APPENDIX 1 – Summary of Partnership Programme Grant Applications received 12/23/2015

Applicants Scheme(s) Flood risk Delivery Costs (£) ECC Risk Factor (L: Low; Notes Recommendations

source year funding M: Medium and H: requeste High) d (£) Fire and 1. 5 Water Surface 2015-16 37,000 30,000 L (funding secured,  Water Gate Barriers can  It is recommended that the Rescue Service Gate water (+1,350) minimal be deployed during Water Gate barriers should Barriers maintenance flooding episodes to be funded. Although Essex 2. Flood required and ECC minimize risk to Fire Service have revised the Alleviation contributions residents. quantity of barriers Equipment would be utilised in  Flood alleviation requested (now 20) and this 3. Flood Alert the current equipment will help in additional request also signs for financial year) delivering the current includes Pumps, Generators motorists county-wide programme and Lighting and of works (county-wide  The funding of the Flood Alert pedestrians maintenance exercises on signs for motorists cannot go deployable ditches and ordinary ahead until Essex Fire and in two watercourses with Rescue Service reach an locations reported flood incidents) accord with Essex Highways.  Application for flood  The funding of the Flood warning signs includes Alleviation Equipment for evidence of avoidable volunteer flood works cannot instances of EFRS be funded presently as this personnel rescuing equipment has been people who have driven classified as a revenue into flood waters purchase. Mersea Harbour Mersea Storm 2017-19 600,000 327,000 H (funding from  Mudflat recharge  This project cannot be Protection Trust Harbour surge tide other sources have material to be obtained funded at this time for the Protection not been secured, from Harwich Harbour following reasons; there is no Project Mersea Harbour Authority dredging clear funding plan for the (Recharging Trust’s contribution activities scheme, scheme start date is eroded marsh mainly in the form  Other risks include the not clearly defined and the lands and of in-kind volunteer need for planning nature of the flood risk is mudflats at contributions, permission, consents and tidal; responsibility for this Parking Marsh, project start date is licenses from the Marine falls beyond our remit as Cobmarsh, Old only provisional Management LLFA. Hall and and is highly Organisation, Natural Tollesbury dependent on HHA , EA, Local Wick) capital dredge Planning Authority, programme) Crown Estate, Admiralty and landowners  Besides residential properties, there are also various local commercial properties and activities at risk as well as over 700 Ha of international nature conservation area at risk in this location JW and FD Eagle Naze 2065 Tidal 2016-20 1,185,150 50,000 H (heavily  There are potential  This project cannot be Flood Flooding dependent on environmental benefits funded at this time for the Protection funding from  The project sponsors are following reasons; there is no (rebuilding a Anglian Water, actively seeking funding clear funding plan for the sea wall) there are no and partnership scheme, scheme start date is residential agreements from the EA, not clearly defined and the properties at risk, AW, Essex Wildlife Trust nature of the flood risk is an AW facility and and Natural England tidal; responsibility for this farmlands are at  Need for planning falls beyond our remit as risk and project permission from Natural LLFA. start date is England and the EA currently unknown)  Plans to submit a planning application for the works at the end of 2016  Construction is scheduled to be completed in 2020 Rayleigh Town Lower Wyburns Fluvial N/A N/A N/A H (No project start I spoke to the applicant  Funds cannot be provided for Council Wood Flooding dates, no funding and they have confirmed this project as not enough plans and no they are still seeking information was provided preferred options funding for an appraisal. I with the application; delivery were outlined in have recommended PLP to year is unknown, project the application) the applicant. costs and grant contribution are also unknown. APPENDIX 1 – Summary of Partnership Programme Grant Applications received 12/23/2015

Chelmsford City Surface 2015-16 140,000 70,000 M (preferred  Anglian Water funding  It is recommended that this Council Telford Place Water option currently secured project should be funded as Soak away being modified,  Remaining Funds to be the flooding problem is as a (building a new Anglian Water secured from residents result of surface water; the off-site soak making a 25% via a recharge from a location is in CDA (CHE8), away within the contribution but Building Act notice funding is secured from public open this is contingent  There is active Anglian Water and the space opposite on ECC making a engagement with the 17 residents and the scheme 29 Telford 50% contribution) property owners start date is within the Place, and  The location is in a CDA current financial year. pumping water (CHE8) from the existing soak away) Alphamstone Culvert Repair Fluvial 2015-16 570 570 M (evidence linking There are no other sources  The project cannot be and (Concreting the problem to of funding funded at this time as this is Parish Council sides and the property flooding is a problem to be resolved by bottom of the anecdotal) Essex Highways culvert, which is on the junction of Henry Road and Alphamstone Road, to try to keep it clear and in good working order)

Maldon District North Fluvial 2016-19 8,000,000 1,200,000 H (Main Earliest start date is June  This scheme cannot be Council Heybridge FAS and funding,S106 2016 and this is subject to funded for a number of (Attenuation Pluvial contribution from planning approval and reasons; the delivery date is and diverting developers, has not £400,000 is being sought not defined, funding has not overland been secured, MDC from ECC per year from been secured and more surface water are not making any 2015 to 2018 importantly, the proposed run-off financial scheme will attenuate and flowpaths and contribution to the divert surface water flows, in-channel scheme and EA but these surface water flows from funding has not flows and runoff will be three been secured) originating from a planned watercourses major development in North and re-routing Heybridge. Therefore it is the discharge appropriate for the to the tidal developers and the Local River Chelmer Planning Authority to come upstream of to an arrangement on how to Maldon and fund the North Heybridge Heybridge) FAS. Sturmer Flood Surface 2016-17 4,300 4,000 M (evidence linking  Application made to the  The culvert jetting component Action Group Water Lane Water problem to Parish Council for a of this project cannot be Culvert (Clear property flooding is minimum contribution of funded from the grant as this culvert through anecdotal) £500 is an issue for Highways. jetting and  Repeated requests to However the ditch reinstating reinstating a Highways to undertake this component can be funded. ditch to allow work culvert function  This scheme has been properly) included in the EFRS flood maintenance works Essex Highways 10 county-wide Surface 2016- N/A N/A H (incomplete  Working with Essex  These schemes cannot be SWAS schemes water 2020 information Highways to obtain data funded because there is not provided regarding relating to flood currently enough information number of houses frequency, flood duration, to establish whether these flooded and no internal flooding , flood problems are solely for information on problem and remedial Highways to resolve or if they delivery timeline) work are areas of overlap between Highways and Flood and Water Management Environment Coggeshall, Fluvial 2016-17 4,567,000(t N/A H (preferred option  This scheme cannot be Agency Kelvedon and and he highest has not been funded as the EA have not Feering Flood Surface cost from selected, Project prepared a final business Alleviation Water all options Appraisal not case for the scheme and Scheme Flooding being complete and there there is no preferred option. appraised) is no project timeline)