In In
Need Need
re
Respectfully Respectfully
Calpine Calpine
: :
Power Power
gives gives
Petition Petition
for for
Cycle Cycle
P.E. P.E.
for for
CALPINE CALPINE
BEFORE BEFORE
positions positions
Citrus Citrus
Plant Plant
Determination Determination
notice notice
Construction Construction
with with
Power Power
THE THE
for for
CONSTRUCTION CONSTRUCTION
submitted submitted
Exhibits Exhibits
County County
regarding regarding
of of
FLORIDA FLORIDA
Plant
Determination Determination
filing filing
NOTICE NOTICE
Finance Finance
Combined Combined
. .
of of
this this
JS-1 JS-1
PUBLIC PUBLIC
Attorneys Attorneys
Construction Construction
L.P. L.P.
Wright, Wright,
Tallahassee, Tallahassee,
Gardner, Gardner,
Bowden, Bowden,
1300 1300
Florida Florida
John John
Florida Florida
Robert Robert
[email protected] [email protected]
[email protected] [email protected]
Need Need
Is/ Is/
Duke Duke
(850) (850)
(850) (850)
the the
OF OF
FINANCE FINANCE
1 1
15th 15th
through through
FILING FILING
Robert Robert
Direc
Company, Company,
Thomaswood Thomaswood
T. T.
Energy Energy
for for
385-5416 385-5416
385-0070 385-0070
SERVICE SERVICE
Scheffel Scheffel
day day
Bush, Bush,
Bar Bar
P.A. P.A.
LaVia, LaVia,
Bar Bar
COMPANY, COMPANY,
Bist, Bist,
the the
t t
for for
July July
Submitted Submitted
DOCKET DOCKET
Scheffel Scheffel
JS-2 JS-2
Testimony Testimony
of of
No. No.
No. No.
Florida, Florida,
Finance Finance
Florida Florida
Citrus Citrus
L
Calpine Calpine
Dee, Dee,
COMMISSION COMMISSION
July, July,
.
Wiener, Wiener,
III III
P. P.
15, 15,
Telephone Telephone
Facsimile Facsimile
Drive Drive
Wright Wright
853666 853666
966721 966721
in in
NO. NO.
L.P.'S L.P.'S
("Calpine") ("Calpine")
LaVia LaVia
support support
2
Wright Wright
County County
for for
014 014
2
Company, Company,
32308 32308
Inc
of of
140110-EI 140110-EI
014
Wadsworth, Wadsworth,
John John
Filing Filing
.
. .
& &
'
s s
of of L. L.
Richard Richard
Washington, Washington,
Stuart, Stuart,
Richard Richard
2336 2336
Eighth Eighth
1025 1025
Brickfield, Brickfield,
Tallahassee, Tallahassee, James James
111 111
c/o c/o
Office Office
Erik Erik
Charles Charles
J.R. J.R.
Tampa, Tampa,
Carlton Carlton
Blaise Blaise
James James
P.O. P.O.
Tallahassee, Tallahassee,
Michael Michael
Division Division
Curt Curt
Florida Florida
was was
2540 2540
day day
& &
West West
The The
of of
furnished furnished
S.E. S.E.
Thomas Thomas
Stone, Stone,
L. L.
Kelly Kelly
Box Box
Shumard Shumard
Kiser Kiser
W. W.
I I
Michael Michael
Floor, Floor,
of of
N. N.
Florida Florida
July, July,
A. A.
A. A.
Florida Florida
HEREBY HEREBY
Florida Florida
Rehwinkel Rehwinkel
Sayler Sayler
Fields Fields
Public Public
Lawson Lawson
Madison Madison
Brew Brew
3239 3239
of of
Ocean Ocean
the the
Gamba Gamba
Zambo, Zambo,
Zambo Zambo
DC DC
Jefferson Jefferson
Burchette, Burchette,
P.C. P.C.
Legal Legal
Florida Florida
Oak Oak
Florida Florida
2014. 2014.
West West
Public Public
Walls Walls
to to
CERTIFY CERTIFY
Jorden Jorden
Service Service
Boulevard
Legislature Legislature
20007-5201 20007-5201
Street, Street,
33601
Boulevard Boulevard
the the
34966 34966
P.A. P.A.
Servic
Tower Tower
Counsel Counsel
following, following,
Street, Street,
Burt Burt
-
32399 32399
Ritts Ritts
that that
32399-1400 32399-1400
3239 3239
Commission Commission
CERTI:PI:CATE CERTI:PI:CATE
es es
Room Room
, ,
#309 #309
a a
NW
true true
812 812
, ,
by by
2 2
and and
electronic electronic
OF OF
Attorney Attorney
Is/ Is/
New New
NRG NRG
Gordon Gordon
South South
112 112
Tallahassee, Tallahassee,
Marsha Marsha
Suite Suite
Rutledge Rutledge
119 119
Tallahassee, Tallahassee,
Moyle Moyle
Karen Karen Jon Jon
118 118
Tallahassee, Tallahassee,
Duke Duke
Matthew Matthew
106 106
800 800
Paul Paul
Duke Duke
Dianne Dianne
33733-4042 33733-4042
St. St.
John John
P.O. P.O.
correct correct
SERVI:CE SERVI:CE
Robert Robert
Telly Telly
Roads, Roads,
Energy, Energy,
South South
North North
Moyle, Moyle,
East East
Petersburg, Petersburg,
Energy Energy
Lewis, Lewis,
Box Box Energy Energy
T. T.
Central Central
202 202
Law Law
Putnal Putnal
D. D.
E
M. M.
delivery, delivery,
R. R.
. .
Burnett Burnett
copy copy
Ecenia, Ecenia,
College College
14042 14042
Street Street
Monroe Monroe
Polozola Polozola
Rule Rule
Gadsden Gadsden
Firm, Firm,
Triplett Triplett
Louisiana Louisiana
Jr. Jr.
Bernier Bernier
Scheffel Scheffel
Inc Inc
Jr. Jr. Florida, Florida,
Florida, Florida,
Florida Florida
Florida Florida
Florida Florida
of of
Region Region
. .
P.A. P.A.
Florida Florida
the the
Street Street
P.A. P.A.
Avenue, Avenue,
on on
Street Street
foregoing foregoing
thi
Wright Wright
Inc. Inc.
Inc
7076
32301 32301
32301 32301
323
s s
. .
Suite Suite
0 0
15th 15th 01 01 BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION
In re: Petition for Determination DOCKET NO. 140110-EI Of Need for Citrus County Submitted for filing: Combined Cycle Power Plant, by July 14, 2014 Duke Energy Florida, Inc.
DIRECT TESTIMONY
OF
JOHN L. SIMPSON, P.E.
ON BEHALF OF
CALPINE CONSTRUCTION FINANCE COMPANY, L.P.
DIANA WOODMAN HAMMETT ROBERT SCHEFFEL WRIGHT Vice President and Managing Counsel Florida Bar No. 0966721 CALPINE CORPORATION JOHN T. LAVIA, III 717 Texas Avenue, Suite, 1000 Florida Bar No. 0853666 Houston, Texas 77002 GARDNER BIST WIENER WADSWORTH Te:lephone: (713) 820-4030 BOWDEN BUSH DEE LAVIA &WRIGHT Email: [email protected] 1300 Thomaswood Drive Tallahassee, Florida 32308 Telephone: (850) 385-0070 Facsimile: (850) 385-5416 IN RE: PETITION FOR DETERMINATION OF COST EFFECTIVE GENERATION ALTERNATIVE TO MEET NEED PRIOR TO 2018, BY DUKE ENERGY FLORIDA, INC.
ON BEHALF OF CALPINE CONSTRUCTION FINANCE COMPANY, L.P.
FLORIDA PUBLIC SERVICE COMMISSION DOCKET NO. 140110-EI
DIRECT TESTIMONY OF JOHN L. SIMPSON, P.E.
1 I. INTRODUCTION AND QUALIFICATIONS
2 Q. Please state your name, employer, and business address.
3 A. My name is John Simpson and I am self-employed as a Transmission Engineering
4 Consultant. My business address is 40318 Colfax Road, Magnolia, Texas 77354.
5
6 Q. On whose behalf are you testifying?
7 A. I am testifying on behalf of Calpine Construction Finance Company, L.P ., a
8 subsidiary of Calpine Corporation, (collectively "Calpine") in support of its
9 intervention in this docket, which addresses Duke Energy Florida's ("DEF") Petition
10 for Determination of Need for Citrus County Combined Cycle Power Plant. Calpine
11 owns and operates the Osprey Energy Center ("Osprey" or the "Osprey Facility''),
12 which is located in Auburndale, Florida.
13
14 Q. Please summarize your educational background and your employment
15 experience. 1 1 A. I received a Bachelor of Science Degree in Electrical Engineering from the
2 University of Colorado in 1972. I began my career with the Public Service Company
3 of Colorado where I held various engineering and engineering supervisory positions
4 of increasing importance in electric utility generation and substation engineering. I
5 then joined Florida Power Corporation ("FPC") in 1985 where I held various
6 engineering management positions of increasing responsibility, serving for over six
7 years as the Manager of Transmission Design where I was responsible for the overall
8 project activities for the engineering, design, permitting, right-of-way acquisition,
9 material procurement, and construction specifications for new transmission lines and
10 modifications to existing transmission lines on the FPC system. I then served for
11 over four years as the Director of System Planning where I was responsible for the
12 planning of all transmission, substation, and major distribution facility additions on
13 the FPC System. In that role, I was also responsible for administration of FPC's
14 open access transmission tariff. In November 1999, I joined Reliant Energy where I
15 served as the Director of Transmission Analysis. In this role, I was responsible for
16 the transmission analysis activities required to support the trading, power origination,
17 and generation development functions of Reliant Energy and its successor
18 companies, RRI Energy and GenOn Energy, in the development, operation, and
19 management of their merchant generation fleet throughout the United States. In
20 April 2011, I began working as an independent transmission consultant for various
21 merchant electric generators, including Calpine. In this role I provide transmission
22 expertise related to generator interconnection and transmission access issues. I
2 1 currently represent Calpine on the Florida Reliability Coordinating Council
2 ("FRCC") Planning Committee, Operating Committee, and Regional Entity
3 Committee and Compliance Forum.
4 I am a Registered Professional Engineer in the states of Colorado and Florida.
5
6 Q. Are you sponsoring any exhibits with your testimony?
7 A. Yes. I am sponsoring the following exhibits:
8 Exhibit JS-1 Resume' of John L. Simpson, P.E.
9 Exhibit JS-2 Excerpts from FPL Ten Year Site Plan - Turkey Point
10 Synchronous Condenser Operation
11
12 II. PURPOSE AND SUMMARY OF TESTIMONY
13 Q. What is the purpose of your testimony in this proceeding?
14 A. The purpose of my testimony is to provide an overview of the transmission system
15 impacts and issues related to the opportunities for Calpine's Osprey Facility to
16 deliver energy and capacity to the DEF Balancing Authority Area ("BAA") in the
17 2016 to 2019 and beyond time period.
18
19 Q. Please summarize your testimony.
20 A. Calpine's Osprey Facility is well positioned to deliver energy and capacity to the
21 DEF BAA as a replacement or substitute for the Suwannee simple cycle peaking
22 units ("Suwannee CTs" or "Suwannee Peakers") that DEF proposes in this
3 1 proceeding to add in 2016 and the Hines Chiller upgrades ("Hines Chillers") that
2 DEF proposes to add in 2017. In addition, Osprey provides a unique opportunity to
3 complete a cost effective direct connection to the DEF transmission system by
4 January 1, 2020, and possibly as early as the summer of 2017, to support a purchase
5 option offered by Calpine. The direct connection to the DEF transmission system
6 will not only fully integrate the Osprey generation into the DEF system, but will also
7 provide ancillary transmission system benefits by creating a southern tie between the
8 two largest load centers on the DEF system, the Florida Suncoast area (Pinellas,
9 Pasco and Hernando Counties) and the Central Florida area (Orange, Osceola, and
10 Seminole Counties), thus enhancing load and generation deliverability between these
11 two areas.
12
13 Q. What is your understanding of the Osprey Facility and the proposals by which
14 Osprey's capacity and energy would be delivered into the DEF balancing
15 authority area?
16 A. I understand that Osprey is a nominal599 MW, 2-on-1 natural gas fired combined
17 cycle facility located in Auburndale, Florida, that began commercial operation in
18 2004. Osprey can provide 515 MW of electric capacity.
4 1 I further understand that Calpine has offered to provide 515 MW of capacity and
2 energy to DEF from 2015 through 2019 pursuant to the proposed terms of a power
3 purchase agreement ("PP A"), and that, as part of its proposals, Calpine has offered to
4 sell Duke the Osprey Facility outright at the end of the PPA term, i.e., on January 1,
5 2020. I understand that Calpine participated in a 2012 Request for Proposals
6 ("RFP") conducted by Progress Energy Florida, which is now DEF, in which DEF
7 sought proposals to meet its needs before 2018, and further that Calpine was selected
8 for negotiations toward a PPA, although no PPA was ever executed.
9
10 Ill. TRANSMISSION ANALYSIS OF OSPREY DELIVERING TO DEF BAA
11 Q. Please describe Osprey's use of the transmission system.
12 A. The Osprey Facility was placed in commercial operation in 2004. It is
13 interconnected to the Tampa Electric Company {"TEC") transmission system at the
14 Recker 230 kV substation. ("TEC" is the common abbreviation for Tampa Electric
15 Company in the FRCC and Florida transmission documents.) Since its construction,
16 the Osprey Facility has delivered energy and capacity to DEF, TEC, and Seminole
17 Electric Cooperative ("SEC" or "Seminole"). Calpine Energy Services, an affiliate
18 of Calpine, has purchased Firm Point to Point ("PTP") transmission service from
19 TEC for deliveries from the Osprey Facility to both the DEF and Florida Power &
20 Light ("FPL") BAAs. From 2009 to 2014, most of the Osprey Facility's capacity
21 and energy were sold to Seminole pursuant to a long-term PPA and, during this
22 period, the Osprey Facility was designated as a Network Resource to serve SEC
5
22 22
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9 9
8 8
7 7
4 4
6 6
5 5
3 3
2 2
1 1
Q. Q.
A. A.
Q. Q.
A. A.
Q. Q.
issues issues
Do Do
Yes. Yes.
its its
likely likely
Are Are
in in
transmission transmission
Service. Service.
Yes, Yes,
capacity capacity
Does Does
FPL FPL
the the
energy energy
Calpine Calpine
deliver deliver
Network Network
Calpine Calpine
5-year 5-year
Crystal Crystal
the the
DEF DEF
there there
BAA BAA
Calpine Calpine
DEF DEF
Osprey Osprey
to to
on on
retirements retirements
and and
up up
rolled rolled
purchased purchased
impact impact
from from
BAA BAA
These These
(or (or
the the
Load Load
River River
any any
recently recently
to to
to to
capacity capacity
longer) longer)
service service
FRCC FRCC
Energy Energy
expire. expire.
249 249
still still
Osprey Osprey
pending pending
and and
over over
in in
transmission transmission
1 1
the the
MW MW
both both
and and
hold hold
retired retired
allowed allowed
and and
of of
or or
increments increments
FRCC FRCC to to
agreement agreement
Transmission Transmission
Services Services
to to
2 2
Crystal Crystal
extended extended
the the
of of
the the
utilized utilized
any any
developments developments
coal coal
the the
energy energy
its its
DEF DEF
FPL FPL
the the
transmission transmission
DEF DEF
transmission transmission
service service
units units
Crystal Crystal
still still
River River
277 277
with with
Long Long
BAA. BAA.
and and
for for
the the
and and
BAA BAA
owns owns in in
MW MW
as as
System? System?
249 249
FPL FPL
rights rights
TEC. TEC.
River River
the the
capacity capacity
Term Term
Units Units
long long
Upon Upon
6 6
in in
through through
MW MW
the the
summer summer of of
BAAs. BAAs.
DEF's DEF's
system? system?
service service
have have
3 3
as as
Firm Firm
Firm Firm
1, 1,
rights rights
the the
nuclear nuclear
of of
Calpine Calpine
to to
2, 2,
TEC TEC
rollover rollover
Firm Firm
the the
expiration expiration
and and
PTP PTP
PTP PTP
To To
power power
of2018. of2018.
to to
rights rights
DEF DEF
deliver deliver
unit, unit,
deliver deliver
using using
3 3
PTP PTP
Transmission Transmission
Transmission Transmission
continues continues
create create
rights rights
supply supply
on on
BAA BAA
and and
Transmission Transmission
Firm Firm
of of
this this
249 249
the the
the the
further further
any any
and and
and and
system system
Network Network
TEC TEC
to to
PTP PTP
MW MW
Seminole Seminole
problems problems
may may
renew renew
up up
Service Service
Service Service
Transmission Transmission
plans plans
of of
System? System?
to to
be be
that that
Service Service
energy energy
277 277
Resource, Resource,
its its
extended extended
to to
contract, contract,
to to
to to
are are
or or
MW MW
retire retire
the the
and and
to to of of 1 A. Yes. The FRCC completed a study ofthe impacts ofthe retirement of Crystal River
2 Units 1 and 2, with Crystal River Unit 3 already retired. This study, titled FRCC's
3 Evaluation ofTransmission Impact ofthe EPA's Mercury and Air Toxics Standard
4 ("MATS") (Transmission Impact Study for Shutdown of Crystal River Units 1 & 2,
5 with retirement of Crystal River Unit 3), is commonly called the "MATS Study" and
6 has been provided as Exhibit ES-1 to the Direct Testimony of Ed Scott in this
7 docket. The MATS Study showed that significant transmission issues would be
8 created by the loss of such a large quantity of generation at the Crystal River site that
9 then had to be replaced by dispatching other DEF resources within FRCC. Many of
10 these transmission issues did not have a solution, or a solution could not be
11 implemented within the time frame required if Crystal River Units 1 and 2 were shut
12 down in April201 5 as required by the MATS regulation. For this reason, DEF was
13 granted an extension for compliance with the MATS regulation until April2016.
14 DEF has subsequently developed a plan to allow Crystal River Units 1 and 2 to
15 continue operation in compliance with the MATS regulation until summer of2018,
16 thereby providing additional time to replace this capacity or implement transmission
17 solutions to the problems caused by their retirement. The plan developed by DEF
18 would actually allow Crystal River Units 1 and 2 to operate through 2020 should
19 DEF encounter delays or find it advantageous to delay replacing that capacity or
20 implementing transmission solutions.
21
7 1 Q. Have you evaluated Osprey's ability to deliver to DEF as a resource to replace
2 the planned additions at Suwannee and Hines?
3 A. Yes. As I mentioned previously, the retirements of Crystal River Units 1, 2, and 3
4 create significant issues on the FRCC transmission grid. However, if Crystal River
5 Units 1 and 2 continue to operate through 2016 and 2017, as now planned by DEF,
6 the deliverability of Osprey is much improved. I stated earlier that Calpine currently
7 holds the rights to 249 MW of Firm PTP Transmission from Osprey to DEF. This
8 service can be provided with no required upgrades on the TEC system. Calpine's
9 current offer to DEF for energy and capacity from Osprey is for 515 MW with the
10 249 MW of Firm PTP Transmission Service included. This guarantees the delivery
11 of249 MW of energy and capacity from Osprey to DEF. Additional transmission
12 service will need to be purchased from TEC for the delivery of additional energy and
13 capacity from Osprey.
14
15 Q. What were the results of your evaluation of Osprey's ability to replace the
16 planned additions at Suwannee and Hines?
17 A. With the support of Calpine's Transmission Department, I modeled the ability of
18 Osprey to replace the addition of the Suwannee CTs (334 MW) in 2016 and the
19 installation ofthe Hines Chillers (220 MW) in 2017. During the summer of2016,
20 with Osprey delivering 334 MW to the DEF BAA to replace the capacity of the new
21 CTs at Suwannee, minor 69 kV issues were found under double contingency outages
22 on the TEC system. From previous studies and solutions proposed by TEC, I believe
8 1 all of these issues can be resolved through operating procedures by TEC. One 115
2 kV overload was found on the DEF system (on the Baker Tap to Miccosukee Tap
3 line), also under a double contingency line outage. However, this overload already
4 has an operating procedure that DEF currently uses to alleviate the overload under
5 this contingency.
6 During the summer of2017, with Osprey delivering 515 MW to the DEF BAA to
7 replace both the new Suwannee CTs and the Hines Chillers, a few additional
8 constraints were identified on the TEC system along with the overload of the Griffin
9 to Morgan Road 115 kV line on the DEF system. Again, the issues on the TEC
10 system should be resolved through operating procedures and/or redispatch ofTEC
11 resources. If minor construction to resolve 69 kV overloads is required, this can be
12 completed in time to allow the transmission service to proceed and the cost of those
13 upgrades would be rolled in to the transmission rate charged by TEC for the
14 transmission service. The Griffin to Morgan Road overload on the DEF system
15 would occur under a double line outage on the DEF system. DEF also has an
16 existing operating solution to mitigate this overload that can be utilized for the
17 summer of2017 and beyond. lfDEF exercises the purchase option offered by
18 Calpine, a different long term solution can be put in place to mitigate all overloads
19 caused by Osprey delivering to DEF.
20
21 Q. Please describe or give some examples of what you mean by "operating
22 solutions" or "redispatch solutions."
9 1 A. Often a transmission overload does not warrant the construction of new facilities to
2 eliminate its occurrence. This can be due to a number of reasons. For example, the
3 overload can be very minor, or the probability of the causing events may be very
4 low, such as a double contingency, or the cost of the new construction can be so high
5 that it would not make economic sense to have customers pay for new construction
6 to alleviate an overload that only occurs on rare occasions. In these instances, if the
7 overload occurs, the utility must still meet the required NERC reliability standard
8 requirements, so an "operating solution" is sought that will eliminate the overload
9 and allow all facilities to return to their planned operating limits. The operating
10 solution generally involves switching (i.e., opening and closing electrical breakers or
11 switches on) the transmission system to reconfigure the system and redistribute
12 transmission flows to eliminate the overload condition. The operating solution can
13 also involve the redispatch of generation, that is, raising some generation output and
14 lowering other generation. This is called a "redispatch solution" and it also changes
15 the flow distribution on the transmission system. Generally an operating solution
16 will include the most economic combination of switching and redispatch required to
17 eliminate the overload condition.
18
19 Q. Do other utilities in Florida use operating and/or redispatch solutions to control
20 overloads on their systems?
21 A. Yes. All utilities in Florida use operating and redispatch solutions to control
22 overloads where possible on their systems. Their use results in lower total costs for
10 1 customers in the state and is a very prudent action by the utilities. DEF makes
2 extensive use of operating procedures and redispatch solutions on their system.
3
4 Q. Is Osprey limited to delivering only 249 MW of energy and capacity to the DEF
5 BAA during all hours of a year?
6 A. No. During most hours of the year, Osprey can deliver up to the full 515 MW as
7 proposed by Calpine's offer. It is only during certain specific conditions during the
8 year, such as the peak load hours of the year, that Osprey is limited on the amount of
9 energy and capacity that can be delivered without the use of operating procedures
10 and/or redispatch of other DEF or TEC resources. When a request for finn PTP
11 transmission service is made to a Transmission Service Provider, a study is
12 completed under the most limiting conditions for granting the requested service.
13 Generally this is during the summer and winter peak load conditions. In addition,
14 certain sensitivities, which would include adverse conditions for providing the
15 service, are studied. If any limitation is found for granting the service, even if for
16 only one hour of the year, and the limitation cannot be mitigated by either an
17 operating solution or construction of new facilities, then the requested service is
18 denied. Generally, these limiting conditions only exist during the very peak load
19 hours of each year or during certain stressed dispatch conditions. Outside of these
20 very peak load hours, or under more normal dispatch conditions, additional energy
21 and capacity can be delivered. This is the case for Osprey delivering to the DEF
22 BAA. My evaluation of Osprey's ability to deliver energy and capacity to the DEF
11 1 BAA shows that with the use of operating procedures and/or redispatch solutions,
2 and some possible minor 69 kV upgrades on the TEC system for double contingency
3 outages, Osprey should be able to deliver 515 MW of capacity to DEF as a
4 replacement for the Suwannee CTs and the Hines Chillers until January 1, 2020, the
5 end of the PPA term offered by Calpine. After January 1, 2020, a long-term solution
6 needs to be completed to avoid additional transmission constraints that begin to
7 appear in the summer of 2020.
8
9 Q. What is the long-term solution for Osprey to deliver to DEF?
10 A. The long-term solution for Osprey is a direct connection of the plant to the DEF
11 transmission system. This solution was evaluated by DEF as part of the asset
12 purchase evaluation of Osprey and is summarized in Ed Scott's testimony in Docket
13 No. 140111-EI, the docket that addresses DEF's Petition for Determination of Cost
14 Effective Generation Alternative to Meet Need Prior to 2018. This solution involves
15 the construction of two new 230 kV lines from the Recker Substation to the DEF
16 system. One line would be constructed from Recker to Duke's existing Kathleen
17 Substation and the other line would be constructed from Recker to Duke's existing
18 Haines City East Substation. According to Ed Scott's testimony, these lines and the
19 new connection to DEF resolve not only the overloads on the DEF system, but also
20 all of the overloads identified on the TEC system and the overloads identified on
21 third party systems in FRCC.
22
12
22 22
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
10 10
11 11
9 9
8 8
7 7
6 6
4 4
5 5
3 3
2 2
1 1
A. A.
Q. Q.
A. A.
Q. Q.
A. A.
Q. Q.
sooner sooner
Obviously, Obviously,
What What
generally generally
a a
is is
transmission transmission
for for
of of
When When
Duke's Duke's
based based
new new
facilities facilities
I I
connection connection
Do Do
DEF DEF
approximately approximately
What What
specific specific
believe believe
usually usually
different different
new new
you you
230 230
estimates, estimates,
are are
on on
reviewing reviewing
the the
is is
predecessor, predecessor,
transmission transmission
believe believe
kV kV
most most
the the
that that
my my
lower lower
option option
on on
the the
new new
from from
options. options.
lines lines
transmission transmission
the the
system, system,
experience experience
cost cost
it it
timing timing
likely likely
lines lines
$150 $150
is is
than than
in in
that that
high high
the the
is is
various various
and and
of of
a a
Ed Ed
chosen, chosen,
typical typical
considerable considerable
are are
these these
Florida Florida
the the
million. million.
The The
will will
planning planning
this this
line line
side side
requirements requirements
Scott's Scott's
facilities? facilities?
constructed constructed
cost cost
and and
construction construction
be be
common common
construction construction
is is
lines. lines.
to to
new new
planning planning
a a
a a
less less
Power Power
on on
give give
detailed detailed
per per
testimony, testimony,
reasonable reasonable
engineers engineers
lines lines
my my
I I
than than
mile mile
benefits benefits
an an
believe believe
way way
Corporation
specific specific
and and
estimate, estimate,
for for
upper upper
and and
site site
the the
estimate. estimate.
alternative
at at
13 13
of of
that that
a a
placed placed
need need
each each
$150 $150
specific specific
the the
that that
provided provided
estimate estimate
doing doing
direct direct
bound bound
knowledge knowledge
this this
direct direct
based based
a a
voltage voltage
the the
million million
in in
, ,
quick quick
for for s
this this
make make
new new
connection connection
for for
estimate estimate
actual actual
service, service,
by by
of of
on on
connection connection
is is
the the
future future
interconnection interconnection
method method
level. level.
the the
the the
their their
estimate. estimate.
to to
a a
of of
cost cost
cost cost
generic generic
use use
cost cost
direct direct
how how
the the
is is
planning planning
expansion expansion
The The
made, made,
of of
to to
a a
of of
better. better.
for for
for for
utilities, utilities,
generic generic
the the
the the
the the
connection, connection,
to to
This This
cost cost
cost cost
comparing comparing
these these
the the
direct direct
which which
DEF DEF
new new
estimates. estimates.
Assuming Assuming
per per
would would
per per
is is
of of
cost cost
DEF DEF
including including
my my
new new
line. line.
system? system?
the the
mile mile
mile mile
connection connection
is is
per per
opinion opinion
the the
cost cost
the the
system? system?
direct direct
Once Once
for for
used used
mile mile
that that cost cost
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9 9
8 8
7 7
4 4
6 6
5 5
3 3
2 2
1 1
Q. Q.
A. A.
Q. Q.
totaling totaling
service service
that that
How How
placed placed
believe believe
Allowing Allowing
fact, fact,
by by
10.) 10.)
Yes. Yes.
not not
the the
Can Can
by by
purchase purchase
Osprey Osprey
options options
the the
Calpine Calpine
January January
subject subject
needed needed
direct direct
TEC TEC
in in
this this
does does
The The
in in
Ed Ed
from from
these these
delivering delivering
$169 $169
would would
service service
new new
option option
for for
required required
performed performed
connection connection
this this
Scott's Scott's
allows allows
to to
1, 1,
date? date?
lines lines
Osprey Osprey
appropriate appropriate
million million
the the
2020. 2020.
interconnection interconnection
scenario scenario
be be
offered offered
by by
Florida Florida
testimony, testimony,
required required
DEF DEF
can can
the the
transmission transmission
th
to to
would would
is is
e e
to to
full full
be be
to to
summer summer
not not
DEF, DEF,
by by
fit fit
provide provide
planning planning
Transmission Transmission
placed placed
purchase purchase the
515 515
to to
with with
Calpine, Calpine,
constructed constructed
he he
be be
mitigate mitigate
and and
MW MW
be be
states states
required required
lines lines
of of
the the
in in
the the
by by
constructed constructed
2017. 2017.
in in
service service
to to
the the
transmission transmission
additional266 additional266
are are
DEF DEF
which which
that that
some some
14 14
DEF DEF
Osprey Osprey
Line Line
until until
new new
within within all
(See (See
on on
he he
before before
before before
prior prior
transmission transmission
Siting Siting
TEC TEC
direct direct
2020, 2020,
believes believes
their their
the the
Facility Facility
in in
to to
the the
exercising exercising
Direct Direct
time time
estimated estimated
study, study,
system? system?
Act. Act.
connection connection
Polk Polk
operating operating
2020. 2020.
MW MW
summer summer
the the
on on
to to
County County
The The
Testimony Testimony
facility facility
facilities facilities
which which
January January
be be
of of
If If
the the
purchase purchase
DEF DEF
solutions solutions
that that
PTP PTP
placed placed
of of
needs needs
purchase purchase
and and
was was
2018 2018
overloads overloads
upgrades upgrades
exercises exercises
transmission transmission
required required
1, 1,
of of
are are
to to
in in
2020. 2020.
cited cited
if if
option option
or or
Ed Ed
b
service service
therefore therefore
desired. desired.
e e
redispatch redispatch
option, option,
in in
Scott Scott
by by
with with
can can
the the
service service
offered offered
DEF DEF
be be
by by
at at
I I In In 1 A. The TEC study that DEF's witness Ed Scott cited in Exhibit ES-3 to his direct
2 testimony in Docket No. 140111-EI was done for transmission service starting in
3 summer 2018 and continuing through the planning horizon. Since this covers a
4 longer period and has to resolve overloads that show up in the later years, additional
5 upgrades are required in those later years to mitigate all of the issues identified in the
6 study. In addition, this study was completed with a smaller size combined cycle
7 installation at Citrus County and the generation at Osprey further reduced the
8 capacity installation at Citrus County. TEC did not study an additional 266 MW of
9 transmission service from Osprey to DEF starting in summer of2016. The scenario I
10 have laid out in this testimony calls for Osprey to directly replace the Suwannee CTs
11 in 2016 and the Hines Chillers in 2017. With the construction of a new direct
12 connection of Osprey to the DEF transmission system, it is my opinion that the total
13 cost of all required transmission upgrades to the FRCC grid through the planning
14 horizon is no more than $150 million.
15
16 Q. Did DEF evaluate this scenario in its evaluation of alternative supply-side
17 generation proposals to their self-build generation options?
18 A. No. To the best of my knowledge, from reviewing the testimony and submittals in
19 these dockets, DEF did not evaluate an option of Osprey replacing the Suwannee
20 CTs and the Hines Chillers through a PPA in 2015 followed by an asset purchase and
21 a direct connection to the DEF system by 2020.
22
15 1 Q. Does the direct connection of Osprey to DEF provide any additional benefits to
2 the transmission system?
3 A. Yes. To understand this, one needs to look at the design ofthe DEF transmission
4 system. The 500 kV system on DEF consists of two radial lines, one starting at
5 DEF's Crystal River station and running to the south, through Brookridge Substation
6 and terminating at Lake Tarpon, and the other starting at Crystal River and running
7 east, then south, through DEF's Central Florida Substation and terminating at
8 Kathleen. An additional500 kV line connecting the two ends ofthese circuits was
9 originally planned to be constructed, creating a loop for the 500 kV system, but this
10 project was abandoned in the 1990's due to escalating easement and right-of-way
11 acquisition costs. DEF has two major load centers, one being the Florida Suncoast
12 area (Pinellas, Pasco and Hernando Counties) and the other being the Central Florida
13 area (Orange, Osceola, and Seminole Counties). The only significant transmission
14 connections between these two load centers are through 230 kV connections on the
15 far northern end of the Central Florida area to Central Florida Substation and then
16 following the 500 kV lines through Crystal River and down to Lake Tarpon
17 Substation. There is very limited transmission capability south out of Kathleen
18 Substation back to the Florida Suncoast area due to a single 115 kV DEF line from
19 Griffin to Higgins. This is an old line that was never intended to carry bulk power
20 transfers between the radial ends of the 500 kV system. The Morgan Road
21 Substation is planned to be added in this line in 2017. By directly connecting the
22 Osprey Facility to the DEF transmission system through a 230 kV line from Recker
16 1 to Kathleen and then from Recker to Haines City East, a southern 230 kV tie on the
2 DEF transmission system is created between the two load centers. This will increase
3 the reliability of the DEF transmission system and improve the deliverability ofDEF
4 generation to DEF load.
5
6 Q. Has DEF recognized this transmission reliability benefit in the analysis of a
7 direct connection of Osprey to the DEF transmission system?
8 A. DEF mentioned this reliability benefit in the written testimony of Ed Scott, Scott
9 Exhibit ES-3 at page 2 of 4, however no monetary value was placed on this
10 transmission benefit.
11
12 Q. Are there any other transmission reliability benefits that the new CTs at
13 Suwannee would provide to the DEF transmission system?
14 A. Yes, there may be a need for additional reactive supply and voltage support in the
15 Suwannee area that would be provided by the new Suwannee CTs. This may be
16 especially true ifDEF retires the existing Suwannee steam units in 2018 as noted in
17 the 2014 Ten Year Site Plan.
18
19 Q. If DEF uses Osprey to replace the planned capacity of the Suwannee CTs, are
20 there other cost effective options for providing this reactive supply or voltage
21 support?
17
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9 9
8 8
7 7
4 4
6 6
5 5
3 3
2 2
1 1
Q. Q.
A. A.
building building
necessary, necessary,
Is Is
needed needed
more more
retire retire
transmission transmission
manner manner
the the
prime prime
provided provided
synchronous synchronous
operation operation
synchronous synchronous
or or
through through
Voltage Voltage
voltage voltage
possible possible
Yes. Yes.
it it
(2) (2)
reactive reactive
reasonable reasonable
of of
the the
While While
through through
mover mover
at at
the the
them them
support, support,
the the
support support
the the
to to
Suwannee Suwannee
by by
the the
is is
would would
synchronous synchronous
move move
power power
installation installation
that that
a a
Osprey Osprey
Suwannee Suwannee
system system
motor, motor,
condenser condenser
of of
Suwannee Suwannee
to to
generating generating
the the
the the
synchronous synchronous
to to
the the
can can
has has
reactive reactive
be be
conversion conversion
flowing flowing
expect expect
generator generator
steam steam
reactive reactive
spinning spinning
voltage, voltage,
also also
be be
to to
more more
be be
provided provided
of of
operation. operation.
site. site.
CTs? CTs?
condenser condenser
supplies supplies
unit. unit.
power power
provided provided
that that
units units
static static
either either
cost-effective cost-effective
supply supply
depending depending
with with
condenser condenser
is is
of of
In In
using using
uncoupled uncoupled
from from
supply supply
one one
over over
at at
out out
synchronous synchronous
reactive reactive
no no
An An
can can
the the
close close
is is
or or
of of
electric electric
load. load.
this this
long long
then then
18 18
advantage advantage
be be
Suwannee Suwannee
more more
on on
or or
on on
operation operation
to to
for for
synchronous synchronous
power power
used used
into into
the the
and and
the the
distances. distances.
a a
The The
the the
dynamic dynamic
of of
production production
Duke Duke
transmission transmission
needs needs
condenser condenser
the the
the the
to to
point point
the the
field field
to to
of of
to to
site site
either either
generator generator
synchronous synchronous
existing existing
the the
and and
the the
provide provide
of of
excitation excitation
on on
Generally Generally
supply, supply,
in in
transmission transmission
the the
synchronous synchronous
condenser condenser
raise raise
its its
the the
use use
one one
operation, operation,
system. system.
customers customers
system system
steam steam
grid grid
and and
is is
any any
of of
or or
essentially essentially
operated operated
two two
is is
motor. motor.
lower lower
reactive reactive
where where
convert convert
voltage voltage
adjusted adjusted
units units
from from
option, option,
ways: ways:
DEF DEF
generally generally
system, system,
condenser condenser
th
than than
it it
In In
to to
as as
capacitors, capacitors,
e e
one one
power, power,
support support
the the
is is
could could
this this
(1) (1)
a a
to to
if if
needed. needed.
simply simply
same same
it it
or or
control control
either either
the the
is is
still still
or or
not not as as
22 22
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 2
1 1
A. A.
Q. Q.
A. A.
individual individual
transmission transmission
evaluated evaluated
for for
sufficient sufficient
which which
grouped grouped
No. No.
proposal proposal
Do Do
condition condition
speed. speed.
voltage voltage
conversion conversion
changes changes
operation operation
also also
to to
providing providing converted converted
Yes. Yes.
two two
synchronous synchronous
you you
In In
plans plans
compete compete would
Synchronous Synchronous
evaluation, evaluation, its
similarly similarly
Ongoing Ongoing
starting starting
agree agree
them them
are are
transmission transmission
by by
it it
and and
generator. generator.
in in
reactive reactive
to to
one one
are are
received received
found found
upgrades upgrades
itself itself
2017. 2017.
convert convert
into into
the the
with with
of of
minimal. minimal.
mechanism mechanism
condenser condenser
costs costs
situated situated
the the
cost cost
may may
various various
in in
power power
Excerpts Excerpts
th
condensers condensers
in in
Another Another
steam steam
a a
Exhibit Exhibit
DEF DEF
e e
may may
with with
include include
oflosses oflosses
capacity capacity
be be second second
way way
response response
generation generation
The The
supply supply
economic, economic,
combinations combinations
operation operation
be be
DEF's DEF's took took
turbine turbine
is is
DEF DEF
from from
JS-2 JS-2
generator generator
required required
problem problem
the the
added added
unit unit
are are
may may
during during
all all
or or
to to
self-build self-build
O&M O&M
conducted conducted
to to
FPL's FPL's
at at
a a
of of
generators generators
voltage voltage
proposals. proposals.
the the
exist exist
to to
to to
widely widely
my my
when when
Turkey Turkey
the the
19 19
operation operation
that that
is is
provide provide
be be
is is
RFP? RFP?
to to
to to
2013 2013
direct direct
that that
individual individual
for for
uncoupled uncoupled
able able
compare compare
maintain maintain
grouped grouped
would would
support. support.
options. options.
known known
Point Point
one one
since since
the the
Ten Ten
at at
testimony. testimony.
to to
exactly exactly
In In
its its
for for
proposal proposal
bring bring transmission transmission
not not
that that
Year Year
to to
transmission transmission
and and
Turkey Turkey
together together
as as
the the
proposals proposals
the the
from from
In In
One One
synchronous synchronous
have have
case, case,
different different
these these
the the
frequently frequently
Florida, Florida,
generator generator
generator generator
Site Site
problem problem
the the
The The
to to
been been
generator generator
Point Point
while while
with with
Plan Plan
support support
deliver deliver
turbine turbine
it it
costs costs
evaluation evaluation
blocks blocks
FPL FPL
necessary necessary
upgrades upgrades received received
generating generating
other other
detailing detailing
to to
in in
one one
used used
with with
condenser condenser
spin spin
operating operating
of of
to to
benefits. benefits.
to to
recently recently
and and
proposal proposal
of of
proposals, proposals,
DEF, DEF,
such such
synchronous synchronous
means means
this this
at at
and and
capacity capacity
are are
a a
for for
these these
of of
no no
reduced reduced
is is
station station
a a
but but
then then
each each
an an
that that
load. load.
of of
FPL FPL not not
21 21
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
8 8
9 9
7 7
6 6
4 4
5 5
3 3
2 2
1 1
Q. Q.
A. A.
Q. Q.
Please Please
receive receive
with with
expansion expansion
developed developed
serving serving
option option
of of
and and
individually. individually.
evaluation evaluation
In In
How How
make make
requiring requiring
effective effective
small small
such such
"lumpy" "lumpy"
the the
my my
capacity capacity
DEF's DEF's
as as
should should
proposal proposal
the the
increments), increments),
opinion, opinion,
summarize summarize
which which
the the
obligation. obligation.
the the
(i.e., (i.e.,
set set
entire entire
upgrades, upgrades,
plan plan
by by
of of
greatest greatest
own own
amount amount
of of
from from
DEF DEF
would would
combining combining
the the
Transmission Transmission
such such
results. results.
the the
and and
upgrades, upgrades,
group group
most most
proposals proposals
each each
most most
have have
the the
a a
benefit benefit
would would
In In
upgrades upgrades
of of
th
result result
proposal proposal
economic economic
e e
this this
of of
power power
main main
facility facility
next next
appropriate appropriate
conducted conducted
the the
proposals proposals
but but
then then
in in
the the manner,
in in
it it
expansion expansion
most most
increment increment
the the
conclusions conclusions
can can
received received
this this
that that
when when
considered considered
offered offered
be be
self-build self-build
net net
only only
instance instance
can can
economic economic
coupled coupled
no no
grouped grouped
the the
way way
capacity capacity
be be
be be
20 20
would would
longer longer
costs costs
optimum optimum
would would
of of
transmission transmission
carried carried
for for
added added
by by
of of
upgrade upgrade
option option
as as
with with
associated associated
offers offers
together together
your your
DEF DEF
itself itself
well, well,
increase increase
have have
economic. economic.
b
e e
a a
in in
over over
generation generation
included included
or or
corresponding corresponding
to to
testimony. testimony.
may may
large, large,
may may
been been
received received
since since
options. options.
conduct conduct
with with
a a
needed needed
evaluation? evaluation?
with with
require require 230 230
be be
to to
the the
discrete discrete
in in
other other
much much
evaluate evaluate
kV kV
expansion expansion
in in
the the
truly truly
the the
the the
DEF's DEF's
to to
response response
a a
circuit circuit
delivery delivery
proposals proposals
meet meet
total total
optimum optimum
reasonable reasonable
more more
transmission transmission
blocks blocks
lowest lowest
each each
customers customers
evaluated evaluated
DEF's DEF's
rather rather
plan plan
expensive expensive
to to
of of
of of
cost cost
offer offer
self-build self-build
also also
the the
capacity, capacity,
energy energy
is is
or or
load load
than than
RFP RFP
cost cost
price price
and and in in
14 14
15 15
13 13
12 12
11 11
10 10
9 9
8 8
7 7
5 5
6 6
4 4
3 3
2 2
1 1
A. A.
Q. Q.
A. A.
Yes, Yes,
Does Does
addition addition
purchase purchase
ancillary ancillary
if if
Suwannee Suwannee
to to
connection connection
construction construction
begin begin
starting starting
Hines Hines
Calpine's Calpine's
so so
be be
it it
desired desired
this this
fully fully
delivering delivering
does. does.
Chillers Chillers
in in
to to
transmission transmission
with with
conclude conclude
Osprey Osprey
CTs CTs
2015. 2015.
integrated integrated
the the
transmission transmission
by by
can can
a a
DEF DEF
proposed proposed
and and
DEF. DEF.
direct direct
be be
energy energy
Operating Operating
Facility Facility
the the
your your
utilized utilized
system. system.
into into
transmission transmission
system system
DEF DEF
Hines Hines
and and
facilities facilities
by by
testimony? testimony?
the the
is is
did did
DEF. DEF.
to to
procedures, procedures,
well well
capacity capacity
DEF DEF
benefits benefits
Chillers Chillers
mitigate mitigate
not not
positioned positioned
are are
From From
transmission transmission
evaluate evaluate
connection. connection.
to to
constructed constructed
21 21
through through
resulting resulting
any any
DEF DEF
redispatch redispatch
a a
transmission transmission
transmission transmission
the the
to to
through through
a a
replace replace
in in
ability ability
system system
The The
5-year 5-year
to to
a a
solutions solutions
reliable reliable
allow allow
direct direct
firm firm
the the
of of
PP PP
perspective, perspective,
by by
constraints constraints
Osprey Osprey
A A
Suwannee Suwannee
the the
PTP PTP
January January
connection connection
and and
followed followed
and/or and/or
full full
transmission transmission
cost cost
to to
capacity capacity
1, 1,
minor minor
replace replace
Osprey Osprey
until until
effective effective
CTs CTs
2020 2020
by by
provides provides
an an
new new
and and
69 69
of of
or or
the the
can can
asset asset
service service
kV kV
Osprey Osprey
earlier earlier
the the direct direct
Reliant Reliant
Direct Direct
DIRECTOR, DIRECTOR,
Generation Generation
RELIANT RELIANT
Provide Provide
generator generator
opportunities opportunities
CONSULTANT CONSULTANT
RRI RRI
Provide Provide
MANAGER, MANAGER,
commercial commercial
RRI RRI
FERC FERC
on on
Provide Provide
JOHN JOHN
CONSULTANT CONSULTANT
company's company's
an an
process process
Agreement Agreement
Secured Secured
Negotiated Negotiated
Issues Issues
Has Has
transmission transmission
highest highest value
Directed Directed
through through
Improved Improved
transmission transmission
individual individual
by by
ENERGY, ENERGY,
appeared appeared
the the
regulatory regulatory
Energy Energy
related related L. L.
representing representing
consulting consulting
transmission transmission
leading leading
transmission transmission
approval approval
new new
power power
the the
SIMPSON SIMPSON
ENERGY, ENERGY,
Transmission Transmission
transmission transmission
Development. Development.
expert expert
opportunities opportunities
the the
with with
to to
generator generator
utility, utility, transfer transfer
development development
TRANSMISSION TRANSMISSION
TRANSMISSION TRANSMISSION
as as
to to
interconnection interconnection
Power Power
Standard Standard
optimize optimize
INC./GENON INC./GENON
access access
sales sales to to
an an
open open
Transmission Transmission
and and
of of
on on
services services
FERC FERC
expert expert
RRI RRI
the the
i.e., i.e.,
TRANSMISSION TRANSMISSION
Generation. Generation.
consulting consulting
projects. projects.
federal federal
NERC NERC
capabilities, capabilities,
INC. INC.
technical technical
access access
and and
interconnection interconnection
access access
first first
on on
the the
Analysis Analysis
transmission transmission
Large Large
and and
Order Order
Provide Provide
witness, witness,
to to
congestion congestion
of of
NERC NERC
addition addition
significant significant
regulatory regulatory
compliance compliance
Reliant Reliant
transmission, transmission,
improve improve
a a
arrangements. arrangements.
capability capability
ENERGY, ENERGY,
40318 40318
Providers Providers
Represent Represent
Generator Generator
power power
2003. 2003.
services services
expertise expertise
Direct Direct ANALYSIS ANALYSIS
POLICY POLICY
and and
overall overall
Department Department
and and
provided provided
PROFESSIONAL PROFESSIONAL
TRANSMISSION TRANSMISSION
Email: Email:
Energy Energy
ofNetwork ofNetwork
plant plant
services services
Colfax Colfax
impacts impacts
issues. issues.
Regional Regional
system system
requests. requests.
modification modification
issues issues
CONSULTING CONSULTING
for for
the the
to independent to independent
matters. matters.
and and
Reliant Reliant
transmission transmission
JOHN JOHN
Interconnection Interconnection
INC. INC.
and and
Cell Cell
eminent eminent
efficiency. efficiency.
generating generating
preparation preparation
on on
expert expert
[email protected] [email protected]
other other
related related
Provide Provide
model model
Road, Road,
to to
on on
generator generator
activities activities
support support
(281) (281)
Reliability Reliability
Contract Contract
Provided Provided
benefit benefit
Energy Energy
nodal nodal
L. L.
testimony, testimony,
Independent Independent
domain, domain,
to to
for for
to to
Magnolia, Magnolia,
SIMPSON SIMPSON
plants plants
the the
transmission transmission
954-1853 954-1853
Proactively Proactively
EXPERIENCE EXPERIENCE
CONSULTANT CONSULTANT
strategy strategy
of of
prices. prices.
power power
open open
to to
interconnection, interconnection,
the the
forecasting forecasting
on on
in in
Demand Demand
FERC FERC
transmission transmission
forecasts forecasts
Procedures Procedures
Organization Organization
Commercial Commercial
and and
NERC NERC
RRI RRI
by by
support support
access access
and and
producers producers
upgrading upgrading
to to
pro pro
Generators Generators
generator generator
generation generation
TX TX
served served
influence influence
maximize maximize
Transmission Transmission
of of
and and
and and
forma forma
transmission. transmission.
transmission transmission
of of
and and transmission transmission
77354 77354
expertise expertise
RRO RRO
generation generation
Trading, Trading,
transmission transmission
committees. committees.
as as
and and
and and
transmission transmission
open open
Large Large
reactive reactive
a a
transmission transmission
as as
fleet. fleet.
November November
value value
speaker speaker
exempt exempt
committees committees
Plant Plant
part part
Docket Docket
Resume Resume
JS-1, JS-1,
access access
to to
Service. Service.
Generator Generator
June June
Power Power
congestion, congestion,
May May
of of
determine determine
power power
related related
congestion congestion
ofFERC's ofFERC's
Operations Operations
April April
on on service, service,
Page Page
generation generation
wholesale wholesale
Identify Identify
transmission transmission
interconnection interconnection
2008 2008
2007 2007
No. No.
1999 1999
Federal Federal
policy policy
of of
Recognized Recognized
Origination, Origination,
tariffs. tariffs.
and and
2011 2011
expertise expertise
Interconnection Interconnection
1 1
John John
to to
140110-EI 140110-EI
and and
to to
and and
to to
of2 of2
and and
task task
and and
reductions reductions
favorable favorable rule rule
April April
June June
May May
to to
Regulatory Regulatory
generators generators
to to
assets assets
implement implement
merchant merchant
L. L.
evaluate evaluate
changes changes
Present Present
forces. forces.
tariff tariff
making making
enable enable
on on
Simpson, Simpson,
2008 2008
2007 2007
2011 2011
as as
rights rights
and and
for for
the the
for for
to to
in in P.E. P.E.
Executive Executive
Registered Registered
Member: Member:
Bachelor Bachelor
V V
SUPERVISOR, SUPERVISOR,
SUPERVISOR, SUPERVISOR,
SUPERVISOR, SUPERVISOR,
Various Various
PUBLIC PUBLIC
MANAGER, MANAGER,
SUPERVISOR, SUPERVISOR,
transmission transmission
Managed Managed procurement, procurement,
MANAGER, MANAGER,
million million
development development
electrical electrical
economic economic DIRECTOR, DIRECTOR,
additions additions
Direct Direct
Various Various
FLORIDA FLORIDA
filings filings
technical technical
new new
of of
in in
RELIANT RELIANT
(281) (281)
JOHN JOHN
ARlO ARlO
transmission transmission
the the
generation. generation.
transmission transmission
954-1853 954-1853
at at
US US
positions positions
annually. annually.
the the
positions positions
of of
L. L.
SERVICE SERVICE
the the
needs needs
Education
FERC FERC
support support
on on
Professional Professional
plan plan
ENGINEERING ENGINEERING
Science Science
POWER POWER
ENERGY, ENERGY,
SIMPSON SIMPSON
lines lines
overall overall
of of
planning planning
the the
RELAY RELAY
and and
TRANSMISSION TRANSMISSION
SYSTEM SYSTEM
of of
transfer transfer
that that
transmission transmission
and and
PLANT PLANT
SUBSTATION SUBSTATION
SYSTEM SYSTEM
TRANSMISSION TRANSMISSION
Negotiate Negotiate
of of Florida Florida
to to
from from
of of
wholesale wholesale
Responsible Responsible
construction construction
system system
Degree Degree
COMPANY COMPANY
Trading Trading
increasing increasing
project project
-
provides provides
direct direct
increasing increasing
CORPORATION CORPORATION
Engineer Engineer
continued continued
69 69
DESIGN DESIGN
The The
Strategic Strategic
Eta Eta
capabilities capabilities Sigma Sigma
activities activities
Power Power
PLANNING PLANNING
ELECTRICAL ELECTRICAL
kV kV
to to
the the
-
Kappa Kappa
PROTECTION PROTECTION
activities activities
Generator Generator
Wharton Wharton
for for
and and
Electrical Electrical
policy policy
support support
to to
POSITIONS POSITIONS
for for
preparation preparation
Tau-
responsibility responsibility
PROFESSIONAL PROFESSIONAL
for for
responsibility responsibility
Transmission Transmission
specifications specifications
500 500
-
retail retail customers
Corporation Corporation
Thinking Thinking
OF OF
ENGINEERING ENGINEERING
transmission, transmission,
DESIGN DESIGN
States States
Nu Nu
for for
Tau Tau
the the
in in
and and
AND AND
kV. kV.
for for
COLORADO COLORADO
new new
School-
ERCOT ERCOT
-
Interconnection Interconnection
Engineering Engineering
administration administration
Beta Beta
Electrical Electrical
the the
strategies strategies
all all
of of
Testified Testified
generation generation
SUBSTATION SUBSTATION
and and
and and
ENGINEERING ENGINEERING
Colorado Colorado
engineering, engineering,
transmission, transmission,
EDUCATION EDUCATION
Pi Pi
ENGINEERING ENGINEERING
in in
Service Service
in in
(FPC) (FPC)
University University
and and
filing filing
Management Management
for for
electric electric
-
substation, substation,
electric electric
of of
Engineering Engineering
to to
Engineering Engineering
as as
PJM. PJM.
new new
FPC. FPC.
EXPERIENCE EXPERIENCE
-
achieve achieve
development development
of of
system. system.
Requests Requests
and and
University University
FPC's FPC's
of of
Agreements Agreements
utility utility
Interventions Interventions
design, design,
utility utility
transmission transmission
Direct Direct
Capital Capital
Florida Florida
of of
FPC FPC
STANDARDS STANDARDS
and and
substation, substation,
Pennsylvania-
expert expert
the the
Honor Honor
engineering engineering
Includes Includes
and and
engineering engineering
Honor Honor
' '
permitting, permitting,
transmission transmission
s s
of of
desired desired
distribution distribution
Budget Budget
and and
open open
Agreements. Agreements.
witness witness
Colorado Colorado
with with
Society Society
and and
Society Society
power power
lines lines
the the
access access
results. results.
developed developed
and and
February February
Transmission Transmission
Protests Protests
August August
and and
right-of-way right-of-way
in in
management management
November November
March March
1997 1997
formulation formulation
and and
sales sales
studies studies
-
facility facility
February February
eminent eminent
major major
1972 1972
supervision supervision
Docket Docket
Resume Resume
JS-1, JS-1,
transmission transmission
Monitor Monitor
June June
[email protected] [email protected]
modifications modifications
in in
from from
1987 1987
1995 1995
1985 1985
and and
to to
appropriate appropriate
additions additions
1972 1972
Page Page
domain domain
1985 1985
distribution distribution
assess assess
1988 1988
acquisition, acquisition,
No. No.
existing existing
administered administered
Providers. Providers.
to to
transmission transmission
to to
of of
of of
to to
as as
November November
to to
November November
including: including:
November November
2 2
follows: follows:
John John
a a
to to
to to
140110-EI 140110-EI
PAGE PAGE
the the
tariff tariff
January January
of2 of2
technical technical
proceedings. proceedings.
August August
March March
to to
and and
to to
capabilities capabilities
dockets. dockets.
L. L.
meet meet
existing existing
material material
and and
planned planned
Provide Provide
facility facility
Simpson, Simpson,
related related
TWO TWO
is is
1985 1985
1988 1988
1987 1987
1995 1995
1999 1999
1999 1999
$50 $50
and and
the the
the the P.E. P.E. DocketNo. 140110-EI Excerpts-FPL TYSP-Turkey Point Synchronous Condenser Operation JS-2, Page 1 of 7
I=PL
Ten Year Power Plant Site Plan
2013-2022
Submitted To:
Florida Public Service Commission
Miami, Florida Apri/2013
0 I 5 7 9 APR-I !!
FPSC-Cot1~·1!SSIONCLERK IV.
Florida Ill.
11.
I.
List OVerview Executive
List
List
of of
of
Power
Abbreviations
Schedules Figures
Environmental
Projection
Forecast
Description
of
Summary
A.
G. E. C. D. F. E. A. F. B. B. D. G. C. A.
H.
E. C. A. F. B. C. D.
B.
D.
&
the
light
Transmission Environmental Preferred Renewable FPL'• FPl's Environmental Envlronmenta.l Demand FPl's Protection Projected Discussion FPL's
Hourly Uncertainty' System DSM Long- OVerview Nat Comparison
Non-Finn and
FPl..Qwned Finn
Demand
Document
of
......
of
Company
Energy
Electric
Tables
of
Capacity
··························································~··························································
Tenn
Incremental
......
Fuel
Resource
Resource-
Environmenta.l
......
Load
Existing
3. 2.
4. 1.
and
Peak
Side
Side
and
of (As
Incremental
of
Mix ......
Preferred Preferred
Preferred Preferred
Resources
Sales
for
of
land
......
...... •...... •......
Resources
the
Power
of Forecast
the
Forecasts
Management
Available) Management
Potential Plan
the
Power
Communication
Management Assurance
Load
and
FPL's
Resources
load
Planning
Planning
Table
Environment
Use
Forecasts
Projected
Resource
......
Demand
Price
......
Site# Site Site
Site#
Sta.tement
Purchases
-
Current
lnfonnation Forecasting
......
Resource
......
......
Sites
......
of
......
Energy
Forecasts
# #
Work
......
Program
Contents
(DSM)
2
- 4
3 -
(DSM) 1
......
Resource
Additions
......
......
......
• •
......
and
Turkey
Cape
Riviera Port
......
......
and
Purchases
......
Additions/Changes
......
......
......
......
Previous
Process
......
Everglades
......
Facilitation
Canaveral
Plan
Point
Beach
......
Docket
Excerpts-FPL
Synchronous
JS-2,
......
and
......
load
Plant
Plant
Plant
Plant
Issues
..
Page
_
Forecasts
......
No.
......
......
......
......
......
2
Impacting 140110-EI
of
Condenser
TYSP-Turkey
7
......
Operation
-
......
151 128 129
146 141 127 123 128
125 128 127
Point
83 89
75
82 70 41
51 49 59 40 32 40 36 38 29 31 26 33
22
26
15
13
lv
Ill
3
5
1 Florida
V.
Power
Dlscusalon Discussion
Discussion
Discussion
Discussion
Discussion
Discussion
Discussion
Discussion
Discussion
Other
Discussion
lnhduction
Discussion
&
Light
Planning
Company
ltltm
Item
Item
tt.n Item
Item
Item Item
Item
Item
Item
Item
......
9.
10.
11. 12.
6. 5. 7. 8.
Assumptions
#12
#1
#11 '1#7 ft
#8
#4
#6 #5
#2
#3
#1
0
Potential
Potential Potential Potential
Preferred Preferred Potential
Preferred
......
......
......
......
......
......
......
......
......
...... •......
Site#
Site# Site#
Site#
Site#
Site Site# Site#
and
#
ii
lnfonnation
5- •
- 3 -DeSoto - 2
1 -
6-
7-
5
-Martin
-
Putnam
Manatee
Babcock
NE Palatka
Hendry
Okeechobee
County
Solar
County
......
County
Site
Plant
Ranch
_
......
......
Expansion
......
Slte
Docket
JS-2,
Excerpts-FPL
Synchronous
......
......
......
County
......
Page
No.
......
......
3
140110-EI
of
Condenser
TYSP-
7
Turkey
236
237
238 234
236
235
23•
233
233
232
232
231
231 Operation
229
171
168 169 170
156 159 163 168
Point Florida
<41
5I
21
31
11
The
exillting Turkey
Capabilities Commlaslon Total
The
~ and
Represents
Space
Comby!d!pn
Fort !i!!
DeSoto
Fort
Port Lauderdale Turkey Q.ll~llll!!m
Martin Turkey
Weal
Sanford
Manatee Port
Martin Combined-CYcle
Putnam
CoaiSt!!m
Fort St. Manatee Nuclear Lauderdale
St.
Turkey Scherer
Units
Power
Table
the
John's
25
Lucie"
Combined
Myers
Myers
capability
Everglades
Turbl!!.tJ(!i!l
Everglades
Myers
1
County
Point
MW
c:apaclty
Coast
rille
and
Poinl-41
Point
Point
5I
FPL'a
of
sMMII
River
218
V
2
(OUC)
(GT)
(GT)
&
PV I.A.1:
is
operating
Cycles
"
Turt!inaa
orst
from
100%
currenUy
Light
Unit
at
ownaship
Power
rap11111ent
(GT)
and
11
DeSoto
Lucie
these
lind
tnl85%,
Tll!!!
Florida
Capacity
permllhrough
Company
operating
11 Park
Combustion Total
1
units
Total
and
share:
FPL's ia
Total
System
Plant
98111,003
Municipal
'll
the respectively
has
Total
Combustion
Gas
Olllplt
as
SJRPP
Syatem
Total
10
Name
been
a
Twbines
MW
the
Firm
TurlllneaiD!Hela:
Total
Combined
synchronous
Resource
P0111111r
MW.
ahare
removed
011/Gas
end
coal:
or
Total
.
Generation Generation
Coal
PV
FPL'ashareofst.
of
from
Agency
are
Turtllnaa:
20%
ToteiPV:
2013
at
NuciMr:
from
broken
S18am:
Ste1111:
each
Cycle:
Spaee
condenser.
or
and
(FMPA)
two
the
or
by
down n •
is
Coast
"System
unill).
the
not
of of
17
DeSoto,
Brevard
Fort
Port
Florida Port
Fort Dania,
Palm
Parrish,
lndiantown,FL Indiantown,
Jac:ksonville, Dania, Lake Palalka,
Monroe
Fort Florida Parrish,
Florida
Hutchinson
Unit
combined
unlls
Lucie2118431862.
by
If
accounted
December December
are
~ad.
components
Myers,
Myers,
Everglades,
Myers,
Everglades,
Firm
Monroe,
Beach
(approx.
considered
FL
FL
County,
City,
City,
City,
Location Type
County,
FL
FL
FL
FL
portion
~ration"
can
for
FL
FL
FL
Island,
FL
FL
FL
County,
FL
92.5'11.
FL
31, 31,
FL
In
FL
be
on
es
of
Ga
(as
Reserve
FL
FL
2012 2012
convertad
Table
FPL's
appraxlrnately
non-firm
FL
and
FL
row
of
"' •
$11dudlo
1A2.
ownership
Margin
at
December
back
generating
the
JS-2,
Docket Excerpts-FPL
Synchronous
S!!.Y!!!!!
Number
and
the
..
82 80
24
Calculation.
15
12
12
to
7.44778% 2 2
2 1
8
2 2 1
2 2 3
2 3 2 2
4
2
3 1
1
1
2 2
1
a
share
of
Ollllndo Utilities
generating
Page
the
capacity
No.
ofSt
tabla.
Solar
Solar
par
Ga8/0il
Oil/Gas Oil/Gas
011/Ga&
Gas/Oil
Gas/011 Gas/Oil
Oil/Gas
Gas/Oil Gas/OU
Nuclear Nuclear Gas/Oil
31,
4
Coal Coal
lucie Fuel
Gas
Gas Gas
unit.
Gas
Oil
unit
140110-EI
Energy
Energy
of7
Condenser
TYSP-
per
2012)
the
Summer
24,065 24,030
12,755
1,908
3,657
4,822
1,621
2,079
1,652
1,111 3,333 1,946
1,148
1,432
1,832 1,501
318 420 316
781
840
848
498
788
!!!!
884
642 896
254
36 25
10
Turkey
Operation
Point Florida
111.8
Step
4:
Power
entering
through Canaveral,
2022
of power achieved
FPL's The
current
chapter
with
that
resource
Broward.
resource system, than generating
value
discussed
Other
and
plans.
purchase
assumed rankings
and
being
Impact
Projected
Finalizing
actions
on
an
&
results
resource
include
in
are
revenue
Light
to
factors projected
While
being
resource
terms
system
eye
in
Measure
other
system
Into
depicted
of
plans
option
minimize
In
as
options,
as
section
in
that
capacity,
Company
Riviera
to
the
conducting
of
FPL's
quantitative,
these
a
(but
new
a
Incremental
delivered
of
whether
are
uprates
plans
requirement
the
revenue
given
primarily
are
result
resource
dollars.
emission
or
plan.
incremental
or
III.C
in
are
comparisons
purchase
also
previous
FPL's
resource
factors
best
Beach,
Current
Table
RIM particularly in
in
and
.
This
of
the to
not
the
such
under
included
requirements
These
for
consist
options
but
existing
methodology).
plant
projected
the
levels,
system
111.8.1.
may
limited
(CPVRR)
evaluations
plan
FPL's
and
three
contracts,
plan
Resource
non-economic,
cases
Resource
generation
only
existing
factors
component
of
have
is
of:
Port
in
.
and
being
These
concern
capacity),
system,
competing
presented
the
fundamental
These,
to)
competing
FPL's
levelized can
(i)
basis.
will
an
maintaining
are
Southeastern
Everglades
59
maintaining/enhancing
needed
contracts
changes
(iii)
evaluated.
capacity
be
economic
yield
Plan
capacity
Additions/Changes
In
often
evaluation
and
is
the
the
replacements
evaluated
terms
(ii)
cases
in
positively
resource
system
options
identical
non-economic
other,
the
to
modernizations
steps
referred
changes
to
additions/changes
as
determine
a
such
Consequently,
additions/changes sites
following
component
existing
in
regional
Florida
per
of
factors
average
are
were
which
or
plans'
on
outcomes
JS-2,
Excerpts-FPL
Synchronous
DocketNo.
as
to
resource
by
negatively
the
in
typically
a
during
by
percentages,
counties
new
section.
units
the
which
the
system
balance
the
are
impacts
evaluations
Page
contract
FPL
fuel
electric
or
of
amounts
removal
generating
in
discussed
DSM
the
impact,
(which major
options
as
FPL's
resource
diversity
used
regard
5
impacted
result
of
cumulative
140110-EI
•system
competing
of
between
on
for
Condenser
schedules
rate
Miami-Dade TYSP-
contribution
tons,
7
to
overhauls
electricity
are
existing
are
of 2013
they
from
of
and
to
develop
(i.e.,
units
options
in
later
the
the
purchased
conducted
by
frequently etc.
concerns•
are
load
a
Turkey
resource the
through
present
a
options
relative
variety
a
steam
in
and/or
or
Cape
rather
given
often
Operation
rates
Rate
FPL
and
and and and
was
this
the
by
Point Florida
(8)
(4)
(3)
(6) (5) (7)
(2)Winlervalues
-
(1)
------
-
-~------
·2ofs·
"2026"-
_2_9_1~--
2019
2017
2016
2014
This All
2013
These
Outages
OUtages
Sum,., Year
Acldlllonallnforma11an
This
in
the
n-
unit
unit
Summer
Power
.,.
.1\dl!l!i!'.IJ!!~J);;~p-:
unit
Turkey
Vero
~t~~~~E~~ Changes
Ft.
9!1!1!.l~!~~~li_l'l9..!..1!.rptl~~~- Changes
Turkey Turkey ~9!:1.1;~~-~~-~9!1-~-~-~-~!
Changes Martin ~'!'! Turkey
Martin Martin ~-~~~~9~~l~-~------Ft ~~Com~~oo
Martin ~~~;~~~=1! Manatee
Cape
Manatee Cape Sanford Changes
sanford
Manatee Sanford Turkey Turkey Scherer
for for
~~~2 Changes
will Sanford Turkey
Part
WilliS
Ia
------
finn
eJII)8CI8d
addltione
ESP
Myens
uprate MyeJB
be
~.l'!'JI!!C1~
INI
EYI!Iglades
Beach
capacity
C&ntNeral
CaniMII'III
NIIIIIVI
lldclecl
aNI
Unit Unit &
Unit Unit
Point
Point
Point
Point
Point Point
Point
wortt.
fotwc:~sted
Unit
Unit
Unit
unit
Unit
Unit
worll. Unit
Unit
to
to
to
Light
Unit
to
to
Uni12
becasted
to
2
2
1
1
are
Existing
Combined
Elcisting
Existing
Existing
Ellisting
about
es
Table
Unit
Unit
Unit Unit 4
4
4 5
Unit Unit
Unit
5
ESP ESP
mervin
ESP ESP
be
and
3
1
1
2
---
CT
CT
CT
CT
scheduled
pert
CT
ESP
ESP
~9J!!l.IIJ!!!q!!f!f!l!l!.!"!!!.!&l.9~
CT
CT
n~drad
Company
Next
Next
& 4 Units
energy
4
5
5
1
4 4
2
these
·
Vlllues
•
-Outage ·Outage
-Outage
Upgrade
Upgrade
Upgrade
-- Upgl&de
Upgrade
of
ope!8lion
CT
CT
Uprate
Uprale Uprate cperatlon
Outage
Upgrade
Upgrade
9.!J!l!u!
~~
valua
calculation
Purchases
-
-
Purchases
Purdlases
--- Purchases
PU!dlases
111e
Generation
Generation
OUtage 3
Outage
within
Cycle
Upgrade
Upgrade
NIIUIIing
111.8.1:
contrac111
for
·
agreement
to
-
far
F-_i4C_-.=-_-_-:_-_-_-_-_-:_-_-_-_-:_-_-_-_-_-_-_-_-_
----
be
-Completed
-Completed -OUtage
Januaryotlhe
.
(7)
(7)
(7)
retired
t7l
3
':l
(II
changed
August
changed
in1enlice
years.
•••.•.
lllllting
(7)
(7)
9
rwserw
141
141
!1!1!1!~J:I!!Nt~~-~------
t•l
""
t•J
with
Clean
Clean
1
-
·
for
that
-··
---
of111a
ProJected
Projected
-
QF,
in
ISl
:.:.----
------
-
Modernization
to
to
ma~gins
FPL
In
Energy
Energy
that
---
151
yeariiiXlWn
synchronous
utilities,
June
synchronous
!188r
will
---
year
------
shDWn
of
and
aerw
Canter
f:aNf:lfJt Cenler
---
and
and
the
capacity
·
.
-
year
In
.
Vero
other
------
1118
oondenser
(IJ
(II
-~~ condenser
Capacity
61
shown
Beach'&
ChaiiQU
entitlea
Winter
______
------
change•
.
All
.
reseM
elacllic
S•
-
additione
.,.
-
for
-
------
Table
found
FPL
margin
----.
-_-_-_-_-_
-----
Changes
lOad
eseumecl
1.8.1
on
&larling
fiJ
_
calculation
Schedulea
.
---
-_-_-_~-_-_-_-_1
------
------
______
------~------
______
and
------::------
••••
January,
Table
to
JS-2,
Synchronous
Excerpts-FPL
Docket
alllrt
JJ~-
1.~~
Blllrting
(858)
(398) 1,355
t3..8..8J_- (832)
(717)
(822)
for
7
(545)
(76S) (394)
832
(37) (48)
115
(28)
822
51
Ul.2
70
22
::
33
~---
~
~
19
16
-
-
& -
- - -
- -
-
-
In
=---
2014
8
______
June
Page
for
rupecliwly.
·
-=---~~=-=---~~=:
------::
---
FPL
--
with
.
------
No.
men
an1 ---
·
------(!!,?§)----
the
Included
-
7
------:.._------
deta~s.
--
nell!:
140110-EI
of
-
Condenser
------
year.
TYSP-
7
.!~1)_-
'!_~.'[!
1
1,210
(396) (928)
(826)
826
826
(426)
(761) (392)
(37)
(~)
115
~6.?
~
70
51
19
33
37
10
16
-
-
~ - -
- 9
-
-
- -
-
-
-
-----
..•
_____
_____
Turkey
----
---
-
--
-
_ _
Operation
Point