Kildare County Council Corporate Plan 2019 2024

Total Page:16

File Type:pdf, Size:1020Kb

Kildare County Council Corporate Plan 2019 2024 M M h h ea ac ea ac nm ne nm ne a agus Mis a agus Mis COMHAIRLE CONTAE COMHAIRLE CONTAE C HILL DARA C HILL DARA KILDARE COUNTY COUNCIL KILDARE COUNTY COUNCIL Kildare County Council Kildare County Council Corporate Corporate Plan 2019-2024 Plan 2019-2024 M M h h ea ac ea ac nm ne nm ne a agus Mis a agus Mis COMHAIRLE CONTAE COMHAIRLE CONTAE C HILL DARA C HILL DARA KILDARE COUNTY COUNCIL KILDARE COUNTY COUNCIL Comhairle Contae Chill Dara, Áras Chill Dara, Páirc Uí Dhubhuí, An Nás, Co. Chill Dara. Kildare County Council, Áras Chill Dara, Devoy Park, KILDARE Naas, Co. Kildare. T 045 980200 • F 045 980240 Living; growing; leading E [email protected] Working together towards an www.kildarecoco.ie inclusive and sustainable County. Foreword Contents Foreword 1 We are pleased to present our Corporate Plan However certain challenges that were already Kildare - Our County 3 for the period 2019 to 2024. Adopted by the apparent in 2015, have grown in profile, Elected Members at their meeting on the 25th urgency and scale. Census figures show that Our Vision & Mission Statement 6 November 2019; our Plan guides our strategic Kildare is one of the fastest growing and The Role and Functions of Our Council 7 actions during the lifetime of this Council. This youngest population centres in the country; Plan is based on current resources and realistic with the highest proportion of people aged Local Government in Context 11 expectations regarding future resource and 0-24 in the state at almost 37%1. Population Main Service Areas by Directorate 17 operating environments. The Council welcomes growth combined with proximity to Dublin is adoption of the Plan as a commitment by all to driving housing costs and demand for housing, Looking Back - Delivering our 19 our shared vision to make Kildare a leading and, inevitably many of our citizens are struggling Corporate Plan 2015-2019 22 inclusive and sustainable county. to meet their housing needs. Our external operating environment 26 Kildare County Council actively continues to Our Plan commits us to continuing our work Our internal operating environment 33 implement reforms set out in the Action with all partners to strive to meet Kildare’s Programme for Effective Local Government, housing needs while supporting social inclusion, Informing the Corporate Plan 2019-2024 37 Putting People First. Over the last five years, equality and quality of life in new communities - Public consultation we have shown our capacity to innovate and that have grown in recent years. maintain services through change by Core Values 38 embedding Municipal District structures, A strong infrastructure platform including a Strategic Objectives 39 successfully growing the Public Participation greater range of sustainable transport options, Network (PPN), Local Community Development will serve to sustain growth in our County’s Supporting Strategies 40 Committee (LCDC), Local Enterprise Office (LEO) businesses and attract new employment. Equally, Making it happen: 48 and delivering services in a challenging financial increased local employment and more sustainable Implementation, Monitoring, Reporting 49 and human resource environment. In this transport options can mitigate the environmental regard it is important to recognise the efforts of and economic challenges presented by almost and Reviewing our Elected Members, our staff, and our 40% of our workforce commuting out of Kildare.2 community and agency partners. 1 Kildare 2016 Census Profile 2 Kildare 2016 Census Profile. Appendix 1: List of Strategies and Plans 50 Influencing Local Government in Kildare: Appendix 2: National Performance Indicators 54 Appendix 3: Glossary of terms 55 Appendix 4: Baseline Metrics 56 1 Kildare - Our County In 2020, in consultation with key stakeholders Finally, where needed, we will continue our robust Kildare is located in Leinster and is part of the Town Population 2016 we will develop and begin implementing a enforcement, licensing, certification and regulation Mid East Region. Our neighbouring counties are; Newbridge 22,742 wide-ranging economic strategy. We will in the area of environmental protection, planning, Naas 21,393 continue through the Local Enterprise Office and building control fire safety and public health in Dublin, Carlow, Laois, Meath, Offaly and Wicklow. Celbridge 20,288 in partnership with enterprise agencies, to nurture order to protect the built and natural environment. Kildare acts as a major transport hub as the M4, Leixlip 15,504 a pro-business environment supporting enterprise To deliver this Plan we will continue to support Maynooth 14,585 and promoting Kildare nationally and globally, our Elected Members in exercising local M7 and M9 run through it, as well as the main Athy 9,677 as a location of choice for business, innovation and democracy. We will also continue to improve national rail-lines. Kildare also has over Kildare 8,634 investment. Creating employment locally delivers service delivery, engagement and communications Clane 7,280 economic, social and environmental benefits by by maximising the effectiveness of our people, 2,500km of roads. Kildare is one of the fastest Kilcock 6,093 reducing the effects of commuting and renewing budgets, operations and ICT resources. growing counties in Ireland. Sallins 5,849 our towns and villages. In this regard opportunities Monasterevin 4,246 such as our development of a Mid-East Our Corporate Plan comprises a broad range of Regional Innovation Think Space (MERITS) will performance goals that describe how we propose Meath Royal Canal M4 provide innovation space for entrepreneurs to to make our vision a reality and how we will R148 base themselves in Kildare. In addition, the newly measure our progress M4 Kilcock created Strategic Development and Public Realm R148 Projects team will drive delivery of strategic We are your Council working with you and on your Leixlip Population R401 projects across our County that aim to revitalise behalf. 225,504 R402 Maynooth M4 towns and villages and sustain the local economy 5th Highest R148 and rural hinterlands. Our Elected Members and staff are committed to in Ireland R402 Celbridge delivering our Plan in collaboration with the many Grand Canal R407 River Liey Dublin R403 We will also focus on leveraging growth statutory, voluntary and community groups with Derrinturn opportunities in the agri-food sector and in the whom the Council works. We share a common Prosperous Average Clane Household equine sector. On the tourism front we will renew interest in working together towards an inclusive R403 Grand Canal 2.9 persons efforts to leverage economic benefits from our and sustainable Kildare, for the present and future Offaly N7 Growth of R414 location as the first stop on Ireland’s Ancient East, generations of our great and growing County. 19.4% Sallins 2006–2016 on Dublin’s Doorstep, including the development Grand Canal Kill of greenways and blueways in the County. 4th Highest in Ireland Rathangan R415 Naas R445 R411 R416 R410 Underpinning everything we do however is the R401 R414 Newbridge urgent need to meet the challenge of climate Kildare R415 R448 R411 change. This Council has a key role to play; as host Monasterevin N81 Wicklow of the Eastern & Midlands Climate Action Regional Athgarvan River Liey Office. We are the lead for coordinating the work M7 Kilcullen R448 of 17 local authorities in preparing adaptation R417 R413 strategies. Climate Resilient Kildare, our Climate R448 R412 N81 Change Adaptation Strategy, outlines financial Grand Canal R415 R418 M7 and environmental imperatives in mainstreaming R417 climate action into Council policies, buildings, infrastructure and operations, to tackle climate R415 change. River Barrow R418 36.6% Average Age Athy R448 aged 0-24 However, we will not only look to our own internal R428 34.9 Years N78 activities but will support climate change action Highest in Ireland and environmental protection through our N78 R418 planning and policies and by enhancing R448 organisational and community awareness, KEY Laois R417 supports, incentives, research and facilities that Councillor Mr Peter Carey Motorway National Primary Roads sustain a better future for our County. Castledermot Suzanne Doyle Chief Executive National Secondary Roads Cathaoirleach Regional Roads R418 Rail Line R448 M9 River Canal Carlow 2 3 Our Vision & Mission Statement Underpinning everything we do is the urgent need to meet the challenge of climate change. This Council has a key role to play; as host of Our Vision the Eastern & Midlands Climate Action Regional Office. We are the lead for coordinating the Kildare– Living; growing; leading work of 17 local authorities in preparing Working together towards an inclusive adaptation strategies. and sustainable County. Mission Statement Kildare County Council Shaping a sustainable future while improving the quality of life of all citizens. Delivering enabling infrastructure and efficient accessible services and pursuing our vision through collaboration, innovation, inclusion and community engagement. 4 5 The Role and Functions of Our Council Executive Structure In this regard a draft budgetary plan is prepared The Management Team, consisting of the Chief annually for each Municipal District and Elected Executive, Head of Finance and five Directors of Members at district level develop a programme, Service, carries out the executive role of the with the Council, to fund a range of local priorities Council. The Council’s staff operate under the for local towns and villages, for the coming year. direction of the Chief Executive and the To deliver these priorities at District level, the Management Team. Council has revised administrative and operational structures to facilitate local service delivery Full Council under the Municipal District structure. Information Kildare County Council has 40 Elected Members on projects funded locally in each Municipal which make up the Council. It meets on the last District is here. Monday of every month in the Council Chamber, Strategic Policy Committee’s (SPC) Áras Chill Dara, Naas.
Recommended publications
  • Leixlip - Local Area Plan 2020-2026 Submission by Catherine Murphy TD
    Leixlip - Local Area Plan 2020-2026 Submission by Catherine Murphy TD The core strategy contained within the Kildare County Development Plan 2017-2023 allocated one third of Kildare’s housing growth to Celbridge, Leixlip, Maynooth and Kilcock with the latter designated to accommodate 5% and each of the other three designated to accommodate 10%. At that time the underpinning plan was the National Spatial Strategy this has now been superseded by the National Planning Framework (NPF). The NPF was published in February 2018 in tandem with the National Development Plan (NDP). The NPF sought to prioritize growth in the cities of Dublin, Cork, Limerick, Galway and Waterford with one of its aims to achieve compact growth and balance regional development. The publication of the NPF and NDP together was aimed to achieve a degree of certainty around the delivery of infrastructure alongside housing and industrial development, this is to be welcomed. Despite the change in focus contained in the NPF the settlement strategy for Kildare confirmed Leixlip’s position within the Dublin Metropolitan Area, largely on the basis of its proximity to the Maynooth Railway Line and the presence of two Railway Stations; Louisa Bridge and Confey. It is curious that no revision to the Kildare County Development Plan settlement strategy took place following the adoption of the NPF/NDP it does pose the question as to what guarantees there are for associated infrastructure and services should such large scale development take place. The allocation to Leixlip of 10% growth and the provision of 3315 new housing units is a huge challenge not least because of the very significant constraints which include; County Boundaries with Fingal; Meath and South Dublin – the presence of the River Liffey and the River Rye together with the Royal Canal – The M4 motorway – St Catherine’s Park and the Liffey Valley itself.
    [Show full text]
  • Annual Report 2020
    Contents Joint Foreword ......................................................................................................................... 3 Kildare County Council Elected Members ............................................................................ 4 Response to the Covid 19 Pandemic .................................................................................... 9 Corporate Services ................................................................................................................ 10 Housing ................................................................................................................................... 16 Community & Culture ............................................................................................................ 29 Enterprise & Economic Development ................................................................................. 41 Human Resources ................................................................................................................. 46 Planning & Strategic Development ...................................................................................... 48 Roads, Transportation & Public Safety ............................................................................... 56 Environment, Water & Climate Action................................................................................. 69 ICT ............................................................................................................................................ 74
    [Show full text]
  • Ryewater Arterial Drainage Scheme
    Office of Public Works Arterial Drainage Maintenance Works - Ryewater Arterial Drainage Scheme Natura Impact Statement 2016 to 2020 Office of Public Works Main Street Headford Co Galway Ireland JBA Project Manager Tom Sampson 24 Grove Island Corbally Limerick Ireland Revision History Revision Ref / Date Issued Amendments Issued to Nathy Gilligan, OPW Draft Report / October 2015 Tony Brew, OPW Revised description of Nathy Gilligan, OPW Final Report / November 2015 proposed maintenance works Tony Brew, OPW Final report revised following Nathy Gilligan, OPW V6.0 /July 2016 Tufa Springs Surveys in 2016 Tony Brew, OPW Revisions following client Nathy Gilligan, OPW V7.0 / August 2016 review Tony Brew, OPW Change of report title and Nathy Gilligan, OPW V8.0 / August 2016 amendment to concluding text Tony Brew, OPW Contract This report describes work commissioned by the Office of Public Works, by a letter dated 05/06/2015. The Office of Public Works representative for the contract was Tony Brew. Laura Thomas, Tom Sampson and Anne Murray of JBA Consulting carried out this work. Prepared by .................................................. Anne Murray BSc MCIEEM Senior Ecologist Reviewed by ................................................. Declan Egan Environmental Director Purpose This document has been prepared as a Final Report for the OPW. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared. JBA Consulting has no liability regarding the use of this report except to the OPW. Copyright © JBA Consulting Engineers and Scientists Ltd 2016 Carbon Footprint A printed copy of the main text in this document will result in a carbon footprint of 140g if 100% post-consumer recycled paper is used and 140g if primary-source paper is used.
    [Show full text]
  • Inspector's Report
    An Bord Pleanála Inspector’s Report Board Reference: 09.JP0008 Proposed Development: Works at the North Leixlip Sewerage Scheme comprising the laying of 4.2km of new sewerage pipeline and provision of special tunnel crossings at certain points. Location: Leixlip, County Kildare. Local Authority: Kildare County Council Type of Case: Application for approval under Section 177AE(2) of the Planning and Development Act 2010 Prescribed Bodies: NRA, Irish Aviation Authority, Department of Communications, Energy and Natural Resources, Iarnród Éireann, Inland Fisheries Ireland, Department of Arts, Heritage and the Gaeltacht. Observers: Thomas Reid Date of Site Inspection: 30 th May 2012 Inspector: D. MacGabhann ___________________________________________________________________________ 09.JP0008 An Bord Pleanála Page 1 of 23 1 INTRODUCTION Background 1.1 Kildare County Council is seeking approval from the Board for the laying of a 4.2km new sewerage pipeline between Collinstown and Leixlip Wastewater Treatment Plant with provision for tunnel crossings under the Rye Water River, the R149 regional road and under the Dublin-Sligo railway line. The sewerage pipeline crosses the Rye Water Valley/Carton Special Area of Conservation and part of the route is adjacent to the protected site. The application for approval includes a Natura Impact Statement. 1.2 Section 177AE of the Planning and Development Act 2000 (as amended) requires that, where an appropriate assessment is required in respect of a local authority development, the proposed development shall not be carried out unless the Board has approved it with or without modifications. (As the competent authority for local authority development the Board is also required to carry out the appropriate assessment and to determine whether or not the proposed development would adversely affect the integrity of a European site).
    [Show full text]
  • The Beetles of Decaying Wood in Ireland
    The beetles of decaying wood in Ireland. A provisional annotated checklist of saproxylic Coleoptera. Irish Wildlife Manuals No. 65 The beetles of decaying wood in Ireland. A provisional annotated checklist of saproxylic Coleoptera. Keith N. A. Alexander 1 & Roy Anderson 2 1 59 Sweetbrier Lane, Heavitree, Exeter EX1 3AQ; 2 1 Belvoirview Park, Belfast BT8 7BL, N. Ireland Citation : Alexander, K. N. A. & Anderson, R. (2012) The beetles of decaying wood in Ireland. A provisional annotated checklist of saproxylic Coleoptera. Irish Wildlife Manual s, No. 65. National Parks and Wildlife Service, Department of the Arts, Heritage and the Gaeltacht, Dublin, Ireland. Keywords: beetles; saproxylic; deadwood; timber; fungal decay; checklist Cover photo: The Rhinoceros Beetle, Sinodendron cylindricum © Roy Anderson The NPWS Project Officer for this report was: Dr Brian Nelson; [email protected] Irish Wildlife Manuals Series Editors: F. Marnell & N. Kingston © National Parks and Wildlife Service 2012 ISSN 1393 – 6670 Saproxylic beetles of Ireland ____________________________ Contents Executive Summary........................................................................................................................................ 2 Acknowledgements........................................................................................................................................2 Introduction....................................................................................................................................................
    [Show full text]
  • General Report Template
    Inspector’s Report PL09.248582 Development Revised design of previously permitted manufacturing building over four levels including support areas, roof mounted stacks and equipment ranging in height up to 24 metres above parapet. Location Blakestown, Kellystown, Collinstown Industrial Park, Leixlip, Co. Kildare. Planning Authority Kildare County Council. Planning Authority Reg. Ref. 16/1229 Applicant(s) Intel Ireland Ltd Type of Application Planning Permission. Planning Authority Decision Grant Type of Appeal Third Party Appellant(s) Tania Wynne Thomas Reid Observer(s) Emmet Stagg Mr. Peter Sweetman and Wild Ireland Date of Site Inspection 21/07/2017. Inspector A. Considine PL09.248582 Inspector’s Report Page 1 of 86 Contents 1.0 Site Location and Description .............................................................................. 4 2.0 Proposed Development ....................................................................................... 5 3.0 Planning Authority Decision ................................................................................. 7 3.1. Decision ........................................................................................................ 7 3.2. Planning Authority Reports ........................................................................... 8 3.3. Prescribed Bodies ....................................................................................... 10 3.4. Third Party Observations ............................................................................ 11 4.0 Planning History ................................................................................................
    [Show full text]
  • Environmental Impact Statement for Proposed Intel FAB 24C Project, Collinstown Industrial Park, Leixlip, Co Kildare
    Environmental Impact Statement for proposed Intel FAB 24C Project, Collinstown Industrial Park, Leixlip, Co Kildare. prepared for Intel Ireland For inspection purposes only. Consent of copyright owner required for any other use. by Environmental Impact Services Second Floor The Courtyard 25 Great Strand Street Dublin 1 RGB December 2011 EPA Export 15-08-2012:00:12:12 EIS for Intel FAB 24C Table of Contents Table of Contents 1 Introduction and Preamble ............................................................................ 1 1.1 Introduction and Terms of Reference ................................................................................. 1 1.2 Legislation ....................................................................................................................... 1 1.3 EIS Format .......................................................................................................................2 1.4 A Note on Quotations ........................................................................................................3 2. Screening and Scoping ................................................................................... 4 2.1 Legislation ....................................................................................................................... 4 2.2 Screening......................................................................................................................... 4 2.3 Basis of Scoping for this EIS .............................................................................................
    [Show full text]
  • Kildare County Council Draft Revised Leixlip LAP Natura Impact Report
    Kildare County Council Draft Revised Leixlip LAP Natura Impact Report 262800/NIR/Issue 2 Issue 2 | 21 May 2019 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 262800-00 Ove Arup & Partners Ireland Ltd Ove Arup & Partners Ltd Bedford House 3rd Floor 16-22 Bedford Street Belfast BT2 7FD Northern Ireland www.arup.com Document verification Job title Draft Revised Leixlip LAP Job number 262800-00 Document title Natura Impact Report File reference 4-04-02 Document ref 262800/NIR/Issue 2 Revision Date Filename Draft Revised Leixlip LAP Draft 1 2 1 Mar Description First draft 2019 Prepared by Checked by Approved by Name Donncha Madden Fiona Patterson Clodagh O’Donovan Signature Draft 2 29 Mar Filename Draft Revised Leixlip LAP 2019 Description Second Draft Prepared by Checked by Approved by Name Donncha Madden Fiona Patterson Clodagh O’Donovan Signature Issue 1 7 May Filename 262800_Leixlip LAP NIR_Issue_ 17.05.19.docx 2019 Description Issue Prepared by Checked by Approved by Name Donncha Madden Fiona Patterson Clodagh O’Donovan Signature Issue 2 21 May Filename 262800_Leixlip LAP NIR_Issue 2_ 21.05.19.docx 2019 Description Issue 2 Prepared by Checked by Approved by Name Donncha Madden Fiona Patterson Clodagh O’Donovan Signature Issue Document verification with document ✓ 262800/NIR/Issue 2 | Issue 2 | 21 May 2019 \\GLOBAL\EUROPE\DUBLIN\JOBS\262000\262800-00\4. INTERNAL\4-04
    [Show full text]
  • Leixlip Online Submissions
    leixlip online submissions Name Cathy, Barry On behalf of Rinawade Residents association I wish to voice concerns regarding the Draft LAP for Leixlip. To summarise, the current plan rezones land without any rationale being given, that would take a decade or more to develop, without the parallel provision of Enter your improved infrastructure (water, electricity, public transport, etc), in a town which already has challenges due to geographic constraints, and in a context where submission here extensive development is also taking place in neighbouring towns. Please see accompanying document for more information RRA_LAP_2019_V2.docx File Upload File Upload File Upload File Upload Name Denis, McCarthy Enter your submission here Submission on Draft Leixlip Plan 2020-2026 Name Bernadine, Bracken To whom it may concern, I wish to make the following submission in regard to the proposed CONFEY Urban Design Framework (KDA) 1) The “Mixed use units” concept (Section 2.1.6.1 ) is highly ambitious, given that within 500m at Riverforest Shopping Centre, there is already an array of established businesses. Considerable risk of not being able to attract business tenants for the many ground floor business units due to commercial non viability as local market already covered . Empty units can result in increase in anti social behaviour and a look of urban decay. If such a scenario arose, Landlords may be tempted to rent the business units out to lesser favourable business types that would not be of a community benefit but are simply availing of a cheap rental premises opportunity. This could thus magnify and increase risk of antisocial behaviour.
    [Show full text]
  • Leixliptown RENEWAL PLAN - PUBLIC CONSULTATION
    leixlipTOWN RENEWAL PLAN - PUBLIC CONSULTATION leixlip TOWN RENEWAL PLAN - UPDATE MAY 2021 INTRODUCTION Leixlip Town A Focus on How Covid 19 has Renewal Sustainability Changed the Plan Way we Interact The Strategic Projects and Public Realm Providing sustainable communities where COVID-19 has brought a sudden section of Kildare County Council and people can live, work and socialise is the unexpected change in how we socialise Metropolitan Workshop, in association cornerstone of the Town Renewal Plan. The and use our surrounding environment. with the community of Leixlip, are in the following high level aims will inform the These changes in how we live and work process of preparing a Town Renewal Plan emerging Plan. have placed stresses upon our town for Leixlip. The key objective of the Leixlip infrastructures, highlighting inadequacies Town Renewal Plan is to deliver a new vision but also opportunities to develop our for the town with pedestrian focused public They include: towns in a sustainable and progressive way. spaces and liveable streets. The aim is to Local parks, paths and outdoor amenities put the pedestrian and cyclist at the heart • Providing a mix of land uses to have become so important to our physical of the design solution for the town and to minimise transport demand by prioritising and mental wellbeing during this time. create fully accessible, inclusive and age- walking, cycling and public transport, and We have begun to interact more with our friendly public spaces. The Town Renewal minimise the need to use cars; home towns as we no longer commute and Plan will include a masterplan of the area • Delivering a quality of life which have more spare time to enjoy the natural with key priority regeneration projects and residents and visitors are entitled to expect, beauties which our localities have to offer.
    [Show full text]
  • The Remarkable Rye River Publication
    Dedication to John Bracken Professor John Bracken, in his role at Aquens in UCD, was a mentor to many fishery scientists and limnology students over the years and was instrumental in the monitoring and rehabilitation works completed in the 1990s on the Rye Water. As a global technology and business leader, we LDARE FISH R “ ING he ye Riv COU d t er are committed to doing the right things, the right RSE Intel an way. For Intel, corporate responsibility is simply good business ” t Intel, we consider corporate responsibility an inseparable part of our business. While many companies in the electronics industry This Paul Ottelini A Intel President and Chief Executive Officer now outsource most of their manufacturing, we continue to design and manufacture the majority of our products in our own factories. As a result, we place a strong emphasis on driving environmental detailed monitoring of the River Rye has reached an important milestone sustainability across our global operations. We continually strive to as we are now in the 20th year of reporting. To mark this occasion, and improve our operations and minimise our impact on the environment to share the wealth of unique information obtained through many years and vigilantly pursue new ways to reduce emissions and improve energy of monitoring, Intel is delighted to commission this special publication management through conservation, renewable energy, efficient building design, and other efforts. Intel first made the decision to locate a manufacturing location in Leixlip, Co. Kildare in 1989 and today the Ireland campus comprises 350 acres, of which 150 acres are in industrial use, with the balance of 200 acres being comprised of a mixture of amenity, residential and agricultural areas.
    [Show full text]
  • Leixlip Strategic Transportation Assessment
    Leixlip Strategic Transportation Assessment Kildare County Council May 2019 Quality information Prepared by Checked by Approved by Matthew Richardson / John Neil Caughey Joseph Seymour Humphreys Senior Consultant Principal Consultant Director Revision History Revision Revision date Details Authorized Name Position 0 3 April 2019 Draft issue JS Joe Seymour Director 1 9 April 2019 Issued JS Joe Seymour Director 2 3 May 2019 Reissue following JS Joe Seymour Director draft LAP review Distribution List # Hard Copies PDF Required Association / Company Name 0 Y Kildare County Council Prepared for: Kildare County Council 2 Prepared for: Kildare County Council Devoy Park, Naas, Co. Kildare, W91 X77F Project number: 60596485 AECOM Ireland Limited 4th Floor Adelphi Plaza Georges Street Upper Co. Dublin Ireland T: +353 1 238 3100 aecom.com © 2019 AECOM Ireland Limited. All Rights Reserved. This document has been prepared by AECOM Ireland Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: Kildare County Council 3 Table of Contents 1. Introduction ............................................................................................................................................................................................8
    [Show full text]