CBM / CMM / AMM Development of Coalbed Methane in India

Total Page:16

File Type:pdf, Size:1020Kb

CBM / CMM / AMM Development of Coalbed Methane in India THIRD INDO-US WORKING GROUP MEETING ON COAL CBM / CMM / AMM Development of Coalbed Methane in India CMPDI has estimated CBM gas-in-place resource of about 1.4 TCM in an area of 12500 Sq.Km in India. 16 CBM blocks have so far been allotted with prognosticated resource of 825 BCM in 7807 Sq. Km area. The production potential from the allotted blocks is 23 MMSCMD. Process for 3rd round of global bidding has already been initiated in respect of 10 blocks with cumulative area of 5800 Sq. Km. Coalmine Methane A CMM demonstration project is under implementation jointly by BCCL and CMPDI in Sudamdih and Moonidih mines of BCCL with GoI/GEF/UNDP funding. TheThe surfacesurface drillingdrilling hashas started.started. CBMCBM productionproduction likelylikely toto commencecommence fromfrom 20072007-- 0808 UltimateUltimate expectedexpected productionproduction 40000m40000m3/day/day fromfrom surfacesurface andand UGUG wellswells UtilisationUtilisation proposedproposed forfor powerpower generationgeneration && minemine truckstrucks Coalmine Methane Thurst Areas ToTo accelerateaccelerate explorationexploration andand exploitationexploitation ofof CBM,CBM, CMMCMM && AMMAMM ResourceResource modelingmodeling ofof coalcoal seamsseams underunder dede-- stressedstressed conditioncondition TechnoTechno--economiceconomic analysisanalysis ofof thethe projectproject conceivedconceived Coalmine Methane Possible areas for CMM development In a project mode Jharia/Raniganj coalfield could be considered for model CMM project. In these coalfields, large number of operating/disused and abandoned mines are present. High density of coal seams in these coalfields Mostly upper seams have been worked by U/G methods, lower seams are virgin, part of which are likely to be under de-stressed condition Likely coal resource of about 16BT in above coalfields for formulation of CMM project after working out techno- economics. RaniganjRaniganj CoalfieldCoalfield JhariaJharia CoalfieldCoalfield 86° 10' 86° 15' 86° 20' 86° 25' 23° 23° 55' 55' T O G O M O KATRAS AREA H SIJUA AREA BARORA AREA KUSUNDA AREA BLOCK II PROJ. AREA BARORA AREA GOVINDPUR AREA POOTKEE BALHARI PROJECT AREA KUSTORE AREA 23° 23° 50' WESTERN JHARIA AREA 50' BASTACOLLA AREA WESTERN JHARIA AREA LODNA AREA F ALLOTTED CBM BLOCK L E G E N D EASTERN JHARIA CBM BLOCK F FAULT F AREA P AT HE RD AREA BOUNDARY RANIGANJ FM. IH 23° C 23° HO RD 45' COLLIERY BOUNDARY BARREN MEASURES 45' RIVER/JORE BARAKAR FM. RAILWAYLINE TALCHIR FM. TO AD 0 5 Km RA ROAD PRECAMBRIAN F 86° 10' 86° 15' 86° 20' 86° 25' THANKTHANK YOUYOU.
Recommended publications
  • Government of India
    Contents: Sl. No Topic Page No 1 General characteristics of the District 1 1.1 Location & geographical area 1 1.2 Topography 1 1.3 Availability of Minerals 2 1.4 Forest 2 1.5 Administrative setup 2 2 District at a Glance 3-5 2.1 Existing status of Industrial Area in the District 6 3 Industrial Scenario of …. 6 3.1 Industry at a glance 6 3.2 Year wise trend of Units registered 7 3.3 Details of existing Micro & small enterprises & Artisan Units in the 8 District 3.4 Large Scale Industries/ Public Sector Undertakings 9 3.5 Major Exportable Items 9 3.6 Growth Trend 10 3.7 Vendarization /Ancillarisation of the Industry 10 3.8 Medium Scale Enterprises 11 3.8.1 List of the units in Dhanbad & near by Area 11 3.8.2 Major Exportable Item 11 3.9 Service Enterprises 11 3.9.1 Coaching Industry --------- 3.9.2 Potential Areas for Service Industry 11 3.10 Potentials for New MSMEs 12-15 4 Existing clusters of Micro & Small Enterprise 15 4.1 Details of Major Clusters 15 4.1.1 Manufacturing Sector 15 4.1.2 Service Sector 15 4.2 Details of identified cluster 15 4.2.1 Refractory Cluster: Present Status, 15 5 General issues raised by the industry association during the course of 16 meeting 6 Steps to set up MSMEs 17 Brief Industrial Profile of Dhanbad District 1. General Characteristics of the District: Dhanbad District, an administrative district of Jharkhand has it’s headquarter at Dhanbad.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1ST JANUARY, 2016 to 14Th JULY, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1ST JANUARY, 2016 TO 14th JULY, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID
    List of Nodal Officers of Public Grievances in BCCL Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID. 1 Koyla Bhawan HQ S K Singh GM(P)VIP/CPGRAM/Legal 90183591 7547835164 [email protected] 2 Koyla Bhawan HQ B K Das Dy Manager(P)VIP/CPGRAM 90295379 6287695458 [email protected] 3 Sijua SIJUA AREA SUNIL KUMAR CHIEF MGR (PERS.)/APM 90077751 6287697496 [email protected] 4 LOYABAD COLLIERY RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 5 REGIONAL HOSPITAL LOYABAD RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 6 SIJUA AREA CHANDAN KR SRIVASTAVA DY.MGR (PERS.) 90293994 9438877160 [email protected] 7 SENDRA BANSJRA COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 8 BASDEOPUR COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 9 NICHTPUR COLLIERY MUKESH KUMAR ASSTT.MGER (PERS.) 90311762 6287698708 [email protected] 10 MUDIDIH COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 11 KANKANEE COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 12 TETULMARI COLLIERY JOHN SINGH ASSTT.MGER (PERS.) 90294950 6287695898 [email protected] 13 Govindpur Area Office Manoj Kumar Saha CM(P)/APM 90042060 6287696411 [email protected] 14 Area Office O P Singh Dy Manager(P) 90292491 6287695891 [email protected] 15 New Akashkinree Colliery Rajesh Kumar Kar Manager(P) 90216466 6287696885 [email protected] 16 Area Office (Legal) Anant mishra Dy Manager(P) 90267659
    [Show full text]
  • Sl. No. Application Sl. No. Name of the Candidates and Father's JHARIA
    JHARIA REHABILITATION AND DEVELOPMENT AUTHORITY List of Eligible Candidates for the post of Computer Operator Sl. Application Sl. Name of the No. No. candidates and Father's Sanjeev Kumar S/o Ramashish Yadav 1 173 B-11/94 Karmik Nagar, PO-ISM Campus, Dhanbad-826004 Manoj Kumar S/o HiralalAt-Loharkulhi 2 100 Post-Saraidhela, Dhanbad-828127 Shambhu Gupta S/o Nand Kishor Sahu 3 113 Gr-153, Gola Road Opp.-UCO Bank Ramgarh-829122 Ranglal Mandal S/o Subal Chandra Mandal 4 41 Qr. No.-A1/301, Koyla Nagar, Dhanbad Ajay Kumar S/o Krishna Sahu 5 17 Qr. No.-F-7B ACC Colony, Sindri, Dhanbad Neeraj Kumar Vishwakarma S/o Umashankar Vishwakarma 6 260 At-Bhuda C/o Gayatri Studio Rani Road, Dist.-Dhanbad PIN- 826001 Vikash Kumar S/o Kameshwar Pd. Singh 7 114 Gali No-10, Jai Prakash Nagar, Dhanbad PIN-826001 Rajat Kr. Singh S/o Akhilesh Singh 8 92 At-Bishanpur, Rajput Tola, Post-Mansahi, Distt.-Katihar (Bihar) PIN-854103 Md. Kadir Ansari S/o Md. Farid Ansari 9 101 At-Kanchandih, Post-Mugma Dhanbad-828204 Santosh Kr. Mandal S/o Ajit Kr. Mandal 10 103 At+Post-Mahuli, Distt-Darbhanga Bihar Pin-847201 Deepak Kumar S/o Gallu Mahto 11 74 At+Post-Badgaon Distt.-Ramgarh Jharkhand PIN-829134 Md Faiyaz Ansari S/o Muslim Ansari Shamsher Nagar, Near Quality bakery, Post-B.Polytechnic, 12 267 Dhanbd-828130 Sonali Saha D/o Lt. Shankar Kr. Saha 13 224 Telipara Kali Mandir , Masterpara Hirapur Dhanbad Kumari Janki Mahto D/o Kalipada Mahto 14 277 At-Baghmara, Post-Baliapur, dist.-Dhanbad PIN-828201 Shahjadi Khatoon D/o Md.
    [Show full text]
  • Tender Document# YES Corrigendum Document# Bid Document
    Free tenders for Drain Construction by Bharat Coking Coal Limited-6006034547 Format for Tender Uploading at www.tenders.gov.in Organization Name Bharat Coking Coal Limited Organization Type Public Sector Undertaking Ministry Ministry of Coal Tender Title* Construction of monsoon drain for KPC behind pond near sub-station of KPC under Katras Area. Tender Ref. No.* BCCL/GM/IV/Civil/Tender/12-13/7314 Dated: 12/14.11.2012 Product Category* Construction Works Sub-Category Construction of monsoon drain Tender Value (INR)* 4,54,423.97 EMD: 4,545.00 Document Cost*: 250.00 Tender Type* Open Tender Type of Bidding* Single Bid Two Bid YES Three Bid Four Bid Location* near sub-station of KPC under Katras Area First Announcement Date* 12/14.11.2012 Publication date on Portal Automatic from system At Last date of document collection 01.12.2012 Up to 11:30 A.M Last date for submission 03.12.2012 Up to 03:00 P.M Opening Date 05.12.2012 At 04:00 A.M Work Description* Construction of monsoon drain Pre-Qualification As per NIT Pre-Bid Meet Date Tender Document# YES Corrigendum Document# Bid Document# Tech. Document# Sector Coal State Jharkhand Note: * indicates mandatory fields. # indicates that the file name should be given. It should match with the file name sent by e-mail. This is to confirm that the softcopy of tender document has been forwarded to EDP Department through email: [email protected] Signature of Tendering Authority Free tenders for Drain Construction by Bharat Coking Coal Limited-6006034547 BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) Office of the General Manager, Katras Area P.O.
    [Show full text]
  • Land Subsidence in Jharia Coalfields, Jharkhand, India – Detection, Estimation and Analysis Using Persistent Scatterer Interferometry
    LAND SUBSIDENCE IN JHARIA COALFIELDS, JHARKHAND, INDIA – DETECTION, ESTIMATION AND ANALYSIS USING PERSISTENT SCATTERER INTERFEROMETRY Vamshi Krishna Rao Karanam1,2,3, Mahdi Motagh2,3, and Kamal Jain1 1Department of Civil Engineering, Indian Institute of Technology Roorkee, Roorkee, India ([email protected]) 2Institute for Photogrammetry and Geo-Information, Leibniz University Hannover, Hannover, Germany 3Remote Sensing and Geoinformatics, GFZ German Research Centre for Geosciences, Potsdam, Germany INTRODUCTION LOCATION PROBLEM . Dhanbad district, Jharkhand, India . Coal fires resulting in land subsidence associated with roof SIGNIFICANCE collapse is the primary environmental hazard in this coal . It is the largest and one of the oldest (since field 1894) coal mines in India . Due to subsidence, crack appear It lets oxygen in helping in . One of the most densely populated combustion of coal and further increasing the subsidence. coalfields in the world . Known as the exclusive storehouse of prime coking coal in the country METHODOLOGY SNAP DHANBAD Subsidence detection and pre-processing for StaMPS analysis JHARIA StaMPS Persistent scatterer Time Series analysis TRAIN Atmospheric correction using GACOS model 2 VELOCITY MAPS AFTER VERTICAL AND HORIZONTAL NOV 2017-APR 2018 (PHASE I) GACOS CORRECTION DECOMPOSITION . Velocity maps are derived for both 100 the directions and decomposed yr into vertical and horizontal 50 components . Results show subsidence velocity 0 of up to 140 mm/yr -50 . 12 out of the 21 collieries are affected by the subsidence -100 Deformation velocity in mm/ velocity Deformation COLLIERIES AFFECTED BY SUBSIDENCE DHANBAD JHARIA 3 VELOCITY MAPS AFTER VERTICAL AND HORIZONTAL NOV 2018-APR 2019 (PHASE II) GACOS CORRECTION DECOMPOSITION . 100 Results show subsidence velocity of up to 160 mm/yr yr 50 .
    [Show full text]
  • BHARAT COKING COAL LIMITED Office of the General Manager-IV
    BHARAT COKING COAL LIMITED ( A Subsidiary of Coal India Ltd.) Office of the General Manager-IV, Katras Area P.o. Sijua , Dhanbad. Ref. No. BCCL:KA-IV:AM(E&M):TENDER NOTICE/2015-16/274 Dated:06/11/2015 TENDER NOTICE Sealed Tender is hereby invited from experienced and eligible contractors for taking up the following works. Sl. DESCRIPTION OF JOB ESTIMATED EARNEST Cost of TIME OF No COST(RS.) MONEY(RS.) Tender COMPLETION 1% Paper(Rs.) (DAYS). 01 Erection of cradle guards at 6.6 Within 15(Fifteen) KV, 3.3 KV,550V,440V,220V, Rs.43,125/- Rs.431/- Rs.100/- Days from date of over head line at AKWMC OCP issue of Work Mega Project West Modidih order Colliery, Colony & Keshapur Colliery, Katras Area. Cost of Tender Paper (Non refundable) & EMD shall be deposited at Cash Section, Katras Area from 20/11/2015 (Friday) to 25/11/2015 (Wednesday) during office working hours. Tender documents will be available from the Office of the Area Manager (E&M), Katras Area, on production of Money receipt from 20/11/2015(Friday) to 25/11/2015 (Wednesday). Tender will be received upto 3.00 PM on 26/11/2015(Thursday) in the Office of the Area Manager (E&M) , Katras Area. Tender will be opened on 26/11/2015(Thursday) at 4.00 PM at Office of the Area Manager (E&M) Katras Area. No tender will be issued or submitted by postal means. Tender should be submitted in one sealed envelope super scribing NIT No. with date of opening.
    [Show full text]
  • Environmental Consequences of a Burning Coal Mine : a Case Study on Jharia Mines
    Special Issue - 2017 International Journal of Engineering Research & Technology (IJERT) ISSN: 2278-0181 ICBA - 2016 Conference Proceedings Environmental Consequences of a Burning Coal Mine : A Case Study on Jharia Mines Mayank Chhabra and Manishita Das Mukherji Amity Institute of Biotechnology, Amity University Rajasthan, Jaipur Abstract: Coal mining has always been associated with soil pollution and changes in topography, land cover and various environmental consequences. Geo-environmental vegetation patterns. parameters such as air, water, soil, agricultural lands, vegetation, landforms are affected directly by coal mining activities. Coal fires are an ever-present problem in coal-mines, Coal CO2 + SO2 [3] the world over. In the Jharia coalfield (JCF), it is a well-known HEAT fact that subsurface fires, are burning the energy resources, Jharia coalfield (JCF), is well known for the phenomenon impacting the environment negatively and and rendering of subsurface fires. The fires are burning the precious energy mining of coal hazardous. Taking a note of this grave condition, in the present review paper an attempt had been made to resource as well as impacting the environment negatively. identify the environmental parameters which are most effected by mining at (JCF). The reports from EIA studies conducted on The objectives of the research presented in this paper are the area have been methodically studied for the present work. as follows: Keywords: Coal mining, enviromental impact assesment, i. To have a review on various environmental effects on air, water, land, Jharia coal-field, AHP consequences of coal mining in India and in particular Jharia coal-field (JCF). I. INTRODUCTION ii. A systematic study on environmental Impact Assessment (EIA) is carried out to assess the effects Coal is one of the cheapest, easily available and abundant (both positive and negative) of coal mining on the fossil fuel around the world that meets the major energy environment.
    [Show full text]
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]
  • Selection of Consultancy Firm for Preparation of Comprehensive Mobility Plan for Dhanbad Under Urban Infrastructure & Governance (UIG)-Jnnurm
    Selection of Consultancy Firm For Preparation Of Comprehensive Mobility Plan for Dhanbad Under Urban Infrastructure & Governance (UIG)-JnNURM URBAN DEVELOPMENT DEPARTMENT, June, 2009 GOVT. OF JHARKHAND, 4TH FLOOR, PROJECT BHAWAN, DHURWA, RANCHI- 834004 Comprehensive Mobility Plan (CMP) for Dhanbad City of Jharkhand 1. BACKGROUND Dhanbad : Introduction The district of Dhanbad in the country occupies a unique place as an important resource region which is a part of the South‐East resource region. The resource is the coal, often termed as “Black Diamond”, a term which befits its importance as basic fuel in most industries. The Dhanbad district has the largest coal reserves, about 13,000 million tons of metallurgical coal. The region is most commonly identified as “Jharia Coal Field (JCF)” which is the one single depository of coal spread over an area of about 480 sq.kms. This has influenced the location of many coal‐oriented industries, such as fertilizers, washeries, coke plants, ceramic industry, pottery works, steel industries, lead and zinc smelting and numerous other engineering industries. In a relative perspective, the region could be linked to industrial zone of Asansol‐ Durgapur in the West Bengal and Jamshedpur – Chaibasa in the Jharkhand‐ the comparative elements being the Bokaro Steel Plant in the west, Sindri Fertilizer complex, Sulphuric Acid Plant and ACC Cement Factor in the south and a number of coal‐based chemical industries scattered around the coal‐belt. In this venture of coal mining, a number of new mining towns have sprung up in a chain, spreading from Dhanbad south‐wards upto Sindri and westwards upto Katras.
    [Show full text]
  • Annexure-III Details of Tenders Awarded from CMC for Hired HEMM Contracts (From FY 2008-09) Sl
    Annexure-III Details of Tenders Awarded from CMC for Hired HEMM Contracts (from FY 2008-09) Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 1 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/2008 16-06-2008 M/s Ujjal extraction and transportation of coal with OS/2008/21 dtd. 11.01.2008 /487 dtd. 16.06.2008 Transport firefighting from VIIIA, VIII, VII, V/VI & IV Katras 68,84,48,000/- 36 months Agency, seams of Chandore Patch Phase-II of Katras Burdwan. Area. 2 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/2008 16-06-2008 M/s Ujjal extraction and transportation of coal from V, OS/2008/37 dtd. 19.01.2008 Bastacolla/ /488 dtd. 14/16.06.2008 Transport 11,18,72,000/- 12 months VI, VII, VIII & VIIIA Seams of L-3 Patch of Kustore Agency, ROCP under Kustore Area. Burdwan. 3 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM:CMC:HEMM- 15-12-2008 M/s Dhansar extraction and transportation of coal from IV OS/2008/502 dtd. 17.06.2008 OS:Gondudih:2008:1100 Kusunda Engg. Co. Pvt. 64,53,68,560/- 36 months Top, IV Bottom, III and II seams of Gondudih dtd. 15.12.2008 Ltd., Dhanbad. P Patch of Kusunda Area. 4 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 13-03-2009 extraction and transportation of coal from OS/2008/1159 dtd.
    [Show full text]