electrification 2/2 (Payment made to WAPDA, (7)Sullage Carrier 3000/14975 Rft, (8) staff Quarter 1/1 (95%).(9) Drain 0/7000 Rft (10) Bricks Pavement.3876/64681 Rft. (11) Complaint Cell 0/1. (12) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

142 1364 Tuff tile for City package Okara Okara Approved 40.000 10.000 98.000 98.000 98.000 100% 138.000 100% Date of AA- 08.04.2016 Date of TS -11.04.2016 Date of Pre-qualification. 19.04.2016 Date of Invitation of Tender,04.05.2016 Date of Receipt of Tenders,05.05.2016 Date of work Order.20.05.2016 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion, 30.06.2017 Re-appropriation of funds (+) 14.00 dt: 31.10.2016 Additional funds amounitng to Rs.74.00 Million released on 22.02.2017. The Desired progress will be achieved in next month. Projected Population 471998 Person Release of Funds 27.07.2016. Tuff tile 60mm 403000/688550 Sft Tuff tile 80mm 0/54400 sft Work is in progress.

143 1365 Tuff Tile City Package Renala Khurd Okara Approved 7.650 7.163 1.863 1.863 1.863 100% 9.513 64% Date of AA-18.08.2015 Date of TS-22.08.2015 Date of Invitation of Tender,30.11.2015 Date of Receipt of Tenders,01.12.2015 Date of work Order.08.12.2015 Date of completion As per PC-I. 30.11.2016 Anticipated date of completion.30.06.2017 Re-appropriation of funds ( -) 5.00 dt: 31.10.2016 (-) 0.300 dt: 31.01.2017 Projected Population 66310 Person Release of Funds 27.07.2016. Tuff Tile 137215/137215 sft Scheme Completed.

144 1366 Laying of RCC Sewer, Tuff Tiles & Drain in Ward Okara Approved 5.000 3.500 2.945 2.945 2.945 100% 7.945 93% Date of AA- 21.03.2016 No. 1 to 7 Okara City Date of TS-25.03.2016 Date of Pre-qualification. Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of completion 30.06.2017 Re-appropriation of funds ( -) 0.300 dt: 31.01.2017 (-) 0.250 dt: 28-04-2017 Projected Population 69897 Person Release of Funds 27.07.2016. Tuff tile 60mm 27023/37065 Sft RCC Sewer 12" i/d 3590/4070 Rft Scheme completed in Saving due to low rates qouted by the contractor. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

145 1367 Laying of RCC Sewer, Tuff Tiles & Drain in Ward Okara Approved 5.000 2.300 2.000 2.000 2.000 100% 7.000 96% Date of AA- 21.03.2016 No. 8 to 18 Okara City Date of TS-25.03.2016 Date of Pre-qualification. Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Projected Population 103987 Person Release of Funds 27.07.2016. Re-appropriation of funds ( -) 0.300 dt: 31.01.2017 (-) 0.100 dt: 28-04-2017 Tuff tile 60mm 38100/44628 Sft RCC Sewer 15" i/d 425/425 Rft RCC Sewer 12" i/d 2166/1540 Rft,Sullage Carrier 0/210 Rft Scheme completed in Saving due to low rates qouted by the contractor.

146 1368 Laying of RCC Sewer, Tuff Tiles & Drain in Ward Okara Approved 5.000 3.500 3.050 3.050 3.050 100% 8.050 95% Date of AA- 21.03.2016 No. 19 to 22 Okara City Date of TS-25.03.2016 Date of Pre-qualification. Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of completion 30.06.2017 Re-appropriation of funds ( -)0.300 dt: 31.01.2017 (-) 0.200 dt: 28-04-2017 Projected Population 82485 Person Release of Funds 27.07.2016. Tuff tile 60mm 63000/69705 Sft RCC Sewer 12" i/d 950/1020 Rft, Sullage carrier 0/390 Rft Scheme completed in Saving due to low rates qouted by the contractor.

147 1369 Laying of RCC Sewer, Tuff Tiles & Drain in Ward Okara Approved 5.000 3.700 3.290 3.290 3.290 100% 8.290 95% Date of AA- 21.03.2016 No. 23 to 29 Okara City Date of TS-25.03.2016 Date of Pre-qualification. Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Re-appropriation of funds (-) 0.200 dt: 31.01.2017 (-) 0.300 dt: 28-04-2017 Projected Population 40098 Person Release of Funds 27.07.2016. Tuff tile 60mm 39630/39630 Sft RCC Sewer 12" i/d 3051/3051 Rft Scheme completed in Saving due to low rates qouted by the contractor. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

148 1370 Laying of RCC Sewer, Tuff Tiles & Drain in Ward Okara Approved 5.000 1.000 0.750 0.750 0.750 100% 5.750 96% Date of AA- 21.03.2016 No. 30 to 37 Okara City Date of TS-25.03.2016 Date of Pre-qualification. Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of completion 30.06.2017 Re-appropriation of funds (-) 0.200 dt: 31.01.2017 (-) 0.050 dt: 28-04-2017 Projected Population 140500 Person Release of Funds 27.07.2016. Tuff tile 60mm 35350/39630 Sft RCC Sewer 12" i/d 1629/1629 Rft Scheme completed.

149 1371 Laying of RCC Sewer, Tuff Tiles & Drain in Ward Okara Approved 5.000 1.000 0.790 0.790 0.790 100% 5.790 97% Date of AA- 21.03.2016 No. 38 to 50 Okara City Date of TS-25.03.2016 Date of Pre-qualification. Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of completion 30.06.2017 Re-appropriation of funds (-) 0.100 dt: 31.01.2017 (-) 0.145 dt: 28-04-2017 Projected Population 141309 Person Release of Funds 27.07.2016. Tuff tile 60mm 35030/35030 Sft RCC Sewer 12" i/d 2050/2050 Rft, RCC Sewer 9" i/d 0/225 Rft, Scheme completed in Saving due to low rates qouted by the contractor.

150 1372 Sewerage & Tuff Tiles in UC 89/1 Okara Approved 1.500 1.500 1.270 1.270 1.270 100% 2.770 92% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 18.06.2016 Date of completion 31.12.2016 Re-appropriation of funds (-) 0.100 dt: 31.01.2017 (-) 0.140 dt: 28-04-2017 Projected Population 39855 Person Release of Funds 27.07.2016. Tuff Tile 60mm 26663/26663 Sft Scheme completed in Saving due to low rates qouted by the contractor. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

151 1373 Sewerage & Tuff Tiles in UC 90/2 Okara Approved 1.500 1.500 1.400 1.400 1.400 100% 2.900 97% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Re-Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 24.06.2016 Date of completion 31.12.2016 Re-appropriation of funds (-) 0.100 dt: 31.01.2017 (-) 0.119 dt: 28-04-2017 Projected Population 48217 Person Release of Funds 27.07.2016. Tuff Tile 60mm 20060/20060 Sft RCC Sewer 12" i/d 812/812 Scheme completed in Saving due to low rates qouted by the contractor.

152 1374 Sewerage & Tuff Tiles in UC 91/3 Okara Approved 1.000 1.000 1.000 1.000 1.000 100% 2.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,16.04.2016 Date of Receipt of Tenders,18.04.2016 Date of work Order.26.04.2016 Date of completion 31.12.2016 Projected Population48682 Person Release of Funds 27.07.2016. Tuff Tile 60mm 16700/16700 Sft Scheme Completed

153 1375 Sewerage & Tuff Tiles in UC 92/4 Okara Approved 2.000 2.000 2.000 2.000 2.000 100% 4.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 16.06.2016 Date of completion 31.12.2016 Re - Appropriation funds (-) 0.129 dt: 28-04-2017 Projected Population 49662 Person Release of Funds 27.07.2016. Tuff Tile 60mm 28170/28170 Sft RCC Sewer 12" i/d 700/700 Rft Scheme completed in Saving due to low rates qouted by the contractor.

154 1376 Sewerage & Tuff Tiles in UC 93/5 Okara Approved 1.000 1.000 1.000 1.000 1.000 100% 2.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,16.04.2016 Date of Receipt of Tenders,18.04.2016 Date of work Order.26.04.2016 Date of completion 31.12.2016 Projected Population 48643 Person Release of Funds 27.07.2016. Tuff Tile 60mm 18010/18010 Sft RCC Sewer 9" i/d 50/50 Rft Scheme Completed Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

155 1377 Sewerage & Tuff Tiles in UC 94/6 Okara Approved 1.000 1.000 1.000 1.000 1.000 100% 2.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 26.04.2016 Date of completion 31.12.2016 Projected Population 46483 Person Release of Funds 27.07.2016. Tuff Tile 60mm 17469/17469 Sft Scheme Completed

156 1378 Sewerage & Tuff Tiles in UC 95/7 Okara Approved 1.250 1.250 1.250 1.250 1.250 100% 2.500 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 16.06.2016 Date of completion 31.12.2016 Re- Appropriation of funds (-) 0.115 dt: 28-04-2017 Projected Population 49889 Person Release of Funds 27.07.2016. Tuff Tile 60mm 21944/21944 Sft Scheme completed in Saving due to low rates qouted by the contractor.

157 1379 Sewerage & Tuff Tiles in UC 96/8 Okara Approved 1.250 1.250 1.135 1.135 1.135 100% 2.385 95% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 18.06.2016 Date of completion 31.12.2016 Re-appropriation of funds (-) 0.050 dt: 31.01.2017 (-) 0.065 dt: 28-04-2017 Projected Population 46282 Person Release of Funds 27.07.2016. Tuff tile 60mm 23583/23583 Sft RCC Sewer 9" i/d 55/55 Rft Scheme completed in Saving due to low rates qouted by the contractor.

158 1380 Sewerage & Tuff Tiles in UC 97/9 Okara Approved 1.000 1.000 1.000 1.000 1.000 100% 2.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,16.04.2016 Date of Receipt of Tenders,18.04.2016 Date of work Order.30.04.2016 Date of completion 31.12.2016 Projected Population 47376 Person Release of Funds 27.07.2016. Tuff Tile 60mm 17962/17962 Sft Scheme Completed Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

159 1381 Sewerage & Tuff Tiles in UC 98/10 Okara Approved 1.000 1.000 1.000 1.000 1.000 100% 2.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,16.04.2016 Date of Receipt of Tenders,18.04.2016 Date of work Order.30.04.2016 Date of completion 31.12.2016 Projected Population 44297 Person Release of Funds 27.07.2016. tuff Tille 17233/17233 Sft RCC Sewer 12" i/d 0/110 Rft Scheme completed

160 1382 Sewerage & Tuff Tiles in UC 99/11 Okara Approved 1.500 1.500 1.500 1.500 1.500 100% 3.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,13.05.2016 Date of Receipt of Tenders,14.05.2016 ( No. Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of Award 20.06.2016 Date of completion 31.12.2016 Projected Population 52824 Person Release of Funds 27.07.2016. Tuff Tile 60mm 22528/22528 Sft, Scheme completed in Saving due to low rates qouted by the contractor.

161 1383 Sewerage & Tuff Tiles in UC 16 Okara Approved 1.000 1.000 1.000 1.000 1.000 100% 2.000 100% Date of AA- 21.03.2016 Date of TS-25.03.2016 Date of Invitation of Tender,16.04.2016 Date of Receipt of Tenders,18.04.2016 Date of work Order.30.04.2016 Date of completion 31.12.2016 Projected Population 46745 Person Release of Funds 27.07.2016. RCC Sewer 12" i/d 818/818 Rft Brick Pavement 5975/5975 Cft Scheme Completed.

162 1384 Provision of sewerage system at Hayatabad Sahiwal Approved 6.782 2.395 5.805 5.805 5.805 100% 12.587 100% 1. Date of AA 18.08.2015 Chichawatni 2. Date of TS 21.08.2015 3. Date of Pre-qualification ------4. Date of inviting of Tender 24.08.2015 5. Date if receipt of tender 21.09.2015 6. Date of Work Order 11.11.2015 7. Date of completion as per PC-1 10.05.2016 8. Anticipated date of completion 31.12.2016 9. Re-appropriation of funds (+/-) ------10. Project Population = 9919 Person Scheme has been completed.

163 1385 Provision of sewerage system at Maharabad Sahiwal Approved 5.568 1.308 0.030 0.030 0.030 100% 5.598 81% 1. Date of AA 18.08.2015 Chichawatni 2. Date of TS 21.08.2015 3. Date of Pre-qualification ------4. Date of inviting of Tender 24.08.2015 5. Date if receipt of tender 21.09.2015 6. Date of Work Order 23.11.2015 7. Date of completion as per PC-1 22.03.2016 8. Anticipated date of completion 31.12.2016 9. Re-appropriation of funds (-) Rs.1.278 Million 10. Project Population = 4040 Person Scheme has been completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

164 1386 Provision of sewerage system at Shakir Colony Sahiwal Approved 5.568 1.169 0.000 0.000 0.000 0% 5.568 83% 1. Date of AA 18.08.2015 Chichawatni 2. Date of TS 21.08.2015 3. Date of Pre-qualification ------4. Date of inviting of Tender 24.08.2015 5. Date if receipt of tender 21.09.2015 6. Date of Work Order 11.11.2015 7. Date of completion as per PC-1 10.03.2016 8. Anticipated date of completion 31.12.2016 9. Re-appropriation of funds (-) Rs.1.169 Million 10. Project Population = 4418 Person Scheme has been completed.

165 1387 Extension Urban Sewerage Scheme Jalalpur Multan Approved 99.980 20.000 45.000 45.000 44.993 100% 144.973 74% 1. Date of A.A. 15.01.2014 (21.04.2016) Pirwala, District Multan (1st Revised). 2. Date of T.S. 22.01.2014 (05.08.2016) 3. Date of Prequalification 27.01.2014 4. Date of Invitation of Tender 12.02.2014 5. Date of Receipt of Tenders 24.02.2014 6. Date of work order 10.03.2014/18.11.2016 7. Date of Completion as per PC-l 14.01.2016 8. Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 / 22.02.207 10. No. of beneficiaries= 170275 persons. Work is in progress.

166 1388 Sewerage Water Disposal from (North South) Multan Approved 75.980 8.447 45.447 45.447 42.138 93% 118.118 81% 1. Date of AA 26.08.2014. Shujabad City, Multan. 2. Date of T.S 15.10.2014. 3. Dated of Prequalification 11.08.2014. 4. Date of invitation of tender 23.10.2014. 5. Date of Receipt of tenders 24.10.2014. 6. Date of work order 08.11.2014. 7. Date of Completion as per PC-l 25.08.2016 8. Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 / 22.02.2017. 10. No. of beneficiaries=111527 persons. The scheme handed over to TMA on 10.03.2017. Rs.27.500 million were to be paid to Highway Department. But due to construction of new road by the Highway Department Rs.12.686 million perposed for surrender.

167 1389 Rehabilitation / extension of sewerage / drainage Khanewal Approved 114.522 20.000 120.000 120.000 119.895 100% 234.417 73% 1. Date of AA: 12-02-2015. system of Mian Channu City 2. Date of TS: 05-03-2015. 3. Date of Pre-qualification 19-03-2015 4. Date of invitation of tender. 11-04-2015 5. Date of Receipt of tender. 23-04-2015 6. Date of Work order. 11-05-2015 7. Date of Completion as per PC-I. 11.02.2017 8. Anticipated date of Completion. 30-06-2017 9. Date of released of funds 27.07.2016 / 22.02.2017. 10. No. of Beneficiaries 200428 Persons. Work is in progress.

168 1390 Provision of drainage / sewerage, soling & water Vehari Approved 100.000 20.000 60.000 60.000 59.971 100% 159.971 42% 1. Date of A.A: 29.12.2014. supply in Municipal Area of Burewala City. 2. Date of T.S: 12.03.2015 3. Date of Pre-Qualification: 13.03.2015 4. Date of Invitation of Tender: 10.04.2015 5. Date of receipt of Tender: 11.04.2015 6. Date of Award: 20.04.2015 7. Date of Completion as per PI: 28.12.2016 8. Anticipated Date of Complion: 30.06.2017 9. Date of released of funds 27.07.2016 10. No. of Benificiary= 226016 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

169 1391 Sewerage Scheme Siddiqabad D.G. Khan City. Dera Ghazi Approved 46.799 12.843 12.843 12.843 12.800 100% 59.599 100% • Date of A.A = 16.01.2014 Khan • Date of TS = 25.02.2014 • No. of Beneficiaries = 24956 • Date of Prequalification = 31.03.2014 • Date of invitation of tenders = 31.03.2014 • Date of receipt of tenders = 16.04.2014 • Date of work order = 05.06.2014 • Date of completion as per PC-I = 15.01.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016

• Funds utilized 100% • Scheme Completed.

170 1392 Comprehensive Sewerage / Drainage Scheme Dera Ghazi Approved 74.986 27.146 105.946 105.946 105.946 100% 180.932 33% • Date of A.A = 12.02.2015 Taunsa Sharif including Tuff Tilling of Streets Khan • Date of TS = 29.04.2015 • No. of Beneficiaries =148052 • Date of Prequalification = 14.05.2015 • Date of invitation of tenders = 14.05.2015 • Date of receipt of tenders = 20.05.2015 • Date of work order = 27.05.2015 • Date of completion as per PC-I = 11.02.2017 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016. • Supplementry Grant = 60 M (22.02.2017) Re-Appropirate Funds Date = +Rs. 18.8 M (15.05.2017).

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

171 1393 Sewerage / Sanitation of Kot Chuttha Dera Ghazi Approved 59.999 20.000 40.000 40.000 40.000 100% 99.999 58% • Date of A.A = 12.12.2014 Khan • Date of TS = 20.03.2015. • No. of Beneficiaries =104534 • Date of Prequalification = 03.04.2015 • Date of invitation of tenders = 03.04.2015 • Date of receipt of tenders = 18.04.2015 • Date of work order = 07.05.2015 • Date of completion as per PC-I = 11.12.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016 • Supplementry Grant = 20 M (22.02.2017)

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

172 1394 Urban drinage/sewerage/tuff tile scheme in Rajanpur Approved 120.000 20.000 55.000 55.000 55.000 100% 175.000 42% • Date of A.A = 23.12.2014 Jampur City (replacement of outlived sewer and • Date of T.S = 26.02.2015 new sewer system in Faisal Colony, Shah Jamal • No. of Beneficiaries =200445 • Date of pre-qualification = 18-2-2015 Colony and Tattar Wala) • Date of Invitation of Tender = 23.03.2015 • Date of reciept of Tenders 11.03.2015 • Date of work order = 26.03.2015 • Date of completion as per PC-I = 22.12.2016 • Anticipated date of completion 30.06.2018 • Funds released by F.D = 15.07.2016. • Supplimentary Grant = 35 (M) 16.02.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

173 1395 Construction of Urban Sewerage Drainage Earth Rajanpur Approved 20.000 20.000 27.005 27.005 27.005 100% 47.005 89% • Date of A.A = 24.4.2015 filling brick pavement and Tuff Tile scheme for • Date of T.S = 26.8.2015 Rojhan City and Adj. Abadies. • No. of Beneficiaries = 31961 • Date of invitation of Tender = 04.09.2015 • Date of receipt of tenders = 22.09.2015 • Date of work order = 22.10.2015 • Date of completion as per PC-I = 30.06.2017 • Anticipated date of completion = 30.06.2018 • Funds released by F.D = 15.07.2017 • Re-appropriation of funds = (+) 7.005 M 15.11.2016. Additional supplementary grant received on 16.02.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

174 1396 Urban Sewerage / Drainage Scheme Chowk Layyah Approved 121.014 20.354 9.896 9.896 9.896 100% 130.910 93% • Date of AA(Original) = 10-09-2007 Azam Date of AA(Amended) = 21-08-2008 Date of AA(Revised) = 10-03-2010 Date of AA(2nd Revised) = 22-11-2016 • Date of TS = 18-03-2008 Date of TS(Revised) = 07-05-2010 • No. of Beneficiaries = 8339 • Date of invitation of tenders= 02-09-2008 • Date of Receipt of Tenders = 24-09-2008 • Date of Work Order= 29-09-2008 • Date of completion as per PC-I= 09-03-2012 (Revised) • Anticipated date of completion= 30-06-2018 • Funds released by FD = 27.07.2016 • Reappropriation of funds= (-) 10.458 million (21.04.2017)

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

175 1397 Urban Sewerage Scheme for Kot Sultan Layyah Approved 99.767 14.751 25.636 25.636 25.636 100% 125.403 100% • Date of AA = 24-02-2009 Date of AA(Revised) = 08-05-2012 Date of AA(2nd Revised) = 22-11-2016 • Date of TS = 10-04-2009 Date of TS(Revised) = 13-11-2012 • No. of Beneficiaries = 37047 • Date of invitation of tenders= 11.04.2009 / 23.01.2017 • Date of Receipt of Tenders = 27.04.2009 / 16.02.2017 • Date of Work Order= 12-05-2009 • Date of completion as per PC-I= 07-05-2013 (Revised) • Anticipated date of completion= 30-06-2018 • Funds released by FD = 27.07.2016 • Reappropriation of funds= (+) 10.885 million (21.04.2017)

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

176 1398 Sewer Line from Bahawalpur Victoria Hospital to Bahawalpur Approved 132.443 20.000 25.000 25.000 24.740 99% 157.183 86% Date of AA :26-02-2014 Disposal Lal Bagh Tehsil & District Bahawalpur. Date of TS :05-03-2014. Date of RAA=12-05-2016 Date of pre-qualification: 07-03-2014. Date of receipt of tenders. 02-04-2014 Date of work order :29-04-2014. Date of completion as per PC-1=25-02-2016 Date of completion as per agreement:28.04.2016. Anticipated date of completion=30-06-2018 No. of beneficiaries=246378 persons Funds released by FD : 15-07-2016 Additional funds Rs.5.0 million received on 28-04-2017 & online dated 16-05-2017. Original scope of work completed. Revised Balance work is in progress.

177 1399 Comp: Urban Sewerage Scheme Bahawalnagar Bahawalnagar Approved 203.000 14.577 8.577 8.577 8.562 100% 211.562 97% Date of AA :04.04.2009. Date of TS :06.05.2009 Date of RTS: 20.07.2012. Date of invitation of tenders=02-05-2009 Date of receipt of tenders = 25-05-2009. Date of work order=09.06.2009. Date of completion as per PC-1=03-04-2011 Date of completion as per agreement=:08.06.11. Anticipated date of completion= 30-06-2017. No. of beneficiaries=215803 persons Funds released by FD : 15-07-2016 Re-appropriation of Excess funds(-Rs.13.0 M) dated 20-01- 2017 & 31-01-2017 & 31-3-17. Scheme completed and handed over to TMA.

178 1400 Laying of Tuff Paver and provision of Water Bahawalnagar Approved 54.048 23.630 0.130 0.130 0.095 73% 54.143 70% Date of AA: 11.01.2014 Supply Pipelines in City Bahawalnagar. Date of TS: 17.01.2014 Date of RTS 23-11-2016 Date of pre-qualification: 28.02.2014. Date of invitation of tenders:02-03-2014 Date of receipt of tenders = 19-03-2014 Date of work order=11.04.2014. Date of completion as per PC-1=10-01-2016 Date of completion as per agreement=10.04.16. Anticipated date of completion=30-06-2018 No. of beneficiaries=162000 persons Funds released by FD : 15-07-2016 Re-appropriation of funds(-Rs.23.50 M) dated 20-01-2017 , 31-01-17 & 24-02-2017 & 31-3-17. Original scope of work is completed. Estimate has been revised technical sanction by Chief Engineer(S), PHED Lahore on 23-11-2016 on the demand of Mr. Rana Rauf MPA PP-279. Revised scope of work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

179 1401 Sewerage Scheme Chishtian (City Uplift Bahawalnagar Approved 252.860 20.000 219.418 219.418 218.916 100% 471.776 49% Date of A.A 25.05.2014 . Package Chishtian) Date of T.S. 21-07-2014. Date of Prequalification. 21-07-2014 DAte of invitation of tenders=25-07-2014 Date of receipt of tenders =12-08-2014 Date of work order= 16-09-2014. Date of completion as per PC-1=24-05-2017 Date of completion as per agreement= 15.09.2017. Anticipated date of completion = 30.06.2018 No. of beneficiaries=342309 persons Funds released by FD : 15-07-2016 Reappropriation of Funds Rs.79.534 million dated 28.10.2016 & 20-1-17 , 31-01-2017 , 24-02-2017 , 31-3-17 & 19-4-17 & 15-5-17. Additional funds Rs.119.384 million provided by Government dated 16-02-2017 , 28-04-2017 & 11-05-2017 & online dated 18-05-2017.Work is in progress.

180 1402 Reh: & Aug: of Sewrage Scheme Khanpur City, Rahim Yar Approved 239.992 20.000 192.922 192.922 190.857 99% 430.849 95% Date of AA :05.03.2014. Phase-II. Khan Date of TS :05.03.2014 Date of pre-qualification: 05.03.2014 Date of invitation of tenders:08-03-2014 Date of receipt of tenders =25-03-2014 Date of work order=14.04.2014. Date of completion as per PC-1=04-03-2016 Date of completion as per agreement= 13.04.2016. Anticipated date of completion=30-06-2017 No. of beneficiaries=364725 persons Funds released by FD : 15-07-2016 work is progress. Additional funds for Rs.192.922 million released through supplementary grant vide No.SO(PH- S)10-11/2013(RYK) dated 16.12.2016 & online by FD on 12-01-2017. Funds Rs.20.00 million surrendered vide Chief Engineer(S), PHED Lahore office letter dated 15-05-2017.

181 1403 Request for provision of Sewerage Scheme of Rahim Yar Approved 103.662 20.000 42.500 42.500 42.500 100% 146.162 66% Date of AA. 23-09-2014. Feroza Town, Tehsil Liaqat Pur Khan Date of TS.. 27-11-2014. Date of prequalification. 08-12-2014. Date of invitation of tenders: 13-12-2014 Date of receipt of tenders = 31-12-2014. Date of work order=10-2-15. Date of completion as per PC-1=22-03-2016 Date of completion as per agreement= 09-8-2016. Anticipated date of completion=30-06-2018 No. of beneficiaries=45520 persons Funds released by FD : 15-07-2016 Additional funds Rs.22.500 million provided by F.D on 28-04- 2017 & 11-05-2017. Work is in progress. Fund Rs.7.500 received without demand and late on 19.05.2017. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

182 1404 Rehabilitation of Sewerage City Sadiqabad Rahim Yar Approved 41.784 12.119 12.119 12.119 10.590 87% 52.374 97% Date of AA. 09-10-2014. Khan Date of TS. 21-11-2014 Rev: TS 28.10.2016. Date of prequalification. 08-12-2014. Date of invitation of tender:13-12-2014 Date of receipt of tenders = 31-12-2014. Date of work order= 10-01-2015. Date of completion as per PC-1=08-10-2015 Date of completion as per agreement= 09-01-2016 Anticipated date of completion=30-06-2018 No. of beneficiaries=471208 persons Funds released by FD : 15-07-2016 Work is in progress. Full funds not utilized due to site conflict.

183 1405 Sewerage Scheme Rahim Yar Khan City with Rahim Yar Approved 30.000 20.000 416.420 416.420 266.716 64% 296.716 85% Date of A.A= 30-12-2015. Date of RAA= 23-09-2016 Treatment Plant-Construction of Intermediate Khan Date of T.S. 30.09.2016. Date of prequalification= 03-08- Pumping Station Near Niazi Colony & Installation 2016 Funds released by FD : 15-07-2016 of Force Main Date of tender= 21-10-2016 Date of work awarded=19-12-2016 Date of completion=18-05-2017 No. of beneficiaries=351570 persons Work is in progress. Additional Funds for Rs.416.420 million provided through supplementary grant dated 02.03.2017. Notices has been issued to the contractor vide EE office letter No51 dated 11.01.2017 , No.175 dated 08.02.2017, No.229 dated 18-02-2017 and SE office letter No.1245 dated 20.02.2017 , E.E office letter No.348 dated 04-03-17, SE office letter No.2015-17 dated 07-03-2017, EE, RYK office letter No.446 dated 15-03-17, No.1463 dated 22-05- 17 & SE office letter No.5392 dated 27-05-17 to accelerate the progress. Funds Rs.50.00 million were proposed for surrender vide this office letter No. 3460 dated 20-04-2017. Accordingly P&D Department has approved the same and issued by the Secretary, HUD & PHE Department Lahore vide Order No.SO(PH-S)9-11/2016(SGD) dated 10-05-2017 but Funds have not yet online up till now. Funds Rs.20.00 million surrender vide Chief Engineer(S), PHED Lahore office letter dated 15-05-2017. Full funds could not be utilized due to slow progress of the contractor, even after repeated notices issued. Work temporarily stopped due to shift / change of site due to community of uplift station Niazi Colony.

184 1406 Completion of Remaining Work of Rahim Yar Approved 21.671 3.550 0.000 0.000 0.000 0% 21.671 81% Date of A.A= 18-08-2007 Comprehensive Sewerage Scheme Phase-I City Khan Date of RAA= 10-01-2013 Sadiqabad Rahim Yar Khan (Revised) Date of T.S= 23-04-2008 Date of RTS=13-02-2013 Date of work awarded=01-11-2007 Date of completion =30-06-2010. Funds released by FD : 15-07-2016 Reappropriation of Funds (-Rs.3.550 million) dated 28.10.2016. Scheme completed & handed over to TMA. Liability of the contractor has been cleared during last Financial Year. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

185 1407 New urban sewerage scheme for Mohallah Fateh Chiniot Approved 76.000 10.000 10.000 10.000 10.000 100% 86.000 42% 1. Date of AA =15.09.2014. Abad Rashida Osmanaabad paris road Moazam 2. Date of TS =28.11.2014 ShahShahbaal Shah, Bawanali Rajan, 3. Date of Pre-qualification =06.12.2014 4. Date of inviting Tenders=20.12.2014 Maqsoodabad Alli Eidgah District Chinioit 5. Date receipt of Tenders= 20.12.2014 6. Date of work order= 01.01.2015 7. Date of Completion as per PC-I = 2 Year 8. Anticipated Date of Completion = 31.12.2017 9. No. of Beneficiaries 94630 10. Funds released by FD=27.07.2016 11. Funds onlined on=22.02.2016 . Full Funds utilized

186 1408 Comprehensive sewerage scheme, Chenab Chiniot Approved 1.000 10.000 80.000 80.000 80.000 100% 81.000 11% 1. Date of AA =02.05.2016 Nagar, Chiniot 2. Date of TS = 19.08.2016 . 3. Date of work order= 22.10.2016 4. Date of Completion as per PC-I = 3 Year 5. Anticipated Date of Completion = 30.06.2019 6. No. of Beneficiaries= 116058 Full Funds utilized .

187 1409 Water Supply & Drainage Sch: Qasim Abad UC Rawalpindi Approved 2.394 9.405 0.000 0.000 0.000 0% 2.394 20% A.A cost:-10.394M dt: 25-06-2014 Lodhran Tehsil & District Rawalpindi T.S cost:-11.291M dt:19-08-2014, Date of Start:-19-11-2014. Date of Completion:-30-06-2017 Source not available. Substitution is under process under C.M Directive No.PS/SECY(IMP)CMO/AB-5/0098617 dt: 15- 04-2016 188 1410 W/S/Sch: Awan Town Qasim Abad Tehsil & Rawalpindi Approved 0.984 4.130 0.000 0.000 0.000 0% 0.984 19% • A.A cost:-4.487M dt: 25-06-2014 District Rawalpindi • T.S cost:-4.894M dt:11-06-2015 • Date of Start:-05-12-2014 • Date of Completion:-30-06-2017 • Source not available under C.M Directive No.DIR(ASSEM)CMO/17/AA-54/128121 dt: 20-01-2017. • Substitution approved by the cabinet Committee on Finance. Revised Administrative approval issued by the DDC on15-05-17. Funds for the substituted scheme were not allocated.

189 1411 W/S/Sch: Bokra District Rawalpindi Rawalpindi Approved 0.475 4.615 0.460 0.460 0.460 100% 0.935 18% • A.A cost:-4.463M dt: 25-06-2014 • T.S cost:-4.871M dt:19-08-2014 • Date of Start:-19-11-2014 • Date of Completion:-30-06-2017 • Source not available under C.M Directive No.DIR(ASSEM)CMO/17/AA-54/128121 dt: 20-01-2017. • Substitution approved by the cabinet Committee on Finance. Revised Administrative approval issued by the DDC on15-05-17. Funds for the substituted scheme were not allocated

190 1412 W/S/Sch: Chishtia Abad District Rawalpindi Rawalpindi Approved 0.518 4.359 0.000 0.000 0.000 0% 0.518 11% • A.A cost:-4.319M dt: 25-06-2014 • T.S cost:-4.667M dt:19-08-2014 • Date of Start:-08-12-2014 • Date of Completion:-30-06-2017 • Source not available under C.M Directive No.DIR(ASSEM)CMO/17/AA-54/128121 dt: 20-01-2017. • Substitution approved by the cabinet Committee on Finance. Revised Administrative approval issued by the DDC on15-05-17. Funds for the substituted scheme were not allocated Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

191 1413 W/S/Sch: Dhoke Gujjran District Rawalpindi Rawalpindi Approved 0.983 3.690 0.526 0.526 0.525 100% 1.508 32% • A.A cost:-4.283M dt: 25-06-2014 • T.S cost:-4.472M dt:24-04-2015 • Date of Start:-22-11-2014 • Date of Completion:-30-06-2017 • Source not available under C.M Directive No.DIR(ASSEM)CMO/17/AA-54/128121 dt: 20-01-2017. • Substitution approved by the cabinet Committee on Finance. Revised Administrative approval issued by the DDC on15-05-17. Funds for the substituted scheme were not allocated 192 1414 R/W/S Scheme Dhamial Rawalpindi Approved 21.000 20.000 125.824 125.824 125.793 100% 146.793 91% • A.A cost:-174.866M dt: 14-12-2015 • T.S cost:-161.241M dt:02-02-2016 • Date of Start:-26-04-16 • Date of Completion:-30-06-2018 • Work in progress. 193 1415 Rural Water Supply Scheme Bhoon, Tehsil Rawalpindi Approved 5.000 3.297 3.297 3.297 3.297 100% 8.297 100% • A.A cost:-8.434M dt: 08-04-2016 Kahuta, District Rawalpindi • T.S cost:-8.297M dt:23-04-2015 • Date of Start:-29-02-2016 • Date of Completion:-30-06-2017 • Scheme completed except electric connection.Demand notice paid to IESCO on 23-08-2016 which is in progress. 194 1416 Rural Water Supply Scheme, Thatha Khalil Tehsil Rawalpindi Approved 9.665 4.890 0.000 0.000 0.000 0% 9.665 66% A.A cost:-14.555M dt: 24-04-2007 Taxila District Rawalpindi T.S cost:-14.555M dt:28-04-2007 Date of Start:-16-04-2011 Excess funded. Funds already re-appropriated vide C.E (N) PHED Lahore letter No.4478-87/B(4) dt: 13-10-2016 195 1417 Rural Water Supply Scheme Kallari Tehsil & Rawalpindi Approved 5.203 4.936 0.000 0.000 0.000 0% 5.203 51% A.A cost:-10.203M dt: 18-11-2011 District Rawalpindi T.S cost:-10.139M dt:14-12-2011 Date of Start:-14-12-2011 Excess funded. Funds already re-appropriated C.E (N) PHED Lahore letter No.4478-87/B(4) dt: 13-10-2016 196 1418 Rural water Supply Scheme in Dhok Nawaz Attock Approved 1.500 1.519 0.965 0.965 0.965 100% 2.465 82% ● A.A Date 11.18.2015. Abad and Dhok Karam Khan District and Tehsil ● T.S Date 12.09.2015. Attock. ● Date of Start of Scheme 28.10.2015. ● Date of Completion of Scheme 30.06.2017. ● Scheme Completed and is under test operation . 197 1419 Rehab: & Aygmentation/Ext of Water Supply Attock Approved 20.000 20.000 18.000 18.000 17.999 100% 37.999 84% ● A.A Date 03.09.2015. Scheme for Village Dhullian ● T.S Date 23.09.2015. ● Date of Start of Scheme 10.11.2015. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. 198 1420 Augmentation/Extension of Water Supply Attock Approved 12.710 6.392 4.666 4.666 4.663 100% 17.373 91% ● A.A Date 07.09.2016. Scheme Haji Shah, Tehsil & District Attock ● T.S Date 12.09.2015. ● Date of Start of Scheme 28.10.2015. ● Date of Completion of Scheme 30.06.2017. ● Scheme completed. The scheme is functional and handed over to CBO. 199 1421 Rehabilitation of Rural Water Supply Scheme Attock Approved 8.874 0.390 0.000 0.000 0.000 0% 8.874 96% Scheme has been completed 2014-15 and is in functional Injra Afghan District Attock condition / handed over to local CBO. Fund to the tune of Rs.0.390 Million received in excess, which have been reappropriated by the Chief Engg: (N) vide No.5022-24/BS (4) dated 17.01.2017. 200 1422 Rehabilitation/Ext: of Rural Water Supply Chakwal Approved 24.440 4.224 1.705 1.705 1.705 100% 26.145 91% Date of A.A 03.09.2014 Scheme Ghazial & Adjoining villages Mehmood Date of T.S 07.03.2015 (Rv) Mohra, Rairra & Ratta Tehsil & District Chakwal Date of Sart 13.02.2015 Date of completion 05.11.2016 Scheme completed in saving and handed over to CBO for further O&M. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

201 1423 Reh/Ext: of Water Supply Scheme Sethi Dakhli Chakwal Approved 29.213 2.870 4.070 4.070 3.914 96% 33.127 103% Date of A.A 03.09.2014 Date of T.S i.e Dhoke Ajan Dhoke Mosa Dhoke Lunda Dhoke 07.03.2015 Date of Sart 13.02.2015 Bakhwal Tehsil Kallar Kahar District Chakwal Date of completion 30.06.2017 Work is completed in saving and under testing. 202 1424 Reh: of RWSS Village Nali Chakwal Approved 20.474 3.770 11.875 11.875 11.875 100% 32.349 100% Date of A.A 03.09.2014 Date of T.S 07.09.2014 Date of Sart 11.02.2015 Date of completion 30.06.2017 Work completed & electric connection awaited. 203 1425 Revival & Rehabilitation of Water Supply Scheme Chakwal Approved 16.572 15.022 12.517 12.517 12.517 100% 29.089 92% Date of A.A 12.09.2015 Date of T.S District Chakwal 06.10.2015 Date of Sart 30.12.2015 Date of completion 31.12.2017 Work is in progress.

204 1426 Augmentation / Extension of Water Supply Chakwal Approved 5.000 5.000 4.065 4.065 4.052 100% 9.052 91% Date of A.A 12.09.2015 Date of T.S Scheme for Village Dharyala Kahoon 30.09.2016 (Rev) Date of Sart 18.11.2015 Date of completion 30.06.2017 Work is completed in saving & under test operation. 205 1427 Rehab: / Extension of Rural Water Supply Chakwal Approved 5.000 5.000 2.000 2.000 1.977 99% 6.977 70% Date of A.A 07.03.2016 Date of T.S Scheme Matan Kalan & Matan Khurd 15.03.2016 Date of Sart 04.05.2016 Date of completion 30.06.2017 Work completed in saving & electric connection awaited. 206 1428 Rehabilitation of Rural Water Supply Scheme Chakwal Approved 7.330 0.326 2.723 2.723 2.575 95% 9.905 100% Date of A.A 08.12.2014 Date of T.S Dalailpur Tehsil Choa Saiden Shah District 02.01.2015 Date of Sart 03.03.2015 Chakwal Date of completion 30.06.2017 Work completed in saving & electric connection awaited.

207 1429 Reh: of RWSS Sarkalan Chakwal Approved 20.206 4.241 0.000 0.000 0.000 0% 20.206 83% Date of A.A 08.01.2015 Date of T.S 21.01.2015 Date of Sart 20.04.2015 Date of completion 30.06.2018 Percolation well, Ground Storage Tank and Rising main completed. Work on the scheme suspended due to loss of water in newly developed source as some blasting was done by Mining Department. Now after discussion with local community, Revised RCE has been prepared for the installation of tube well in order to cater with the water demand of people. PC-1/ RCE submitted in commissioner office Rawalpindi for revised administrative approval. Available funds have been proposed for reappropriation. 208 1430 Rehabilitation of Rural Water Supply Scheme Chakwal Approved 6.915 0.315 3.206 3.206 2.907 91% 9.822 100% Date of A.A 08.01.2015 Date of T.S Makhiala Mohan Tehsil Choa Saiden District Date of Sart 16.04.2015 Date of Chakwal completion 30.06.2017 Scheme completed in saving and IESCO connection awaited. 209 1431 Rehabilitation of Rural Water Supply Scheme Chakwal Approved 8.903 2.466 5.049 5.049 4.732 94% 13.635 100% Date of A.A 16.03.2015 Date of T.S Chak Khushi Tehsil Kallar Kahar District Chakwal 20.03.2015 Date of Sart 24.04.2015 Date of completion 30.06.2017 Work completed in saving & IESCO connection awaited. 210 1432 Rehabiitation / Extension of Rural Water Supply Chakwal Approved 3.000 26.975 29.875 29.875 29.663 99% 32.663 109% Date of A.A 13.02.2016 Date of T.S Scheme (Barani) 01.03.2016 Date of Sart 13.05.2016 Date of completion 30.06.2017 Work completed in saving & IESCO Connection awaited. 211 1433 Extension/ Augmentation of Rural Water Supply Chakwal Approved 15.000 14.964 15.764 15.764 15.764 100% 30.764 103% Date of A.A 17.09.2015 Date of T.S Scheme 13.10.2015 Date of Sart 23.11.2015 Date of completion 30.06.2017 Work completed & under test operation. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

212 1434 Rural Water Supply & Drainage Scheme Chak Sargodha Approved 30.400 14.318 14.318 14.318 14.318 100% 44.718 100% Date of A.A 27.06.2015, Date of T.S 09.09.2015, Date of No. 19-SB Award 30.11.2015, Scheduled date of Completion is 30.06.2017, Date of Commencement, 30.11.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per provision of estimate, the scheme has been completed in saving. Revision of estimate is under process with Commissioner Office living within the original A.A amount. 213 1435 Rural Water Supply Scheme Chak No. 122/SB Sargodha Approved 18.700 2.996 0.135 0.135 0.135 100% 18.835 87% Date of A.A 27.04.2015, Date of T.S 29.04.2015, Date of Tehsil Sillanwali District Sargodha Award 13.11.2015, Scheduled date of Completion is 30.06.2017, Date of Commencement, 13.11.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed in saving and handed over to user committee. 214 1436 Rehabilitation & Augmentation of Rural Water Sargodha Approved 5.949 0.502 0.000 0.000 0.000 0% 5.949 92% Date of A.A 11.02.2009, Date of T.S 11.02.2009, Date of Supply Scheme Nehang Tehsil Sahiwal District Award 20.04.2009, Scheduled date of Completion is Sargodha 30.06.2017, Date of Commencement, 20.04.2009, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. Funds have been surrendered. 215 1437 Installation of Hand Pumps (300 Nos) Khushab Approved 66.000 20.000 50.500 50.500 50.500 100% 116.500 88% Date of AA 18.12.2015 Date of TS Quaidabad, Khushab. 06.02.2015 Date of award 31.03.2015 Date of completion 30.06.2018 Work of installtion of Hand pump is in Progress. 216 1438 Water Supply Scheme, Mitha Tiwana Khushab Approved 33.500 16.990 8.990 8.990 8.990 100% 42.490 84% Date of AA 20.12.2014 Date of TS 23.01.2015 Date of award 31.03.2015. Date of completion 30.06.2017 Scheme under test operation. 217 1439 Water Supply Scheme of Roda Khushab Approved 35.000 20.000 24.000 24.000 24.000 100% 59.000 70% Date of AA 11.08.2015 Date of TS 31.8.2015 Date of award 05.01.2016 Date of completion 30.06.2018. Scheme completed. Eletric connection from WAPDA awaited. 218 1440 Installation of 300 Hand Pumps Khushab Khushab Approved 35.000 10.000 45.000 45.000 45.000 100% 80.000 61% Date of AA 15-10-2015 Date of TS 09-11-2015 Date of award 05.01.2016 Date of completion 30.06.2018 Full funds utilized.Work is in progress.

219 1441 Rural Water Supply Scheme Waheer Khushab Khushab Approved 15.000 15.000 11.800 11.800 11.800 100% 26.800 89% Date of AA 11.8.2015 Date of TS 15.8.2015 Date of award 31.10.2015 Date of completion 30.06.2017. The Scheme completed. Eletric connection from WAPDA awaited. 220 1442 Rural Water Supply Scheme Butte Wala U.C Khushab Approved 8.795 4.572 5.572 5.572 5.572 100% 14.367 100% Date of AA 11-08-2015 Date of TS Kund Khushab 15.08.2015 Date of award 07.11.2015 Date of completion 31.12.2017 Scheme completed. Eletric connection from WAPDA awaited. 221 1443 Rural Water Supply Scheme Dand U.C Padhrar Khushab Approved 9.000 3.202 0.202 0.202 0.202 100% 9.202 75% Date of AA 11.08.2015 Date of TS 15.8.2015 Date of award 23.11.2015 Scheme completed. Eletric connection from WAPDA awaited. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

222 1444 Provision / Installation of Submercible Pumps in Mianwali Approved 40.000 20.000 41.425 41.425 41.421 100% 81.421 81% Date of A.A 02.12.2014. PP-43 UC Khaglan Wala, UC Sultan Khel, UC Date of T.S 09.03.2015. Date of Vanjari, UC Paccaa Kamar Mashani, UC Tibbi Revised A.A 23.12.2016 Date of Start of Work Sar, UC Tarag, UC Tani Khel, UC Kot Chandra, 19.05.2015. Date of Completion 30.06.2018. Bottlenecks / Remarks UC Kallur Sharief, UC Chapri, UC Tola E.R.S=157/157, T/Well boring=157/157, P/Machinery=157/157, G.S.Tank=157/157. Scheme completed in saving.

223 1445 Reh; of Rural Water Supply Scheme Musa Khel Mianwali Approved 9.998 0.137 2.222 2.222 1.653 74% 11.651 100% Date of A.A 12.02.2010 Tehsil & District Mianwali Date of T.S 19.02.2010 Date of Revised T.S 19.01.2012 Date of Revised A.A 26.01.2016 Date of Start of Work 19.05.2015. Date of completion 30.06.2018 Bottlenecks / Remarks E.R.S=3/3, Tube Well=3/3, Pump House=3/3, P/Machinery=3/3, R/FMain= 6"i/d PVC Pipe= 2150/2500, 4"i/d PVC= 658/1000, 3"i/d PVC= 4593/5000, T/Line=0/3. Scheme completed in saving. 224 1446 Extension of Sewerage and Water Supply, Bhakkar Approved 20.000 20.000 25.000 25.000 19.997 80% 39.997 56% Date of A.A 25.08.2015 Mankera. Date of T.S 11.11.2015 Date of Commencement 28.12.2015 Date of completion 28.12.2017 Work in progress. 225 1447 Extension of Water Supply Hyderabad Thal, Bhakkar Approved 10.000 19.983 15.983 15.983 15.913 100% 25.913 86% Date of A.A 11.08.2015 Tehsil Mankera Distt: Bhakkar Date of T.S 15.08.2015 Date of Commencement 24.11.2015 Date of completion 24.11.2017. Scheme completed. 226 1448 Rehab: of Rural Water Supply Scheme Chak No. Faisalabad Approved 13.224 7.382 2.382 2.382 2.375 100% 15.599 76% ) Date of A.A 01.04.2015. 228/GB Tehsil Sammundari Distt: Faisalabad 2) Date of T.S.14.04.2015. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 15.04.2015. 5) Date of receipt of tenders 08.05.2015. 6) Date of work order 18.05.2015 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.30.06.2017 Scheme completed in saving. 227 1449 Water supply Scheme Chak No.263/RB, Dijkot Faisalabad Approved 58.301 1.896 3.017 3.017 3.017 100% 61.318 100% 1) Date of A.A 03.12.2008 & 20.05.2009. District Faisalabad (Revised) 2) Date of T.S.09.01.2009 & 07.05.2010. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 14.01.2009 & 13.12.2010. 5) Date of receipt of tenders 30.01.2009 & 03.01.2011. 6) Date of work order 16.02.2009 & 21.01.2011 7)Date of Completion as per PC-I = 2 Year 8) Scheme completed. 228 1450 Rural Water Supply Scheme Chak No.471/GB Faisalabad Approved 8.107 0.611 0.611 0.611 0.611 100% 8.718 100% 1) Date of A.A 17.05.2010. 2) Date of T.S.27.08.2010. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 14.10.2010. 5) Date of receipt of tenders 01.11.2010. 6) Date of work order 08.12.2010 7)Date of Completion as per PC-1 = 2 Year 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

229 1451 Rural Water Supply Scheme Chak No.689/31- T.T.Singh Approved 21.959 6.098 0.000 0.000 0.000 0% 21.959 78% 1-Date of A.A 27.09.2014 GB 2- Date of T.S 01.10.2014 3-Date of Prequalification - 4-Date of invitation of tenders 27.11.2014 5- Date of Receipt of tenders 17.12.2014 6- Date of work order 26.12.2014 7- Date of completion as per PC-I 26.03.2016 8- Anticipated date of completion 30.06.2016 9- No. of Beneficiary - 4399 Person 10-Funds Released by F.D 11-Re-appropriation of funds(+/-) (-) 31.08.2016 Scheme completed & functional. Excess funds receivedsurrendered.

230 1452 Rural Water Supply Scheme Chak No.703/45- T.T.Singh Approved 14.406 5.839 0.000 0.000 0.000 0% 14.406 71% 1-Date of A.A 27.09.2014 GB 2- Date of T.S 01.10.2014 3-Date of Prequalification - 4-Date of invitation of tenders 27.11.2014 5- Date of Receipt of tenders 17.12.2014 6- Date of work order 26.12.2014 7- Date of completion as per PC-I 26.03.2016 8- Anticipated date of completion 30.06.2016 9- No. of Beneficiary - 2433 Person 10-Funds Released by F.D 11-Re-appropriation of funds(+/-) (-) 31.08.2016 Scheme completed & functional. Excess funds received surrendered.

231 1453 Water Supply & Sewerage Scheme Rajana T.T.Singh Approved 60.000 20.000 20.000 20.000 20.000 100% 80.000 43% 1-Date of A.A 06.12.2014 District Toba Tek Singh 2- Date of T.S 02.03.2015 3-Date of Rev: AA 28.05.2015 4-Date of Prequalification - 16.08.2016 5-Date of invitation of tenders 03.10.2016 6- Date of Receipt of tenders 04.10.2016 7- Date of work order 27.10.2016 8- Date of completion as per PC-I 26.10.2018 9- Anticipated date of completion 26.10.2018 10- No. of Beneficiary -21302 Person 11-Funds Released by F.D 15.07.2016 12-Re-appropriation of funds(+/-) Work for water supply portion is completed and under test operation. Work for sewerage portion is in progress.

232 1454 Rural Water Suply Scheme plot No.54 (Tukra) T.T.Singh Approved 10.000 6.126 3.026 3.026 3.026 100% 13.026 81% 1-Date of A.A 26.12.2014 2- Date of T.S 19.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 25.09.2015 5- Date of Receipt of tenders 15.10.2015 6- Date of work order -12.11.2015 7- Date of completion as per PC-I 25.12.2015 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 6352 Person 10-Funds Released by F.D 15..07.2016 11-Re-appropriation of funds(+/-) (-)14.11.2016 Scheme is completed and under test operation. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

233 1455 Rural Water Supply Scheme for Chak T.T.Singh Approved 15.000 10.000 39.616 39.616 39.616 100% 54.616 54% 1-Date of A.A 10.09.2015 No.407/JB, 409/JB, 410/JB & 411/JB 2- Date of T.S 25.02.2016 3-Date of Prequalification -07.03.2016 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work order -27.04.2016 7- Date of completion as per PC-I 09.09.2017 8- Anticipated date of completion - 09.09.2017 9- No. of Beneficiary - 15516 Person 10-Funds Released by F.D 15.07.2016 & 22.02.2017 11-Re-appropriation of funds(+/-) Work is in progress.

234 1456 Rural Water supply schemes Chak No.285/GB, T.T.Singh Approved 30.000 30.000 30.000 30.000 30.000 100% 60.000 65% 1-Date of A.A 28.12.2015 383/JB, 390/JB, 380/JB, 382/JB Feroz and 2- Date of T.S 25.02.2016 336/GB, T.T. Singh 3-Date of Prequalification -07.03.2016 4-Date of invitation of tenders 06.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work order -28.04.2016 7- Date of Completion as per PC-I 30.06.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 37501 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) Work is in progress.

235 1457 Rural Water Supply Scheme Chak No. 669/10 T.T.Singh Approved 10.000 11.620 10.120 10.120 10.120 100% 20.120 93% 1-Date of A.A 20.08.2015 GB 2- Date of T.S 21.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 02.10.2015 5- Date of Receipt of tenders 22.10.2015 6- Date of work order -03.12.2015 7- Date of completion as per PC-I 20.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 9790 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) -28.04.2017 Scheme is completied.

236 1458 Rural Water Supply Scheme Chak No. 681/22 T.T.Singh Approved 5.000 16.761 5.161 5.161 5.161 100% 10.161 47% 1-Date of A.A 20.08.2015 GB 2- Date of T.S 21.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 09.10.2015 5- Date of Receipt of tenders 29.10.2015 6- Date of work order -30.11.2015 7- Date of completion as per PC-I 20.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 10722 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed.

237 1459 Rural Water Supply Scheme Chak No. 680/21 T.T.Singh Approved 10.000 13.608 7.008 7.008 7.008 100% 17.008 72% 1-Date of A.A 20.08.2015 GB 2- Date of T.S 22.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 09.10.2015 5- Date of Receipt of tenders 29.10.2015 6- Date of work order -30.11.2015 7- Date of completion as per PC-I 20.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 10911 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

238 1460 Rural Water Supply Scheme Chak No. 320 GB T.T.Singh Approved 5.000 30.028 27.828 27.828 27.828 100% 32.828 94% 1-Date of A.A 10.09.2015 2- Date of T.S 25.02.2016 3-Date of Prequalification -07.03.2016 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work order -27.04.2016 7- Date of completion as per PC-I 09.03.2017 8- Anticipated date of completion 09.03.2017 9- No. of Beneficiary - 11276 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) - 28..04.2017 Scheme is completed..

239 1461 Rural Water Supply Scheme Chak No. 739 GB T.T.Singh Approved 5.000 20.000 20.000 20.000 20.000 100% 25.000 68% 1-Date of A.A 10.09.2015 (Jakhar) 2- Date of T.S 25.02.2016 3-Date of Prequalification -07.03.2016 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work order -26.04.2016 7- Date of completion as per PC-I 09.03.2017 8- Anticipated date of completion 9- No. of Beneficiary - 25415 Person 10-Funds Released by P&D 11-Funds Released by F.D 15.07.2016 12-Re-appropriation of funds(+/-) .Full funds utilized.

240 1462 Rehabilitation of Rural Water Supply Scheme T.T.Singh Approved 10.000 21.138 12.138 12.138 12.138 100% 22.138 71% 1-Date of A.A 20.08.2015 Chak No. 324 GB 2- Date of T.S 22.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 09.10.2015 5- Date of Receipt of tenders 29.10.2015 6- Date of work order -30.11.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 6850 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed..

241 1463 Rural Water Supply Scheme Chak No. 665/6 GB T.T.Singh Approved 10.000 18.990 10.890 10.890 10.89 100% 20.890 72% 1-Date of A.A 20.08.2015 2- Date of T.S 22.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 09.10.2015 5- Date of Receipt of tenders 29.10.2015 6- Date of work order -30.11.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 9609 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed.. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

242 1464 Rural Water Supply Scheme Chak No. 673/14 T.T.Singh Approved 5.000 20.000 52.816 52.816 52.816 100% 57.816 96% 1-Date of A.A 10.09.2015 GB (Harrisabad) 2- Date of T.S 25.02.2016 3-Date of Prequalification -07.03.2016 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders 26.03.2016 6- Date of work order -27.04.2016 7- Date of completion as per PC-I 09.03.2017 8- Anticipated date of completion 9- No. of Beneficiary - 12605 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (+) 31.08.2016 & 14.11.2016 Scheme is completed..

243 1465 Rural Water Supply Scheme Chak No. 678/19 T.T.Singh Approved 10.000 7.487 6.187 6.187 6.187 100% 16.187 93% 1-Date of A.A 20.08.2015 GB 2- Date of T.S 21.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 02.10.2015 5- Date of Receipt of tenders 22.10.2015 6- Date of work order -03.12.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 8717 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) -28.04.2017 Scheme is completed..

244 1466 Rural Water Supply Scheme, Chak No.705/GB T.T.Singh Approved 10.000 11.178 11.878 11.878 11.878 100% 21.878 103% 1-Date of A.A 26.12.2014 2- Date of T.S 21.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 02.10.2015 5- Date of Receipt of tenders 2210.2015 6- Date of work order -03.12.2015 7- Date of completion as per PC-I 25.12.2015 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 8479 Person 11-Funds Released by F.D 15.07.2016 12-Re-appropriation of funds(+/-) + 28.04.2017 Scheme is completed..

245 1467 Rural Water Supply Scheme Chak No. 735/ GB T.T.Singh Approved 10.000 4.603 2.203 2.203 2.203 100% 12.203 84% 1-Date of A.A 20.08.2015 2- Date of T.S 19.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 29.09.2015 5- Date of Receipt of tenders 15.10.2015 6- Date of work order -16.11.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 6530 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed..

246 1468 Rural Water Supply Scheme Chak No. 688/28 T.T.Singh Approved 5.000 12.140 11.240 11.240 11.24 100% 16.240 95% 1-Date of A.A 20.08.2015 GB 2- Date of T.S 21.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 02.10.2015 5- Date of Receipt of tenders 22.10.2015 6- Date of work order -03.12.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 5313 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) - 28.04.2017 Scheme is completed.. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

247 1469 Rural Water Supply Scheme Chak No. 672/13 T.T.Singh Approved 10.000 13.217 4.817 4.817 4.817 100% 14.817 64% 1-Date of A.A 20.08.2015 GB 2- Date of T.S 22.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 09.10.2015 5- Date of Receipt of tenders 29.10.2015 6- Date of work order -30.11.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 5477 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed..

248 1470 Rural Water Supply Scheme Plot No.56 (Tukra) T.T.Singh Approved 5.772 7.152 3.752 3.752 3.752 100% 9.524 74% 1-Date of A.A 26.12.2014 2- Date of T.S 19.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 25.09.2015 5- Date of Receipt of tenders 15.10.2015 6- Date of work order -16.11.2015 7- Date of completion as per PC-I 25.12.2015 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 3755 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed..

249 1471 Rural Water Supply Scheme Chak No. 677/18 T.T.Singh Approved 10.000 7.039 4.039 4.039 4.039 100% 14.039 82% 1-Date of A.A 20.08.2014 GB 2- Date of T.S 21.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 02.10.2015 5- Date of Receipt of tenders 22.10.2015 6- Date of work order -16.11.2015 7- Date of Completion as per PC-I 19.02.2016 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 4588 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 Scheme is completed..

250 1472 Rural Water Supply Scheme Chak No. 715 GB T.T.Singh Approved 10.000 12.188 7.088 7.088 7.088 100% 17.088 77% 1-Date of A.A 20.08.2015 2- Date of T.S 22.09.2015 3-Date of Prequalification - 4-Date of invitation of tenders 09.10.2015 5- Date of Receipt of tenders 29.10.2015 6- Date of work order -30.11.2015 7- Date of completion as per PC-I 19.02.2017 8- Anticipated date of completion 30.06.2017 9- No. of Beneficiary - 9676 Person 10-Funds Released by F.D 15.07.2016 11-Re-appropriation of funds(+/-) (-) 14.11.2016 & 28.04.2017 Scheme is completed..

251 1473 Water Supply and Sewerage Scheme in PP-114, Gujrat Approved 39.770 9.885 3.635 3.635 3.385 93% 43.155 87% A.A Date =1.1.2015 District Gujrat. T.S date=12.2.2015 Start date 06.05.2015. completion date 30.06.2017 Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

252 1474 Rural Water Supply and drainage Scheme M.B.Din Approved 17.498 20.000 25.900 25.900 25.885 100% 43.383 83% * A.A Date. 28.04.2015 Bhaagowal & Noor Pur Peeran with adjecent * T.S Date. 19.05.2015 abadies tehsil Mailk waal district mandi bahuddin * Start Date 18.06.2015. * Completion date 30.06.2017. * Work in progress. Full funds utilized.

253 1475 Rural Water Supply & Drainage Scheme Village M.B.Din Approved 29.989 20.000 12.500 12.500 12.500 100% 42.489 65% * A.A Date. 28.04.2015 Jayya Tehsil & District M.B.Din * T.S Date. 19.05.2015 * Start Date 18.06.2015. * Completion date 30.06.2017. * Work in progress. Full funds utilized.

254 1476 Rural Water Supply & Drainage Scheme Village M.B.Din Approved 29.995 30.000 45.000 45.000 45.000 100% 74.995 84% * A.A Date. 19.03.2015 Badshah Pur Tehsil Malikwal District M.B.Din * T.S Date. 02.04.2015 * Start Date 22.05.2015. * Completion date 30.06.2017. * Work in progress. Full funds utilized.

255 1477 Water Supply Scheme at villge kot Blocha M.B.Din Approved 2.000 7.991 3.616 3.616 3.615 100% 5.615 56% * A.A Date. 19.03.2015 * T.S Date. 02.04.2015 * Start Date 22.05.2015. * Completion date 30.06.2017. * Work in progress. Full funds utilized.

256 1478 Water Supply Scheme at Wara Balian M.B.Din Approved 2.000 8.000 3.975 3.975 3.975 100% 5.975 60% * A.A Date. 07.09.2015 * T.S Date. 08.09.2015 * Start Date 17.12.2015. * Completion date 30.06.2017. Scheme completed.

257 1479 Watre Supply Scheme Chot Dhirian, M.B.Din M.B.Din Approved 30.000 30.000 20.000 20.000 19.998 100% 49.998 64% * A.A Date. 07.09.2015 * T.S Date. 10.09.2015 * Start Date 17.12.2015. * Completion date 30.06.2017. * Work in progress. Full funds utilized. 258 1480 Rural Water Supply Scheme Hundal Kalan Wali Sialkot Approved 5.000 4.870 4.870 4.870 4.870 100% 9.870 100% Scheme completted Tehisl & District Sialkot 259 1481 Rural Water Supply & Drainage Scheme Pandoki Lahore Approved 50.100 8.417 4.517 4.517 4.501 100% 54.601 93% ●Scheme completed Tehsil & Distt: Lahore ●Water Supply scheme completed and put operational ● Funds are for the operation & maintenance of scheme for 1-Year. 260 1482 Rural Water Supply Scheme Mohlanwal Lahore Approved 40.625 11.136 1.936 1.936 1.935 100% 42.560 82% ● Scheme completed. ● Funds are for the operation & maintenance of scheme for 1-Year. ● Joint account opening is in progress, for the transfer of O&M amount. Rural Water Supply Scheme Sundar Lahore Approved 3.934 261 1483 23.524 0.984 0.984 0.981 100% 24.505 89% ● Scheme completed and is in operation. ● Funds are for the operation & maintenance of scheme for 1-Year. Rural Water Supply Scheme Village Bath Lahore Approved 13.785 262 1484 27.086 1.735 1.735 1.733 100% 28.819 71% ● Scheme completed and is in operation. ● Funds are for the operation & maintenance of scheme for 1-Year. 263 1485 Rural Water Supply Scheme Village Chah Tamoli Lahore Approved 14.225 3.458 0.724 0.724 0.724 100% 14.949 85% ● Scheme put operational. ● Funds are for the operation & maintenance of scheme for 1- Year. Installation of 02 tubewells at Tahayat & Chandrai Lahore Approved 9.202 264 1486 27.676 0.202 0.202 0.202 100% 27.878 76% ●Scheme is in operation initially for 1st Year. Village, Green Town, Lahore ● Funds are for the operation & maintenance of scheme for 1-Year. 265 1487 Installation of 03 Nos. Ultra Filtration Plant at Lahore Approved 5.459 9.862 12.581 12.581 12.573 100% 18.032 100% Scheme completed. Kahna Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

266 1488 Installation of 09 Nos. Filtration Plants in three Lahore Approved 10.000 20.000 32.298 32.298 32.292 100% 42.292 98% Scheme completed. Ucs of Raiwind 267 1489 Rural Water Supply & Drainage Scheme Iqbal Sheikhupura Approved 30.404 27.035 42.035 42.035 42.036 100% 72.440 126% Work in progress Town District Sheikhupura 268 1490 Rural Water Supply and Drainage Scheme Sheikhupura Approved 25.000 29.268 44.268 44.268 44.268 100% 69.268 128% Work in progress Javed Nagar, District Sheikhupura 269 1491 Rural Water Supply & Drainage Scheme UC Kot Sheikhupura Approved 16.750 20.000 35.000 35.000 35.000 100% 51.750 54% Work in progress Ranjet Singh Sheikhupura 270 1492 Establishment/Construction of Water Supply Sheikhupura Approved 30.000 30.000 50.000 50.000 50.000 100% 80.000 53% Work in progress Scheme at UC 30, 31, 32 wanadala dial singh and dhaka nizampura tehsil feroz wala District Sheikhupura 271 1493 Rehabilitation of Rural water Supply Nankana Approved 4.000 7.500 7.718 7.718 7.718 100% 11.718 102% Trial Bore 0/1 No. Scheme,13/GB, District Nankana Sahib. Sahib Tube well Boring 1/1 No Pump House 1/1 Nos. Pumping Machinery 1/1 set Electric Connection 0/1 job 3" i/d 1405/1412 Rft 4" i/d 840/860 Rft 6" i/d 12655/15017 Rft OHR 100000 Glns 1/1 No. Scheme completed with saving .

272 1494 Construction of Rural Water Supply Scheme,Kot Nankana Approved 8.000 15.000 27.500 27.500 27.500 100% 35.500 91% Trial Bore 2/2 Nos. Nazam Din,184/RB,District Nankana Sahib. Sahib Tube well Boring 2/2 Nos Pump House 2/2 Nos. Pumping Machinery 0/2 sets Electric Connection 0/3 job applied. 3" i/d 14005/21152 Rft 4" i/d 2425/1465 Rft 6" i/d 650/1610 Rft 8" i/d 0/29050 Rft Pumping Machinery GST 0/2 set OHR 100000 Glns 1/1 No. GST 25000 Glns 1/1 No. Scheme completed.

273 1495 Water Supply & Drainage Scheme Kot Wassan Kasur Approved 49.586 26.111 24.561 24.561 24.557 100% 74.143 98% Date of A.A :28/05/2014 Singh, Sarey Cheemba, Ittefaq Adda & Madina Revised Date of A.A :Nil Town Date of T.S :05/08/2014 Date of Award :05/09/2014 Scheduled date of Completion on :04/09/2016 Revised date of Completion :04/09/2016 Date of Commencement :05/09/2014 Tube-Wells 1.00 cusec = 3/3, Pump House 12x16 = 3/3 No, Pumping Machinery = 3/3 Set, Electric Connection= 0/3 No., Distribution System 3"i/d PVC Pipe =25885/28950 Rft, 4"i/d PVC Pipe =3143/3143 Rft, 6"i/d PVC Pipe =6364/6530 Rft= 8"i/d PVC Pipe =1546/2575, Surface Drains = 23268/ 9817 Rft,, Brick Pavement= 129823/51131 Cft, Sullage Carrier 2x2 = 500/500 Rft, 1.5x1.5 =5420/5420 Rft, 1'x1'= 470/470 Rft Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

274 1496 Water Supply & Drainage Scheme Nathey Jagir, Kasur Approved 65.410 26.715 26.565 26.565 26.462 100% 91.872 100% Date of A.A :28/05/2014 Lakhankay Abadies, Kamogill, Mega Jatt, Sardar Revised Date of A.A : Mill & Choudharian Wala. Date of T.S :05/08/2014 Date of Award :05/09/2014 Scheduled date of Completion on :04/09/2016 Revised date of Completion :04/09/2016 Date of Commencement :05/09/2014 Electric Resistivity Survey = 3 Jobs/3 Job,, Tube-Wells Boring & Conversion= 4No. /4 No., Pump House 12x16 = 4/4 No., Pumping Machinery = 3/4 No., Electrict Connection= 0/ 4Job, Distribution System 3"i/d Pipe = 53208/39155 Rft, 4"i/d Pipe= 14111/13650 Rft, 6"i/d Pipe = 3706/5105 Rft, 8"i/d Pipe= 2517/1250 Rft, 10"i/d Pipe= 0/50 Rft, OHR 1/1 No., Surface Drains= 28714/ 29995 Rft, Brick Pavement= 141589/ 117590 Cft, Sullage Carrier 2'x2'= 900/1400 Rft, 1.5'x1.5'= 4300/4400 Rft, 1'x1'= 5000/10900 Rft, Oxidation Pond & Sullage Carrier= 0/3 Job. work in progrss

275 1497 Water Supply and Drainage Scheme Gondy Kasur Approved 64.700 9.966 8.666 8.666 8.666 100% 73.366 98% Date of A.A :28/05/2014 Warha, Lambey Jagir, Dhaban, Sherpur, Lambey Revised Date of A.A :Nil Mahtam & Fatey Wala. Date of T.S :05/08/2014 Date of Award :03/09/2014 Scheduled date of Completion on :03/09/2016 Revised date of Completion :03/09/2016 Date of Commencement :03/09/2014 Electric Resistivity Survey = 3 Jobs/3 Job,, Tube-Wells Boring & Conversion 1.00 Cusec= 4No. /4 No., Pump House 12x16 = 4 No. /4 No., Pumping Machinery = 4/ 4 No., Electrict Connection= 0/ 4Job, Distribution System 3"i/d Pipe = 55465 Rft/ 41545 Rft, 4"i/d Pipe= 3522 Rft/ 3550 Rft, 6"i/d Pipe = 7013 Rft/ 5000 Rft, 8"i/d Pipe= 1940 Rft/ 4850 Rft, Surface Drains= 13341Rft/ 22190Rft , Brick Pavement= 108739/95037Cft, Sullage Carrier 1.5'x1.5'= 2500 Rft/ 6150 Rft, Sullage Carrier 1'x1'= 2800 Rft/ 4210 Rft, Oxidation Pond = 1 /3 Job work in progrss

276 1498 Water Supply & PCC Scheme Bhoe Asal i/c Kot Kasur Approved 73.409 20.000 38.100 38.100 38.100 100% 111.509 100% Date of A.A :21/05/2014 Meewat. Revised Date of A.A :Nil Date of T.S :05/08/2014 Date of Award :03/09/2014 Scheduled date of Completion on :02/09/2016 Revised date of Completion :02/09/2016 Date of Commencement :03/09/2014 Electric Resistivity Survey = 1 Job/1 Job, Tube-Wells Boring & Conversion 1.00 Cusec= 7 No. /7 No., Pump House 12x16 = 7 No./7 No., Pumping Machinery = 7/7 No., Electrict Connection= 0/7 Job, Rising Main 6"i/d Pipe = 1887/1888 Rft, 8"i/d Pipe= 1424/1425 Rft, 10"i/d Pipe= 1195/3050 Rft, 12"i/d Pipe= 2111/2125 Rft, 14"i/d Pipe= 10392 Rft/ 10400 Rft, Distribution System 3"i/d Pipe = 68775/49500 Rft , 4"i/d Pipe= 5162/6170 Rft, 6"i/d Pipe = 3500/3500Rft, 8"i/d Pipe= 1365/1600Rft, 10"i/d Pipe = 810/815 Rft, 12"i/d pipe= 560/560 OHR 30000 Gillian 1 No. 90% OHR 20000 Gallion 1/1 Const of Drain 5092/700 PCC & B/ Pavement 22015/26813, Sullage Carrier 3.5'x3.5'= 0/2110 Rft, Sullage Carrier 3.5'x2.5'= 0/2900 Rft, Sullage Carrier 2.5'x2.5'= 1380/1700 Rft, Sullage Carrier 1.5'x2.00'= 570/1700 Rft, Sullage Carrier 1.5'x1.5'= 515/1550 Rft Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

277 1499 Rural Water Supply and Drainage PCC Scheme Kasur Approved 44.995 30.000 58.550 58.550 58.549 100% 103.544 100% Date of A.A :28.05.2014 Rajuwal and adjoining Abadies District Kasur. Revised Date of A.A :Nil Date of T.S :05.08.2014 Date of Award :11.05.2015 Scheduled date of Completion on : 10.05.2017 Revised date of Completion : 10.05.2017 Date of Commencement : 11.05.2015 Tube-Wells Boring= 2/2 No., Pump House= 90%/2 No., Pumping Machinery = 2 Arrange/2 Set, EC 2 Job Demad Notice pay to Wapda Distribution System 3"i/d Pipe = 38789/38102 Rft, 4"i/d Pipe= 2908/2000Rft, 6"i/d Pipe= 5181/3750 Rft, 8"i/d Pipe=20314/20300 Rft, Surface Drains= 5616/35345 Rft, PCC Flooring= 5286/140445 Cft,BP 189736/23124 Sullage Carrier 1.5'x1.5'= 1968/3816 Rft, Oxidation Pond 0/1 No. Work in Progrss

278 1500 Rural Water Drainage PCC Scheme Bhoojke, Kasur Approved 64.998 20.000 39.400 39.400 39.376 100% 104.374 104% Date of A.A :21.05.2014 Naike & Adjoing Abadies District Kasur. Revised Date of A.A :Nil Date of T.S :30.10.2014 Date of Award :09.12.2014 Scheduled date of Completion on :08.03.2017 Revised date of Completion :08.03.2017 Date of Commencement :09.12.2014 Additional Funds Received on 11.05.2015 Tubwell Boring 2/2, Pump House 12x16 =95%/2, Pumping Machinery = 2 /2 EC 2/2 No.demand notice paid , Destibustion System 3"i/d PVC pipe 49807/46135, 4" i/d PVC pipe 4220/3690, 6" i/d 3699/3630, 8" 2253/4375, Surface Drain 20354/33530, PCC Florimg 73654/61959 Brick Pavement =85117/178826, Sullage Carrier 10848/15470 Rft Work in Progress

279 1501 Rural Water Supply and Drainage PCC Scheme Kasur Approved 85.000 40.000 70.144 70.144 70.107 100% 155.107 99% Date of A.A :12.12.2014 Maan Bhamni Wala and Adjoining Abadies Revised Date of A.A :Nil District Kasur. Date of T.S :16.29.01.2015 Date of Award :13.02.2015 Scheduled date of Completion on :12.02.2017 Revised date of Completion :12.02.2017 Date of Commencement :13.02.2015 Additional Funds received on 11.05.2015 Electric Resistivity Survey = 4 Job/4 Job, Tube-Wells Boring= 3 No. /3 No., Pump House= 75%/ 3 No., Pumping Machinery = 3/3 No., Electrict Connection= 0/3 Job/,paid wapda Distribution System 3"i/d Pipe = 79274/65020 Rft, 4"i/d Pipe= 8618/8685 Rft, 6"i/d Pipe= 7929/8150 Rft, 8"i/d Pipe= 2525/1050 Rft, 10"i/d Pipe= 0Rf t848/ 600 Rft, 12"i/d= 194/2060 Rft, OHR 80%/2No. Surface Drains= 30485/76835 Rft, PCC Flooring= 45043/74503 Cft, Brick Pavement= 209789/436891Cft, Sullage Carrier 1.5'x1.5'= 13280/76730 Rft, Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

280 1502 Rural Water Supply and Drainage PCC Scheme Kasur Approved 74.490 24.646 44.646 44.646 44.641 100% 119.131 82% Date of A.A :12.12.2014 at Mandi Usmanwala and Adjoining Abadies Revised Date of A.A :Nil District Kasur. Date of T.S :16.29.01.2015 Date of Award :20.02.2015 Scheduled date of Completion on :19.02.2017 Revised date of Completion :19.02.2017 Date of Commencement :20.02.2015 Electric Resistivity Survey = 4 Job/4 Job, Tube-Wells Boring= 4/4 No., Pump House= 95%/ 4 No., Pumping Machinery = 4/4 No., Electrict Connection= 0/4 Job, Distribution System 3"i/d Pipe = 88086/83240 Rft, 4"i/d Pipe= 7728/5800 Rft, 6"i/d Pipe= 5766/9705 Rft, 8"i/d Pipe= 4958/5560 Rft,12" 697/700 OHR 2/ 85% No. Surface Drains= 3049/63680 Rft, PCC Flooring= 3735/112860 Cft, Brick Pavement= 24676/66565Cft, Sullage Carrier 1.5'x1.5'= 18190/24380 Rft, Sullage Carrier 2.0'x2.0'= 0/5700 Rft,

281 1503 Rural Water Supply & Drainage PCC Scheme at Kasur Approved 48.998 20.000 40.000 40.000 40.000 100% 88.998 90% Date of A.A :12.12.2014 Marali Hithar and Adjoining Abadies District Revised Date of A.A :Nil Kasur. Date of T.S :26.03.2015 Date of Award 08.05.2015 Scheduled date of Completion on : 19.02.2017 Revised date of Completion : 19.02.2017 Date of Commencement : 08.05.2015 Tube-Wells Boring= 1/1 No., Pump House= 1/1 No., Pumping Machinery = 0/1 Set, Distribution System 3"i/d Pipe =16748/38105 Rft, 4"i/d Pipe= 1347/2000 Rft, 6"i/d Pipe= 4683/3750 Rft, 8"i/d Pipe= 0/20300 Rft, Surface Drains= 4420/37960 Rft, PCC Flooring= 12453/154895 Cft, B/Pavement 174092/285980 Sullage Carrier 1.5'x1.5'=1921 /2330 Rft, Oxidation Pond 65 %/1 No. Work in Progress

282 1504 Rural Water Supply & Drainage Scheme Qila Kasur Approved 25.459 2.479 2.479 2.479 2.455 99% 27.914 100% Date of A.A 24.12.2008 Ganjay Revised Date of A.A Date of T.S :29.12.2008 Date of Award :30.01.2009 Scheduled date of Completion on 29.06.2009 Revised date of Completion : 30.06.2017 Date of Commencement 30.01.2009 Tubwell Boring 1/1 Job Pump House 1/1 Job Machainery 1/1 Set Electric Conection 1/1 Rising Main 3" 49617/49617 Rft 4" 3995/3995 5" 9399/939 Drain 13950/13950 Rft Sullage Carier 1.5 x 1.5 6664/6664 B/Pavement 97316/104837 Const: Of Park 1/1 Job OHR 10000 Gillian 1/1 Scheme completed

283 1505 Rehabilitation of Rural Water Supply Scheme Kasur Approved 27.954 13.098 7.305 7.305 7.305 100% 35.259 86% Date of A.A 21.08.2009 Khara District Kasur Revised Date of A.A Date of T.S :01.10.2009 Date of Award :26.10.2009 Scheduled date of Completion on 25.07.2010 Revised date of Completion : 30.06.2017 Date of Commencement 26.10.2009 Tubwell Boring 3/3 Job Pump House 3/3 Job Machainery 3/3 Set Electric Conection 0/3 Rising Main 8" 1448/2250 Rft 12" 4210/4300 14" 1133/8500 Distribution System 3"i/d Pipe = 50628/51465 Rft , 4"i/d Pipe= 5823/6650 Rft, 6"i/d Pipe = 1929/2810 Rft, 8"i/d Pipe= 1292/1260 OHR 30000 Gillian 75%/1 Staff Quarter 0/1 Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

284 1506 Rehabilitation of Rural Water Supply Scheme Kasur Approved 16.419 1.032 1.032 1.032 1.032 100% 17.451 100% Date of A.A :06.06.2009 Dholan Chak No.7 Revised Date of A.A 09-05-2012 Revised Date of T.S :19.02.2013 Date of Award :06.09.2009 Scheduled date of Completion on 05.09.2010 Revised date of Completion : 30.06.2017 Date of Commencement 06.09.2009 Tubwell Boring 03/03 Job Pump House 3/3 Job Machainery 3/3 Set Electric Conection 3/3 Rising Main Distribution System 3"i/d Pipe = 21887/21887 Rft , 4"i/d Pipe= 1400/1440 Rft, 6"i/d Pipe = 2670/2700 Rft, 8"i/d Pipe= 1400/14015 Rft, OHR 10000 Gillian 1/1 Job Staff Qarter 1/1. Work in progress

285 1507 Rural Water Supply and drainage Scheme Kasur Approved 50.834 1.282 3.082 3.082 2.722 88% 53.556 103% Date of A.A :28.08.2008 Kanween Jhoke Mallian , District Kasur Ammended Date of A.A :04-04-2009 (Amended) Reised Date of T.S :24.-03-2010 Date of Award :16.05.2009 Scheduled date of Completion on 15.05.2010 Revised date of Completion : 30.06.2017 Date of Commencement :16.05.2009 Tubwell Boring 4/4 Job Pump House 4/4Job Machainery 4/4 Set Electric Conection 4/4 Rising Main 8" 2879/1300 Rft 14" 20683/24600 Rft Distribution System 3"i/d Pipe = 16873/18985 Rft , 4"i/d Pipe= 3019/5400 Rft, 6"i/d Pipe =2309 /2250 Rft, 12"i/d Pipe= 514/100 Rft, OHR 50000 Gillian 1/1 Const of DrainType-I 16218/20730 Const of DrainType-II 2729/4595 B/ Pavement 31511/30008, Sullage Carrier 1.5x1.625'=5730 /1275 Rft,,Oxidation Pound 95 %/01 Job Sullage Pump 1/01 Work in progress

286 1508 Rural Water Supply & Drainage Scheme Chak Kasur Approved 17.000 20.000 40.121 40.121 40.121 100% 57.121 52% Date of A.A :23.09.2015 No.14 & Ghandhi Otar Tehsil Pattoki District Revised Date of A.A :Nil Kasur. Date of T.S :05.10.2015 Date of Award :03.12.2015 Scheduled date of Completion on 02.06.2017 Revised date of Completion : Date of Commencement 03.12.2015 Tubwell Boring 05/05 Job Pump House 5/5 Job Machainery 5/5 Set Electric Conection 0/5 Rising Main 6" 2239/2000 Rft 8" 8820/10100 Rft 10" 5061/5000 t Distribution System 3"i/d Pipe = 58449/43635 Rft , 4"i/d Pipe= 5231/6400 Rft, 6"i/d Pipe = 1310/2000 Rft, 8"i/d Pipe= 460/700 Rft, 10"i/d Pipe = 614/250 Rft, OHR 10000 Gillian 1/1 Job OHR 20000 Gallion 1/1 Const of Drain 5428/15475 B/ Pavement 33460/91562, Sullage Carrier 1.5'x1'= 0/2700Rft, Sullage Carrier 1.5'x1.5'= 80/2800 Oxidation Pound 0/03 Job Sullage Pump 0/03 Job. Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

287 1509 Water Supply & Drainage Scheme Chak Kasur Approved 12.500 10.000 68.000 68.000 67.931 100% 80.431 41% Date of A.A :23.09.2015 No.31,32,33 Phullani, Dhoop Sarri & Saharankey Revised Date of A.A :Nil District Kasur Date of T.S :05.10.2015 Date of Award :05.12.2015 Scheduled date of Completion on 04.06.2017 Revised date of Completion : Date of Commencement :05.12.2015 Tubwell Boring 12/12 Job Pump House 11/12 Job Machainery 0/12 Set Electric Conection 0/12 Rising Main 4" 898/2100 Rft 6" 418/2100 Rft 8" 2897/6200 10" 0/8000 Rft Distribution System 3"i/d Pipe = 47453/92472 Rft , 4"i/d Pipe= 7094/16835 Rft, 6"i/d Pipe = 1744/5425 Rft, 8"i/d Pipe= 1733/1850 Rft, 10"i/d Pipe = 1500/2000 Rft, OHR 10000 Gillian 0/02 Job OHR 20000 Gallion 0/1 Const of Drain 1880/51200 B/ Pavement 23554/225909, Sullage Carrier 2'x2'= 829/1500 Rft, Sullage Carrier 1.5'x1'= 61/1870 Rft, Sullage Carrier 1.5'x1.5'= 47/506 Rft,Oxidation Pound 0/01 Job Sullage Pump 0/01 Job RCC Sewer 12" i/d 0/1696 Rft 15" i/d 0/1536 Rft Work in progress

288 1510 Water Supply & Drainage Scheme They Kalay, Kasur Approved 15.000 30.000 53.500 53.500 53.490 100% 68.490 63% Date of A.A :23.09.2015 Basti Balochi, Jhalar Qadir, Jhalar Rehmani, Revised Date of A.A :Nil Jhalar Choudhry & Jhalar Baglian Wali i/c Date of T.S :05.10.2015 Date of Award 05.12.2015 Tubewell of Rao Tamkeen District Kasur. Scheduled date of Completion on 04.12.2017 Revised date of Completion : Date of Commencement :05.12.2015 Tubwell Boring 03/03 Job Pump House 2/3 Job Machainery 2/3 Set Electric Conection 0/3 Rising Main 4" i/d C Class 0/4000 Rft 4" i/d B Class /7200 Rft Distribution System 3"i/d Pipe = 42285/35515 Rft , 4"i/d Pipe= 17270/7670 Rft, 6"i/d Pipe = 12722/1675 Rft, 8"i/d Pipe= 0/700 Rft, OHR 10000 Gillian 0/2 Job Const of Drain 3262/37759 PCC Pavement 83049/249046, Sullage Carrier 2'x2'= 0/1800Rft, Sullage Carrier 1.5'x1'= 0/1100 1.5 x1.5 1629/17552 Oxidation Work in progress

289 1511 Rural Water Supply and Drainage PCC Scheme Kasur Approved 20.000 20.000 40.000 40.000 40.000 100% 60.000 56% Date of A.A :20.08.2015 Hardo Ban Bodla and Adjoining Abadies District Revised Date of A.A :Nil Kasur. Date of T.S :28.08.2015 Date of Award :23.09.2015 Scheduled date of Completion on 22.09.2017 Revised date of Completion : 22.09.2017 Date of Commencement :23.09.2015 Electric Resistivity Survey = 0 Job/1 Job, Tube-Wells Boring= 1/1 job., Pump House= 0/ 1 No., Pumping Machinery = 0/1 No., Electrict Connection= 0/1 Job, Distribution System 3"i/d Pipe = 37620/37075 Rft, 4"i/d Pipe=3829/2020 Rft, 6"i/d Pipe=0/100 Rft, Surface Drains= 7306/55840 Rft, PCC Flooring= 1051/112917 Cft, Brick Pavement= 20936/100369Cft, Sullage Carrier 1.5'x1.5'= 1046/22150 Rft, Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

290 1512 Rural Water Supply & Drainage Scheme Qila Okara Approved 25.500 5.605 4.605 4.605 4.605 100% 30.105 97% Date of AA-11.06.2015 Dewa Singh, District Okara Date of TS-15.06.2015 Date of Invitation of Tender,14.08.2015 Date of Receipt of Tenders,15.08.2015 ( Invitation of Tenders were delayed due to outstanding dues of DGPR) Date of work Order.10.10.2015 Date of completion As per PC-I. 30.06.2016 Anticipated date of completion,30.06.2017 Projected Population 13335 Person Release of Funds 27.07.2016. Re - Appropriation of funds. (-) 1.000 dt: 28-04-2017 (1)Tubewell 2/2, (2) Pump House 2 /2 (3) Pumping Machinery 2/2 (4) Rising Main & Distribution System 3" to 10“ i/d 35891/35953, (5) OHR 30000 Glns 1/1, (6) Staff Quarter 1/1 (8) External Electrification 2/2 (Payment made to WAPDA) (9) Surface Drain 787/850 Rft (10) Bricks Pavement 20508/20523 Cft (11) Sullage Carrier 3482/5680 Rft .(12) Boundary Wall 600/600 . Electric Connection are awaited to make the scheme operational. Due to dispute at site of construction of waste water collecting tank, the work was held up at site. Now te work has started and work in progress.

291 1513 Rural Water Supply & Drainage Scheme Ghous Okara Approved 15.019 6.445 3.095 3.095 3.095 100% 18.114 84% Date of AA-11.06.2015 Pura Gujrana Depalpur, District Okara Date of TS-15.06.2015 Date of Invitation of Tender,13.08.2015 Date of Receipt of Tenders,15.08.2015 ( Tenders are delayed due to outstanding dues of DGPR) Date of work Order.12.10.2015 Date of completion As per PC-I.30.06.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-)2.00 dt: 31.10.2016 Projected Population. 6147 Person Re- Appropriation of funds (-) 1.350 dt: 28-04-2017 Release of Funds 27.07.2016. (1)Tubewell 1/1, (2) Pump House 1 /1 (3) Pumping Machinery 1/1 (4) Rising Main & Distribution System 3" to 6“ i/d 20329/21708, (5) OHR 10000 Glns 1/1, (95%) (6) Staff Quarter 1/1 (8) External Electrification 2/2 (Paid to WAPDA) (9) Surface Drain 6740/6829 Rft (10) Bricks Pavement 47118/47887 Cft (11) Sullage Carrier 1566/3163 Rft .(12) RCC Sewer 0/1928. electric connection is pending to make the scheme operational. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

292 1514 Rural Water Supply & Drainage Scheme Qila Okara Approved 15.200 14.436 9.936 9.936 9.936 100% 25.136 85% Date of AA-11.06.2015 Sandha Singh, District Okara Date of TS-15.06.2015 Date of Invitation of Tender, 04.12.2015 Date of Receipt of Tenders 05.12.2015 Date of work Order,22.12.2015 Date of completion As per PC-I. 30.06.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 4.200 dt: 31.10.2016 Projected Population 13119 Person Release of Funds 27.07.2016. Re- Appropriation of funds (-) 0.300 dt: 28-04-2017 (1)Tubewell 2/2, (2) Pump House 2 /2 (3) Pumping Machinery 2/2 (4) Rising Main & Distribution System 3" to 10“ i/d 47744/48114, (5) OHR 10000 Glns 1/1 (6) Staff Quarter 0/1 (7) External Electrification 2/2 (Payment made to WAPDA) (8) Surface Drain 4102/6342 Rft (10) Bricks Pavement 17013/20752 Cft (11) Sullage Carrier 1575/1625 Rft Electric Connection are pending by LESCO otherwise scheme is ready to make operational.

293 1515 Rural Water Supply & Drainage Scheme Rajowal Okara Approved 35.627 14.387 14.387 14.387 14.387 100% 50.014 100% Date of AA-12.09.2014 Date of TS-18.12.2014 Date of Invitation of Tender, 29.11.2014 Date of Receipt of Tenders.01.12.2014 Date of work Order.14.01.2015 Date of completion As per PC-I. 14.09.2016 Anticipated date of completion,30.06.2017 Projected Population 22704 Person Release of Funds 27.07.2016. (1)Tubewell 2/2, (2) Pump House 2/2 (3) Rising Main & Distribution system 3" to 8" 51687/51703 (4) OHR 20000 Glns 2/2, (5) Pumping Machinery 2/2, (6) Staff Quarter 2/2 (7) External Electrification 2/2 ( Payment made to WAPDA).(8) Drain 3348/7638(09) Bricks Pavement 3475/52373(10)Sullage Carrier 6872/7800. electric connections are pending to operationalise the scheme.

294 1516 Rural Water Supply & Drainage Scheme Chak Okara Approved 21.880 8.364 4.364 4.364 4.364 100% 26.244 87% Date of AA-28.08.2014 No.18/D & 17/D, Depalpur Date of TS-16.09.2014 Date of Invitation of Tender,22.05.2015 Date of Receipt of Tenders,23.05.2015 Date of work Order.28.05.2015 Date of completion As per PC-I. 14.09.2016 Anticipated date of completion.30.06.2017 Re-appropriation of funds (-) 2.500 dt: 31.2016 Projected Population. 6648 Person Release of Funds 27.07.2016. Re- Appropriation of funds (-) 1.500 dt: 28-04-2017 1)Tubewell 2/2 (2) Pump House 2/2 (3) Rising Main & Distribution system 3" to 8“ i/d 30442/30865 (4) OHR 10000 Glns 2/2, (5) Pumping Machinery 2/2 (6) Staff Quarter 2/2 (7) External Electrification 2/2 (Demand Notice Paid to WAPDA) (8) Water Filtration Plant 1/1 (9) Drain 3484/8514 Rft (10) Bricks Pavement 12411/17745Cft (11)Sullage Carrier 1330/1500Rft . electrci Connection are pending by LESCO to put the scheme on operational. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

295 1517 Rural Water Supply & Drainage Scheme Bhutta Okara Approved 24.166 4.127 4.477 4.477 4.477 100% 28.643 101% Date of AA-14.05.2014 Muhabbat Date of TS-16.09.2015 Date of Invitation of Tender,22.05.2015 Date of Receipt of Tenders,23.05.2015 Date of work Order.08.06.2015 Date of completion As per PC-I. 14.09.2016 Anticipated date of completion.30.06.2017 Papulation 10910Person Release of Funds 27.07.2016 Re- Appropriation of funds (+) 0.350 dt: 28-04-2017 :(1)Tubewell 1/1 (2) Pump House 1/1 (3) Rising Main & Distribution system 3“i/d to 8“ i/d 26077/ 26280 (4) OHR 20000 Glns 1/1, (5) Pumping Machinery ,1/1(6) Staff Quarter 1/1 (7) External Electrification 1/1.(Demand Notice Paid to WAPDA)(8) Water Filtration Plant 1/1 (9) Drain 6297/6318(10) Bricks Pavement 39617/39902 Cft (11)Sullage Carrier 2110/2296Rft . Scheme completed except installation of electric connection.

296 1518 Rural Water Supply Scheme at Machrian District Okara Approved 10.000 21.115 10.615 10.615 10.615 100% 20.615 66% Date of AA-18.08.2015 Okara Date of TS-22.08.2015 Date of Invitation of Tender,26.10.2015 Date of Receipt of Tenders,27.10.2015 Date of work Order.02.12.2015 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 4.00 dt: 31.10.2016 (-) 4.00 dt: 31.01.2017 (-) 2.500 dt: 28-04-2017 Projected Population 20420 Person Release of Funds 27.07.2016. 1)Tube Wells 2/2,(2) Pump House 2/2 (3) Pumping Machinery 2/2 (4) Rising Main 3" i/d to 8" i/d 30975/44247 (5) staff quarter 0/2 (6) O.H.R 20000 Glns 0/1 (7) External Electrification 0/2. the work was held up because of dispute at site for the OHR's. Now the site has been got cleared and work completed at site.

297 1519 Rural Water Supply Scheme Chak No. 2/1AL Okara Approved 4.000 3.944 1.344 1.344 1.344 100% 5.344 67% Date of AA- 18.08.2015 Tehsil Renala Khurd Date of TS -22.08.2015 Date of Invitation of Tender,28.09.2015 Date of Receipt of Tenders,30.09.2015 Date of work Order.18.11.2015 Date of completion As per PC-I. 30.11.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (- ) 2.00 dt: 31.10.2016 (-) 0.400 dt: 31.01.2017 (-) 0.200 dt: 28-04-2017 Projected Population 6749 Person Release of Funds 27.07.2016. (1) Repair of Pump House 12'x12' 2/2 (2) Pumping Machinery 1/1 (3) Rising main & Distribution system 3" i/d to 6" i/d 12531/ 12685 Rft (4) OHR 10000 Glns 1/1 (95%) (5) Eletric connection 1/1 ( Payment made to WAPDA) .Rates are compitative Scheme completed in Saving due to low rates qouted by the contractor. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

298 1520 Rural Water Supply Scheme Chak No. 3/1AL Okara Approved 4.000 4.778 1.578 1.578 1.578 100% 5.578 64% Date of AA-18.08.2015 Tehsil Renala Khurd Date of TS-22.08.2015 Date of Invitation of Tender,28.09.2015 Date of Receipt of Tenders,30.09.2015 Date of work Order.18.11.2015 Date of completion As per PC-I. 31.12.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 2.800 dt: 31.10.2016 (-) 0.200 dt: 31.01.2017 (-) 0.200 dt: 28-04-2017 Projected Population 4645 Person Release of Funds 27.07.2016. (1) Tube well Boring 1/1(2) Pump house 1/1 (3) Pumping Machinery 1/1 (4) Rising Main / Distribution System 3' i/d to 5" i/d 17500/17695 Rft (5) Electric connection 1/1 work in Progress

299 1521 Rural Water Supply Scheme Chak No. 4/1AL Okara Approved 4.000 3.815 1.515 1.515 1.515 100% 5.515 71% Date of AA-18.08.2015 Tehsil Renala Khurd Date of TS-22.08.2015 Date of Invitation of Tender,28.09.2015 Date of Receipt of Tenders, 30.09.2015 Date of work Order.18.11.2015 Date of completion As per PC-I. 31.12.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 1.900 dt: 31.10.2016 (-) 0.200 dt: 28-04-2017 Projected Population 9700 Person Release of Funds 27.07.2016. (1) Tube well Boring 1/1(2) Pump house 1/1 (95%) (3) Pumping Machinery 1/1 (4) Rising Main / Distribution System 3' i/d to 8" i/d 16350/16385 Rft (5) Electric connection 1/1 ( Payment made to WAPDA) Scheme Completed & under Test operations.

300 1522 Rural Water Supply Scheme Chak No. 5/1AL Okara Approved 4.000 5.482 2.142 2.142 2.142 100% 6.142 65% Date of AA-18.08.2015 Tehsil Renala Khurd Date of TS-22.08.2015 Date of Invitation of Tender, 28.09.2015 Date of Receipt of Tenders,30.09.2015 Date of work Order.18.11.2015 Date of completion As per PC-I. 31.12.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 2.600 dt: 31.10.2016 (-) 0.700 dt: 31.01.2017 (-) 0.200 dtL 28-04-2017 Projected Population 6104 Person Release of Funds 27.07.2016. ((1) Tubewell Boring 1/1(2) Pump house 1/1 (3) Pumping Machinery 1/1 (4) Rising Main / Distribution System 3' i/d to 6" i/d 18100/18175 Rft (5) OHR 10000 Glns 1/1 ( 60%) (6) Electric connection 1/1 ( Payment made to WAPDA) work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

301 1523 Rural Water Supply Scheme Chak No. 6/1AL Okara Approved 4.000 5.730 2.750 2.750 2.750 100% 6.750 69% Date of AA-18.08.2015 Tehsil Renala Khurd Date of TS-22.08.2015 Date of Invitation of Tender. 28.09.2015 Date of Receipt of Tenders. 30.09.2015 Date of work Order.18.11.2015 Date of completion As per PC-I. 31.12.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 2.900 dt: 31.10.2016 (-) 0.080 dt: 28-04-2017 Projected Population 6272 Person Release of Funds 27.07.2016. (1) tubewell Boring 1/1(2) Pump House 1/1 (30%) (3) Pumping Machinery 1/1 (4) Rising Main / distribution System 3' i/d to 6" i/d 11324/18679 Rft (5) OHR 10000 Glns 0/1 (85%) (6) Electric connection 0/1 work in Progress

302 1524 Rural Water Supply & Drainage Scheme Dhabbi, Okara Approved 5.000 5.852 4.752 4.752 4.752 100% 9.752 90% Date of AA-18.08.2015 Depalpur Date of TS-22.08.2015 Date of Invitation of Tender,26.10.2015 Date of Receipt of Tenders, 27.10.2015 Date of work Order.04.12.2015 Date of completion As per PC-I. 30.11.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 1.500 dt: 31.10.2016 Projected Population 1853 Person Release of Funds 27.07.2016. (1)Tube Wells 1/1,(2) Pump House 1/1(3) Pumping Machinery 1/1 (4) Rising Main 3" i/d to 6" i/d 5228/16288 (5) staff quarter 1/1 (6) External Electrification 1/1 (Payment made to WAPDA) (7) surface Drain 298/534 Rft (8) Bricks Pavement 21997/22971 Sft (9) Sullage Carrier 150/834 Rft (11) Boundary Wall 300/400 Rft Electric Connection is pending to make the scheme operational.

303 1525 Rural Water Supply & Drainage Scheme Ladhy Okara Approved 5.000 10.730 5.730 5.730 5.730 100% 10.730 68% Date of AA-18.08.2015 Wall Date of TS-22.08.2015 Date of Invitation of Tender,26.10.2015 Date of Receipt of Tenders,27.10.2015 Date of work Order.02.12.2015 Date of completion As per PC-I. 30.11.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 4.00 dt: 31.2016 (-) 1.00 dt: 31.01.2017 Projected Population 11264 Person Release of Funds 27.07.2016. 1)Tube Wells 1/1,(2) Pump House 1/1(3) Pumping Machinery 1/1 (4) Rising Main 3" i/d to 8" i/d 18691/19333 (5) staff qaurter 1/1 (6) O.H.R 20000 Glns 1/1 (50%) (7) External Electrification 1/1,(Payment made to WAPDA) work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

304 1526 Rural Water Supply & Drainage Scheme Gango Okara Approved 5.000 7.382 5.682 5.682 5.682 100% 10.682 86% Date of AA-18.08.2015 Wal Date of TS-22.08.2015 Date of Invitation of Tender 26.10.2015 Date of Receipt of Tenders. 27.10.2015 Date of work Order.08.12.2015 Date of completion As per PC-I. 30.11.2016 Anticipated date of completion,30.06.2017 Re-appropriation of funds (-) 1.200 dt: 31.10.2016 (-) 0.500 dt: 28-04-2017 Projected Population 3069 Person Release of Funds 27.07.2016. (1)Tube Wells 1/1,(2) Pump House 1/1(3) Pumping Machinery 1/1 (4) Rising Main 3" i/d to 4" i/d 7290/12209 (5) staff quarter 0/1 (6) O.H.R 10000 Glns 0/1 (7) External Electrification 1/1 ( Payment made to WAPDA) (8) surface Drain 0/379 Rft ( 9) Bricks Pavement 21782/22581 Cft (10) Sullage Carrier 0/510 Rft work in Progress .

305 1527 Rural Water Supply Chak No. 7/11-L. Sahiwal Approved 18.428 2.377 0.279 0.279 0.279 100% 18.707 90% 1. Date of AA 28.08.2014 (Rawanwala) 2. Date of TS 13.11.2014 3. Date of Pre-qualification ------4. Date of inviting of Tender 07.11.2014 5. Date if receipt of tender 29.11.2014 6. Date of Work Order 23.12.2014 7. Date of completion as per PC-1 22.04.2015 8. Anticipated date of completion 31.12.2016 9. Re-appropriation of funds (-) Rs.2.098 Million 10. Project Population = 6420 Person Scheme has been completed and commissioned and handed over to user committee.

306 1528 Water Supply Schemes Chak No. 88A-12/L Sahiwal Approved 16.938 0.763 0.528 0.528 0.528 100% 17.466 99% 1. Date of AA 12.09.2014 2. Date of TS 16.09.2014 3. Date of Pre-qualification ------4. Date of inviting of Tender 18.09.2014 5. Date if receipt of tender 13.10.2014 6. Date of Work Order 30.10.2014 7. Date of completion as per PC-1 30.01.2016 8. Anticipated date of completion 31.12.2016 9. Re-appropriation of funds (-) Rs.0.235 Million 10. Project Population = 2835 Person Scheme has been completed and commissioned and handed over to user committee

307 1529 Water Supply Scheme Chak No. 88/12-L Sahiwal Approved 20.720 0.933 1.003 1.003 1.000 100% 21.720 100% 1. Date of AA 12.09.2014 Chichawatni 2. Date of TS 16.09.2014 3. Date of Pre-qualification ------4. Date of inviting of Tender 29.10.2014 5. Date if receipt of tender 13.10.2014 6. Date of Work Order 29.10.2014 7. Date of completion as per PC-1 28.06.2016 8. Anticipated date of completion 31.12.2016 9. Re-appropriation of funds (-) Rs.0.280 Million 10. Project Population = 6752 Person Scheme has been completed , commissioned and handed over to user committee. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

308 1530 Water Supply Scheme Chak No.54/12L Sahiwal Approved 19.185 10.804 14.204 14.204 14.000 99% 33.185 111% 1. Date of AA 12.09.2014 Chichanwatni District Sahiwal 2. Date of TS 16.09.2014 3. Date of Pre-qualification ------4. Date of inviting of Tender 11.10.2014 5. Date if receipt of tender 13.10.2014 6. Date of Work Order 04.02.2015 7. Date of completion as per PC-1 03.10.2015 8. Anticipated date of completion 30.06.2017 9. Re-appropriation of funds () ------10. Project Population = 6752 Person Scheme completed and under test operation.

309 1531 Water Supply Scheme Chak No.120/9-L Sahiwal Approved 62.342 17.606 17.606 17.606 17.606 100% 79.948 100% 1. Date of AA 27.05.2009 Kameer. 2. Date of TS 05.06.2009 3. Date of Pre-qualification ------4. Date of inviting of Tender 19.06.2009 5. Date if receipt of tender 20.06.2009 6. Date of Work Order 26.06.2009 7. Date of completion as per PC-1 25.03.2011 8. Anticipated date of completion 30.06.2017 9. Re-appropriation of funds () ------10. Project Population = 20491 Person Work in Progress.

310 1532 Rural Water Supply & Drainage Scheme Chak Sahiwal Approved 20.827 13.451 12.751 12.751 12.750 100% 33.577 98% 1. Date of AA 23.10.2009 No.85/5-L Sahiwal 2. Date of TS 29.10.2009 3. Date of Pre-qualification ------4. Date of inviting of Tender 15.12.2009 5. Date if receipt of tender 16.12.2009 6. Date of Work Order 25.01.2010 7. Date of completion as per PC-1 24.11.2016 8. Anticipated date of completion 30.06.2017 9. Re-appropriation of funds () ------10. Project Population = 4300 Person Work in Progress & balance funds will be utilized upto 26th June, 2017.

311 1533 Rural Water Supply Scheme Chak No. 16/14-L, Sahiwal Approved 15.560 14.702 9.402 9.402 9.400 100% 24.960 82% 1. Date of AA 18.08.2015 Chichawatni (Brackish) 2. Date of TS 21.08.2015 3. Date of Pre-qualification 29.09.2015 4. Date of inviting of Tender 17.12.2015 5. Date if receipt of tender 18.12.2015 6. Date of Work Order 06.02.2016 7. Date of completion as per PC-1 05.10.2016 8. Anticipated date of completion 30.06.2017 9. Re-appropriation of funds (+) ------10. Project Population = 5465 Person Scheme completed.

312 1534 Rural Water Supply Scheme Chak No.70/D, Pakpattan Approved 14.962 0.684 0.684 0.684 0.684 100% 15.646 100% Date of AA = 16.04.15 Pakpattan Date of T.S = 16.04.15 Date of invitation of tenders= 04.05.15 Date of receipt tenders = 05.05.15 Date of Work order =08.05.15 Date of completion as per PC-I = 07.05.16 Anticipated date of completion = 30.05.16 Re-appropriation of funds Projected Population = 5415 scheme completed, Functional and handed over to User Committee. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

313 1535 Rural Water Supply Scheme Chak No.32/SP, Pakpattan Approved 16.000 1.430 0.680 0.680 0.680 100% 16.680 96% Date of AA = 16.04.2015 Pakpattan Date of T.S = 16.04.2015 Date of invitation of tenders= 04.05.15 Date of receipt tenders = 05.05.15 Date of Work order =08.05.15. Date of completion as per PC-I = 07.08.16 Anticipated date of completion = 30.06.16 Re-appropriation of funds (+/-) = Projected Population = 9674 The scheme completed, functional and handed over to User Committee.

314 1536 Reh. Of Rural Water Supply Scheme Malka Pakpattan Approved 12.813 2.633 0.333 0.333 0.333 100% 13.146 85% Date of AA = 24.12.2008 Hans, Tehsil & District Pakpattan Date of T.S = 21.02.2009 Date of invitation of tenders= 23.02.2009 Date of receipt tenders = 24.02.2009 Date of Work order =28.03.2009. Date of completion as per PC-I = 30.06.2010 Anticipated date of completion = 30.06.2010 The scheme completed, functional and handed over to the Union Council Malka Hans. 315 1537 Water Supply Scheme at Chak No.9/EB Dsitrict Pakpattan Approved 16.000 0.720 0.720 0.720 0.720 100% 16.720 100% Date of AA = 06.08.15 Pakpattan. Date of T.S = 10.08.15 Date of invitation of tenders= 29.08.15 Date of receipt tenders = 31.08.15 Date of Work order =09.09.15. Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.2016 Re-appropriation of funds (+/-) Projected Population = 5359 The Scheme completed, functional and handed to User Committee.

316 1538 R/W/S & Sewerage Scheme Kyian Pur, Tehsil & Multan Approved 15.000 37.243 49.705 49.705 49.466 100% 64.466 100% 1. Date of A.A: 17.09.2015 (28.05.2016) District Multan. 2. Date of T.S: 08.06.2016 3. Date of Pre-Qualification: 11.06.2016 4. Date of Invitation of Tender: 18.07.2016 5. Date of receipt of Tender: 20.07.2016 6. Date of Award: 22.07.2016 7. Date of Completion as per PC-I: 16.09.2016 8. Anticipated Date of Complion: 30.06.2017 9. Date of released of funds 27.07.2016 10. No. of Benificiary= 8645 Persons. Work is in progress.

317 1539 R/W/S & Sewerage Scheme Bheni, Tehsil & Multan Approved 15.000 20.000 50.000 50.000 49.942 100% 64.942 100% 1. Date of A.A: 17.09.2015 (28.05.2016) District Multan. 2. Date of T.S: 09.06.2016 3. Date of Pre-Qualification: 11.06.2016 4. Date of Invitation of Tender: 18.07.2016 5. Date of receipt of Tender: 20.07.2016 6. Date of Award: 22.07.2016 7. Date of Completion as per PC-I: 16.09.2016 8. Anticipated Date of Complion: 30.06.2017 9. Date of released of funds 27.07.2016 / 22.02.2017 10. No. of Benificiary=13479 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

318 1540 Rural Water Supply Scheme Mansoor Nagar 5 Multan Approved 9.849 0.123 0.000 0.000 0.000 0% 9.849 99% 1.Date of AA 09.03.2011 Marla Scheme Mattital Road UC-56, Tehsil & 2.Date of T.S 31.03.2011 District Multan 3.Date of Pre-Qualification: 4.Date of invitation of tender 21.04.2011 5.Date of Receipt of tenders 23.04.2011 6.Date of work order 18.05.2011 7.Date of Completion as per PC-l 17.01.2012 8.Anticipated date of completion 31.12.2016 9. Date of released of funds 27.07.2016 No. of beneficiaries 3646 Persons. Scheme Completed. Rs. 0.123 million surrendered.

319 1541 R/W/S & Sewerage Scheme Nai Wala, Tehsil & Multan Approved 15.000 10.000 39.300 39.300 39.148 100% 54.148 104% 1. Date of A.A: 17.09.2015 (28.05.2016) District Multan. 2. Date of T.S: 08.06.2016 3. Date of Pre-Qualification: 11.06.2016 4. Date of Invitation of Tender: 18.07.2016 5. Date of receipt of Tender: 20.07.2016 6. Date of Award: 22.07.2016 7. Date of Completion as per PC-I: 16.09.2016 8. Anticipated Date of Complion: 30.06.2017 9. Date of released of funds 27.07.2016 10. No. of Benificiary=6508 Persons. Work is in progress.

320 1542 R/W/S/Scheme Raja Pur, Siddiquebad, Multan Approved 52.053 25.909 11.609 11.609 11.367 98% 63.420 81% 1.Date of AA 14.11.2009 Hirwat,Yere Wala 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 14.04.2010 7.Date of Completion as per PC-l 13.02.2013 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10. No. of beneficiaries 43334 Persons. PM package un-funded schemes. Revised demand ntotice applied. 1 No.T/Well under test operation. Work is in progress.

321 1543 R/W/S/Scheme Gareywala, Nawabpur,Basti Nau Multan Approved 46.638 20.000 5.700 5.700 5.682 100% 52.320 74% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 04.03.2010 5.Date of Receipt of tenders 06.03.2010 6.Date of work order 14.04.2010 7.Date of Completion as per PC-l 13.02.2013 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10. No. of beneficiaries 51946 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

322 1544 R/W/S/Scheme Chak No.1/MR,4/T,,5/T,6/T Multan Approved 52.795 3.838 3.607 3.607 3.607 100% 56.402 100% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 04.03.2010 5.Date of Receipt of tenders 06.03.2010 6.Date of work order 14.04.2010/19.04.2010 7.Date of Completion as per PC-l 13.02.2011/18.02.2011 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10.No. of beneficiaries 56055 Persons. PM package un-funded schemes. Demand totice applied. Work is in progress.

323 1545 R/W/S/Scheme Chak No.15/MR,17/MR,&21/MR. Multan Approved 24.986 1.922 1.644 1.644 1.644 100% 26.630 99% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 02.03.2010/02.04.2010 7.Date of Completion as per PC-l 01.12.2011/01.04.2011 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10.No. of beneficiaries 8230 Persons. PM package un-funded scheme. Work is in progress.

324 1546 R/W/S/Scheme Taraggar. Multan Approved 33.027 10.000 6.000 6.000 5.952 99% 38.979 64% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 18.06.2010 7.Date of Completion as per PC-l 17.06.2012 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10.No. of beneficiaries 20623 Persons. PM package un-funded scheme. Demand totice applied. Work is in progress.

325 1547 R/W/S/Scheme Wahi Sawaya Wahi Noon. Multan Approved 28.225 8.555 8.555 8.555 8.554 100% 36.779 100% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 20.03.2010 7.Date of Completion as per PC-l 19.03.2012 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10No. of beneficiaries 16775 Persons. PM package un-funded scheme. Demand totice applied. Work is in progress.

326 1548 R/W/S/Scheme Thath Janubi Dera Arbi Multan Approved 27.075 1.696 1.696 1.696 1.664 98% 28.739 100% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 05.03.2010/13.03.2010 7.Date of Completion as per PC-l 04.12.2011/12.03.2011 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10.No. of beneficiaries 8523 Persons. Scheme completed in saving and partly functional. Tender called on 12.06.2017 of distribution work for additional abadies on the demand of concerned MPA. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

327 1549 R/W/S/Scheme Munshi Wala, Taji Wala Kahar Multan Approved 15.964 5.036 4.630 4.630 4.630 100% 20.594 98% 1.Date of AA 14.11.2009 Wala and adjoing abadies. 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 05.03.2010/13.03.2010 7.Date of Completion as per PC-l 04.12.2010/12.12.2010 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10.No. of beneficiaries 7997 Persons. PM package un-funded scheme. Partially functional and handed over. Balance work is in progress.

328 1550 R/W/S &D/Scheme Chak Multan Approved 60.248 3.322 0.522 0.522 0.507 97% 60.755 96% 1.Date of AA 14.11.2009 No.3/MR,4/MR,5/MR,6/MR,8/MR 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 04.03.2010 5.Date of Receipt of tenders 06.03.2010 6.Date of work order 14.04.2010/19.04.2010 7.Date of Completion as per PC-l 13.02.2011/18.02.2011 8.Anticipated date of completion 30.06.2017 9. Date of released of funds 27.07.2016 10No. of beneficiaries 34699 Persons. Scheme completed and handed over.

329 1551 Rural Water Supply Scheme Makhdoom Aali Lodhran Approved 12.000 9.938 9.938 9.938 9.776 98% 21.776 99% 1. Date of A.A. 22-08-2015. Lodhran. 2. Date of T.S. 27-08-2015 3. Date of Pre-Qualification: - 3. Date of invitation of tender 01-12-2015 4. Date of Receipt of tenders 02-12-2015 5. Date of work order. 22-12-2015. 6. Date of Completion as per PC-l 21-08-2016 7. Anticipated date of completion 30-06-2017 9. Date of released of funds 27.07.2016 10.No. of beneficiaries 6464 Persons. Scheme completed. Electric connection awaited.

330 1552 Rural Water Supply Scheme Mauza 346/WB Lodhran Approved 9.000 6.111 5.551 5.551 5.550 100% 14.550 96% 1.Date of A.A. 22-08-2015. Tehsil Dunyapur. 2.Date of T.S. 27-08-2015 3. Date of Pre-Qualification: - 4. Date of invitation of tender 01-12-2015 5. Date of Receipt of tenders 02-12-2015 6. Date of work order 22-12-2015. 7. Date of Completion as per PC-l 21-08-2016 8. Anticipated date of completion 30-06-2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 5684 Persons. Scheme completed. Electric connection awaited. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

331 1553 Rural Water Supply Scheme Mauza 362/WB Lodhran Approved 12.000 14.312 12.912 12.912 12.193 94% 24.193 92% 1.Date of A.A. 22-08-2015. Dunyapur. 2.Date of T.S. 27-08-2015 3. Date of Pre-Qualification: - 4. Date of invitation of tender 01-12-2015 5. Date of Receipt of tenders 02-12-2015 6. Date of work order 22-12-2015. 7. Date of Completion as per PC-l 21-08-2016 8. Anticipated date of completion 30-06-2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 6105 Persons. Scheme completed and under test operation. TPV payment yet to be pad.

332 1554 Rural Water Supply Scheme Mauza 365/WB Lodhran Approved 12.433 6.829 5.929 5.929 5.737 97% 18.170 94% 1.Date of A.A. 22-08-2015. Dunyapur. 2.Date of T.S. 27-08-2015 3. Date of Pre-Qualification: - 4. Date of invitation of tender 01-12-2015 5. Date of Receipt of tenders 02-12-2015 6. Date of work order 17-12-2015. 7. Date of Completion as per PC-l 21-08-2016 8. Anticipated date of completion 30-06-2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 6700 Persons. Scheme completed Electric connection awaited.

333 1555 Rural Water Supply Scheme Mauza 366/WB Lodhran Approved 12.490 8.922 8.122 8.122 7.733 95% 20.223 94% 1.Date of A.A. 22-08-2015. Dunyapur. 2.Date of T.S. 27-08-2015 3. Date of Pre-Qualification: - 4. Date of invitation of tender 01-12-2015 5. Date of Receipt of tenders 02-12-2015 6. Date of work order 17-12-2015. 7. Date of Completion as per PC-l 21-08-2016 8. Anticipated date of completion 30-06-2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 9918 Persons. Scheme completed Electric connection awaited.

334 1556 Rural Water Supply Scheme Mauza 373/WB and Lodhran Approved 7.000 10.000 24.200 24.200 23.579 97% 30.579 98% 1.Date of A.A. 22-08-2015. 386/WB Dunyapur. 2.Date of T.S. 27-08-2015 3. Date of Pre-Qualification: - 4. Date of invitation of tender 01-12-2015 5. Date of Receipt of tenders 02-12-2015 6. Date of work order 16-12-2015. 7. Date of Completion as per PC-l 21-08-2016 8. Anticipated date of completion 30-06-2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 8374 Persons. Work is in progress.

335 1557 Rural Water Supply Scheme Qutabpur Lodhran Approved 8.000 10.000 15.352 15.352 15.212 99% 23.212 74% 1. Date of A.A. 22-08-2015. Dunyapur. 2. Date of T.S. 27-08-2015 3. Date of Pre-Qualification: 4. Date of invitation of tender 01-12-2015 5. Date of Receipt of tenders 02-12-2015 6. Date of work order 16-12-2015. 7. Date of Completion as per PC-l 21-08-2016 8. Anticipated date of completion 30-06-2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 23060 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

336 1558 Rural Water Supply Scheme Chak No. 309/WB Lodhran Approved 8.000 10.960 10.060 10.060 9.916 99% 17.916 94% 1.Date of A.A 04-04-2016 2.Date of T.S 06-04-2016 3. Date of Pre-Qualification: 4. Date of invitation of tender 25-04-2016 5. Date of Receipt of tenders 26-04-2016 6. Date of work order 30-05-2016 7. Date of Completion as per PC-l 30-03-2017 8. Anticipated date of completion 30-03-2017 9.Date of released of funds 27.07.2016 10.No. of Beneficiaries 5598 Persons. Work is in progress.

337 1559 Rural Water Supply Scheme Maqbool Wah & Lodhran Approved 25.364 5.321 3.621 3.621 3.621 100% 28.985 94% 1.Date of A.A 27-04-2015. additional abadies Chak No. 297/WB Teshil 2.Date of T.S 28-04-2015. Dunyapur District Lodhran. 3. Date of Pre-Qualification: 4.Date of Rev. T.S 31-12-2015 5.Date of invitation of tender 19-05-2015 6. Date of Receipt of tenders 20-05-2015 7.Date of work order. 22-05-2015 8. Date of Completion as per PC-I 26-04-2016 9. Anticipated date of completion 30-06-2017 10.Date of released of funds 27.07.2016 11 No. of Beneficiaries 2546 Persons. Scheme completed & Functional.

338 1560 Provision of Water Supply Schemes in Chak No. Khanewal Approved 5.000 20.000 30.000 30.000 29.773 99% 34.773 69% 1. Date of A.A. 17.09.2015. (04.04.2016). 135/10.R, District Khanewal. 2. Date of T.S. 12.04.2016. 3. Date of Pre-qualification 14.05.2016 4. Date of invitation of tender. 06.06.2016 5. Date of Receipt of tender. 07.06.2016 6.Date of work order. 21.06.2016 7. Date of Completion as per PC-I. 30.11.2017 8. Anticipated date of Completion. 30.11.2017 9.Date of released of funds 27.07.2016. 10.No. of Beneficiaries 15048 Persons. Work is in progress.

339 1561 Provision of Water Supply Schemes in Chak No. Khanewal Approved 5.000 20.000 41.000 41.000 40.998 100% 45.998 76% 1. Date of A.A = 17.09.2015. 136/10.R, District Khanewal. 2. Date of T.S = 07-03-2016 3. Date of Pre-qualification 02.04.2016 4. Date of invitation of tender. 21.04.2016 5. Date of Receipt of tender. 23.04.2016 6. Date of Work order. 30.04.2016 7. Date of Completion as per PC-I. 16.09.2017 8. Anticipated date of Completion. 30.06.2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10. No. of Beneficiaries 12907 persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

340 1562 Provision of Water Supply Schemes in Chak No. Khanewal Approved 5.000 40.000 63.348 63.348 60.344 95% 65.344 98% 1. Date of A.A = 17.09.2015. 137/10.R, District Khanewal. 2. Date of T.S = 07-03-2016 3. Date of Pre-qualification 02.04.2016 4. Date of invitation of tender. 21.04.2016 5. Date of Receipt of tender. 23.04.2016 6. Date of Work order. 30.04.2016 7. Date of Completion as per PC-I. 16.09.2017 8. Anticipated date of Completion. 30.06.2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of Beneficiaries 12356 persons. Scheme completed in saying

341 1563 Provision of Water Supply Schemes in Chak No. Khanewal Approved 5.000 20.000 25.450 25.450 25.400 100% 30.400 66% 1. Date of A.A = 17.09.2015. 139/10.R, District Khanewal. 2. Date of T.S = 07-03-2016 3. Date of Pre-qualification - 4. Date of invitation of tender. 27-04-2016 5. Date of Receipt of tender. 29-04-2016 6. Date of Work order. 12.05.2016 7. Date of Completion as per PC-I. 16-09-2017 8. Anticipated date of Completion. 30-06-2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of Beneficiaries 10363 persons. Scheme completed in saying.

342 1564 Provision of Water Supply Schemes in Chak No. Khanewal Approved 5.000 20.000 21.000 21.000 20.997 100% 25.997 62% 1. Date of A.A = 17.09.2015. 123/10.R District Khanewal. 2. Date of T.S = 07-03-2016 3. Date of Pre-qualification - 4. Date of invitation of tender. 27-04-2016 5. Date of Receipt of tender. 29-04-2016 6. Date of Work order. 12.05.2016 7. Date of Completion as per PC-I. 16-09-2017 8. Anticipated date of Completion. 30-06-2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of Beneficiaries 9335 persons. Scheme completed in saying.

343 1565 Rural Water Supply Scheme Chak Khanewal Approved 48.792 2.088 2.088 2.088 2.057 99% 50.849 100% 1. Date of AA 14-12-2009 No.10/GH,11/GH,21/GH 22/GH & 23/GH Tehsil 2. Date of T.S 19-01-2010 Kabirwala 3. Date of Pre-qualification 23.01.2010 4. Date of invitation of tender 16-02-2010 5. Date of Receipt of tenders 17-02-2010 6. Date of work order 19-03-2010 7. Date of Completion as per PC-I. 30.06.2012 8. Anticipated date of Completion. 30.06.2017 9.Date of released of funds 27.07.2016 10. No. of beneficiaries 16462 Persons. Work is in progress.

344 1566 Rehabilitation of Rural Water Supply Scheme Khanewal Approved 8.227 0.257 0.257 0.257 0.000 0% 8.227 97% 1. Date of AA 03-12-2008 Chak No.125/15-L (Jhandwali) Mianchannu 2. Date of T.S 17-01-2009. 3. Date of Pre-qualification 4. Date of invitation of tender 02-02-2009 5. Date of Receipt of tenders 03-02-2009 6. Date of work order 18-04-2009 7. Date of Completion as per PC-I. 30.06.2011 8. Anticipated date of Completion. 30.06.2017 9.Date of released of funds 27.07.2016 10. No. of beneficiaries 18043 Persons. Scheme completed in saying. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

345 1567 Rural Water Supply Scheme Chak No. 155/WB Vehari Approved 5.000 10.000 10.850 10.850 10.850 100% 15.850 56% 1. Date of A.A: 27.04.2015 2. Date of T.S: 28.04.2015 3. Date of Pre-qualification - 4. Date Invitation of Tender: 18.05.2015 5. Date of Receipt of Tender: 19.05.2015 6. Date of award: 06.08.2015 7. Date of completion as per Pc-I: 06.04.2016 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 27.07.2016 10. No. of Benificiary= 6520 Persons Trial Bore= 2/2, T/W=2/2, PH=2/2, PM=2/2 Set, RM 6" i/d PVC =0/600 Rft, 10" i/d PVC= 3930/9350 D/System 3" i/d PVC=19522/21540 Rft, 4" i/d PVC = 1740/2595 Rft, 6" i/d PVC = 1068/1570, Rft, 8" i/d PVC = 859/1080 Rft, 10" i/d PVC = 262/420 Rft, 12" i/d PVC = 0/50 Rft Hypochlorinator =0/2, Ex. Elect = 0/2 Job, OHR 20000 Gallons= 0/1 No, Single Room Staff Quarter=0/1 No. 10. Reason of Slow Moving: NIL 11 No. of beneficiaries 6520Persons Work is in progress.

346 1568 Rehabilitation Water Supply Scheme Chak Vehari Approved 5.000 8.346 0.000 0.000 0.000 0% 5.000 37% 1. Date of A.A: 27.04.2015 No.84/WB, Tehsil Mailsi, District Vehari. 2. Date of T.S: 28.04.2015 3. Date of Pre-qualification 4. Date Invitation of Tender: 18.05.2015 5. Date of Receipt of Tender: 19.05.2015 6. Date of award: 05.11.5015 7. Date of Completion as per PC-I. 04.04.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 27.07.2016 10. No. of Benificiary= 3548 Persons. Scheme completed. Rs.8.346 million re-appropriated.

347 1569 Rehabilitation of Rural Water Supply Scheme Vehari Approved 0.311 6.613 6.613 6.613 6.523 99% 6.834 99% 1. Date of AA: 27.08.2016 Chak No. 409/EB 2. Date of T.S: 02.09.2016 3. Date of Pre-qualification - 4. Date of invitation of tender: 06.12.2016 5. Date of Receipt of tenders: 07.12.2016 6. Date of work order: 23.12.2016 7. Date of Completion as per PC-l: 22.12.2017 8. Anticipated date of completion: 30.06.2017 9.Date of released of funds 27.07.2016 PM=0/1 Set, RM 6" i/d PVC =0/830 Rft, D/System 3" i/d PVC=0/6740 Rft, 4" i/d PVC = 0/360 Rft, 6" i/d PVC = 0/300 Rft, 8" i/d PVC = 0/100 Rft, Hypochlorinator =0/1, Ex. Elect = 0/1 Job, OHR 10000 Gallons= 0/1 No, 10. Reason of Slow Moving: NIL 11. No. of beneficiaries 2608 Persons Work is in progress. site issues being resolved. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

348 1570 Rehabilitation of Rural Water Supply Scheme Vehari Approved 0.581 6.944 7.444 7.444 7.373 99% 7.954 106% 1. Date of AA: 27.08.2016 Chak No.181/EB Tehsil Burewala District Vehari 2. Date of T.S: 02.09.2016 3. Date of Pre-qualification - 4. Date of invitation of tender: 06.12.2016 5. Date of Receipt of tenders: 07.12.2016 6. Date of work order: 23.12.2016 7. Date of Completion as per PC-l: 22.12.2017 8. Anticipated date of completion: 30.06.2017 9.Date of released of funds 27.07.2016 10. No. of Benificiary= Persons. PH= 0/1, PM=0/1 Set, RM 6" i/d PVC =0/100 Rft, D/System 3" i/d PVC=0/1120 Rft, 4" i/d PVC = 0/6975 Rft, 4" i/d PVC = 0/1825 Rft, Hypochlorinator =0/1, Ex. Elect = 0/1 Job, OHR 10000 Gallons= 0/1 No, 10. Reason of Slow Moving: NIL 11 No. of beneficiaries 2467 Persons Work is in progress. site issues being resolved.

349 1571 Rehab. Of Rural Water Supply Scheme Chak Vehari Approved 13.074 9.789 0.000 0.000 0.000 0% 13.074 57% 1. Date of AA: 27.08.2016 No.78/WB (2nd revised) 2.Date of Rev. AA: - 3. Date of T.S: 02.10.2016 4. Date of Pre-qualification - 5. Date of invitation of tender: - 6. Date of Receipt of tenders: - 7. Date of work order: - 8. Date of Completion as per PC-l: - 9. Anticipated date of completion: - 10.Date of released of funds - 11. No. of Benificiary= 3076 Persons. Pending for replacement by concerned MPA. Funds surrenders for amounting to Rs. 1.789 Million.

350 1572 Provision of Water Supply Scheme in Notak Dera Ghazi Approved 20.000 27.027 9.527 9.527 9.527 100% 29.527 63% • Date of A.A = 22.08.2015 Sakhani UC-Kala Khan • Date of TS = 07.03.2016 • No. of Beneficiaries = 19125 • Date of invitation of tenders = 04.04.2016 • Date of receipt of tenders = 26.04.2016 • Date of work order = 07.05.2016 • Date of completion as per PC-I = 21.08.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016 Re-Appropirate Funds Date = - Rs. 17.5 (0.9 M 05.05.2017 & 16.6 M 16.6 15.05.2017).

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

351 1573 Provision of Water Supply Scheme in Sabzani Dera Ghazi Approved 20.000 15.347 7.747 7.747 7.746 100% 27.746 78% • Date of A.A = 22.08.2015 UC-Kala Khan • Date of TS = 07.03.2016 • No. of Beneficiaries = 15837 • Date of invitation of tenders = 04.04.2016 • Date of work order = 07.05.2016. • Date of receipt of tenders = 26.04.2016 • Date of completion as per PC-I = 21.08.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016 Re-Appropirate Funds Date = - Rs. 7.6 M (15.05.2017).

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

352 1574 Rural water Supply scheme Dibrani and Dera Ghazi Approved 4.241 4.452 4.452 4.452 4.450 100% 8.691 100% • Date of A.A = 18.03.2016 Adjoining Abadies Tehsil Kot Chutta District D.G. Khan • Date of TS = 27.09.2016. Khan • No. of Beneficiaries = 3538 • Date of invitation of tenders = 27.09.2016 • Date of receipt of tenders = 21.11.2016. • Date of work order = 22.12.2016 • Date of completion as per PC-I = 17.03.2017 • Anticipated date of completion = 30.06.2017 • Funds Released by F.D = 15.07.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

353 1575 Installation of Affri Dev Hand Pumps (Deep) at Rajanpur Approved 15.000 15.128 15.128 15.128 15.082 100% 30.082 100% • Date of A.A 21.03.2015 Different Location in Tehsil Jampur District • Date of TS 06.04.2015 • No. of Beneficiaries = 13800 Rajanpur "7" in No. • Date of inivation of Tender = 26.04.2015 • Date of reciept of Tender 12.05.2015 • Date of Work Order 15.07.2015 • Date of completion as per PC-I. 20.03.2016 • Anticipated date of completion 30.06.2017 • Funds released by F.D = 15.07.2016

• Funds utilized 100% • Scheme completed.

354 1576 Rehabilitation of rural water supply scheme Haji Rajanpur Approved 7.500 18.705 7.105 7.105 7.091 100% 14.591 56% • Date of A.A=24.04.2015 Pur Tehsil Jham Pur • Date of T.S 02.07.2015 • No. of Beneficiaries = 53363 • Date of Invitation of tender = 12.11.2015 • Date of receipt of Tenders 30.11.2015 • Date of Work Order 26.12.2015 • Date of Completion as per PC-I =23.04.2017 • Anticipated date of completion 30.06.2017 • Funds released by F.D = 15.07.2016 • Re-appropriation of funds = (-) 12.00 M (8.00 M 15.11.2016 & 4.00 M 14.12.2016) + 0.400 M (18.06.2017)

• Funds utilized 100% • Scheme completed.

355 1577 Rural water supply scheme Bukhara Tehsil Jham Rajanpur Approved 8.970 10.101 5.101 5.101 5.101 100% 14.071 74% • Date of A.A=24.04.2015 Pur • Date of T.S 9.07.2015 • No. of Beneficiaries = 17219 • Date of invitation of tenders = 12.11.2015 • Date of receipt of tenders 30.11.2015 • Date of work order 26.12.2015 • Date of Completion as per PC-I=23.04.2017 • Anticipated date of completion 30.06.2017 • Funds released by F.D = 15.07.2016 • Re-appropriation of funds = (-) 5.00 M (4.00 M 15.11.2016 & 1.00 M 14.12.2016)

• Funds utilized 100% • Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

356 1578 Rural water supply scheme Muhammad Pur Rajanpur Approved 5.400 6.052 1.052 1.052 1.050 100% 6.450 56% • Date of A.A=24.04.2015 Diwan Tehsil Jham Pur • Date of T.S 13.07.2015 • No. of Beneficiaries = 11840 • Date of invitation of tenders =12.11.2015 • Date of receipt of tenders. 30.11.2015 • Date of work order 24.12.2015 • Date of Completion as per PC-I=23.04.2017 • Anticipated date of completion 30.06.2017 • Funds released by F.D = 15.07.2016 • Re-appropriation of funds = (-) 5.00 M (4.00 M 15.11.2016 & 1.00 M 14.12.2016)

• Funds utilized 100% • Scheme Completed.

357 1579 Rural water supply scheme Miran Pur Thesil Rajanpur Approved 7.288 8.062 4.062 4.062 4.062 100% 11.350 74% • Date of A.A=24.04.2015 Jham Pur • Date of T.S 13.07.2015 • No. of Beneficiaries = 6698 • Date of invitation of tenders = 12.11.2015 • Date of receipt of tenders 30.11.2015 • Date of work order 26.12.2015 • Date of Completion as per PC-I = 23.04.2017 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016 • Re-appropriation of funds = (-) 4.00 M (3.00 M 15.11.2016 & 1.00 M 14.12.2016)

• Funds utilized 100% • Scheme Completed.

358 1580 Improvement of Rural Water Supply Scheme, Rajanpur Approved 130.000 20.000 30.000 30.000 30.000 100% 160.000 67% • Date of A.A = 23.12.2014 Dajal. • Date of T.S = 26.02.2015 • No. of Beneficiaries = 44465 • Date of pre-qualification = 18.02.2015 • Date of invitation of Tendering = 23.02.2015 • Date of Reiept of Tenders .11.03.2015 • Date of Work Order = 26.03.2015 • Date of completion as per PC-I = 22.12.2017 • Anticipated date of completion 30.06.2018 • Funds released by F.D = 15.07.2016 • Supplimentary Grant = 20 (M) 16.02.2017 • Reappropriation = (-) 10 (M) 25.04.2017

• Funds utilized 100% • Scheme Completed.

359 1581 Rehabilitation of Rural Water Supply Scheme Rajanpur Approved 1.129 0.990 0.990 0.990 0.990 100% 2.119 100% • Date of A.A = 16.12.2014 Nawan Shehar District Rajanpur. • Date of T.S = 31.12.2015 • No. of Beneficiaries = 17299 • Date of invitation of Tender = 26.01.2015 • Date of receipt of tenders 27.01.2015 • Date of work order =31.01.2015. • Date of completion as per PC-I = 30.06.2017 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016 Funds transferred to CBO for (O&M).

• Funds utilized 100% • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

360 1582 Rehabilitation of Rural Water Supply Scheme Rajanpur Approved 0.847 0.156 0.156 0.156 0.156 100% 1.003 100% • Date of A.A = 08.12.2014 Kotla Ahmad and adjoining abadies Tehsil • Date of T.S =31.12.2015 Jampur District Rajanpur • No. of Beneficiaries = 19751 • Date of invitation of Tender = 03.03.2015 • Date of receipt of tenders 04.03.2015 • Date of work order =12.03.2015 • Date of completion as per PC-I = 30.06.2017 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016

Funds transferred to CBO for (O&M). • Funds utilized 100% • Scheme Completed.

361 1583 Rehabilitation of Rural Water Supply Scheme Rajanpur Approved 0.847 0.224 0.224 0.224 0.224 100% 1.071 100% • Date of A.A =08.12.2014 Kotla Robait Tehsil Jampur District Rajanpur • Date of T.S = 31.12.2015 • No. of Beneficiaries = 6850 • Date of invitation of Tender =03.03.2015 • Date of receipt of tenders 04.03.2015. • Date of work order =10.03.2015. • Date of completion as per PC-I = 30.06.2017 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016

Funds transferred to CBO for (O&M). • Funds utilized 100% • Scheme Completed.

362 1584 Rehabilitation of Rural Water Supply Scheme Rajanpur Approved 0.008 1.063 0.000 0.000 0.000 0% 0.008 1% Date of A.A =08.12.2014 Basti Gul Muhammad Dasti Tehsil Jampur • Date of T.S = 31.12.2015 District Rajanpur. • Date of invitation of Tender = 03.03.2015 • Date of receipt of tenders 04.03.2015. • Date of work order =12.03.2015. • Re-appropriation of funds = (-) 1.063 M 15.11.2016.

Scheme dropped during 06/2015 due to theft of the material of the existing scheme by the comunity. Hence, no expenditure was incurred at that time. Rs. 1.063 (M) re- appropriated.

363 1585 Rural Water Supply Scheme Adda Jaman Shah Layyah Approved 4.471 0.897 0.502 0.502 0.502 100% 4.973 93% • Date of AA = 13-05-2015 • Date of TS = 28-08-2015 • No. of Beneficiaries = 5832 • Date of invitation of tenders= 15-09-2015 • Date of Receipt of Tenders = 10-10-2015 • Date of Work Order= 8-12-2015 • Date of completion as per PC-I= 12-05-2017 • Anticipated date of completion= 30-06-2017 • Funds released by FD = 27.07.2016

Funds utilized 100%. Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

364 1586 Construction of Rural Water Supply Scheme, Bahawalpur Approved 10.000 9.789 6.789 6.789 6.789 100% 16.789 85% Date of A.A= 22-04-2015. Chak No.115/DB Pacci, Tehsil Yazman, District Date of T.S= 09-05-2015. Bahawalpur Date of Rev: T.S=25.03.2017. Funds released by FD : 15-07-2016 Date of receipt of tenders= 08-03-2016. Date of work order=19-05-2016 Date of completion as per PC-1=21-04-2016 Date of completion as per agreement=18-05-2017 Reappropriation of excess Funds (-Rs.3.00 million) dated 28- 10-16 No. of beneficiaries=7869 persons. Scheme completed in saving and under test operation.

365 1587 Rural Water Supply Scheme Chak No.16/DNB & Bahawalpur Approved 7.019 0.431 0.431 0.431 0.431 100% 7.450 100% Date of AA= 03-08-2005 Manzoorabad Azafi Abadi Chak No.106-107/DB Date of Revised A.A=03-06-2010. Tehsil Yazman District Bahawalpur (Revised). Date of TS=13-08-2005 Date of Revised T.S= 23-06-2010 Date of work order= 02-11-2005. Date of completion as per PC-1=02-08-2006 Date of completion as per agreement= 01-11-2006 Anticipated date of completion 30-06-2010 No. of beneficiaries= 3587 persons Funds released by FD : 15-07-2016. Scheme completed, Functional and handed over to CBO.

366 1588 Water Supply Scheme Noor Sar ( New & Old) Bahawalnagar Approved 20.000 20.000 18.300 18.300 18.300 100% 38.300 57% Date of AA(DDWP). 06.10.2015. Date of TS. 22-02-2016 Date of invitation of tenders=28-01-2016 Date of receipt of tenders = 02-03-2016 Date of work order=01-04-2016 Date of completion as per PC-1=05-04-2017 Date of completion as per agreement= 30-10-2017 No. of beneficiaries=15011 persons Funds released by FD : 15-07-2016 Re-appropriation of funds ( - Rs.1.700 M dated 15-05- 2017). Work is in progress.

367 1589 Rural Water Supply Scheme Jand wala and Jand Bahawalnagar Approved 10.000 17.146 4.696 4.696 4.696 100% 14.696 54% Date of AA(DDWP). 18-08-2015 . wala sani Date of TS. 06-10-2015. Date of invitation of tenders=28-08-2015 Date of receipt of tenders = 20-10-2015 Date of work order= 04.11.2015. Date of completion as per PC-1=17-08-2016 Date of completion as per agreement= 03.11.16. Anticipated date of completion = 30.12.2017 No. of beneficiaries=14398 persons Funds released by FD : 15-07-2016 Reappropriation of Excess Funds =-Rs.12.450 million dated 26.10.2016 , 20-01-2017 , 31-3-17 & 15-5-2017. Original scope of the scheme is completed, estimate has been Revised T.S & enhanced liabilities are yet to be paid. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

368 1590 Water Supply Scheme Doonga Boonga Bahawalnagar Approved 60.000 20.000 57.000 57.000 56.941 100% 116.941 69% Date of AA (DDSC). 15-10-2015 Date of TS. 22-02-201`6 Date of prequalification on 22-03-2016 Date of invitation of tenders=24-03-2016 Date of receipt of tenders = 07-04-2016 Date of work awarded 18.05.2016. Date of completion as per PC-1=14-04-2017 Date of completion as per Agreement: 18.11.2017 No. of beneficiaries=64021 persons Funds released by FD : 15-07-2016 Re-appropriation of funds (+ Rs.17.00 M) dated 20-01-17 & 15-05-2017 Additional funds Rs.20.00 million received on 28-04-2017 & online dated 16-05-2017. Work is in progress.

369 1591 Rural Water Supply Scheme Bala Arain Bahawalnagar Approved 6.000 7.112 3.512 3.512 3.500 100% 9.500 72% Date of AA (DDWP). 18.08.2015 Date of TS=06-10-2015. Date of invitation of tenders=28-08-2015 Date of receipt of tenders = 20-10-2015 Date of work order= 04.11.15. Date of completion as per PC-1=17-06-2016 Date of completion as per agreement= 03.09.16. Anticipated dat of completion: 30.06.2017 No. of beneficiaries=10062 persons Funds released by FD : 15-07-2016 Reappropriation of Funds =-Rs.3.100 million dated 26.10.2016 & 15-05-2017 Scheme completed in sving & functional.

370 1592 Provision of Fund for Restortaion of Water Bahawalnagar Approved 30.000 20.000 17.500 17.500 17.482 100% 47.482 69% Date of AA(DDWP) 06.10.2015. Supply Scheme in his Constituency District Date of TS. 22-02-2016 Bahwalnagar (i) RWSS Khattan,(ii) RWSS Date of invitation of tenders=28-01-2016 Date of receipt of tenders = 02-03-2016 Jananay wala, (iii) RWSS Ghulab Ali,(iv) RWSS Date of award= 30-04-2016 Bajak & Khamay Wala Date of completion as per PC-1=05-04-2017 Date of completion as per agreement=29-04-2018 No. of beneficiaries=14971 persons Funds released by FD : 15-07-2016 Re-appropriation of funds=(-Rs.2.500 M dated 31-3-2017 Work is in progress.

371 1593 Rural Water Supply Scheme Usman Khera & Bahawalnagar Approved 10.000 8.199 1.699 1.699 1.644 97% 11.644 64% Date of AA (DDWP). 18-08-2015. Adjoining Abadies. Date of TS=21-10-2015. Date of RTS.22-03-2017 Date of invitation of tenders=15-10-2015 Date of receipt of tenders = 06.11.2015. Date of work order= 17.11.2015. Date of completion as per PC-1=17-08-2016 Date of completion as per agreement= 16.11.2016. Anticipated date of completion = 31.12.2017 No. of beneficiaries=6591 persons Funds released by FD : 15-07-2016 Re-appropriation of Funds (- Rs.6.500/-) dated 06.10.2016 Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

372 1594 Rural Water Supply Scheme Chak Laleka & Bahawalnagar Approved 0.500 19.912 17.912 17.912 17.726 99% 18.226 89% Date of AA 19.08.2016. Adjoining Abadies Tehsil Minchanabad District Date of T.S 21.10.2016. Bahawalnagar(Scheme to be subsitituted as Date of receipt of Tender 02.11.2016 Date of Award 30.11.2016 RWSS Sch.Mari Mian Shaib, Dist. Bahawalangar Date of completion 29.11.2017 as requested by Mian Shoukat Ali Laleka, MPA- Date of Fund released 15.07.2016. PP-278) No. of beneficiaries=6681 persons. Re-appropriation of funds=.(-) Rs.2.00 M(dated 24-02-2017 Work is in progress.

373 1595 Water Supply Scheme Maroot, Tehsil Fort Bahawalnagar Approved 20.000 20.000 67.900 67.900 67.866 100% 87.866 80% Date of AA. 15-10-2015 Abbas, District Bahawalnagar Date of TS. 22-02-2016 Prequalification of the contractor=22-03-2016 Date of invitation of tenders=24-03-2016 Date of receipt of tenders = 07-04-2016 Date of award= 30-04-2016. Date of completion as per PC-1=14-02-2017 Date of completion as per agreement=29-04-2018. No. of beneficiaries=18244 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (+ Rs.27.900 million) dated 06-10- 16 & 25-11-16 . Additional funds Rs.20.00 million provided by Govt. dated 16-02-2017.Work is in progress.

374 1596 Rehabilitation of Rural Water Supply Scheme Bahawalnagar Approved 32.688 6.674 0.174 0.174 0.149 86% 32.837 83% Date of A.A: 22-01-2015. Chak No.62/4R, Tehsil Haroonabad District Date of T.S 26-01-2015. Bahawalnagar. Date of revised T.S 12-01-2017 Date of invitation of tenders=26-02-2015 Date of receipt of tenders =15-04-2015 Date of work order= 22-05-2015 Date of completion as per PC-1=21-07-2015 Date of completion as per agreement= 21-11-2015. Anticipated date of completion= 30-06-2017 No. of beneficiaries=7925 persons Funds released by FD : 15-07-2016 Re-appropriation of excess funds (- Rs.6.500) dated 06.10.2016 & 31-01-2017. Work is in progress.

375 1597 Rehabilitation of Rural Water Supply Scheme Bahawalnagar Approved 5.564 7.540 0.240 0.240 0.240 100% 5.804 44% Date of A.A: 11-04-2015. Chak No. 31/3R Tehsil Haroonabad District Date of T.S 11-04-2015. Bahawalnagar Date of revised T.S=17-06-2015 Date of invitation of tenders=04-04-2015 Date of receipt of tenders = 06-05-2015 Date of work order= 09-05-2015 Date of completion as per PC-1=10-10-2015 Date of completion as per agreement= 08-11-2015. Anticipated date of completion= 15-06-2016 No. of beneficiaries=3922 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (-Rs.7.300 million) dated 06.10.2016 Scheme completed in saving and functional. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

376 1598 Rehabilitation of Rural Water Supply Scheme Bahawalnagar Approved 19.000 5.427 0.227 0.227 0.225 99% 19.225 79% Date of A.A: 22-01-2015. Chak No.144/6R, Tehsil Haroonabad District Date of T.S 26-01-2015. Bahawalnagar. Date of invitation of tenders=26-03-2016 Date of receipt of tenders = 22-04-2015 Date of work order= 29-04-2015 Date of completion as per PC-1=21-05-2015 Date of completion as per agreement= 27-10-2015. Anticipated date of completion= 30.12.2017 No. of beneficiaries=2634 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (-5.20 million) dated 25-11-2016 & 31-01-2017 Work is in progress.

377 1599 RWSS Chak No.164/7-R Tehsil Haroonabad Bahawalnagar Approved 8.254 5.178 1.178 1.178 1.175 100% 9.429 70% Date of A.A: 26-11-2009 Date of T.S 26-11-2009 Date of invitation of tenders=04-11-2009 Date of receipt of tenders = 14-12-2009 Date of work order=18-01-2010 Date of completion as per PC-1=25-05-2010 Date of completion as per agreement= 17-07-2010 Anticipated date of completion= 30-06-2012 No. of beneficiaries= 4464 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (-Rs.4.00 million) dated 26.10.2016. Scheme completed & functional.

378 1600 Rural Water Supply Scheme Chak No.102/P Rahim Yar Approved 5.374 7.392 0.000 0.000 0.000 0% 5.374 42% Date of AA. 26-11-2009 Khan Date of TS. 26-11-2009 Date of invitation of tender:17-12-2009 Date of receipt of tenders =30-12-2009 Date of work order= 01-02-2010 Date of completion as per PC-1=25-08-2010 Date of completion as per agreement= 01-11-2010 Anticipated date of completion=30-12-2017 No. of beneficiaries=2108 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (- Rs.7.392 M dated 19-04-2016) Scheme remained un-funded during 2011-12. Revised estimate of the scheme is to be revised administratively approved to complete the balance scope of work & functioning of scheme. Scheme is not functioning due design fault. S.E, PHED Multan has been appointed as probing officer to probe into the matter vide Chief Engineer(S), PHED Lahore office letter No.867/BS dated 05- 04-2017.

379 1601 Rural Water Supply Scheme Chak No.110/P Rahim Yar Approved 7.191 5.518 0.256 0.256 0.256 100% 7.447 59% Date of AA. 26-11-2009 Khan Date of TS. 26-11-2009 Date of invitation of tender:17-12-2009 Date of receipt of tenders =30-12-2009 Date of work order= 01-02-2010 Date of completion as per PC-1=25-08-2010 Date of completion as per agreement= 01-11-2010 Anticipated date of completion=30-06-2012 No. of beneficiaries=2093 persons Funds released by FD : 15-07-2016 Reappropriation of excess funds (-Rs.5.262) dated 28.10.2016 Scheme completed in saving, functional and being maintained by CBO. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

380 1602 Drainage and Sanitation scheme in village Attock Approved 38.134 5.871 0.021 0.021 0.000 0% 38.134 87% ● A.A Date 01.10.2013. Hameed, Tehsil Hazro, District Attock ● T.S Date 27.01.2014. ● Date of Start of Scheme 06.03.2014. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. The work on construction of Nullah is pending due to acqusition of land process, after publication of section 6. Now the matter is under progress in the o/o A.C Hazro. 381 1603 Drainage / Sewerage System in Village Attock Approved 40.000 15.000 24.870 24.870 24.859 100% 64.859 71% ● A.A Date 03.09.2014. Ghourgushti (Phase-II), Tehsil Hazro, District ● T.S Date 29.09.2014. Attock ● Date of Start of Scheme 16.12.2014. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. (The work on the RCC Sewer 18", 27" i/d and PCC is in progress. 382 1604 Construction of Street Pavement in Village Kalu Attock Approved 11.226 10.000 10.000 10.000 9.995 100% 21.221 81% ● A.A Date 23.01.2015. Kalan (Phase-II), (PP-16) Tehsil Hazro District ● T.S Date 18.04.2015. Attock. ● Date of Start of Scheme 05.06.2015. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. (The work on the PCC and Sullage Carrier is in progress). 383 1605 Rural Drainage Scheme Jattial, Tehsil & District Attock Approved 11.923 25.001 18.501 18.501 18.501 100% 30.424 82% ● A.A Date 24.04.2015. Attock ● T.S Date 27.04.2015. ● Date of Start of Scheme 05.06.2015. ● Date of Completion of Scheme 30.06.2017. ● Scheme Completed. 384 1606 Rural drainage scheme in villages Formli,haider Attock Approved 17.500 15.000 15.000 15.000 15.000 100% 32.500 58% ● A.A Date 01.04.2016. Mallah,District Attock. ● T.S Date 22.04.2016. ● Date of Start of Scheme 30.05.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. The work on the Sullage Carrier and PCC is in progress. 385 1607 Rural drainage scheme in villages RAmu,Bhadar Attock Approved 7.500 10.000 10.500 10.500 10.500 100% 18.000 62% ● A.A Date 01.04.2016. Khan,District Attock. ● T.S Date 09.09.2016. ● Date of Start of Scheme 15.12.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. The work of PCC is in progress. 386 1608 Rural Drainage Scheme for Village Chakwal Approved 4.000 9.798 9.798 9.798 9.798 100% 13.798 100% Date of A.A 17.09.2015 Date of T.S 08.10.2015 Date of Sart 18.03.2016 Date of completion 10.01.2017 Scheme completed. 387 1609 Const: of Water Channel & Upgradadtion of Chakwal Approved 2.500 2.500 2.034 2.034 1.999 98% 4.499 90% Date of A.A 07.03.2016 Date of T.S Pond in Village Khewal 15.03.2016 Date of Sart 14.05.2016 Date of completion 31.01.2017 Scheme completed in saving. 388 1610 Const. of Sewerage & Drainage Scheme Kallar Chakwal Approved 20.000 15.000 28.000 28.000 28.000 100% 48.000 46% Date of A.A 17.09.2015 Date of T.S Kahar 08.10.2015 Date of Sart 18.03.2016 Date of completion 30.06.2018 Work is in progress.

389 1611 Improvement/Rehabilitation of Sewerage System Jhelum Approved 10.000 10.000 23.000 23.000 23.000 100% 33.000 111% Date of A.A 16-03-16 in Bilal Town Tehsil & District jehlum. Date of T.S 28-03-2016 Date of Commencement 07-05-2016 Time Extended upto 30-06-2017 Work in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

390 1612 Rural Water Supply Scheme Shaheenabad Sargodha Approved 13.700 2.965 1.539 1.539 1.539 100% 15.239 91% Date of A.A 27.04.2015, Date of T.S 29.04.2015, Date of Tehsil Sillanwali District Sargodha Award 29.10.2015, Scheduled date of Completion is 30.06.2017, Date of Commencement, 29.10.2015, Funds released on 02.08.2016, Funds on-lined on02.08.2016.

As per estimated provision all components of scheme have been completed in saving. Efforts are being made for installation of electric connection. 391 1613 Rural Sewerage / Drainage Scheme Chak No. Sargodha Approved 19.597 20.998 15.998 15.998 15.997 100% 35.594 88% 133/SB & 138/SB Tehsil Sillanwali District Date of A.A 27.04.2015, Date of Revised A.A 23.12.2016, Date of T.S 02.05.2015, Date of Award 06.06.2015, Sargodha. Scheduled date of Completion on 30.06.2017, Date of Commencement, 06.06.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

RCC Sewer 2651-Rft laid. Drains 665-Rft & RCC Box Channel 3260-Rft constructed. Brick Pavement 6356-Cft laid. Revised A.A issued on 23.12.2016. Work in progress.

392 1614 Rural Drainage Scheme Chak No.06/NB Sargodha Approved 10.000 8.645 8.645 8.645 8.641 100% 18.641 100% Date of A.A 27.06.2015, Date of T.S 03.07.2015, Date of Award 10.11.2015, Scheduled date of Completion on 30.06.2017 Date of Commencement, 10.11.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per provision of estimate, the scheme has been completed in saving. Revision of estimate is under process with Commissioner Office living within the original A.A amount. 393 1615 Drainage Scheme Kot Ahmed, Hazoor Pur, Sargodha Approved 15.000 1.677 1.521 1.521 1.504 99% 16.504 99% Date of A.A 27.04.2015, Date of T.S 02.05.2015, Date of Fateh Garh and Adjoing Abadies District Award 01.09.2015, Scheduled date of Completion on Sargodha. 30.06.2016, Date of Commencement, 01.09.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 394 1616 Drainage Scheme Chak Mubarak, Dhall, Chawa Sargodha Approved 15.000 1.913 1.804 1.804 1.804 100% 16.804 99% Date of A.A 27.04.2015, Date of T.S 02.05.2015, Date of and Adjoing Abadies District Sargodha. Award 20.06.2015, Scheduled date of Completion on 30.06.2016, Date of Commencement, 20.06.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 395 1617 Drainage Scheme Ali Pur, Khan Muhammad Sargodha Approved 15.000 1.746 1.714 1.714 1.713 100% 16.713 100% Date of A.A 27.04.2015, Date of T.S 02.05.2015, Date of Wala, Melowal and Adjoing Abadies District Award 19.06.2015, Scheduled date of Completion on Sargodha. 30.06.2016, Date of Commencement, 19.06.2015, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 396 1618 Const: of Drains Solling PCC Tuff Tile Culverts Sargodha Approved 3.000 10.000 8.835 8.835 8.835 100% 11.835 91% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Nullah Miani Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on02.08.2016.

As per estimated provision all components of scheme have been completed. 397 1619 Const: of Drains PCC Mohallah Sahnia Wala Sargodha Approved 2.211 0.745 0.100 0.100 0.100 100% 2.311 78% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Mohalla Hadayat Shah Bhera Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

398 1620 Const: Tuff tiles Ali Bhata Bhera Sargodha Approved 3.000 1.000 2.000 2.000 2.000 100% 5.000 100% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 399 1621 Const: of Drains PCC Ali pur Saidan Sargodha Approved 2.000 2.000 1.209 1.209 1.209 100% 3.209 80% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 400 1622 Const: of Drains PCC Solling Zain pur Sargodha Approved 3.000 0.500 0.030 0.030 0.029 97% 3.029 87% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 401 1623 Repair & Improvement of road Kalyan pur Sargodha Approved 3.000 1.000 0.952 0.952 0.952 100% 3.952 99% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016 Funds on-lined on 02.08.2016.

402 1624 Const: of Boundry wall & Grave yard Miani Sargodha Approved 3.000 1.000 1.041 1.041 1.041 100% 4.041 100% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

403 1625 Const: of Boundry wall & Grave yard Muzafat Sargodha Approved 3.000 3.000 3.000 3.000 2.998 100% 5.998 100% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Bhera Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on -02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 404 1626 Const: of Sabzi & Fruit Mandi Bhera ( Pir Moen Sargodha Approved 3.000 1.000 1.121 1.121 1.121 100% 4.121 100% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of UI din Shah) Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 405 1627 Construction of Drains PCC Mohallah Saithian Sargodha Approved 2.000 0.160 0.040 0.040 0.040 100% 2.040 94% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Wala,Naseer Abad,noor Pur Colony Bhera Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 406 1628 Construction of drains PCC Mohalla Chah Sargodha Approved 3.000 0.200 0.523 0.523 0.520 99% 3.520 100% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Dohliana wala Mohalla Abkari Bhera Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

407 1629 Construction of drains PCC Mohalla Saithian Sargodha Approved 2.000 0.400 0.329 0.329 0.329 100% 2.329 97% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of wala main Road Abdullah market Bhera Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 408 1630 Construction of drains PCC in Din Pur Lokari & Sargodha Approved 1.500 0.468 0.026 0.026 0.026 100% 1.526 78% Date of A.A 25.01.2016, Date of T.S 18.03.2016, Date of Tahir Abad Bhera Award 18.04.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 18.04.2016, Funds released on 02.08.2016, Funds on-lined on 02.08.2016.

As per estimated provision all components of scheme have been completed. 409 1631 Rural Drainage Scheme, Chak No. 62/MB Khushab Approved 10.000 10.000 15.061 15.061 15.061 100% 25.061 82% Date of AA 11.08.2015 Date of TS 15.8.2015 Date of award 31.10.2015 Date of completion 30.06.2017 Work is in progress. 410 1632 Rehabilitation of rural water supply scheme Pail & Khushab Approved 23.000 5.082 4.382 4.382 4.382 100% 27.382 98% Date of AA 11.08.2015 Date of TS Derajat (Tehsil & District Khushab) 15.8.2015 Date of award 4.11.2015 Date of completion 30.06.2017 Scheme completed. Eletric connection from WAPDA awaited. 411 1633 Construction of PCC Slabs in U.C. Bandial Khushab Approved 5.000 5.447 2.747 2.747 2.747 100% 7.747 74% Date of AA 11.08.2015 Date of TS Khushab , Q Abad 15.8.2015 Date of award 04.11.2015 Date of completion 30.06.2017 Scheme completed 412 1634 Construction of PCC Slabs in Mitha Tiwana Khushab Approved 10.000 10.000 8.000 8.000 8.000 100% 18.000 90% Date of AA 11.08.2015 Date of TS Khushab , Q Abad 15.08.2015 Date of award 31.10.2015 Date of completion 30.06.2017 Scheme completed. 413 1635 Construction of PCC Slabs in U.C. Khushab Approved 10.000 10.000 10.000 10.000 10.000 100% 20.000 100% Date of AA 11.08.2015 Date of TS Botala.Khushab , Q Abad 15.8.2015 Date of award 31.10.2015 Scheme completed. 414 1636 Construction of PCC Slabs in U.C. Bijar. Khushab Approved 10.000 10.000 7.500 7.500 7.500 100% 17.500 88% Date of AA 11.08.2015 Date of TS Khushab , Q Abad 15.8.2015 Date of award 31.10.2015 Date of completion 30.06.2017 Scheme completed in saving. 415 1637 Construction of PCC Slabs in U.C. Warcha Khushab Approved 5.000 5.422 3.200 3.200 3.200 100% 8.200 79% Date of AA 11.08.2015 Date of TS Khushab , Q Abad 15.8.2015 Date of award 3.11.2015 Date of completion 30.06.2017 Scheme completed. 416 1638 Construction of PCC Slabs in U.C. Chak Khushab Approved 10.000 10.000 7.000 7.000 7.000 100% 17.000 85% Date of AA 11.08.2015 Date of TS No.14/MB. Khushab , Q Abad 15.8.2015 Date of award 28.10.2015 Date of completion 30.06.2017 Scheme completed. 417 1639 Const. of PCC Slab, Surface Drain, Sullage Khushab Approved 26.243 2.779 2.279 2.279 2.279 100% 28.522 98% Carrier & brick pavement Mitha Tiwana District Scheme completed. Khushab 418 1640 Sewerage / Drainage Scheme Mouch, District Mianwali Approved 30.000 20.000 20.000 20.000 19.996 100% 49.996 75% Mianwali Date of A.A 04.08.2015. Date of T.S 14.09.2015 Date of Start of Work 16.11.2015. Date of Completion 30.06.2018 Bottlenecks / Remarks

RCC Sewer=9" i/d=13393/35130, 12"i/d= 9006/12053, 15"i/d= 2283/4564, 18"i/d=3462/4902, 21"i/d= 1290/1126. Sullage Carrier= 230/2411. Work is in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

419 1641 Sewerage, Draiange, PCC Slab at Abadies of Bhakkar Approved 3.000 7.000 3.800 3.800 3.790 100% 6.790 68% Date of A.A 11.08.2015 Tehsil Kallur Kot, Raitri, Fazil, Hassan wala, Date of T.S 15.08.2015 Kanjan,Mallana UC, Dhudianwala,Vithoy Date of Commencement 24.11.2015 Date of completion wala,Saeed wala, Akairan wala, Daki,Chargal. 24.08.2016 Scheme almost completed.

420 1642 Sewerage Scheme Dullay Wala Tehsil Darya Bhakkar Approved 50.000 10.000 51.297 51.297 50.797 99% 100.797 105% Date of A.A 11.08.2015 Khan Distt: Bhakkar Date of T.S 15.09.2015 Date of Commencement 28.12.2015 Date of completion 28.12.2017 Scheme almost completed. 421 1643 RDS Scheme Chak No. 153/RB Faisalabad Approved 5.500 3.500 2.900 2.900 2.898 100% 8.398 93% 1) Date of A.A 20.08.2015 2) Date of T.S.07.09.2015. 3) Date of invitation of tenders 08.09.2015. 4) Date of receipt of tenders 30.09.2015. 5) Date of work order 12.11.2015 6)Date of Completion as per PC-I = 2 Year 7) Anticipated date of completion.30.06.2017 Scheme completed in saving. 422 1644 Rural Drainage Scheme, Chak No. 69/RB Faisalabad Approved 5.000 15.000 12.500 12.500 11.390 91% 16.390 82% 1) Date of A.A 14.04.2016 2) Date of T.S.15.04.2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 15.04.2016. 5) Date of receipt of tenders 06.05.2016. 6) Date of work order 30.05.2016 7)Date of Completion as per PC-I = 2 Year Scheme completed in saving. 423 1645 Rural Drainage Scheme, Chak No. 70/RB Faisalabad Approved 5.000 15.000 11.796 11.796 10.495 89% 15.495 77% 1) Date of A.A 14.04.2016 2) Date of T.S.15.04.2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 15.04.2016. 5) Date of receipt of tenders 06.05.2016. 6) Date of work order 30.05.2016 7)Date of Completion as per PC-I = 2 Year Scheme completed in saving. 424 1646 Const: of Sewerage Scheme Chak No. 469/GB. Faisalabad Approved 16.614 5.760 43.693 43.693 23.578 54% 40.192 67% 1) Date of A.A 07.9.2015 2) Date of T.S.08.09.2015. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 08.09.2015. 5) Date of receipt of tenders 30.09.2015. 6) Date of work order 12.11.2015 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.31.12.2017. 9) Scheme revised late receipt of fund tender received on 10.05.2017. Work is in progress. Rs.25.00 millions proposed for surrender vide this office No.1729 dt: 05.04.2017

425 1647 Construction of Streets and Drains at Mohallah Gujranwala Approved 4.315 4.415 1.088 1.088 1.088 100% 5.403 62% A.A. dated 10.02.2016. Salamat Pura T.S. dated 15.02.2016. *Start Date 21.03.2016. *Completion date 30.06.2017. Scheme completed. 426 1648 Construction of Streets and Drains at Mohallah Gujranwala Approved 5.382 5.482 0.000 0.000 0.000 0% 5.382 50% A.A. dated 10.02.2016. Rasul Nagar Kasoke Road T.S. dated 15.02.2016. *Start Date 21.03.2016. *Completion date 30.06.2016. Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

427 1649 PCC and Sewerage Schemes at Khiali Shahpur, Gujranwala Approved 69.200 5.000 81.031 81.031 81.029 100% 150.229 76%

District Gujranwala. A.A. dated 21.04.2015. T.S. dated 12.02.2016. *Start Date 23.05.2015. *Completion date 30.06.2018. Work in progress. Work in progress. Full funds utilized.

428 1650 PCC, Sewerage / Drainage Scheme Disposal, Gujranwala Approved 20.661 18.992 40.405 40.405 40.405 100% 61.066 68% Scheme revised on 18.02.2017. UC Nandpur & UC Botala Sham Singh Work in progress. Full funds utilized. 429 1651 PCC, Sewerage / Drainage Scheme Disposal, Gujranwala Approved 20.000 29.446 36.467 36.467 36.467 100% 56.467 57% UC Kot Shera, UC Marali Wal & UC Dhriwala A.A. dated 25.04.2015. T.S. dated 29.04.2015. *Start Date 20.05.2015. *Completion date 30.06.2017. Work in progress. Full funds utilized. 430 1652 PCC, Sewerage/Drainage Scheme, UC Sansra Gujranwala Approved 10.587 19.000 34.570 34.570 34.563 100% 45.150 65% Scheme revised on 18.02.2017. Work in progress. Full Goraya funds utilized. 431 1653 PCC, Sewerage / Drainage Scheme Disposal, Gujranwala Approved 40.499 39.148 51.116 51.116 51.116 100% 91.615 61% UC City Ladhywala Warraich, Qila Dedar Singh, Scheme revised on 18.02.2017. Work in progress. Full funds utilized. Madu Khalil & Ghakhar City 432 1654 Drainage & PCC Scheme Jagowala, Bubbar Gujranwala Approved 10.187 19.496 19.696 19.696 19.696 100% 29.883 101% A.A. dated 25.04.2015. T.S. dated 28.04.2015. *Start Date 23.05.2015. *Completion date 30.06.2017. Scheme completed. 433 1655 Drainage & PCC Scheme Chahal Kalan, Kot Gujranwala Approved 10.698 18.165 18.865 18.865 18.865 100% 29.563 102% A.A. dated 25.04.2015. Abdul malik, Gogrnwalay T.S. dated 28.04.2015. *Start Date 23.05.2015. *Completion date 30.06.2017. Scheme completed. 434 1656 Drainage & PCC Scheme Uddowali, Beriwala Gujranwala Approved 12.783 16.995 19.695 19.695 19.687 100% 32.470 100% A.A. dated 25.04.2015. T.S. dated 28.04.2015. *Start Date 23.05.2015. *Completion date 30.06.2017 Scheme completed. 435 1657 Rural Drainage & PCC Scheme Shamsa Dhada / Gujranwala Approved 10.000 15.000 37.081 37.081 37.081 100% 47.081 105% A.A. dated 25.04.2015. Dera Jaat, Pagala / Dera Jaat, Mari Bhindran, T.S. dated 28.04.2015. Budha Goraya / Chitti Goraya, Piple Goraya / *Start Date 23.05.2015. Lala Pur and Noweshara Virkan / Mohallah Bath / *Completion date 30.06.2018 Mohallah Ranwala/ mohallah Islampura Scheme completed.

436 1658 Constt. Of PCC Streets, Drain at Ali Pur Chattha Gujranwala Approved 5.000 5.000 5.000 5.000 5.000 100% 10.000 100% City Tehsil Wazirabad, Distt. Gujranwala A.A. dated 27.06.2015. T.S. dated 21.08.2015. *Start Date 17.09.2015. *Completion date 30.06.2017. Scheme completed. 437 1659 Constt. Of PCC Streets, Drain at Sohdha Talwara Gujranwala Approved 3.000 1.000 1.000 1.000 1.000 100% 4.000 100% Scheme completed. Tehsil Wazirabad, Distt. Gujranwala 438 1660 Constt. Of PCC Streets, Drain at Vangowali Kotla Gujranwala Approved 3.000 1.000 1.000 1.000 1.000 100% 4.000 100% A.A. dated 27.06.2015. Peeran, Tehsil Wazirabad Distt. Gujranwala T.S. dated 21.08.2015. *Start Date 17.09.2015. *Completion date 30.06.2016 Scheme completed. 439 1661 Constt. Of PCC Street, Drain at Hiranwal Khurd, Gujranwala Approved 3.000 0.500 0.500 0.500 0.500 100% 3.500 100% Adil Garh not Tehsil Wazirabad, Distt. Gujranwala Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

440 1662 Constt. Of PCC Street, Drain at Shair Pur, Gujranwala Approved 2.000 1.000 1.000 1.000 0.996 100% 2.996 100% A.A. dated 27.06.2015. Pandore Khurd Jhahnwala Lahore, Tehsil T.S. dated 21.08.2015. Wazirabad, Gujranwala *Start Date 17.09.2015. *Completion date 30.06.2016 Scheme completed in saving. 441 1663 Const: of disposal / Sewerage Drainage PCC Gujranwala Approved 40.000 30.000 60.000 60.000 59.947 100% 99.947 50% A.A. dated 07.01.2016. Scheme Morr Eminabad Sharqi UC Dhillanwali T.S. dated 15.01.2016. Tehsil & Distt Gujranwala *Start Date 11.03.2016. *Completion date 30.06.2018 Work in progress. Full funds utilized.

442 1664 Const: of disposal / Sewerage Drainage PCC Gujranwala Approved 40.000 20.000 50.000 50.000 50.000 100% 90.000 50% Scheme Morr Eminabad Gharbi(Audo Rai) UC A.A. dated 07.01.2016. Maraliwala Tehsil & Distt Gujranwala T.S. dated 15.01.2016. *Start Date 05.02.2016. *Completion date 30.06.2018 Work in progress. Full funds utilized.

443 1665 Provision of Drainage Facilities at Tatley Aali, Gujranwala Approved 5.000 20.000 20.000 20.000 20.000 100% 25.000 100% A.A. dated 02.01.2016. Tehsil Nowshera Virkan Distt Gujranwala T.S. dated 05.01.2016. *Start Date 04.02.2016. *Completion date 30.06.2017 Scheme completed. 444 1666 Drainage, Sewerage & PCC UC Atawa, UC Rakh Gujranwala Approved 17.000 30.000 80.000 80.000 80.000 100% 97.000 35% A.A. dated 29.04.2016. Kikran Wali T.S. dated 03.05.2016. *Start Date 26.05.2016. *Completion date 30.06.2018 Work in progress. Full funds utilized.

445 1667 Provision of Drainage Facilities of Qila Mustafa Gujranwala Approved 10.000 7.500 8.300 8.300 8.300 100% 18.300 100% A.A. dated 29.04.2016. Abad Dera Jaat, Tehsil Nowshera Virkan Distt T.S. dated 02.05.2015. Gujranwala *Start Date 04.06.2016. *Completion date 30.06.2017 Scheme completed. 446 1668 Provision of Drainage Facilities at Tung Kalan, Gujranwala Approved 10.000 10.000 11.000 11.000 10.999 100% 20.999 100% A.A. dated 29.04.2016. Tehsil Nowshera Virkan Distt Gujranwala T.S. dated 02.05.2015. *Start Date 04.06.2016. *Completion date 30.06.2017 Scheme completed. 447 1669 Const. of Drainage / PCC UC Sharifpura Kamoki Gujranwala Approved 10.000 11.736 13.836 13.836 13.834 100% 23.834 100% Scheme completed. City 448 1670 Sewerage scheme For Kotli Peer Ahmad Shah Gujranwala Approved 40.000 15.000 28.000 28.000 28.000 100% 68.000 82% A.A. dated 07.09.2015. Adjacent Area District Gujranwala T.S. dated 05.10.2015. *Start Date 13.11.2015. *Completion date 30.06.2018 Work in progress. Full funds utilized. 449 1671 Provision of sewerage, Drainage and water Gujranwala Approved 40.000 5.000 65.000 65.000 65.000 100% 105.000 53% A.A. dated 02.12.2015. supply scheme in Qila Dedar Singh, Gujranwala T.S. dated 18.12.2015. *Start Date 29.02.2016. *Completion date 30.06.2018. Work in progress. Full funds utilized. 450 1672 Const: of Drain, PCC, Nullah & Solling etc at Hafizabad Approved 5.000 15.000 24.500 24.500 24.500 100% 29.500 98% Date of A.A 09.04.2016 Mohalla Iqbal Nagar Manget Meecha Date of T.S 12.04.2016 Date of Start 17-05-2016 , Date of completion 11-05-2017 Scheme completed.

451 1673 Rural Drainage Scheme, Chak Bhatti & Allied Hafizabad Approved 9.000 3.000 3.000 3.000 3.000 100% 12.000 100% Scheme completed. Abadies. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

452 1674 Rural Drainage Scheme,Kot Ishaq i/c Allied Hafizabad Approved 8.500 1.500 1.500 1.500 1.500 100% 10.000 100% Scheme completed. Abadies. 453 1675 Rural Drainage Scheme Solangi Khral i/c Allied Hafizabad Approved 8.500 4.500 4.500 4.500 4.500 100% 13.000 100% Date of A.A 07.09.2015 Abadies. Date of T.S 08.09.2015 Date of Start 07-12-2015 , Date of completion 06-06-2017 Scheme completed. 454 1676 Rural Drainage Scheme Solanwala i/c Allied Hafizabad Approved 8.500 6.500 6.500 6.500 6.500 100% 15.000 100% Scheme completed. Abadies. 455 1677 Rural Drainage Scheme Vanike Tarar & Allied Hafizabad Approved 8.500 11.500 11.500 11.500 11.500 100% 20.000 100% Scheme completed. Abadies. 456 1678 Rural Drainage scheme Bukkan Kalan Hafizabad Approved 18.000 11.591 11.591 11.591 11.591 100% 29.591 100% Scheme completed. 457 1679 Construction of Streets & Drains in 16 union Gujrat Approved 45.824 4.896 3.296 3.296 3.296 100% 49.120 97% A.A Date =12.12.2015 Councils District Gujrat T.S date=30.1.2015 Start date 05.03.2015. Completion date 30.06.2017 Scheme completed. 458 1680 Drainage/Sewerage and Water Supply Scheme M.B.Din Approved 77.175 29.458 4.788 4.788 4.786 100% 81.961 77% of Mangat and Rasul * Org. A.A Date. 03.10.2011 * Rev. A.A Date. 23.02.2013 * T.S Date. 18.11.2011 * Start Date 02.11.2011 * Completion date 30.06.2017. * Alloted work is complete. For balance work scheme needs revision. This will be alloted after successful completion of 1st phase.

459 1681 Provision of Sewerage / Drainage / Pavement in M.B.Din Approved 30.004 21.539 17.539 17.539 17.539 100% 47.543 92% * A.A Date. 28.01.2015 Halian & Ghanian, Tehsil Phalia * T.S Date. 08.02.2015 * Start Date 11.04.2015 * Completion date 30.06.2017. * Work in progress. Full funds utilized.

460 1682 Provision of Sewerage / Drainage / Pavement in M.B.Din Approved 30.000 21.540 16.040 16.040 15.964 100% 45.964 89% * A.A Date. 28.01.2015 Sarlay,Lasoori Kalan,Duggal, Phalia Boota (Incl. * T.S Date. 08.02.2015 THQ Hospital), Tehsil Pahila * Start Date 11.04.2015 * Completion date 30.06.2017. * Work in progress. Full funds utilized.

461 1683 Provision of Sewerage / Drainage System at M.B.Din Approved 17.995 15.000 25.319 25.319 25.300 100% 43.295 83% * A.A Date. 16.02.2015 Miana Gondal & Faqirian + Head Faqirian in * T.S Date. 28.02.2015 Constituency PP-118, Tehsil Malkwal * Start Date 16.05.2015 * Completion date 30.06.2017. Work in progress.

462 1684 Sewerage / Dranage Scheme Southren Side & M.B.Din Approved 14.000 15.000 36.100 36.100 36.099 100% 50.099 96% * A.A Date. 29.04.2015 Left Over Areas village Haria with Adjescent * T.S Date. 27.05.2015 Abadies * Start Date 22.06.2015 * Completion date 30.06.2017. * Scheme completed.

463 1685 Construction of Solling, Drainage, PCC & M.B.Din Approved 10.000 10.000 10.000 10.000 9.996 100% 19.996 100% * A.A Date. 10.02.2016 Sewerage in Villages/Dera Jaat Kotli Pandowal * T.S Date. 15.02.2016 * Start Date 01.06.2016 * Completion date 30.06.2017. * Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

464 1686 Sewerage/Drainage/Tuff tiles/PCC Scheme in M.B.Din Approved 30.000 15.008 15.008 15.008 15.008 100% 45.008 100% Villages Kailu,Kot Reman * A.A Date. 09.04.2016 Shah,Bambli,Sainthal,Sheikh Alipur,Chak Jano * T.S Date. 15.04.2016 Khurd, Aadu Sarwani, Lasoori Khurd, Kotla * Start Date 23.05.2016 * Completion date 30.06.2017. Mehmood Shah,Dhal,Kot Sattar * Scheme completed. Sharqi,daday,Chatkay,Phiray,Pir Bullah,Kot Ghulam Rasool and Phalia Ci 465 1687 Construction of streets/Drains/ Sewerage and M.B.Din Approved 20.000 20.000 20.000 20.000 19.951 100% 39.951 100% * A.A Date. 09.04.2016 Installation of filteration plant in PP-116 District * T.S Date. 15.04.2016 MB Din * Start Date 23.05.2016 * Completion date 30.06.2017. * Scheme completed. 466 1688 Rural Sewerage & Drainage Scheme Village M.B.Din Approved 23.000 31.350 28.520 28.520 28.511 100% 51.511 95% * A.A Date. 07.09.2015 Mianwal, Tehsil & District M.B. Din * T.S Date. 10.09.2015 * Start Date 17.12.2015 * Completion date 30.06.2017. * Scheme completed.

467 1689 Rural Sewerage / Drainage Scheme Village M.B.Din Approved 10.000 20.000 55.051 55.051 55.050 100% 65.050 84% * A.A Date. 07.09.2015 Gujra, Tehsil Malikwal, District M.B. DIN * T.S Date. 10.09.2015 * Start Date 17.12.2015 * Completion date 30.06.2017. * Scheme completed.

468 1690 Rural Sewerage / Drainage Scheme Village M.B.Din Approved 10.000 20.000 20.000 20.000 19.995 100% 29.995 52% * A.A Date. 07.09.2015 Kuthiala Sheikhan, Tehsil & District M.B. DIN * T.S Date. 10.09.2015 * Start Date 17.12.2015 * Completion date 30.06.2017. * Work in progress. Full funds utilized. 469 1691 Rural Sewerage/Drainage scheme village Bosal, M.B.Din Approved 37.000 15.000 35.000 35.000 34.987 100% 71.987 76% * A.A Date. 07.09.2015 Tehsil Malikwal, District M.B. Din * T.S Date. 10.09.2015 * Start Date 17.12.2015 * Completion date 30.06.2017. * Work in progress. Full funds utilized.

470 1692 Rural Drainage Scheme Village Mona Syedan, M.B.Din Approved 10.000 9.433 6.433 6.433 6.412 100% 16.412 84% * A.A Date. 07.09.2015 Tehsil Malikwal, District M.B. Din * T.S Date. 08.09.2015 * Start Date 17.12.2015 * Completion date 30.06.2017. * Scheme completed.

471 1693 Construction of RCC Sewer & RCC from Zohara Sialkot Approved 59.998 30.509 35.509 35.509 35.509 100% 95.507 106% *A.A Date =17.01.15 Memorial Hospital Chowk to Railway Crossing to *T.S date=02.03.15 Ajmal Garden to Shetab Garha to Adalat Pur Revised T.S=30.09.2016 road to Nullah Aik, Tehsil & District Sialkot *Start Date 31.03.15 *Completion date 30.06.2018. work in progress. Full funds utilized. 472 1694 Const: of Streets/drains & PCC & Village Saidpur Sialkot Approved 0.500 2.000 2.000 2.000 2.000 100% 2.500 100% *A.A Date =09.04.16 Kalan *T.S date=10.04.16 *Start Date 25.05.16 *Completion date 30.06.2017 Scheme completed. 473 1695 Const: of Streets/drains & PCC & Village Sialkot Approved 0.500 3.000 3.000 3.000 3.000 100% 3.500 100% *A.A Date =09.04.16 Partanwali *T.S date=10.04.16 *Start Date 28.05.16 *Completion date 30.06.2017 Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

474 1696 Providing & Laying of Sewer / Nullah & Tuff Tile Sialkot Approved 15.000 15.000 34.000 34.000 34.000 100% 49.000 100% *A.A Date =12.09.15 Mohlllah Dabouji Arrain, UC Doubrji Arrain, Distt. *T.S date=14.09.15 Sialkot *Start Date 24.12.15 *Completion date 30.06.2018 Work in progress.

475 1697 Providing & Laying of Sewer / Nullah & Tuff Tile Sialkot Approved 15.000 7.500 7.500 7.500 7.500 100% 22.500 100% *A.A Date =12.09.15 Mohallah Bogra, Street of Fateh garh Road etc. *T.S date=18.09.15 UC Fateh, Distt. Sialkot *Start Date 15.12.15 *Completion date 31.12.2016 Scheme completed. 476 1698 Construction of Sewerage at Village Phanget Sialkot Approved 5.000 6.667 6.667 6.667 6.660 100% 11.660 100% *A.A Date =09.04.16 *T.S date=12.04.16 *Start Date 17.05.16 *Completion date 31.12.2016 Work in progress. 477 1699 Providing Laying of Sewer/ Nullah & Tuff Tile Sialkot Approved 20.000 1.000 1.000 1.000 1.000 100% 21.000 100% Mohallah Din Pura, Eid Gah, Miana Pura, Scheme completed. Toheed Town, Jamia Kasjid Ramzan UC Miana Pura 478 1700 Providing Laying of Sewer/ Nullah & Tuff Tile Sialkot Approved 11.000 1.000 1.000 1.000 1.000 100% 12.000 100% Mohallah Bazar Ninasan Jandar Bazzar, Gali Scheme completed. Phoolan Wali, Galla Mandi, Gali Ch. Riaz & Path Jubli Garden Wala UC Imam Sahib 479 1701 Providing of Sewer. Nullah & Tuff Tile Mohallah Sialkot Approved 11.000 1.000 1.000 1.000 1.000 100% 12.000 100% Scheme completed. Islam Nagar Latif Abad UC Kotli Behram 480 1702 Construction of sewerage,drainage scheme Sialkot Approved 12.000 6.833 7.954 7.954 7.954 100% 19.954 100% *A.A Date =12.09.15 kisney wali rakhnay and Ittefaq pura,District *T.S date=21.09.15 Silkot. *Start Date 15.12.15 *Completion date 30.06.2017 Scheme completed. 481 1703 Construction of Sewerage,Drainage Scheme Sialkot Approved 18.000 9.087 10.351 10.351 10.351 100% 28.351 105% *A.A Date =12.09.15 Talwara Mughlan ,District Silkot. *T.S date=21.09.15 *Start Date 15.12.15 *Completion date 30.06.2017 Scheme completed. 482 1704 Construction of Nullah from Nullah Bhed Shell Sialkot Approved 20.000 13.000 27.363 27.363 27.363 100% 47.363 100% *A.A Date =12.09.15 pump chowk to Pakistan chowk to Nullah Phalko *T.S date=06.10.15 mehmood Ghaznavi road. *Start Date 24.12.15 *Completion date 30.06.2017 Scheme completed. 483 1705 Construction of PCC Streets and Drainage Sialkot Approved 15.000 8.729 8.729 8.729 8.729 100% 23.729 100% *A.A Date =12.09.15 Scheme Mohallah Nizamabad Shafi da Bhatta *T.S date=06.10.15 Pindian Arrian and Irshad Pura,District Sialkot. *Start Date 15.12.15 *Completion date 30.06.2017 Scheme completed. 484 1706 Construction of PCC Streets and Drainage Sialkot Approved 15.000 7.015 9.522 9.522 9.522 100% 24.522 100% *A.A Date =12.09.15 Scheme Bonga Jodey Wali Kurd,District Sialkot. *T.S date=06.10.15 *Start Date 15.12.15 *Completion date 30.06.2017 Scheme completed. 485 1707 Provision of PCC/Soling /Nalian/Streets Sialkot Approved 9.000 10.500 25.500 25.500 25.500 100% 34.500 117% *A.A Date =07.09.15 Schemes at Bohalwala Bashamula Chak *T.S date=11.09.15 Kheena, Kotli Nonaan, Kot Dharan, Badoki *Start Date 04.02.16 *Completion date 30.06.2018 Cheema, Kot Bhagat, Jalianwala,Ahmedabad Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

486 1708 Provision of PCC/Soling/nalian/Streets Schemes Sialkot Approved 9.000 10.500 15.500 15.500 15.500 100% 24.500 83% at Malkhanwala Bashamula Wan,Pasia, *A.A Date =07.09.15 Firdospu, Bangla Nai Abadi,Chak Basaow, Dhop *T.S date=11.09.15 *Start Date 04.02.16 Sari, Hameed Colony, Malowali, Abdullah Abad, *Completion date 31.12.2018 Dera Roshan Gujjar, Amreekh Pura Work in progress. Full funds utilized.

487 1709 Provision of PCC/Soling/nalian/Streets Schemes Sialkot Approved 9.000 10.500 15.500 15.500 15.500 100% 24.500 83% at Baigo Wala Bashamula Kot Marth, Kot *A.A Date =07.09.15 Muhammad Hussain, Pipli Wala, Teko Wala, *T.S date=11.09.15 Bego Wala Adda,Bhola Musa, Kotli Bawarian, *Start Date 04.02.16 Kot Khuda Yar, Kot Qadar Daar, Randheer, *Completion date 31.12.2018 Bagrian, Chak Kupa, Ghulab Garh, Doburji Cha Work in progress. Full funds utilized.

488 1710 Provision of PCC/Soling/nalian/Streets Schemes Sialkot Approved 4.000 15.000 60.000 60.000 60.000 100% 64.000 100% at Kopra Bashamula Kopra khurd, kopran kalan, *A.A Date =07.09.15 Dado Wali, Damyal, Dogranwali, Ghuman Wali, *T.S date=11.09.15 *Start Date 11.02.16 , Dera Mojdin, Dera Bhattian, *Completion date 31.12.2018 Mustgrh,kolti khokhran,kotli khurd, kotli khokhran Work in progress. Full funds utilized. klan, Dodowal, Sarankay 489 1711 Provision of PCC/Soling/nalian/Streets Schemes Sialkot Approved 4.000 15.000 65.000 65.000 65.000 100% 69.000 100% *A.A Date =07.09.15 at Nawan pind Bashamula Akbarabad, pandal, *T.S date=14.09.15 chnnu Moam, Majothra, kotla *Start Date 07.11.16 *Completion date 31.12.2018 Work in progress. Full funds utilized.

490 1712 Provision of PCC/Soling/nalian/Streets Schemes Sialkot Approved 19.000 15.000 48.900 48.900 48.900 100% 67.900 100% *A.A Date =07.09.15 at Sheeni Bashamula Chaila, bjola, Muljhan, *T.S date=14.09.15 Sagar, punowal rattowal Chogpur *Start Date 11.02.16 *Completion date 30.06.2018 Work in progress. Full funds utilized. 491 1713 Provision of PCC/Soling/nalian/Streets Scehmes Sialkot Approved 21.741 13.259 38.259 38.259 38.259 100% 60.000 100% at Majra kalan, Chak Ekhtiar, Dingowal, Mahiwal, *A.A Date =07.09.15 rakh Noshera, Khothay pardansingh (Islamabad) *T.S date=14.09.15 *Start Date 11.02.16 Khothay Chishtian, Dorarbe, Malianwala Jattan & *Completion date 30.06.2018 Arrian, Pano Attari Hussain Pur , Jamal Pur, Work in progress. Full funds utilized.

492 1714 Provision of Sewerage Drainage , PCC Solling, Sialkot Approved 1.000 9.000 0.000 0.000 0.000 0% 1.000 10% Drainage in UC( Construction of Streets & Drains PCC brick pavement/ Nullah Villages Jarwal, Chak Lala, Saidnial, Chawinda, Chobara, Chah Scheme already completed during 2015-16 and funds surrendered. Jatta, Kotli Mughlan, balowali, Uddowali, Dugri Harian, Sangraipur, Joy

493 1715 Provision of Sewerage Drainage , PCC Solling, Sialkot Approved 1.000 9.000 0.000 0.000 0.000 0% 1.000 10% Drainage in UC(Construction of Streets & Drains PCC brick pavement/ Nullah Villages Bauddi Scheme already completed during 2015-16 and funds surrendered. Dhoney, Salhowal, Kotli Lala, Peero Shah, Chak Alya, Behrampur, Bhooni, Bhagnian, Kot Kalal, Judhala, Kotli Tarkhanan, 494 1716 Provision of Sewerage Drainage , PCC Solling, Sialkot Approved 1.000 9.000 0.000 0.000 0.000 0% 1.000 10% Drainage in UC (Construction of Streets & Drains PCC brick pavement/ Nullah Villages Ramke, Scheme already completed during 2015-16 and funds surrendered. Mardana, Nakhey, Abdali, Salimke, Lalial, Ghumnal, Naju Chak, Salanke, Sangial, Merajke, Dinaga, Tourianwala, Chahal Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

495 1717 Provision of Sewerage Drainage , PCC Solling, Sialkot Approved 1.000 9.000 0.000 0.000 0.000 0% 1.000 10% Drainage in UC (Construction of Streets & Drains PCC brick pavement/ Nullah Villages Musapur, Gogial, Barthal, Dhamala Hakimwala, Sajanwala, Scheme already completed during 2015-16 and funds surrendered. Dosandiwal, Nandipur, Malike Sharaf Din, Joian, Umeranwali, Sabazpir

496 1718 Const. of Nullah from Sublime Chowk to Uggoki Sialkot Approved 70.000 20.000 100.000 100.000 100.000 100% 170.000 56% More to Sahowala Bridge to Syphonof Nullah Aik, Work in progress. Sialkot 497 1719 Const. of PCC Drainage / Sewerage Sialkot Sialkot Approved 30.000 5.000 23.000 23.000 23.000 100% 53.000 106% *A.A Date =07.09.15 *T.S date=14.09.15 * Date of work awarded 07-11-2015 * Completion date 31-12-2018 work in progress. Full funds utilized.

498 1720 Cosnt. Of Streets, Drains, PCC and Soling UC, Sialkot Approved 20.000 10.000 7.100 7.100 7.100 100% 27.100 68% Scheme completed. Balance funds re-appropriated. Bogray, Budha Goraya, Bharthanwala 499 1721 Sewerage scheme for Oncha Sadawala, Narowal Approved 29.927 21.442 21.442 21.442 21.023 98% 50.950 99% A.A Date.3.5.2014 Narowal. T.S Date*23.5.2014 Start Date 18.09.2014 *Completion date 30.06.2017. 1)T/well boring1.00 Cusec 1No 2)Pump House 100% completed. 3)P/Machinery 30BHP Installed 4)OHR 20000 Glns. 90% Completed 5)RCC sewer pipe 18" i/d 4260 Rft. 6)PVC pipe 3" i/d 32903Rft. 7)PVC pipe 4" i/d 5885Rft 8)PVC pipe 6" i/d 1360Rft. 9)Brick Pavement 9901Cft. 10)PCC flooring 20428Cft Pcc work is in full swing.

500 1722 Sewerage scheme for Ghaziwal, Narowal. Narowal Approved 24.995 13.529 13.529 13.529 13.229 98% 38.224 99% A.A Date.3.5.2014 T.S Date.23.5.2014 Start Date 18.09.2014 *Completion date 30.06.2017. Pumping machinery arranged at site. Available funds will be utilized.Structure of disposal work is 90% completed.

501 1723 Rural Drainage / Sewerage and installtion of Narowal Approved 20.000 8.787 8.787 8.787 8.785 100% 28.785 59% A.A Date.7.9.2015 water purificiton plant in village Mardowal, T.S Date .11.9.2015 Sharkargarh *Start Date 18.12.2015 *Completion date 17.06.2017. Work in progress. Full funds utilized. Additional funds Rs.8.300 rerquired fof completion of work. 502 1724 Rural Drainage PCC Scheme and installation of Narowal Approved 20.000 20.000 20.000 20.000 19.899 99% 39.899 77% water purification plant in Village Jabbal, A.A Date. 7.9.2015 T.S Date 11.9.2015 *Start Date 18.12.2015 *Completion date 17.06.2017. Work in porgress. Full funds utilized. 503 1725 Construction of PCC/Street/Nalian at Fazil Pur & Narowal Approved 20.000 14.820 14.820 14.820 14.780 100% 34.780 100% A.A Date. 7.9.2015 others(No.13 scheme ) T.S Date 11.9.2015 *Start Date 18.12.15 *Completion date 17.06.2017. Scheme completed. 504 1726 Sewerage, System in Basti Amin Pura, tehsil Lahore Approved 125.320 7.471 5.807 5.807 5.807 100% 131.127 99% Scheme completed, functional and handed over to TMA Iqbal Town Raiwind (left over area), Lahore Lahore for O&M. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

505 1727 Rural Drainage Scheme Kamahan & Adjoining Lahore Approved 57.003 14.248 37.467 37.467 37.467 100% 94.470 66% ●A.A by the Secretary vide No.SO(PH-S)9-1/2013(LHR),Dated: Abadies 09-04-2014 ●T.S by the C.E (N) PHED vide No.883/P&D-I, Dated:17-04-14 Start of work 9.5.2014 Date of completion 30.6.17 Scope of Work. Sullage Carrier =1 Job 70% Drain 70% PCC 80% ● Work is in progress.

506 1728 Disposal of Waste Water of Manga Mandi upto Lahore Approved 25.027 5.000 50.196 50.196 50.196 100% 75.223 49% ●Revised PC-I based on disposal station / pumping system River Ravi approved by DDSC on 18.12.2015 . ●A.A issued on 29.02.2016 ●Start of Work 8-04-2016. Date of completion 7.4.18 Scope of Work Disposal =1 Job 90% RCC Sewer/AC Force 90% Boundry wall 100% Sullage Carrier 50% Out fall structure 40% Brick pavement 55% ● Work is in progress.

507 1729 Provision of Sanitation Facilities including Lahore Approved 25.335 5.000 42.500 42.500 42.500 100% 67.835 72% ●A.A by the Commissioner Lahore vide No.Dir(D&F)1(88) /02 construction of Lift Station at Tahayat & Chandrai Dt.02-01-2015 Village, Lahore. ●T.S by the Chief Engineer (N) vide No.24/P&D/CS, Dated: 02.02.2015 ●Start of Work 8-12-2015. Date of completion 30.6.17 Scope of Work Disposal station =1 Job 100% RCC Sewer =1 Job 90% Drain 90% Brick pavement 50% PCC 80% Sullage Carrier 70% E.Connection 100% ●Work is in progress. ●Scheme functional. 508 1730 Project Devlopment of Mission Colony Raiwind Lahore Approved 38.000 10.447 3.447 3.447 3.447 100% 41.447 86% Scheme completed. Lahore into a Model Colony Distt. Lahore 509 1731 PCC & Drainage at Salamatpura and adjoining Lahore Approved 60.000 19.819 40.369 40.369 40.347 100% 100.347 100% Scheme completed. abadies,lahore 510 1732 Construction of PCC and Drainage at Manga Lahore Approved 8.000 15.000 25.000 25.000 25.000 100% 33.000 17% ●A.A by Secretary vide No. SO(PH-S)8-8/2015(DDSC), dated. Mandi 09.12.2015 ●T.S by the Chief Engineer PHE Department Lahore vide No. 2154/P&D-I dt: 18.12.2015 Start of work 9.3.2016 Date of completion 8.3.2018 ● Scope of work RCC Sewer =1 Job 50% Drain Brick pavement PCC 10% Tuff tile Nallah =1 Job 30% ● Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

511 1733 Construction of PCC and Drainage at Khurd Pur Lahore Approved 6.000 15.000 15.000 15.000 15.000 100% 21.000 29% ●A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/513, dated. 17.08.2015 ●T.S by Chief Engineer (N) vide No. 1179/P&D-I dt: 27.08.2015. Start of work 30.9.2015 Date of completion 30.6.2018 Scope of work Sullage carreir =1 Job 90% Drain 10% PCC 50% Brick pavement ● Work is in progress

512 1734 Construction of PCC and Drainage at Chung Lahore Approved 6.000 15.000 39.025 39.025 39.025 100% 45.025 35% ●A.A by Secretary vide No. SO(PH-S)8-8/2015(DDSC), dated. 06.11.2015 ●T.S by the Chief Engineer PHE Department Lahore vide No. 2154/P&D-I dt: 04.12.2015 Start of work 26.1.2016 Date of completion 30.6.2018 Scope of work Nallah =1 Job 100% PCC 40% Brick pavement 10% ● Work is in progress. 513 1735 PCC & Drainage Scheme in Dullu Kalan and Lahore Approved 114.000 5.907 2.977 2.977 2.976 100% 116.976 98% Scheme completed. Khurd and Adjoining Abadies, UC-142 514 1736 PCC & Drainage Scheme in Kot Pars Ram, Azad Lahore Approved 55.000 10.000 5.136 5.136 5.101 99% 60.101 92% Town, Gulvera, Shehzada, Asal Suleman, UC- Scheme completed. 150, 515 1737 PCC & Drainage Scheme in Jia Bhagga, Kingra Lahore Approved 70.000 10.000 0.000 0.000 0.000 0% 70.000 88% and Karyal, Khana Nepal, Jheedo, UC-147, Scheme completed.

516 1738 PCC & Drainage Scheme in Mehdipur, Rorra Lahore Approved 25.000 10.000 0.000 0.000 0.000 0% 25.000 71% Scheme completed. Bhogan Nepal, UC-66, 517 1739 Construction of PCC Nallah Different Streets Lahore Approved 10.386 5.615 5.615 5.615 5.615 100% 16.001 100% Scheme completed Jallo Village Manawan Village UC-52 Lahore 518 1740 Construction of PCC and Drainage at Sheikh Da Lahore Approved 13.000 15.000 32.028 32.028 32.028 100% 45.028 108% Scheme completed. Kot,lahore 519 1741 Construction of PCC and Drainage at Lahore Approved 13.000 15.000 28.525 28.525 28.407 100% 41.407 102% Scheme completed. Pajian,lahore 520 1742 Construction of PCC and Drainage at Maanak Lahore Approved 8.000 15.000 24.267 24.267 23.972 99% 31.972 89% Scheme completed. 521 1743 Construction of PCC and Drainage at Mohlanwal Lahore Approved 11.077 15.000 26.614 26.614 26.607 100% 37.684 72% ●A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/513, dated. 17.08.2015 ●T.S by the Chief Engineer (N) vide No. 1184/P&D-I dt: 27.08.2015 Start of work 30.9.2015 Date of completion 30.6.2017 Scope of work Sullage Carrier =1 Job 85% Drain 70% PCC 90% Brick pavement 65% ● Work is in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

522 1744 Construction of PCC and Drainage at Adda Lahore Approved 6.000 10.000 9.658 9.658 9.657 100% 15.657 52% ●A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/513, Talaab Saral dated. 17.08.2015 ●T.S by the Chief Engineer (N) vide No. 1204/P&D-I dt: 27 .08.2015 Start of work 30.9.2015 Date of completion 30.6.2017 Scope of work Sullage Carrier =1 Job 90% Drain 100% PCC 85% Brick pavement 70% ● Due to community conflict, work held up. 523 1745 Construction of Drain in Manawan Village Lahore Lahore Approved 7.665 2.087 2.037 2.037 2.035 100% 9.700 99% Scheme completed.

524 1746 Rural Drainage Scheme Faizpur Khurd IIc Sheikhupura Approved 42.750 15.000 15.000 15.000 15.000 100% 57.750 38% Work in progress abadis, Tehsil Ferozewala 525 1747 Rural Drainage & PCC Scheme UC Dhamkey Sheikhupura Approved 27.000 15.000 35.000 35.000 35.000 100% 62.000 62% Work in progress Approved Sheikhupura , Ferozwala 526 1748 Rural Drainage & PCC Scheme UC Mahmood Sheikhupura Approved 41.000 6.335 21.335 21.335 21.335 100% 62.335 132% Work in progress Kot, Sheikhupura , Sharqpur 527 1749 Rural Drainage & PCC Tuff Tile Scheme UC Sheikhupura Approved 30.000 15.000 19.000 19.000 19.000 100% 49.000 50% Work in progress Sharqpur, Sheikhupura 528 1750 Rural Drainage & PCC Scheme UC Sheikhupura Approved 56.200 31.195 31.195 31.195 31.195 100% 87.395 100% Work in progress QuershianApproved Sheikhupura , Sharqpur 529 1751 Rural Drainage & PCC Scheme UC Mandain Sheikhupura Approved 32.886 15.000 50.000 50.000 50.000 100% 82.886 83% Work in progress WalaApproved Sheikhupura , Sharqpur 530 1752 Rural Drainage & PCC Scheme UC Marh Sheikhupura Approved 50.000 15.000 15.000 15.000 15.000 100% 65.000 65% Work in progress Bhaguwan Approved Sheikhupura 531 1753 Rural Drainage & PCC Scheme UC Sahjowal Sheikhupura Approved 48.500 10.296 10.296 10.296 10.296 100% 58.796 100% Work in progress Approved Sheikhupura , Sharqpur 532 1754 Rural Sewerage & Drainage System at Village Sheikhupura Approved 26.700 15.000 15.000 15.000 15.000 100% 41.700 29% Work in progress Kot Pindi Das Tehsil Ferozewala, Distt. Sheikhupura Approved Sheikhupura 533 1755 Rural Drainage & PCC Scheme, UC Sehjowal Sheikhupura Approved 35.915 15.000 35.000 35.000 35.000 100% 70.915 76% Work in progress Distt: Sheikhupura (Revised Rs. 26.095 to 93.095), Sheikhupura 534 1756 Rural Drainage & PCC Scheme, UC Faizpur Sheikhupura Approved 53.720 39.377 39.377 39.377 39.377 100% 93.097 100% Work in progress Kalan Distt: Sheikhupura Approved Sheikhupura

535 1757 Rural Drainage & PCC Scheme, UC-Mhar Sheikhupura Approved 54.805 30.000 30.000 30.000 30.000 100% 84.805 88% Work in progress Bhanguwan Distt: Sheikhupura Approved 536 1758 Rural Drainage & PCC Scheme, UC- Easan Sheikhupura Approved 52.487 30.000 90.000 90.000 90.000 100% 142.487 116% Work in progress (Qureshianwala) Distt: Sheikhupura (Revised Rs. 29.915 to 97.245) 537 1759 Rural Drainage & PCC Scheme, UC Baddo Distt: Sheikhupura Approved 40.000 3.966 88.148 88.148 88.148 100% 128.148 135% Work in progress Sheikhupura (Revised Rs.45.50 to 94.644)Approved Sheikhupura , Ferozwala 538 1760 Rural Drainage & PCC Scheme, Wandala Dial Sheikhupura Approved 84.065 14.306 129.306 129.306 129.306 100% 213.371 148% Work in progress Shah UC-24 Distt: Sheikhupura (Revised Rs. 47.10 to 95.557) Approved Sheikhupura 539 1761 Rural Drainage & PCC Scheme, Wandala Dial Sheikhupura Approved 82.125 12.992 115.992 115.992 115.992 100% 198.117 138% Work in progress Shah UC-25 Distt: Sheikhupura (Revised Rs. 47.50 to 95.557) Approved Sheikhupura 540 1762 Const. and Rehabilitation PCC / Sewerage Sheikhupura Approved 21.850 15.000 35.000 35.000 35.000 100% 56.850 59% Work in progress Scheme of City Muridke, District Sheikhupura Approved Sheikhupura , Muridke Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

541 1763 Const. and Rehabilitation PCC / Sewerage Sheikhupura Approved 21.210 15.000 15.000 15.000 15.000 100% 36.210 38% Work in progress Scheme of Ravi Rayan, Mannu Abad and Nazar Abad District Sheikhupura Muridke 542 1764 Provision of PCC in Streets and Sanitation and Sheikhupura Approved 21.900 8.100 8.100 8.100 8.100 100% 30.000 100% Work in progress Sewerage System in UC Rata Gujran, UC Mehta Suja and UC ahdain Tehsil Muredky Muridke

543 1765 Balance work of Sewerage, Water supply and Sheikhupura Approved 48.000 30.000 80.000 80.000 80.000 100% 128.000 136% Work in progress.Balance funds are required to complete PCC Scheme Town Committtee Kot Abdul Malik, the scheme in next financial year. District Sheikhpura 544 1766 Rural Drainage & Constt. Of Street Scheme Sheikhupura Approved 25.000 15.000 35.000 35.000 35.000 100% 60.000 84% Work in progress Chak No. 44,45 and Village Jair, District Sheikhpura 545 1767 Rural Drainage & Constt. Of Street Scheme Sheikhupura Approved 28.000 15.000 97.000 97.000 97.000 100% 125.000 132% Work in progress Dograi Gill Qadeem Dograi Gill District Sheikhpura 546 1768 Rural PCC and Drainge Scheme Ghuchli 28.500 Sheikhupura Approved 23.490 5.000 5.000 5.000 5.000 100% 28.490 100% Work in progress Virkan Tehsil Muridke Muridke 547 1769 Construction of Drainage /PCC/Soling Scheme at Sheikhupura Approved 41.110 15.000 15.000 15.000 15.000 100% 56.110 45% Work in progress Khanqah Dogran Safdarabad 548 1770 Rural Drainage Scheme UC Chapa Minera Sheikhupura Approved 6.700 15.000 30.000 30.000 30.000 100% 36.700 42% Work in progress Sheikhupura 549 1771 Rural Drainage Scheme UC Jahamke Sheikhupura Approved 6.700 15.000 30.000 30.000 30.000 100% 36.700 39% Work in progress Sheikhupura 550 1772 Rural Drainage Scheme UC Mallian Kalan Sheikhupura Approved 6.800 15.000 25.000 25.000 25.000 100% 31.800 34% Work in progress Sheikhupura 551 1773 Rural Drainage Scheme UC Chichoki Malian Sheikhupura Approved 5.000 15.000 25.000 25.000 25.000 100% 30.000 35% Work in progress Sheikhupura 552 1774 Rural Drainage Scheme UC Khanpur Approved Sheikhupura Approved 16.900 15.000 153.000 153.000 153.000 100% 169.900 211% Work in progress Sheikhupura , Ferozwala 553 1775 Rural drainage & Const of streets scheme UC Sheikhupura Approved 35.775 15.000 25.000 25.000 25.000 100% 60.775 86% Work in progress Mandialy Sheikhupura 554 1776 Rural drainage & Const of streets scheme UC Sheikhupura Approved 35.850 15.000 49.436 49.436 49.436 100% 85.286 100% Work in progress Qila Sattar Shah Sheikhupura 555 1777 Rural drainage & Const of streets scheme UC Sheikhupura Approved 45.910 15.000 90.462 90.462 90.462 100% 136.372 145% Work in progress Khan pur Sheikhupura 556 1778 Rural drainage & Const of streets scheme Zia Sheikhupura Approved 15.905 20.071 30.071 30.071 30.071 100% 45.976 128% Work in progress abad Sheikhupura 557 1779 Rural Drainage Scheme Afzal Kot, Madina Sheikhupura Approved 4.000 5.000 5.000 5.000 5.000 100% 9.000 100% Work in progress Colony, Mumtaz Park & Kahtta Mandi 558 1780 Rural Drainage Scheme Mubarikabad Sheikhupura Approved 2.000 2.000 2.000 2.000 2.000 100% 4.000 100% Work in progress 559 1781 Rural Drainage Scheme Zafar Park & People Sheikhupura Approved 4.000 5.000 5.000 5.000 5.000 100% 9.000 100% Work in progress Colony 560 1782 Rural Drainage Scheme Salamat Pura, Rakh Sheikhupura Approved 8.591 6.000 6.000 6.000 6.000 100% 14.591 100% Work in progress Bouly 561 1783 Construction of PCC / Tuff Tiles / Sewerage & Sheikhupura Approved 30.000 30.000 110.000 110.000 110.000 100% 140.000 37% Work in progress Drainage Scheme in PP-163, District Sheikhupura Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

562 1784 Construction of Soling / Sewerage & Drainage Sheikhupura Approved 30.000 20.000 20.000 20.000 20.000 100% 50.000 50% Work in progress Scheme at UC Anjianwala, UC Jhabran, UC Kakar Gill, UC Gujiana Nau, UC Kot Sohnda, UC Esserkay, UC Bahalikay, UC Jatri Kohna, UC 85Farooqabad, UC Ghazi Minara, UC Buttar, UC Jhandian Wali, UC Warn, UC Kalokay Construction of PCC /Soling/Sewerage and Drainage Scheme District Sheikhupura.

563 1785 Rural Drainage and PCC scheme Jandiala Sher Sheikhupura Approved 35.000 30.000 30.000 30.000 30.000 100% 65.000 87% Work in progress Khan, District Sheikhupura 564 1786 Const: of Drain/Solling/PCC & Nullah at UC Nankana Approved 15.000 5.000 13.795 13.795 13.795 100% 28.795 96% Drains 9352/14536 Rft Warburton Sahib PCC 42944/54289 Cft Brick pavement 12377/4843 Cft S/ Carrier 1.5'x1.5' 1864/3843 Rft 1.25'x1.25' 119/260 Rft 1.0'x1.25' 880/580 Rft 1.00x1.00 650/- 1.5x1.25 290/- 2x2.50 1000/- Work is in progress.

565 1787 Const: of Drain/Solling/PCC & Nullah at UC Nankana Approved 15.000 10.000 13.774 13.774 13.774 100% 28.774 96% Drains 3622/8167 Rft Ganaishpur Sahib PCC 28385/76476 Cft Brick pavement 12092/13095 Cft S/ Carrier 1.5'x1.5' 975/1750 Rft 1.25'x1.25' 104/1484 Rft 1.0'x1.25' 175/1484 Rft Work is in progress.

566 1788 Const: of Drain/Solling/PCC & Nullah at UC Nankana Approved 15.000 10.000 14.350 14.350 14.350 100% 29.350 98% Drains 4103/12124 Rft Jewaharpur Sahib PCC 30019/69003 Cft Brick pavement 1047/3465 Cft S/ Carrier 1.5'x1.5' 1800/2850 Rft 1.25'x1.25' 104/1484 Rft 1.0'x1.25' 175/1484 Rft Work is in progress.

567 1789 Const: of Drain/Solling/PCC & Nullah at UC Nankana Approved 15.000 10.000 14.350 14.350 14.350 100% 29.350 98% Drains 7967/5836 Rft Jogay Kot Nau Bahar Sahib PCC 51155/79807 Cft Brick pavement 11405/4095 Cft S/ Carrier 1.5'x1.5' 2800/3400 Rft 1.25'x1.25' 104/1484 Rft 1.0'x1.25' 290/1484 Rft Work in Progress. 568 1790 Construction of Drains/Soling/PCC & Naullah Nankana Approved 50.000 15.000 33.150 33.150 33.150 100% 83.150 69% Drains 44440/63350 Rft Schemes in PP-171 District Nankana Sahib Kari Sahib Brick pavement 45337/ 208175 Cft Wala, Chak No.49/RB, Chak No.25/RB Sathyali PCC in streets 203077/115239 Cft Sullage Carrier Kalan and Sathyali Khurd, Nullah at Walipur Bora 1.5'x1.5' 4500/22400 Rft i/c Mashmoola Jaat Nullah at Sheroki Work is in progress. Safdarabad, Nankana Sahib. 569 1791 Rural Drainage Scheme Rattian Chak No.5/RB, Nankana Approved 13.844 3.165 2.315 2.315 2.315 100% 16.159 95% Sullage Carrier 1.5x1.5 6216/6216 Rft Muhajran & including Abadies Marrh Sharki, Sahib Surface Drain Type-1 16519/16519 Rft Brick Pavement 27059/27059 Cft Marrh Gharbi, District Nankana Sahib PCC 19511/19511 Cft Court Case, contractor's liabilities paid. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

570 1792 Rural Drainage Scheme Matta Beroon Matta Kasur Approved 28.997 2.212 5.012 5.012 5.011 100% 34.008 100% Date of A.A :05.11.2014 Revised Date of A.A :Nil Date of T.S :06.11.2014 Date of Award :15/10/2014 Scheduled date of Completion on :15/10/2016 Revised date of Completion :15/10/2016 Date of Commencement :30/06/2016 Surface Drains= 15799/25825 Rft, Brick Pavement = 96210/100644 Cft, Sullage Carrier= 4492/4450 Rft Work in Progress 571 1793 Rural Drainage Scheme Paimar Otar Kasur Approved 40.045 13.007 13.991 13.991 13.991 100% 54.036 100% Date of A.A :01/09/2014 Revised Date of A.A :Nil Date of T.S :10/09/2014 Date of Award :20/10/2014 Scheduled date of Completion on :14/10/2015 Revised date of Completion :14/10/2015 Date of Commencement :20/10/2014 Surface Drains= 6447/27378 Rft, PCC Flooring = 53983/54863 Cft, Brick Pavement = 18004/19025 Cft, Sullage Carrier= 5825/6500 Rft, Oxidation Pond 80%/1 No. Work in Progress

572 1794 Rural Drainage PCC Scheme Theh Shaikham Kasur Approved 43.045 15.000 46.500 46.500 46.417 100% 89.462 100% Date of A.A :21/05/2014 and Adjoining Abadies District Kasur. Revised Date of A.A : Date of T.S :05/08/2014 Date of Award :22/10/2014 Scheduled date of Completion on :21/10/2016 Revised date of Completion :21/10/2016 Date of Commencement :22/10/2014 Surface Drains= 16390/46550 Rft, PCC Flooring = 15754/54428 Cft, Brick Pavement = 53357/174025 Cft, Sullage Carrier= 19365/25710 Rft

573 1795 Rural Drainage Scheme Gaggar (Revised) Kasur Approved 59.721 2.131 0.131 0.131 0.126 96% 59.847 97% Date of A.A :10/09/2007 Revised Date of A.A :02/05/2014 Date of T.S :08/10/2007 Date of Award :11/12/2007 Scheduled date of Completion on :10/06/2008 Revised date of Completion :30/06/2016 Date of Commencement :11/12/2007 Drains Type-I= 19906 Rft/21824 Rft, Brick Pavement= 88152 Cft/127054 Cft, Pacca Sullage Carrier 1.5x1.5= 8613 Rft/6867 Rft, Const. of Park= 1/1 No Scheme Completed in saving and funds reappropriated. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

574 1796 Sewerage/ Drainage Scheme, Habibabad Kasur Approved 100.003 14.148 22.230 22.230 22.230 100% 122.233 100% Date of A.A :09/05/2012 Revised Date of A.A :Nil Date of T.S :10/05/2012 Date of Award :02/06/2012 Scheduled date of Completion on :01/12/2013 Revised date of Completion :30/06/2016 Date of Commencement :02/06/2012 Screenign Chamber= 1/ 1 No., Collecting Tank= 1/ 1 No., Pumping Chamber= 1/ 1 No., Pumping Machinery= 2 No./ 2 No., Generator & Generator Room = 1/ 1 No., Electric Connection = 1 No./ 1 No , Staff Quarter= 2/ 2 No., Discharge Sump= 1 No/ 1 No., Boundary Wall=1 No./ 1 No., Sullage Carrier 3x2 = 5200 Rft/5200 Rft, RCC Sewer 9"i/d= 27445 Rft/ 34500 Rft, 12"i/d= 2689 Rft/ 5430 Rft, 15"i/d= 408Rft/ 1948 Rft, 18"i/d= 2695Rft/ 2644 Rft , 21"i/d= 667 Rft / 688Rft, 24"i/d= 730 Rft/ 785 Rft, 27"i/d= 1984 Rft/ 2130 Rft, Sullage Carrer 1.5x1.5= 2655 Rft/ 2800 Rft, Drains Type-I= 21436Rft/ 21450 Rft, Brick Pavement= 105020Cft/ 106331 Cft Work In Progress

575 1797 PCC & Drainage Scheme Jamber Kalan & Khurd Kasur Approved 84.609 19.865 11.365 11.365 11.339 100% 95.948 92% Date of A.A :21/05/2014 i/c adjoining Abadies of Kot Khushi & Kot Mand. Revised Date of A.A :Nil Date of T.S :05/08/2014 Date of Award :05/09/2014 Scheduled date of Completion on :04/09/2016 Revised date of Completion :04/09/2016 Date of Commencement :05/09/2014 Surface Drains= 37734 Rft/34685 Rft, PCC Pavement = 225415Cft/180277 Cft, Sullage Carrier 2'x2'= 300/300 Rft, Sullage Carrier 1.5'x1.5'= 2800Rft/2800 Rft Work in Progress

576 1798 Rural Drainage Scheme, Lakhankey, Tehsil & Kasur Approved 28.000 15.000 30.000 30.000 29.832 99% 57.832 81% Date of A.A :02.29.01.2015 District Kasur. Revised Date of A.A :Nil Date of T.S :19.02.2015 Date of Award : 01.04.2015 Scheduled date of Completion on : 31.03.2017 Revised date of Completion : 31.03.2017 Date of Commencement : 01.04.2017 SUrface Drains= 13286/56535 Rft, RBick Pavement = 79379/165250 Cft, Sullage Carrier= 15081/18000 Rft, Oxidation Pond= 0/1 Jobs Work in Progress

577 1799 Rural Drainage Scheme Baroon Raja Jang & Kasur Approved 38.960 15.000 25.800 25.800 25.798 100% 64.758 62% Date of A.A :21.29.01.2015 Adjoining Abadies, Tehsil & District Kasur. Revised Date of A.A :Nil Date of T.S :19.02.2015 Date of Award : 27.03.2015 Scheduled date of Completion on : 26.03.2017 Revised date of Completion : 26.03.2017 Date of Commencement : 27.03.2015 Const. of Drains= 16281/61400 Rft, Brick Pavement= 123799/350239 Cft, Sullage Carrier 1.5x1.5'= 17304/20505, Oxidation Pond= 0/ 2 Job.Bunderywall 0/2 Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

578 1800 Rural Drainage Scheme Sarhali Kalan & Kasur Approved 23.991 15.000 25.000 25.000 25.000 100% 48.991 50% Date of A.A :02.29.01.2015 Adjoining Abadies, Tehsil & District Kasur. Revised Date of A.A :Nil Date of T.S :19.02.2015 Date of Award : 01.04.2015 Scheduled date of Completion on : 31.03.2017 Revised date of Completion : 31.03.2017 Date of Commencement : 01.04.2015 Const. of Drains= 3126/67230 Rft, Brick Pavement= 47476/230922 Cft, Sullage Carrier = 10584/11240 Rft, Oxidation Pound 0/1 Sullage Pump 0/1 Boundarywell 0/01 Job Work in Progress

579 1801 Rural Drainage & Pcc Scheme Bohar And Kasur Approved 17.500 15.000 35.000 35.000 34.984 100% 52.484 62% Date of A.A :09.02.2015 Adjoining Abadies District Kasur. Revised Date of A.A :Nil Date of T.S : 26.03.2015 Date of Award : 13.05.2015 Scheduled date of Completion on :12.05.2017 Revised date of Completion : :12.05.2017 Date of Commencement :13.05.2015 Const. of Drains= 12796/82550 Rft, PCC flooring Brick Pavement= 77711/115765+25625 Cft, Sullage Carrier 1.5x1.5'= 6162/16841 Oxidation Pond= 0/ 2 Job. Work in Progress

580 1802 Rural Drainage & Pcc Scheme Bhamba Kalan & Kasur Approved 22.500 15.000 45.000 45.000 44.981 100% 67.481 68% Date of A.A :09.02.2015 Khurd And Adjoining Abadies District Kasur. Revised Date of A.A :Nil Date of T.S :26.03.2015 Date of Award : 13.05.2015 Scheduled date of Completion on :12.05.2017 Revised date of Completion : :12.05.2017 Date of Commencement :13.05.2015 Scheduled date of Completion on :12.05.2017 Scheduled date of Completion on :12.05.2017 Revised date of Completion : :12.05.2017 Date of Commencement :13.05.2015 Const. of Drains= 11960/184476 Rft, PCC flooring 7079/393639 Brick Pavement= 57023/858246 Cft, Sullage Carrier 1.5x1.5'=0/29850 Sullage Carrier 2x2'=6010/19200 Work in Progress

581 1803 Rural Drainage PCC Scheme Dholan District Kasur Approved 47.500 15.000 48.500 48.500 48.484 100% 95.984 92% Date of A.A :28.05.2014 Kasur. Revised Date of A.A :Nil Date of T.S :24.10.2014 Date of Award :18.11.2014 Scheduled date of Completion on :17.08.2017 Revised date of Completion :17.08.2017 Date of Commencement 18.11.2014 Surface Drains = 43229/79520 Rft, PCC Flooring= 29541/82561 Cft, Brick Pavement = 89715/147627 Cft, Sullage Carrier= 16900/20895, Oxidation Pond= 1/2 Nos., Sullage Pump= 0/2 Nos. Work in Progress

582 1804 Rural Drainage Scheme Sheikhamad, Kasur Approved 2.500 2.724 3.200 3.200 3.198 100% 5.698 109% Date of A.A 18.05.2015 Nathewala, Faqrey Wala & Nayekey, District Revised Date of A.A Kasur Date of T.S :25.06.2015 Date of Award :20.02.2016 Scheduled date of Completion on 19.06.2016 Revised date of Completion : 30.06.2017 Date of Commencement 20.02.2016 Drain 0/3330Rft B/Pavement 16338/16482 Cft Sullage Carier 1.5x1.5 1187/1567 Rft Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

583 1805 Rural Drainage Scheme Kaisar Garh, Maan Kasur Approved 2.500 2.715 3.334 3.334 3.326 100% 5.826 112% Date of A.A 18.05..2015 Bhamni wala, Harihar, District Kasur Revised Date of A.A Date of T.S :25.06.2015 Date of Award :20.02.2016 Scheduled date of Completion on 19.06.2016 Revised date of Completion : 30.06.2017 Date of Commencement 20.02.2016 Drain 2517/4830 Rft B/Pavement 11147/16712 Cft Sullage Carier 1.5x1.5 312/625 Rft Work in progress 584 1806 Rural Drainage Scheme Chanda Singh, Kasur Approved 2.500 2.722 3.963 3.963 3.945 100% 6.445 123% Date of A.A 18.05.2015 Pikhiwind, Dhoop Sari & Sehjra, District Kasur Revised Date of A.A Date of T.S :09.06.2015 Date of Award :20.02.2016 Scheduled date of Completion on 19.06.2016 Revised date of Completion : 30.06.2017 Date of Commencement 20.02.2016 Drain 1546/1920 Rft B/Pavement 11287/12940 Cft Sullage Carier 1.5x1.5 1716/2766 Rft Work in progress 585 1807 Rural Drainage Scheme Hardo Sahari & Kasur Approved 2.500 2.713 2.713 2.713 2.158 80% 4.658 89% Date of A.A 18.5.2015 Havellian, District Kasur Revised Date of A.A Date of T.S :09.06.2015 Date of Award :20.02.2016 Scheduled date of Completion on 19.06.2016 Revised date of Completion : 30.06.2017 Date of Commencement 20.02.2016 Drain 1129/300 Rft B/Pavement 12536/17181 Cft Sullage Carier 1.5x1.5 329/2383 Rft Work in progress 586 1808 Rural Drainage Scheme Qadiwind Kasur Approved 20.000 10.000 29.500 29.500 29.500 100% 49.500 50% Date of A.A 20.11.2015 Date of T.S :24.03.2016 Date of Award :28.04.2016 Scheduled date of Completion on 27.04.2018 Revised date of Completion : Date of Commencement : 28.04.2016 Surface Drains =6696/76750 Rft, Brick Pavement = 48941/229979 Cft, Sullage Carrier1.5 x 1.5= 816/12750, Sullage Carrier 2 x 2=465/8430 2x1 0/950 2x1.5 0/1500 3x2.5 0/200 Oxidation Pond= 0/1 Nos., Sullage Pump= 0/1 Nos. Work in progress

587 1809 Rural PCC & Drainage Scheme Green Kot and Kasur Approved 20.000 15.000 35.000 35.000 34.971 100% 54.971 70% Date of A.A :17.08.2015 Ibrahimabad & Adjoining Abadies District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :02.10.2015 Scheduled date of Completion on :01.10.2017 Revised date of Completion : :01.10.2017 Date of Commencement :02.10.2015 Surface Drains =9000/33252 Rft, PCC Flooring= 40225/49447 Cft, Brick Pavement = 37167/145714 Cft, Sullage Carrier1.5 x 1.5= 8566/14900, Sullage Carrier 2 x 2=15061/3500 Oxidation Pond= 0/1 Nos., Sullage Pump= 0/1 Nos. Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

588 1810 Rural Drainage Scheme Cheena Arla Tehsil & Kasur Approved 17.500 19.048 17.048 17.048 16.855 99% 34.355 94% Date of A.A :17.08.2015 District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :29.09.2015 Scheduled date of Completion on 28.09.2017 Revised date of Completion : 28.09.2017 Date of Commencement :29.09.2015 Surface Drains =9037/18258 Rft, PCC Flooring= 15921/28310 Cft, BP 100956/88802 Sullage Carrier1.5 x 1.5= 2975/4140, Work Work in progress

589 1811 Rural Drainage & PCC Scheme Mudke UC Kasur Approved 20.000 15.000 38.900 38.900 38.892 100% 58.892 58% Date of A.A :17.08.2015 District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :06.10.2015 Scheduled date of Completion on 05.10.2017 Revised date of Completion : Nil Date of Commencement :06.10.2015 Surface Drains =19794/65920 Rft, PCC Flooring= 47652/108524 Cft, BP 3576/135226 Sullage Carrier1.5 x 1.5= 2972/8142Carrier 2x2= 0/5600 Oxidation Pound 0/01 Work in progress

590 1812 Rural PCC & Drainage Scheme Roosa Bail & Kasur Approved 19.000 15.000 31.358 31.358 31.311 100% 50.311 97% Date of A.A :17.08.2015 Adjoining abadies District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :07.10.2015 Funds Relesed On; 14.10.2015 Surface Drains =19534/42119 Rft, PCC Flooring= 60229/35370 Cft, BP 45077/75257 Sullage Carrier1.5 x 1.5= 3975/7496Carrier 2x2= 1239/1200 Oxidation Pound 0/01 Work in progress 591 1813 Rural PCC & Drainage Scheme Zafarkey and Kasur Approved 17.000 15.000 22.320 22.320 22.307 100% 39.307 75% Date of A.A :17.08.2015 Ghanikey & adjoining abadies District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :23.09.2015 Scheduled date of Completion on 22.09.2017 Revised date of Completion : Nil Date of Commencement :23.09.2015 Surface Drains =6606/40545 Rft, PCC Flooring= 655/7990Cft, BP 87810/132384Sullage Carrier1.5 x 1.5= 6995/6350Carrier 2x2= 0/1130 Oxidation Pound 60 %/01 Work in progress

592 1814 Rural PCC & Drainage Scheme Handal and Kasur Approved 17.000 15.000 38.300 38.300 38.276 100% 55.276 88% Date of A.A :17.08.2015 Rawal Jhangar & adjoining abadies District Revised Date of A.A :Nil Kasur. Date of T.S :27.08.2015 Date of Award :07.10.2015 Date of Completion 06.10.2017 Surface Drains =607/31480 Rft, PCC Flooring= 0/12007Cft, BP 175727/193546Sullage Carrier1.5 x 1.5= 2645/11331Carrier 2x2= 541/1000 Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

593 1815 Rural PCC & Drainage Scheme Ramthaman and Kasur Approved 18.000 15.000 41.400 41.400 41.316 100% 59.316 87% Date of A.A :17.08.2015 Matta & adjoining abadies District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :08.10.2015 Scheduled date of Completion on 07.10.2017 Revised date of Completion : Nil Date of Commencement :08.10.2015 Surface Drains =5571/27550 Rft, PCC Flooring= 3083/21240Cft, BP 118454/258910Sullage Carrier1.5 x 1.5= 5575/5575 Work in progress

594 1816 Rural PCC & Drainage Scheme Khara and Kasur Approved 15.000 15.000 15.000 15.000 14.969 100% 29.969 57% Date of A.A :17.08.2015 Wadana & adjoining abadies District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :10.10.2015 Scheduled date of Completion on 09.10.2017 Revised date of Completion : Nil Date of Commencement :10.10.2015 Funds Relesed On; 14.10.2015 Drain 9700/27985 Rft PCC 14599/21663 B/Pevement 60960/105568 Sullage Carrier 1.5 x 1.5 1235/7623 Sullage Carrier 2.0 x 2.0 0/3250 Work in progress

595 1817 Rural PCC & Drainage Scheme Dafto & Kasur Approved 15.000 15.000 27.221 27.221 27.207 100% 42.207 81% Date of A.A :17.08.2015 adjoining abadies District Kasur. Revised Date of A.A :Nil Date of T.S :27.08.2015 Date of Award :29.09.2015 Scheduled date of Completion on 28.09.2017 Revised date of Completion : Nil Date of Commencement :29.09.2015 Surface Drains =4992/26140 Rft, PCC Flooring=0/4810Cft, BP 78193/207739 Sullage Carrier1.5 x 1.5= 1354/3150Carrier Work in progress

596 1818 PCC and drainage scheme Thieng More /Illah Kasur Approved 20.000 40.000 60.000 60.000 60.000 100% 80.000 30% Date of A.A :02.02.2016 abad, Tehsil Chunian, District Kasur Revised Date of A.A :Nil Date of T.S :08.02.216 Date of Award :14.03.2016 Scheduled date of Completion on 13.09.2018 Revised date of Completion : Nil Date of Commencement :14.03.2016 Surface Drains =2249/28800 Rft, PCC Pavement=22890/591976Cft, BP 0/27919 Sullage Carrier1.5 x 1.5= 1500/2900 2'x2' 0/1535 RCC Sewer 9" i/d 0/1000 P.M 2/2 Force main 12" i/d 5000/5000 6" Ac pipe 0/560 Repair of Screening Chamber 70 %/1 Job Repair of Colecting Tank 90% / 01 Job Repiar of P.Chamber 90% / 1 Job Repiar of Boundary Wall 90% 1Job Section Delevery 10" i/d 116/160 Rft Work in progress

597 1819 Drainage schems and soling work at UC-Pipli Okara Approved 1.000 15.000 26.000 26.000 26.000 100% 27.000 75% Date of AA-23.03.2016 Pahar District Okara Date of TS- 12.05.2016 Date of Pre-qualification Date of Invitation of Tender,11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of work Order.18.06.2016 Date of completion As per PC-I. 18.06.2017 Anticipated date of completion,18.06.2017 Projected Population 26075 Person Release of Funds 27.07.2016. Work is ini progress.(TPV Awaited) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

598 1820 Drainage schems and soling work at UC Okara Approved 1.000 10.000 12.500 12.500 12.500 100% 13.500 50% Date of AA-23.03.2016 Amlimuti district Okara Date of TS-25.03.2016 Date of Pre-qualification Date of Invitation of Tender,16.05.2016 Date of Receipt of Tenders,17.05.2016 ( No Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of work Order.24.06.2016 Date of completion As per PC-I. 18.06.2017 Anticipated date of completion,18.06.2017 Projected Population 29719 Person Release of Funds 27.07.2016. Work is ini progress.(TPV Awaited)

599 1821 Drainage schems and soling work at UC Okara Approved 1.000 24.468 19.168 19.168 19.168 100% 20.168 79% Date of AA-23.03.2016 Chiplipur Tehsil Depalpur District Okara Date of TS-25.03.2016 Date of Pre-qualification Date of Invitation of Tender,16.05.2016 Date of Receipt of Tenders,17.05.2016 ( No Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of work Order.24.06.2016 Date of completion As per PC-I. 18.06.2017 Anticipated date of completion,18.06.2017 Re-appropriation of funds (-)0.800 dt: 31.10.2016 Projected Population 23830 Person Release of Funds 27.07.2016. Work is ini progress.(TPV Awaited)

600 1822 Drainage schems and soling work at UC-103 Okara Approved 1.000 10.000 10.000 10.000 10.000 100% 11.000 38% Date of AA-23.03.2016 Depalpur District Okara Date of TS-25.03.2016 Date of Pre-qualification Date of Invitation of Tender,16.05.2016 Date of Receipt of Tenders,17.05.2016 ( No Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of work Order.24.06.2016 Date of completion As per PC-I. 18.06.2017 Anticipated date of completion,18.06.2017 Projected Population 51130 Person Release of Funds 27.07.2016. Work is ini progress.(TPV Awaited)

601 1823 Drainage schems and soling work at UC-104 Okara Approved 1.000 16.435 14.635 14.635 14.635 100% 15.635 90% Date of AA-23.03.2016 Depalpur District Okara Date of TS-25.03.2016 Date of Pre-qualification Date of Invitation of Tender,16.05.2016 Date of Receipt of Tenders,17.05.2016 ( No Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of work Order.24.06.2016 Date of completion As per PC-I. 18.06.2017 Anticipated date of completion,18.06.2017 Re-appropriation of funds (-) 0.300 dt: 31.10.2016 Projected Population 48119 Person Work is in progress.(TPV Awaited) work is Stop due to side problem Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

602 1824 Drainage schems and soling work at UC-105 Okara Approved 1.000 10.000 13.000 13.000 13.000 100% 14.000 48% Date of AA-23.03.2016 Depalpur District Okara Date of TS-25.03.2016 Date of Invitation of Tender,16.05.2016 Date of Receipt of Tenders,17.05.2016 ( No Tender Received) Date of Invitation of Tender 11.06.2016 Date of Receipt of Tenders,13.06.2016 Date of work Order.18.06.2016 Date of completion As per PC-I. 18.06.2017 Anticipated date of completion,18.06.2017 Projected Population 51398 Person Work is ini progress.(TPV Awaited)

603 1825 Sewerage Scheme 93-A/12-L Chichawatni Sahiwal Approved 29.988 1.349 3.799 3.799 3.799 100% 33.787 108% 1. Date of AA 12.09.2014 2. Date of TS 16.09.2014 3. Date of Pre-qualification 01.09.2014 4. Date of inviting of Tender 18.09.2014 5. Date if receipt of tender 13.10.2014 6. Date of Work Order 23.10.2014 7. Date of completion as per PC-1 30.06.2016 8. Anticipated date of completion 30.06.2016 9. Re-appropriation of funds (+) ------10. Project Population = 5571 Person Scheme completed and under test operation.

604 1826 Rural Drainage Scheme Chak No.353/E.B, Pakpattan Approved 23.308 0.413 5.663 5.663 5.663 100% 28.971 100% Date of AA =16.04.14 Arifwala Date of T.S = 16.04.15 Date of invitation of tenders=04.05.15 Date of receipt tenders = 05.05.15 Date of Work order =08.05.15 Date of completion as per PC-I = 07.05.16 Anticipated date of completion = 30.06.2016 Re-appropriation of funds (+/-) = Projected Population = 5067 Work in progress

605 1827 Rural Drainage/Sewerage Scheme Chak Pakpattan Approved 29.240 1.316 2.316 2.316 2.316 100% 31.556 100% Date of AA =16.04.15 No.149/E.B, Arifwala Date of T.S = 16.04.15 Date of invitation of tenders= 04.05.15 Date of receipt tenders = 05.05.15 Date of Work order =08.05.15 Date of completion as per PC-I = 07.05.16 Anticipated date of completion = 30.06.2016 Re-appropriation of funds (+/-) Projected Population = 14468 Scheme Completed functional and handed over to CBO. 606 1828 Reh of rural Drainage Scheme Chak No. 159/EB Pakpattan Approved 7.000 5.436 5.136 5.136 5.136 100% 12.136 98% Date of AA = 06.08.2015 Arifwala Date of T.S = 10.08.15 Date of invitation of tenders= 29.08.15 Date of receipt tenders = 31.08.15 Date of Work order =09.09.15 Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.16 Re-appropriation of funds (+/-) = - Projected Population = 6102 Scheme completed. Handed over to user committee. Liability is to be cleared. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

607 1829 Darinage Schenme at Chak No. 67/EB, District Pakpattan Approved 5.000 26.141 21.141 21.141 21.141 100% 26.141 84% Date of AA = 06.08.2015 Pakpattan Date of T.S = 10.08.15 Date of invitation of tenders= 29.08.15 Date of receipt tenders =31.08.15 Date of Work order =05.09.15 Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.16 Re-appropriation of funds (+/-) = Projected Population =19332 Scheme completed and functional. 608 1830 Darinage Schenme at Chak No. 89/EB District Pakpattan Approved 23.000 3.543 4.443 4.443 4.443 100% 27.443 100% Date of AA = 06.08.2015 Pakpattan Date of T.S = 10.08.15 Date of invitation of tenders= 29.08.15 Date of receipt tenders = 31.08.15 Date of Work order =09.09.15 Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.16 Re-appropriation of funds (+/-) = Projected Population =11371 Scheme completed made functional and handed over to User Committee. 609 1831 Rural Drainage Scheme in Chak No. 141/EB Pakpattan Approved 10.000 9.751 11.241 11.241 11.241 100% 21.241 100% Date of AA = 06.08.2015 Date of T.S = 10.08.15 Date of invitation of tenders= 29.08.15 Date of receipt tenders = 31.08.15 Date of Work order =05.09.15 Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.16 Re- appropriation of funds (+/-) = Projected Population =3960 Work in Progress and will be completed within current financial year.

610 1832 Rural Drainage Scheme in Chak No. 165/EB Pakpattan Approved 10.000 13.408 11.708 11.708 11.708 100% 21.708 93% Date of AA = 06.08.2015 Date of T.S = 10.08.15 Date of invitation of tenders= 29.08.15 Date of receipt tenders = 31.08.15 Date of Work order =07.09.15 Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.16 Re-appropriation of funds (+/-) = Projected Population =6409 Scheme completed and handed over to user committee. 611 1833 Rural Drainage Scheme in Chak No. 207/EB Pakpattan Approved 7.000 8.560 8.010 8.010 8.010 100% 15.010 96% Date of AA = 06.08.2015 Date of T.S = 10.08.15 Date of invitation of tenders=29.08.15 Date of receipt tenders = 31.08.15 Date of Work order =05.09.15 Date of completion as per PC-I = 30.06.16 Anticipated date of completion = 31.12.16 Re-appropriation of funds (+/-) = Projected Population = 9670 Scheme Completed and functional. Liabilities are to be cleared. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

612 1834 Rural Drainage Scheme, Rasheeda (Kot Abbas Multan Approved 5.000 6.729 6.729 6.729 6.696 100% 11.696 100% 1.Date of AA 12.03.2016 Shaheed) 2.Date of T.S 12.03.2016 3. Date of Pre-qualification - 4.Date of invitation of tender 07.04.2016 5.Date of Receipt of tenders 09.04.2016 6.Date of work order 24.05.2016 7.Date of Completion as per PC-l 23.11.2016 8.Anticipated date of completion 30.06.2017 9..Date of released of funds 27.07.2016 10 No. of beneficiaries 7821 Persons. Work is in progress.

613 1835 Rural Sewerage / drainage scheme, Ali Town Multan Approved 81.000 22.685 17.125 17.125 17.088 100% 98.088 95% 1.Date of AA 26.08.2014 (01.03.2016) (Setal Mari), District Multan. 2.Date of T.S 15.10.2014 3.Dated of Prequalification 11.08.2014 4.Date of invitation of tender 23.10.2014 5.Date of Receipt of tenders 24.10.2014 6.Date of work order 08.11.2014 7.Date of Completion as per PC-l 08.11.2015 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries=10921 persons. Work is in progress.

614 1836 Ext. of Rural Sewerage Scheme, Basti Khuda Multan Approved 53.230 15.000 35.000 35.000 34.962 100% 88.192 86% 1.Date of AA 26.08.2014 (01.03.2016) Dad, Multan 2.Date of T.S 15.10.2014 3.Dated of Prequalification 11.08.2014 4.Date of invitation of tender 23.10.2014 5.Date of Receipt of tenders 24.10.2014 6.Date of work order 08.11.2014 7.Date of Completion as per PC-l 25.08.2016 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of beneficiaries= 24631 persons. Work is in progress.

615 1837 Rural Sewerage / drainage scheme, Kot Rab Multan Approved 70.000 20.745 20.745 20.745 20.712 100% 90.712 100% 1.Date of AA 26.08.2014 (01.03.2016) Nawaz District Multan. 2.Date of T.S 15.10.2014 3.Dated of Prequalification 11.08.2014 4.Date of invitation of tender 23.10.2014 5.Date of Receipt of tenders 24.10.2014 6.Date of work order 08.11.2014 7.Date of Completion as per PC-l 25.08.2016 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 20190 persons. Work is in progress.

616 1838 Rural Sewerage / drainage scheme, Raza Town Multan Approved 51.170 18.787 20.487 20.487 20.395 100% 71.565 102% 1.Date of AA 26.08.2014 (01.03.2016) District Multan. 2.Date of T.S 15.10.2014 3.Dated of Prequalification 11.08.2014 4.Date of invitation of tender 23.10.2014 5.Date of Receipt of tenders 23.10.2014 6.Date of work order 08.11.2014 7.Date of Completion as per PC-l 25.08.2016 8.Anticipated date of completio n 30.06.2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 8954 persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

617 1839 Rural Sewerage / Drainage Scheme in Qadir Pur Multan Approved 25.000 20.000 61.580 61.580 61.548 100% 86.548 94% 1.Date of AA 09.03.2015 Raan, District Multan. 2.Date of T.S 20.04.2015 3.Dated of Prequalification 08.12.2014 4.Date of invitation of tender 27.04.2015 5.Date of Receipt of tenders 02.05.2015 6.Date of work order 02.06.2015 7.Date of Completion as per PC-l 08.03.2017 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of beneficiaries=13539 persons. Work is in progress.

618 1840 Rural Sewerage / Drainage Scheme in Budhla Multan Approved 30.000 17.173 32.173 32.173 32.167 100% 62.167 100% 1. Date of AA 09.03.2015 Santt, District Multan. 2. Date of T.S 23.04.2015 3. Dated of Prequalification 08.12.2014 4. Date of invitation of tender 27.04.2015 5. Date of Receipt of tenders 02.05.2015 6. Date of work order 06.06.2015 7. Date of Completion as per PC-l 08.03.2016 8. Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of beneficiaries 17822 persons. Work is in progress.

619 1841 Rural Drainage Scheme Sewra Chok, Adjoining Multan Approved 21.000 20.000 60.500 60.500 60.454 100% 81.454 78% 1.Date of AA 09.03.2015 Abadies, Mouza Mubarak Pur Taj Pur Sandila. 2.Date of T.S 21.04.2015 3.Dated of Prequalification 28.01.2015 4.Date of invitation of tender 27.04.2015 5.Date of Receipt of tenders 02.05.2015 6.Date of work order 02.06.2015 7.Date of Completion as per PC-l 08.03.2016 8.Anticipated date of completion 30.06.2016 9.Date of released of funds 27.07.2016 / 22.02.2017. 10.No. of beneficiaries 46964 persons. Work is in progress.

620 1842 Construction of Drain, Brick Pavement, Pacca Multan Approved 11.598 3.544 3.544 3.544 3.543 100% 15.141 100% 1.Date of AA 09.03.2015 Sullage Carrier, Tuff Tiles for Mouza Allam Pur, 2.Date of T.S 15.05.2015 District Multan. 3.Dated of Prequalification - 4.Date of invitation of tender 24.03.2015 5.Date of Receipt of tenders 25.03.2015 6.Date of work order 29.05.2015 7.Date of Completion as per PC-l 08.03.2016 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 12475 persons. Work is in progress.

621 1843 R/S/D/Scheme Mouza Jahangirabad Multan Multan Approved 25.426 10.000 5.000 5.000 4.967 99% 30.393 66% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3.Dated of Prequalification - 4.Date of invitation of tender 30.01.2010 5.Date of Receipt of tenders 15.03.2010 6.Date of work order 20.03.2010 7.Date of Completion as per PC-l 08.03.2013 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 2250 persons. PM Package un-fundeed scheme. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

622 1844 R/S/D/Scheme Siddiquebad Multan Approved 37.472 8.528 8.528 8.528 8.523 100% 45.995 100% 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3.Dated of Prequalification - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 20.03.2010/20.03.2010 7.Date of Completion as per PC-l 19.03.2011/19.03.2011 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 10No. of beneficiaries 10926 Persons. PM Package un-fundeed scheme. Work is in progress.

623 1845 R/S/D/Scheme Basti Nau, (Baroon) Basti Multan Approved 58.563 20.000 22.000 22.000 21.991 100% 80.554 84% 1.Date of AA 14.11.2009 Muhammad pur. 2.Date of T.S 19.01.2010 3.Dated of Prequalification - 4.Date of invitation of tender 15.02.2010 5.Date of Receipt of tenders 10.03.2010 6.Date of work order 20.03.2010 7.Date of Completion as per PC-l 08.03.2011 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 27.07.2016 10.No. of beneficiaries 4648 persons. PM Package un-fundeed scheme. Work is in progress.

624 1846 Rural Sewerage/Drainage Scheme, Chah Rattay Multan Approved 8.000 20.800 15.636 15.636 15.321 98% 23.321 81% 1.Date of AA 12.03.2016 wala (Mouza Jangal Barirah), Distt. Multan 2.Date of T.S 3.Dated of Prequalification 12.03.2016 4.Date of invitation of tender 07.04.2016 5.Date of Receipt of tenders 09.04.2016 6.Date of work order 27.05.2016 7.Date of Completion as per PC-l 26.11.2016 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 13.10.2016 10.No. of beneficiaries 8253 Persons. Work is in progress.

625 1847 Rural Sewerage/Drainage Scheme, Saddiqabad Multan Approved 8.000 14.840 9.840 9.840 9.795 100% 17.795 78% 1.Date of AA 12.03.2016 Hirawat and Yaray wala , Distt. Multan 2.Date of T.S 3.Dated of Prequalification 12.03.2016 4.Date of invitation of tender 07.04.2016 5.Date of Receipt of tenders 09.04.2016 6.Date of work order 01.06.2016 7.Date of Completion as per PC-l 31.11.2016 8.Anticipated date of completion 30.06.2017 9.Date of released of funds 13.10.2016 10.No. of beneficiaries 25285 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

626 1848 Provision of Drainage / Sewerage, Soling & Vehari Approved 54.763 10.000 20.000 20.000 19.818 99% 74.581 93% 1. Date of A.A: 26.08.2014. Water supply in Gaggo Mandi, Dharyan, Chak 2. Date of T.S: 15.10.2014 No. 187/EB 3. Date of Pre-Qualification: 13.09.2014 4. Date Invitation of Tender: 15.11.2014 5. Date of Receipt of Tender: 15.11.2014 6. Date of Award: 19.11.2014 7. Date of Completion as per PC-I: 26.08.2016 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 27.07.2016 Trial Bore= 0/1, T/W=0/1, PH=0/1, PM=0/1 Set, RM 8" i/d PVC =0/618 Rft, 12" i/d PVC= 0/50 Rft, D/System 3" i/d PVC=0/74740 Rft, 4" i/d PVC = 0/7458 Rft, 6" i/d PVC = 0/6355, Rft, 8" i/d PVC = 0/6084 Rft, 10" i/d PVC = 0/470 Rft, 12" i/d PVC = 0/219 Rft Hypochlorinator =0/1, Ex. Elect = 0/1 Job, OHR 50000 Gallons= 0/2 No. 10. Reason of Slow Moving: NIL 11. No. of beneficiaries 13005 Persons Work is in progress.

627 1849 Provision of Sewerage and Drainage schemes in Vehari Approved 6.000 6.546 6.546 6.546 6.546 100% 12.546 100% 1. Date of A.A: 27.08.2016 Chak No.4/WB Tehsil & District Vehari. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 22.12.2016 7. Date of Completion as per PC-I: 21.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 27.07.2016 RCC Sewer 9" i/d = 4631/4088 Rft, 12" i/d = 326/550 Rft, Out Fall Chamber = 0/1 No, Inter Connection = 0/1 No, Sullage Carrier = 0/425 Rft, Surface Drain Type-I = 0/300 Rft, Soling = 0/3640 Cft, Re-Soling = 0/1274 Cft, B/Wall & Gate Pillar =200/290 Rft, , Single Room Staff Quarter = 0.5/1 No. 10. Reason of Slow Moving: NIL 11. No. of beneficiaries Persons Work is in progress. Site issue.

628 1850 Provision of Water Supply Scheme in Kundi Dera Ghazi Approved 15.000 20.000 20.000 20.000 20.000 100% 35.000 70% • Date of A.A = 22.08.2015 Wala, UC-Shadan Lund Khan • Date of TS = 07.03.2016 • No. of Beneficiaries = 5222 • Date of invitation of tenders = 04.04.2016 • Date of receipt of tenders = 26.04.2016 • Date of work order = 07.05.2016 • Date of completion as per PC-I = 21.08.2016 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 15.07.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

629 1851 Dainage / Sewerage Scheme Wang, Tehsil & Rajanpur Approved 3.000 7.333 8.321 8.321 8.321 100% 11.321 110% • Date of A.A = 24.4.2015 District Rajanpur • Date of T.S = 27.01.2016 • No. of Beneficiaries = 12987 • Date of invitation of Tender = 11.02.2016 • Date of receipt of tenders 29.02.2016 • Date of work order =26.03.2016 • Date of completion as per PC-I = 31.12.2016 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100% • Scheme Completed..

630 1852 Dainage / Sewerage Scheme Kotla Naseer, Rajanpur Approved 3.000 4.733 4.733 4.733 4.733 100% 7.733 100% • Date of A.A = 24.4.2015 Tehsil & District Rajanpur • Date of T.S = 27.01.2016 • No. of Beneficiaries = 17299 • Date of invitation of Tender = 11.02.2016 • Date of receipt of tenders 29.02.2016 • Date of work order =26.03.2016 • Date of completion as per PC-I = 31.12.2016 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016

• Funds utilized 100% • Scheme Completed.

631 1853 Dainage / Sewerage Scheme Shikarpur, Tehsil & Rajanpur Approved 3.000 4.705 4.705 4.705 4.704 100% 7.704 100% • Date of A.A = 24.4.2015 District Rajanpur • Date of T.S = 27.01.2016 • No. of Beneficiaries = 19751 • Date of invitation of Tender = 11.02.2016 • Date of receipt of tenders 29.02.2016 • Date of work order =26.03.2016 • Date of completion as per PC-I = 31.12.2016 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100% • Scheme Completed.

632 1854 Dainage / Sewerage Scheme Noorpur, Tehsil & Rajanpur Approved 3.000 6.080 6.080 6.080 6.080 100% 9.080 100% • Date of A.A = 24.4.2015 District Rajanpur • Date of T.S = 27.01.2016 • No. of Beneficiaries = 6850 • Date of invitation of Tender = 11.02.2016 • Date of receipt of tenders 29.02.2016 • Date of work order =26.03.2016 • Date of completion as per PC-I = 30.06.2017 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100% • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

633 1855 Dainage / Sewerage Scheme Murghai, Tehsil & Rajanpur Approved 3.000 6.719 6.719 6.719 6.719 100% 9.719 100% • Date of A.A = 24.4.2015 District Rajanpur • Date of T.S = 27.01.2016 • No. of Beneficiaries = 9448 • Date of invitation of Tender = 11.02.2016 • Date of receipt of tenders 29.02.2016 • Date of work order =26.03.2016 • Date of completion as per PC-I = 30.06.2017 • Anticipated date of completion 31.12.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100% • Scheme Completed.

634 1856 Drainage / Sewerage Scheme Kot Mithan Tehsil Rajanpur Approved 10.000 15.000 25.000 25.000 25.000 100% 35.000 55% • Date of A.A = 13.05.2015 & District Rajanpur. • Date of T.S = 26.08.2015 • No. of Beneficiaries = 45617 • Date of invitation of Tender = 12.11.2015 • Date of receipt of tender 30.11.2015 • Date of work order =24.02.2016 • Date of completion as per PC-I= 30.06.2017 • Anticipated date of completion 30.06.2018 • Funds released by FD = 15.07.2016 • Supplimentary Grant = 10 (M) 11.02.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

635 1857 Drainage / Sewerage Scheme Nowshehra Sharqi Rajanpur Approved 6.400 7.005 0.000 0.000 0.000 0% 6.400 48% Scheme completed in the year 2015-16. Excessive funds Tehsil & District Rajanpur Rs. 7.005 (M) has been re-appropriated on 15.11.2017.

636 1858 Construction of Soling Drain Tuff Tile in Qasba Muzaffargarh Approved 10.000 20.201 17.301 17.301 16.900 98% 26.900 89% • Date of A.A 28.10.2015 Sultan Pur (Ist revised) Date of revised A.A 09.2.2016 • Date of TS 16-02-2016 • No. of Beneficiaries = 30109 • Date of invitation of tenders 16.2.2016 • Date of receipt of tenders 12.3.2016 • Date of work order 17.3.2016 • Date of completion as per PC-I = 27.10.2017 • Anticipated date of completion = 30.06.2017 • Funds released by FD = 15.07.2016

Work completed in saving.

637 1859 Provision of Soling, Tuff Tiles and Drains in Town Muzaffargarh Approved 5.500 6.004 34.587 34.587 34.587 100% 40.087 100% • Date of A.A 28-10-2015 Alludewali District Muzaffargarh • Date of Revised A.A 9.6.2016 • Date of TS 10-11-2015 • No. of beneficiaries = 22807 • Date of invitation of tenders 15.1.2016 Date of recipt of tenders 8.2.2016 • Date of work order 26.2.2016 • Date of completion as per PC-I = 27.10.2017 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016 • Supplementary Grant = 28.583 M (16.02.2017)

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

638 1860 Provision of Soling, Tuff Tiles and Drains in Town Muzaffargarh Approved 5.000 9.264 26.119 26.119 26.119 100% 31.119 100% • Date of A.A 28-10-2015 Manik Pur District Muzaffargarh • Date of Revised A.A 9.6.2016 • Date of TS 10-11-2015 • No. of Beneficiaries = 20987 • Date of invitation of tenders 15.1.2016 • Date of receipt of tenders 8.2.2016 • Date of work order 26.2.2016 • Date of completion as per PC-I = 27.10.2017 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016 • Supplementary Grant = 16.855 M (16.02.2017)

• Funds utilized 100%. • Scheme Completed.

639 1861 Provision of Soling, Tuff Tiles and Drains in Town Muzaffargarh Approved 10.000 7.901 17.301 17.301 17.200 99% 27.200 100% • Date of A.A 28-10-2015 Meeran Pur District Muzaffargarh • Date of Revised A.A 9.6.2016 • Date of TS 03-11-2015 • No. of Beneficiaries = 20987 • Date of invitation of tenders = 14-04-2016 • Date of completion as per PC-I = 27.10.2017 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016 • Supplementary Grant = 9.600 M (16.02.2017) • Reappropriation of funds = (-) 2.700 M (07.03.2017)

• Funds utilized 100%. • Scheme Completed in saving

640 1862 Provision of Soling, Tuff Tiles and Drains in Town Muzaffargarh Approved 0.500 12.207 12.059 12.059 12.000 100% 12.500 100% • Date of A.A 28-10-2015 Usman Korea District Muzaffargarh • Date of Revised A.A 9.6.2016 • Date of TS 10-11-2015 • No. of Beneficiaries = 20890 • Date of invitation of tenders = 14.04.2016 • Date of completion as per PC-I = 27.10.2017 • Anticipated date of completion 30.06.2017 • Funds released by FD = 15.07.2016 • Supplementary Grant = 0.110 M (16.02.2017) • Reappropriation of funds = (-) 5.312 M

• Funds utilized 100%. • Scheme Completed.

641 1863 Construction of Soling Drain Tuff Tiles in Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohallah Ghous Colony 1st Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1850 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

642 1864 Construction of Soling Drain Tuff Tiles in Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohallah Dossay Wala Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1975 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

643 1865 Construction of Soling Drain Tuff Tiles in Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohallah Qayum Nagar Wala Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 2000 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

644 1866 Construction of Soling Drain Tuff Tiles in Tibba Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Karim Abad St: No.1 & 2 Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1896 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

645 1867 Construction of Soling Drain Tuff Tiles in Tibba Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Karim Abad St: No.3 & 4 Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1875 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

646 1868 Construction of Soling Drain Tuff Tiles in Tibba Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Karim Abad St: No.5 & 6 Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1867 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

647 1869 Construction of Soling Drain Tuff Tiles in Doaba Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Gareeba Abad Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1973 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

648 1870 Construction of Soling Drain Tuff Tiles in Basti Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Qasai, Basti Arain, Basti Chena Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1767 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

649 1871 Construction of Soling Drain Tuff Tiles in Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohallah Zafar Colony, Tibbi Hussain Abad • Date of TS 25-01-2016 Muzaffargarh • No. of Benificiaries = 2175 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

650 1872 Construction of Soling Drain Tuff Tiles in Mahrah Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Nasheb & Mahrah Fraz Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 2225 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

651 1873 Construction of Soling Drain Tuff Tiles in Shah Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Rang Pur Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1875 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

652 1874 Construction of Soling Drain Tuff Tiles in Malik Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Wala Farooq abad Muzaffargarh • Date of TS 25-01-2016 • No. of Benificiaries = 1725 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

653 1875 Construction of Soling Drain Tuff Tiles in Tibbi Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohana Umer Farooq Colony Bagh Iram • Date of TS 25-01-2016 Muzaffargarh • No. of Benificiaries = 2530 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

654 1876 Construction of Soling Drain Tuff Tiles in Basti Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Gattan Nirali Wala Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 2176 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

655 1877 Construction of Soling Drain Tuff Tiles in Sunaki, Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Basti Gujja, Basti Hinjra Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 1936 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

656 1878 Construction of Soling Drain Tuff Tiles in Chak Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Rohari Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 2525 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

657 1879 Construction of Soling Drain Tuff Tiles in Gulab Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Shah Bihari Colony Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 2276 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

658 1880 Construction of Soling Drain Tuff Tiles in Basti Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Kachi Hashmi Wala Muzaffar.arh • Date of TS 27-01-2016 • No. of Benificiaries = 725 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

659 1881 Construction of Soling Drain Tuff Tiles in Bagay Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Wala Bilal Nagar Bohar Wala Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 2000 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

660 1882 Construction of Soling Drain Tuff Tiles in Basti Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mahran, Basti Shah Wala Safdar Colony • Date of TS 27-01-2016 Muzaffargarh • No. of Benificiaries = 3532 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

661 1883 Construction of Soling Drain Tuff Tiles in Gazi Pur Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Dasti Darman Wala Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 1590 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

662 1884 Construction of Soling Drain Tuff Tiles in Nai Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Basti Talkot Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 1903 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

663 1885 onstruction of Soling Drain Tuff Tiles in Chah Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mitho Wala Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 1952 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

664 1886 Construction of Soling Drain Tuff Tiles in Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohallah Pipal Wala Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 1672 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

665 1887 Construction of Soling Drain Tuff Tiles in Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Mohallah Ghous Cony 2nd Muzaffargarh • Date of TS 27-01-2016 • No. of Benificiaries = 2000 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

666 1888 Construction of Soling Drain Tuff Tiles in Basti Muzaffargarh Approved 1.000 1.000 1.000 1.000 1 100% 2.000 100% • Date of A.A 18-01-2016 Chandiya near Chenab Cinema Mohallah • Date of TS 27-01-2016 Rajpotan Muzaffargarh • No. of Benificiaries = 1435 • Date of invitation of tenders = 01.03.2016 • Date of receipt of tenders = 28.03.2016 • Date of work order = 12/05/2016 • Date of completion as per PC-I =18.04.2016 • Anticipated date of completion 30.09.2016 • Funds released by FD = 15.07.2016

• Funds utilized 100%. • Scheme Completed.

667 1889 Rural Sewerage / Drainage Scheme Chak No. Layyah Approved 5.800 6.368 10.368 10.368 10.368 100% 16.168 100% • Date of AA = 28-10-2015 106/TDA Tehsil Karor Lal Easan District Layyah • Date of TS = 11-11-2015 • No. of Beneficiaries = 5438 • Date of invitation of tenders= 14-11-2015 • Date of Receipt of Tenders = 23-12-2015 • Date of Work Order= 15-02-2016 • Date of completion as per PC-I= 27-10-2016 • Anticipated date of completion= 30-06-2018 • Funds released by FD = 27.07.2016 Reappropriation= (+ 4.000 M), dt.15-11-2016

Funds utilized 100%. Scheme Completed.

668 1890 Rural Sewerage / Drainage Schemes Chak No. Layyah Approved 5.000 24.599 24.206 24.206 24.206 100% 29.206 99% • Date of AA = 13-05-2015 171/TDA, Tehsil & Distt. Layyah (Revised) • Date of TS = 28-08-2015 • No. of Beneficiaries = 5320 • Date of invitation of tenders= 15-09-2015 • Date of Receipt of Tenders = 10-10-2015 • Date of Work Order= 08-12-2015 • Date of completion as per PC-I= 12-05-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD = 27.07.2016 • Reappropriation= (-) 2.000 M), dt.15-11-2016 (+1.607 M) 21.04.2017

Funds utilized 100%. Scheme Completed.

669 1891 Rural Sewerage/Drainage Scheme Chak No. Layyah Approved 5.000 22.224 22.224 22.224 22.224 100% 27.224 100% • Date of AA = 13-05-2015 172/TDA, Tehsil & Distt. Layyah (Revised) • Date of TS = 11-11-2015 • No. of Beneficiaries = 5868 • Date of invitation of tenders= 14-11-2015 • Date of Receipt of Tenders = 23-12-2015 • Date of Work Order= 09-02-2016 • Date of completion as per PC-I= 12-05-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD = 27.07.2016

• Funds utilized 100%. Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

670 1892 Rural Sewerage/Drainage Scheme Chak No. Layyah Approved 5.000 20.403 20.403 20.403 20.403 100% 25.403 100% • Date of AA = 13-05-2015 173/TDA, Tehsil & Distt. Layyah (Revised) • Date of TS = 11-11-2015 • No. of Beneficiaries = 4708 • Date of invitation of tenders= 14-11-2015 • Date of Receipt of Tenders = 23-12-2015 • Date of Work Order= 09-02-2016 • Date of completion as per PC-I= 12-05-2017 • Anticipated date of completion= 30-06-2017 • Funds released by FD = 27.07.2016

Funds utilized 100%. Scheme Completed.

671 1893 Rural Sewerage / Drainage Scheme Chak No. Layyah Approved 5.000 19.495 17.495 17.495 17.495 100% 22.495 92% • Date of AA = 13-05-2015 174/TDA, Tehsil & Distt. Layyah • Date of TS = 28-08-2015 • No. of Beneficiaries = 5832 • Date of invitation of tenders= 15-09-2015 • Date of Receipt of Tenders = 10-10-2015 • Date of Work Order= 8-12-2015 • Date of completion as per PC-I= 12-05-2017 • Anticipated date of completion= 30-06-2017 • Funds released by FD = 27.07.2016 • Reappropriation= ( - 2.000 M), dt.15-11-2016

Funds utilized 100%. Scheme Completed.

672 1894 Rural Sewerage Drainage Scheme Dhori Adda, Layyah Approved 29.975 26.073 24.039 24.039 24.039 100% 54.014 96% • Date of AA = 25.10.2014 and Adj Abadies and Chak No. 426 AB, Chak • Date of TS = 18.11.2014 No. 438/TDA, Layyah • No. of Beneficiaries = 10222 • Date of invitation of tenders= 08-12-2014 • Date of Receipt of Tenders = 30.12.2014 • Date of Work Order= 28.02.2015 • Date of completion as per PC-I= 24-10-2016 • Anticipated date of completion= 30-06-2018 • Funds released by FD =27.07.2016 • Reappropriation of funds= (-) 2.034 million

Original Scheme Completed. Revised Scheme included in next ADP 2017-18 with estimated cost of Rs.198.000 million.

673 1895 Sewerage / Drainage Scheme, Chak No. 117/DB Bahawalpur Approved 7.000 19.125 0.000 0.000 0.000 0% 7.000 27% Date of A.A= 18-08-2015. Date of T.S= 28-08-2015 Date of invitation of tenders=27-08-2015 Date of receipt of tenders = 16-09-2015. Date of work order= 18.11.2015. Date of completion as per PC-1=18-10-2016 Date of completion as per agreement= 17.11.2016 No. of beneficiaries=9316 persons Funds released by FD : 15-07-2016 Reappropriation of Funds (-Rs19.125 M) The MPA Khalid Mehmood Jajja PP 275 requested for substitution of scheme Chak No.90/DB instead of Chak No.117/DB .A summary has already been submited vide this office letter No.5621 dated 06-09-2016 & No.1800 dated 02-03-2017 for substitution of scheme.Hence funds Rs.19.125 million surrendered through reappropriation vide Chief Engineer(S), PHED Lahore office letter No.4847/B(4) dated 28-10-2016. Scheme has been included in next ADP 2017-18 with new proposed name as per direction by Sec HUD & PHED LHR office letter No.SO(PH-S)6- 1/2016(BWP) dated 15.03.2017. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

674 1896 Sewerage/Tuff tlles in Basti Vaslan, Tehsil & Bahawalpur Approved 3.500 5.120 6.197 6.197 6.019 97% 9.519 100% Date of A.A= 04-05-2016. District Bahawalpur. Date of T.S= 26-05-2016. Date of receipt of tenders=04-06-2016 Date of award= 18-06-2016. Date of completion as per agreement=17-12-2016 Date of completion as PC-1=27-11-2016 Anticipated date of completion 20-05-2017 No. of beneficiaries= 2175 persons Funds released by FD on: 15-07-2016 Reappropriation of Funds (-) Additional funds Rs.1.077 million provided by F.D dated 28- 04-2017. Scheme completed in saving and functional.

675 1897 Sewerage/Tuff tlles in Basti Bahlan Chak Bahawalpur Approved 3.500 3.030 4.634 4.634 4.576 99% 8.076 100% Date of A.A= 04-05-2016. No.5/BC, Tehsil & District Bahawalpur. Date of T.S= 26-05-2016. DAte of RTS. 23-05-2017 Date of receipt of tenders-04-06-2016. Date of work order=09-06-2016 Date of completion as per agreement=08-12-2016 Date of completion as per PC-1=25-11-2016 Anticipated date of completion 20-05-2017 No. of beneficiaries= 3107 persons Funds released by FD : 15-07-2016 Additional funds Rs.1.604 million provided by F.D dated 28- 04-2017. Scheme completed & functional.

676 1898 Sewerage/Tuff tlles in Basti Shah Colony, Tehsil Bahawalpur Approved 1.000 1.830 2.160 2.160 2.133 99% 3.133 100% Date of A.A= 04-05-2016. & District Bahawalpur. Date of T.S= 26-05-2016. Date of receipt of tenders=04-06-2016 Date of work order=20-06-2016 Date of completion as per PC-1=25-09-2016 Date of completion as per agreement=19-10-2016 Anticipated date of completion 25.04.2017 No. of beneficiaries= 1320 persons Re-appropriation of funds(+Rs.330 M) dated 20-1-2017 Funds released by FD : 15-07-2016 Scheme completed in saving & functional.

677 1899 Sewerage/Tuff tlles in Basti Bhattian, Tehsil & Bahawalpur Approved 3.500 4.207 6.742 6.742 6.511 97% 10.011 100% Date of A.A= 04-05-2016. District Bahawalpur. Date of T.S= 26-05-2016. Date of receipt of tenders-04-06-2016 Date of work order=11-06-2016 Date of completion as per PC-1=25-11-2016 Date of completion as per agreement=10-12-2016 Anticipated date completion 30-06-2017 No. of beneficiaries= 1950 persons Funds released by FD : 15-07-2016 Additional funds Rs.2.535 million provided by F.D dated 28- 04-2017. Scheme completed in saving.

678 1900 Sewerage/Tuff tlles in Jaffar Colony, Tehsil & Bahawalpur Approved 3.500 4.059 4.429 4.429 4.429 100% 7.929 100% Date of A.A= 04-05-2016. District Bahawalpur. Date of T.S= 26-05-2016. Date of receipt of tender= 04-06-2016 Date of work awarded= 11-06-2016 Date of completion= 10-12-2016 Date of completion as per PC-1=25-11-2016 Anticipated date of completion 20-05-2017 No. of beneficiaries= 2013 persons Funds released by FD on : 15-07-2016 Re-appropriation of funds(+Rs.0.373 M) dated 20-1-2017 Scheme completed & functional. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

679 1901 Sewerage/Tuff tlles in Banker Colony, Tehsil & Bahawalpur Approved 1.000 0.768 0.723 0.723 0.723 100% 1.723 97% Date of A.A= 04-05-2016. District Bahawalpur. Date of T.S= 26-05-2016. Date of receipt of tenders=04-06-2016 Date of work order=11-06-2016 Date of completion as per agreement=10-09-2016 anticipated date of completion = 30.12.2016 Date of completion as per PC-1=25-08-2016 No. of beneficiaries= 1020 persons Funds released by FD : 15-07-2016 Re-appropriation of funds = -0.045 dated 20.01.2017 Scheme completed in saving & Functional.

680 1902 Sewerage/Tuff tlles in Faisal Colony,(East & Bahawalpur Approved 3.000 5.552 7.734 7.734 7.724 100% 10.724 100% Date of A.A= 04-05-2016. West) Tehsil & District Bahawalpur. Date of T.S= 26-05-2016. Date of receipt of tenders=04-06-2016 Date of work order=11-06-2016 Date of completion as per agreement=10-12-2016 Date of completion as per PC-1=25-11-2016 Anticipated date of completion 15-05-2017 No. of beneficiaries= 2240 persons Funds released by FD : 15-07-2016 Re-appropriation of funds (+Rs.0.450 M) dated 20-1-2017 Additional funds Rs.1.732 million provided by F.D dated 28- 04-2017. Scheme completed & functional.

681 1903 P/L Sewerage & Tuff Tiles in Javed Colony Bahawalpur Approved 14.536 2.623 0.000 0.000 0.000 0% 14.536 85% Date of A.A 06-03-2015. Bahawalpur Date of T.S. 14.04.2015. Date of receipt of tenders 27-04-2015 . Date of work order= 02-05-2015. Date of completion as per PC-1=05-09-2015 Date of completion as per agreement= 01-11-2015. Anticipated date of completion=: 15.06.2016 No. of beneficiaries=6478 persons Funds released by FD : 15-07-2016 Scheme completed and functional. The excess funds Rs.2.623 million has been surrender through re- appropriation dated 20-01-2017.

682 1904 Construction of Sewerage Scheme Chak Bahawalpur Approved 16.956 14.100 19.429 19.429 19.429 100% 36.385 100% Date of AA :22.04.15 No.5/DNB Pacci, Tehsil Yazman District Date of TS :09.05.15. Date of Revised T.S. 22.05.2017 Bahawalpur Date of receipt of tenders = 25-07-2015. Date of work order=19-08-2015 Date of completion as per PC-1= 21-10-2015 Date of completion as per agreement=.18-02-2016. Anticipated date of completion= 30-06-2017 No. of beneficiaries=18750 persons Funds released by FD : 15-07-2016 Re-appropriation of funds = -1.200 million dated 20.01.2017 Additional funds Rs.6.929 million provided by F.D dated 28- 04-2017. Scheme completed.

683 1905 Sewerage / Drainage Scheme, Chak No. 110/DB Bahawalpur Approved 7.000 10.000 10.000 10.000 9.951 100% 16.951 56% Date of A.A= 18-08-2015. Date of T.S= 28-08-2015 Date of release of funds.19-10-2015. Date of receipt of tenders = 08-03-2016. Date of work order= 18.04.2016.. Date of completion as per PC-1=17-08-2016 Date of completion as per agreement=17.04.2017. Anticipated date of completion = 30.06.2018 No. of beneficiaries=9501 persons Funds released by FD : 15-07-2016 Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

684 1906 Sewerage Scheme of Abadi Pull Fordwah, Tehsil Bahawalnagar Approved 25.000 20.670 20.670 20.670 20.619 100% 45.619 100% Date of AA (DDWP). 06.10.2015. & District Bahawalnagar. Date of TS. 25-02-2016 Date of invitation of tenders=28-01-2016 Date of receipt of tenders = 02-03-2016 Date of work order=01-04-2016 Date of completion as per PC-1=05-04-2017 Date of completion as per agreement= 30-10-2017 No. of beneficiaries=7858 persons Funds released by FD : 15-07-2016 Work is in progress. 685 1907 Const: of Sewerage / Open Drain in Chachran Rahim Yar Approved 1.000 30.000 30.000 30.000 30.000 100% 31.000 30% Date of A.A= 26-02-2016 Sharif Khan Date of T.S= 05-05-2016 Date of prequalification. 03-08-2016 Funds released by FD : 15-07-2016 Reappropriation of Funds (-) Date of invitation of tenders=23-09-2016 Date of tender received on 10-10-2016 Date of award= 16-11-2016 Date of completion= 15-04-2018 No. of beneficiaries=39828 persons work is in progress.

686 1908 Digital Survey Mapping for prepartion of Punjab Approved 73.270 10.000 7.100 7.100 7.100 100% 80.370 84% Work is in progress. comprehensive plans for Urban Water Supply Scheme, Sewerge Scheme and Treatment Solution 687 1909 Const: of Residential Buildings at Lahore Head Punjab Approved 45.056 10.000 20.000 20.000 20.000 100% 65.056 83% Work is in progress. Quarter for officers BS-16 to BS-18 PHED 688 1910 Improvement & Extension of the Water Testing Punjab Approved 19.538 10.000 0.000 0.000 0.000 0% 19.538 56% Work is in progress. Laboratories (Phase-I) 689 1911 Third Party Validation for Quality Control of the Punjab Approved 10.091 10.000 1.100 1.100 1.100 100% 11.191 28% Work is in progress. New Initiatives through out Punjab 690 1912 Survey & investigation of water source Punjab Approved 4.878 4.558 0.008 0.008 0.008 100% 4.886 52% Work is in progress. 691 1913 Preparation of Water Quality Survey & Sewerage Punjab Approved 2.435 10.000 10.000 10.000 10.000 100% 12.435 68% Work is in progress. Master Plan/Development Plan of Districts, Tehsil and Urban Area 692 1914 Establishment of regional design cell at each civil Punjab Approved 7.551 11.492 2.692 2.692 2.692 100% 10.243 54% Work is in progress. division / Circle level 693 1915 Model installation of tubewells Solar Driven for Punjab Approved 10.890 10.000 35.050 35.050 35.050 100% 45.940 92% Work is in progress. urban/rural water supply schemes 694 1916 Scaling up Pakistan Approach for Total Punjab Approved 170.407 100.000 96.617 96.617 96.617 100% 267.024 67% Work is in progress. Sanitation (PATS) in Punjab (ODF) 695 1917 Establishment of Management Information Punjab Approved 5.000 10.000 11.500 11.500 11.500 100% 16.500 85% Work is in progress. System and Monitoring & Evaluation (MIS & ME) For Capacity Building Cell at circle level 696 1918 Renovation of PHED Head Quarter Building Punjab Approved 3.500 7.500 13.500 13.500 13.500 100% 17.000 155% Work is in progress. Total: ON-GOING SCHEMES 29379 8000 15530 15530 15291 98% 44670 71% NEW SCHEMES 1 1919 Augmentation of Water Supply Scheme, Sargodha Un-Approved 0.000 80.000 0.000 0.000 0.000 0% 0.000 0% M/s G3 Engineering Consultants (Pvt.) Ltd Lahore have Sargodha Based on Canal Water Supply been appointed for designing / planning & they have been Sargodha, Phase-II. directed to prepare rough cost estimate / PC-I. The same has been presented to P&D Department for approval. 2 1920 Replacement of Old Water Supply Pipeline in Khushab Approved 0.000 20.000 21.200 21.200 21.200 100% 21.200 16% Date of AA 27.08.2016 Khushab City. Date of TS 01.11.2016 Date of award 06.02.2017 Work is in progress. Efforts are being made to achieve the target within shortest possible period. 3 1921 Water supply scheme Lalamusa and Rural Areas Gujrat Approved 0.000 30.000 30.000 30.000 30.000 100% 30.000 6% Scheme approved on 23.02.2017. Funds awaited. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

4 1922 Provision of Water Filtration Plants in Sahiwal Sahiwal Approved 0.000 10.000 24.600 24.600 24.600 100% 24.600 82% 1. Date of AA 13.10.2016 City 2. Date of TS 18.10.2016 3. Date of inviting of Tender 24.12.2016 4. Date if receipt of tender 26.12.2016 5. Date of completion as per PC-1 30.06.2018 6. Anticipated date of completion 30.06.2018 Work in progress. 5 1923 PC-II for feasibility study / detail design etc. for Dera Ghazi Un-Approved 0.000 10.000 10.000 10.000 0.000 0% 0.000 0% PC-II not approved by the P&DD. Urban Water Supply Scheme D.G.Khan Khan 6 1924 Rehabilitation and Agmentation of Water Supply Dera Ghazi Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 33% • Date of A.A = 23.09.2016 Scheme of Choti Zareen City Khan • Date of T.S = 24.09.2016 • No. of Beneficiaries = 37844 • Date of invitation of tenders = 27.10.2016 • Date of work order = 22.12.2016. • Date of receipt of tenders = 19.11.2016 • Date of completion as per PC-I = 23.09.2018 • Anticipated date of completion = 30.06.2019 • Funds Released by F.D = 29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

7 1925 Rehabilitation of Sewerage and Water Supply Dera Ghazi Approved 0.000 30.000 30.000 30.000 0.000 0% 0.000 0% Scheme approved by DDWP on 27.04.2017. Funds Scheme, D.G.Khan city Khan awaited. Funds not yet released. 8 1926 Comprehensive Extension Rehab: Urban Water Rajanpur Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 21% • Date of A.A = 22.09.2016 Supply Scheme Rojhan & adjoining abadies • Date of T.S =24.09.2016 • No. of Beneficiaries = 14257 • Date of invitation of Tender = 01.12.2016 • Date of receipt of tenders 29.12.2016 • Date of completion as per PC-I 21.09.2018 • Anticipated date of completion 30.06.2018 • Funds released by FD = 25.11.2016/29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

9 1927 Installation of Ultra Filtration Plant in Jampur City Rajanpur Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 64% • Date of A.A = 22.09.2016 Group No.II • Date of T.S =24.09.2016 • No. of Beneficiaries = 25750 • Date of invitation of Tender = 26.11.2016 • Date of receipt of tenders 17.12.2016 • Date of work order 31.12.2016 • Date of completion as per PC-I 21.09.2017 • Anticipated date of completion 30.06.2018 • Funds released by FD = 25.11.2016/29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

10 1928 Installation of Ultra Filtration plant in Jampur City Rajanpur Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 64% • Date of A.A = 22.09.2016 • Date of T.S =24.09.2016 • No. of Beneficiaries = 27054 • Date of invitation of Tender =26.11.2016 • Date of receipt of tenders 17.12.2016 • Date of award = 31.12.2016. • Date of completion as per PC-I 21.09.2017 • Anticipated date of completion 30.06.2018 • Funds released by FD = 10.02.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

11 1929 Enhancement of supply of Water for Rojhan City, Rajanpur Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 33% • Date of A.A = 22.09.2016 District Rajanpur • Date of T.S =24.09.2016 • No. of Beneficiaries = 33971 • Date of invitation of Tender = 01.11.2016 • Date of receipt of tenders 29.12.2016 • Date of work order 31.12.2016 • Date of completion as per PC-I 21.09.2018 • Anticipated date of completion 30.06.2018 • Funds released by FD = 25.11.2016/29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

12 1930 Urban Water Supply Scheme for Hasilpur Bahawalpur Approved 0.000 30.000 41.500 41.500 41.457 100% 41.457 41% Date of AA(DDWP)=24-10-2016. Funds released by FD=13-12-2016. Date of TS=19-01-2017. Prequalification of the contractors=05-01-2017. Date of receipt of tender 27-02-2017 Date of award=03-03-2017 Date of completion02-03-2018 Re-appropriation of funds (+ Rs.11.500 M dated 15-05- 2017).Work is in progress. 13 1931 Water Supply Scheme of Chak Sarkari and Bahawalnagar Approved 0.000 10.287 8.087 8.087 8.086 100% 8.086 79% Date of AA. 08.08.2016. Adjoining Abadies, Tehsil Minchinabad, District Date of T.S. 27.09.2016. Bahawalnagar. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.07.2017. Reappropriation of funds (-Rs.2.200 M) dated 31-01-2017. Work is in progress. 14 1932 Rehabilitaiton and repair of Sewerage, road, Rahim Yar Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 100% Date of AA 01.12.2016 water supply THQ Sadiqabad Khan Date of T.S 16.12.2016 Tender received on 07.01.2017 Date of funds receipt by FD.31.01-2017 Date of work award.14-01-2017 Date of completion. 13-12-2017 Scheme completed on 25-05-2017 15 1933 Provision of water supply /sewerage scheme for Rahim Yar Approved 0.000 20.000 20.000 20.000 12.601 63% 12.601 10% Date of AA(DDWP)=28-10-2016. MC Tranda Saway Khan, Tehsil & District RYK Khan Date of T.S. 13.02.2017 Funds released by FD=13-12-2016. Prequalification of the contractor=05-01-2017 Tenders received on 13-03-2017 . Date of work awarded .25-04-2017. Date of completion 30-06-2018. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

16 1934 Urban Water Supply / Sewerage Scheme for City Rahim Yar Approved 0.000 30.000 30.000 30.000 30.000 100% 30.000 25% Date of AA =17-09-2016 Tranda Muhammad Pannah Khan Date of TS=23-11-2016 Funds released by FD=29-11-2016 & 05.05.2017. Prequalification of contracators 05-01-2017. Date op receipt of Tenders 06-02-2017. Date of work awarded 17.03.2017. Date of completion 16.09.2018. Work is in progress. 17 1935 Laying & Rehab: of Sewerage & Water Supply & Rahim Yar Approved 0.000 20.000 47.825 47.825 37.318 78% 37.318 93% The nomenclature of the scheme desired vide C.M.Directive Tuff Tiles, City Sadiqabad Khan issued vide No.PS/SECY/(IMP)CMO/AB-296/0117131 dated 113-10-2016 has been changed by the P&D Department vide letter No.3(75)PO(Dir) P&D/201617 dated 22.11.2016. Date of A.A= 01.12.2016. Date of T.S.08-12-2016 Date of receipt of tenders. 07.01.2017 Date of funds released.07-03-2017 Date of work award. 09-03-2017 Date of completion.08-08-2017 Additional funds Rs.27.825 M provided through supplimentary grant dated 16.05.17. Work is in progress.

18 1936 Const: of Sew: & Drianage Sch: Sohawa City Jhelum Approved 0.000 10.000 7.500 7.500 7.500 100% 7.500 25% Date of A.A 26-08-2016 Date of T.S 30-09-2016 Work awarded on 24-01-2017. Work in progress. • Final Notice issued to the contractor on 25-04-2017 on slow progress. Now contractor has re-started the work at site. • Funds of Rs. 2.500 million were re-appropriated to fast moving scheme of PHE Division Jhelum. 19 1937 Augmentation of Sewerage Scheme Sargodha Sargodha Un-Approved 0.000 150.000 0.000 0.000 0.000 0% 0.000 0% M/s G3 Engineering Consultants (Pvt.) Ltd Lahore have been appointed for designing / planning. The rough cost estimate / PC-I was submitted to P&D Department but withdrawn on the request of MPA for change in planning. New planning has been prepared & submitted to P&D Department for approval. 20 1938 Construction of PCC Slabs and Drains in Village Khushab Approved 0.000 20.000 0.000 0.000 0.000 0% 0.000 0% Scheme approved by DDWP on 24.03.2017. Funds not yet Roda released. 21 1939 Urban Sewerage/Drainage scheme, PCC Slab & Bhakkar Un-Approved 0.000 100.000 0.000 0.000 0.000 0% 0.000 0% Scheme Administratively Approved in PDWP meeting held on Brick Pavement in Bhakkar City 13.06.2017. Formal A.A letter is awaited. 22 1940 Provision of PCC Slab and Sewerage Scheme in Bhakkar Approved 0.000 20.000 20.000 20.000 19.998 100% 19.998 29% Date of A.A 27.08.2016 Municipal Committee Dullay wala Date of T.S 30.09.2016 Date of Commencement 28.11.2016 Date of completion 28.11.2018 Work in progress. 23 1941 Provision of Sewerage in Tandlianwala City, Faisalabad Approved 0.000 20.000 20.000 20.000 19.988 100% 19.988 20% ) Date of A.A 20-10-2016. District Faisalabad (Phase-I) 2) Date of T.S.31-10-2016. 3) Date of Pre-Qualification 12-11-2016. 4) Date of invitation of tenders 28-11-2016. 5) Date of receipt of tenders 28-11-2016. 6) Date of work order 17-12-2016 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.16-12-2018. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

24 1942 Comprehensive Sewerage/ Drainage scheme AP Jhang Approved 0.000 20.000 20.000 20.000 18.000 90% 18.000 18% 1. Date of A.A 20.10.2016 2. Date of T.S 24.11.2016 Sial (Urban) 3. Date of Invitation of tenders 15.12.2016. 4. Date of Receipt of tender 24.12.2016 5. Date of work order 28.12.2016 6. Date of Completion As per PC-I 19.10.2019 7. Anticipated date of completion. 27.12.2019 8. No of Baneficiary 24475-Persons 9. Funds online on 03.01.2017 10. Agreement Amount 96.709-Million Work is in progress.

25 1943 Provision of Sanitation facilities in City Sukhike Hafizabad Approved 0.000 20.000 80.000 80.000 80.000 100% 80.000 57% Date of A.A 06.09.2019 Mandi Date of T.S 30.09.2016 Date of Start 26-11-2016 , Date of completion 05-09-2019 Work in progress. Full funds utilized.

26 1944 Urban Sewerage/Drainage scheme Jalapur Gujrat Approved 0.000 20.000 63.800 63.800 63.800 100% 63.800 49% A.A Date =06.09.2016 Jattan City District Gujrat T.S date=30.09.2016 Start Date=18.11.2016 Completion date=18.11.2018 Work in progress. Full funds utilized.

27 1945 Construction of PCC Street/ Drain, Soling and Gujrat Approved 0.000 10.000 15.600 15.600 15.600 100% 15.600 85% A.A Date =23.09.2016 Nullah in U.C 1 to 4 Lalamusa City Tehsil Kharian T.S date=26.09.2016 District Gujrat Start date 21.11.16. Completion date 20.11.2017 Scheme completed in saving.

28 1946 Provision of Sewerage Drainage and and Tuff Sialkot Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 20% *A.A Date =23.09.2016 Tile at Daska City *T.S date= 26.09.2016 Revised A.A=27.12.2016 work in progress. Full funds utilized. 29 1947 Provision of clean drinking water, sewerage Lahore Approved 0.000 80.000 0.000 0.000 0.000 0% 0.000 0% system, PCC and allied facilities in Walton ● Scheme transferred to WASA Lahore by P&D Department. Hussainabad and adjoining abadies 30 1948 Provision of clean drinking water, sewerage Lahore Approved 0.000 80.000 80.000 80.000 80.000 100% 80.000 16% ● AA by the Secretary HUD & PHED Govt of the Punjab Lahore system, PCC and allied facilities in Jallo More, vide No.SO(PH-S)9-1/2016(LHR), dated. 20.01.2017. Batapur and adjoining abadies T.S by the C.E (North) PHED Lahore vide No.171/P&D-I dated:25.01.2017 ● Start of work. 18.3.2017. ● Completion date. 30.6.2019. ● Work is in progress.

31 1949 Provision of clean drinking water, sewerage Lahore Approved 0.000 80.000 60.000 60.000 60.000 100% 60.000 30% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, system, PCC and allied facilities in Chung, dated. 09.09.2016 Mohlanwal, Manak and adjoining abadies ● T.S by the Chief Engineer (N), vide No. 522/P&D-II, dated:19.9.2016. ● Start of Work:31-10-2016 ● Completion:30-10-2018. Scope of work Sullage Carrier =1 Job 85% RCC Sewer 60% PCC 70% ● Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

32 1950 Provision of clean drinking water, sewerage Lahore Approved 0.000 80.000 60.000 60.000 60.000 100% 60.000 30% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/480, system, PCC and allied facilities in Babo Mehar dated. 10.10.2016. Town, Lidhar, Bedian Road and adjoining ● T.S by the C.E (N) vide No.2331/P&D-I, dated:19.10.2016. abadies ● Start of Work:15-11-2016 ● Completion:14-11-2018 Scope of work RO Plant 5 No. Sullage Carreir =1 Job 70% Drain 40% RCC Sewer 60% PCC pavement 75% ● Work is in progress. 33 1951 Provision of Open Water Supply Scheme Sheikhupura Approved 0.000 30.000 30.000 30.000 30.000 100% 30.000 15% Work in progress. Ferozwala 34 1952 Provision Of Sewerage And Pcc Scheme Pir Sheikhupura Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 11% Work in progress. Bahar Shah, Qazi Park Ramgarah & Purana Shehar City Sheikhupura 35 1953 Augmentation / Rehabilitation of Urban Nankana Approved 0.000 25.000 45.000 45.000 45.000 100% 45.000 17% Work in progress. Sewerage Scheme, Nankana Sahib Sahib 36 1954 Provision of Sewerage & Drainage System in Kasur Approved 0.000 20.000 46.500 46.500 45.447 98% 45.447 45% Date of A.A 09.09.2016 Chunian City, Kasur Revised Date of A.A Date of T.S :30.09.2016 Date of Award :29.10.2016 Scheduled date of Completion on 28.10.2018 Revised date of Completion : Nil Date of Commencement 29.10.2016 Drain 7821/37595 Rft PCC & B/Pavement 15124/139653 Cft Sullage Carier 1.5x1.5 0/9700 Rft RCC Sewer Pipe 21" i/d 0/2900 Work in progress

37 1955 Urban Drainage Scheme Kasur city District kasur Kasur Approved 0.000 20.000 25.000 25.000 25.000 100% 25.000 25% Date of A.A 13.08.2016 Revised Date of A.A Date of T.S :30.09.2016 Date of Award :28.10.2016 Scheduled date of Completion on 27.10.2018 Revised date of Completion : Nil Date of Commencement 28.10.2016 Drain 2656/37595 Rft PCC & B/Pavement 15212/139653 Cft Sullage Carier 1.5x1.5 0/9700 Rft RCC Sewer Pipe 21" i/d 0/2900 Work in progress

38 1956 Rehabilitation/Augmentation of Sewerage Sahiwal Approved 0.000 20.000 25.000 25.000 20.000 80% 20.000 25% Date of AA 13.10.2016 System at Harrappa City Date of TS 07.12.2016 Date of Pre-qualification 08.02.2017 Date of completion as per PC-1 30.06.2018 Anticipated date of completion 30.06.2018 Work is in progress. 39 1957 Sewerage, Tuff Tiles in Remaining Portion of Lodhran Approved 0.000 20.000 26.276 26.276 18.320 70% 18.320 29% 1. Date of A.A: 27-08-2016. Gaily Wal City. 2. Date of T.S: 26-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 08-12-2016 7. Date of Completion as per PC-I: 31-12-2017 8. Anticipated Date of Completion: 10-03-2018 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 69757 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

40 1958 Revamping of Jahanian Sewerage System, Khanewal Approved 0.000 40.000 78.292 78.292 77.866 99% 77.866 39% 1. Date of AA 27-08-2016 Jahanian 2. Date of T.S 25.10.2016 3. Date of Pre-qualification 26.10.2016 4. Date of invitation of tender 03.12.2016 5. Date of Receipt of tenders 05.12.2016 6. Date of work order 15.12.2016 7. Date of Completion as per PC-I. 30.09.2019 8. Anticipated date of Completion. 30.09.2019 9.Date of released of funds 01.11.2016. 10.No. of Benificiary= 76582 Persons. Work is in progress.

41 1959 Open Drainage & Tuff Tile Scheme in Remaining Muzaffargarh Approved 0.000 20.000 20.000 20.000 19.500 98% 19.500 39% • Date of A.A 22-09--2016 Portion of Kot Addu City • Date of TS 24-09-2016 • No. of Benificiaries = 185625 • Date of tendering 14.01.2017 • Date of Pre-qualification 11-02.2017 • Date of invitation of tenders = 17-03-2017 • Date of receipt of tenders = 18-03-2017 • Date of work order = 22-03-2017 • Date of completion as per PC-I =30-09-2017 • Anticipated date of completion30-09-2017

• Scheme reflected in ADP 2017-18.

42 1960 Comprehensive Sewerage Scheme alongwith Layyah Approved 0.000 30.000 40.000 40.000 40.000 100% 40.000 20% • Date of AA = 22-09-2016 Tuff Tiles in City Chowk Azam • Date of TS = 06.01.2017 • No. of Beneficiaries = 58248 • Date of pre-qualification= 31.12.2016 • Date of invitation of tenders= 31.12.2016 • Date of Receipt of Tenders = 07.02.2017 • Date of Work Order= 03.03.2017 • Date of completion as per PC-I= 21-09-2018 • Anticipated date of completion=30.06.2018 • Funds released by FD =14.12.2016 Rs. 15.00 (M) • Funds released by FD =11.05.2017 Rs. 15.00 (M) • Funds released by FD =12.05.2017 Rs. 10.00 (M)

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

43 1961 Reh:/ Aug. Urban Sewerage Scheme Yazman/ Bahawalpur Approved 0.000 10.000 35.000 35.000 34.965 100% 34.965 100% Date of AA. 17.09.2016. Treatment Solutiont, Bahawalpur Date of T.S. 20.10.2016. Funds recleased by FD 29-11-2016. Tender Re-invited on 14.11.2016. Date of award-03-01-2017 Date of completion=02-12-2017 Re-appropriation of funds (+Rs.15.0 M dated 19-04-2017. Additional funds Rs.10.00 million received on 28-04-2017 and online dated 16-05-2017. Scheme jcompleted.

44 1962 Sewer Line & Tuff Tile Habib Ullah Town BWP Bahawalpur Approved 0.000 2.278 2.598 2.598 2.549 98% 2.549 112% Date of AA. 19.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016 Date of receipt of tender= 14-11-2016 Date of award=29-11-2016 Date of completion =28-02-2017 Anticipated date of completion =15-05-2017 Re-appropriation of funds (+Rs.0.320 M dated 15-05-2017. Scheme completed and functional. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

45 1963 Sewer Line & Tuff Tile Sadat Colony BWP Bahawalpur Approved 0.000 5.014 5.741 5.741 5.741 100% 5.741 114% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=29-11-2016 Date of completion =28-04-2017 Re-appropriation of funds (+0.727 M dated 20.01.2017) Scheme completed & functional. 46 1964 Sewer Line & Tuff Tile Goth Ghani & Quaid-e- Bahawalpur Approved 0.000 5.752 6.586 6.586 6.524 99% 6.524 113% Date of AA. 08.08.2016. Azam Colony BWP Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=23-11-2016 Date of completion =22-04-2017 Re-appropriation of funds(+0.838 M dated 201.01.2017) Scheme completed in saving & functional. 47 1965 Provision of Sewerage Scheme "Zone-A'' with Bahawalnagar Approved 0.000 100.000 93.000 93.000 87.981 95% 87.981 22% Date of AA = 29-09-2016(DDSC). Tuff Paver at Bahawalnagar Date of T.S. 08.02.2017 Funds released by FD=29-11-2016 & 05.05.2017. Prequalification of the contractor 26-01-2017 Tender received on 22.03.2017 & was with held till the final decision of Grievances Redressal Committee on the complaint as per direction by the Commissioner, Bahawalpur Division Bahawalpur vide letter No.2- 39/DD&F/P&D/BWP/1436-39 dated 06-04-2017.The tender re-submitted vide this office letter No.3598 dated 28-04- 2017 after decision by Grievances Redressal Committee & direction by the Director (D&F), Bahawalpur dated 24-04- 2017 . Remaining funds Rs.50.00 million released on 18-05- 2017. Date of work awarded.03-05-2017. Date of completion 02-05-2019. Work is in progress.

48 1966 Mega Sewerage Scheme Liaqatpur City Rahim Yar Approved 0.000 80.000 0.000 0.000 0.000 0% 0.000 0% The scheme has been approved by PDWP in its meeting Khan held on 27.12.2016 and A.A issued by Secretary, HUD & PHE Department Lahore vide office letter No.SO(PH-S)10- 11/2016(RYK) dated 19-01-2017 & techincal sanctioned by CE (S) PHED LHR No.471/P&D dated 16.02.2017. Prequalification of the contractor 15.03.2017.Funds awaited. Tender received on 03.04.2017 & under process of approval. Secretary, HUD & PHED was constituted a committee on the complaint lodged by the contractors regarding tendering process vide No.SO(PH-S)6- 5/2016(MISC) dated 18-05-2017. Committee submitted report on 22-05-2017 & Govt. directed to proceed further in the light of recommendation of the committee dated 25-05- 2017. Tender under process of approval.

49 1967 Feasibility Study and Construction of Sewerage Rahim Yar Un-Approved 0.000 40.000 10.843 10.843 8.302 77% 8.302 3% PC-II has been Administratively approved by Govt of Punjab System & Rehabilitation of Roads, Municipal Khan HUD & PHED vide letter No.SO(PH-S)10-11 (RYK) dated Committee Zahir Pir Tehsil Khanpur District 24.11.2016 amouting to Rs.10.843 million. The consultant has been appointed for engineering survey, preparation of Rahim Yar Khan rough cost estimate, GEO technical investigation etc, Funds released on 31-01-2017. Design vetted from UET professional & RCE is to be submitted by the consultant for AA.

50 1968 Rehabilitation of Rural Water Supply & Drainage Rawalpindi Approved 0.000 10.000 15.000 15.000 14.961 100% 14.961 52% • A.A cost:-28.634M dt: 02-11-2016 Scheme Mohra Daroga, Tehsil & District • T.S cost:-27.007M dt:13-11-2016 Rawalpindi. • Funds released in January 2017. • Work in progress. • Work on P/Well in progress • Pipe 6" i/d laying in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

51 1969 Rehabilitation of Rural Water Supply Scheme Rawalpindi Approved 0.000 4.446 4.446 4.446 4.445 100% 4.445 100% • A.A cost:-4.446M dt: 11-03-2017 Phalina, Tehsil Kalar Syedan, District Rawalpindi. • T.S cost:-4.446M dt:15-03-2017. • Substitution of scheme granted on 05-01-2017. A.A issued on 11-03-2017 • Tender invited 12-04-2017. • Work awarded on 27-04-2017 • Scheme completed 52 1970 Rehabilitation of Rural Water Supply Scheme Attock Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 57% ● A.A Date 05.08.2016. Dhoke Parri Dakhli Uchri, Tehsil Jand, District ● T.S Date 09.09.2016. Attock ● Date of Start of Scheme 15.12.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. The work on P/Well, R/Main, D/system is in progress. 53 1971 Augmentation / Rehabilitation of Water Supply Attock Approved 0.000 10.000 7.000 7.000 6.999 100% 6.999 10% ● A.A Date 10.09.2016. Scheme Khour, Tehsil Pindigheb, District Attock ● T.S Date 02.05.2017. ● Date of Start of Scheme 15.06.2017. ● Date of Completion of Scheme 30.06.2019. ● Work is in progress. 54 1972 Rehabilitation of Water Supply Scheme Village Chakwal Approved 0.000 6.000 5.300 5.300 5.300 100% 5.300 88% Date of A.A 03.08.2016 Date of T.S Ratta Sharif, District Chakwal. 19.08.2016 Date of Sart 13.12.2016 Date of completion 30.06.2017 Work completed and under test operation.

55 1973 Extension of water supply scheme Khewra, Jhelum Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 12% Date of A.A 11-04-2016 Tehsil Pind Dadan Khan, District Jhelum Date of T.S 19-08-2016 Work awarded on 06-02-2017 Work in progress. 56 1974 Authority to maintain & Regulate Naroomi Dhan Jhelum Approved 0.000 40.000 0.000 0.000 0.000 0% 0.000 0% Water Supply Scheme Tehsil P.D.Khan Date of A.A 29-09-2016 • Funds released on 08-12-16. • NOC for spring source has been arranged from DCO Chakwal. • Scheme requires revision. • Detailed feasibility of spring source is being conducted. Rough Cost estimate is under preparation. • Funds of Rs. 20.00 million have been be re-appropriated to fast moving schemes of PHE Division Jhelum

57 1975 Replacement of Old Water Supply Pipeline in Khushab Approved 0.000 20.000 12.000 12.000 12.000 100% 12.000 13% Date of AA 27.08.2016 Jauharabad. Date of TS 01.11.2016 Date of award 06.02.2017 Full funds utilized.Work is in progress. 58 1976 Water Supply Scheme Kalial UC Khura. Khushab Approved 0.000 10.000 1.000 1.000 1.000 100% 1.000 4% Date of AA 27.08.2016 Date of TS 03-09-2016 Date of Award 24.01.2017 Mini Tubewells 2 No. installed and Work on installation of 4 No. tube well is in progress. 59 1977 Water Supply Scheme Jhunge Walan of UC Khushab Approved 0.000 10.000 5.000 5.000 5.000 100% 5.000 18% Date of AA 27.08.2016 Khabeki. Date of TS 03-09-2016 Date of Award 21.01.2017. After successfull installation of tube well, allied work will be taken over in hand. 60 1978 Provision of Submersible Pumps (UC Bani Mianwali Approved 0.000 15.000 15.000 15.000 14.995 100% 14.995 30% Date of A.A 27.08.2016 Afghan, Sawance, Ghundi, Chakrala, Ban Hafiz Date of T.S 15.10.2016 Date of Start Gee, Thamay Wali, Namal) of Work 03.12.2016 Date of Completion 30.06.2018 Bottlenecks / Remarks

Work is in progress. E.R.S=0/2, T/Well boring= 8-No completed & 03-No in progress/85, P/Machinery=8/85 & 42- No Arranged, G.S.Tank=0/62-No. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

61 1979 Reh: of Rural Water Supply scheme, Chak Faisalabad Approved 0.000 9.635 9.635 9.635 9.634 100% 9.634 100% ) Date of A.A 20-10-2016. No.45/GB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Rs.2.857 Million for demand of funds to complete the scheme on 30-06-2017. Work is in progress. 62 1980 Reh: of Rural Water Supply scheme, Chak Faisalabad Approved 0.000 10.000 10.000 10.000 9.996 100% 9.996 89% ) Date of A.A 20-10-2016. No.42/GB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Rs.2.500 Million for demand of funds to complete the scheme on 30-06-2017. Work is in progress. 63 1981 Reh: of Rural Water Supply scheme, Chak Faisalabad Approved 0.000 10.000 10.000 10.000 9.984 100% 9.984 81% ) Date of A.A 20-10-2016. No.226/GB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Rs.2.500 Million for demand of funds to complete the scheme on 30-06-2017. Work is in progress. 64 1982 Rural Water Supply Scheme at Chak No.265/RB Faisalabad Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 65% ) Date of A.A 20-10-2016. 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Rs.7.265 Million for demand of funds to complete the scheme on 30-06-2017. Work is in progress. 65 1983 Reh: of Rural Water Supply scheme, Chak Faisalabad Approved 0.000 10.000 10.000 10.000 9.994 100% 9.994 63% ) Date of A.A 20-10-2016. No.47/GB (Sansra) 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Rs.2.500 Million for demand of funds to complete the scheme on 30-06-2017. Work is in progress. 66 1984 Rural Water Supply and Drainage Scheme Chak Faisalabad Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 58% ) Date of A.A 20-10-2016. No.32/JB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.30-06-2018. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

67 1985 Rural Water Supply and Drainage Scheme Chak Faisalabad Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 54% ) Date of A.A 20-10-2016. No.51/JB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.30-06-2018. Work is in progress. 68 1986 Laying of Water Supply Lines in different areas of Faisalabad Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Scheme falls under the Urban jurisdiction of WASA PP-71 Faisalabad. 69 1987 Rural Water Supply and Drainage Scheme Chak Faisalabad Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 41% ) Date of A.A 20-10-2016. No.57/JB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.30-06-2018. Work is in progress.

70 1988 Rural Water Supply Scheme at Chak No.84/JB Faisalabad Approved 0.000 6.727 6.727 6.727 6.725 100% 6.725 100% ) Date of A.A 20-10-2016. 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Scheme completed in saving.

71 1989 Water Supply Scheme, Chak No.247/RB (Miani), Faisalabad Approved 0.000 10.000 10.000 10.000 9.992 100% 9.992 38% ) Date of A.A 20-10-2016. District Faisalabad 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.30-06-2018. Work is in progress. (Full funds have been utilized.) Rs.2.376 Million demand. 72 1990 Reh:Rural Water Supply Scheme Chak Faisalabad Approved 0.000 2.923 3.117 3.117 3.117 100% 3.117 107% ) Date of A.A 20-10-2016. No.141/GB 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Anticipated date of completion.30-06-2017. Work is in progress.Funds Rs. 0.194 Million has been provided vide endt: No.Re-app:2016-17/960-64/B, dated 18.04.2017.

73 1991 Rural Water Supply Scheme at Chak No.257/RB Faisalabad Approved 0.000 3.749 3.807 3.807 3.806 100% 3.806 102% ) Date of A.A 20-10-2016. 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Anticipated date of completion.30-06-2017. Work is in progress.Funds Rs. 0.058 Millionhas been provided vide endt: No.Re-app:2016-17/960-64/B, dated 18.04.2017. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

74 1992 Rural Water Supply Scheme Chak No.411-GB, Faisalabad Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 100% ) Date of A.A 20-10-2016. Darbar Pir Qandhari, Tehsil Tandilianwala, 2) Date of T.S.24-10-2016. District Faisalabad. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Scheme completed. 75 1993 Installation of 2 Nos. Tube Wells (0.50 Cfs Jhang Approved 0.000 7.597 7.597 7.597 4.945 65% 4.945 65% 1. Date of A.A 20.10.2016 discharge each) for Water Supply Scheme 2. Date of T.S 02.11.2016 Shorkot Cantt, District Jhang 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 19.04.2017 7. Anticipated date of completion 25.07.2017. 8. No of Baneficiary 54617-Persons 9. Funds online on 03.01.2017. 10. Agreement Amount 4.341-Million Scheme completed in saving.

76 1994 Establishment of Rural Water Supply Scheme, T.T.Singh Approved 0.000 10.000 7.000 7.000 7.000 100% 7.000 51% 1-Date of A.A 20.10.2016 Chak No.244/GB, Tehsil Gojra 2- Date of T.S 21.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 20.10.2017 6- Date of work order - 14.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 2988 Persons 9-Funds Released by F.D 21.12.2016 10-Re-appropriation of funds(+/-) - 28.04.2017 Work is in progress.

77 1995 Rehab. of rural water supply scheme Chak No. T.T.Singh Approved 0.000 10.000 7.000 7.000 7.000 100% 7.000 47% 1-Date of A.A 20.10.2016 318/GB T.T. Singh 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 08.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 23220 Persons 9-Funds Released by F.D - 21.12.2016 10-Re-appropriation of funds(+/-) - 28.04.2017 Work is in progress.

78 1996 Rural Water Supply Scheme, Chak No.709/GB T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 63% 1-Date of A.A 20.10.2016 and 710/GB, Tehsil Kamalia, District Toba Tek 2- Date of T.S 31.10.2016 Singh 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 5867 Persons 9-Funds Released by F.D 21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

79 1997 Rural Water supply Scheme, Chak No.712/GB T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 59% 1-Date of A.A 20.10.2016 and Jamal Pahar, Tehsil Kamalia, District toba 2- Date of T.S 31.10.2016 Tek Singh 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 03.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 4430 Persons 9-Funds Released by F.D -23.01.2017 10-Re-appropriation of funds(+/-) Work is in progress.

80 1998 Rural Water Supply Scheme Chak No.668/9/GB T.T.Singh Approved 0.000 10.000 7.000 7.000 7.000 100% 7.000 41% 1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 08.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 4680 Persons 9-Funds Released by F.D - 21.12.2016 10-Re-appropriation of funds(+/-) -28.04.2017 Work is in progress.

81 1999 Rehab. of rural water supply scheme Chak No. T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1-Date of A.A 20.10.2016 343/GB T.T. Singh 2- Date of T.S 21.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 06.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 5333 Persons 9-Funds Released by F.D -23.01.2017 10-Re-appropriation of funds(+/-) Work is in progress.

82 2000 Rural Water Supply Scheme Chak No.667/8/GB T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 4680 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress.

83 2001 Rural Water Supply Scheme Chak No.54/1 Tukra T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 3104 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

84 2002 Rural Water Supply Scheme Chak T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 43% 1-Date of A.A 20.10.2016 No.670/11/GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 08.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 3816 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress.

85 2003 Rural Water Supply Scheme Chak No.685/26- T.T.Singh Approved 0.000 10.000 2.000 2.000 2.000 100% 2.000 7% 1-Date of A.A 20.10.2016 GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 04.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 3381 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) - 17.04.2017 Work is in progress.

86 2004 Rural Water Supply Scheme Chak T.T.Singh Approved 0.000 10.000 2.000 2.000 2.000 100% 2.000 7% 1-Date of A.A 20.10.2016 No.674/15/GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 6390 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) - 17.04.2017 Work is in progress.

87 2005 Rural Water Supply Scheme Chak No.682/23- T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 33% 1-Date of A.A 20.10.2016 GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 04.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 2130 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress.

88 2006 Rural Water Supply Scheme Chak No.683/24- T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 32% 1-Date of A.A 20.10.2016 GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 4807 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

89 2007 Rural Water Supply Scheme Chak T.T.Singh Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 31% 1-Date of A.A 20.10.2016 No.675/16/GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 3561 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress.

90 2008 Rural Water Supply Scheme Chak No.323 & T.T.Singh Approved 0.000 15.000 15.000 15.000 15.000 100% 15.000 40% 1-Date of A.A 20.10.2016 322/GB 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order -09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 6919 Persons 9-Funds Released by F.D -21.12.2016 10-Re-appropriation of funds(+/-) Work is in progress.

91 2009 Reh: of Water Supply Scheme, Chak No.300/JB, T.T.Singh Approved 0.000 2.240 5.240 5.240 5.240 100% 5.240 234% 1-Date of A.A 20.10.2016 Tehsil Gojra 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 20.10.2017 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 4487 Persons 9-Funds Released by F.D -23.01.2017 10-Re-appropriation of funds(+/-) + 28.04.2017 Scheme is Completed .

92 2010 Installation of Water Filtration Plant at Haweli Lahore Approved 0.000 5.104 5.138 5.138 5.137 100% 5.137 101% Scheme completed. Hassan Khan. 93 2011 Installation of Water Filtration Plant at Gulloo Kot. Lahore Approved 0.000 5.104 5.139 5.139 5.137 100% 5.137 101% Scheme completed.

94 2012 Installation of Water Filtration Plant at Ghurki Lahore Approved 0.000 5.104 5.145 5.145 5.144 100% 5.144 101% Scheme completed. 95 2013 Installation of Water Filtration Plant at Ghaniekey Lahore Approved 0.000 5.104 5.167 5.167 5.166 100% 5.166 101% Scheme completed. 96 2014 Installation of Water Filtration Plant at Dogarai Lahore Approved 0.000 5.104 5.104 5.104 5.104 100% 5.104 100% Scheme completed. Kalan 97 2015 Installation of Water Filtration Plant at Baseen Lahore Approved 0.000 5.104 5.104 5.104 5.104 100% 5.104 100% Scheme completed. 98 2016 Installation of Water Filtration Plant at Barki Lahore Approved 0.000 5.104 5.104 5.104 5.104 100% 5.104 100% Scheme completed. 99 2017 Installation of Water Filtration Plant at Asif Town Lahore Approved 0.000 5.104 5.171 5.171 5.159 100% 5.159 101% Scheme completed. No. II. 100 2018 Installation of Water Filtration Plant at Tera Lahore Approved 0.000 5.104 5.104 5.104 5.104 100% 5.104 100% Scheme completed. 101 2019 Installation of Water Filtration Plant at Talwara Lahore Approved 0.000 5.104 5.121 5.121 5.121 100% 5.121 100% Scheme completed. 102 2020 Installation of Water Filtration Plant at Sutar Mill Lahore Approved 0.000 5.104 5.231 5.231 5.231 100% 5.231 102% Scheme completed.

103 2021 Installation of Water Filtration Plant at Sagian Lahore Approved 0.000 5.104 5.104 5.104 5.100 100% 5.100 100% Scheme completed. 104 2022 Installation of Water Filtration Plant at Nathoki Lahore Approved 0.000 5.104 5.104 5.104 5.104 100% 5.104 100% Scheme completed. 105 2023 Installation of Water Filtration Plant at Lahore Approved 0.000 5.104 5.104 5.104 5.010 98% 5.010 98% Scheme completed. Mandianwala 106 2024 Installation of Water Filtration Plant at Dhullam Lahore Approved 0.000 5.104 5.162 5.162 5.161 100% 5.161 101% Scheme completed. Chalian 107 2025 Installation of Water Filtration Plant at Yohana Lahore Approved 0.000 5.104 5.130 5.130 5.125 100% 5.125 100% Scheme completed. Abad No. II. 108 2026 Installation of Water Filtration Plant at Wahga Lahore Approved 0.000 5.104 5.104 5.104 5.100 100% 5.100 100% Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

109 2027 Installation of Water Filtration Plant at Wagharian Lahore Approved 0.000 5.104 5.246 5.246 5.246 100% 5.246 103% Scheme completed.

110 2028 Installation of Water Filtration Plant at Taizghar Lahore Approved 0.000 5.104 5.104 5.104 5.100 100% 5.100 100% Scheme completed. 111 2029 Installation of Water Filtration Plant at Sherwani Lahore Approved 0.000 5.104 5.133 5.133 5.129 100% 5.129 100% Scheme completed. Mohallah Nashter Colony UC. 112 2030 Installation of Water Filtration Plant at Shadab Lahore Approved 0.000 5.104 5.151 5.151 5.149 100% 5.149 101% Scheme completed. Colony Atari. 113 2031 Installation of Water Filtration Plant at UC- Lahore Approved 0.000 5.104 5.154 5.154 5.151 100% 5.151 101% Scheme completed. Jahman 114 2032 Installation of Water Filtration Plant at Rampur Lahore Approved 0.000 5.104 5.132 5.132 5.132 100% 5.132 101% Scheme completed. Hadiara 115 2033 Installation of Water Filtration Plant at Purse Lahore Approved 0.000 5.104 5.121 5.121 5.121 100% 5.121 100% Scheme completed. Raam / Azad Town Lahore 116 2034 Installation of Water Filtration Plant at Phularwan Lahore Approved 0.000 5.104 5.172 5.172 5.172 100% 5.172 101% Scheme completed. 117 2035 Installation of Water Filtration Plant at Nashter Lahore Approved 0.000 5.104 5.135 5.135 5.134 100% 5.134 101% Scheme completed. Colony. 118 2036 Installation of Water Filtration Plant at Minhala Lahore Approved 0.000 5.104 5.104 5.104 5.104 100% 5.104 100% Scheme completed. 119 2037 Installation of Water Filtration Plant at Mehar Lahore Approved 0.000 5.104 5.128 5.128 5.126 100% 5.126 100% Scheme completed. Town-Lidhar. 120 2038 Installation of Water Filtration Plant at Attari Lahore Approved 0.000 5.104 5.134 5.134 5.134 100% 5.134 101% Scheme completed. 121 2039 Installation of Water Filtration Plant at Jhugian Lahore Approved 0.000 5.104 5.131 5.131 5.131 100% 5.131 101% Scheme completed. Mehran and Dera Afghan. 122 2040 Installation of Water Filtration Plant at Jalal Pura. Lahore Approved 0.000 5.104 5.134 5.134 5.134 100% 5.134 101% Scheme completed.

123 2041 Rural water supply and drainage scheme Sheikhupura Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 21% Work in Progress. Muraday Kalan, District Sheikhupura 124 2042 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 6.000 4.900 4.900 4.900 100% 4.900 44% Date of AA- 28.04.2016 Scheme of Chak No. 31/4-L, District Okara Date of TS-28.04.2016 Date of Invitation of Tender,01.06.2016 Date of Receipt of Tenders,03.06.2016 Date of work Order.16.06.2016 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion, 30.06.2017 Re-appropriation of funds (-)0.800 dt: 31.10.2016 (-) 0.300 dt: 31.01.2017 Projected Population 9038 Person ((1) Tubewell. 1/1 (2) Pumping Machinery 1/1 (3) Pump House 1/1 (4) Distribution system 3" to 6" i/d 25299/ 29360 (5) Brick Pavement 700/2074 Cft (6) sullage Carrier (7) Drain 0/551 Rft Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

125 2043 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 7.000 6.100 6.100 6.100 100% 6.100 49% Date of AA- 28.04.2016 Scheme of Chak No. 29-30/2-L, District Okara Date of TS-28.04.2016 Date of Invitation of Tender,01.06.2016 Date of Receipt of Tenders,03.06.2016 Date of work Order.16.06.2016 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion, 30.06.2017 Re-appropriation of funds (-)0.500 dt: 31.10.2016 (-) 0.400 dt: 31.01.2017 Projected Population 5450 Person (1) Tubewell. 1/1 ( 2) Pump House 1/1 (3) Pumping Machinery 1/1 (4) Distribution system 3" to 6" i/d 30200/ 30520 (5) Sullage Carrier 1.25'x1.25' 0/ (6) Drain 0/1108 Rft (7) Brick Pavement 400/6552 Cft Work in Progress

126 2044 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 10.000 8.500 8.500 8.500 100% 8.500 52% Date of AA- 28.04.2016 Scheme of Chak No. 51/2-L, District Okara Date of TS-28.04.2016 Date of Invitation of Tender,01.06.2016 Date of Receipt of Tenders,03.06.2016 Date of work Order.16.06.2016 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion, 30.06.2017 Re-appropriation of funds (-) 0.900 dt: 31.10.2016 (-) 0.600 dt: 31.01.2017 Projected Population 10294 Person (1) Tubewell. 2/2 (2) Pumping House 2/2 (3) Distribution system 3" to 6" i/d 27837/ 27047 (4) Pumping Machinery 2/2 (5) Sullage Carrier 1.5'x1.5 350/400 Rft (6) Drain 0/3253 Rft (7) Brik Pavement 0/13864 Cft Work in Progress

127 2045 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 53% Date of AA- 28.04.2016 scheme of Chak No. 49/2-L, District Okara Date of TS-28.04.2016 Date of Invitation of Tender,01.06.2016 Date of Receipt of Tenders,03.06.2016 Date of work Order.16.06.2016 Date of completion As per PC-I. 30.06.2017 Anticipated date of completion, 30.06.2017 Projected Population 9797 Person (1) Tubewell. 2/2 (2) Pump House 2/2 (3) Pumping Machinery 2/2 (4) Distribution system 3" to 6" i/d 33312/33316 (5) Brick Pavement 6800/ 15095 Sft (6) Sullage Carrier 1.5'x1.5 (7) Drain 0/5579 Rft , Work in Progress

128 2046 Rural Water Supply and Sewerage Drainage Okara Approved 0.000 15.000 27.010 27.010 27.010 100% 27.010 63% Date of AA- 03.06.2016 Scheme of Chak No. 52/2-L, District Okara Date of TS-30.07.2016 Date of Invitation of Tender,03.11.2016 Date of Receipt of Tenders,05.11.2016 Date of work Order.04.01.2017 Date of completion As per PC-I.30.06.2018 Anticipated date of completion, 30.06.2018 Re-appropriation of funds (+) 5.650 dt: 31.01.2017 (+) 4.508 dt: 28-04-2017 Projected Population 15024 Person (1) tube well 0/2 (2) Pump House 0/2 (3) Rising Main / Distribution system 3" to 10" i/d 0/18433 Rft (4) RCC Sewer 9" to 18" i/d 6400/9810 Rft(arranged) (5) Drain 0/22597 Rft (6) Brick Pavement 0/11071 Rft (7) Puming Machinery 0/2 Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

129 2047 Rural Water Supply Scheme Chak No. 29/1-AL Okara Approved 0.000 10.000 7.800 7.800 7.800 100% 7.800 28% Date of AA- 31.08.2016 Okara Date of TS-08.09.2016 Date of Invitation of Tender,03.11.2016 Date of Receipt of Tenders,05.11.2016 Date of work Order.04.01.2017 Date of completion As per PC-I. 31.12.2017 Anticipated date of completion, 31.12.2017 Re- Appropriation (-) 2.200 dt: 28-04-2017 Projected Population 4494 Person (1) Tube Well 0/1 (2) Pump House 0/1 (3) Pumping Machinery 0/1 (4) Rising Main / distribution system 3" to 6" i/d 30600/31128 Rft

130 2048 Rural Water Supply Scheme Chak No. 30/1-AL Okara Approved 0.000 10.000 9.100 9.100 9.100 100% 9.100 32% Date of AA- 31.08.2016 Okara Date of TS-08.09.2016 Date of Invitation of Tender,03.11.2016 Date of Receipt of Tenders,05.11.2016 Date of work Order.04.01.2017 Date of completion As per PC-I. 31.12.2017 Anticipated date of completion, 31.12.2017 Re - Appropriation funds ( -) 0.900 dt: 28-04-2017 Projected Population 3867 Person (1) Tube Well 0/1 (2) Pump House 0/1 (3) Pumping Machinery 0/1 (4) Rising Main / distribution system 3" to 6" i/d 29660/31128 Rft

131 2049 Rural Water Supply Scheme Chak No. 76/5-R Sahiwal Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 26% 1. Date of AA 31.08.2016 2. Date of TS 09.09.2016 3. Date of Pre-qualification ------4. Date of inviting of Tender 06.12.2016 5. Date if receipt of tender 31.12.2016 6. Date of Work Order ------7. Date of completion as per PC-1 30.06.2017 8. Anticipated date of completion 30.06.2017 9. Re-appropriation of funds (-) ------Work in progress further funds required to complete the scheme.

132 2050 Rural Water Supply Scheme 351/EB Pakpattan Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 52% (1). Date of AA = 13.10.2016 (2) Date of T.S = 25.10.2016 (3).Date of invitation of tenders= 18.11.2016 (4) Date of receipt tenders = 10.12.2016 (5) Date of completion as per PC-I = 30.06.2018 (6) Anticipated date of completion = 30.06.2018 (7) Funds released by FD = 15.12.2016 (8) Funds onlined on = 15.12.2016 (9) Re-appropriation of funds (+/-) = (10) Projected Population = 9261 persons. Wor, in is progress. Full funds utilized.

133 2051 Rural Water Supply Scheme 75/EB Pakpattan Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 47% (1). Date of AA = 13.10.2016 (2) Date of T.S = 25.10.2016 (3).Date of invitation of tenders= 18.11.2016 (4) Date of receipt tenders = 10.12.2016 (5) Date of completion as per PC-I = 30.06.2018 (6) Anticipated date of completion = 30.06.2018 (7) Funds released by FD = 15.12.2016 (8) Funds onlined on = 15.12.2016 (9) Re-appropriation of funds (+/-) = (10) Projected Population = 10959 persons. Wor, in is progress. Full funds utilized.

134 2052 Repair of Water Supply in various localities of Multan Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Under WASA Jurisdiction. NA150/PP196 Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

135 2053 Water Supply Scheme, Pull Angsi Jago Wala Multan Approved 0.000 10.000 5.000 5.000 5.000 100% 5.000 20% 1. Date of A.A: 27.08.2016 Basti Zubar Abad Moza Lal Wha. 2. Date of T.S: 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of award: 15.02.2017 7. Date of Completion as per PC-I: 14.02.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 10.No. of Benificiary= 2768 Persons. Work is in progress.

136 2054 Rural Water Supply and Sewerage Schemes in Multan Approved 0.000 15.000 34.000 34.000 33.990 100% 33.990 69% 1. Date of A.A: 27.08.2016 UC’s 96. 2. Date of T.S: 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 10.11.2016 7. Date of Completion as per PC-I: 09.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

137 2055 Rural Water Supply Scheme Chak No.27/M Lodhran Approved 0.000 9.040 9.040 9.040 9.000 100% 9.000 100% 1. Date of A.A: 27-08-2016. Tehsil Dunyapur District Lodhran. 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 18-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 18-07-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 3768 Persons. Work is in progress.

138 2056 Reh: Rural Water Supply Scheme Chak Lodhran Approved 0.000 10.000 11.392 11.392 11.300 99% 11.300 99% 1. Date of A.A: 27-08-2016. No.251/WB. 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 18-11-2016 7. Date of Completion as per PC-I: 31-10-2017 8. Anticipated Date of Completion: 18-09-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 6038 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

139 2057 Rural Water Supply Scheme Chak No.351/WB Lodhran Approved 0.000 10.000 11.392 11.392 11.300 99% 11.300 99% 1. Date of A.A: 27-08-2016. Tehsil Dunyapur District Lodhran. 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 18-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 18-09-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 4703 Persons. Work is in progress.

140 2058 Rural Water Supply Scheme Chak No.350/WB Lodhran Approved 0.000 10.000 12.020 12.020 12.000 100% 12.000 100% 1. Date of A.A: 27-08-2016 Tehsil Dunyapur District Lodhran. 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 18-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 18-09-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 2452 Persons. Work is in progress.

141 2059 Rural Water Supply Scheme Chak No.348/WB Lodhran Approved 0.000 10.000 13.960 13.960 13.960 100% 13.960 100% 1. Date of A.A: 27-08-2016. Tehsil Dunyapur District Lodhran 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 18-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 18-09-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 5325 Persons. Work is in progress.

142 2060 Rural Water Supply Scheme Chak No.345/WB Lodhran Approved 0.000 10.000 19.240 19.240 19.100 99% 19.100 99% 1. Date of A.A: 27-08-2016. Tehsil Dunyapur District Lodhran. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 09-12-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 08-10-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 4508 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

144 2061 Reh: Rural Water Supply Scheme Chak Lodhran Approved 0.000 10.000 20.000 20.000 19.800 99% 19.800 98% 1. Date of A.A: 27-08-2016. No.233/WB. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of award: 14-12-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 07-10-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 8535 Persons. Work is in progress.

143 2062 Rural Water Supply Scheme Chak No.354/WB Lodhran Approved 0.000 10.000 23.700 23.700 23.500 99% 23.500 94% 1. Date of A.A: 27-08-2016 Tehsil Dunyapur District Lodhran. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-20165. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 09-12-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 08-12-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 7646 Persons. Work is in progress.

145 2063 Water Supply / Sewerage Mouza Rawani. Lodhran Approved 0.000 10.000 20.000 20.000 19.100 96% 19.100 65% 1. Date of A.A: 27-08-2016 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 03-12-2016 7. Date of Completion as per PC-I: 31-12-2017 8. Anticipated Date of Completion: 02-12-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 17196 Persons. Work is in progress.

146 2064 Rural Water Supply Scheme Chak No.12/M & Lodhran Approved 0.000 10.000 20.000 20.000 10.500 53% 10.500 35% 1. Date of A.A: 27-08-2016. 14/M (East & West) Tehsil Dunyapur, District 2. Date of T.S: 19-09-2016 Lodhran 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 08-12-2016 7. Date of Completion as per PC-I: 31-12-2017 8. Anticipated Date of Completion: 07-12-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 11892 Persons. Work is in progress.

147 2065 Rural Water Supply Scheme Chak No.219/WB Lodhran Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 67% 1. Date of A.A: 27-08-2016. Teshil Dunyapur, District Lodhran. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 14-12-2016 7. Date of Completion as per PC-I: 31-10-2017 8. Anticipated Date of Completion: 13-12-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 6795 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

148 2066 Water Supply Chak No.225/WB bhana marla. Lodhran Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 52% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 14-12-2016 7. Date of Completion as per PC-I: 31-12-2017 8. Anticipated Date of Completion: 07-12-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 11892 Persons. Work is in progress.

149 2067 Rural Water Supply & Drainage Scheme Amir Khanewal Approved 0.000 10.000 12.500 12.500 12.445 100% 12.445 70% 1. Date of AA 27-08-2016 Pur, Tehsil Kabirwala District Khanewal. 2. Date of T.S 15-09-2016 3. Date of Pre-qualification - 4. Date of invitation of tender 30-09-2016 5. Date of Receipt of tenders 02-11-2016 6. Date of work order 18-11-2016 7. Date of Completion as per PC-I. 18-02-2018 8. Anticipated date of Completion. 18.02.2018 9.Date of released of funds 01-11-2016 10. No. of beneficiaries 8795 Persons. Work is in progress.

150 2068 Rural Water Supply & Drainage Scheme Salar Khanewal Approved 0.000 10.000 25.000 25.000 23.836 95% 23.836 98% 1. Date of AA 27-08-2016 Wahin Kohna & Azafi Abadi Tehsil Kabirwala 2. Date of T.S 15-09-2016 District Khanewal. 3. Date of Pre-qualification - 4. Date of invitation of tender 30-09-2016 5. Date of Receipt of tenders 02-11-2016 6. Date of work order 18-11-2016 7. Date of Completion as per PC-I. 30-06-2018 8. Anticipated date of Completion. 30.06.2018 9.Date of released of funds 01-11-2016 / 22.02.2017 10. No. of beneficiaries 12796 Persons. Scheme completed in saying.

151 2069 Water Supply Schemes Chak No. 178/wb Vehari Approved 0.000 10.000 10.215 10.215 10.183 100% 10.183 102% 1. Date of A.A: 27-08-2016 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 23.12.2016 7. Date of Completion as per PC-I: 22.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 5219 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

152 2070 Water Supply Schemes Chak No. 72/wb Vehari Approved 0.000 10.000 10.000 10.000 9.944 99% 9.944 83% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 23.12.2016 7. Date of Completion as per PC-I: 22.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 33539 Persons. Work is in progress.

153 2071 Water Supply Machiwal Tehsil and District Vehari Approved 0.000 10.000 10.000 10.000 0.000 0% 0.000 0% After subsitution scheme administratively approved by Vehari. Commissioner Multan Division Multan vide No. Dir (D&F) /DDWP/09/135 dated 04.04.2017. Tender will be received on 09.05.2017. Funds awaited. 154 2072 Rural Water Supply Scheme Chak No.112 WB. Vehari Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 51% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 23.12.2016 7. Date of Completion as per PC-I: 22.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 4862 Persons. Work is in progress.

155 2073 Water Supply Schemes Chak No. 44/wb Vehari Approved 0.000 10.000 10.000 10.000 9.997 100% 9.997 40% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 24.12.2016 7. Date of Completion as per PC-I: 23.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 8746 Persons. Work is in progress.

156 2074 Water Supply Schemes Chak No. 80/wb Vehari Approved 0.000 5.374 5.868 5.868 5.851 100% 5.851 109% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 24.12.2016 7. Date of Completion as per PC-I: 23.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= Persons. Work is in progress.

157 2075 Rural Water Supply Scheme Chak No.122, 136, Vehari Approved 0.000 10.000 15.000 15.000 14.371 96% 14.371 48% 1. Date of A.A: 27-08-2016. 118/WB. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 24.12.2016 7. Date of Completion as per PC-I: 23.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 3302+ 3799 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

158 2076 Rural Water Supply Chak No.98 WB /186 WB. Vehari Approved 0.000 10.000 15.000 15.000 14.999 100% 14.999 50% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 24.12.2016 7. Date of Completion as per PC-I: 23.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 1614+ 4423 Persons. Work is in progress.

159 2077 Water Supply Schemes Chak No. 74/wb Vehari Approved 0.000 4.918 5.178 5.178 4.991 96% 4.991 101% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 24.12.2016 7. Date of Completion as per PC-I: 23.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= Persons. Work is in progress.

160 2078 Water Supply Scheme at Councilor Muhammad Dera Ghazi Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 40% • Date of A.A = 23.09.2016 Ali Basti Rojhani Sakhi Sarwar Khan • Date of TS = 24.09.2016 • No. of Beneficiaries = 8864 • Date of invitation of tenders = 27.10.2016 • Date of work order = 22.12.2016. • Date of receipt of tenders = 19.11.2016 • Date of completion as per PC-I = 23.03.2017 • Anticipated date of completion = 30.06.2017 • Funds Released by F.D = 29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. 161 2079 Provision of Rural Water Supply Scheme Dera Ghazi Approved 0.000 20.000 45.000 45.000 45.000 100% 45.000 54% • Date of A.A = 23.09.2016 Nutkani, District D.G. Khan Khan • Date of TS = 15.12.2016. • No. of Beneficiaries = 17478 • Date of Pre-qualification = 02.04.2017. • Date of invitation of tender = 11.04.2017 • Date of awarded = 27.04.2017 • Date of completion as per PC-I = 23.09.2018 • Anticipated date of completion = 30.06.2019 • Funds Released by F.D = 29.11.2016. Supplementry Grant Rs.20 M (23.05.2017). Re-Appropirate Funds Date = + Rs. 5.00 M (15.05.2017).

162 2080 Rheblitiation and Extension of Rural Water Dera Ghazi Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 100% • DateFunds of utilized A.A = 23.09.2016100% Supply Scheme Tunga (Meenhal) Tribal Area Khan • Date of TS = 24.09.2016 Dera Ghazi Khan • No. of Beneficiaries = 37121 • Date of invitation of tenders = 27.10.2016 • Date of receipt of tenders = 19.11.2016 • Date of work order = 21.01.2017. • Date of completion as per PC-I = 23.09.2017 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

163 2081 Provision of 100 deep handpumps in Pachad Rajanpur Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 47% • Date of A.A = 02.11.2016 Area, District Rajanpur • Date of T.S =24.09.2016 • No. of Beneficiaries = 71517 • Date of invitation of Tender = 23.11.2016 • Date of receipt of tenders 14.12.2016 • Date of work order=25.02.2017 • Date of completion as per PC-I 21.09.2018 • Anticipated date of completion 30.06.2018 • Funds released by FD = 23.02.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

164 2082 Provision of 100 Deep handpumps for District Rajanpur Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 67% • Date of A.A = 01.11.2016 Rajanpur • Date of T.S =24.09.2016 • No. of Beneficiaries = 71517 • Date of invitation of Tender =26.11.2016 • Date of receipt of tenders 17.12.2016 • Date of work order 31.12.2016 • Date of completion as per PC-I 21.09.2018 • Anticipated date of completion 30.06.2018 • Funds released by FD = 13.12.2016 • Reappropriation = (+) 10 (M) 25.04.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

165 2083 Rural Water supply Scheme in Chak No. Muzaffargarh Un-Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Scheme is not feasible in 25.000 Million. Govt has been 571/TDA, District Muzaffargarh. informed accordingly. 166 2084 Water supply Schemes in Mouza Fateh Pur and Muzaffargarh Approved 0.000 20.000 20.000 20.000 19.400 97% 19.400 28% • Date of A.A 22-09-2016 Ali Pur District Muzaffargarh • Date of TS 22.11.2016 • No. of Benificiaries = 19946 • Date of tendering 14.01.2017 • Date of Pre-qualification 11.02.2017 • Date of invitation of tenders = 17-03-2017 • Date of receipt of tenders = 18-03-2017 • Date of work order 28.04.2017 • Date of completion as per PC-I =30-06-2018 • Anticipated date of completion 30-06-2018

• Scheme reflected in ADP 2017-18.

167 2085 Rural water supply scheme chak no. 178/M Bahawalnagar Approved 0.000 8.600 8.600 8.600 8.593 100% 8.593 100% Date of AA. 08.08.2016. including all adjoining abadies. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 26.11.2016 Date of completion 25.07.2017. Scheme completed dated 25-05-2017 . 168 2086 Rural water supply scheme chak no. 105/6-R Bahawalnagar Approved 0.000 8.660 8.660 8.660 8.660 100% 8.660 100% Date of AA. 08.08.2016. including all adjoining abadies. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 20.11.2016 Date of completion 19.07.2017. Scheme Completed dated 25-05-2017. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

169 2087 Rural water supply scheme chak no. 285/HR. Bahawalnagar Approved 0.000 9.470 9.470 9.470 9.389 99% 9.389 99% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 20.11.2016 Date of completion 19.07.2017. Scheme Completed dated 25-05-2017. 170 2088 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 10.000 10.000 10.000 9.965 100% 9.965 100% Date of AA. 08.08.2016. 95/F, Tehsil Chishtian. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.07.2017. Scheme completed dated 20-05-2017. 171 2089 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 9.857 9.857 9.857 9.857 100% 9.857 99% Date of AA. 08.08.2016. 56/F, Tehsil Chishtian. Date of T.S. 27.09.2016. Date of Rev: T.S. 17.03.2017 Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.07.2017. Additional funds Rs.0.143 million provided by F.D dated 28- 04-2017. Scheme completed dated 25-05-2017. 172 2090 Rehabilitation of Rural Water Supply Scheme Bahawalnagar Approved 0.000 10.000 10.000 10.000 9.945 99% 9.945 85% Date of AA. 19.08.2016. Tobian, Chogtan and adjacent abdies. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016 . Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.11.2017. Work is in progress. 173 2091 Rural water supply chak no 161/7-R and azafi Bahawalnagar Approved 0.000 10.000 11.800 11.800 11.788 100% 11.788 98% Date of AA. 08.08.2016. abadis Haroonabad Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 20.11.2016 Date of completion 19.11.2017. Additional funds Rs.1.800 million provided by F.D dated 28- 04-2017. Scheme completed dated 25-05-2017. 174 2092 Rural water supply scheme chak no. 26/3-R Bahawalnagar Approved 0.000 10.000 14.200 14.200 14.195 100% 14.195 98% Date of AA. 08.08.2016. including all adjoining abadies. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 20.11.2016 Date of completion 19.11.2017. Additional funds Rs.4.200 million provided by F.D dated 28- 04-2017. Scheme completed dated 25-05-2017. 175 2093 Rehabilitation of rural water supply scheme chak Bahawalnagar Approved 0.000 10.000 14.000 14.000 13.999 100% 13.999 96% Date of AA. 08.08.2016. no. 49/3-R & Azafi Abadi, Mehran wala, Peoples Date of T.S. 27.09.2016. colony, Model town, Rehmat Town and Muslim Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Colony Haroonabad Date of award. 06.12.2016 Date of completion 05.11.2017. Additional funds Rs.4.00 million provided by F.D dated 28- 04-2017. Work is in progress. 176 2094 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 10.000 19.600 19.600 14.599 74% 14.599 97% Date of AA. 08.08.2016. 93/F, Tehsil Chishtian. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.11.2017. Additional funds Rs.4.600 million provided by F.D dated 28- 04-2017. Scheme completed date 25-05-2017. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

177 2095 Rural water supply scheme chak no. 229-230/9- Bahawalnagar Approved 0.000 10.000 16.240 16.240 15.949 98% 15.949 98% Date of AA. 08.08.2016. R Date of T.S. 21.10.2016. Funds released by FD on 05.10.2016. Tender received on 02.11.2016. Date of award. 25.11.2016 Date of completion 24.11.2017. Additional funds Rs.6.240 million provided by F.D dated 28- 04-2017. Scheme completed dated 25-05-2017 178 2096 Rural water supply scheme chak no. 261-262/H- Bahawalnagar Approved 0.000 10.000 15.951 15.951 15.856 99% 15.856 96% Date of AA. 08.08.2016. R. Date of T.S. 21.10.2016. Funds released by FD on 05.10.2016. Tender received on 02.11.2016. Date of award. 25.11.2016 Date of completion 24.11.2017. Additional funds Rs.5.951 million provided by F.D dated 28- 04-2017. Work is in progress 179 2097 Rural water supply scheme chak no. 224-225/9- Bahawalnagar Approved 0.000 10.000 20.150 20.150 20.150 100% 20.150 106% Date of AA. 08.08.2016. R. Date of T.S. 21.10.2016. Funds released by FD on 05.10.2016. Tender received on 02.11.2016. Date of award. 25.11.2016 Date of completion 24.11.2017. .Additional funds Rs.10.150 million provided by Govt. dated 16-02-2017 & 15-5-17. Scheme completed . 180 2098 Rural water supply scheme chak no. 128/6-R Bahawalnagar Approved 0.000 10.000 17.000 17.000 16.993 100% 16.993 77% Date of AA. 08.08.2016. including all adjoining abadies. Date of T.S. 21.10.2016. Funds released by FD on 05.10.2016. Tender received on 02.11.2016. Date of award. 28.11.2016 Date of completion 27.11.2017. Additional funds Rs.7.00 million provided by F.D dated 28- 04-2017. Work is in progress. 181 2099 Rehabilitation of rural water supply scheme chak Bahawalnagar Approved 0.000 10.000 40.242 40.242 40.172 100% 40.172 102% Date of AA. 08.08.2016. no. 69/4-R, 80/1-L & Azafi Abadis Chak No. 85/5- Date of T.S. 21.10.2016. R Funds released by FD on 05.10.2016. Tender received on 02.11.2016. Date of award. 25.11.2016 Date of completion 24.11.2017. Re-appropriation/Additional funds Rs.30.204 million provided by F.D dated 28-04-2017 & 15-5-2017. Work is in progress. 182 2100 Rural Water Supply Schemes Mouza Janu Khan, Bahawalnagar Approved 0.000 20.000 45.000 45.000 19.995 44% 19.995 20% Date of AA. 19.08.2016. Basti Kapooran & kot Ganga Singh, District Date of T.S. 25.10.2016 Bahawalnagar. Funds released by FD on 19-10-2016. Date of receipt of tender=14-12-2016 Date of award +19-01-2017 Date of completion+18-12-2017 Work is in progress. 183 2101 Rehabilitation of Rural Water Supply Schemes Bahawalnagar Approved 0.000 15.000 49.100 49.100 29.036 59% 29.036 29% Date of AA. 19.08.2016. Muga, Chandna Mirdin, Hakim Mirdin, Mohib Ali, Date of T.S. 25.10.2016 Khazan Singh Nathu Dhaka, District Funds released by FD on 19-10-2016. Date of receipt of tenders= 14-12-2016 Bahawalnagar. Date of award=29-12-2016 Date of completion=28-11-2017 Re-appropriation of funds=(+ Rs14.100 M) dated 31-01- 2017 & 28-04-2017.Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

184 2102 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 7.000 7.000 7.000 6.992 100% 6.992 100% Date of AA. 08.08.2016. 18/G, Tehsil Chishtian. Date of T.S. 27.09.2016. Date of Rev: T.S 17.03.2017 Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.07.2017. Scheme completed on 25-05-2017. 185 2103 Rural water supply chak no 172/7-R incl Adjoinng Bahawalnagar Approved 0.000 7.015 0.000 0.000 0.000 0% 0.000 0% Date of AA.17.09.2016. Abadis Haroonabad Date of T.S. 27.09.2016. Funds awaited by FD. Tender received on 02.11.2016. Tenders received on 02-11-2016 & under process of award.Scheme reflected in ADP with the estimated cost Rs.7.015 million but approved by DDWP with the cost of Rs.16.087 million as the cost reflected in ADP is not enough for the completion of the scheme.A request for demand of allocated funds has been submitted to C.E(S),PHED, Lahore vide this offic letter No.1302 dated 21-02-2017. Funds awaited, scheme has been reflected in next ADP 2017-18.

186 2104 Rural water supply scheme chak no. 221/9R Bahawalnagar Approved 0.000 7.874 7.874 7.874 7.866 100% 7.866 100% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 80.11.2016 Date of completion 19.07.2017. Scheme completed on 25-05-2017. 187 2105 Rural Water Supply Scheme of Chak Bahoo Bahawalnagar Approved 0.000 8.282 8.282 8.282 8.277 100% 8.277 100% Date of AA. 08.08.2016. Sarro & Adjoining Abadies Tehsil Minchinabad, Date of T.S. 27.09.2016. District Bahawalnagar. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 23.11.2016 Date of completion 22.07.2017. Scheme completed on 25-05-2017. 188 2106 Rehab of Rural water supply chak no 54/4-R , Bahawalnagar Approved 0.000 10.000 22.000 22.000 21.968 100% 21.968 83% Date of AA. 08.08.2016. azafi abadis and dera Jatianwala azafi abadi 58/4- Date of T.S. 27.09.2016. R dera jaat 58/4-R and 55/4-R incl adjoining Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. abadis Haroonabad Date of award. 25.11.2016 Date of completion 24.11.2017. Additional funds Rs.12.0 million provided by F.D dated 28- 04-2017. Work is in progress. 189 2107 Reheblitiation of water supply scheme in chak no. Bahawalnagar Approved 0.000 5.000 5.000 5.000 4.999 100% 4.999 100% Date of AA. 08.08.2016. 97/F, Tehsil Chishtian. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 07.12.2016 Date of completion 06.07.2017. Scheme completed on 25-05-2017. 190 2108 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 100% Date of AA. 08.08.2016. 51/F, Mumtaz Abad, Tehsil Chishtian. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 30.11.2016 Date of completion 29.07.2017. Scheme completed on 25-05-2017. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

191 2109 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 5.000 5.000 5.000 4.996 100% 4.996 100% Date of AA. 08.08.2016. 41/F (Chazel Abad), Tehsil Chishtian. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 26.11.2016 Date of completion 25.07.2017. Scheme completed on 25-05-2017. 192 2110 Provision of water supply scheme in chak no. Bahawalnagar Approved 0.000 5.000 5.000 5.000 4.996 100% 4.996 100% Date of AA. 08.08.2016. 108/F, Tehsil Chishtian. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 02.11.2016. Date of award. 06.12.2016 Date of completion 05.07.2017. Scheme completed on 25-05-2017.

193 2111 Rural Water Supply Scheme 100/1-L, Khanpur. Rahim Yar Approved 0.000 9.000 9.000 9.000 9.000 100% 9.000 100% Date of AA. 08.08.2016. Khan Date of T.S. 07.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.05.2017. Scheme completed. 194 2112 Rehabilitation: Rural water supply scheme 9/P, Rahim Yar Approved 0.000 8.000 8.000 8.000 7.906 99% 7.906 99% Date of AA. 08.08.2016. Khanpur. Khan Date of T.S. 07.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.05.2017. Scheme completed. 195 2113 Rural Water Supply Scheme, Kalowal Tehsil Chiniot Approved 0.000 10.000 20.000 20.000 3.700 19% 3.700 29% 1. Date of AA = 15.12.2016 Lalian District Chiniot 2. Date of TS = 23.12.2016 3.Date of Award of work . 19.05.2017 4. No. of Beneficiaries = 5375 Persons Nomenclature of the scheme has been changed and Funds are received on 12.05.2017. At this stage full funds cannot be utilized, hence 5.000 Million funds have been proposed for surrender (Copy attached) 196 2114 Rural Water Supply Scheme, Vinoka Tehsil Chiniot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 43% 1. Date of AA = 20.10.2016 Lalian District Chiniot 2. Date of TS = 25.10.2016 3.Date of Award of work 23.12.2016 4.Date of released of funds 21.12.2016. 5. No. of Beneficiaries = 8142 Persons. Work is in progress.

197 2115 Rural drainage scheme in villages, Nartopa, Attock Approved 0.000 10.000 10.000 10.000 9.998 100% 9.998 18% ● A.A Date 05.08.2016. Khagwani, District Attock ● T.S Date 15.08.2016. ● Date of Start of Scheme 28.11.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. The work on the Drain and PCC is in progress. 198 2116 Extension of Rural Drainage Scheme in Villages Attock Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. Ramu & Bahadar Khan 199 2117 Extension of Rural Drainage Scheme in Villages Attock Approved 0.000 10.000 31.850 31.850 31.839 100% 31.839 53% ● A.A Date 05.08.2016. Haroon, Saleem Khan & Adalzai ● T.S Date 15.08.2016. ● Date of Start of Scheme 28.11.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress.The work on the Drain and PCC is in pogress. 200 2118 Extension of Rural Drainage Scheme in Villages Attock Approved 0.000 15.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. Formali, Haider & Mallah Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

201 2119 Rural drainage scheme in villages Perzai, Attock Approved 0.000 10.000 17.800 17.800 17.798 100% 17.798 60% ● A.A Date 05.08.2016. Muraria, Pandak, District Attock ● T.S Date 09.09.2016. ● Date of Start of Scheme 24.11.2016. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. The work on the Drain and PCC is in progress.

202 2120 Rural drainage scheme UC Thanil Kamal Chakwal Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 100% Date of A.A 03.08.2016 Date of T.S 15.08.2016 Date of Sart 21.11.2016 Date of completion 31.12.2016 Scheme completed. 203 2121 Rural drainage scheme UC Siral Chakwal Approved 0.000 7.000 5.850 5.850 5.850 100% 5.850 84% Date of A.A 03.08.2016 Date of T.S 15.08.2016 Date of Sart 28.12.2016 Date of completion 29.05.2017 Scheme completed. 204 2122 Sewerage Scheme Lawa, District Chakwal Chakwal Approved 0.000 10.000 40.000 40.000 40.000 100% 40.000 51% Date of A.A 24.08.2016 Date of T.S 01.11.2016 Date of Sart 23.12.2016 Date of completion 27.12.2018 Work is in progress. 205 2123 Rural Drainage Scheme Union Chakwal Approved 0.000 10.000 30.900 30.900 30.900 100% 30.900 106% Date of A.A 08.10.2016 Council Date of T.S 10.10.2016 Date of Sart 12.11.2016 Date of completion 11.11.2017 Work completed. 206 2124 Rural Drainage Scheme Chakwal Approved 0.000 10.000 33.435 33.435 33.435 100% 33.435 100% Date of A.A 19.12.2016 Date of T.S 23.12.2016 Date of Sart 28.01.2017 Date of completion Scheme 27.07.2018 Work completed. 207 2125 Rural Drainage Scheme Khanpur Chakwal Approved 0.000 10.000 38.000 38.000 37.998 100% 37.998 25% Date of A.A 24.08.2016 Date of T.S 01.11.2016 Date of Sart 16.01.2017 Date of completion 15.01.2019 Work is in progress. 208 2126 W.S and drainage Sodhi Gujjar, Tehsil Pind Jhelum Approved 0.000 10.000 8.200 8.200 8.200 100% 8.200 82% Date of A.A 26-08-2016 Dadan Khan Date of T.S 30-09-2016 Date of Commencement 19-11-2016 • Contractor has arranged pipe at site • Work in progress 209 2127 Rural drainage scheme Chotalla, Tehsil Jhelum Jhelum Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 100% Date of A.A 26-08-2016 Date of T.S 30-09-2016 Work awarded on 24-01-2017 Work in progress 210 2128 Rural drainage scheme Pinanwal, Tehsil Pind Jhelum Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 10% Date of A.A 26-08-2016 Dadan Khan. Date of T.S 15-12-2016 • Approval of tenders are under process • Work awarded on 02-03-2017 • Contractor has mobilized his resource at site • Work in progress. • Approval of Mobilization Advance payment in process. 211 2129 Sewerage scheme Mouza Ahmaday Wala Sargodha Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 43% Date of A.A 27.08.2016, Date of T.S 03.09.2016, Date of District Sargodha Award 06.12.2016, Scheduled date of Completion on 05.12.2017, Date of Commencement, 06.12.2016, Funds released on 27.10.2016, Funds on-lined on 27.10.2016.

Sullage Carrier 3250-Rft constructed. Work in progress. 212 2130 Rural Sewerage / Drainage Scheme Sargodha Approved 0.000 20.000 14.000 14.000 13.991 100% 13.991 17% Date of A.A 27.08.2016, Date of T.S 28.10.2016, Date of Bhagtanwala Award 31.01.2017, Scheduled date of Completion on 30.01.2018, Date of Commencement, 31.01.2017, Funds released on 27.10.2016, Funds on-lined on 27.10.2016.

Sullage Carrier 4470-Rft constructed. Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

213 2131 Urban Drainage / PCC Flooring Scheme Miani Sargodha Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 21% Date of A.A 27.08.2016, Date of T.S 28.10.2016, Date of District Sargodha Award 14.02.2017, Scheduled date of Completion on 13.02.2018, Date of Commencement, 14.02.2017, Funds released on 27.10.2016, Funds on-lined on 27.10.2016.

Sullage Carrier 3579-Rft constructed. Work in progress. 214 2132 Rural Sewerage / Drainage PCC Scheme for Sargodha Approved 0.000 10.000 19.000 19.000 18.990 100% 18.990 19% Date of A.A 27.08.2016, Date of T.S 07.11.2016, Date of Jhawarian Award 10.02.2017, Scheduled date of Completion on 09.02.2018, Date of Commencement, 10.02.2017, Funds released on 27.10.2016, Funds on-lined on 27.10.2016.

3400-Rft, Nallah 01- No. collecting tank constructed and steel arranged at site and Work in progress. 215 2133 Rural Sewerage Drainage Scheme Chak No. Sargodha Un-Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Rough Cost Estimate was discussed in DDWP meeting 36/NB (Shumali) dated: 15-09-2015. After detailed discussion, the scheme was deferred by the Committee being non-feasible. 216 2134 RSD Scheme Chak No 4 SP, Chak No 5 NB, Sargodha Approved 0.000 20.000 33.213 33.213 33.260 100% 33.260 31% Date of A.A 27.08.2016, Date of T.S 28.10.2016, Date of Chak No 7 ML, Chak No 65 SB, Hujjan District Award 14.02.2017, Scheduled date of Completion on Sargodha 13.02.2018, Date of Commencement, 14.02.2017, Funds released on 27.10.2016, Funds on-lined on 27.10.2016.

Sullage Carrier 5870-Rft constructed. Work in progress. 217 2135 Sewerage/Sullage Carrier for Jalpana/Chak Sargodha Approved 0.000 10.000 11.659 11.659 11.616 100% 11.616 39% Date of A.A 27.08.2016, Date of T.S 03.09.2016, Date of Muzafarabad/Masar/Sardarpur etc. Award 08.12.2016, Scheduled date of Completion on 07.12.2017, Date of Commencement, 08.12.2016, Funds released on 27.10.2016, Funds on-lined on 27.10.2016.

Sullage Carrier 2790-Rft & Drain 2619-Rft constructed. Work in progress. 218 2136 PCC Slab / Drainage Scheme Botala Khushab Approved 0.000 10.000 12.500 12.500 12.500 100% 12.500 63% Date of AA 27.08.2016 Date of TS 03-09-2016 Date of Award 17.01.2017 Date of completion 16.01.2018 Work in progress. 219 2137 Sewerage Scheme Dilley Wali Mianwali Approved 0.000 10.197 9.912 9.912 9.207 93% 9.207 90% Date of A.A 27.08.2016 Date of T.S 03.09.2016 Date of Start of Work 05.12.2016 Date of Completion 30.06.2017 Bottlenecks / Remarks Work is in progress. RCC Sewer=9" i/d=0/5316, 12"i/d= 0/2364, PCC Slab=8182/8182.

220 2138 Sewerage / Drainage Scheme UC Rokhari Mianwali Approved 0.000 10.000 9.500 9.500 9.496 100% 9.496 26% Date of A.A 27.08.2016 Date of T.S 03.09.2016 Date of Start of Work 03.12.2016 Date of Completion 30.06.2018 Bottlenecks / Remarks

Work is in progress. RCC Sewer=9" i/d=1440-Rft Arranged/13484, 12"i/d= 513-Rft Laid & 887-Rft Arranged/7642, 15"i/d= 1328/6288, 18"i/d=1028/1299, Sullage Carrier= 0/200.

221 2139 Sewerage & Sanitation Scheme Daud Khel Mianwali Approved 0.000 10.000 10.000 10.000 9.981 100% 9.981 10% Date of A.A 27.08.2016 Date of T.S 09.12.2016 Date of Start of Work Date of Completion 30.06.2019 Bottlenecks / Remarks Work is in progress. RCC Sewer=9" i/d=0/20356, 12"i/d= 0/12821, 15"i/d= 0/6645, 18"i/d=0/3348, 21"i/d= 0/1768, 24"i/d=0/4870, 27"i/d= 0/5505, 33"i/d=0/3128, S/Carrier= 0/200, PCC Slab= 0/33597. Material arranged at site Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

222 2140 Sewerage & Sanitation Scheme Shahbaz Khel Mianwali Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 21% Date of A.A 27.08.2016 Date of T.S 06.10.2016 Date of Start of Work 22.12.2016 Date of Completion 30.06.2019 Bottlenecks / Remarks Work is in progress. RCC Sewer=9" i/d=1500-Rft Arranged/33286, 12"i/d= 2500-Rft Arranged/21045, 15"i/d= 800-Rft Arranged/3659, 21"i/d= 600-Rft Arranged/864, 24"i/d=400-Rft Arranged/2445, PCC Slab= 0/62379.

223 2141 Rural Sewerage Scheme Harnoli Tehsil Piplan, Mianwali Approved 0.000 10.000 20.000 20.000 19.999 100% 19.999 21% Mianwali Date of A.A 27.08.2016 Date of T.S 09.12.2016 Date of Start of Work 27.01.2017 Date of Completion 30.06.2019 Bottlenecks / Remarks Work is in progress. RCC Sewer=9" i/d=0/19157, 12"i/d= 0/8786, 15"i/d= 0/2826, 18"i/d=0/1624, 21"i/d= 0/1356, 24"i/d=0/1329, 30"i/d= 0/392, Screening Chamber=0/1, Collecting Tank 20'dia= 0/1, Control Room=0/1, Discharge Sump=0/1, P/Machinery=0/2, S/Carrier=0/1250, S/Drain= 0/4175, PCC Slab= 1160/142412, Culvert=0/1, Electric T/Line=0/1.

224 2142 Sewerage Drainage, RCC Culverts, Soling PCC Bhakkar Approved 0.000 10.000 25.000 25.000 22.874 91% 22.874 91% Date of A.A 27.08.2016 Slab. Tuff Tile in UC Ghulaman I and II, Ali Khel & Date of T.S 03.09.2016 Daily Namdar Date of Commencement 03.11.2016 Date of completion 03.11.2018 Work in progress. Additional funds of Rs.12.877 Million received during March, 2017. 100 % utilization is assured before 30th June, 2017. 225 2143 Sewerage Drainage scheme & PCC Slab in Bhakkar Approved 0.000 10.000 21.314 21.314 21.314 100% 21.314 78% Date of A.A 27.08.2016 Kohawar Kalan Town Tehsil Darya Khan District Date of T.S 03.09.2016 Date of Bhakkar. Commencement 24.11.2016 Date of completion 24.11.2018 Work in progress. Additional funds of Rs.11.314 Million received during March, 2017. 100 % utilization is assured before 30th June, 2017. 226 2144 PCC Slab and Sewerage Scheme Shahyan Bhakkar Approved 0.000 10.000 13.400 13.400 10.897 81% 10.897 36% Date of A.A 27.08.2016 Wala U/C Noora Sharif, Tehsil Kaloor Kot District Date of T.S 03.09.2016 Bhakkar Date of Commencement 09.11.2016 Date of completion 09.11.2018 Work in progress. 227 2145 Rural Sewerage Drainage / PCC Slab / Brick Bhakkar Approved 0.000 10.000 32.015 32.015 31.995 100% 31.995 93% Date of A.A 27.08.2016 Date of Revised A.A Pavement / Scheme in Chak No.70/ML and 01.03.2017 Chak No.70/AML, Tehsil & District Bhakkar Date of T.S 03.09.2016 Date of Commencement 19.11.2016 Date of completion 19.11.2018 Work in progress. Additional funds of Rs.18.415 Million received during March, 2017. 100 % utilization is assured before 30th June, 2017. 228 2146 Rural Sewerage / Drainage Scheme PCC Slab & Bhakkar Approved 0.000 10.000 8.000 8.000 7.990 100% 7.990 20% Date of A.A 27.08.2016 Brick Pavement in Notak City Date of T.S 03.09.2016 Date of Commencement 28.11.2016 Date of completion 28.11.2018 Work in progress. 229 2147 PCC Slab and Sewerage Scheme in Street Noon Bhakkar Approved 0.000 10.000 9.500 9.500 9.481 100% 9.481 20% Date of A.A 27.08.2016 Dager UC Tehsil Kaloor Kot District Bhakkar Date of T.S 03.09.2016 Date of Commencement 28.11.2016 Date of completion 28.11.2018 Work in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

230 2148 Rural Sewerage / Drainage Scheme PCC Slab & Bhakkar Approved 0.000 10.000 6.600 6.600 6.600 100% 6.600 13% Date of A.A 27.08.2016 Brick Pavement in Behal City Date of T.S 03.09.2016 Date of Commencement 03.11.2016 Date of completion 03.11.2018 Work in progress.

231 2149 Sewerage Drainage & PCC Slab & Drain in Town Bhakkar Approved 0.000 10.000 21.245 21.245 21.149 100% 21.149 21% Date of A.A 27.08.2016 Punjgrain Tehsil Darya Khan District Bhakkar. Date of T.S 21.10.2016 Date of Commencement 24.11.2016 Date of completion 28.11.2018 Work in progress. Additional funds of Rs.6.245 Million received through re- appropriation during March, 2017. 100 % utilization is assured before 30th June, 2017. 232 2150 Rural Drainage Scheme, Chak No.78 GB, Khurd, Faisalabad Approved 0.000 2.000 2.090 2.090 2.072 99% 2.072 104% 1) Date of A.A 29.08.2016 District Faisalabad 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 233 2151 RURAL DRAINAGE SCHEME AT CITY Faisalabad Approved 0.000 2.000 2.090 2.090 2.083 100% 2.083 104% 1) Date of A.A 29.08.2016 TANDLIANWALA. 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 234 2152 RURAL DRAINAGE SCHEME AT CHAK Faisalabad Approved 0.000 2.000 2.090 2.090 2.070 99% 2.070 104% 1) Date of A.A 29.08.2016 NO.619/GB & 620/GB UC 88. 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 235 2153 RURAL DRAINAGE SCHEME AT CHAK Faisalabad Approved 0.000 2.000 2.090 2.090 2.090 100% 2.090 105% 1) Date of A.A 29.08.2016 NO.458/GB & JALLI FATIANA UC 95. 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 236 2154 RURAL DRAINAGE SCHEME AT CHAK Faisalabad Approved 0.000 2.000 2.090 2.090 2.078 99% 2.078 104% 1) Date of A.A 29.08.2016 NO.457/GB & DAKHLI GARH UC 89. 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 237 2155 RURAL DRAINAGE SCHEME AT CHAK Faisalabad Approved 0.000 2.000 2.090 2.090 2.071 99% 2.071 104% 1) Date of A.A 29.08.2016 NO.422/GB & 427/GB UC 76. 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 238 2156 Rural Drainage Scheme, Chak No.85 GB, District Faisalabad Approved 0.000 4.000 4.180 4.180 4.165 100% 4.165 104% 1) Date of A.A 29.08.2016 Faisalabad 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

239 2157 Rural Drainage Scheme, Chak No.81 GB, District Faisalabad Approved 0.000 4.000 4.180 4.180 4.171 100% 4.171 104% 1) Date of A.A 29.08.2016 Faisalabad 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 240 2158 Rural Drainage Scheme, Chak No.83 GB Thudi, Faisalabad Approved 0.000 5.000 5.225 5.225 5.225 100% 5.225 105% 1) Date of A.A 29.08.2016 District Faisalabad 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 241 2159 Rural Drainage Scheme, Chak No.86 GB, District Faisalabad Approved 0.000 6.000 6.270 6.270 6.247 100% 6.247 104% 1) Date of A.A 29.08.2016 Faisalabad 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 242 2160 Rural Drainage Scheme, Chak No.84 GB, District Faisalabad Approved 0.000 6.000 6.270 6.270 6.270 100% 6.270 105% 1) Date of A.A 29.08.2016 Faisalabad 2) Date of T.S.06.09.2016. 3) Date of invitation of tenders 03.11.2016. 4) Date of receipt of tenders 26.11.2016. 5) Date of work order 17.12.2016 6)Date of Completion as per PC-I = 1 Year 7) Scheme completed. 243 2161 Rural Drainage Scheme / PCC 36GB, 37GB, Faisalabad Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1) Date of A.A 20-10-2016.2) Date of T.S.24-10-2016. 38GB, 230, 231GB, District Faisalabad 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 2 Year 8) Anticipated date of completion.30-06-2018. Work is in progress.. 244 2162 Rural Drainage Scheme, Chak No.78 GB, Kalan, Faisalabad Approved 0.000 2.500 2.613 2.613 2.605 100% 2.605 104% 1) Date of A.A 20-10-2016. District Faisalabad 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Scheme completed. 245 2163 Rural Drainage Scheme, Chak No.83 GB Faisalabad Approved 0.000 3.000 3.135 3.135 3.097 99% 3.097 103% ) Date of A.A 20-10-2016. MALUMANA, District Faisalabad 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Scheme completed. 246 2164 RURAL DRAINAGE SCHEME AT CHAK Faisalabad Approved 0.000 3.000 3.197 3.197 3.154 99% 3.154 105% ) Date of A.A 20-10-2016. NO.610/GB, MOUZA MEHR SHAHANA, ALAM 2) Date of T.S.24-10-2016. SHAH, DUDH BOHER & PINDI SHEIKH MUSA 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. UC 83. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

247 2165 Sewerage / Drainage Scheme Garh Mor, Jhang Approved 0.000 20.000 0.000 0.000 0.000 0% 0.000 0% 1.Date of A.A 16.03.2017 Ahmedpur Sial 2. Date of T.S 24.03.2017 3. Tenders received on 20.04.2017 & are under process. Funds not released. 248 2166 Rural Drainage / Soling / Sullage Carrier Scheme Jhang Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% 1. Date of A.A 24.10.2016 of Mouza Bhone Tehsil & District Jhang. 2. Date of T.S 02.11.2016 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 23.10.2017 7. Anticipated date of completion 25.01.2018 8. Funds online on 03.01.2017. 9. Agreement Amount 12.853-Million Work is in progress 249 2167 Rural Drainage / Soling / Sullage Carrier Scheme Jhang Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1. Date of A.A 24.10.2016 of Mouza Kot Esa Shah, Tehsil & District Jhang. 2. Date of T.S 02.11.2016 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 23.10.2017 7. Anticipated date of completion 25.01.2018 8. Funds online on 03.01.2017. 9. Agreement Amount 17.166-Million Work is in progress. 250 2168 Rural Drainage / Soling / Sullage Carrier Scheme Jhang Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 52% 1. Date of A.A 24.10.2016 of Mouza Bheroo, Tehsil & District Jhang. 2. Date of T.S 02.11.2016 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 23.10.2017 7. Anticipated date of completion. 25.01.2018 8. Funds online on 03.01.2017. 9. Agreement Amount 17.673-Million Work is in progress. 251 2169 Drainage Scheme Chak No. 484/JB, District Jhang Approved 0.000 10.000 10.000 10.000 9.595 96% 9.595 66% 1. Date of A.A 20.10.2016 Jhang 2. Date of T.S 02.11.2016 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 19.10.2017 7. Anticipated date of completion 25.01.2018 8. Funds online on 03.01.2017. 9. Agreement Amount 11.723-Million Work is in progress 252 2170 Provision of Sewerage / Nala / Culverts / Soling & Jhang Approved 0.000 7.612 7.612 7.612 6.300 83% 6.300 83% 1. Date of A.A 20.10.2016 Drains at Chak No. 169/JB Tehsil & District 2. Date of T.S 02.11.20163. Jhang. 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 19.04.2017 7. Anticipated date of completion 25.07.2017 8. Funds online on 03.01.2017. 9. Agreement Amount 6.264-Million Scheme completed in saving. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

253 2171 Provision of Sewerage / Nala / Culverts / Soling & Jhang Approved 0.000 6.349 6.349 6.349 5.435 86% 5.435 86% 1. Date of A.A 20.10.2016 Drains at Nikka Doltana, Tehsil & District Jhang. 2. Date of T.S 02.11.2016 3. Date of Invitation of tenders 10.11.2016. 4. Date of Receipt of tender 28.11.2016 5. Date of work order 26.01.2017. 6. Date of Completion As per PC-I 19.04.2017 7. Anticipated date of completion 25.07.2017 8. Funds online on 03.01.2017. 9. Agreement Amount 5.342-Million Scheme completed in saving. 254 2172 Provision of Drains & Soling including resoling in T.T.Singh Approved 0.000 2.334 2.334 2.334 2.334 100% 2.334 100% 1-Date of A.A 20.10.2016 Union Council No.19 & 20, Tehsil gojra, District 2- Date of T.S 31.10.2016 Toba Tek Singh 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 20.10.2017 6- Date of work order -11.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - Persons 9-Funds Released by F.D - 21.12.2016 10-Re-appropriation of funds(+/-) Scheme is Completed .

255 2173 Provision of Drains & Soling including resoling in T.T.Singh Approved 0.000 4.857 4.357 4.357 4.357 100% 4.357 90% 1-Date of A.A 20.10.2016 Union Council No.22, Tehsil Gojra, District Toba 2- Date of T.S 31.10.2016 Tek Singh 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 20.10.2017 6- Date of work order - 09.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - Persons 9-Funds Released by F.D - 21.12.2016 10-Re-appropriation of funds(+/-) - 28.04.2017 Scheme is Completed .

256 2174 Sewerage Drainage and Street Pavement, T.T.Singh Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 20% 1-Date of A.A 20.10.2016 2- Date of T.S 11.11.2016 Sandhilianwali, District Toba Tek Singh (Phase-I) 3-Date of Prequalification - 21.11.2016 4-Date of invitation of tenders 16.12.2016 5- Date of Receipt of tenders 17.12.2016 6- Date of work order -27.12.2016 7- Date of completion as per PC-I 26.12.2018 8- Anticipated date of completion 26.12.2018 9- No. of Beneficiary - 33312 Person 10-Funds Released by F.D 21.12.2016 11-Re-appropriation of funds(+/-) .Work allotted on 27.12.2016. Mobilization paid. Work is in progress.

257 2175 Provision of Drains & Soling including resoling in T.T.Singh Approved 0.000 2.809 2.809 2.809 2.809 100% 2.809 100% 1-Date of A.A 20.10.2016 Union Council No.21 &23,, Tehsil Gojra, District 2- Date of T.S 31.10.2016 Toba Tek Singh 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 20.10.2017 6- Date of work order - 13.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - Persons 9-Funds Released by F.D - 21.12.2016 10-Re-appropriation of funds(+/-) Scheme is Completed .

258 2176 Galian Nalian and PCC Scheme at Nangal Dona Gujranwala Approved 0.000 3.369 3.369 3.369 3.369 100% 3.369 100% A.A. dated 23.09.2016. Singh T.S. dated 24.09.2016. *Start Date 26.10.2016. *Completion date 25.01.2017. Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

259 2177 Galian Nalian and PCC Scheme at Mandiala Gujranwala Approved 0.000 3.569 3.569 3.569 3.569 100% 3.569 100% A.A. dated 23.09.2016. Taiga T.S. dated 24.09.2016. *Start Date 26.10.2016. *Completion date 25.01.2017. Scheme completed. 260 2178 Drainage and PCC Scheme for Tibba Gujranwala Approved 0.000 10.000 10.100 10.100 10.093 100% 10.093 85% Work started on clarification by C.E (N) Office that it is un- Muhammad Nagar, Tehsil Kamonke, District funded and on-going/approved scheme. Dispute on site. Gujranwala Scheme will be completed next Financial Year. 261 2179 Sanitation Schemes in UCs, Gadgore, Sialkot Approved 0.000 10.000 21.500 21.500 21.500 100% 21.500 54% *A.A Date =23.09.16 Khanawali, Alhar, Jassoran, Baddiana and *T.S date=24.09.2016 Chawinda, Tehsil Pasrur, District Sialkot Work in progress. Full funds utilized.

262 2180 Rural Drainage and PCC Scheme at Wandala Gujranwala Approved 0.000 10.000 10.000 10.000 9.998 100% 9.998 20% A.A. dated 23.09.2016. Virkan, Taly Aali, Badhay new Abadi, Gaibi, Lunj T.S. dated 24.09.2016. Sharif, Kolo wala, Matu Bhanake Al Ditta, Ratta *Start Date 29.10.2016. Goraya. Chak Poryan and Paryan, Karyal Khan *Completion date 28.08.2017. Work in progress. Full funds and Adjoining Dera Jaat. utilized. 263 2181 Sewerage and PCC Scheme for Bismillah Colony Gujranwala Approved 0.000 10.000 50.000 50.000 50.000 100% 50.000 48% A.A. dated 06.09.2016. Wania and Adjust Area Gujranwala T.S. dated 30.09.2016. Work in progress. Full funds utilized. 264 2182 Sewerage Scheme Kamoke of Leftover Area Gujranwala Approved 0.000 30.000 50.000 50.000 50.000 100% 50.000 25% A.A. dated 08.12.2016. Gujranwala T.S. dated 23.12.2016. Work in progress. Full funds utilized. 265 2183 Construction of Sewerage/Drainage/Tuff tiles in Gujranwala Approved 0.000 15.000 15.000 15.000 15.000 100% 15.000 7% A.A. dated 29.09.2016. Noshera Virkan T.S. dated 14.10.2016. Work in progress. Full funds utilized. 266 2184 Provision of Sewerage, New Disposal & PCC at Gujranwala Approved 0.000 30.000 60.000 60.000 60.000 100% 60.000 32% A.A. dated 06.09.2016. & Mudhokhalil, Tehsil Saddar, T.S. dated 06.10.2016. Gujranwala *Start Date 22.12.2016. *Completion date 21.12.2018. Work in progress. Full funds utilized.

267 2185 Provision of Sewerage, New Disposal & PCC at Gujranwala Approved 0.000 20.000 60.000 60.000 60.000 100% 60.000 31% Ladhay wala Warraich & Mughal Chak, Tehsil A.A. dated 06.09.2016. Saddar, Gujranwala T.S. dated 06.10.2016. *Start Date 22.12.2016. *Completion date 21.12.2018. Work in progress. Full funds utilized.

268 2186 Rural Drainage /PCC Schemes in U.C Garmula Gujranwala Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 18% A.A. dated 23.09.2016. Virkan U.C Budha Goraya, Dogrnwala, U.C T.S. dated 13.10.2016. Phama Sara, Kalsian Dhutaran, Kot Bilal and *Start Date 23.05.2017 Madan Chak Tehsil Nowshera Virkan *Completion date 31.12.2018 Work in progress. Full funds utilized. 269 2187 Provision of PCC/Drainage/Sewerage Scheme at Gujranwala Approved 0.000 15.000 45.000 45.000 44.999 100% 44.999 23% Muncipal Committee, Ghakar Mandi A.A. dated 06.09.2016. T.S. dated 06.10.2016. *Start Date 22.12.2016. *Completion date 21.12.2018. Work in progress. Full funds utilized.

270 2188 Provision of PCC/Drainage Sewerage Schemes Gujranwala Approved 0.000 20.000 70.000 70.000 69.997 100% 69.997 53% A.A. dated 06.09.2016. at UC No 14, 15, 46, 50, 51, 52, 53 Gujranwala T.S. dated 30.09.2016. *Start Date 22.12.2016. *Completion date 21.12.2018. Work in progress. Full funds utilized.

271 2189 Galian Nalian and PCC Scheme at Balowali Gujranwala Approved 0.000 2.683 2.683 2.683 2.683 100% 2.683 100% Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

272 2190 Construction of Drain, PCC,Street Master Kazmi Hafizabad Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 68% Date of A.A 23.09.2016 or Aur Hafeez-ur-Rehman Wali Village Kot Date of T.S 24.09.2016 Sajana District Hafizabad Start Date 30-01-2017 Completion Date 30-01- 2018 Work is stop. Full funds utilized. 273 2191 Rural Drainage Scheme karyal ,Jurian, Hardu, Hafizabad Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 100% Date of A.A 23.09.2016 Wachoke and Bashmolajat District Hafizabad Date of T.S 24.09.2016 Start Date 06-02-2017 Completion Date 06-02- 2018 Scheme completed. 274 2192 Rural Drainage Scheme Madhrianwla Solangi Hafizabad Approved 0.000 10.000 35.025 35.025 35.025 100% 35.025 100% Date of A.A 23.09.2016 Awan Mamna kot awan channi Mitha Channi Date of T.S 24.09.2016 Kareen, Jhanian, Lakhia and Bashmolajat District Start Date 04-02-2017 Completion Date 04-02- 2019 Hafizabad Scheme completed. 275 2193 Construction of PCC Street/ Drain, Soling and Gujrat Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 100% A.A Date =23.09.2016 Nullah in U.C Fatta Band Tehsil Kharian District T.S date=26.09.2016 Gujrat Start date 21.11.16. Completion date 20.11.2017 Scheme completed.

276 2194 Sewerage / Drainage Scheme Chorranwala, M.B.Din Approved 0.000 10.000 25.000 25.000 24.951 100% 24.951 83% * A.A Date. 23.09.2016 Noor Jamal and Multanlawala * T.S Date. 24.09.2016 * Start Date 01.12.2016 * Completion date 30.11.2018. Work in progress. Full funds utilized.

277 2195 Sewerage / Drainage Scheme Thathi Bawa, M.B.Din Approved 0.000 10.000 24.800 24.800 24.774 100% 24.774 74% * A.A Date. 23.09.2016 Madheray, Ruk and Matnal * T.S Date. 24.09.2016 * Start Date 08.12.2016 * Completion date 07.12.2018. * Work in progress. Full funds utilized.

278 2196 Provision of Sewerage / Drainage / Pavement in M.B.Din Approved 0.000 10.000 40.200 40.200 40.192 100% 40.192 62% * A.A Date. 23.09.2016 Narang / Saadullaha Pur / Khoosor * T.S Date. 28.10.2016 * Start Date 24.12.2016 * Work in progress. Full funds utilized.

279 2197 Provision of Sewerage / Drainage / Pavement in M.B.Din Approved 0.000 10.000 42.500 42.500 42.498 100% 42.498 56% * A.A Date. 23.09.2016 Jano Chak Khurd & Kalan , Basi Khurd & Kalan, * T.S Date. 28.10.2016 Channi Mast , Aado Sarwani * Start Date 24.12.2016 * Work in progress. Full funds utilized.

280 2198 Rural Sewerage / Drainage Scheme of Village M.B.Din Approved 0.000 25.000 10.000 10.000 10.000 100% 10.000 14% * A.A Date. 23.09.2016 Bherowal Tehsil Phalia Distt. Mandi Bahaddin * T.S Date. 28.10.2016 * Start Date 24.12.2016 Work in progress. Full funds utilized. 281 2199 Rural Sewerage, Drainage/Soling & PCC M.B.Din Approved 0.000 16.000 36.000 36.000 35.999 100% 35.999 72% * A.A Date. 23.09.2016 Scheme in Chak No. 20 With Abadies Tehsil * T.S Date. 24.09.2016 Malikwal Distt. M.B Din * Start Date 19.11.2016 * Completion date 18.11.2018. * Work in progress. Full funds utilized.

282 2200 Rural Sewerage / Drainage Scheme of Village M.B.Din Approved 0.000 25.000 45.000 45.000 44.940 100% 44.940 60% * A.A Date. 23.09.2016 Khai and Bukkan Tehsil & Distt. M.B. Din * T.S Date. 28.10.2016 * Start Date 06.12.2016 * Completion date 23.12.2018. * Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

283 2201 Rural Sewerage, Drainage/Soling & PCC M.B.Din Approved 0.000 15.000 30.000 30.000 29.974 100% 29.974 56% * A.A Date. 23.09.2016 Scheme in Villages Main Mandi Mona Depot Pind * T.S Date. 28.10.2016 Makko Tehsil Malikwal Distt. M.B Din * Work in progress. Full funds utilized.

284 2202 Sewerage / Drainage of Village Rerka Mumdana, M.B.Din Approved 0.000 20.000 7.000 7.000 6.999 100% 6.999 17% * A.A Date. 23.09.2016 Tehsil Malikwal * T.S Date. 24.09.2016 * Start Date 24.12.2016 * Completion date 31.12..2018. Work in progress. Full funds utilized. 285 2203 Construction of PCC Street, Drain/ Nullah Sialkot Approved 0.000 10.000 5.000 5.000 5.000 100% 5.000 20% Providing and Laying of RCC Sewer And Tuff Tile *A.A Date =23.09.16 U/C Water Works (Silver Star Road Mohallah *T.S date=24.09.2016 Islamia Park) Tehsil and District Sialkot (PP-122) Work in progress. Full funds utilized.

286 2204 Construction of Streets, Naullahas, PCC, Soling Sialkot Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 100% *A.A Date =23.09.16 at Villages Kotli Noshahra, Chowk Dharam Koot, *T.S date=24.09.2016 Binna, Golian Tehsil Daska Scheme completed. 287 2205 Constuction of Streets, Naullahs, PCC Soling at Sialkot Approved 0.000 6.000 6.000 6.000 6.000 100% 6.000 100% *A.A Date =23.09.16 Villages Koreki, Ratta Bajwa, Jhulki, Faqiran *T.S date=24.09.2016 Wali, Chianwali, Tehsil Daska Scheme completed. 288 2206 Construction of Streets Naullahs, PCC,Soling at Sialkot Approved 0.000 6.000 6.000 6.000 6.000 100% 6.000 100% Villages Changa Changi, Kotli Baba Heera, Raokay, Merk Pur, Kotli Shams, Loharnwali, *A.A Date =23.09.16 Bhadaal, Kotli Gull Muhammad, Kotli Momman, *T.S date=24.09.2016 Ghano kay, Bhagar Pur, Ugo Chuk, Gurro Chuk, Scheme completed. Shatab Ghar, Nannd Pur, Fateh Pur

289 2207 Construction of Streets, Naullahas, PCC Soling Sialkot Approved 0.000 7.000 7.000 7.000 7.000 100% 7.000 100% at Villages Marnana Veer wala, Sian, Tarsika *A.A Date =23.09.16 Hachar, Malowali, Dheerkay, Beiriwala Noor Pur *T.S date=24.09.2016 Jattan, Kotli Matwan, Nawan Pind, Tehsil Daska Scheme completed.

290 2208 Construction of Street Drain PCC/ and Nullah Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 100% *A.A Date =23.09.16 U/C Kundan Sian *T.S date=24.09.2016 Scheme completed. 291 2209 Construction of Street Drain PCC/ and Nullah Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 100% *A.A Date =23.09.16 U/C Kharolian *T.S date=24.09.2016 Scheme completed. 292 2210 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 36% at Shahuwala Bashamula Balo Chak, Nashtar *A.A Date =23.09.16 *T.S date=24.09.2016 Abad, Zafarwali, Kamalpur, Manpur etc. Work in progress. Full funds utilized.

293 2211 Providing and Laying of Tuff Tile RCC Sewer and Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 31% Construction of Drain / Nullah Mohallah Kashmiri *A.A Date =23.09.16 *T.S date=24.09.2016 Saray Bhabrian Alamgir Bazar Nikhas UC Imam Work in progress. Full funds utilized. Sahib Tehsil and District Sialkot 294 2212 Providing and Laying Tuff Tile RCC Sewer and Sialkot Approved 0.000 10.000 14.000 14.000 14.000 100% 14.000 40% Construction of of Drain /Nullah Mohallah Shahab *A.A Date =23.09.16 Pura Bijli Mohallah Darbar Shahab Shah UC *T.S date=24.09.2016 Shahab Pura Tehsil and District Sialkot Work in progress. Full funds utilized.

295 2213 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 20% *A.A Date =23.09.16 at Verowala Bashamula Wassankay, *T.S date=24.09.2016 Magokaman, Nandpur, Baryar, Wan Garthal, *Start Date 19.11.16 Umerkay Klan, Umerkay Khurd, Ahmedabad, *Completion date 31.12.2018 Veeramkay etc. Work in progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

296 2214 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 20% *A.A Date =23.09.16 at Gojra Bashamula Thatha Lathi, Qila Tek *T.S date=24.09.2016 Singh, Bhonawali, Phagant, Dhera Sanda, *Start Date 18.11.16 *Completion date 31.12.2018 Islampura, Kotliwala, Kandan Sian Work in progress. Full funds utilized. 297 2215 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 40% *A.A Date =23.09.16 at Barath Bhoth Bashamula Markiwal, Khorta *T.S date=24.09.2016 Syedan, Ballanwala, Machi Khokhar, Gul Bahar *Start Date 19.11.16 Khurd / Gul Bahar Klan *Completion date 31.12.2018 Work in progress. Full funds utilized. 298 2216 Construction of PCC / Drain in Dheera Sandha Sialkot Approved 0.000 10.000 38.000 38.000 38.000 100% 38.000 76% *A.A Date =23.09.16 District Sialkot *Revised AA=01.12.2016 *T.S date=24.09.2016 *Completion date 31.12.2018 Work in progress. Full funds utilized. 299 2217 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 36% *A.A Date =23.09.16 at Chaprar Bashamula Punowal, Najwal, Parwal, *T.S date=30.09.2016 Sagarpur, Madipur, Baghpur, Sagripur etc. *Start Date 22.11.16 *Completion date 31.12.2018 Work in progress. Full funds utilized. 300 2218 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 20.000 10.000 10.000 10.000 100% 10.000 14% *A.A Date =23.09.16 at Saidowali Bashamula Hambokay, Kot Mahraj, *T.S date=30.09.2016 Merian Pindi, Lalay Wali, Eas Pur, Khorray, *Start Date 22.11.16 *Completion date 31.12.2018 Suraj, Chak Hana, etc. Work in progress.Full funds utilized. 301 2219 Provision of PCC/Soling/Nalian/Streets Schemes Sialkot Approved 0.000 10.000 40.000 40.000 40.000 100% 40.000 53% *A.A Date =23.09.16 at Mandran Wala Bashamula Adamkay Cheema, *T.S date=30.09.2016 Nai Abadi, Tajjoki, Harsian etc. *Start Date 23.11.16 *Completion date 31.12.2018 Work in progress. Full funds utilized. 302 2220 Provision of Sewerage and Tuff Tile in Various Sialkot Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 17% UCS of District Sialkot, Ucs, kotli Behram, *A.A Date =23.09.16 Mubarik pura, Mianan pura, Model Town, Fateh *T.S date=30.09.2016 *Start Date 23.11.16 Garh, Muzafar pur, Haji pura band, Haji Pura -II, *Completion date 31.12.2018 Imam Sahib, Shahab pura, pacca Garha, Hamza Work in progress. Full funds utilized. Ghous, 303 2221 Provision of Sewerage & PCC Schemes UC Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 25% *A.A Date =23.09.16 Jharah Wala Salhoke, Bharlham Wala *T.S date=24.09.2016 Work in progress. Full funds utilized. 304 2222 Provision of PCC Sewerage Schemes in UC Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 25% *A.A Date =23.09.16 Dhuda Goraya, MaloMahay, Bogray SEO KE *T.S date=24.09.2016 Work in progress. Full funds utilized. 305 2223 Provision of Sewerage & PCC Schemes in Pero Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 25% *A.A Date =23.09.16 Chak, Sego Wala, Adha Kanwamlit *T.S date=24.09.2016 Work in progress. Full funds utilized. 306 2224 Provision of Sewerage / Drainage Scheme at UC Sialkot Approved 0.000 10.000 40.000 40.000 40.000 100% 40.000 80% *A.A Date =23.09.16 Dhodha *T.S date=24.09.2016 *Start Date 18.11.16 *Completion date 31.12.2018 Work in progress. Full funds utilized. 307 2225 Construction of PCC Street, Drain/ Nullah Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 39% Providing and Laying of RCC Sewer And Tuff Tile *A.A Date =23.09.16 *T.S date=24.09.2016 U/C Water Works (Mohallah Pak Pura) Tehsil Work in progress. Full funds utilized. and District Sialkot (PP-122) 308 2226 Construction of PCC Street, Drain/ Nullah Sialkot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 35% Providing and Laying of RCC Sewer And Tuff Tile *A.A Date =23.09.16 *T.S date=24.09.2016 U/C Muhammad Pura (Nishat Park) Tehsil and Work in progress.Work in progress. Full funds utilized. District Sialkot Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

309 2227 Construction of PCC Street, Drain/ Nullah Sialkot Approved 0.000 10.000 17.250 17.250 17.250 100% 17.250 58% Providing and Laying of RCC Sewer And Tuff Tile *A.A Date =23.09.16 *T.S date=24.09.2016 U/C Duburji Arrian (Moh: Babe Beri, Habib Pura) Work in progress.Work in progress. Full funds utilized. Tehsil and District Sialkot 310 2228 Drainage / PCC Scheme Village Mahais Narowal Approved 0.000 10.000 22.000 22.000 21.952 100% 21.952 105% A.A. dated 23.9.2016. T.S. dated 24.9.2016. *Start Date 16.11.2016 *Completion date 15.11.2017. Scheme completed.

311 2229 Drainage / PCC Scheme Village Bhainia Narowal Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 95% A.A. dated 23.9.2016. T.S. dated 24.9.2016. *Start Date 16.11.2016 *Completion date 15.11.2017. Work in porgress. Full funds utilized.

312 2230 Drainage / PCC scheme for village Gorala Narowal Approved 0.000 10.000 15.000 15.000 14.963 100% 14.963 30% A.A. dated 23.9.2016. Maanpur T.S. dated 24.9.2016. *Start Date 16.11.2016 *Completion date 18.05.2018. Work in porgress. Full funds utilized. 313 2231 Urban / Sewerage / PCC & Tuff Tile Scheme Narowal Approved 0.000 15.000 15.000 15.000 14.953 100% 14.953 9% A.A Date.23.9.2016. Narowal City T.S Date*28.10.2016 Date of start 17.2.2017 Date of completion 16.2.2019. Rcc pipes 140 Nos sewer pipe 72" i/d have been stacked at site. Work in progress. Full funds utilized. 314 2232 PCC and Drainage Scheme in UC- 271at Jia Lahore Approved 0.000 20.000 75.000 75.000 75.000 100% 75.000 75% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Bhagga and RO Plant at Jia Bhagga dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 1900/P&D-I, dated 26.08.2016. ● Start of Work:29-10-2016 ● Completion:28-10-2018 Scope of work Sullage Carrier =1 Job 85% PCC 80% Surface Drain 65% Brick pavement 80% RCC Sewer 90% RO Plant =1 No. ● Work is in progress. 315 2233 Construction of PCC and Nallah from Jamia Lahore Approved 0.000 10.000 17.212 17.212 17.212 100% 17.212 110% Scheme completed. Masjid Abdullah to Gajjumatta 316 2234 PCC and Drainage Scheme in UC- 181 at Lahore Approved 0.000 10.000 18.000 18.000 18.000 100% 18.000 40% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Narwar dated. 09.09.2016 ● T.S by the Superintending Engineer, PHE Circle Lahore vide No. 1335/E dated:21.9.2016. Star of work 1.11.2016 Date of completion 31.10.2018 Scope of work Sullage Carrier =1 Job 95% PCC 85% ● Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

317 2235 Up-Gradation of Streets PCC Flooring in Asif Lahore Approved 0.000 10.000 70.000 70.000 70.000 100% 70.000 47% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Town I, II Galaxo Town and Adjoining abadies dated. 13.08.2016 (NA-129) ●T.S by the Chief Engineer PHE Department Lahore vide No. 1976/P&D-I, dated 07.09.2016 ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage Carrier =1 Job 65% PCC 60% ● Work is in progress. 318 2236 PCC and Drainage Scheme in UC- 182 at Jallo Lahore Approved 0.000 10.000 20.000 20.000 19.962 100% 19.962 36% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, More & Batapur dated. 13.08.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 1981/P&D-I dt: 07.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 45% Drain 20% Brick pavement PCC 40% ● Work is in progress.

319 2237 PCC and Drainage Scheme in UC- 180 at Lahore Approved 0.000 10.000 40.000 40.000 40.000 100% 40.000 26% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Minhala dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 527/P&D-II, dated 19.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 30% PCC 25% Brick pavement ● Work is in progress.

320 2238 PCC and Drainage Scheme in UC- 190 at Lahore Approved 0.000 20.000 40.000 40.000 40.000 100% 40.000 25% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Hadiara dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 532/P&D-II, dated 19.09.2016 ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 30% Brick pavement Drain PCC 25% ● Work is in progress. 321 2239 PCC and Drainage Scheme in UC- 176 at Awan Lahore Approved 0.000 15.000 30.000 30.000 29.468 98% 29.468 42% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Dhaiwa dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 1986/P&D-I, dated 07.09.2016. ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 45% PCC 35% ● Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

322 2240 PCC and Drainage Scheme in Khananapal, Lahore Approved 0.000 20.000 60.000 60.000 60.000 100% 60.000 75% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Kangra, Karyal, Dhoondy, dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 1991/P&D-I, dated 07.09.2016. ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 85% PCC 80% Drain 65% Brick pavement 80% Sewer 70% ● Work is in progress.

323 2241 PCC and Drainage Scheme in UC- 249 at Lahore Approved 0.000 20.000 50.000 50.000 50.000 100% 50.000 62% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Kamahan dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 1996/P&D-I, dated 07.09.2016. ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1Job 70% PCC 65% ● Work is in progress. 324 2242 PCC and Drainage Scheme in UC- 189 at Barki Lahore Approved 0.000 20.000 71.848 71.848 71.848 100% 71.848 80% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 2001/P&D-I, dated 07.09.2016. ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1Job 90% PCC 80% Brick pavement 75% Drain 75% ● Work is in progress.

325 2243 PCC and Drainage Scheme in UC- 179 at Lahore Approved 0.000 20.000 58.014 58.014 58.014 100% 58.014 64% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Bhaseen dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 396/P&D/CS, dated 02.09.2016. ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 80% PCC 70% Brick pavement 60% ● Work is in progress. 326 2244 PCC and Drainage Scheme in Nanghar , Katcha, Lahore Approved 0.000 20.000 65.000 65.000 65.000 100% 65.000 72% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Tibba Katcha, Islampura, Halloki, Sadhuke dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 458/P&D- II, dated 05.09.2016. ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 85% PCC 75% ● Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

327 2245 PCC and Drainage Scheme in UC- 250 at They Lahore Approved 0.000 30.000 80.000 80.000 80.000 100% 80.000 89% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Panjo dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 463/P&D- II, dated 05.09.2016. ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 90% Sewer =1 Job 90% PCC 85% ● Work is in progress. 328 2246 PCC and Drainage Scheme in UC- 254 Deo Lahore Approved 0.000 20.000 69.946 69.946 69.946 100% 69.946 70% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Khurd and Kalan dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 468/P&D- II, dated 05.09.2016. ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 80% PCC 75% ● Work is in progress. 329 2247 PCC and Drainage Scheme in UC- 248 at Lahore Approved 0.000 20.000 100.000 100.000 100.000 100% 100.000 67% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Shehzada and Pura Kahna dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 537/P&D-II, dated 19.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 85% Drain 55% Sewer =1 Job 75% PCC 80% ● Work is in progress.

330 2248 PCC and Drainage Scheme in UC- 247 at Kahna Lahore Approved 0.000 20.000 50.000 50.000 50.000 100% 50.000 25% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Kohna dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 542/P&D-II, dated 19.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 35% Sewer =1 Job 20% Tuff tile PCC 30% ● Funds released in December 2016, work is in progress.

331 2249 PCC and Drainage Scheme in UC- 246 at Lahore Approved 0.000 20.000 70.000 70.000 70.000 100% 70.000 70% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Youhanabad dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 473/P&D- II, dated 05.09.2016. ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 80% Sewer 70% PCC 75% ● Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

332 2250 PCC and Drainage Scheme in UC- 197 at Lahore Approved 0.000 20.000 75.000 75.000 75.000 100% 75.000 75% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Dhalloki dated. 13.08.2016 ● T.S by the Chief Engineer (N), PHED Lahore vide No. 478/P&D- II, dated 05.09.2016. ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 80% Drain 65% PCC 75% Brick pavement 55% ● Work is in progress. 333 2251 PCC and Drainage Scheme in UC- 196 at Jaman Lahore Approved 0.000 20.000 75.000 75.000 75.000 100% 75.000 75% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 547/P&D-II, dated 19.09.2016 ● Start of Work:01-11-2016. ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 80% PCC 75% ● Work is in progress. 334 2252 PCC and Drainage Scheme in UC-191 at Lahore Approved 0.000 20.000 75.000 75.000 75.000 100% 75.000 75% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Gawind dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 552/P&D-II, dated 19.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 85% PCC 80% ● Work is in progress. 335 2253 PCC and Drainage Scheme in UC- 252 at Lahore Approved 0.000 20.000 70.000 70.000 70.000 100% 70.000 70% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Pandoki dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 557/P&D-II, dated 19.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 85% Drain 65% Brick pavement 55% PCC 80% ● Work is in progress.

336 2254 PCC and Drainage Scheme in UC- 268 at Judho Lahore Approved 0.000 20.000 70.000 70.000 70.000 100% 70.000 70% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Dheer dated. 13.08.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 483/P&D-II dt: 05.09.2016 ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 85% Drain 85% PCC 70% ● Work is in progress. 337 2255 PCC and Drainage Scheme in UC- 245 at Dhulo Lahore Approved 0.000 20.000 103.000 103.000 103.000 100% 103.000 103% Scheme completed. Kalan & Khurd Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

338 2256 PCC and Drainage Scheme in UC- 194 at Lahore Approved 0.000 20.000 35.000 35.000 35.000 100% 35.000 35% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/481 dt: Liddhar 14.10.2016. ● T.S by the C.E (N) PHED Lahore vide No.2358/P&D-I, dated 21.10.2016. ● Start of Work:15-11-2016 ● Completion:14-11-2018 Scope of work Sullage carrier =1 Job 55% PCC 40% ● Work is in progress. 339 2257 PCC and Drainage Scheme in UC- 253 at Lahore Approved 0.000 20.000 62.500 62.500 62.490 100% 62.490 52% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/386, Suraich dated. 13.08.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 488/P&D-II dt: 05.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier =1 Job 65% PCC 55% ● Work is in progress. 340 2258 PCC and Drainage Scheme in UC- 195 at Hair Lahore Approved 0.000 20.000 79.026 79.026 79.026 100% 79.026 66% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 567/P&D-II, dated 19.09.2016 ● Start of Work:01-11-2016 ● Completion:31-10-2018 Scope of work Sullage carrier =1 Job 75% PCC 65% ● Work is in progress. 341 2259 PCC and Drainage Scheme in UC- 243 at Attari Lahore Approved 0.000 20.000 61.000 61.000 61.000 100% 61.000 47% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Saroba Pind dated. 09.09.2016 ●T.S by the Chief Engineer PHE Department Lahore vide No. 580/P&D-II, dated 21.09.2016 ● Start of Work:31-10-2016 ● Completion:30-10-2018 Scope of work Sullage carrier = 60% Sewer = 50% PCC 55% ● Work is in progress. 342 2260 PCC and Drainage Scheme in UC- 242 at Attari. Lahore Approved 0.000 20.000 139.000 139.000 139.000 100% 139.000 93% ● Physically scheme completed.

343 2261 PCC and Drainage Scheme in UC- 145 Lahore Approved 0.000 50.000 88.983 88.983 88.000 99% 88.000 44% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/481 dt: Gajjumatta and Adjoining Abadies. 14.10.2016. ● T.S by the C.E (N) PHED Lahore vide No.2336/P&D-I, dated:19.10.2016. ● Start of Work:18-11-2016 ● Completion:17-11-2018 Scope of work Sullage carrier =1 Job 70% Sewer =1 Job 50% PCC 65% Work is in progress. 344 2262 Construction of PCC / Sewerage Iqbal Colony Lahore Approved 0.000 5.000 20.000 20.000 20.000 100% 20.000 100% Ahmed Town, Aziz baig Ali Colony & Shadipura Scheme completed.

345 2263 Construction of PCC / Sewerage Links Streets Lahore Approved 0.000 5.000 9.903 9.903 9.903 100% 9.903 99% Scheme completed. Gulistan Colony, Bostan Colony, Chobacha. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

346 2264 Construction of PCC / Sewerage Links Streets Lahore Approved 0.000 5.000 9.902 9.902 9.902 100% 9.902 99% Nizam Abad, Nabi Nagar, Solling Road and Scheme completed. Talian Bazar. 347 2265 Construction of PCC / Sewerage Links Streets Lahore Approved 0.000 10.000 9.902 9.902 9.902 100% 9.902 99% Usman Nagar, Hussain Pura, Madina Mohallah Scheme completed. and Muslim Mohallah. 348 2266 Construction of Sullage carrier along burke road Lahore Approved 0.000 11.226 0.000 0.000 0.000 0% 0.000 0% in front of Mehfooz Shaheed Garrison Lahore ● Work under execution by private builders, M/S Paragon Housing Society. Scheme proposed for dropped.

349 2267 Construction of PCC and Nallah from Hadyara Lahore Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 34% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/439, Drain to Dulam Village dated. 09.09.2016 ● T.S by the S.E, PHE Circle Lahore vide No. 1336/E dated:21.9.2016. ● Start of Work:29-10-2016 ● Completion:28-10-2018 Scope of work Sullage Carrier =1 Job 40% PCC 35% ● Work is in progress. 350 2268 Rural Drainage Scheme at Jugian District Sheikhupura Approved 0.000 1.500 0.750 0.750 0.750 100% 0.750 50% Work is in progress. Sheikhupura 351 2269 Construction of Drains, PCC at Shahab Garh Sheikhupura Approved 0.000 2.000 1.000 1.000 1.000 100% 1.000 50% Work is in progress. District Sheikhupura 352 2270 Construction of Nullah at Bara Jewan Goraya Sheikhupura Approved 0.000 4.400 2.200 2.200 2.200 100% 2.200 50% Work is in progress. District Sheikhupura 353 2271 Construction of Drainage & PCC Scheme at Sheikhupura Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 100% Work is in progress. Chak No.13/RB District Sheikhupura 354 2272 Constrution of PCC, Drain / Soling and Nullah at Sheikhupura Approved 0.000 10.000 9.951 9.951 9.951 100% 9.951 100% Work is in progress. UC Mehta Suja, District Sheikhupura 355 2273 Construction of PCC, Drain / Soling and Nullah at Sheikhupura Approved 0.000 10.000 9.952 9.952 9.952 100% 9.952 100% Work is in progress. Guchli Virkan, District Sheikhupura 356 2274 Rural drainage scheme at UC Hardev District Sheikhupura Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 105% Work is in progress. Sheikhupura 357 2275 Rural drainage scheme at UC Jhabran, District Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% Work is in progress. Sheikhupura 358 2276 Construction of PCC, Drains / Soling & Nallah at Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% Work is in progress. UC 84, Makki 460l, District Sheikhupura 359 2277 Construction of PCC, Drains / Soling & Nallah at Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% Work is in progress. UC 83, Jatri Kohna, District Sheikhupura 360 2278 Construction of PCC, Drains / Soling & Nallah at Sheikhupura Approved 0.000 10.000 11.000 11.000 11.000 100% 11.000 73% Work is in progress. UC 78, Gujniana Nu, District Sheikhupura 361 2279 Construction of PCC, Drains / Soling & Nallah at Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% Work is in progress. UC 75, Kakar Gill, District Sheikhupura 362 2280 Rural drainage scheme at UC Bhadro District Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 66% Work is in progress. Sheikhupura 363 2281 Rural drainage scheme at UC Kalokay District Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 65% Work is in progress. Sheikhupura 364 2282 Rural drainage scheme at UC Kurlkey District Sheikhupura Approved 0.000 10.000 12.600 12.600 12.600 100% 12.600 63% Work is in progress. Sheikhupura 365 2283 Drainage & PCC Scheme UC 88 Mananwala Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% Work is in progress. Sham Singh district Sheikhupura 366 2284 Drainage & PCC Scheme UC 86 Mananwala Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% Work is in progress. Karpal Singh District Sheikhupura 367 2285 Construction of Drainage & PCC Scheme at Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 40% Work is in progress. Mariam Abad District Sheikhupura 368 2286 Provision of PCC and draniage at Manawala Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 33% Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

369 2287 Construction of Drainage & PCC Scheme at Mian Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 33% Work is in progress. Ali Dogran District Sheikhupura 370 2288 Rural Drainage & PCC scheme Union Council Sheikhupura Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 22% Work is in progress. Kot Mehmood, District Sheikhupura 371 2289 Rural Drainage & PCC scheme Union Council Sheikhupura Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 20% Work is in progress. Burj Attari, District Sheikhupura 372 2290 Construction of PCC, Drains, Soling in District Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 10% Work is in progress. Sheikhupura 373 2291 Rural Drainage/PCC Scheme Moran Wala Sheikhupura Approved 0.000 20.000 110.000 110.000 110.000 100% 110.000 122% Work is in progress. District Sheikhupura 374 2292 Rural Drainage & PCC Scheme U.C. Ajnianwala Sheikhupura Approved 0.000 12.000 17.000 17.000 17.000 100% 17.000 23% Work is in progress.

375 2293 Rural Drainage & PCC Scheme U.C. Buttar Sheikhupura Approved 0.000 14.000 19.000 19.000 19.000 100% 19.000 33% Work is in progress. 376 2294 Rural Drainage & PCC Scheme U.C. Sacha Sheikhupura Approved 0.000 14.000 14.000 14.000 14.000 100% 14.000 18% Work is in progress. Souda 377 2295 Rural Drainage & PCC Scheme U.C. Muridke Sheikhupura Approved 0.000 14.000 14.000 14.000 14.000 100% 14.000 31% Work is in progress. 378 2296 Rural Drainage & PCC Scheme U.C. Nookhar Sheikhupura Approved 0.000 14.000 16.600 16.600 16.600 100% 16.600 37% Work is in progress. 379 2297 Rural Drainage & PCC Scheme U.C. Kot Sonda Sheikhupura Approved 0.000 14.000 14.000 14.000 14.000 100% 14.000 31% Work is in progress.

380 2298 Rural Drainage & PCC Scheme U.C. Harchand Sheikhupura Approved 0.000 1.000 13.000 13.000 13.000 100% 13.000 37% Work is in progress. 381 2299 Rural Drainage & PCC Scheme U.C. Keelay Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 21% Work is in progress. 382 2300 Rural Drainage & PCC Scheme U.C. Gujiana Nu Sheikhupura Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 27% Work is in progress.

383 2301 Rural Drainage & PCC Scheme U.C. Easerkey Sheikhupura Approved 0.000 15.000 20.000 20.000 20.000 100% 20.000 53% Work is in progress. 384 2302 RSD Scheme Faizpur Khurd District Sheikhupura Sheikhupura Approved 0.000 13.000 6.500 6.500 6.500 100% 6.500 16% Work is in progress.

385 2303 Rural Drainage Scheme Chak No 8/RB Sheikhupura Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 13% Work is in progress. Sheikhupura 386 2304 Construction of PCC, Nallah & Culverts at village Sheikhupura Approved 0.000 3.000 3.000 3.000 3.000 100% 3.000 100% Bhollay Shah & Dera Khullay, District Work is in progress. Sheikhupura 387 2305 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 10.000 9.999 9.999 9.998 100% 9.998 100% Drain = 682/8159 Rft Brick at Ratian Araiyan, Chak No.5/RB, District Sahib Pavement = /20584 Cft PCC = Nankana Sahib 2879/7950 Cft Sullage Carrier 1.5' x1.5' /420 Rft Work is in progress. 388 2306 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 7.000 15.675 15.675 15.675 100% 15.675 105% Drain = --- /11810 Rft Brick at Naizampura Molla Singh, Chak NO.80/RB, Sahib Pavement = --- /10473 Cft PCC = --- District Nankana Sahib /24022 Cft Sullage Carrier 1.5' x1.5' --- /454 Rft Work is in progress. 389 2307 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 7.000 15.675 15.675 15.675 100% 15.675 105% Drain = 1039/15754 Rft at Chak No.42/RB, District Nankana Sahib Sahib Brick Pavement = --- /23933 Cft PCC = 4596/12104 Cft Sullage Carrier 1.5' x1.5' --- /384 Rft Work is in progress. 390 2308 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 7.000 7.000 7.000 7.000 100% 7.000 47% at Chak No.41/RB, District Nankana Sahib Sahib Work in progress. 391 2309 Provision of Rural Drainage / PCC Scheme for Nankana Approved 0.000 15.000 17.799 17.799 17.790 100% 17.790 36% 16 Nos. of Union Councils in , District Sahib Work in progress. Sheikhupura 392 2310 Construction of Drain Nullah Soling at Chak No. Nankana Approved 0.000 10.000 52.200 52.200 52.200 100% 52.200 100% Drain = 265/29918 Rft Brick 3, Bchuki par, Chak No. 01 , Jalal Khana, Sahib Pavement = 7462/49795 Cft PCC = Mangtan wala Nankana Sahib 5439/71258 Cft Sullage Carrier 1.5' x1.5' 924/4442 Rft Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

393 2311 Provision of Sewerage System at Warburton Nankana Approved 0.000 10.000 30.000 30.000 30.000 100% 30.000 23% Work is in progress. Town Nankana Sahib. Sahib 394 2312 Construction of PCC Streets and Drains at Kot Nankana Approved 0.000 3.000 3.000 3.000 3.000 100% 3.000 100% Drain 1390/1275 Rft Padhiar including Mouza Pindi Chery Nankana Sahib PCC 2100/2115 Cft Sullage Sahib Carrier 1.5' x1.5' 262/250 Rft Scheme physically Completted 395 2313 Construction of PCC Streets and Drains at Dhari Nankana Approved 0.000 3.000 3.000 3.000 3.000 100% 3.000 100% Drain = --- /1460 Rft Mohlan including Chak No.4/54, Nankana Sahib Sahib PCC = 2300/2615 Cft Sullage Carrier 1.5' x1.5' 269/541 Rft. Work is in progress. 396 2314 Const. of Soling Drains, PCC, Culverts U.C Zafar Kasur Approved 0.000 10.000 19.650 19.650 19.650 100% 19.650 98% Date of A.A 13.08.2016 Key, Tehsil KRK, District, Kasur Revised Date of A.A Date of T.S :25.08.2016 Date of Award :02.11.2016 Scheduled date of Completion on 01.05.2018 Revised date of Completion : Date of Commencement 02.11.2016 Drain 1656/3100 Rft PCC & B/Pavement 9328/7599 Cft Sullage Carier 1.5x1.5 661/12255 Rft. Culverts 02/12 No. Work in progress 397 2315 Const. of Soling Drains, PCC, Culverts U.C Kasur Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 75% Date of A.A 13.08.2016 Rosa, Tehsil KRK, District, Kasur Revised Date of A.A Date of T.S :25.08.2016 Date of Award :03.11.2016 Scheduled date of Completion on 02.05.2018 Revised date of Completion : Nil Date of Commencement 03.11.2016 Drain 860/15020 Rft PCC & B/Pavement 13217/15072 Cft Sullage Carier 1.5x1.5 2230/4500 Rft. Culverts 0/07 No. Work in progress 398 2316 Const. of Soling Drains, PCC, Culverts U.C Kasur Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% Date of A.A 13.08.2016 Cheena Ottar, Tehsil KRK, District, Kasur Revised Date of A.A Date of T.S :25.08.2016 Date of Award :01.11.2016 Scheduled date of Completion on 30.04.2018 Revised date of Completion : Nil Date of Commencement 01.11.2016 Drain 8792/10735 Rft PCC & B/Pavement 3244/55794 Cft Sullage Carier 1.5x1.5 0/3200 Rft. Culverts 0/09 No. Work in Progress. 399 2317 Const. of Soling Nullah, PCC etc. Union Council Kasur Approved 0.000 10.000 18.000 18.000 17.992 100% 17.992 60% Date of A.A 13.08.2016 Chirrawan, Tehsil & District, Kasur Revised Date of A.A Date of T.S :25.08.2016 Date of Award :01.11.2016 Scheduled date of Completion on 30.04.2018 Revised date of Completion : Nil Date of Commencement 25.08.2016 Drain 2384/18312 Rft PCC & B/Pavement 92950/55794 Cft Sullage Carier 1.5x1.5 441/3200 Rft. Culverts 0/09 No. Work in Progress. 400 2318 Const. of Soling, Nullah, PCC etc. Katlohi, Kasur Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 50% Date of A.A 13.08.2016 Wadara and adjoining abadies, Tehsil & District, Revised Date of A.A Nil Kasur Date of T.S :28.08.2016 Date of Award :02.11.2016 Scheduled date of Completion on 01.05.2018 Revised date of Completion : Nil Date of Commencement 28.8.2016 Drain 3025/12110 Rft PCC & B/Pavement 2758/120464 Cft Sullage Carier 1.5x1.5 0/3280Rft. Culverts 0/09 No. Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

401 2319 Const. of Soling, Nullah PCC etc. Badian, Rai Kasur Approved 0.000 10.000 15.000 15.000 14.992 100% 14.992 50% Date of A.A 13.08.2016 Kalan, Khurd, Baddar Pur and adjoining abadies, Revised Date of A.A Tehsil & District, Kasur Date of T.S :25.08.2016 Date of Award :08.11.2016 Scheduled date of Completion on 07.05.2018 Revised date of Completion : Nil Date of Commencement 08.11.2016 Drain 16280 Rft PCC & B/Pavement 27261/91242 Cft Sullage Carier 1.5x1.5 12130 Rft. Work in progress 402 2320 Rural drainage Scheme Hanjray Kalan & Allied Kasur Approved 0.000 20.000 40.000 40.000 40.000 100% 40.000 59% Date of A.A 13.08.2016 Abadies, Khudian, Bhaseen, Dello Multani, Revised Date of A.A Wander, Jagu Wal, Tehsil Pattoki, District Kasur Date of T.S :30.09.2016 Date of Award :28.10.2016 Scheduled date of Completion on 27.10.2018 Revised date of Completion : Nil Date of Commencement 28.10.2016 Drain 10012/63420 Rft PCC & B/Pavement 15000/ 200433Cft Sullage Carier 1.5x1.5 5201 Rft. 2'x2' 2100 Rft. Work in progress

403 2321 Rural Drainage PCC Brick pavement Schemes Kasur Approved 0.000 20.000 25.000 25.000 25.000 100% 25.000 32% Date of A.A 13.08.2016 Rao Khan wala and Beroon Rao Khan Wala and Revised Date of A.A Adjoining Abadies, Tehsil & District, Kasur Date of T.S :30.09.2016 Date of Award :28.10.2016 Scheduled date of Completion on 27.10.2018 Revised date of Completion : Nil Date of Commencement 28.10.2016 Drain 1398/41285 Rft PCC & B/Pavement 33426/230713 Cft Sullage Carier 1.5x1.5 9150 Rft. 2x2 4800 Rft Work in progress 404 2322 Rural drainage scheme Hardo Sahari, District Kasur Approved 0.000 20.000 47.100 47.100 47.098 100% 47.098 56% Date of A.A 20.11.2015 Kasur Revised Date of A.A Date of T.S :30.05.2016 Date of Award :25.10.2016 Scheduled date of Completion on 24.10.2018 Revised date of Completion Nil: Date of Commencement 25.10.2016 Drain /41285 Rft PCC & B/Pavement 41089/230713 Cft Sullage Carier 1.5x1.5 481/9150 Rft. 2x2 4800 Rft Work in progress 405 2323 Construction of Sullge Carrier at Chah Kasur Approved 0.000 20.000 27.000 27.000 26.983 100% 26.983 31% Work in Progress Kalalanwala, Tehsil Pattoki, District Kasur 406 2324 RWSDS, Jaithpur Depalpur Okara Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 48% Date of AA- 31.08.2016 Date of TS- 08.09.2016 Date of Invitation of Tender,15.10.2016 Date of Receipt of Tenders,17.10.2016 Date of work Order.17.11.2016 Date of completion As per PC-I.31.12.2017 Anticipated date of completion, 31.12.2017 Projected Population 10309 Person (1) Tube Well 1/1 (2) Pump House 0/1 (3) Pumping Machinery 0/1 (4) Rising Main / distribution system 3" to 8" i/d 7650/17699 Rft (5) Boundry Wall 0/400 Rft (6) staff qaurter 0/1 (7) Sullage Carrier 1.25'x 1.25' 0/6100 Rft (8) Brick Pavemnet 0/10281 Cft. Work in Progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

407 2325 RWSDS, Chishti Sham Din Depalpur Okara Approved 0.000 5.000 11.500 11.500 11.500 100% 11.500 54% Date of AA- 31.08.2016 Date of TS-08.09.2016 Date of Invitation of Tender,15.10.2016 Date of Receipt of Tenders,17.10.2016 Date of work Order.17.11.2016 Date of completion As per PC-I.31.12.2017 Anticipated date of completion, 31.12.2017 Re - Appropriation of funds(+). 2.500 dt: 28-04-2017 Projected Population 2791 Person (1) Tube Well 1/1 (2) Pump House 0/1 (3) Pumping Machinery 0/1 (4) Rising Main / distribution system 3" to 6" i/d 8652/22666 Rft (5) Boundry Wall 0/400 Rft (6) staff qaurter 0/1 (7) Sullage Carrier 1.25'x a1.25' 0/4501 Rft (8) Brick Pavemnet 0/1039 Cft. Work in Progress 408 2326 RWSDS, Awan Kalan, Depalpur Okara Approved 0.000 5.000 11.500 11.500 11.500 100% 11.500 46% Date of AA- 31.08.2016 Date of TS-08.09.2016 Date of Invitation of Tender,15.10.2016 Date of Receipt of Tenders,17.10.2016 Date of work Order.17.11.2016 Date of completion As per PC-I.31.12.2017 Anticipated date of completion, 31.12.2017 Re - Appropriation of funds (+) 2.500 dt: 28-04-2017 Projected Population 7758 Person (1) Tube Well 0/1 (2) Pump House 0/1 (3) Pumping Machinery 0/1 (4) Rising Main / distribution system 3" to 6" i/d 0/25538 Rft (5) Boundry Wall 0/400 Rft (6) staff qaurter 0/1 (7) Sullage Carrier 1.25'x a1.25' 0/803 Rft (8) Brick Pavemnet 0/20644 Cft. Work clould not be started to dispute of work at site

409 2327 RWSDS, Qila Dewan Singh Okara Approved 0.000 5.000 5.000 5.000 5.000 100% 5.000 20% Work in Progress 410 2328 Laying of Tuff Tile, Brick Pavement and Okara Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 50% Date of AA- 31.08.2016 Construction of Drain with slabs etc at Sher Garh, Date of TS-08.09.2016 District Okara Date of Invitation of Tender,15.10.2016 Date of Receipt of Tenders,17.10.2016 Date of work Order.29.11.2016 Date of completion As per PC-I.31.12.2017 Anticipated date of completion, 31.12.2017 Projected Population 24422 Person (1) Tuff Tile 60mm 50020/289356 Sft (2) Brick Pavement 0/264 Cft (3) Drain 0/150 Rft Work in Progress

411 2329 Rural Drainage Scheme / Tuff Tiles / PCC / Okara Approved 0.000 10.000 35.380 35.380 35.380 100% 35.380 36% Date of AA- 31.08.2016 Sewerage and Soling, 3/SP, 43/SP, Khurpy/44- Date of TS-22.11.2016 SP, Waltoya, Matan Wala, Amliya Kay suhag, Date of Invitation of Tender,09.12.2016 Date of Receipt of Tenders,10.12.2016 Nihal Muhar, Mahlo sheikhu, Mahant Darshan, Date of work Order.05.01.2017 Nama Jindida, District Okara Date of completion As per PC-I.30.06.2018 Anticipated date of completion, 30.06.2018 Re- Appropriation funds (+) 6.000 dt: 28-04-2017 Projected Population 24422 Person (1) Drain 0/87983 Rft (2) Soling 1035/330163 Cft (3) Tuff Tiles 0/57459 Sft work strated recently. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

412 2330 Solling & Drain Chak No 8/4L Tehsil & Distrcit Okara Approved 0.000 5.000 4.050 4.050 4.050 100% 4.050 81% Date of AA- 31.08.2016 okara Date of TS-08.09.2016 Date of Invitation of Tender,03.11.2016 Date of Receipt of Tenders,05.11.2016 Date of work Order.17.11.2016 Date of completion As per PC-I. 31.12.2017 Anticipated date of completion, 31.12.2017 Re-appropriation of funds (-) 0.900 dt: 31.01.2017 (-) 0.050 dt: 28-04-2017 Projected Population 2420 Person (1) Bricks Pavement 10082/14578 Cft (2) Drain 2700/4605 Rft (3) Sullage carrier 1050/1355

413 2331 Sewerage scheme 82-6/R District Sahiwal Sahiwal Approved 0.000 10.000 9.050 9.050 9.050 100% 9.050 91% 1. Date of AA 31.08.2016 2. Date of TS 09.09.2016 3. Date of inviting of Tender 06.12.2016 4. Date if receipt of tender 31.12.2016 5. Date of completion as per PC-1 30.06.2017 6. Anticipated date of completion 30.06.2017 Tenders received and are under process. Scheme comprises of of 9", 12" & 15" lateral sewer which has been completed and is functional. 414 2332 Rehabilitation / Improvement /Augmentation of Sahiwal Approved 0.000 11.006 9.256 9.256 9.256 100% 9.256 84% Date of AA 13.10.2016 Sewerage Scheme Chak No. 32-35/14-L Date of inviting of Tender 25.10.2016 Date if receipt of tender 19.11.2016 Scheme Completed. 415 2333 Rehabilitation / Improvement /Augmentation of Sahiwal Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 78% 1. Date of AA 13.10.2016 Sewerage Scheme Chak No. 39/14-L 2. Date of TS 18.102.2016 3. Date of Pre-qualification ------4. Date of inviting of Tender 06.12.2016 5. Date if receipt of tender 31.12.2016 6. Date of Work Order ------7. Date of completion as per PC-1 ------8. Anticipated date of completion ------9. Re-appropriation of funds (-) ------10. Project Population = ------Person Scheme completed.

416 2334 P/Laying Sewerage / Drainage and brick Sahiwal Approved 0.000 10.000 23.000 23.000 23.000 100% 23.000 115% 1. Date of AA Under process of approval payment scheme Chak 100/12L & 103/12L 2. Date of TS ------3. Date of Pre-qualification ------4. Date of inviting of Tender ------5. Date if receipt of tender ------6. Date of Work Order ------7. Date of completion as per PC-1 ------8. Anticipated date of completion ------9. Re-appropriation of funds (-) ------10. Project Population = ------Person Work in progress

417 2335 P/Laying Sewerage / Drainage and Brick Sahiwal Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1. Date of AA 13.10.2016 Pavement Scheme Chak 83/12L, 85/12L 2. Date of TS 18.10.2016 3. Date of Pre-qualification ------4. Date of inviting of Tender 12.11.2016 5. Date if receipt of tender 06.12.2016 6. Date of Work Order ------7. Date of completion as per PC-1 ------8. Anticipated date of completion ------9. Re-appropriation of funds (-) ------10. Project Population = ------Person Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

418 2336 Sewerage Scheme in Sahiwal City Sahiwal Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 40% 1. Date of AA 22.02.2017 3. Date of Pre-qualification ------4. Date of inviting of Tender 24.02.2017 5. Date if receipt of tender 20.03.2017 6. Date of Work Order ------7. Date of completion as per PC-1 30.06.2018 8. Anticipated date of completion 30.06.2018 9. Re-appropriation of funds (-) ------10. Project Population = ------Person Work in progress and further funds required to complete the scheme.

419 2337 Sewerage Scheme Sahiwal City, City Bund Sahiwal Approved 0.000 15.000 15.000 15.000 15.000 100% 15.000 10% 1. Date of AA 22.02.2017 Road, LBDC, High Street & Girls College Road 2. Date of inviting of Tender 24.02.2017 3. Date if receipt of tender 20.03.2017 4. Date of completion as per PC-1 30.06.2018 5. Anticipated date of completion 30.06.2018

Work in progress and further funds required to complete the scheme. 420 2338 Rural Drainage Scheme Chowk Marlay Tehsil Pakpattan Approved 0.000 10.000 12.500 12.500 12.500 100% 12.500 50% (1). Date of AA = 31.08.2016 Arifwala District Pakpattan (2) Date of T.S = 09.09.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = 02.01.2017 (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = 01.11.2016 (11) Funds onlined on = 01.11.2016 (12) Re-appropriation of funds (+/-) = (13) Projected Population = 14405 Persons. (14) Project Details = (15) Reason of slow progress = Scope of Work 1 Surface Drain = 0/29712 Rft Type II 0/1250 Rft 2 Brick Pavement = 0/53763 Cft 3 S/ Carrier 2x2 = 0/4125 Rft. Work in progress. Full fund utilized.

421 2339 Rural Drainage Scheme Chak No. 10/SP Tehsil Pakpattan Approved 0.000 10.000 16.000 16.000 16.000 100% 16.000 63% (1). Date of AA = 31.08.2016 & District Pakpattan (2) Date of T.S = 09.09.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = 02.01.2017 (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2016 (9) Funds released by P&D =- (10) Funds released by FD = 01.11.2016 (11) Funds onlined on = 01.11.2016 (12) Re-appropriation of funds (+/-) = (13) Projected Population = 6965 Persons (14) Project Details = (15) Reason of slow progress = Nil work in progress. Full funds utilized Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

422 2340 Rural Drainage Scheme Chak Machi Singh Pakpattan Approved 0.000 10.000 12.500 12.500 12.500 100% 12.500 45% (1). Date of AA = 31.08.2016 Tehsil Arifwala District Pakpattan (2) Date of T.S = 09.09.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = 02.01.2017 (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = 01.11.2016 (11) Funds onlined on = 01.11.2016 (12) Re-appropriation of funds (+/-) = (13) Projected Population = 12943 Persons. (14) Project Details = Work in prograss. Full fund utilized.

423 2341 Rural Drainage Scheme Chak No. 39/SP Tehsil Pakpattan Approved 0.000 10.000 10.000 10.000 0.000 0% 0.000 0% The scheme has been wrongly printed as 38/SP instead of & District Pakpattan 39/SP. Change of nomanclature of scheme vide C.M Directive No.DS/W/CMO/16/AV/013115 dated: 23.08.2016. Now Mian Atta Muhammad Manika MPA PP-227 (Minister of Revenue) has obtained C.M Directive No.DS(W)CMO/16/AB-227/128708 dated: 23.01.2017 to change the scheme of Chak 67/D instead of 39/SP. Govt. of the Punjab HUD & PHE Department vide letter No.SO(PH- S)5-6/2016(PKT) dated: 24.03.2017 stated that change of nomenclature i-e Rural Drainge Scheme Chak No.67/D Tehsil & District Pakpattan may be included in the next ADP 2017-18.

424 2342 Rural Sewerage / Drainage Scheme Chak NO. Pakpattan Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 63% (1). Date of AA = 31.08.2016 58/EB (2) Date of T.S = 25.10.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = - (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = (11) Funds onlined on = (12) Re-appropriation of funds (+/-) = (13) Projected Population = 7226 Persons. (14) Project Details = (15) Reason of slow progress = Nill Wor, in is progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

425 2343 Provision of Drainage system at Chak No. Pakpattan Approved 0.000 10.000 22.060 22.060 22.060 100% 22.060 63% (1). Date of AA = 13.10.2016 351/EB (2) Date of T.S = 25.10.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = (11) Funds onlined on = (12) Re-appropriation of funds (+/-) = (13) Projected Population = 10476 persons. (14) Project Details = (15) Reason of slow progress = Nill Scope of Work 1 Surface Drain = 0/19674 Rft Type II 0/1000 Rft 2 Brick Pavement = 0/43731 Cft 3 S/ Carrier 2x2 = 785/7945 Rft. Wor, in is progress. Full funds utilized.

426 2344 Rural Drainage Scheme 38/EB Arifwala Pakpattan Approved 0.000 15.000 25.000 25.000 25.000 100% 25.000 78% (1). Date of AA = 13.10.2016 (2) Date of T.S = 24.11.2016 (3).Date of Prequalification = 18.08.2016 (4).Date of invitation of tenders= 05.01.2017 (5) Date of receipt tenders = 23.01.2017 (6) Date of Work order = 30.01.2017 (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = 15.12.2016 (11) Funds onlined on = 15.12.2016 (12) Re-appropriation of funds (+/-) = (13) Projected Population = 14050 Persons. (14) Project Details = (15) Reason of slow progress = Nill Wor, in is progress. Full funds utilized.

427 2345 Rural Sewerage / Drainage Scheme Chak No. Pakpattan Approved 0.000 10.000 4.000 4.000 4.000 100% 4.000 6% (1). Date of AA = 13.10.2016 38/EB (2) Date of T.S = 25.10.2016 (3).Date of Prequalification = Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = ----- (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = (11) Funds onlined on = (12) Re-appropriation of funds (+/-) = (13) Projected Population = 14825 persons (14) Project Details = (15) Reason of slow progress = Nill Wor, in is progress. Full funds utilized. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

428 2346 Rural Sewerage / Drainage Scheme Chak No. Pakpattan Approved 0.000 10.000 20.000 20.000 20.000 100% 20.000 67% (1). Date of AA = 13.10.2016 78/EB (2) Date of T.S = 25.10.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order =- (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = (11) Funds onlined on = (12) Re-appropriation of funds (+/-) = (13) Projected Population = 9490 Persons. (14) Project Details = (15) Reason of slow progress = Nill Wor, in is progress. Full funds utilized.

429 2347 Rural Sewerage and Drainage Scheme 65/EB Pakpattan Approved 0.000 20.000 15.000 15.000 15.000 100% 15.000 50% (1). Date of AA = 13.10.2016 Tehsil Arifwala District Pakpattan (2) Date of T.S = 25.10.2016 (3).Date of Prequalification =Nil (4).Date of invitation of tenders= 18.11.2016 (5) Date of receipt tenders = 10.12.2016 (6) Date of Work order = - (7) Date of completion as per PC-I = 30.06.2018 (8) Anticipated date of completion = 30.06.2018 (9) Funds released by P&D =- (10) Funds released by FD = 15.12.2016 (11) Funds onlined on = 15.12.2016 (12) Re-appropriation of funds (+/-) = (13) Projected Population = 10292 persons. (14) Project Details = (15) Reason of slow progress = Nill Wor, in is progress. Full funds utilized.

430 2348 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 2.000 2.000 2.000 1.986 99% 1.986 99% 1. Date of A.A: 27.08.2016 Streets in Union Council Panjani, District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 07.02.2017 7. Date of Completion as per PC-I: 06.06.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= 2768 Persons. Work is in progress.

431 2349 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 2.000 2.000 2.000 1.996 100% 1.996 100% 1. Date of A.A: 27.08.2016 Streets in Union Council Jahani Pur / Miran 2. Date of T.S: 01.09.2016 Malha, District Multan. 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 07.12.2016 7. Date of Completion as per PC-I: 06.04.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

432 2350 Rural Drainage Scheme Bheni, Tehsil and Multan Approved 0.000 3.430 3.430 3.430 3.390 99% 3.390 99% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of award: 07.12.2016 7. Date of Completion as per PC-I: 30.03.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

433 2351 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 3.500 3.500 3.500 3.488 100% 3.488 100% 1. Date of A.A: 27.08.2016 Streets in Union Council Thaiklan / Karam Ali 2. Date of T.S: 01.09.2016 Wala, District Multan. 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of award: 07.12.2016 7. Date of Completion as per PC-I: 04.05.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

434 2352 Rural Drainage Scheme Qadir Pur Laar, Tehsil Multan Approved 0.000 3.630 3.630 3.630 3.604 99% 3.604 99% 1. Date of A.A: 27.08.2016 and District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 30.11.2016 7. Date of Completion as per PC-I: 29.03.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= 3249 Persons. Work is in progress.

435 2353 Rural Drainage Scheme Jalal Abad, Tehsil and Multan Approved 0.000 4.390 4.390 4.390 4.382 100% 4.382 100% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 02.12.2016 7. Date of Completion as per PC-I: 01.04.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

436 2354 Rural Sewerage Scheme Chah Khundu Multan Approved 0.000 4.410 4.660 4.660 4.607 99% 4.607 104% 1. Date of A.A: 27.08.2016 WalaDistrict Multan 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 13.12.2016 7. Date of Completion as per PC-I: 12.04.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

437 2355 Rural Drainage Scheme Jhoke Lashkar, Tehsil Multan Approved 0.000 6.160 5.160 5.160 5.154 100% 5.154 84% 1. Date of A.A: 27.08.2016 and District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 02.12.2016 7. Date of Completion as per PC-I: 01.06.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

438 2356 Rural Drainage Scheme Bootay Wala Tehsil and Multan Approved 0.000 6.280 6.280 6.280 6.270 100% 6.270 100% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 02.12.2016 7. Date of Completion as per PC-I: 01.06.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Scheme completed.

439 2357 Rural Drainage Scheme Kot Rab Nawaz, Tehsil Multan Approved 0.000 7.150 7.150 7.150 6.608 92% 6.608 92% 1. Date of A.A: 27.08.2016 and District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 30.11.2016 7. Date of Completion as per PC-I: 29.05.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

440 2358 Rural Drainage Scheme Gharyala Tehsil and Multan Approved 0.000 7.860 7.860 7.860 7.852 100% 7.852 100% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 02.12.2016 7. Date of Completion as per PC-I: 01.06.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

441 2359 Rural Drainage Scheme Chak No.5-Faiz, Tehsil Multan Approved 0.000 8.360 8.360 8.360 8.297 99% 8.297 99% 1. Date of A.A: 27.08.2016 and District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 25.11.2016 7. Date of Completion as per PC-I: 24.05.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

442 2360 Construction of Soling, Drain Sullage Carrier and Multan Approved 0.000 8.655 8.655 8.655 8.617 100% 8.617 100% 1. Date of A.A: 27.08.2016 Culverts in UC Bootay Wala. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 25.11.2016 7. Date of Completion as per PC-I: 24.05.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

443 2361 Construction of Soling, Drain Sullage Carrier and Multan Approved 0.000 10.000 12.885 12.885 12.829 100% 12.829 100% 1. Date of A.A: 27.08.2016 Culverts in UC Jalalbad. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 25.11.2016 7. Date of Completion as per PC-I: 24.05.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

444 2362 Rural Drainage Scheme Mouza Buch Mubarak Multan Approved 0.000 10.000 15.120 15.120 15.113 100% 15.113 106% 1. Date of A.A: 27.08.2016 (Bhinda Sandeep), Multan. 2. Date of T.S: - 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 13.12.2016 7. Date of Completion as per PC-I: 12.06.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

445 2363 Sewerage/Drainage Scheme Ghazipur Tehsil Multan Approved 0.000 10.000 30.000 30.000 29.995 100% 29.995 77% 1. Date of A.A: 27.08.2016 Jalalpur Pirwala 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 11.11.2016 7. Date of Completion as per PC-I: 10.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 / 22.02.2017 10.No. of Benificiary= Persons. Work is in progress.

446 2364 Sewerage/Drainage Scheme Qasba Jalalpur Multan Approved 0.000 10.000 37.000 37.000 36.911 100% 36.911 88% 1. Date of A.A: 27.08.2016 Khaki Shujabad 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 12.11.2016 7. Date of Completion as per PC-I: 11.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 / 22.02.2017 10.No. of Benificiary= Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

447 2365 Sewerage/Drainage Scheme Matotli Kaiserpur Multan Approved 0.000 10.000 30.000 30.000 29.982 100% 29.982 65% 1. Date of A.A: 27.08.2016 Shujjabad 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 10.11.2016 7. Date of Completion as per PC-I: 09.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 / 22.02.2017 10.No. of Benificiary= Persons. Work is in progress.

448 2366 Rural Sewerage Schemes Basti Laar Multan Approved 0.000 10.000 35.000 35.000 34.956 100% 34.956 70% 1. Date of A.A: 27.08.2016 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 12.11.2016 7. Date of Completion as per PC-I: 11.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 / 22.02.2017 10.No. of Benificiary= Persons. Work is in progress.

449 2367 Rural Sewerage Schemes Ambala. Multan Approved 0.000 10.000 25.000 25.000 24.990 100% 24.990 50% 1. Date of A.A: 27.08.2016 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 10.11.2016 7. Date of Completion as per PC-I: 09.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 / 22.02.2017 10.No. of Benificiary= Persons. Work is in progress.

450 2368 Rural Sewerage & Drainage Scheme in UC 52 Multan Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Under WASA Jurisdiction. District Multan. 451 2369 Rural Sewerage & Drainage Scheme in UC 129 Multan Un-Approved 0.000 15.000 0.000 0.000 0.000 0% 0.000 0% Under WASA Jurisdiction. District Multan. 452 2370 Rural Sewerage / Drainage Scheme Mill Multan Approved 0.000 10.000 45.000 45.000 44.998 100% 44.998 52% 1. Date of A.A: 27.10.2016 Sadiqabad. 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 18.11.2016 7. Date of Completion as per PC-I: 17.05.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 21.12.2016 / 22.02.2017 10.No. of Benificiary= 23659 Persons. Work is in progress.

453 2371 Sewerage and Water Supply Schemes in UC1 Multan Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Under WASA Jurisdiction. Nizamabad, UC2 Amirabad, UC3 Shadab Colony, UC4 Gulgasht Colony, UC5 Usmanabad, UC6 Officers Colony, UC7 Shamsabad, UC8 Shamsabad, UC9 Wahdat Colony, UC10 Khushal Colony, UC11 Hasanabad, UC12 Mehria Colony, UC 13 B 454 2372 Rural, Drainage / Sewarage Scheme Multan Un-Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Fesibilty report of substitute scheme "Rural Sewerage Phakhewala Mouza Anayatpur, Scheme Qasim Bela Tehsil and District Multan submitted to C.E. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

455 2373 Rural Sewerage Scheme, Buapur Multan Approved 0.000 15.000 44.880 44.880 44.872 100% 44.872 90% 1. Date of A.A: 27.08.2016 2. Date of T.S: - 3. Date of Pre-Qualification: 05.10.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of Award: 12.11.2016 7. Date of Completion as per PC-I: 11.11.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 14.12.2016 / 22.02.2017 10.No. of Benificiary= 15927 Persons. Work is in progress.

456 2374 Rural Drainage Nizam Wala Nawab Pur Road Multan Approved 0.000 10.000 10.500 10.500 10.440 99% 10.440 54% 1. Date of AA 09.03.2015 (16.05.2016) District Multan 2. Date of T.S 15.05.2015 3. Dated of Prequalification __ 4. Date of invitation of tender 24.03.2015 5. Date of Receipt of tenders 25.03.2015 6. Date of work order 29.05.2015 7. Date of Completion as per PC-l 08.03.2016 8. Anticipated date of completion 30.06.2016 9. Funds released on. 13.10.2016 10. No. of beneficiaries 2768 persons. Work is in progress.

457 2375 Rural Sewerage Scheme Qasim Bella Tehsil & Multan Approved 0.000 10.000 18.930 18.930 18.743 99% 18.743 56% 1. Date of A.A: 27.08.2016 District Multan 2. Date of T.S: - 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 09.11.2016 5. Date of Receipt of Tender: 10.11.2016 6. Date of Award: 16.12.2016 7. Date of Completion as per PC-I: 15.06.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

458 2376 Upgrading and new lines of water supply & Multan Un-Approved 0.000 15.000 0.000 0.000 0.000 0% 0.000 0% Under WASA Jurisdiction. sewerage in each Union Councils 14 & 15 459 2377 Rural Drainage Scheme Kabeer Pur, Tehsil and Multan Approved 0.000 2.500 2.787 2.787 2.754 99% 2.754 110% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 12.11.2016 7. Date of Completion as per PC-I: 11.03.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

460 2378 Rural Drainage Scheme Billi Wala, Tehsil and Multan Approved 0.000 2.580 2.580 2.580 2.553 99% 2.553 99% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 30.11.2016 7. Date of Completion as per PC-I: 29.03.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

461 2379 Rural Drainage Scheme Kyian Pur, Tehsil and Multan Approved 0.000 2.880 2.880 2.880 2.799 97% 2.799 97% 1. Date of A.A: 27.08.2016 District Multan. 2. Date of T.S: 01.09.2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 12.11.2016 7. Date of Completion as per PC-I: 11.03.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01.11.2016 10.No. of Benificiary= Persons. Work is in progress.

462 2380 Rural Sewerage / Drainage Scheme Kherra Multan Approved 0.000 10.000 10.000 10.000 9.975 100% 9.975 35% 1. Date of A.A: 20.10.2016 Abad (Phase-I) 2. Date of T.S: - 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03.11.2016 5. Date of Receipt of Tender: 05.11.2016 6. Date of Award: 03.12.2016 7. Date of Completion as per PC-I: 02.06.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 14.12.2016 10.No. of Benificiary= Persons. Work is in progress.

463 2381 Laying of Soling, Sullage Carrier, Drains in Kotla Lodhran Approved 0.000 5.000 5.486 5.486 5.486 100% 5.486 110% 1. Date of A.A: 27-08-2016. Ali Dasti. 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 14-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 14-05-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 16350 Persons. Work is in progress.

464 2382 Laying of Soling in Basti Kallu Wala, Moza Kallu Lodhran Approved 0.000 6.000 6.588 6.588 6.588 100% 6.588 110% 1. Date of A.A: 27-08-2016. Wala. 2. Date of T.S: 02-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 17-10-2016 5. Date of Receipt of Tender: 18-10-2016 6. Date of Award: 16-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 16-05-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary=14310 Persons. Work is in progress.

465 2383 Flooring and Sewerage Mouza Chak No.53/M Lodhran Approved 0.000 10.000 15.650 15.650 15.000 96% 15.000 72% 1. Date of A.A: 27-08-2016. Tehsil and District Lodhran. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 25-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 24-11-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 8399 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

466 2384 Flooring and Sewerage Mouza Thathi Samajia. Lodhran Approved 0.000 14.000 21.260 21.260 21.033 99% 21.033 99% 1. Date of A.A: 27-08-2016. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 26-11-2016 7. Date of Completion as per PC-I: 31-12-2017 8. Anticipated Date of Completion: 25-11-2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 14501 Persons. Work is in progress.

467 2385 Tuff Tiles & Sewerage Scheme for remaining Lodhran Approved 0.000 10.000 25.000 25.000 24.943 100% 24.943 60% 1. Date of A.A: 27-08-2016. portion of Gogran City. 2. Date of T.S: 19-09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Award: 24-11-2016 7. Date of Completion as per PC-I: 30-06-2017 8. Anticipated Date of Completion: 23-01-2018 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 35113 Persons. Work is in progress.

468 2386 Construction of drainage scheme jaswand sing Khanewal Approved 0.000 10.000 3.500 3.500 3.321 95% 3.321 33% 1. Date of AA 27-08-2016 wala 5-kassi kabirwala 2. Date of T.S 15-09-2016 3. Date of Pre-qualification - 4. Date of invitation of tender 30-09-2016 5. Date of Receipt of tenders 02-11-2016 6. Date of work order 18 -11-2016 7. Date of Completion as per PC-I. 18-08-2017 8. Anticipated date of Completion. 30.06.2018 9.Date of released of funds 01-11-2016 10. No. of beneficiaries 18472 Persons. Work is in progress.

469 2387 Construction of sewerage and tuff tiles basti Khanewal Approved 0.000 10.000 4.700 4.700 4.700 100% 4.700 31% 1. Date of AA 27-08-2016 hussain abad mouza maan wala kabirwala 2. Date of T.S 15-09-2016 3. Date of Pre-qualification - 4. Date of invitation of tender 30-09-2016 5. Date of Receipt of tenders 02-10-2016 6. Date of work order 18 -11-2016 7. Date of Completion as per PC-I. 18-11-2017 8. Anticipated date of Completion. 18.11.2017 9.Date of released of funds 01-11-2016 10. No. of beneficiaries 40332 Persons. Work is in progress.

470 2388 Provision of Sewerage Line Qaiser Talamba Khanewal Approved 0.000 10.000 10.000 10.000 9.900 99% 9.900 58% 1. Date of AA 27-08-2016 Road Abdul Hakim Tehsil Kabirwala District 2. Date of T.S 15-09-2016 Khanewal 3. Date of Pre-qualification - 4. Date of invitation of tender 30-09-2016 5. Date of Receipt of tenders 02-11-2016 6. Date of work order 24 -11-2016 7. Date of Completion as per PC-I. 24-02-2018 8. Anticipated date of Completion. 31.12.2017 9.Date of released of funds 01-11-2016 10. No. of beneficiaries 75437 Persons. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

471 2389 Provision / Laying of Sewer Lines in Missing Khanewal Approved 0.000 20.000 35.000 35.000 35.000 100% 35.000 35% 1. Date of A.A: 27-08-2016. Areas of Khanewal City including new and old 2. Date of T.S: 25.10.2016 Azafi Abadis, Khanewal 3. Date of Pre-Qualification: 22.10.2016 4. Date Invitation of Tender: 29.11.2016 5. Date of Receipt of Tender: 05.12.2016 6. Date of Award: 15.12.2016 7. Date of Completion as per PC-I: 30.06.2018 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 379227 Persons. Work is in progress.

472 2390 Rural Drainage Scheme Sham Kot Khanewal Approved 0.000 21.650 16.650 16.650 16.574 100% 16.574 77% 1. Date of AA 27-08-2016 2. Date of T.S 15-09-2016 3. Date of Pre-qualification - 4. Date of invitation of tender 30-09-2016 5. Date of Receipt of tenders 02-10-2016 6. Date of work order 18 -11-2016 7. Date of Completion as per PC-I. 31-12-2017 8. Anticipated date of Completion. 31.12.2017 9.Date of released of funds 01-11-2016 10. No. of beneficiaries 15208 Persons. Work is in progress.

473 2391 Sewerage Scheme for UC 73 Mian Channu Khanewal Un-Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Scheme not feasible within given cost. One page estimate and draft summary re-submitted for Chief Minister vide this office No.5893, dated 27.10.2016 for increase in cost.

474 2392 Rehabilitation of Sewerage & Drainage Scheme Vehari Approved 0.000 10.000 12.500 12.500 12.434 99% 12.434 64% 1. Date of A.A: 27-08-2016. Machiwal, Tehsil and District Vehari. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Award: 23.12.2016 7. Date of Completion as per PC-I: 22.12.2017 8. Anticipated Date of Completion: 30.06.2017 9.Date of released of funds 01-11-2016 10.No. of Benificiary= 22259 Persons. Work is in progress.

475 2393 Construction of Culverts UC Notak Mahmeed Dera Ghazi Approved 0.000 3.400 3.400 3.400 3.400 100% 3.400 100% • Date of A.A = 23.09.2016 Khan • Date of TS = 24.09.2016 • No. of Beneficiaries = 37639 • Date of invitation of tenders = 27.10.2016 • Date of receipt of tenders = 19.11.2016 • Date of work order = 24.12.2016. • Date of completion as per PC-I = 23.09.2017 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. 476 2394 Construction of Drain / Soling of UC Dera Ghazi Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 78% • Date of A.A = 23.09.2016 Notak Mahmeed Khan • Date of TS = 24.09.2016 • No. of Beneficiaries = 37639 • Date of invitation of tenders = 27.10.2016 • Date of receipt of tenders = 19.11.2016 • Date of work order = 24.12.2016. • Date of completion as per PC-I = 23.09.2017 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

477 2395 Construction of Drain / Soling of UC Mana Dera Ghazi Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 55% • Date of A.A = 23.09.2016 Ahmadani Khan • Date of TS = 24.09.2016 • No. of Beneficiaries = 46657 • Date of invitation of tenders = 27.10.2016 • Date of receipt of tenders = 19.11.2016 • Date of work order = 07.01.2017. • Date of completion as per PC-I = 23.09.2017 • Anticipated date of completion = 30.06.2018 • Funds Released by F.D = 29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

478 2396 PC-II for Construction of Sewerage & Sanitation Dera Ghazi Un-Approved 10.000 0.000 0.000 0.000 0.000 0% 10.000 10% Change of nomenclature was not approved by P&DD. Scheme for Tehsil HQ D.G.Khan Khan 479 2397 Rural Drainage / Sewerage PCC and Tuff Tile Rajanpur Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 25% • Date of A.A = 22.09.2016 flooring Rajan Pur City and Adjoining Abadies • Date of T.S =24.09.2016 UC Rajan Pur Sharqi • No. of Beneficiaries = 71517 • Date of invitation of Tender = 26.12.2016 • Date of receipt of tenders 17.12.2016 • Date of award =31-12-2016 • Date of completion as per PC-I 21.09.2018 • Anticipated date of completion 30.06.2018 • Funds released by FD = 25.11.2016/29.11.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

480 2398 Provision of Sewerage & Tuff Tiles for Dajal City Rajanpur Approved 0.000 15.000 15.000 15.000 15.000 100% 15.000 15% • Date of A.A = 05.11.2016 in • Date of T.S =16.11.2016 • No. of Beneficiaries = 50860 • Date of prequalification = 01.02.2017. • Date of invitation of tenders = 01.03.2017. • Date of receipt of tender = 01.03.2017 • Date of work order=11.03.2017 • Date of completion as per PC-I 04.11.2018 • Anticipated date of completion 30.06.2018 • Funds released by FD = 10.02.2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

481 2399 Construction of Drain, Brick Pavement, Tuff tiles Muzaffargarh Approved 0.000 10.000 20.000 20.000 19.875 99% 19.875 99% • Date of A.A 22-09-2016 & RCC Culverts in U/C Thatha Qureshi • Date of TS 24-09-2016 • No. of Benificiaries = 14476 • Date of tendering 30.112016 • Date of invitation of tenders = 28-10-2016 • Date of receipt of tenders = 22-11-2016 • Date of work order 09.01.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017 • Funds released by F.D 25.11.2016 / 29.11.2016 • Supplementary Grant = 10 M (16.02.2017)

• Scheme Completed in saving. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

482 2400 Construction of Drain, Brick Pavement & Tuff tiles Muzaffargarh Approved 0.000 10.000 20.000 20.000 19.780 99% 19.780 99% • Date of A.A 22-09-2016 in U/C Nohan Wali • Date of TS 24-09-2016 • No. of Benificiaries =13364 • Date of Tendering 30.112016 • Date of invitation of tenders = 28-10-2016 • Date of receipt of tenders = 22-11-2016 • Date of work order 09.01.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017 • Funds released by F.D 25.11.2016 / 29.11.2016 • Supplementary Grant = 10 M (16.02.2017)

• Funds utilized 100%. • Scheme Completed in saving.

483 2401 Construction of Drain, Brick Pavement & Tuff tiles Muzaffargarh Approved 0.000 10.000 20.000 20.000 19.800 99% 19.800 99% • Date of A.A 22-09-2016 in U/C Kharak • Date of TS 24-09-2016 • No. of Benificiaries =21715 • Date of Tendering 30.11.2016 • Date of invitation of tenders = 28-10-2016 • Date of receipt of tenders = 22-11-2016 • Date of work order 09.01.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017 • Funds released by F.D 25.11.2016 / 29.11.2016 • Supplementary Grant = 10 M (16.02.2017)

• Funds utilized 100%. • Scheme Completed in saving.

484 2402 Construction of Drain, Brick Pavement & Tuff tiles Muzaffargarh Approved 0.000 10.000 20.000 20.000 19.915 100% 19.915 100% • Date of A.A 22-09-2016 in U/C Jaggat Pur • Date of TS 24-09-2016 • No. of Benificiaries =6839 • Date of tendering 30.11.2016 • Date of invitation of tenders = 28-10-2016 • Date of receipt of tenders = 22-11-2016 • Date of work order 09.01.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017 • Funds released by F.D 25.11.2016 / 29.11.2016 • Supplementary Grant = 10 M (16.02.2017)

• Funds utilized 100%. • Scheme Completed.

485 2403 Comprehensive Sewerage / Drainage / Soling / Muzaffargarh Approved 0.000 10.000 10.000 10.000 9.200 92% 9.200 37% • Date of A.A 22-09-2016 PCC / Tuff Tile scheme at Sanawan Town, • Date of TS 24-09-2016 District Muzaffargarh (Remaining Portion) • No. of Benificiaries =46875 • Date of invitation of tenders = • Date of receipt of tenders = 08.02.2017 • Date of work order = 29.04.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017 Chief Minister vide CM Directive No.PSO(IMP)CMO/16/AB- 252/D dated 12/08/2016 had approved the shifting of executing agency from PHE to LG & CD. After word the P&D vide letter No.1(10)PPH/P&D/2008-09 dated 11-04- 2017 directed PHED to take up the scheme. Tender approved on 28.04.2017. Work order issued on 29.04.2017. .

• Funds utilized 100%. • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

486 2404 Sewerage / Drainage Scheme for Rangpur Muzaffargarh Approved 0.000 20.000 20.000 20.000 19.400 97% 19.400 8% • Date of A.A 22.9.2016 Muzaffargarh • Date of TS 27.01.2017 • Date of tendering 02.01.2017 • Date of Pre-qualification 21.01.2017 • Date of receipt of tenders 27.02.2017 • Date of work order 29.04.2017 • Date of completion as per PC-I =30.06.2019 • Anticipated date of completion 30.06.2019

Competative tender received on 27.02.2017. Work order issued on 29.04.2017. . • Scheme reflected in ADP 2017-18.

487 2405 RURAL DRAINAGE SCHEME AT CHAK Faisalabad Approved 0.000 3.000 3.197 3.197 3.155 99% 3.155 105% ) Date of A.A 20-10-2016. NO.391/GB, 415/GB & 410/GB UC 79. 2) Date of T.S.24-10-2016. 3) Date of Pre-Qualification N/A.. 4) Date of invitation of tenders 17-11-2016. 5) Date of receipt of tenders 10-12-2016. 6) Date of work order 12-01-2017. 7)Date of Completion as per PC-I = 1 Year 8) Anticipated date of completion.30-06-2017. Work is in progress.Funds Rs. 0.197 Million has been provided vide endt: No.Re-app:2016-17/960-64/B, dated 18.04.2017.

488 2406 Sewerage scheme Chak No. 251/TDA, Tehsil Layyah Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% • Date of AA = 22-09-2016 Karor, District Layyah • Date of TS = 27-09-2016 • No. of Beneficiaries = 3392 • Date of invitation/advertisement of tenders=27.10.2016 • Date of Receipt of Tenders = 21.11.2016 • Date of Work Order= 10-12-2016 • Date of completion as per PC-I= 21-07-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD =14.12.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

489 2407 Sewerage scheme Chak No. 229/TDA, Tehsil Layyah Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 67% • Date of AA = 22-09-2016 Karor, District Layyah • Date of TS = 27-09-2016 • No. of Beneficiaries = 2433 • Date of invitation/advertisement of tenders=27.10.2016 • Date of Receipt of Tenders = 21.11.2016 • Date of Work Order= 03-12-2016 • Date of completion as per PC-I= 21-07-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD =14.12.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

490 2408 Sewerage scheme Chak No. 110/TDA, Tehsil Layyah Approved 0.000 10.000 10.395 10.395 10.395 100% 10.395 69% • Date of AA = 22-09-2016 Karor, District Layyah • Date of TS = 27-09-2016 • No. of Beneficiaries = 2597 • Date of invitation/advertisement of tenders=27.10.2016 • Date of Receipt of Tenders = 21.11.2016 • Date of Work Order= 10-12-2016 • Date of completion as per PC-I= 21-07-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD =14.12.2016

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

491 2409 Rural Sewerage/Drainage/Solling Scheme UC Layyah Approved 0.000 20.000 30.000 30.000 30.000 100% 30.000 100% • Date of AA = 22-09-2016 Warian Seharian, Tehsil Karor District Layya • Date of TS = 27-09-2016 • No. of Beneficiaries = 30000 • Date of invitation/advertisement of tenders=27.10.2016 • Date of Receipt of Tenders = 21.11.2016 • Date of Work Order= 10-12-2016 • Date of completion as per PC-I= 21-07-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD =14.12.2016 Rs. 20.00 (M) • Funds released by FD =22.02.2017 Rs. 10.00 (M)

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

492 2410 Brick Pavement Mohallah Khurshidia Mohallah Bahawalpur Approved 0.000 2.244 2.538 2.538 2.546 100% 2.546 113% Date of AA. 08.08.2016. Shafiq Abad Tibba Baddar Sher. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=23-11-2016 Date of completion =22-02-2017 Anticipated date of completion 30-04-2017 Re-appropriation of funds (+0.314 M dated 20.01.2017) Scheme completed & functional. 493 2411 Drain / Brick Pavement Mouza Chawan & Mouza Bahawalpur Approved 0.000 2.384 2.343 2.343 2.342 100% 2.342 98% Date of AA. 08.08.2016. Mangwani BWP. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=24-11-2016 Date of completion =23-02-2017 Anticipated date of completion 30-04-2017 Scheme completed and functional. 494 2412 Sewerage/ Drainage Scheme Bast iBazi Garan Bahawalpur Approved 0.000 4.223 4.223 4.223 4.221 100% 4.221 100% Date of AA. 08.08.2016. (Deramasti) Tehsil & District Bahawalpur Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of award=30-11-2016 Date of completion =29-03-2017 Anticipated date of completion 30.08.2017 Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

495 2413 Construction of sewerage chak no. 13-BC. Bahawalpur Approved 0.000 5.000 0.000 0.000 0.000 0% 0.000 0% The scheme has been approved by DDWP in its meeting held on 08.08.2016 but Mr. Khalid Mehmood Jajja MPA PP- 275 as requested for substituion of scheme vide CM directive No. DS (IMP) \CMO \16\AB-275\0111036 Dated 28.07.2016. A summary in this regard has been submitted to CE (S) PHED Lahore on 05.09.2016 & again submitted vide this office letter No.1792 dated 02-03-2017.Funds released by FD on 05.10.2016. Scheme has been included in next ADP 2017-18 with new proposed name as per direction by Sec HUD & PHED LHR office letter No.SO(PH- S)6-1/2016(BWP) dated 15.03.2017. Funds for Rs.5.00 has been surrendered dated 19-04-2017.

496 2414 Sewerage/ Drainage Scheme Basti Tariq Abad Bahawalpur Approved 0.000 5.008 3.997 3.997 3.961 99% 3.961 79% The scheme has been approved by DDWP in its meeting (Naubad) Tehsil & District Bahawalpur held on 08.08.2016 Tenders received on 03.04.2017 Date of award. 14-04-2017 Date of completion.30-06-2017 Re-appropriation of funds(-1.00 M dated 20.01.2017) Work is in progres. 497 2415 Sewerage/ Drainage Scheme Basti Jamrani Bahawalpur Approved 0.000 5.583 6.365 6.365 6.303 99% 6.303 113% Date of AA. 19.08.2016. Kohna Tehsil & District Bahawalpur Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016 Date of receipt of tender= 14-11-2016 Date of award=24-11-2016 Date of completion =23-04-2017 Re-appropriation of funds (+0.779 M dated 20.01.2017) Scheme completed & functional. 498 2416 Sewerage/ Drainage Scheme Wali Hussain Bahawalpur Approved 0.000 8.603 8.603 8.603 8.599 100% 8.599 100% Date of AA. 08.08.2016. Tehsil & District Bahawalpur Date of T.S. 27.09.2016. Funds released by FD 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=23-11-2016 Date of completion =20-05-2017 Scheme completed and functional 499 2417 Construction of sewerage chak no. 103-DB. Bahawalpur Approved 0.000 9.984 9.984 9.984 9.961 100% 9.961 100% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of award=30-11-2016 Date of completion =20-05-2017 Scheme completed. 500 2418 Sewerage Scheme and Provision of Tuff Tiles in Bahawalpur Approved 0.000 10.000 10.000 10.000 9.932 99% 9.932 99% Date of AA. 08.08.2016. Arifabad Khanqah Sharif Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=29-11-2016 Date of completion =20-05-2017 Scheme completed in saving and functional. 501 2419 Sewerage/ Drainage Scheme Khanpur Tehsil & Bahawalpur Approved 0.000 10.603 10.603 10.603 10.588 100% 10.588 100% Date of AA. 19.08.2016. District Bahawalpur Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016 Date of receipt of tender= 14-11-2016 Date of award=24-11-2016 Date of completion =15-05-2017 Additional funds Rs.0.603 million provided by F.D dated 28- 04-2017. Scheme completed Liability of the contractor is to be cleared. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

502 2420 P/L Tufftiles Sewerage and Drainage for Ward Bahawalpur Approved 0.000 11.000 12.500 12.500 12.499 100% 12.499 114% Date of AA. 08.08.2016. No 1,3, 5, 6, 7, 8, 9, 10, 11,12,13, Uch Sharif Date of T.S. 27.09.2016. Ahmed pureast Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=23-11-2016 Date of completion =15-05-2017 Re-appropriation of fund (+1.500 M dated 20.01.2017) Scheme completed. 503 2421 Sewerage Scheme Chak no. 17/Ford Wah, Bahawalpur Un-Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% The same scheme has been reflected in ADP 2016-2017 Tehsil Hasilpur. (double) at ADP No.2438. Ch: Muhammad Afzal Gill MPA PP-274 has requested for substitution of sewerage scheme Chak No.188/M instead of Chak No.17/FW vide CM Directive No.PS/SECY(IMP)/ CMO/AB-274/111857 dated 13.08.2016. A summary in this regard has been submitted to CE (S) LHR office on 05.09.2016 & No.1796 dated 02-03- 2017 Funds awaited. Scheme has been included in next ADP 2017-18 with new proposed name as per direction by Sec HUD & PHED LHR office letter No.SO(PH-S)6- 1/2016(BWP) dated 15.03.2017. Funds allocated Rs.10.00 million surrender by F.D dated 28-04-2017

504 2422 Sewerage/ Drainage Scheme Basti Gharib Abad Bahawalpur Approved 0.000 10.000 15.065 15.065 15.035 100% 15.035 100% Date of AA. 08.08.2016. (DeraMasti) Tehsil & District Bahawalpur Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=24-11-2016 Date of completion =20-05-2017 Additional funds Rs.5.065 million provided by F.D dated 28- 04-2017. Scheme completed. 505 2423 Rural sewerage with tufftiles at Lohariwala tehsil Bahawalpur Approved 0.000 10.000 15.339 15.339 14.692 96% 14.692 95% Date of AA. 08.08.2016. ahmedpur Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 14-11-2016 Date of award=19-11-2016 Date of completion =18-11-2017 Additional funds Rs.5.339 million provided by F.D dated 28- 04-2017. Scheme completed in saving and functional. 506 2424 Sewerage Scheme Chak no. 15/Ford wah, Tehsil Bahawalpur Approved 0.000 10.000 4.500 4.500 4.435 99% 4.435 28% Date of AA. 08.08.2016. Hasilpur. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tender 14-11-2016 Date of award 15-12-2016 Date of completion 14-11-2017 Re-appropriation of funds (- Rs.5.500 M dated 15-05- 2017.Work is in progress. 507 2425 Construction of sewerage chak no. 63-DB South. Bahawalpur Approved 0.000 10.000 13.000 13.000 12.754 98% 12.754 80% Date of AA. 08.08.2016. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Tender received on 14-11-2016 Date of award-03-01-2017 Date of completion=02-12-2017 Re-appropriation of funds (-Rs.2.00 M dated 15-05- 2017.Additional funds Rs.5.00 million provided by F.D dated 28-04-2017 & online dated 16-05-2017.Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

508 2426 Construction of sewerage chak no. 93-DB. Bahawalpur Approved 0.000 10.000 15.000 15.000 14.968 100% 14.968 80% Date of AA. 08.08.2016. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Tender received on 14-11-2016 Date of award-03-01-2017 Date of completion=02-12-2017 Additional funds Rs.5.00 million provided by F.D dated 28- 04-2017. Work is in progress. 509 2427 Construction of sewerage chak no. 63-DB. Bahawalpur Approved 0.000 10.000 8.000 8.000 7.979 100% 7.979 42% Date of AA. 08.08.2016. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Tender received on 14-11-2016 Date of award-03-01-2017 Date of completion=02-12-2017 Re-appropriation of funds (- Rs.7.00 M dated 15-05- 2017.Additional funds Rs.5.00 million provided by F.D dated 28-04-2017 .Work is in progress. 510 2428 Sewerage & Tuff Tile Jamalpur Bahawalpur Approved 0.000 10.000 8.200 8.200 8.194 100% 8.194 27% Date of AA. 08.08.2016. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Date of receipt of Tender 14.11.2016. Date of award 30.11.2016. Date of completion 29.10.2017. Re-appropriation of funds (- Rs.1.80 M dated 15-05-2017. Work is in progress. 511 2429 Provision of sewerage / Tuff Tile in Basti Bahawalpur Approved 0.000 20.000 20.000 20.000 19.991 100% 19.991 65% Date of AA. 08.08.2016. Jhangara Sharqi, Mouza Jhangara Sharqia, Date of T.S. 13.10.2016. Union Council Bahawalpur Ghalvan, Tehsil Funds released by FD on 05.10.2016. Tender received on 14-11-2016 Ahmedpur Sharqia, District Bahawalpur. Date of award-03-01-2017 Date of completion=02-12-2017 Work is in progress. 512 2430 Construction of Sewer line and tuff tiles Nawaz Bahawalpur Approved 0.000 10.000 10.000 10.000 9.991 100% 9.991 100% Date of AA. 19.08.2016. Colony. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016 . Date of receipt of tender= 14-11-2016 Date of award=22-11-2016 Date of completion =20-05-2017 Scheme completed. 513 2431 Construction of sewer line Basti Matma. Bahawalpur Approved 0.000 7.000 7.716 7.716 7.677 99% 7.677 110% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=23-11-2016 Date of completion =22-06-2017 Re-appropriation of fund (+0.716 M dated 20.01.2017) Scheme completed & functional. 514 2432 Construction of sewer line Basti Sahala. Bahawalpur Approved 0.000 12.000 12.000 12.000 12.000 100% 12.000 100% Date of AA. 19.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016. Date of receipt of tender= 14-11-2016 Date of award=24-11-2016 Date of completion =20-05-2017 Scheme completed. 515 2433 Construction of sewer line, tuff tiles Jaffar Colony. Bahawalpur Approved 0.000 7.500 7.770 7.770 7.768 100% 7.768 104% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of award=24-11-2016 Date of completion =20-05-2017 Re-appropriation of funds (+Rs.0.270 M dated 15-05-2017. Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

516 2434 Sewer Line Fouji Basti Sharki & Gharbi BWP Bahawalpur Approved 0.000 2.978 3.310 3.310 3.267 99% 3.267 110% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=29-11-2016 Date of completion =28-02-2017 Anticipated date of completion 30-04-2017 Re-appropriation of fund (+0.332 M dated 20.01.2017) Scheme completed & functional. 517 2435 Sewerage / Soling Basti Maqbool Joyia BWP. Bahawalpur Approved 0.000 2.712 2.712 2.712 2.618 97% 2.618 97% Date of AA. 19.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016 . Date of receipt of tender 14.11.2016. Date of award 29-11-2016. Date of completion 28-02-2017 Anticipated date of completion 30-04-2017 Scheme completed in saving and functional. 518 2436 Rural Sewerage Drainage Scheme 161/M Bahawalpur Approved 0.000 12.200 12.200 12.200 11.998 98% 11.998 98% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of award=30-11-2016 Date of completion =29-07-2017 Work is in progress. 519 2437 Rural Sewerage Scheme Basti Chohan Bahawalpur Approved 0.000 10.000 3.500 3.500 3.469 99% 3.469 16% Date of AA. 08.08.2016. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Date of Receipt of tender 14.11.2016. Date of award 15.12.2016 Date of completion 14.11.2017/ Re-appropriation of funds(-Rs.6.500 M dated 19-04-2017 & 15-05-17).Work is in progress. 520 2438 Rural Sewerage Scheme 17/F.W Bahawalpur Approved 0.000 10.000 4.500 4.500 4.500 100% 4.500 18% Date of AA. 08.08.2016. Date of T.S. 13.10.2016. Funds released by FD on 05.10.2016. Date of Receipt of tender 14.11.2016. Date of award 15.12.2016 Date of completion 14.11.2017. Re-appropriation of funds(-Rs.5.50 M dated 19-04-2017 &n 15-5-17).Work is in progress.

521 2439 Sewer Line Basti Oudan Near Satluj Colony & Bahawalpur Approved 0.000 2.502 2.502 2.502 2.502 100% 2.502 100% Date of AA. 19.08.2016. Abbasia Town. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016. Date of receipt of tender= 14-11-2016 Date of award=29-11-2016 Date of completion =28-02-2017 Anticipated date of completion 30-04-2017 Scheme completed and functional. 522 2440 Sewer line Basti Riddan BWP. Bahawalpur Approved 0.000 2.550 2.550 2.550 2.488 98% 2.488 98% Date of AA. 19.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 19-10-2016. Date of receipt of tender= 14-11-2016 Date of award=22-11-2016 Date of completion =21-02-2017 Anticipated date of completion 30-04-2017 Scheme completed in saving and functional. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

523 2441 Sewer Line & Tuff tile Basti Matman BWP. Bahawalpur Approved 0.000 2.550 2.863 2.863 2.858 100% 2.858 112% Date of AA. 08.08.2016. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=23-11-2016 Date of completion =22-02-2017 Anticipated date of completion 15.05.2017 Re-appropriation of fund (+0.313 M dated 20.01.2017) Scheme completed & functional. 524 2442 Construction of Soling Chak No.33/BC & Abadi Bahawalpur Approved 0.000 2.950 3.050 3.050 2.950 97% 2.950 100% Date of AA. 08.08.2016. Sardar Wali / Gharbi. Date of T.S. 27.09.2016. Funds released by FD on 05.10.2016. Date of receipt of tender= 14-11-2016 Date of award=24-11-2016 Date of completion =23-03-2017 Anticipated dated of completion 15.05.2017 Re-appropriation of fund(+0.100 M dated 20.01.2017) Scheme completed & functional. 525 2443 Sewerage Scheme Chaveka, Tehsil & District Bahawalnagar Approved 0.000 10.000 35.920 35.920 35.920 100% 35.920 106% Date of AA. 19.08.2016. Bahawalnagar. Date of T.S. 27.09.2016. Date of RT.S. 25.03.2017. Funds released by FD on 19-10-2016. Tender received on 02.11.2016. Date of award. 30.11.2016 Date of completion 29.07.2017. Re-appropriation of funds=(+)Rs.12.0 M dated 24-02-2017 , 31-3-17 & 15-05-2017. Additional funds Rs.13.920 million provided by F.D dated 28- 04-2017. Scheme completed on 25-05-2017.

526 2444 Construction of Sewerage / Drainage Schemes Bahawalnagar Approved 0.000 10.000 15.000 15.000 14.900 99% 14.900 15% Date of AA. 21.10.2016. Abadi Jodheka, Qasim Ka, Chak Sarkari, Bagar Date of T.S. 26.10.2016. Wala Khoo, Chaveka, Toba Balochan. Date of Tender 12.12.2016 Funds released by FD .13-12-2016 Date of receipt of tender 14-12-2016 Date of award 19-01-2017 Date of comletion 18-12-2017 Re-appropriaotin of funds=(-Rs.5.0 M) dated 31-3-17.Work is in progress.

527 2445 Sewererage and Drainage Scheme Maroot Bahawalnagar Approved 0.000 10.000 38.000 38.000 32.986 87% 32.986 27% Date of AA.17.09.2016. Tehsil Fortabbas, District Bahawalnagar. Date of T.S. 25.10.2016 Funds released by FD. 29-11-2016. Prequalification of the contractors=03-01-2017. Date of receipt of tender 25-01-2017 Date of work awarded 27-01-2017 Date of completion 26-04-2018 Re-appropriation of funds(+)Rs.3.00 million dated 31-01- 2017. Additional funds Rs.20.00 million provided by FD on 28-04-2017 & online dated 16-05-2017. Work is in progress.

528 2446 Sewerage system Oad Colony, Khanpur City Rahim Yar Approved 0.000 5.000 5.000 5.000 4.347 87% 4.347 87% Date of AA(DDWP)=24-10-2016. Khan Date of TS= 20-11-2016. Funds released by FD-13-12-2016. Tenders received on 16-01-2017 Date of work award-03-02-2017 Date of completion 02-08-2017 Scheme completed on 25-06-2016 in saving Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

529 2447 Rehabilitation, Augmentation, Sewerage, Rahim Yar Approved 0.000 5.000 5.000 5.000 4.985 100% 4.985 100% Date of AA. 08.08.2016. Drainage remaining portion Garhi Ikhtyar Khan. Khan Date of T.S. 07.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.05.2017. Scheme completed. 530 2448 Rehabilitation: Sewerage system chak no. 17/P & Rahim Yar Approved 0.000 8.000 8.000 8.000 7.903 99% 7.903 99% Date of AA. 08.08.2016. Tuff Tile. Khan Date of T.S. 07.10.2016. Funds released by FD on 05.10.2016. Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.05.2017. Scheme completed. 531 2449 Construction of new road repair /rehabilitiation of Rahim Yar Approved 0.000 10.000 10.000 10.000 9.995 100% 9.995 100% Date of AA. 08.08.2016. exisitng road and laying of tufftiles and repair of Khan Date of T.S. 07.10.2016. latrial swerage line Mohalla Zareen mohalla Funds released by FD on 05.10.2016. pathana, mohalla loharan Khanpur Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.06.2017. Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

532 2450 Rural Sewerage Scheme, Tuff Tiles Basti Dhoop Rahim Yar Approved 0.000 10.000 10.000 10.000 9.999 100% 9.999 100% Date of AA. 08.08.2016. Sari. Khan Date of T.S. 07.10.2016. Funds released by FD on 19.10.2016. Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.05.2017. Scheme completed. 533 2451 Construction of new road repair /rehabilitiation of Rahim Yar Approved 0.000 10.000 10.000 10.000 9.017 90% 9.017 60% Date of AA. 08.08.2016. exisitng road and laying of tufftiles and repair of Khan Date of T.S. 07.10.2016. latrial swerage line basti lashkari Khanpur Funds released by FD on 19.10.2016. Date of receipt of tenders=12-11-2016 Date of award 16.11.2016 Date of completion 15.05.2017. Anticipated date of completion 30-06-2018 Work is in progress. Full Funds could not be utilized due to community conflict at site. 534 2452 Construction of new road repair /rehabilitiation of Rahim Yar Approved 0.000 8.000 22.250 22.250 17.500 79% 17.500 100% Date of AA. 08.08.2016. exisitng road and laying of tufftiles and repair of Khan Date of T.S. 13.10.2016. latrial swerage line douaba colony, bank colony, Funds released by FD on 19.10.2016. rehamn pura, new akhtar abad, ward # 7 Tender received on 12.11.2016 Date of award =05-01-2017 Khanpur Date of completion=04-12-2017 Additional funds Rs.14.250 million provided by F.D on 11- 05-2017 & online dated 18-05-2017. Scheme completed 535 2453 Sewerage, Drainage, Tuff Tile and Soling in Rahim Yar Approved 0.000 10.000 10.000 10.000 9.934 99% 9.934 55% Date of AA. 24.10.2016. Union Council 34/E, City Rahim Yar Khan. Khan Date of T.S. 29.11.2016. Tenders received on 16-01-2017 Date of work awarded 08-02-2017 Date of completion 07-08-2017 Work is in progress in saving. 536 2454 Rehabilitation, Augmentation, Sewerage, Rahim Yar Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 56% Date of AA. 24.10.2016. Drainage and Tuff Tile Qasba Mou Mubarak. Khan Date of T.S. 29.11.2016. Funds released by FD=13-12-2016. Tenders received on 16-01-2017 Date of work awarded 08-02-2017 Date of completion 07-08-2017 Work is in progress. 537 2455 Construction of Sewerage / Tuff Tile in U/C 37-H, Rahim Yar Approved 0.000 10.000 10.000 10.000 9.920 99% 9.920 43% Date of AA. 24.10.2016. Rahim Yar Khan. Khan Date of T.S. 29.11.2016. Funds released by FD=13-12-2016. Tenders received on 16-01-2017 Date of work awarded 08-02-2017 Date of completion 07-11-2017 Work is in progress in saving. 538 2456 Sewerage & Tuff tiles in UC 36, 37, 38, 40, 41, Rahim Yar Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 29% Date of AA. 24.10.2016. 42 and 71 under Rahim Yar Khan Khan Date of T.S. 29.11.2016. Funds released by FD=13-12-2016. Tenders received on 16-01-2017 Date of work awarded 08-02-2017 Date of completion 07-08-2017 Work is in progress. 539 2457 Completion of sewerage scheme, Mouza Chiniot Approved 0.000 10.000 10.000 10.000 10.000 100% 10.000 50% 1. Date of AA = 20.10.2016 Salaray, District Chiniot 2. Date of TS = 25.10.2016 3.Date of Award of work 23.12.2016 4. Date of released of funds 21.12.2016 5. No. of Beneficiaries = 5395 Persons Full funds utilized Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

540 2458 Provision of Sewerage in Chak No. 141/JB Chiniot Approved 0.000 10.000 15.000 15.000 15.000 100% 15.000 50% 1. Date of AA = 20.10.2016 Khokhran, tehsil & District Chiniot. 2. Date of TS = 25.10.2016 3.Date of Award of work 17.12.2016 4. Date of released of funds 21.12.2016 5. No. of Beneficiaries = 1891 Persons Full funds utilized 541 2459 Establishment of PMU for WASH (Water, Punjab Approved 0.000 10.000 0.100 0.100 0.100 100% 0.100 1% Work in progress. Sanitataion & Hygiene) 542 2460 Multi Sectoral Nutrition Strategy for WASH Punjab Un-Approved 0.000 150.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. Including Water Supply, Sanitation, Hygiene, Waste Water Treatment, Disposal of Solid Waste (9 Villages of Brackish / Barani Districts with minimum population of 5000 persons, one village from each Civil Division Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

543 2461 Preparation of Water Quality Survey & Sewerage Punjab Approved 0.000 10.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. Master Plan / Cities Development Plan

544 2462 Upgradation / Strengthening of Existing Punjab Approved 0.000 20.000 20.000 20.000 20.000 100% 20.000 7% Funds not yet been released. Laboratories at District Head Quarter 545 2463 Capacity strenghthening for project development/ Punjab Un-Approved 0.000 15.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. Management of HUD & PHE Department.

546 2464 Rehabilitation of need based (identified through Punjab Approved 0.000 172.744 503.174 503.174 492.319 98% 492.319 16% Funds not yet been released. TPV) Dys-Functional Rural Water Supply Schemes 547 2465 Capacity Strenghthening of Design Cell of Punjab Approved 0.000 39.794 19.897 19.897 19.897 100% 19.897 20% Work is in progress. HUD&PHED for project 548 2466 Feasibilitiy Studies for Water, Sanitation & Punjab Un-Approved 0.000 20.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. Treatment related activities Total (New) 10.000 7000 9719.853 9719.853 9493.575 98% 9503.575 31%

Special Development Package appearing at G.Sr. No.4828 of ADP 2016-17 1 4841 Soling / Driange / Drain Nala, Chak No. 151/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.994 100% 1.994 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 2 4842 Soling / Driange / Drain Nala, Chak No. 150/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.996 100% 1.996 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 3 4843 Soling / Driange / Drain Nala, Chak No. 99/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 4 4844 Soling / Driange / Drain Nala, Chak No. 63/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.991 100% 1.991 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 5 4845 Soling / Driange / Drain Nala, Chak No. 62/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

6 4846 Soling / Driange / Drain Nala, Chak No. 65/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 7 4847 Soling / Driange / Drain Nala, Chak No. 44/JB, Faisalabad Approved 0.000 0.000 1.700 1.700 1.690 99% 1.690 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 8 4848 Soling / Driange / Drain Nala, Chak No. 43/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.996 100% 0.996 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 9 4849 Soling / Driange / Drain Nala, Chak No. Faisalabad Approved 0.000 0.000 1.000 1.000 0.999 100% 0.999 100% 1) Date of A.A 19-05-2016 472,471/JB, District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 10 4850 Soling / Driange / Drain Nala, Chak No. 130/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.985 99% 0.985 99% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 11 4851 Soling / Driange / Drain Nala, Chak No. 131/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.998 100% 0.998 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 12 4852 Soling / Driange / Drain Nala, Chak No. 152/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.994 100% 1.994 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

13 4853 Soling / Driange / Drain Nala, Chak No. 137/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.991 100% 1.991 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 14 4854 Soling / Driange / Drain Nala, Chak No. 143/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.995 100% 1.995 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 15 4855 Soling / Driange / Drain Nala, Chak No. 102/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.995 100% 0.995 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 16 4856 Soling / Driange / Drain Nala, Chak No. 103/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.979 98% 0.979 98% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 17 4857 Soling / Driange / Drain Nala, Chak No. 109/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.980 98% 0.980 98% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 18 4858 Soling / Driange / Drain Nala, Chak No. 20/JB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.900 95% 1.900 95% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 19 4859 Soling / Driange / Drain Nala, Chak No. 105/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

20 4860 Soling / Driange / Drain Nala, Chak No. 106/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.996 100% 0.996 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 21 4862 Soling / Driange / Drain Nala, Chak No. 104/JB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.986 99% 1.986 99% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 22 4863 Soling / Driange / Drain Nala, Chak No. 113/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 23 4864 Soling / Driange / Drain Nala, Chak No. 111/JB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.972 99% 1.972 99% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 24 4865 Soling / Driange / Drain Nala, Chak No. 112/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.995 100% 0.995 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 25 4866 Soling / Driange / Drain Nala, Chak No. 190/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.999 100% 1.999 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 26 4867 Soling / Driange / Drain Nala, Chak No. 199/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.995 100% 1.995 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

27 4868 Soling / Driange / Drain Nala, Chak No. 25/JB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.998 100% 0.998 100% 1) Date of A.A 19-05-2016 District Faislabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 28 4869 Soling / Drainage Scheme in Chak No 135/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.995 100% 1.995 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 29 4870 Soling / Drainage Scheme in Chak No 147/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.996 100% 0.996 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 30 4871 Soling / Drainage Scheme in Chak No 146/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.997 100% 0.997 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 31 4872 Soling / Drainage Scheme in Chak No 145/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 32 4873 Soling / Drainage Scheme in Chak No 154/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed.. 33 4874 Soling / Drainage Scheme in Chak No 156/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

34 4875 Soling / Drainage Scheme in Chak No 148/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 35 4876 Soling / Drainage Scheme in Chak No 141/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 36 4877 Soling / Drainage Scheme in Chak No 159/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 37 4878 Soling / Drainage Scheme in Chak No 158/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 38 4879 Soling / Drainage Scheme in Chak No 157/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.999 100% 0.999 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 39 4880 Soling / Drainage Scheme in Chak No 159/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 0.998 100% 0.998 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 40 4881 Soling / Drainage Scheme in Chak No.91 /RB, Faisalabad Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

41 4882 Soling / Drainage Scheme in Chak No 92/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.994 100% 1.994 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 42 4883 Soling / Drainage Scheme in Chak No 76/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 43 4884 Soling / Drainage Scheme in Chak No 72/RB, Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 44 4885 Soling / Drainage Scheme in Chak No 68/RB, Faisalabad Approved 0.000 0.000 2.000 2.000 1.985 99% 1.985 99% 1) Date of A.A 19-05-2016 District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 45 4972 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% 1) Date of A.A 19-05-2016 No.134/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 46 4973 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% 1) Date of A.A 19-05-2016 No.139/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 47 4974 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 0.996 100% 0.996 100% 1) Date of A.A 19-05-2016 No.140/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

48 4975 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% 1) Date of A.A 19-05-2016 No.163/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 49 4976 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 No.467/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 50 4977 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 1.993 100% 1.993 100% 1) Date of A.A 19-05-2016 No.18/JB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 51 4978 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 1.996 100% 1.996 100% 1) Date of A.A 19-05-2016 No.45/JB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 52 4979 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 1.986 99% 1.986 99% 1) Date of A.A 19-05-2016 No.153/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 53 4980 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 0.999 100% 0.999 100% 1) Date of A.A 19-05-2016 No.52/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 54 4981 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 No.54/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

55 4982 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 0.999 100% 0.999 100% 1) Date of A.A 19-05-2016 No.59/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 56 4983 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 100% 1) Date of A.A 19-05-2016 No.61/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 57 4984 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 0.989 99% 0.989 99% 1) Date of A.A 19-05-2016 No.74/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 58 4985 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 1.998 100% 1.998 100% 1) Date of A.A 19-05-2016 No.93/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 59 4986 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 0.999 100% 0.999 100% 1) Date of A.A 19-05-2016 No.94/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme Completed. 60 4987 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 2.000 2.000 1.994 100% 1.994 100% 1) Date of A.A 19-05-2016 No.97/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. 61 4988 Provision of Soling / Drainage Scheme Chak Faisalabad Approved 0.000 0.000 1.000 1.000 0.999 100% 0.999 100% 1) Date of A.A 19-05-2016 No.149/RB, District Faisalabad 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Scheme completed. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

62 4994 Rural water Supply Scheme Chak No.187/WB, Vehari Approved 0.000 0.000 10.000 10.000 9.977 100% 9.977 33% 1) Date of A.A 19-05-2016 (Rohtak),183/WB Basti Jarhi, Mailsi 2) Date of T.S.21-05-2016. 3) Date of Pre-Qualification N.A 4) Date of invitation of tenders 27-05-2016. 5) Date of receipt of tenders 28-05-2016. 6) Date of work order 31-08-2016 7)Date of Completion as per PC-I = 6-Months. 8) Anticipated date ofcompletion.28-02-2017. Scheme completed.

63 4995 Construction of Street / Drain in UC , Chakwal Approved 0.000 0.000 2.000 2.000 1.994 100% 1.994 100% Work completed in saving. District Chakwal (Lo16006001) 64 4996 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 2.500 2.500 2.500 100% 2.500 100% Work completed. , District Chakwal (Lo16006002) 65 4997 Construction of Street / Drain/ Causeway in Chakwal Approved 0.000 0.000 3.000 3.000 2.980 99% 2.980 99% Work completed in saving. UCDharmond, District Chakwal (Lo16006003) 66 4998 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 3.000 3.000 2.997 100% 2.997 100% Work completed. ,Dhurnal, District Chakwal (Lo16006004)

67 4999 Construction of Street/Drain/Causeway in UC Chakwal Approved 0.000 0.000 2.000 2.000 1.967 98% 1.967 98% Work completed. Jabbi Shah Dilawar, District Chakwal (Lo16006005) 68 5000 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 100% Work completed. ,District Chakwal (Lo16006006) 69 5001 Construction of Street / Drain/ Causeway in Chakwal Approved 0.000 0.000 1.000 1.000 0.987 99% 0.987 99% Work completed in saving. UCNakka Kahout,District Chakwal (Lo16006007)

70 5002 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% Work completed. Tamman,District Chakwal (Lo16006008) 71 5003 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 4.000 4.000 3.998 100% 3.998 100% Work completed. Bldher, District Chakwal (Lo16006009) 72 5004 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 5.000 5.000 4.978 100% 4.978 100% Work completed in saving. Pira Fathial,District Chakwal (Lo16006010) 73 5005 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 4.000 4.000 3.971 99% 3.971 99% Work completed in saving. , Dhurnal, District Chakwal (Lo16006011) 74 5006 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 4.500 4.500 4.500 100% 4.500 100% Work completed. Thoa Mehram KhanDistrict Chakwal (Lo16006012) 75 5007 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 1.000 1.000 0.994 99% 0.994 99% Work completed in saving. Laiti,District Chakwal (Lo16006013) 76 5008 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 2.000 2.000 1.997 100% 1.997 100% Work completed. Kot Sarang,District Chakwal (Lo16006014) 77 5009 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 0.500 0.500 0.417 83% 0.417 83% Work completed in saving. Lawa,District Chakwal (Lo16006015) 78 5010 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 2.500 2.500 2.500 100% 2.500 100% Work completed. ,District Chakwal (Lo16006016) 79 5011 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 1.000 1.000 0.996 100% 0.996 100% Work completed. Dhoular District Chakwal (Lo16006017) 80 5012 Construction of Street / Drain/ Causeway in UC Chakwal Approved 0.000 0.000 1.000 1.000 0.994 99% 0.994 99% Work completed in saving. Kot Qazi,District Chakwal (Lo16006018) 81 5023 Construction of PCC, Street & Drain / Nullah an Sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 100% Scheme completed Providing & Laying of Tuff Tiles U.C. Dalowali, Tehsil & District Sialkot (Lo16006029) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

82 5024 Construction of PCC, Street & Drain / Nullah an Sialkot Approved 0.000 0.000 2.500 2.500 2.500 100% 2.500 100% Scheme completed Providing & Laying of Tuff Tiles Mohallah Faisal Colony Marrian Opposite Police Station Nika Pura Sialkot, Tehsil & District Sialkot (Lo16006030) 83 5025 Construction of PCC, Street & Drain / Nullah an Sialkot Approved 0.000 0.000 8.650 8.650 8.650 100% 8.650 100% Scheme completed Providing & Laying of Tuff Tiles Mohallah Habib Pura,Tehsil & District Sialkot (Lo16006031) 84 5026 Construction of PCC, Street & Drain / Nullah an Sialkot Approved 0.000 0.000 4.400 4.400 4.400 100% 4.400 100% Scheme completed Providing & Laying of Tuff Tiles Mohallah Nika Pura Kocha Sheikhan an dGali Kasain,Tehsil & District Sialkot (Lo16006032) 85 5027 Construction of PCC, Street & Drain / Nullah an Sialkot Approved 0.000 0.000 9.100 9.100 9.100 100% 9.100 100% Scheme completed Providing & Laying of Tuff Tiles U/C Islamabad,Tehsil & District Sialkot (Lo16006034)

86 5028 Construction of PCC, Street & Drain / Nullah an Sialkot Approved 0.000 0.000 7.150 7.150 7.150 100% 7.150 100% Scheme completed Providing & Laying of Tuff Tiles U/C Islamabad,Tehsil & District Sialkot (Lo16006034)

87 5029 Construction of PCC, Street & Drain / Nullah Gali Sialkot Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 100% Scheme completed Anwar Inyat Wali U/C Kotli Behram,District Sialkot (Lo16006035) 88 5030 Providing & Laying of Tuff Tile, RCC Sewer and Sialkot Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 100% Scheme completed Construction of Drain / Nullah Back Side K.M Ashrf Gali Masjid Wali U.C Hamza Ghous, District Sialkot (Lo16006036) 89 5031 Providing & Laying of Tuff Tile and Construction Sialkot Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 100% Scheme completed of Drain/ Nullah Street Jamia Masjid Ramzan Shahab Pura Road U.C Muzzafar Pur, District Sialkot (Lo16006037) 90 5032 Providing & Laying of Tuff Tile and Construction Sialkot Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 100% Scheme completed of Drain/ Nullah Street Jamia Masjid Ramzan Shahab Pura Road U.C Muzzafar Pur, District Sialkot (Lo16006038) 91 5033 Providing & Laying of Tuff Tile and Construction Sialkot Approved 0.000 0.000 2.500 2.500 2.500 100% 2.500 100% Scheme completed of Drain/ Nullah Mohallah Arshad Latif Mughal, Hashim Pur Fateh Garah Road, U.C Fateh Garah, District Sialkot (Lo16006039)

92 5312 Construction of Streets, Nullahs, PCC, Soling , Sialkot Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 43% Scheme completed Villages Dhariwal, Uncha Paharing, Koot, Wahga, Punjgrain, Takhat Pur, Chuk Qureshian, Makhan Pur, Adhokey, Dheer, Fateh Pur, Tehsil Pasrue District Sialkot (LO15007572)

93 5313 Construction of Streets, Nullahs, PCC, Soling , Sialkot Approved 0.000 0.000 2.500 2.500 2.500 100% 2.500 42% Scheme completed Villages Thatha Bawa, Thatha Sarkari, Dhoda, Kotli Wirkan, Adil Pur, Kotli Gopi Ray, Bhagowal, Mehta Dhariwal, Chak Ishaq, Dolowali, Thsil Pasrur District Sialkot (LO15007573) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

94 5314 Construction of Streets, Nullahs, PCC, Soling , Sialkot Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 43% Scheme completed Villages Lala Syedan, Fatahwali, Khapralah, Ghatalian, Jalowali, Mehmood Pur, Shameer Pur, Bhorekey, Tehsil Pasrur District Sialkot (LO15007575) 95 5315 Construction of Streets, Nullahs, PCC, Soling , Sialkot Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 50% Scheme completed Villages Manga Qadeem, Sodagar Pur, Data Zaidke, qila Kalarwala, Gakherwali, Tehsil Pasrur, District Sialkot (LO15007576) 96 5316 Construction of Streets, Nullahs, PCC, Soling , Sialkot Approved 0.000 0.000 2.500 2.500 2.500 100% 2.500 45% Scheme completed Villages Sian, Nawan Sohawa, Purana Sohawa, Basi Wala, Chander, Gujar Goraya, Taqi Pur,Bogir Gill, Bakhat Pur, Tehsil Pasrur, District Sialkot (LO15007577) 97 5317 Construction of Streets, Nullahs, PCC, Soling , Sialkot Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 50% Scheme completed Villages Eso Giga, Jeowali, Rajadey Wali Mohri kay, Khan, Jaja, Begum Pur, Nokrian, Hussa Jaja, Sokin Wind Thsil Pasrur District Sialkot (LO15007578) 98 5319 Rural Water Supply & Drainage PCC Scheme Kasur Approved 0.000 0.000 20.000 20.000 19.792 99% 19.792 10% Work in progress. Tibbi Kamboh. Mochi Pura, Kasur City 99 5332 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 15.000 15.000 15.000 100% 15.000 100% Funds Released by P&D on 29.08.2016. culverts etc., UC Sohawa Diloana, District M.B.Din (LO16006185) 100 5333 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 17.500 17.500 17.496 100% 17.496 100% Funds Released by P&D on 29.08.2016. culverts etc., Mangat, District M.B.Din (LO16006186) 101 5334 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 12.500 12.500 12.389 99% 12.389 99% Funds Released by P&D on 29.08.2016. culverts etc., Mandi Bahauddin City (LO16006187) 102 5344 Rehablitation/Extention combined waste water Nankana Approved 0.000 0.000 15.606 15.606 15.605 100% 15.605 100% Scheme completed chanel & disposal facilities for northern zone, Sahib sangla Hill i/c Dismantling and Carpeting of Road, District Nankana Sahib 103 5914 Constt. Of Streets, Nullahs,PCC, Soling in Sialkot Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 100% Scheme completed Villages Satrah, Mokhal Sandhawan, Dhandal,Langyan Wali, Distt. Sialkot. 104 5915 Constt. Of Streets, Nullahs,PCC, Soling in Sialkot Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 100% Scheme completed Villages Siranwali, Mainwali Bangla, Thatha Umra, Distt. Sialkot. 105 5916 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Work in progress. Full fund utilized. Scheme in UC Satrah, Tehsil Daska Distt. Sialkot

106 5917 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 4.975 100% 4.975 50% Work in progress. Full fund utilized. Scheme in UC Sirranwali, Tehsil Daska Distt. Sialkot 107 5918 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Work in progress. Full fund utilized. Scheme in UC Wadala Sindhuan, Tehsil Daska Distt. Sialkot 108 5919 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Scheme in UC Korikay, Tehsil Daska Distt. Sialkot 109 5920 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Scheme in UC Sian, Tehsil Daska Distt. Sialkot Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

110 5921 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Scheme in UC Ghatialian,Tehsil Daska Distt. Sialkot 111 5922 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Scheme in UC Sokand,Tehsil Daska Distt. Sialkot 112 5923 Provision of PCC / Soling / Streets / Nalian Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Scheme in UC Chicharwali,Tehsil Daska Distt. Sialkot 113 5856 Rural Water Supply Scheme Colony No.1, Jhang Approved 0.000 0.000 6.930 6.930 6.480 94% 6.480 94% 1. Date of A.A 13.04.2016 . 2. Date of T.S 25.04.2016 Colony No. 2 and Azafi Abadi Chak No.1 Ghagh 3. Date of Invitation of tenders 05..09.2016. Shorkot, District Jhang 4. Date of Receipt of tender 22.09.2016 5. Date of work order 20.10.2016. 6. Date of Completion As per PC-I 12.10.2016 7. Anticipated date of completion. 19.04.2017 8. No of Baneficiary 5309-Persons 9. Funds online on 03.01.2017. 10. Agreement Amount 5.963-Million Scheme completed.

114 5850 Rehabitiation / Augmenation Sewerage Drainage Rahim Yar Approved 0.000 0.000 15.000 15.000 13.856 92% 13.856 92% Date of AA. 21.05.2016. and Tough Tile qasba Missan Abad Tehsil & Khan Date of T.S. 09.06.2016. District Rahim Yar Khan Date of funds released 21.11.2016 Date of receipt of tender 08.08.2016 Date of award 15.09.2016 Date of Completion 14.03.2017 Anticipaed date of completion 30-05-2017 Scheme completed in saving. 115 5851 Rehabitiation / Augmenation Sewerage Drainage Rahim Yar Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 100% Date of AA. 21.05.2016. and Tough Tile Qasba Jajja Abbasian Tehsil & Khan Date of T.S. 09.06.2016. District Rahim Yar Khan Date of funds released 21.11.2016 Date of receipt of tender 08.08.2016 Date of award 23.08.2016 Date of Completion 22.02.2017. Anticipated date of completion 30-05-2017 Scheme Completed in saving. 116 5852 Rehabitiation / Augmenation Sewerage Drainage Rahim Yar Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Date of AA. 21.05.2016. and Tough Tile Rukan Pur, Tehsil & District Khan Date of T.S. 09.06.2016. Rahim Yar Khan Date of funds released 21.11.2016 Date of receipt of tender 08.08.2016 Date of award 23.08.2016 Date of Completion 22.12.2016 Anticipated date of completion 30-05-17 Scheme completed in Saving 117 5949 Sewerage & Drainage Scheme U.C Rasul Tehsil M.B.Din Approved 0.000 0.000 10.000 10.000 9.148 91% 9.148 46% * A.A Date. 23.09.2016 & District M.B Din. * T.S Date. 24.09.2016 * Start Date 21.12.2016. * Completion date 20.12.2017. * Contractor claim is pending. (1)Work will be resumed after receipt of funds. (2) Balance funds are required to complete the scheme. 118 5950 Sewerage & Drainage Scheme U.C Dhok Kasib M.B.Din Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 50% * A.A Date. 23.09.2016 Tehsil & District M.B Din. * T.S Date. 24.09.2016 * Start Date 23.12.2016. * Completion date 22.12.2017. *Contractor claim is pending. (1)Work will be resumed after receipt of funds. (2) Balance funds are required to complete the scheme. 119 5938 Construction of Urban Drrainage Scheme Pasrur Sialkot Approved 0.000 0.000 15.000 15.000 15.000 100% 15.000 15% Work in progress. Full fund utilized. City, Tehsil Pasrur, District Sialkot Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

120 5912 Rural Water Supply Scheme Bhaloor District Sialkot Approved 0.000 0.000 6.000 6.000 6.000 100% 6.000 100% Work in progress. Sialkot 121 6069 Rural Drainage Scheme UC , PP-20, Chakwal Approved 0.000 0.000 5.000 5.000 4.939 99% 4.939 99% Work in progress. Tehsil & District Chakwal (Including Billages Bheen, Dhoke Haq Char Yar) 122 6070 Rural Drainage Schmee UC-5,Chakwal City Chakwal Approved 0.000 0.000 5.000 5.000 4.327 87% 4.327 87% Work in progress. 123 6076 Provision of Drainage / PCC Facilities at UC Mari Gujranwala Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 50% Work in progress. Full fund utilized. Khurd 124 6077 Provision of Drainage / PCC Facilities at UC Gujranwala Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 50% Work in progress. Full fund utilized. Ghumanwala 125 6078 Provision of Drainage / PCC Facilities at UC Gujranwala Approved 0.000 0.000 10.000 10.000 9.998 100% 9.998 33% Work in progress. Full fund utilized. Baddo Ratta 126 6079 Provision of Drainage / PCC Facilities at UC Gujranwala Approved 0.000 0.000 10.000 10.000 9.996 100% 9.996 33% Work in progress. Full fund utilized. Artali Virkan 127 6080 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 14% work in progress Scheme, Kot Shah Mushtaq 128 6081 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 22% work in progress Scheme Bhai Rao Key 129 6082 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 13% work in progress Scheme, Jhunjh Kalan 130 6083 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 13% work in progress Scheme, Phularwa Wazirkey 131 6084 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 12% work in progress Scheme, Bhukan 132 6085 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 16% work in progress Scheme, Shah pur 133 6086 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 15% work in progress Scheme, Lalay Wala 134 6087 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 18% work in progress Scheme, Shinwal 135 6088 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 17% work in progress Scheme, Behlolpur 136 6089 Rural Water Supply & Sewerage Drainage Okara Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 11% work in progress Scheme, Arrora Mian Khan 137 6003 Construction of Main Nullah at Syedwala Nankana Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 100% Work in Progress. Sahib 138 6004 Construction of PCC at Syedwala Nankana Approved 0.000 0.000 20.000 20.000 20.000 100% 20.000 67% Surface Drain = 1056 /12782 Rft Sahib PCC 10438/55382Cft Sullage Carrier 1' x 1' = 2457/3000 Rft Work in progress. 139 6312 Rural Drainage Scheme in Village Mirza (Phase- Attock Approved 0.000 0.000 15.000 15.000 14.998 100% 14.998 14% Work in progress.but funds not received yet II) 140 6349 Removal of pounds / construction of Pull abd Sialkot Approved 0.000 0.000 15.400 15.400 15.400 100% 15.400 100% Scheme completed establishment of Park at Mouza Bahlo Tehsil Pasrur 141 6436 Sewerage, PCC and Drainage Scheme of Sheikhupura Approved 0.000 0.000 50.000 50.000 50.000 100% 50.000 100% Work in progress. various Abadies of City Sheikhupura 142 6353 Providing & Laying of RCC sewer Lal pura, Tehsil sialkot Approved 0.000 0.000 6.400 6.400 6.397 100% 6.397 100% Scheme completed & Distrcit Sailkot 143 6354 Providing & Laying of RCC sewer Rehman Pura,, sialkot Approved 0.000 0.000 13.600 13.600 13.600 100% 13.600 100% Scheme completed Tehsil & Distrcit Sailkot 144 6355 Providing & Laying of tulff Tile and Construction sialkot Approved 0.000 0.000 13.700 13.700 13.700 100% 13.700 100% Scheme completed of Drain / Nullah Mohallah Poran Nagar, Peoples Colony and Muhammad Pura, Tehsil & Distrcit Sailkot Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

145 6356 Providing & Laying of tuff Tile and Construction of sialkot Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 100% Scheme completed Drain / Nullah Chah Damrian to Katcha Shahab Pura, Gous Pura U/C Haji Pura, Tehsil & Distrcit Sailkot 146 6357 Providing & Laying of tuff Tile and Construction of sialkot Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 100% Scheme completed Drain / Nullah Chah Damrian to Katcha Shahab Pura, Gous Pura U/C Haji Pura, Tehsil & Distrcit Sailkot 147 6358 Providing & Laying of tuff Tile and Construction of sialkot Approved 0.000 0.000 6.000 6.000 6.000 100% 6.000 100% Scheme completed Drain / Nullah Mohallah Hakeem Aslam to Budi Bazar, Ahmedia School to saray Babrain U/C Imam Sahib, Tehsil & Distrcit Sailkot 148 6359 Providing & Laying of tuff Tile and Construction of sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Drain / Nullah Islampura, Minhaspura U/C Mianapura, Tehsil & Distrcit Sailkot 149 6360 Providing & Laying of tuff Tile and Construction of sialkot Approved 0.000 0.000 6.500 6.500 6.500 100% 6.500 100% Scheme completed Drain / Nullah Mohallah Jeevanpura, Shahabpura, sufi Abdil Aziz Gali Darbar Wali Shahbpura U/C Shahabpura, Tehsil & Distrcit Sailkot 150 6361 Providing & Laying of tuff Tile and Construction of sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Scheme completed Drain / Nullah Mohallah Nasir Road U/C Model Town, Tehsil & Distrcit Sailkot 151 6445 Construction of Nallah Around Road from Uggoki sialkot Approved 0.000 0.000 60.000 60.000 60.000 100% 60.000 50% Work in progress. Full fund utilized. to Rai Pur Abba Baigowala Ganda Nallah Railway Station etc. Tehsil Sambrial ,District Sialkot 152 6446 Construction of Sewerage & Drainage Scheme sialkot Approved 0.000 0.000 15.000 15.000 15.000 100% 15.000 50% Work in progress. Full fund utilized. Billage kapooro Wali. Tehsil Sambrial ,District Sialkot 153 6447 Construction of Nullah Village Ranjhai Tehsil sialkot Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 100% Scheme completed Daska, Tehsil Daska ,District Sialkot 154 6448 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 15.000 15.000 15.000 100% 15.000 15% Work in progress. Full fund utilized. Scheme at Adalat Garah Bashamula, Muzaffarpura, Dhanay, phabarainawala, Gujayanwala, Ravail pura, Stabgary, Burj / Butter etc.,Teshil & District Sialkot 155 6449 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 14% Work in progress. Full fund utilized. Scheme at Kapurwali, Bashamula Ajjowali, Basany Pur, Dagary, Olakh, Saidpur, Jatta, Dusir Kala Ghumna, Khambranwala, Kansar pur, Canday Wali etc.,Teshil & District Sialkot 156 6450 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 17% Work in progress. Full fund utilized. Scheme Roras, Bashamula Mango Behram, Pidian, Kot Choda, Manak Chand, Jot Bagaa, Chak Maluk, Chak Janta, Dhana Wali, Mehad Pur, Dadowali, Manair etc.,Teshil & District Sialkot 157 6451 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 20.000 20.000 20.000 100% 20.000 10% Work in progress. Full fund utilized. Scheme at gohad Pur Bashamula, Handlapur, Jorpur, Nawan Pind, Nanga, Ghiti Shekan, Kansarour, Tibbi, Arrian, Saleempur, Malikay Kalan, Malkay Khurd, Olkh Awana etc.,Teshil & District Sialkot Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

158 6452 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 20% Work in progress. Full fund utilized. Scheme at Jaithi Kay Bashaula, Joluki, Maja Khurd, Haddokay, Kot Deena, Tibbi Inayat Shah, Deera Tibbi Inayat Shah, Deera Tarraran, Dra Gujjran, Dera Arrian, Karan Wali etc.,Teshil & District Sialkot 159 6453 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 20% Work in progress. Full fund utilized. Scheme at Jassor Wala Bashamula, Chak Gillan Sharki, Chak Gillan Magrabi, Pandorian, Muhammad Pura, Gega, Addowali, Rajjokay etc.,Teshil & District Sialkot 160 6454 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 10% Work in progress. Full fund utilized. Scheme at Kulowal Bashamula, Aurtala Sharif, Chak Mughal, Tika, Tambary, Gaghar, Basser, Jay, Ditowali, Chanigondal etc.,Teshil & District Sialkot 161 6455 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 18% Work in progress. Full fund utilized. Scheme at Bakhray Wali Bashamula, Dogranwala, Kathiala, Habibpur etc.,Teshil & District Sialkot 162 6456 Provision of PCC / Soling / Nullah / Street sialkot Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 17% Work in progress. Full fund utilized. Scheme at Khambranwala Bashamula, Dogree, Gorian, Sundar Pur, Bidar, Chak Simanwali etc.,Teshil & District Sialkot 163 6471 Construction of Drains, Solling / PCC and Sullage Sargodha Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 28% Date of A.A 25.01.2016, Date of T.S 30.01.2016, Date of Carrier of Ghughiat Award 25.01.2017, Scheduled date of Completion on 30.06.2018, Date of Commencement, 25.01.2017, Funds released on 19-01-2017, Funds on-lined on 19-01-2017.

Work in progress 164 6506 Construction of PCC & Drain at Villages Harpal, Sialkot Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 100% Work in progress. Harn wali & Salhi, Tehsil Pasrur, District Sialkot

165 6675 Rural Sewerage Scheme, Mushtaq Colony & Multan Approved 0.000 0.000 13.750 13.750 13.635 99% 13.635 50% Work is in progress. Basti Kumharan Wali ( Mouza Jangal Barirah), District Multan 166 6676 Rural Sewerage Scheme, Mehdi Pur Haji Block, Multan Approved 0.000 0.000 7.260 7.260 7.158 99% 7.158 49% Work is in progress. District Multan 167 6692 Construction of drain / soling/pcc& Naullah at UC Nankana Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 33% Funds released by FD on 24.01.17 Rehanwala (mughlanwala, Munianwala i/c Sahib Mashmoolah Jatt), district Nankana Sahib 168 6693 Construction of drain / soling/pcc& Naullah at UC Nankana Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 33% Funds released by FD on 24.01.17 More Khunda i/c Mashmoolah Jatt), district Sahib Nankana Sahib 169 6494 Construction of drain / soling/pcc& Naullah at UC Nankana Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 33% Funds released by FD on 24.01.17 Manghanwala, Saleempur Pacca, Noor Mandi, Sahib Balaki i/c Mashmoolah Jatt), district Nankana Sahib 170 6694 PPC / Soling / Filtration Plant in Villagge Noor Kot Narowal Approved 0.000 0.000 8.900 8.900 8.900 100% 8.900 47% Funds released by FD on 08.02.17 Manngri and Bagha Madan Thakrian Pagla, District Narowal Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

171 6695 Construction of Drainage / PCC and Brick Narowal Approved 0.000 0.000 30.000 30.000 30.000 100% 30.000 100% A.A. dated 27.12.2016. Pavement in Village of Ucs, Datewal, Mangolay, T.S. dated 7.1.2017. Hallowal, Drug Miana, Niddokey, Talwandi Completion date. 30.6.2017 Scheme completed. Bhindran, Jor Lakha Singh, Khan Khasa, Dongian, Bubak Marali, Domala, Fleezpura, Ahmed Abad, District Narowal 172 6696 Construction of Drainage / PCC and Brick Narowal Approved 0.000 0.000 20.000 20.000 20.000 100% 20.000 100% A.A. dated 27.12.2016. Pavement in Village of Ucs, Depokey, Jastiwala, T.S. dated 7.1.2017. Saddowala, Uncha,Lalah, Dhamthal, Langerkey, Completion date. 30.6.2017 Scheme completed. Tapyala, Nonar, Mehlowala, Sankhtara, District Narowal 173 6697 Construction of Water Supply System Gujrat Approved 0.000 0.000 8.922 8.922 8.922 100% 8.922 100% Scheme completed. Khojianwali Tehsil and District Gujrat 174 6699 Construction of Brick Pavement PCC Street & Sialkot Approved 0.000 0.000 20.000 20.000 20.000 100% 20.000 40% Work in Progress. Full funds uttilized. Drain / Nullah U.C Mundeke, Ghuinke, Baddokey Cheema, Allomahar, Jamke Cheema, Tehsil Daska District Sialkot 175 6701 Construction of Drains / PCC and Sewerage Gujranwala Approved 0.000 0.000 7.393 7.393 7.393 100% 7.393 11% Work in Progress. Full funds uttilized. Scheme at UC Bhikhu Pur, District Gujranwala 176 6702 Construction of Drains / PCC and Sewerage Gujranwala Approved 0.000 0.000 9.261 9.261 9.260 100% 9.260 14% Work in Progress. Full funds uttilized. Scheme at UC Shaheenabad, District Gujranwala 177 6703 Water Supply and Sewerage Scheme in PP-114 Gujrat Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 20% Work in Progrerss. Full funds utilized District Gujrat 178 6498 PCC, Soling & Drainage Scheme in Village Narowal Approved 0.000 0.000 15.000 15.000 15.000 100% 15.000 36% A.A. dated 23.9.2016. Babral, Kallah, Mahlo, Sahlo T.S. dated 24.9.2016. Completion date. 10.1.2018 Work in progress. 179 6597 Rehab: & Repair of Sewerage Scheme of Rawalpindi Approved 0.000 0.000 4.980 4.980 2.652 53% 2.652 9% A.A cost:- 29.980 M dt: 01-10-2016 Housing Scheme, Gujar Khan City T.S cost:-29.980 M dt:28-01-2017 Date of Start:-27.03.2017 Date of Completion:-26.09.2018 Work in progress. 180 6726 i) Laying of Tuff Tile main road to Mal Lo Sialkot Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 47% Work in progress. ii) Const: of PCC/Brick Pavement & Drain in Villages, Loharkey, Panwana, Arki Dograin iii) Const: of PCC/Brick Pavement & Drain in Villlages, Matykey Mohallah Murad, Baryar, Dairr Peer Muhammad iv) Const: of PCC/Brick Pavement & Drain in Villlages, Mohalla Faisal Colony, Fatha Bhutha v) Const: of PCC/Brick Pavement & Drain in Villlages, Sangriala, Chak Duburji Qazi Paharrang vi) Const: of PCC/Brick Pavement & Drain in Villlages, Bhular Mare wala, Kala Chak, Chak Matto, Ramkay vii) Const: of PCC/Brick Pavement & Drain in Villlages, Bhoray Key,Rahman Pura, Street Masjid wali, Nawn Pind Karpal Pur Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

181 6837 Construction of Drain, Brick Pavement & Tuff Muzaffargarh Approved 0.000 0.000 11.600 11.600 11.600 100% 11.600 50% • Date of A.A 13.01.2017 Tiles in U/C Garay Wahin, District Muzaffargarh • No. of Benificiaries =42580 • Date of tendering 14.01.2017 • Date of invitation of tenders = 06.02.2017 • Date of receipt of tenders = 08.02.2017 • Work alloted dated 03.03.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017

Competative tenders received on 08.02.2017. Additional performance security received on 28.02.2017 Work alloted on 03.03.2017

• Funds utilized 100%. • Scheme reflected in ADP 2017-18.

182 6838 Construction of Drain, Brick Pavement & Tuff Muzaffargarh Approved 0.000 0.000 13.770 13.770 13.770 100% 13.770 50% • Date of A.A 13.01.2017 Tiles Ghanzfargarh, District Muzaffargarh • No. of Benificiaries =54476 • Date of tendering 14.01.2017 • Date of invitation of tenders = 06.02.2017 • Date of receipt of tenders = 08.02.2017 • Work alloted dated 03.03.2017 • Date of completion as per PC-I =30.09.2017 • Anticipated date of completion 30.09.2017

Competative tenders received on 08.02.2017. Additional performance security received on 28.02.2017. Work alloted dated 03.03.2017

• Funds utilized 100%. • Scheme reflected in ADP 2017-18.

183 4411 PCC and Drainage Scheme in UC-117 Mansoora Lahore Approved 0.000 0.000 100.000 100.000 90.000 90% 90.000 45% ● A.A by Commissioner Lahore vide No. Dir(D&F)1(88)/71, Lahore Dated: 14-02-2017. ● T.S by the C.E (N) PHED Lahore vide No.306/P&D-I, dated 17.02.2017. ● Start of work. 16.3.2017. ● Completion. 15.3.2019. ● Work is in progress. 184 3733 Construction of sewerline, tufftile Basti Goth Bahawalpur Approved 0.000 0.000 5.000 5.000 1.667 33% 1.667 33% Scheme transferred from Road sector to PHE sector from Lashkar, Basti Sahib Yar Khan Abbasi Late, P&D Department on 04.01.2017. Moua Qadir Baksh Channer Date of AA 28.02.2017 Date of T.S 15.03.2017 Date of receipt of funds by FD.05-05-2017 & online dated 18-05-2017. Date of receipt of tender 03-04-2017 .Date of award 22-05- 2017. Date of completion 21-07-2017. Work is in progress.

185 3734 Rural PCC Street Pavement / Drains Abbas Bahawalpur Approved 0.000 0.000 20.000 20.000 10.133 51% 10.133 51% Scheme transferred from Road sector to PHE sector from Nagar, Bahawalpur P&D Department on 04.01.2017. Date of AA 28.02.2017 Date of T.S 15.03.2017 . Date of receipt of funds by FD.05-05-2017 & online dated 18-05-2017. Date of receipt of tender 03-04-2017 .Date of award 16-05- 2017. Date of completion 17-11-2017. Work is in progress.

186 3670 Provision of Tuff Pavement in Gaggo Mandi / Vehari Approved 0.000 0.000 18.750 18.750 18.703 100% 18.703 37% Shifted from Road Sector on 16.03.17. Dharian / Chak No. 187/EB Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

187 6892 Provision of Sewerage / Drainage / Soling Nalian Sahiwal Approved 0.000 0.000 42.326 42.326 36.580 86% 36.580 86% Funds released by FD on 28.02.17 Schemes at Chak No. 187/9-L Tehsil and District Sahiwal. 188 7003 Drainage Scheme Ward No. 4, 13 & 14 Sillanwali Sargodha Approved 0.000 0.000 1.300 1.300 1.300 100% 1.300 13% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of City District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 189 7004 Drainage Scheme Masjid Bahar Madina Ward Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 21% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of No. 1, 2 & 3 Sillanwali City District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 190 7005 Drainage Scheme Ward No. 4 & 5, Sillanwali City Sargodha Approved 0.000 0.000 1.800 1.800 1.799 100% 1.799 33% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 191 7006 Drainage Scheme Ward No. 6, 7, 8 & 9 Sillanwali Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 27% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of City District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 192 7007 Drainage Scheme Ward No. 10 & 11 Sillanwali Sargodha Approved 0.000 0.000 1.500 1.500 1.484 99% 1.484 27% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of City District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 193 7008 Drainage Scheme Ward No. 12, 13 & 14 Sargodha Approved 0.000 0.000 2.000 2.000 1.994 100% 1.994 25% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Sillanwali City District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 194 7009 Drainage Scheme Chak No. 132/SB & 137/SB Sargodha Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 18% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 195 7010 Drainage Scheme Chak No. 123/NB, 124/NB, Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 24% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 126/NB & 122/NB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 196 7011 Drainage Scheme Chak No. 128/NB, 129/NB, Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 15% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 125/NB & 127/NB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

197 7012 Drainage Scheme Chak No. 120/NB & 121/NB Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 24% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 198 7013 Drainage Scheme Chak No. 135/SB, 134/SB & Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 24% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 133/SB Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 199 7014 Drainage Scheme Chak No. 125/SB, 121/SB & Sargodha Approved 0.000 0.000 1.500 1.500 1.497 100% 1.497 25% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 124/SB Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 200 7015 Drainage Scheme Chak No. 127/SB, 130/SB, Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 20% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 131/SB & 129/SB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 201 7016 Drainage Scheme Chak No. 117/SB, 118/SB, Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 14% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 119/SB & 115/ASB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 202 7017 Drainage Scheme Chak No. 126/SB & 128/SB Sargodha Approved 0.000 0.000 1.000 1.000 0.983 98% 0.983 15% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 203 7018 Drainage Scheme Chak No. 130/NB & 138/SB Sargodha Approved 0.000 0.000 1.500 1.500 1.495 100% 1.495 18% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 204 7019 Drainage Scheme Chak No. 62/SB, 64/SB, Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 25% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 63/SB, 50/SB & 136/SB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds Sargodha. released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 205 7020 Construction of Drains / Soling Chak No. 139/SB, Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 19% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 140/SB, 141/SB, 144-145/NB, 147-148/NB, 149- Award 08.04.2017, Scheduled date of Completion is 150/NB & 136/NB Tehsil Sillanwali District 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017. Sargodha. Work in progress 206 7021 Drainage Scheme Chak No. 169/NB, 170- Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 23% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 172/NB, Sobhaga, 157/NB & 158/NB Tehsil Award 08.04.2017, Scheduled date of Completion is Sillanwali District Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

207 7022 Drainage Scheme Chak No. 151/NB, 152/NB, Sargodha Approved 0.000 0.000 1.200 1.200 1.200 100% 1.200 17% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 154/NB & 156/NB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 208 7023 Drainage Scheme Chak No. 155/NB, 159/NB, Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 18% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 160/NB, 161/NB, 163/NB, 165/NB & 162-164/NB Award 08.04.2017, Scheduled date of Completion is Tehsil Sillanwali District Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 209 7024 Drainage Scheme Shah Nikdar Tehsil Sillanwali Sargodha Approved 0.000 0.000 1.000 1.000 0.975 98% 0.975 20% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 210 7025 Drainage Scheme Chak No. 120/SB Tehsil Sargodha Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 20% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 211 7026 Drainage Scheme Chak No. 60/SB & 61/SB Sargodha Approved 0.000 0.000 1.000 1.000 1.000 100% 1.000 20% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of Tehsil Sillanwali District Sargodha. Award 08.04.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 212 7027 Drainage Scheme Chak No. 135/NB, 131/NB, Sargodha Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 23% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 142/NB, 166-167/NB & 143/NB Tehsil Sillanwali Award 08.04.2017, Scheduled date of Completion is District Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 213 7028 Drainage Scheme Chak No. 119/NB, 114/NB, Sargodha Approved 0.000 0.000 1.500 1.500 1.496 100% 1.496 21% Date of A.A 14.02.2017, Date of T.S 19.02.2017, Date of 115/NB & 113/NB Tehsil Sillanwali District Award 08.04.2017, Scheduled date of Completion is Sargodha. 30.06.2018, Date of Commencement, 08.04.2017, Funds released on 06.04.2017, Funds on-lined on 06.04.2017.

Work in progress 214 7224 Providing & Laying Tuff Tile / RCC and Sialkot Approved 0.000 0.000 7.500 7.500 7.500 100% 7.500 50% Work in progress. Construction of Drain / Nullah Mohallah Qasir Street Christen Town, Mohallah Changer, Mohallah Qalandiranwala Darbar Sharif, Mohallah Amir Street Jinah Town Capital Road, District Sialkot 215 7225 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 6.000 6.000 6.000 100% 6.000 46% Work in progress. Full fund utilized. Construction of Drain / Nullah Mohallah Jamia Maasjid Abubakkar Islam Nagar Road, Mohallah Kashmir Road to Bathina Hospital, Mohallah Eid Gah Kashmir Road to Baba Zahoor Shah Chowk, District Sialkot 216 7226 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 5.500 5.500 5.500 100% 5.500 44% Work in progress. Full fund utilized. Construction of Drain / Nullah Gulshan Town, Mehar Afzzal, Street Saga Masfid Roras Road, Path Darbar Wala, Street Mohallah Darbar Mai Tandoori, District Sialkot. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

217 7227 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 5.500 5.500 5.500 100% 5.500 41% Work in progress. Full fund utilized. Construction of Drain / Nullah Mohallh Gali No. 34,35,36 Roras Road, Main Path New Miana Pura, Mohallah Eid Gah, Mohallah Streets of Roras Road, Master Azamwal Gali Miana Pura, District Sialkot 218 7228 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 5.500 5.500 5.500 100% 5.500 41% Work in progress. Full fund utilized. Construction of Drain / Nullah Mohallah Chah Paswan Nasir Road, Mohallah Pathak, Mohallah Ward NO.5 Model Town, MOhallah Kareem, Street Capital Road, District Sialkot 219 7229 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 5.500 5.500 5.500 100% 5.500 41% Work in progress. Full fund utilized. Construction of Drain / Nullah Mohallah Bogra, Mohallah Umar Town, Fateh Garah, District Sialkot 220 7230 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 41% Work in progress. Full fund utilized. Construction of Drain / Nullah Mohallah Pharinin Graveyard, Roras Road Muzaffar Pura, Mohallah Roras Road Muzaffar Pura, Street Election Commission Sardar Pura, Street Contractor Tanveer Wali, District Sialkot

221 7231 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 7.500 7.500 7.500 100% 7.500 43% Work in progress. Full fund utilized. Construction of Drain / Nullah Gali Abrar Meer, Chaha Muhammad Hussaain, Ghous Pura Garah Road, Street Sulman Wali, Madrisa Wali Chah Damerian, Back Side Mohallah Ifthikar Butt, Sheikh Zulfiqar Haji Pura, District Sialkot

222 7232 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 50% Work in progress. Full fund utilized. Construction of Drain / Nullah Street Back Side Shagan Marriage Hall, Ansar Street Back Side Shagan Marriage Hall Lalyy Khan, Back Street Sherwani, Javed Pehlwan, Asghar Haji Pura Ban, Back Mohallah Ghulam Raso, District Sialkot 223 7233 Providing & Laying Tuff Tile / RCC Sewer and Sialkot Approved 0.000 0.000 9.000 9.000 9.000 100% 9.000 47% Work in progress. Full fund utilized. Construction of Drain / Nullah Mohallah Mehar Qammar, Ram Garha Doburfi Mallian, Mohallah Ram Garah, Street no. 1, Abdullah Colony, Back Pehlwan Chowk, Quaid-e-Azam Street, Rehabilitation of Tubwell and Water Supply Pipeline Daburji Mallian, District Sialkot 224 7235 Rural Drainage & PCC Scheme UC Ghang Sheikhupura Approved 0.000 0.000 6.000 6.000 6.000 100% 6.000 30% Work in progress. 225 7236 Rural Drainage & PCC Scheme UC Warn Sheikhupura Approved 0.000 0.000 6.000 6.000 6.000 100% 6.000 24% Work in progress. 226 7237 Rural Drainage & PCC Scheme UC Mojoki Sheikhupura Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 29% Work in progress. 227 7238 Rural Drainage & PCC Scheme UC Bhaianwala Sheikhupura Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 20% Work in progress. Priority Programme at G.Sr. No.4827 of ADP 2016-17 Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

228 6746 Tuff Tiles / Drainage for Muhammad Pur Dewan Rajanpur Approved 0.000 0.000 10.994 10.994 10.944 100% 10.944 36% Date of A.A = 17.12.2014 • Date of T.S = 16.03.2015 • Date of Revised T.S = 28.04.2017 • No. of Beneficiaries =27932 • Date of invitation of Tender =8.04.2015 • Date of receipt of tender 10.04.2015 • Date of work order =27.04.2017 • Date of completion as per PC-= • Anticipated date of completion. • Supplimentary Grant = 05.05.2017 Work is in progress.

229 6747 Construction of Drain Brick Pavement, Sullage Rajanpur Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 20% Date of A.A = 17.12.2014 Carrier, Culverts & Tuff Tile Flooring Scheme for • Date of T.S = 14.04.2015 Fazilpur • No. of Beneficiaries = 39164 • Date of invitation of Tender =05.05.2015 • Date of receipt of tender 7.05.2015 • Date of work order =18.05.2015 • Date of completion as per PC-= • Anticipated date of completion. • Supplimentary Grant = 05.05.2017 Work is in progress. 230 6748 Tuff Tiles/Drainage for Lalgarh Town Rajanpur Approved 0.000 0.000 0.819 0.819 0.819 100% 0.819 4% Date of A.A = 17.12.2014 • Date of T.S = • No. of Beneficiaries = 6442 • Date of invitation of Tender =8.04.2015 • Date of receipt of tender 10.04.2015 • Date of work order =27.04.2017 • Date of completion as per PC-= • Anticipated date of completion. • Supplimentary Grant = 05.05.2017 Work is in progress. 231 6763 Installation of Submersible Water Pumps, Tehsil Mianwali Approved 0.000 0.000 25.000 25.000 24.838 99% 24.838 50% Date of A.A 13.01.2017 isa Khel Date of T.S 24.01.2017 Date of Start of Work ---- Date of Completion Bottlenecks / Remarks E.R.S=50/144, Trail Bore=2/6, T/Well boring= 25/72, P/Machinery= 25/72, G.S.Tank= 7/72. Work is in progress.

232 6764 Rural Drainage Scheme Midh Ranjha and Sargodha Approved 0.000 0.000 8.750 8.750 8.679 99% 8.679 99% Date of A.A 13.01.2017, Date of T.S 19.01.2017, Date of adjoining abadies Award 24.03.2017, Scheduled date of Completion on 30.06.2018, Date of Commencement, 24.03.2017, Funds released on 27-02-2017, Funds on-lined on 27-02-2017.

Work in progress 233 6897 Const: of (i)Street and drain in village (ii) Chakwal Approved 0.000 0.000 5.000 5.000 4.868 97% 4.868 97% Funds released by FD on 02.03.17 Janaz Gah in Village Ambreela and street in village Mahinwal & Bun Villages Gohra UC Bashrat (iii) Street and drain in Village Watli UC (iv) Street & Drain in Village Wahali Bala, Kotli, Dhoke Choi, Pir Makhdoom, Jahanian, Khajoola & Chumbi UC Lehr Sultan Pur 234 6898 Const: of (i) Street & Drain in City Choa Saidan Chakwal Approved 0.000 0.000 5.000 5.000 4.881 98% 4.881 98% Funds released by FD on 02.03.17 Shah (ii) Path with Toe Wall in Village Jaswal (iii) Boundry wall in Graveyard Dhoke Malkan Dakhli Village Chumbi (iv) Street & Nullah in Village Chabhar Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

235 6943 Rural Sewerage / Drainage Scheme Tibba Layyah Approved 0.000 0.000 6.864 6.864 6.864 100% 6.864 58% • Date of AA = 08-02-2017 Dastian Wala • Date of TS = 18-02-2017 • No. of Beneficiaries = 3265 • Date of invitation/advertisement of tenders=25-02-2017 • Date of Receipt of Tenders =21-03-2017 • Date of Work Order= 05-04-2017 • Date of completion as per PC-I= 06-10-2017 • Anticipated date of completion= 30-06-2018 • Funds released by FD =24-03-2017

Work allotted on 05.04.2017 and is in progress.

236 6991 Const: of PCC., Nallah at Maraka UC-122, Lahore Approved 0.000 0.000 24.200 24.200 16.566 68% 16.566 68% ● A.A by Deputy Commissioner Lahore vide No. 16(1)DD(Dev)/ Shamke Bhattian, Chahram & Mal, Manga Mandi LHR/2017/50, Dated: 13-02-2017. Sundar, Kot Fateh Muhammad Athual ● Tender called on 06.5.2017. 237 6992 Const: of PCC Sewerage & Drainage System at Lahore Approved 0.000 0.000 5.000 5.000 0.022 0% 0.022 0% ● A.A by Deputy Commissioner Lahore vide No. 16(1)DD(Dev)/ UC-260 Maraka LHR/2017/50, Dated: 13-02-2017. ● Tender re-called on 06.5.2017. 238 6993 Const: of PCC Sewerage & Drainage System at Lahore Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 17% ● A.A by Deputy Commissioner Lahore vide No. 16(1)DD(Dev)/ UC-262 Shamke Bhattian LHR/2017/50, Dated: 13-02-2017. ● Tender re-called on 06.5.2017. 239 6994 Const: of PCC Sewerage & Drainage System at Lahore Approved 0.000 0.000 5.000 5.000 4.995 100% 4.995 17% ● A.A by Deputy Commissioner Lahore vide No. 16(1)DD(Dev)/ UC-264 Sultankey LHR/2017/50, Dated: 13-02-2017. ● Tender re-called on 06.5.2017. 240 6995 Const: of PCC Sewerage & Drainage System at Lahore Approved 0.000 0.000 5.000 5.000 0.022 0% 0.022 0% ● A.A by Deputy Commissioner Lahore vide No. 16(1)DD(Dev)/ UC-267 Manak LHR/2017/50, Dated: 13-02-2017. ● Tender re-called on 06.5.2017. 241 6996 Const: of PCC Sewerage & Drainage System at Lahore Approved 0.000 0.000 8.000 8.000 2.419 30% 2.419 30% ● A.A by Deputy Commissioner Lahore vide No. 16(1)DD(Dev)/ UC-272 Raiwind Kalan & UC-273 Raiwind City LHR/2017/50, Dated: 13-02-2017. ● Tender re-called on 06.5.2017. 242 6887 Rural Water Supply Scheme Sangral, Tehsil Rawalpindi Approved 0.000 0.000 4.400 4.400 3.441 78% 3.441 47% • A.A cost:- 7.400 M dt: 16-12-16 Kahuta, District Rawalpindi. • T.S cost:- 6.442 M dt:29-12-16 • Date of Start:-09-03-17 • Date of Completion:- 31-12-17 • T/Well bore in progress pipe arranged. • Funds made online on 23-05-17 243 6888 Rehabilitation of Rural Water Supply Scheme Rawalpindi Approved 0.000 0.000 2.000 2.000 1.720 86% 1.720 34% A.A cost:-5.000 M dt: 16-12-2016 Maira, Tehsil Kahuta, District Rawalpindi T.S cost:-4.2101M dt:29-12-2016 Date of Start:-09.03.2017 Date of Completion:-08.09.2017 Fund made online 23.05.2017 p/Machinery & pipe arranged T/Well bore in progress 244 6889 Rural Water Supply Scheme Nallah Musalmanah Rawalpindi Approved 0.000 0.000 7.699 7.699 7.675 100% 7.675 46% • A.A cost:-16.669 M dt: 16-12-16 Shamli, District Rawalpindi • T.S cost:-14.977M dt:29-12-16 • Date of Start:-21-03-17 • Date of Completion:- 31-12-2017 • Work in progress. • P.E pipe 6" (3600'). • Laying of 6" G.I in progress 245 6765 Construction of sewerage /PCC/ Soling in Nawab Sargodha Approved 0.000 0.000 2.715 2.715 2.715 100% 2.715 57% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Colony, Aziz Colony and Ghani Park, Sargodha Award 22.02.2017, Scheduled date of Completion is City. 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 246 6766 Construction of sewerage /PCC/ Soling Resoling Sargodha Approved 0.000 0.000 2.588 2.588 2.420 94% 2.420 54% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Bashir Colony, Sargodha City. Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

247 6767 Costruction of Sewerage / PCC / soling / Sullage Sargodha Approved 0.000 0.000 2.963 2.963 2.963 100% 2.963 67% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Carrier Mulsim Town, Usman Park, Shiraz Park, Award 22.02.2017, Scheduled date of Completion is Sargodha City. 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 248 6768 Lying of Water Supply Pipelines in D-Block Old Sargodha Approved 0.000 0.000 2.693 2.693 2.684 100% 2.684 65% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Satellite Town & Millat Abad, Sargodha City. Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 22.02.2017, Funds 249 6769 Construction of Sewerage / PCC/ Soling / Sargodha Approved 0.000 0.000 2.995 2.995 2.995 100% 2.995 50% Datereleasedof A.Aon 27.02.2017,27.08.2016, FundsDate ofon-linedT.S 04.09.2016, on 27.02.2017.Date of Resolling Adil Park, Jamil Park, Sargodha City. Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 22.02.2017, Funds 250 6770 Construction of Sewerage / PCC/ Soling / Fazil Sargodha Approved 0.000 0.000 3.031 3.031 3.031 100% 3.031 50% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Town, Sargodha City. Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 251 6771 Construction of Sullage Carrier / drain / PCC Sargodha Approved 0.000 0.000 3.093 3.093 3.093 100% 3.093 50% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Chak No.49 NB and Chak No. 86/NB, District Award 22.02.2017, Scheduled date of Completion is Sargodha 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 252 6772 Cosntruction of Sewerage / PCC / Soling Gali Dr. Sargodha Approved 0.000 0.000 2.776 2.776 2.772 100% 2.772 50% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Robine Khan, X-Block, New Satellite Town Award 22.02.2017, Scheduled date of Completion is Sargodha City. 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 253 6773 Constuction of Sewerage / PCc / Water Pipe / Sargodha Approved 0.000 0.000 2.937 2.937 2.936 100% 2.936 50% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Soling / Re-soling in New Satellite Twon, W- Award 22.02.2017, Scheduled date of Completion is Block, Sargodha City. 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 254 6774 Construction of Sewerage / PCc / Water Pipe / Sargodha Approved 0.000 0.000 3.166 3.166 3.099 98% 3.099 49% Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Soling / Re-soling in New Satellite Town , Y- Award 22.02.2017, Scheduled date of Completion is Block, Sargodha City. 30.06.2018, Date of Commencement, 22.02.2017, Funds released on 27.02.2017, Funds on-lined on 27.02.2017.

Work in progress 255 6893 Rural Water Supply Dalili Wala Musa khel, Mianwali Approved 0.000 0.000 4.000 4.000 3.998 100% 3.998 50% Date of A.A 17.02.2016 District Mianwali. Date of T.S 19.05.2017 Date of Start of Work 10.05.2017 Date of Completion Bottlenecks / Remarks E.R.S=3/3, Tube Well=1/1, Pump House=In Progress/1, P/Machinery =Arrange/1, R/FMain= 4"i/d PVC Pipe= 4900/4900, 3"i/d PVC= 2400-Rft Laid & 13025-Rft Arranged/15425, T/Line=0/1. Work is in progress. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

256 6894 Construction of Rural Water Supply Scheme Mianwali Approved 0.000 0.000 6.750 6.750 6.101 90% 6.101 45% Date of A.A 16.05.2016 Marmandi Tehsil & District Mianwali. Date of T.S 19.05.2017 Date of Start of Work 10.05.2017 Date of Completion Bottlenecks / Remarks E.R.S=3/3, Tube Well=1/1, Pump House=In Progress/1, P/Machinery=Arranged/1, R/FMain= 6"i/d G.I Pipe=1200-Rft Arranged/1200, 4"i/d G.I Pipe=2240-Rft Arranged/2250, 3"i/d G.I Pipe=3020-Rft Arranged/3020, 2"i/d G.I Pipe=1400- Rft Arranged/1400, 6"i/d PVC Pipe=1900-Rft Arranged/1900, 3"i/d PVC= 9800-Rft Arranged/9805, G.S. Tank 20000-Glns=In progress/1, T/Line=Awaited for Demand Notice/1. Work is in progress.

257 7213 construction of Rural Drainage / Brick Pavement Layyah Approved 0.000 0.000 14.744 14.744 14.744 100% 14.744 50% • Date of AA = 13-01-2017 & Tuff Tiles in Chak NO. 105/ML (Model Village), • Date of TS = Tehsil Karor Lal Eassan , District Layyah • No. of Beneficiaries = 2287 • Date of invitation/advertisement of tenders= 14-01-2017 • Date of Receipt of Tenders =07-02-2017 • Date of Work Order= 13-04-2017 • Date of completion as per PC-I= 12-04-2018 • Anticipated date of completion= 30-06-2018 • Funds released by FD =17-04-2017

• Funds utilized 100% • Scheme reflected in ADP 2017-18.

258 7214 Construction of PCC Drain / Tuff Tile Ward No. 1 Sialkot Approved 0.000 0.000 30.000 30.000 30.000 100% 30.000 43% Work in progress. Full fund utilized. to 30 Daska Kalan, Daska Kot, U. C Galotian Khurd, Galotian Kalan, Rurj Ghuman, Goindke, Mitranwalik, Bambanwal, Village Soba Sara, Boobkanwala, Burj Ariyan, Talahra, Bharoke, Dera Meywoala, Galotian Kalan, Ranganwala, Moseywala, Gaga, Ladhey Bhanbanwal, Thatha, Sukhar Nahar & Bhadeywala, Daska City, District Sialkot. 259 7219 Construction of PCC, Drain / Solling & Nullah at Sheikhupura Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 14% Work in progress. Full fund utilized. UC-83, Jatri Kohna 260 7220 Construction of PCC, Drain / Solling & Nullah at Sheikhupura Approved 0.000 0.000 17.000 17.000 17.000 100% 17.000 29% Work in progress. UC-84, Makki 460 261 7221 Construction of PCC, Drain / Solling & Nullah at Sheikhupura Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 15% Work in progress. UC-75, Kakar Gill 262 7222 Construction of PCC, Drain / Solling & Nullah at Sheikhupura Approved 0.000 0.000 7.000 7.000 7.000 100% 7.000 9% Work in progress. Full fund utilized. UC-77, Ajnianwala 263 7223 Construction of PCC, Drain / Solling & Nullah at Sheikhupura Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 13% Work in progress. Full fund utilized. UC-85, Farooqabad 264 7245 Construction of PCC, Drain and Nallah at UC-55 Sheikhupura Approved 0.000 0.000 7.500 7.500 7.500 100% 7.500 50% Work in progress. Bahuman 265 7246 Construction of PCC, Drain and Nallah at UC-56 Sheikhupura Approved 0.000 0.000 7.500 7.500 7.500 100% 7.500 50% Work in progress. Bharianwala 266 7247 Construction of PCC, Drain and Nallah at UC-97 Sheikhupura Approved 0.000 0.000 7.500 7.500 7.500 100% 7.500 50% Work in progress. Ferozwatun-I 267 7248 Construction of PCC, Drain and Nallah at UC- Sheikhupura Approved 0.000 0.000 7.500 7.500 7.500 100% 7.500 50% Work in progress. 598 Ferozwatun-II 268 7249 Construction of PCC, Streets & Drain at UC Kasur Approved 0.000 0.000 6.000 6.000 5.938 99% 5.938 99% Work in progress. Orara & Basti Barat Shah 269 7268 Rehabilitation of rural water supply scheme Chakwal Approved 0.000 0.000 0.719 0.719 0.000 0% 0.000 0% Funds release by FD on 05.05.17 dhoke khour tehsil talagang chakwal Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

270 7269 Rehabilitation of rural water supply scheme chak Faisalabad Approved 0.000 0.000 3.722 3.722 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice no 215/RB, District Faislabad No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017 271 7270 Extention Urban Water Supply sccheme Faisalabad Approved 0.000 0.000 5.623 5.623 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice Jaranwala District Faislabad No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017 272 7271 Sewerage / Tuff Tile in Choti Karana Tehsil & Bahawalpur Approved 0.000 0.000 5.623 5.623 0.000 0% 0.000 0% Date of A.A 04.05.2016 District Bahwalpur Date of T.S. 26.05.2016 Work awarded 11.06.2016 Scheme remained unfunded during 2015-16. Funds allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017. but not released/ online by FD. 273 7272 Construction of tuff tile in mohallah jagpura Bahawalpur Approved 0.000 0.000 3.537 3.537 0.000 0% 0.000 0% Date of A.A 19.03.2015 shamas colony shamimabad & main street molvi Date of T.S. 11.04.2015 sadiq city UCH sharif tehsil admedpur east, Work awarded 19.05.2015 Scheme remained unfunded during 2015-16. Funds bahawalpur allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017. but not released/ online by FD. 274 7273 construction of tuff tile in main street gillani city Bahawalpur Approved 0.000 0.000 0.801 0.801 0.000 0% 0.000 0% Date of A.A 19.03.2015 UCH sharif, tehsil ahmed pur east bahawalpur Date of T.S. 18.04.2015 Work awarded 18.05.2015 Scheme remained unfunded during 2015-16. Funds allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017. but not released/ online by FD. 275 7274 construction of tuff tile in main street ijaz bukhari Bahawalpur Approved 0.000 0.000 2.281 2.281 0.000 0% 0.000 0% Date of A.A 19.03.2015 muhallah bukhari and main street peer mana and Date of T.S. 18.04.2015 street Work awarded 19.05.2015 Scheme remained unfunded during 2015-16. Funds allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017. but not released/ online by FD. 276 7275 water supply scheme doonga boona district Bahawalnagar Approved 0.000 0.000 0.915 0.915 0.000 0% 0.000 0% Date of A.A 09.03.2010 bahawalnagher Date of T.S. 13.03.2010 Revised T.S. 10.05.2012 Work awarded 14.05.2010 Scheme remained unfunded during 2013-14. Funds allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017. but not released/ online by FD. 277 7276 sewerage scheme doonga bhoonga, district Bahawalnagar Approved 0.000 0.000 1.588 1.588 0.000 0% 0.000 0% Date of A.A 08.02.2011 bahawalnghar Date of T.S. 08.02.2011 Work awarded 11.03.2011 Scheme remained unfunded during 2013-14. Funds allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 07.04.2017. but not released/ online by FD. 278 7333 Sewerage / Tuff Tile Scheme Dhoor Kot, Tehsil Bahawalpur Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 40% Date of A.A. 03.04.2017. Funds released by F&D on Ahmad Pur East, District Bahwalpur 05.05.2017 & online dated 18-05-2017. Date of receipt of tender 06-05-2017 .Date of award 18-05-2017. Date of completion 17-07-2017. Work is in progress. 279 7334 Provision of Sewerage / Drainage Scheme Chak Pakpattan Approved 0.000 0.000 9.000 9.000 9.000 100% 9.000 25% Funds release by P&D on 12.04.2017 No. 64/EB, Arifwala, District Pakpattan. 280 7335 Rural Drainage Scheme Khura Khel (Phase-II), Attock Approved 0.000 0.000 4.000 4.000 3.994 100% 3.994 22% ● A.A Date 04.03.2017. Tehsil Hazro, District Attock ● T.S Date 18.04.2017. ● Date of Start of Scheme 10.06.2017. ● Date of Completion of Scheme 30.06.2018. ● Work is in progress. 281 7344 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 1,2,3,4,5&6 and adjoining abadies urban area Jhang Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

282 7345 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 7,8,9,10,11&12 and adjoining abadies urban area Jhang 283 7346 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 13,14,15,16,17 & 18 and adjoining abadies urban area Jhang 284 7347 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 19,20,21,22,23 & 24 and adjoining abadies urban area Jhang 285 7348 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 25,26,27,28,29 & 30 and adjoining abadies urban area Jhang 286 7349 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 31,32,33,34,35 & 36 and adjoining abadies urban area Jhang 287 7350 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 37,38,39,40,41,42, & 43 and adjoining abadies urban area Jhang 288 7351 Construction of Sewerage, PCC Slab, Drain & Jhang Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds released by FD on 02.05.17 Soling at Ward NO. 44,45,46,47,48,49, & 50 and adjoining abadies urban area Jhang 289 7380 Provision of Drainage / PCC Schem at UC Gujranwala Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 13% Funds released by FD on 05.05.17 Chahal Kalan, District Gujranwala 290 7362 Construction of PCC, Solling & Drain / Nullah Ucs Sialkot Approved 0.000 0.000 16.000 16.000 16.000 100% 16.000 11% Work in progress Head Marala, Machrala, Gondal, Bolwanwala , Pindi Punjorian, Kaman Wala Kundan pur, Dallowali, Katchi Maund, Pholkin, Wadhgran

291 7367 Water Supply Pipe Line i/d for Madina Town Rawalpindi Approved 0.000 0.000 5.100 5.100 0.000 0% 0.000 0% Funds released by FD on 09.05.17 Murree, Districst Rawalpindi 292 7371 Improvement / Construction of drains / Solling / Narowal Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 49% Work in Progess . Full funds utilized PCC / Culverts in Chak Nos. Chak Jamal UC Chak Amru Natla Khurd to house Ibrahim CH.in Village Natla Kalan, UC Baran Natla Kalan to Natla Khurd Bhopal pur Manla to Bhopal pur Operwala UC Chak Amru 293 7372 Construction of Path of Govt. Boys Primary Gujrat Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 26% Work in Progrerss. Full funds utilized School Chak Sikandar 294 7383 Construciton of street, Draingage and Soling of Sahna M.B.Din Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 30% Funds allocated by P&D on 19.04.2017 Kahanana, District M.B.Din 295 7384 Construciton of street, Draingage and Soling of Aaki, M.B.Din Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 50% Funds allocated by P&D on 19.04.2017 District M.B.Din 296 7385 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 33% Funds allocated by P&D on 19.04.2017 Chak No.40, District M.B.Din 297 7386 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 43% Funds allocated by P&D on 19.04.2017 Bhikki Sharif Aionwal, District M.B.Din 298 7387 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 40% Funds allocated by P&D on 19.04.2017 Seeray, District M.B.Din 299 7388 Construciton of street, Draingage and Soling of Saida, M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 33% Funds allocated by P&D on 19.04.2017 District M.B.Din 300 7389 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 40% Funds allocated by P&D on 19.04.2017 Bhoa Hassan, District M.B.Din 301 7390 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 43% Funds allocated by P&D on 19.04.2017 Pindi Rawan, District M.B.Din Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

302 7391 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 40% Funds allocated by P&D on 19.04.2017 Chak No.47,48,49 and 50, District M.B.Din 303 7392 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 40% Funds allocated by P&D on 19.04.2017 Gunian, District M.B.Din 304 7393 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Funds allocated by P&D on 19.04.2017 Chak No.26 District M.B.Din 305 7394 Construciton of street, Draingage and Soling of Kakka M.B.Din Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 46% Funds allocated by P&D on 19.04.2017 and Kot Jafar, Chak No.18 & 19, District M.B.Din

306 7395 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 40% Funds allocated by P&D on 19.04.2017 Thakar Waryam Bherowal, District M.B.Din 307 7396 Construciton of street, Draingage and Soling of M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Funds allocated by P&D on 19.04.2017 Lakhawo Kidhar Gharbi, Raan Musa Kalan, Kot Hast Khan and Syed, Jassowal, Musa Khurd,kot Sher Muhammad,District M.B.Din. 308 7397 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Funds allocated by P&D on 19.04.2017 Dhuni Kalan, District M.B.Din 309 7398 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 8.500 8.500 8.343 98% 8.343 98% Funds allocated by P&D on 19.04.2017 Chak Shehbaz, Bhuk and Burj Agra, Chani Gahna, District M.B.Din 310 7399 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Funds allocated by P&D on 19.04.2017 Nain Ranjha,District M.B.Din 311 7400 Construciton of street, Draingage and Soling of Gohar M.B.Din Approved 0.000 0.000 5.000 5.000 4.905 98% 4.905 49% Funds allocated by P&D on 19.04.2017 Sharif Gohri, District M.B.Din 312 7401 Construciton of street, Draingage and Soling of Bosal M.B.Din Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 40% Funds allocated by P&D on 19.04.2017 Sukha, Masoor, District M.B.Din 313 7402 Construciton of street, Draingage and Soling of Khizar M.B.Din Approved 0.000 0.000 8.000 8.000 6.069 76% 6.069 47% Funds allocated by P&D on 19.04.2017 and Chak No.52, UC Chot Dheeran, District M.B.Din

314 7403 Construciton of street, Draingage and Soling of Musa M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Funds allocated by P&D on 19.04.2017 Rattowal and Makkeywal, Mouza Shumari, District M.B.Din 315 7404 Construciton of street, Draingage and Soling of M.B.Din Approved 0.000 0.000 8.000 8.000 7.840 98% 7.840 98% Funds allocated by P&D on 19.04.2017 Faqeerian, Bachar Kuthiala, Chook Kalan, Balhar, District M.B.Din 316 7405 Construciton of street, Draingage and Soling of UC M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Funds allocated by P&D on 19.04.2017 Khamb Kalan, District M.B.Din 317 7406 Construciton of street, Draingage and Soling of Chak M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 50% Funds allocated by P&D on 19.04.2017 Nos.5,27.28 & 29 Jago Kalan, Mailo Nau, Kohna, District M.B.Din 318 7407 Construciton of street, Draingage and Soling of Chah M.B.Din Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 100% Funds allocated by P&D on 19.04.2017 Gharab and Miana Gondal, District M.B.Din 319 7408 Construciton of street, Draingage and Soling of M.B.Din Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 37% Funds allocated by P&D on 19.04.2017 Rukkan, District M.B.Din 320 7409 Construciton of street, Draingage and Soling of Dera M.B.Din Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 47% Funds allocated by P&D on 19.04.2017 Kidhran Pindiwal, UC Majhi, Kot Hast Khan Near Badshahpur, Wara Chamian and Kitrowal, Chak No.32, District M.B.Din 321 7410 Construciton of street, Draingage and Soling of Ahla, M.B.Din Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 50% Funds allocated by P&D on 19.04.2017 District M.B.Din. 322 7481 Construction of PCC and Tuff Tile Phoolnagar Phase- Kasur Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 5% Funds released by FD on 05.05.17 II, Tehsil Pattoki, District Kasur 323 7482 Construction of Sullage Carrier for Ultimate Disposal Kasur Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 6% Funds released by FD on 05.05.17 of Phoolnagar City, Tehsil Pattoki, District Kasur

324 7490 Construction of Street, PCC and Soling at Village M.B.Din Approved 0.000 0.000 6.500 6.500 6.372 98% 6.372 98% Funds released by FD on 08.05.17 Pandowal Tehsil & District Mandi Bahauddin 325 7415 Laying of Tuff Tiles / Sewerage and Sullage Carrier in Okara Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 21% Funds allocated by P&D Department vide advice Left Over Streets in Ward No.1 to 50 City Okara No.1(17)RO(ADP)P&D/2016-Suppl. Dated 18.04.2017 Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

326 7416 Construction of Nalian, Soling, PCC & Boundary Narowal Approved 0.000 0.000 12.000 12.000 12.000 100% 12.000 14% Funds released by FD on 05.05.17 Walls of Graveyard in Ucs Nallah, Bua, Melo Salo, Kalah, Mainagty, Bara Manga, Kot Naina, Bahree, Ikhras Pur, Jalala, Sujowal, Pehgwari, Malik Pur, Fetha Pur Afghana, Sahari, Ghona, Ghumtala, Kanjror, Langha, Kotli, Baray Khan, Wali Pur Bora, District Narowal 327 7452 Provision of Road, Soling, Tuff Tiles, Drain in Streets Multan Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 40% Work is in progress. in UC 151 and 155, Tehsil Shujabad, District multan

328 7453 Provision of Road, Soling, Tuff Tiles, Drain in Streets Multan Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 40% Work is in progress. in UC 158 and 164, Tehsil Shujabad, District Multan

329 7454 Provision of Road, Soling, Tuff Tiles, Drain in Streets Multan Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 40% Work is in progress. in UC 157 and 159, Tehsil Shujabad, District Multan

330 7455 Provision of Road, Soling, Tuff Tiles, Drain in Streets Multan Approved 0.000 0.000 2.000 2.000 2.000 100% 2.000 40% Work is in progress. in UC 184 and 150, Tehsil Shujabad, District Multan

331 7536 Providing & Laying of RCC Sewer, Tuff Tile and Sialkot Approved 0.000 0.000 10.000 10.000 0.000 0% 0.000 0% Funds released by FD on 10.05.17. Proposal for revision is Construction of Disposal Station Nasir Road Prem prepared and will be submitted to the government. Nagar Road EIC School to Nullah Bhed U/C Model Town, Tehsil & District Sialkot 332 7537 Providing & Laying of RCC Sewer, Tuff Tile and Sialkot Approved 0.000 0.000 10.000 10.000 0.000 0% 0.000 0% Funds released by FD on 10.05.17. Proposal for revision is Construction of Disposal Station Mohallah Water prepared and will be submitted to the government. Works to Abbot Road Phatak and along the Railway line to Dara Arrian U/C Water Works, Tehsil & District Sialkot 333 7539 Construciton of Drain, Sewerage Tuff Tiles in Urban Multan Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice U/Cs-No.1 & 2 Multan City No.1(17)RO(ADP)P&D/2016-Suppl. Dated 27.04.2017 334 7540 Construciton of Drain, Sewerage Tuff Tiles in Urban Multan Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice U/Cs-No.3,4,5, & 6 Multan City No.1(17)RO(ADP)P&D/2016-Suppl. Dated 27.04.2017 335 7541 Construciton of Drain, Sewerage Tuff Tiles in Urban Multan Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice U/Cs-No.7,8,9,10 & 11 Multan City No.1(17)RO(ADP)P&D/2016-Suppl. Dated 27.04.2017 336 7542 Provision / Rehablitation / Improvement of Water Multan Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice Supply in Urban U/Cs-12 & 13 and Construction of No.1(17)RO(ADP)P&D/2016-Suppl. Dated 27.04.2017 Drain, Tuff Tiles, Sewerage in Urban U/Cs-23,24,26 & 41 Multan City 337 7543 Construciton of Drain, Sewerage Tuff Tiles in Urban Multan Approved 0.000 0.000 2.000 2.000 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice U/Cs-No-28 to 36 Multan City No.1(17)RO(ADP)P&D/2016-Suppl. Dated 27.04.2017 338 7549 Rural Sewerage Scheme Chah Sunna Wala Multan. Multan Approved 0.000 0.000 5.000 5.000 0.000 0% 0.000 0% Funds allocated by P&D Department vide advice No.1(17)RO(ADP)P&D/2016-Suppl. Dated 27.04.2017 339 7520 Providing & Laying of RCC Sewer Drain / Nullah, Tuff Sialkot Approved 0.000 0.000 8.000 8.000 8.000 100% 8.000 100% scheme completed Tile Mohallah Masjid Rehman, Hasham Pura, Fateh Garah Road U/C Fateh Garah Mohallah Darbar Syedan, CIA Staff U/C Shah Syedan, Tehsil & District Sialkot 340 7523 Construction of PCC Street & Drain / Nullah and Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 59% Funds released by FD on 08.05.17 Providing & Laying of Tuff Tiles, Taj Pura Mohallah Azam Block Chah Lalarrian, U/C Kotli Behram Tehsil & District Sialkot 341 7524 Providing & Laying of Tuff Tile and Construction of Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 59% Funds released by FD on 08.05.17 Drain / Nullah Mohallah Mehar Javed Street Aimana Abad Road U/C Hamza Ghous Nesi Kothi Haji Pura U/C Haji Pura Mohallah Mujahid Butt U/C Imam Sahib, Tehsil & District Sialkot Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

342 7525 Providing & Laying of Tuff Tile and Construction of Sialkot Approved 0.000 0.000 5.000 5.000 5.000 100% 5.000 59% Funds released by FD on 08.05.17 Drain / Nullah Mohallah Mubarak Pura Roras Road U/C Mubarak Pura, Darfraz U/C Shahab Pura, Tehsil & District Sialkot 343 7691 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 22% Funds allocated by P&D Department vide advice Streets in UC Ali Pur Sadat & UC Belay Wala, Tehsil No.1(17)RO(ADP)P&D/2016-Suppl. Dated 05.05.2017 Jalalpur Pirwala, District Multan 344 7692 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 16% Funds allocated by P&D Department vide advice Streets in UC Ganwain & UC Rasool Pur, Tehsil No.1(17)RO(ADP)P&D/2016-Suppl. Dated 05.05.2017 Shujrabed, District Multan 345 7693 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 0.000 1.500 1.500 0.971 65% 0.971 14% Funds allocated by P&D Department vide advice Streets in UC-149 & UC Mohan Pur Sharqi, Tehsil No.1(17)RO(ADP)P&D/2016-Suppl. Dated 05.05.2017 Shujabed, District Multan 346 7694 Provision of Road, Soling, Tuff Tiles, Drainage, Multan Approved 0.000 0.000 1.500 1.500 1.500 100% 1.500 22% Funds released by FD on 10.05.17 Streets in UC-147 & UC Kotli Nijabat, Tehsil Shujabad, District Multan 347 3612 Laying of Tuff Tiles and Sewerage in Sahiwal Sahiwal Approved 0.000 0.000 25.000 25.000 25.000 100% 25.000 50% Funds release by P&D on 13.04.2017 348 7706 Rural Drainage Scheme in Villages Chachi, Attock Approved 0.000 0.000 5.955 5.955 0.000 0% 0.000 0% Funds released by FD on 10.05.17 Saiden, Yasin, Tehsil Hazro 349 Construction / Rehab: of streets , drains Nullah Sargodha Approved 0.000 0.000 6.000 6.000 0.000 0% 0.000 0% The scheme approved by the Commissioner Sargodha vide and Soling at Chak No. 20 Shumali Chak No. No. DDF-2016 / 432 dated: 23-12-2016 & funds released by 0.61- Shaumali and Village Lak Govt: of Punjab vide Secretary HUD & PHED No. SO(PH- S)9-11/2016 (SGD) dated: 10-05-2017. The District Accounts Officer, Sargodha has informed that the same has not been online. Work completed at site & funds are required to clear the liabilities of contractor. Khadim e Punjab Kissan Package 350 7718 Provision of Drains, Soling Culverts etc to different Khanewal Approved 0.000 0.000 12.000 12.000 12.000 100% 12.000 30% Funds released by FD on 09.05.17 abadies of PP-212, Tehsil Kabirwala, Khanewal 351 7719 Provision of Drains, Soling Culverts in NA-156, Khanewal Approved 0.000 0.000 10.000 10.000 10.000 100% 10.000 49% Funds released by FD on 09.05.17 Khanewal 352 7710 Rural Drainage Scheme PP-20 District Chakwal Approved 0.000 0.000 4.000 4.000 0.823 21% 0.823 7% Funds released by FD on 11.05.17 Chakwal 353 7711 Rural Drainage Scheme UC Pashan PP-20 District Chakwal Approved 0.000 0.000 3.000 3.000 3.000 100% 3.000 43% Funds released by FD on 11.05.17 Chakwal 354 7712 Rural Drainage Scheme UC Udherwal PP-20 District Chakwal Approved 0.000 0.000 3.000 3.000 0.054 2% 0.054 0% Funds released by FD on 11.05.17 Chakwal 355 7713 Rural Drainage Scheme UC Nara PP-20 District Chakwal Approved 0.000 0.000 4.000 4.000 0.072 2% 0.072 1% Funds released by FD on 11.05.17 Chakwal 356 7714 Rural Drainage Scheme UC Muhal PP-20 District Chakwal Approved 0.000 0.000 5.141 5.141 0.140 3% 0.140 1% Funds released by FD on 11.05.17 Chakwal 357 7715 Drainage Scheme Chakwal City & Jabirpur PP- Chakwal Approved 0.000 0.000 4.000 4.000 4.000 100% 4.000 27% Funds released by FD on 11.05.17 20 District Chakwal 358 7870 Consturction of street / drains in us kadhar M.B.Din M.B.Din Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 04.05.17 359 7871 Const: of Sewerage Drainage- PPC Soling in Ucs Gujranwala Approved 0.000 0.000 80.000 80.000 79.971 100% 79.971 17% Funds released by FD on 08.05.17 Tehsil Noshera Virkan including Ucs No. Wala Jhatan wali & Sahran Chahta 360 7937 Providing & Laying of Tuff Tile and Construction of Sialkot Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds not yet been released. PCC, Street & Drain / Nullah Halqa No. 1 Ward No. 4, 6 Halqa No. 2 Ward No. 7 Halqa No. 5 Pully Toop Khana Sialkot Cannt. Khadim e Punjab Saaf Pani Programe 0.000 361 7943 Urban Water Supply Scheme (Distribution Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 System) Factory Area, Essa Nagar, Istaqlalabad, Hameed Town, Corporation Town, Society Colony and Nallah including Slab Karkhana Bazar Sargodha City. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

362 7944 Additional Water Supply pipeline in Cheema Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Colony, Kalyar Town, Rehmat Park, Pir Muhammad Colony & Adjoining Colonies Sargodha City. 363 7945 Rehabilitation of Water Supply Scheme New Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Satellite Town Sargodha City 364 7946 Providing / laying of Distribution System in left Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 over streets of 49-Tail & adjoining abadies Sargodha City. 365 7947 Providing / Fixing Ultra Filtration Plants (U.F / Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 R.O) in Wards / M.Cs in PP-34 Sargodha City (10- No.) 366 7948 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline including Disposal Station Gillwala and Tiwana Park Sargodha City. 367 7949 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline including Disposal Station M.C No. 07 Street No. 01, 02, 03, 04 & 05 to Rehman Pura Chowk via Pistool Marka Gali Sargodha City. 368 7950 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline in M.C No. 08 Sargodha City. 369 7951 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline including Renovation of Disposal Station Eid Gah M.C No. 09 Sargodha City.

370 7952 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline M.C No. 11 & M.C No. 13 Sargodha City 371 7953 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline including Disposal Station Iqbal Colony and at Girls Degree College to Block No. 16 Sargodha City 372 7954 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline Madina Town, New Madina Town, Muhammadi Colony including Disposal Station and Main Water Works Chowk / Road Sargodha City. 373 7955 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline M.C No. 22 with Road Election Commission Sargodha City. 374 7956 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline M.C No. 20 M.C No. 21 Sargodha City. 375 7957 Urban Sewerage & Drainage Scheme / Water Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Supply Pipeline Hameed Town, Society Colony including Renovation of Main Disposal Works Sillanwali Road Sargodha City. 376 7958 Urban Sewerage & Drainage Scheme in M.C-01 Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Sargodha City. 377 7959 Urban Sewerage & Drainage Scheme in M.C-02 Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Sargodha City. 378 7960 Urban Sewerage & Drainage Scheme in M.C-03 Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Sargodha City. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

379 7961 Urban Sewerage & Drainage Scheme in M.C-04 Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Sargodha City. 380 7962 Urban Sewerage & Drainage Scheme in M.C-05 Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Sargodha City. 381 7963 Urban Sewerage & Drainage Scheme in M.C-19 Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Sargodha City. 382 7964 Urban Sewerage & Drainage Scheme in Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Cantonment Ward No. 01 to 05 Sargodha City.

383 7965 Urban Sewerage & Drainage Scheme in Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Cantonment Ward No. 06 to 10 Sargodha City.

384 7966 Up-gradation of Disposal Works in New Satellite Sargodha Approved 0.000 0.000 0.000 0.000 0.000 0% 0.000 0% Funds release by P&D on 24.05.17 Town & Ghani Park and laying of Distribution System in New Satellite Town & adjoining abadies Sargodha City Total ( Supplementary) 0.000 0.000 2239.730 2239.730 2067.071 92% 2067.071 27%

2467 Khadim-e-Punjab Saaf Pani Programme 0.0 30000.0 4500.0 4500.0 4500.0 100% 4500.0 15%

Total (New+Suppl) 10.000 37000.320 16459.583 16459.583 16060.646 98% 16070.646 23%

Grand Total (On-going+New+Suppl) 29388.8 45000.3 31989.2 31989.2 31352.1 98% 60740.9 46%

7000.320 11959.583 11959.583 11560.646 97%

Account - IV Special Development Package appearing at G.Sr. No.4828 of ADP 2016-17 4840 Repair / Improvement of Road from Faisalabad Faisalabad Approved 0.000 0.000 9.300 0.000 0.000 0% 0.000 0% Funds Released by P&D on 25.07.2016 Lahore Road Adda Johal 97/RB to Chak No. 68 /RB Kala Via. 68/RB Jammra, Tehsil Jaranwala, District Faisalabad 1 4861 Repair / Improvement of Road from Faisalabad Faisalabad Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 25.07.2016 Lahore Road Chak No. 110 /RB ,Chak Jhumra, Tehsil Jaranwala, District Faisalabad

2 4916 Estalishment of Play Ground at Amar Kot, Sangla Nankana Approved 0.000 0.000 3.600 0.000 0.000 0% 0.000 0% Hill, Nankana Sahib Sahib 3 4917 Estalishment of Play Ground at Amar Kot, Sangla Nankana Approved 0.000 0.000 3.260 0.000 0.000 0% 0.000 0% Hill, Nankana Sahib Sahib 4 4918 Estalishment of Play Ground at Marrar 42 RB, Nankana Approved 0.000 0.000 3.625 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 5 4919 Estalishment of Play Ground at Gill Chak, Sangla Nankana Approved 0.000 0.000 3.650 0.000 0.000 0% 0.000 0% Hill, Nankana Sahib Sahib 6 4920 Estalishment of Play Ground at Pandorian , Nankana Approved 0.000 0.000 3.375 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 7 4921 Estalishment of Play Ground at Boriyana, Sangla Nankana Approved 0.000 0.000 3.700 0.000 0.000 0% 0.000 0% Hill, Nankana Sahib Sahib 8 4922 Estalishment of Play Ground at Rariyana, Sangla Nankana Approved 0.000 0.000 3.825 0.000 0.000 0% 0.000 0% Hill, Nankana Sahib Sahib 9 4923 Estalishment of Play Ground at Kotla Kalan, Nankana Approved 0.000 0.000 3.150 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

10 4906 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.1, Rawalpindi Cantt. 11 4907 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.2, Rawalpindi Cantt. 12 4908 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.3, Rawalpindi Cantt. 13 4909 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.4, Rawalpindi Cantt. 14 4910 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.5, Rawalpindi Cantt. 15 4911 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.6, Rawalpindi Cantt. 16 4912 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.7, Rawalpindi Cantt. 17 4913 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.8, Rawalpindi Cantt. 18 4914 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.9, Rawalpindi Cantt. 19 4915 Construction of PCC Roads and drainage Rawalpindi Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% system and water filtration in Ward No.10, Rawalpindi Cantt. 20 4916 Establishment of Play Ground at Amar Kot, Nankana Approved 0.000 0.000 3.600 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 21 4917 Establishment of Play Ground at Titranwali, Nankana Approved 0.000 0.000 3.260 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 22 4918 Establishment of Play Ground at Marrarm 42 RB, Nankana Approved 0.000 0.000 3.625 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 23 4919 Establishment of Play Ground at Gill Chak, Nankana Approved 0.000 0.000 3.650 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 24 4920 Establishment of Play Ground at Pandorian, Nankana Approved 0.000 0.000 3.375 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 25 4921 Establishment of Play Ground at Boraywala, Nankana Approved 0.000 0.000 3.700 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 26 4922 Establishment of Play Ground at Rariyana, Nankana Approved 0.000 0.000 3.825 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 27 4923 Establishment of Play Ground at Kotla Kalan, Nankana Approved 0.000 0.000 3.150 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 28 4924 Establishment of Play Ground at Kotla Khurd, Nankana Approved 0.000 0.000 3.650 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 29 4925 Establishment of Play Ground at Chahoor Kotly, Nankana Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% Sangla Hill, Nankana Sahib Sahib 30 4926 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 0.000 6.000 0.000 0.000 0% 0.000 0% at Ahmedabad i/c linksd City Sagla Hill Sahib 31 4927 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 0.000 7.000 0.000 0.000 0% 0.000 0% at Islam Pura i/c linksd City Sagla Hill Sahib Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

32 4928 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 0.000 6.500 0.000 0.000 0% 0.000 0% at Karamatabad i/c linksd City Sagla Hill Sahib 33 4929 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 0.000 7.000 0.000 0.000 0% 0.000 0% at Iqbal Pura, Sharif Pura i/c linksd City Sagla Hill Sahib

34 4930 Construction of Drain / Soling / PCC and Nullah Nankana Approved 0.000 0.000 7.000 0.000 0.000 0% 0.000 0% at UC Badhonku i/c (Gill Chak Titran Wali, Sahib Alibad, Chahoor Kotli, Charwind, Hameeroki, Chahoor Mughlian, Mehmondwali and Mashmoola Jaat), Sagla Hill 35 4940 Construction of Soling Drains Chak No. 719/GB T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% (Main abadi). & 720/GB, District T.T Singh

36 4941 Construction of Soling Drains Chak No. 716/GB T.T.Singh Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% (Main abadi). & 718/GB, District T.T Singh

37 4942 Construction of Soling Drains Chak No. 721/GB, T.T.Singh Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% District T.T Singh 38 4943 Construction of Soling Drains Chak No. 721/GB, T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% District T.T Singh 39 4944 Construction of Soling Khoo Chak No. 757/GB T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Nawab Bhoti Muhammad Ramzan Doltana and azafi abadi Shah Zinda Aroti, District T.T Singh 40 4945 Construction of Soling Drains Chak No. 757/GB, T.T.Singh Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% District T.T Singh 41 4946 Construction of Soling Drains Chak No. 717/GB T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% to Chak No. 723, District T.T Singh 42 4947 Construction of Soling Drains Mouza Dhadhi T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Main abadi and Mouza Dargi Pur,District T.T Singh 43 4948 Construction of Soling Drains Chak No. 717/GB T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% to Chak No. 679/8 GB, District T.T Singh

44 4949 Construction of Soling Chak Sher Singh Link T.T.Singh Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Waryam Bhadroki Bhani and Chak No.733/GB, District T.T Singh 45 4950 Construction of Soling Drains Chak No. 666/7GB T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% and 667/8, District T.T Singh 46 4951 Construction of Soling DrainsChak No No.662/3 T.T.Singh Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% GB,663/4GB and Dera Jat Plot A District T.T Singh 47 4952 Construction of Soling Drains Chak No.678/19 T.T.Singh Approved 0.000 0.000 2.500 0.000 0.000 0% 0.000 0% GB, Chak No.679/20GB, Chak No. 669/10 GB and Chak No. 680/21GB and Chak No. 681/22 GB District T.T Singh 48 4953 Construction of Soling Drains Chak No. T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% 670/11GB and from Chiragh to Darbar Barket Ali Shah Chak No. 717 GB, District T.T Singh 49 4954 Construction of Soling Drains and Nullah Chak T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% No. 687/27GB and Abrar Nagar, District T.T. Singh 50 4955 Construction of Soling Mouza Mahram Kathia T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% and Mouza Major Kathia, District T.T. Singh Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

51 4956 Construction of Soling Gali No.1 to Gali No. 6 T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Main Gali Chak No. 761/GB and Chak No. 759/GB (Nia Chak), District T.T. Singh 52 4957 Construction of Soling Drains and Nullah Chak T.T.Singh Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% No. 683/24GB, District T.T Singh 53 4958 Construction of Soling Mouza Jawia Panwar and T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Jiwin Shah, District T.T Singh 54 4959 Construction of Soling Drains Chak No. 751/GB T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Sharif Oadh and azafi abadi Chak No. 761/GB Mehar Ali Shar Sargana, District T.T Singh

55 4960 Construction of Soling Chak No.661/2 GB Sultan T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Marar, chak No. 664/5 GB, District T.T Singh

56 4961 Construction of Soling and Drains T.T.Singh Approved 0.000 0.000 2.500 0.000 0.000 0% 0.000 0% ChakNo.753/GB,756/GB,/754/GB,755/Gband 758/GB, District T.T Singh 57 4962 Construction of Soling Drains Mouza Aroti, Basti T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Dura Bad Sandhlianwali Gali Mazhar Khan ), District T.T Singh 58 4963 Construction of Soling Drains Mouza Dargi Pur T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% and Mouza Dhahi, District T.T Singh 59 4964 Construction of Soling Drains Chak No. T.T.Singh Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% 685/GB,688/GB,686/27(A) GB, and Chak No 752/GB, District T.T Singh 60 4965 Construction of Soling Drains Mouza Aroti, Basti T.T.Singh Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% Dura bad Sandhlianwali Gali Mazhar Khan), District T.T Singh 61 4966 Construction of PCC Sandhlianwali city, District T.T.Singh Approved 0.000 0.000 4.000 0.000 0.000 0% 0.000 0% T.T Singh 62 4967 Construction of Soling Main Road to Dera Iqbal T.T.Singh Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Bar lub Nhar and abadi Sajjad - sharaf din Chak No. 674/15 GB and abadi sheikhanawali Plot C Kamay Shah, District T.T Singh

63 4968 Construction of Soling Drains 687/27 GB, abadi T.T.Singh Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Mustaq Bub Numberdar, District T.T Singh

64 4969 Construction of Soling Mouza Wahgi and Chak T.T.Singh Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% No. 764/GB and Chak No. 728/GB and 722/GB, Distrcit T.T Singh 65 4970 Construction of Soling Drains chak No. 743/GB, T.T.Singh Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Distrcit T.T Singh 66 4989 Construction of Street / Laying Sewer Line Attock Approved 0.000 0.000 2.500 0.000 0.000 0% 0.000 0% Mohallah Awaisia Dhok Fateh, Tehsil Hazro, District Attock 67 4990 Rehabilitation of Musa Link Road, Tehsil Hazro, Attock Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% District Attock 68 4991 Constrution / Raising of main Path / Street Dhok Attock Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% Alam Din,Distrcit Attock 69 4992 Construction / Raising of main path / Street Near Attock Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% H/O Akbar and Sardar etc. and Rehabilitation of Nullah from GGHS towards Ziarat at Village Sarwala, Tehsil Hazro, Distrcit Attock Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

70 4993 Construction of wall & RCC Slab/ Nullah at Paind Attock Approved 0.000 0.000 3.517 0.000 0.000 0% 0.000 0% Ghullam Khan,Dhok Fathch, Tehsil Hazro, District Attock 71 5200 Improvement of Sewerage Kot Allah Din No. 01 Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice & Hussain Abad Colony, District Shiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated (LO16006198) 26.08.2016. But funds not yet released by the FD. 72 5201 Soling St. No.10 to 15, Muslim Bin Aqeel Colony, Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice District Sahiwal (LO16006199) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 73 5202 Soling Opposite Hazoori Park Towards East Nai Sahiwal Approved 0.000 0.000 0.200 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Abadi Jhall Road,District Sahiwal(LO16006200). No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 74 5203 Sewerage St. Makkah Masjid Wali, Gill ST. Nai Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice abadi & St. Rahmania School Wali, District No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated Sahiwal (LO16006201) 26.08.2016. But funds not yet released by the FD. 75 5204 Sewerage & Metalled St. No. 8 Imran Generator Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Waley Wali Street Pir Bukhari Road, Nadeem No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated Rahmani +Youns, District Sahiwal (LO16006202) 26.08.2016. But funds not yet released by the FD.

76 5205 Sewerage St.No 6 Peoples Colony St.Sheikh Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Suleman Wali Near Ali Masjid,District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated (LO16006203) 26.08.2016. But funds not yet released by the FD. 77 5206 Sewerage Street Hakim Adil Wali Near Ali Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Masjid,District Sahiwal (LO16006204) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 78 5207 Sewerage Safdar Block, Al-Masood Town, Arif Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Wala Road,District Sahiwal (LO16006205) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 79 5208 Sewerage Imamia Colony, Jahaz Ground, District Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal District Sahiwal (LO16006206) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 80 5209 Sewerage St. Sajadia Imam Bargah Wali, Farid Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Town, District Sahiwal District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated (LO16006207) 26.08.2016. But funds not yet released by the FD. 81 5210 Soling Madrassa Near Ladies Park, Farid Town , Sahiwal Approved 0.000 0.000 0.200 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice District Sahiwal (LO16006208) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 82 5211 Sewerage St. Muhammad Sarwar Sahu Wali, Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Chak No. 81/5-R, 1000 Ft, CVC District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated (LO16006209) 26.08.2016. But funds not yet released by the FD. 83 5212 PCC Faisal Colony, District Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal(LO16006210) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 84 5213 Soling & Drains Sabir Colony Entrance, Chak Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice No,85/6-R District Sahiwal (LO16006208) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,60 dated 26.08.2016. But funds not yet released by the FD. 85 5235 Sawerage Baba Mast Colony, District Sahiwal Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice (LO16006233) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 86 5236 PCC Street Abdul Kareem Rahmani Councillor Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Wali, Bashir Colony, District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated (LO16006234) 26.08.2016. But funds not yet released by the FD. 87 5237 Sawerage Qasim Colony, Chak No.86/6-R, Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice District Sahiwal (LO16006235) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

88 5238 Sawerage Street No.3 Kot Khadim Ali Shah Post Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Office Road,District Sahiwal (LO16006236) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 89 5239 Sawerage with Cross Street NO.9 Kot Khadim Ali Sahiwal Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Shah,District Sahiwal (LO16006237) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 90 5240 Water Supply Muslim Bin Aqeel, District Sahiwal Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice (LO16006238) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 91 5241 Sawerage Street Ch. Masjid Wali Fateh Sher Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Colony,District Sahiwal (LO16006239) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 92 5242 Sawerage Gulistan Colony Near Rajibali,District Sahiwal Approved 0.000 0.000 0.700 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal (LO16006240) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 93 5243 Sawerage Street No.4 Mokal Colony, District Sahiwal Approved 0.000 0.000 0.700 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal (LO16006241) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 94 5244 Soling Opposite Residence Malik Muhammad Sahiwal Approved 0.000 0.000 0.100 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Hussain Mithu Nai Abadi Jhall Road, District No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated Sahiwal(LO16006242) 26.08.2016. But funds not yet released by the FD. 95 5245 Sawerage Anarkali Bazar Near Sori Gali to Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Chowk Dr. Cheema Wala, District SahiwalDistrict No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated Sahiwal (LO16006243) 26.08.2016. But funds not yet released by the FD. 96 5246 Sawerage Green Town + Darden Town +Ahamd Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Park Mohallah Noor Park,District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated (LO16006244) 26.08.2016. But funds not yet released by the FD. 97 5247 Sawerage Remaining Portion Street Masjid Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Rabia Wali Sukhera Town,District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated (LO16006245) 26.08.2016. But funds not yet released by the FD. 98 5248 Sawerage Street No.1&2, Madine Colony Sahiwal Approved 0.000 0.000 0.800 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Khokhar Bazar,District Sahiwal (LO16006246) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 99 5249 Sawerage GPO Colony Androon GPO,District Sahiwal Approved 0.000 0.000 0.600 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal (LO16006247) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 100 5250 Sawerage Androon Ghosia Colony Dispensary Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Road,District Sahiwal (LO16006248) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 101 5251 Sawerage Street Mehr Yousaf Tulla Wali Alawal Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Colony Near Noor CNG,District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated (LO16006249) 26.08.2016. But funds not yet released by the FD. 102 5252 Soling & Nali Street Rana Abbas Khan Wali Chak Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice No. 78/5-R(East), District Sahiwal(LO16006250) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 103 5253 Soling Androon DHQ Hospital Mulzmeen Colony, Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice District Sahiwal (LO16006251) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 104 5254 PCC Street Petrol Pump Wali Ward No.1 Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Dispensary Road, District Sahiwal (LO16006252) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 105 5255 Soling & Nali Street Rana Abbas Khan Wali Chak Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice No. 78/5-R(West), District Sahiwal(LO16006253) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 106 5256 Soling Road from Bilal Marriage Lawn to Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Nageena Marriage Lawn, Sukhera Town, District No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated Sahiwal(LO16006254) 26.08.2016. But funds not yet released by the FD. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

107 5257 Sewerage Gulberg Town Noor Shah Road, Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice District Sahiwal (LO16006255) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 108 5258 Soling Lakar Mandi ,District Sahiwal Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice (LO16006256) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated 26.08.2016. But funds not yet released by the FD. 109 5296 Sewerage & PCC Street Malik Hanifwali near Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Jamia Rashidia School Ghala Mandi, District No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,61 dated Sahiwal (LO16006294) 26.08.2016. But funds not yet released by the FD. 110 5297 PCC Street Nazeer Chagtai Advocate wali Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Dispensary Road Ghala Mandi,District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated (LO16006295) 26.08.2016. But funds not yet released by the FD. 111 5298 Sewerage Street Workshop Wali Mohalla Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Rajpura to G.T Road, District Sahiwal No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated (LO16006296) 26.08.2016. But funds not yet released by the FD. 112 5299 Sewerage Darbar Baba Mast Colony Chak Sahiwal Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice No.86/6-R,District Sahiwal (LO16006297) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 113 5300 PCC street Gaspal Colony,District Sahiwal Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice (LO16006298) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 114 5301 Sewerage near Moti Masjid Mohalla Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Islamabad,District Sahiwal (LO16006299) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 115 5302 PCC street Kotcha SA Mahmood Railway Station Sahiwal Approved 0.000 0.000 0.200 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Raod, District Sahiwal (LO16006300) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 116 5303 PCC street Near Bhankari Chowk,District Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal(LO160062301) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 117 5304 PCC from street No.10 to Zulfiqar Goni Kot Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Fareed Khan,District Sahiwal(LO160062302) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 118 5305 PCC street Haji Riaz Khan Wali Kot Allah Din Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice No.1 including,District Sahiwal(LO160062303) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 119 5306 PCC street Sheikh Zubair Gosha Wali Adjacent Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Al-Noor Marriage Hall Bilal Colony, District No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated Sahiwal(LO160062304) 26.08.2016. But funds not yet released by the FD. 120 5307 Sewerage Near Masjid Sheikh Barkat wali bobi Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Mohalla,District Sahiwal (LO16006305) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 121 5308 Sewerage Street Masjid Near Butt wali Insar Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Street, District Sahiwal (LO16006306) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 122 5309 Improvement of sewerage Dobi Mohalla, District Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sahiwal (LO16006307) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 123 5310 Pulli Railway Crossing Opposite Mohalla Noor Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Park,District Sahiwal (LO16006308) No.1(17)RO(ADP)P&D/2016-Suppl. Sr. No,62 dated 26.08.2016. But funds not yet released by the FD. 124 5214 Metalled road from Main Chowk to street Masjid Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Ghousia Mehrab Wali, Chak No. 82/6-R Sahiwal

125 5215 Beautification & Improvement / Widening of Sahiwal Approved 0.000 0.000 1.200 0.000 0.000 0% 0.000 0% Chowk Kashti Wala TBZ Colony Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

126 5216 Improvement of Road Main Gulistan Colony to Sahiwal Approved 0.000 0.000 0.700 0.000 0.000 0% 0.000 0% Kacha Noor Shah Road C/O Dr. Kausar Hayat 127 5217 Improvement of Road from Gama Kabab Wala Sahiwal Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Chowk to Babey wala Chowk 128 5218 Improvement of road from St Behind masjid Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Azizia Mohallah Fareed Gunj 129 5219 Metalled road St. No.5 Mohallah Noor Park Sahiwal Approved 0.000 0.000 1.200 0.000 0.000 0% 0.000 0% 130 5220 Const: of one room of Press Club Sahiwal Approved 0.000 0.000 1.200 0.000 0.000 0% 0.000 0% 131 5221 Improvement of Park Manzoor Colony Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% 132 5222 Metalled road from DPS chowk to Chak No. 93/6- Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% R via Z-block Scheme No. 3 133 5223 Improvement of road ( Main Entrance) Doshera Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% ground 134 5224 Improvement of road Karyana Bazar Ghallah Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Mandi 135 5225 Improvement / Widening of road from Residence Sahiwal Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Sheikh Muhammad Saleem to Main Farid Town

136 5226 Laying of Tuff tile from College Chowk to 1-A Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Farid Town 137 5227 Improvement & Beautification of 2 Chowks, Sahiwal Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% Sahiwal City 138 5228 Studs & Cat eyes in Sahiwal City Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% 139 5229 Imrovement / Widening of road from Waan Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Bazar to Markazi Imam Bargah via Masjid Eid Gah 140 5230 Improvement & Widening of road Liaqat Chowk Sahiwal Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% to City Bund Road 141 5231 Improvement of road st No. 5 Scheme No. 2 Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% (300ft) St Haji Shafique 142 5232 Metalled road P/O to Hussain Store & Ahmed Sahiwal Approved 0.000 0.000 1.200 0.000 0.000 0% 0.000 0% Clinic to Hafiz Sabir Karyana Store 143 5233 Metalled road St. Akbar Qureshi Advocate Wali, Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Barkat Town 144 5234 Improvement of road from Farid Town road to Sahiwal Approved 0.000 0.000 0.800 0.000 0.000 0% 0.000 0% Ramay Town Main road Sahiwal 145 5034 Construction of Rural Drainage / Sewerage Vehari Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice scheme Chak No. 511/ EB, District Vehari No.1(17)RO(ADP)P&D/2016-Suppl. dated 03.08.2016. But funds not yet released by the FD. 146 5035 Construction of Water Supply & Drainage/ Vehari Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice Sewerage scheme Chak No. 451 EB, District No.1(17)RO(ADP)P&D/2016-Suppl. dated 03.08.2016. But Vehari funds not yet released by the FD. 147 5036 Construction of Rural Drainage / Sewerage Vehari Approved 0.000 0.000 2.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice scheme Chak No. 523/ EB, District Vehari No.1(17)RO(ADP)P&D/2016-Suppl. dated 03.08.2016. 148 5037 Construction of Rural Drainage / Sewerage Vehari Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice scheme Chak No. 529/ EB, District Vehari No.1(17)RO(ADP)P&D/2016-Suppl. dated 03.08.2016. But funds not yet released by the FD. 149 5038 Construction of Rural Drainage / Sewerage Vehari Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice scheme Chak No. 547/ EB, District Vehari No.1(17)RO(ADP)P&D/2016-Suppl. dated 03.08.2016. But funds not yet released by the FD. 150 5039 Construction of Rural Drainage / Sewerage Vehari Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% Funds release by P&D Department vide advice scheme Chak No. 561/ EB, District Vehari No.1(17)RO(ADP)P&D/2016-Suppl. dated 03.08.2016. But funds not yet released by the FD. 151 5040 Construction of Rural Drainage / Sewerage Vehari Approved 0.000 0.000 3.000 0.000 0.000 0% 0.000 0% scheme Chak No. 21/ EB, District Vehari Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

152 5047 Providing Laying Tuff Tile/ Paver in City Area M.B.Din Approved 0.000 0.000 1.937 1.937 1.937 100% 0.000 0% Funds released by FD on 02.11.16 Mandi Bahauddin(Lo14004024) 153 5048 Providing Laying Tuff Tile/ Paver in street of M.B.Din Approved 0.000 0.000 7.189 7.189 7.189 100% 0.000 0% Funds released by FD on 02.11.16 Mohallah Tariqabad Faizabad, Khokhrabad, Gurrah Mohallah, Arshad Rown, Mandi Bahauddin(Lo14004025) 154 5259 Metalled Road Arslan Jutt Wali Habib Town Sahiwal Approved 0.000 0.000 0.600 0.000 0.000 0% 0.000 0% District Sahiwal (LO16006257) 155 5260 Metalled Road From Corner Gils School to Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Abudllah Welding House Akhtar Sindi 82/6- R,District Sahiwal (LO16006258) 156 5261 Metalled Road Street Dars Wali Chak No. 82/6- Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% R,District Sahiwal (LO16006259) 157 5262 Laying Tuff Tile Opposite Masjid Khizra Bilal Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Colony,District Sahiwal (LO16006260) 158 5263 Improvement of Road from Main Fateh Sher Sahiwal Approved 0.000 0.000 0.800 0.000 0.000 0% 0.000 0% Road to Corner Batala School Girls College Road,District Sahiwal (LO16006261) 159 5264 Tuff Tile From Computer Market to Masjid Mor Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Wala Chowk 2 Streets for Tuff Tile, District Sahiwal (LO16006262) 160 5265 Metalled Road Street No. 3 Street Jamia Masjid Sahiwal Approved 0.000 0.000 0.600 0.000 0.000 0% 0.000 0% Muhammadi Green Town (560Ft),District Sahiwal (LO16006263) 161 5266 Imporvement of Road 59/Y to 319/x via Rabbani Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Masjid Fareed Town, District Sahiwal (LO16006264) 162 5267 Imporvement and Widening of Road from fareed Sahiwal Approved 0.000 0.000 1.500 0.000 0.000 0% 0.000 0% Town to DPS via Graveyard, District Sahiwal (LO16006265) 163 5268 Metalled Road Street Mirza Imran Mani Wali 80/5- Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% R,District Sahiwal (LO16006266) 164 5269 Improvement of Road MC Junior Girls High Sahiwal Approved 0.000 0.000 0.600 0.000 0.000 0% 0.000 0% School Ghalla Mandi Baroon Side, District Sahiwal (LO16006267) 165 5270 Metalled Road Street Haji Shahid Ameen Wali Sahiwal Approved 0.000 0.000 0.700 0.000 0.000 0% 0.000 0% from Street No.1 to police Chowki Road Chak No. 85/6-R,District Sahiwal (LO16006268) 166 5271 Improvement of Road Behind Teko Bakeri from Sahiwal Approved 0.000 0.000 0.800 0.000 0.000 0% 0.000 0% Shop Hafiz Liaqat to Shop Rashid Test Service, Farid Town, District Sahiwal (LO16006269)

167 5272 Improvement of Road from Corner Main Ground Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% to Garvi Wala Bridge Fateh Sher Colony, District Sahiwal (LO16006270) 168 5273 Metaling Road from Street Irshad Town To Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Alawal Colony, District Sahiwal (LO16006271) 169 5274 Metaling Road Street Masjid Minarwali Shahdad Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% Town, District Sahiwal (LO16006272)

170 5275 Improvement of Road from Jamia Alom-e-Sharia Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% to Pull Shadab Town, District Sahiwal (LO16006273) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

171 5276 Metaling Road from Tankil to Al-Hafiz Gardan W Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Block Scheme No.3 and Balochianwali Gali,District Sahiwal (LO16006274) 172 5277 Metaling Road Street Mehmood Ahmad & Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Muhammad Saleem Bankwalay wali Parnami Mohalla,District Sahiwal (LO16006275) 173 5278 Metaling Road street Tankiwali near Gujjar Ahta Sahiwal Approved 0.000 0.000 0.400 0.000 0.000 0% 0.000 0% Behind Police Station Fateh Sher,District Sahiwal (LO16006276) 174 5279 Improvement of Road Peer Bukhari Road Ghala Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Mandi, from Jamia Alom-e-Sharia to Pull Shadab Town, District Sahiwal (LO16006277)

175 5280 Water Supply Street No.9 Jahaz Ground, District Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Sahiwal (LO16006278) 176 5281 Improvement of Road street Rana Ibrar Police Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% wala Wali Labour Colony,District Sahiwal (LO16006279) 177 5282 Improvement of Road street Kashif Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Mobilinkwalay wali, Tariq Bin Zayad Colony to Bilal Colony,District Sahiwal (LO16006280) 178 5283 Soling Rajbha opposite Muslim Bin Aqeel Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Colony, District Sahiwal (LO16006281) 179 5284 Metaling Road From residence Chacha Ashiq to Sahiwal Approved 0.000 0.000 0.700 0.000 0.000 0% 0.000 0% Dera Mahia Chak No.86/6-R, District Sahiwal (LO16006282) 180 5285 Metaling Road Shadman Town to Main Road Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Chak No.86/6-R District Sahiwal (LO16006283)

181 5286 Metaling Road Street No.2 from Road near Sahiwal Approved 0.000 0.000 0.600 0.000 0.000 0% 0.000 0% Masjid Shoda to residence of Dr. Tahir Siraj U Block Fareed Town,District Sahiwal (LO16006284) 182 5287 Const. of Soling and Drain Abadi Chawni Sabir Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Colony,,District Sahiwal (LO16006285) 183 5288 Metaling Road Street No.2 Al-masood Twon Sahiwal Approved 0.000 0.000 0.228 0.000 0.000 0% 0.000 0% Street Hanif Gujjar Wali, District Sahiwal (LO16006286) 184 5289 P/L Tuff Tile Chowk Masjid Mohajreen to City Sahiwal Approved 0.000 0.000 0.300 0.000 0.000 0% 0.000 0% Post Office Road, District Sahiwal(LO16006287)

185 5290 P/C Tuff Tile Sharabat Bazar, District Sahiwal Sahiwal Approved 0.000 0.000 0.800 0.000 0.000 0% 0.000 0% (LO16006288) 186 5291 Improvement of Road From Karachi Paki Road Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% to Girls Higher Secondary School via Abadi Sharaf Din, District Sahiwal (LO16006289)

187 5292 Improvement & widening, Pashia Street Sahiwal Approved 0.000 0.000 1.000 0.000 0.000 0% 0.000 0% remaining Part, District Sahiwal (LO16006290) 188 5293 Improvement of Road from Pull 86/6-R to Bhutto Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Nagar Chowk TRZC,District Sahiwal (LO16006291) 189 5294 Improvement of Road(remaining Part) Jamia Sahiwal Approved 0.000 0.000 0.500 0.000 0.000 0% 0.000 0% Faridia Road,District Sahiwal (LO16006292) Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

190 5295 Metaling Road (remaining part) Mohalla Rajpura Sahiwal Approved 0.000 0.000 0.572 0.000 0.000 0% 0.000 0% to Oil Depot,District Sahiwal (LO16006293)

191 5335 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 6.000 0.000 0.000 0% 0.000 0% culverts etc., Kot Sattar Shari, Thatha Alia, Thatha Naik, Sahnpal, Sahnianwala, District M.B.Din 192 5336 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 5.500 0.000 0.000 0% 0.000 0% culverts etc., Haigerwala Ghagko, Ranseekay, Khayyan, District M.B.Din 193 5337 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% culverts etc., Charranwala, Haiger Khurd, bhinder Kalan, Chak Saida, Rajoya, District M.B.Din

194 5338 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% culverts etc., Haslanwala, Noor Jamal, Chohranwala, Lasoori, Thatha Hast, District M.B.Din 195 5339 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% culverts etc., Phalia, District M.B.Din 196 5340 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 5.500 0.000 0.000 0% 0.000 0% culverts etc., Jokalian, Ranmal, Channi Sahnpal, Channi Mahram Kotla Mahmood Shah, District M.B.Din 197 5341 Construction of Streets, drains, pavement, M.B.Din Approved 0.000 0.000 7.000 0.000 0.000 0% 0.000 0% culverts etc., Kot Phullay Shah, Arzani, Chak Zahr, Shoawa Warraichan, District M.B.Din 198 5882 Rural Drainage Scheme UC-62 kutub Pur, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 199 5883 Rural Drainage Scheme UC-113 Basti Ridh, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 200 5884 Rural Drainage Scheme UC-114 Billi Walla, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 201 5885 Rural Drainage Scheme UC-116 Gulzar Pur , Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 202 5886 Rural Drainage Scheme UC-117 Chak No Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 18/MR, District Multan 203 5887 Rural Drainage Scheme UC-118 Bootay Wala, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 204 5888 Rural Drainage Scheme UC-119 Khan Pur Maral, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 205 5889 Rural Drainage Scheme UC-125 2/MR, District Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 Multan 206 5890 Rural Drainage Scheme UC-133 Kotla Maharan, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 207 5891 Rural Drainage Scheme UC-129 Kothay Wala , Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 208 5892 Rural Drainage Scheme UC-130 Budhla Santt, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 209 5893 Rural Drainage Scheme UC-136 Bangal Wala, Multan Approved 0.000 0.000 15.000 15.000 0.000 0% 0.000 0% Funds released by FD on 8.11.16 District Multan 210 5853 Construction of Sewerage and Tuff Tiling City Muzaffargarh Approved 0.000 0.000 8.996 0.000 0.000 0% 0.000 0% Area Ahsapur Qasba, DistrictMuzaffagarh. 211 5854 Construction of Sewerage and Tuff Tiling City Muzaffargarh Approved 0.000 0.000 28.323 0.000 0.000 0% 0.000 0% Area Kot Addu,District Muzaffagarh. Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

212 5903 Improvement / Construction of Road from Buddu M.B.Din Approved 0.000 0.000 18.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 02.11.2016 Chowk to Wasu Tibba via Wasu Bangla Chowk, District M.B Din 213 5904 Improvement / Construction of Road from Masjid M.B.Din Approved 0.000 0.000 10.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 02.11.2016 Chillianwala Station Dhoke Saharan Road to Dhoke Nawan Lok via Nawan Lok Bridge, District M.B Din 214 5905 Improvement / Construction of Road from M.B.Din Approved 0.000 0.000 15.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 02.11.2016 Shaheedanwali Bridge to Chak Fateh Shah along with Canal,District M.B Din 215 5906 Improvement / Construction of Road from Dhoke M.B.Din Approved 0.000 0.000 25.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 02.11.2016 shahani to Makhnawali Imanm Bargah and Rind Road Murala,District M.B Din 216 5907 Improvement / Construction of Road from M.B.Din Approved 0.000 0.000 12.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 02.11.2016 Shaana Lok Bridge to Sammu Pur, District M.B Din 217 6035 Construction of PCC Slab / Drain Culvertsd in UC Mianwali Approved 0.000 0.000 9.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 15.11.2016 Watta Khel / UC Gulmiri, Distict Mianwali 218 6036 Construction of PCC Slab / Drain Sewerage Mianwali Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 15.11.2016 Culverts in PP-45(Part-1) Distict Mianwali

219 6037 Construction of PCC Slab / Drain Sewerage Mianwali Approved 0.000 0.000 5.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 15.11.2016 Culverts in PP-45(Part-2) Distict Mianwali

220 6027 Widening / Improvement of Road from Chak Rahim Yar Approved 0.000 0.000 92.638 0.000 0.000 0% 0.000 0% Funds Released by P&D on 11.11.2016 No.94/NP to Adda Chak 86/NP, Tehsil Khanpur, Khan District Rahim Yar Khan 221 6024 Rural PCC and drainage Scheme, UC bhi-wala Sheikhupura Approved 0.000 0.000 15.000 0.000 0.000 0% 0.000 0% Funds Released by P&D on 09.11.2016 Kalam, District Sheikhupura 222 6860 Const. of Streets in Village Palar Sentha, Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Haneser, Baghar Sharif, Moza Moori, Dhok Tarmot, Manianda, UC-Doberan Khurd & Const of Streets UC-Mowara, District Rawalpinid

223 6861 Const. of Streets in Village Sambal, Haneser, Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Dhok Para Mohra, Village Barota, Village Doberan Khurd UC-Doberan Khurd Const. of Road Asloha Satttian UC-Mowara, District Rawalpindi 224 6862 Const. of Streets and Hand Pumps in village Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Mamiam, Streets in Village Khanada, Dhok Sudhan Gharbi, Dhok Dheri, Chakiam, Dhok Makal, Village Mamial, Village Sakote UC- Doberan Kalan, District Rawalpindi 225 6863 Const. of Streets in Village Mamiam, Dhok Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Malkani, Dhok Dupri, Dhok Badri, Ward No Doberan Kalan, Const of street and R/Wall in Mohra Chachian UC-Doberan Kalan, District Rawalpindi 226 6864 Const. of Link Road Barsala to Nara, Const. of Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Street in Village Katheel Hoon, Village Punjwar, Village Barothi, UC- Nara, District Rawalpindi Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

227 6865 Const of Streets in Village Jandi, Balhar, Moza Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Bagoon, Mohalla Mughal Abad, Punjwar, Baroothi, Mohra Rajgan, Madni Mohalla, Moza Azraian, Dhok Bagh, Dhok Kund UC-Nara District Rawalpindi 228 6866 Const. of Street/ Sewerage Line Bagla Rajgan, Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Const of Road Kot Channi Const of Clvert in Village Dakhli Maira and Streets in Dhok Ghor, Viallage Thalla, Dheri Mirzian, Thoa Khalsa UC Matore District Rawalpindi 229 6867 Const, of Streets in Village Matore Const. of Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Streets in Village Thoa Khalsa, Dhambal Dheri, Village Galoor, Samblara, Kaloot and Repair of Stadium GBHS Matore, Const of Streets in Village Opra Mohra, Channi Bandwal, Dhok Chakiala Kinger, Dhok Bhalot, Dhoke Latori Syedan Dhoe Pore, Dhoe Kakriam in UC-Matore District Rawalpindi 230 6868 Const. of Streets in Kahuta, Const. of Streets in Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Village Channi Village Bura HAYAL Kahuta Tehsil Kahuta District Rawalpindi 231 6869 Const. of Street Kahuta Bypass, Kahuta, Village Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Batala, Village Adwala, water Supply Scheme Sakhi Sabzwari Chowk Kahuta (Shumali) & Const. of Road Bagla Rajgan Hothla, Village Nathot, Const. of Road Kaneser Sattian, Street Village Nathot, Street Sangot Sayedan UC- Hothla District Rawalpindi 232 6870 Const of Streets in Village Siahali Umer Khan Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Village Samote, Hayal Mirgala in UC-Samote & Const of Road Street and 2 No Hand Pump in Chulu Mirgala UC-Choa Khalsa, District Rawalpindi 233 6871 Const. of Street and Water Bore in Dhok Gohar, Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Moti Masjid, Dhok Peeran & Const. of roa din Chula Mirgala To Dhokk Awra Mohalla Akbari, Village Gehdar UC Choa Khalsa & Const of Street Dhok Hukamdad, Chak Gujran, Chak Mirza Mahli Plam, Dhok Karam Ilahi, District Rawalpindi 234 6872 Const of Street in Village Salgran Dhok Kass Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Dhok Sudhan Dhok Rajput Dhok Murad Pur, Village Kakrian, Street Link Road to Shed UC- Lehri, District Rawalpindi 235 6873 Const. of Street in Village Kanoha, Mohra Narial, Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Village, Upper Mohra, Chak Warraich, Dhok Bagooni, Dhok Chappar, Dhok Allah Dita, Village Kanoha, Village Dhamali UC-Kanoha, District Rawalpindi 236 6874 Const. of Street Moza Garan, Chak Sathwani, Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Dakhali, Dheri Madhu Bura Hayal (Dhok Hilan), Village Sarot, Dhok Qandhar, Moza Dongi, Mohra Mistrian, Mohra Dhanial, Sarote in UC- Dhakali, District Rawalpindi Sr. No. GS. No. Name of Scheme District Approval Exp Upto Provision for Revised Funds Released Funds %age Total Physical Remarks (including detailed physical progress) Status June 2016 2016-17 allocation for FD utilized utilization on Accummulative exp: progress till (i) Date of Start of the Project 2016-17 till 30.06.17 release till 30.06.17 current (ii) Date of completion of the Project 30.06.17 month (%age)

237 6875 Const. of Road Village Kalahna, Dhok Parri Bura Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Noroz, Bhura Hayal, Dhok Seri Village Kaka Dhok Raja Gulfraz, Village Nalla, Village Kot UC- Dakhali & Const. of Streets Village Mandar, Bhura Naseeb, Bhura Kabli, UC-Guff District Rawalpindi 238 6876 Const. of Streets in Village Numbbal, Village Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Banahal, Const of Causeway Khad Bala, Street in Dhok Baba Shada Const. of Road Village Khad UC-Manianda, District Rawalpindi 239 6877 Const. of Link Road Village Phiri and Street in Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Phiri, Streets in Village Khad Banahal, Const of Street in Mera Mohra, Dhok Khori Dhok Mehboob Khad Village Sakrana UC-Manianda District Rawalpindi 240 6878 Const of Streets in Manianda, Village Sakrana & Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Pind Mir Gala, Const of Streets and Const of 3 Hand Pumps in Village Maniand UC-Manianda District Rawalpindi 241 6879 Const of Street Dhaniam, Link Road to House Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Raja Hassan, P/I of water Bore, Const of Street House Raja Shafique Dhok Peer Panah Dhok Dang Patti, Village Gora, Gareat, Chalial, Baien, Village Sai, Dhok Bagla Dhok Khalid Rasheed Street & R/Wall in Village Distrcit Rawalpindi

242 6880 Const of Road and Water Supply Scheme / Hand Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Pump in UC-Narar, District Rawalpindi 243 6881 Const of Road Dhok Peja to Barsala and Streets Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 in Village Anor & Beor, Culvert in Dhok Shukrana Const of Street in Dhok Jandala Village Kangarh, Dhok Channi, Balrya, Village Jhanger, Jewra, Dhok Qilla, UC Beor & Const of Streets in UC- Khalol, District Rawalpindi 244 6882 Const of Street Moza Ghoi, Dhok Gohra, R/Wall Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Dhok Sarhal, Street Dhok Khandot in Const of Streets & 5 No. Water Bore Pind Bhensoo UC- Nala Musalman & Const. of Streets Village Pihai Meh Ali Village Balakhar UC- Balakhar, District Rawalpindi 245 6883 Const of Water Bores and Const of Streets in Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Kakoi Gala & Bandh Const of Street Punjar Street Moza Chinoian in UC Punjar & Const of Streets UC- Khadiot District Rawalpindi 246 6884 P/I of water Bores and Water Well in UC- Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Doberan Khurd, District Rawalpindi 247 6885 P/I of water Bores and Street in UC-Doberan Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 Kalan, UC Nara Matore UC-Samoter UC-Choa Khalsa UC-Lehri, District Rawalpindi 248 6886 P/I of Water Bores and Water Well in UC-Lehri Rawalpindi Approved 0.000 0.000 8.000 0.000 0.000 0% 0.000 0% Funds released by P&D on 10.02.17 UC-Kanoha UC-Manianda UC-Mowara, UC- Narar UC-Beor, UC-Nala Musalmana UC-Khalol, District Rawalpindi