Te Kowhai Rd and Exelby Rd, Rotokauri DRAFT FOR CONSULTATION WITH COUNCIL REQUEST FOR SPECIAL HOUSING AREA STATUS PURSUANT TO THE HOUSING ACCORDS AND SPECIAL HOUSING AREAS ACT 2013 ‘Rotokauri North’ Special Housing Area (Stage 1) Green Seed Consultants Limited September 2017 Rotokauri North SHA Request, Green Seed Consultants Ltd 1.0 THE SHA REQUEST AND PROPERTY DETAILS APPLICANT Green Seed Consultants Limited SITE AREA Approximately 60ha – Stage 1 DISTRICT PLAN Hamilton City District Plan (partly operative) CURRENT ZONING Future Urban Table: Legal Descriptions Property Address Legal Description 350 Exelby Road Lot 6 DP S15123 372 Exelby Road Lot 5 DP S15123 383 Te Kowhai Road Lot 3 DP S15123 415 Te Kowhai Road Sec 23 SO 495676 365 Te Kowhai Road Lot 1 DP 314799 371 Te Kowhai Road Lot 2 DP 314799 353 Te Kowhai Road Lot 3 DP 314799 349 Te Kowhai Road Lot 1 DP S72047 341 Te Kowhai Road Lot 2 DP 334215 335 Te Kowhai Road Lot 3 DP 334215 321 Te Kowhai Road Lot 1 DP 485743 329 Te Kowhai Road Lot 2 DP 485743 Rotokauri North SHA Request, Green Seed Consultants Ltd Figure: Extent of Proposed Rotokauri North SHA (Stage 1) 2.0 OVERVIEW Green Seed Consultants Limited (GSCL) seeks that the above sites be identified as a Special Housing Area (SHA) to enable the land to be developed for housing and infrastructure through a private plan change and resource consent process. Investors associated with GSCL have secured approximately 60ha of land in the Rotokauri North area. We have been undertaking investigations associated with the feasibility of, and methods to service this area with infrastructure. This is to advance the development of this area ahead of the timeframes identified in the various Council strategic documents for Rotokauri. The 60 ha represents a first stage; investigations are currently underway to partner with adjoining landowners to extend the area. The area is identified as a development opportunity, as part of the urban growth area of Hamilton. The land exists in large enough parcels to allow investors to agglomerate this into an overall development area in order to facilitate developer-led provision of infrastructure. This is rather than waiting for Council to provide infrastructure trunk mains in the future. In this way the land can be serviced in advance of the Council programme, reducing costs to the Council and community, while providing for housing supply to be brought forward. A significant amount of work has been undertaken by Council through the Rotokauri Strucure Plan (RSP). The Rotokauri Integrated Catchment Management Plan (ICMP) has already Rotokauri North SHA Request, Green Seed Consultants Ltd identified and proven the viability and feasibility of the land to be urbanised as part of providing for residential growth in Hamilton. GSCL is a development entity associated with Ma Development Enterprises Ltd (MADE). MADE, along with its allied partners, investors and consultants have been involved in 25 qualifying developments (QDs) and 7 SHA-based private plan change requests in Auckland. As a consequence, the team have a depth of experience with the Housing Accords and Special Housing Areas Act (HASHAA), along with the provision of trunk infrastructure to new greenfield locations. MADE have been involved in the recent development of Sugartree apartments in Auckland (696 units) and the development of 400 lots and houses in Flat Bush, Auckland. MADE is also the lead company in the development of the ‘Auranga’ housing project involving 167 ha of land west of Drury in Auckland. Auranga was recently rezoned and consented as part of the Auckland SHAs. In Hamilton, our group of investors has been purchasing land in the northern corner of the RSP area (approx. 60 ha secured at present). The original intention was to seek a private plan change request under the Resource Management Act (RMA) when the opportunity arose. However, with the recent Hamilton Housing Accord we see an opportunity to identify the area as an SHA, and in collaboration/cooperation with Council to advance a private plan change and associated QDs. There are statutory precusors to this which need to be discussed in detail with Council. From our experiences of HASHAA and SHAs in Auckland, we are firm believers in the benefits of such an approach and have practical experience in its use and application. We consider HASHAA is effective where land can be agglomerated to allow infrastructure to be funded and developed to support housing supply. We are strong advocates for HASHAA’s focus on housing supply and affordable housing, with Auranga having a stated public commitment to deliver a range of housing opportunities and price points beyond the minimum statutory requirements. In Auranga, developing a strong and vibrant community is fundamental to the vision. It has the scale of a new neighbourhood with its own local centre and primary school (Auranga stages A and B comprise 2,650 houses). We have all seen the monoculture of suburbs with the same 4 and 5 bedroom houses and price points which make it difficult for many to own a home. In Auranga, we are delivering 25% of the housing product at a size of three bedrooms or less, and voluntarily providing a total of 15% of homes at the Auckland affordability standard. 3.0 ROTOKAURI STRUCTURE PLAN Rotokauri is an area of approximately 1,000 Ha on the north-west fringe of Hamilton, close to Hamilton Zoo and The Base. In 2007, it was identified for future urban development within Variation 18 to the then Operative District Plan. At the time the Council’s Growth Model indicated that it was necessary for additional land to be brought forward to meet the City’s ongoing development needs. A new Structure Plan was prepared by Council to guide the long-term development of the Rotokauri area. Approximately 350 Ha of this was rezoned as part of as Stage 1. The RSP identifies residential areas comprising approximately 485 Ha through the western half of the Rotokauri area. In addition to a general residential zone, the Structure Plan makes specific provision for character areas based upon Lake Waiwhakareke and the area's ridgelines, and higher density development related to the Suburban Centre located in the south of the RSP. The RSP provides a high level and logical framework to guide subsequent development of the SHA land. We consider this can be supplemented by a more detailed masterplanning process to determine the final development pattern. Rotokauri North SHA Request, Green Seed Consultants Ltd The land subject to this SHA request is in the north-western corner of the RSP area, to the south of Te Kowhai Road. The land is currently zoned Future Urban under the Partly Operative Hamilton City District Plan. The area of the requested SHA falls into a distinctive catchment, and the requester has sought to purchase land to enable stormwater to be managed (through securing the downstream sites) and for infrastructure and roading connections to be achieved (though securing sites with key road frontages). The land is currently in a mix of rural residential properties and medium to larger scale sites associated with pastoral and horticultural activities. The land has attributes, as recognised in the RSP, which make it ideal for residential development. 4.0 PROPOSAL GSCL proposes the establishment of an SHA within the northern corner of the RSP area. The land subject to the SHA request will accommodate approximately 800 to 1,000 dwellings. If the SHA is confirmed, GSCL would seek to undertake a private plan change1 and subsequent development of the land through QDs. GSCL will fund the required infrastructure and the plan change process in accordance with the Council’s SHA Policy. GSCL will enter into a private development agreement with Council to establish certainty as part of the obligations regarding SHAs, PPC and infrastructure funding. GSCL are experienced in this approach, as applied in its own Auranga development. The interest of GSCL is to undertake the subdivision of the land and development of the houses. We are likely to also partner with other house builders to increase the speed in delivery of houses. With regard to timeframes, GSCL would like to develop the land and construct dwellings as fast as possible. GSC would be looking at similar timeframes to those achieved for Auranga. The development of the Rotokauri land will be staged with the private plan change and QD being lodged within the first year after the SHA has been confirmed. Consent applications for housing will be lodged in 2020. The timeframes proposed are as follows: December 2017 SHA status confirmed June 2018 Private Plan Change and first QD consent application made pursuant to HASHAA legislation. November 2018 Council decisions Engineering approvals Lodgement of further QD applications November 2019 224c certificates issued June 2020 First houses constructed 2020 Consent applications for next stage (further dwellings) lodged 1 Subject to confirmation with Council of the means to achieve the statutory requirements of HASHAA to support a PPC request. Rotokauri North SHA Request, Green Seed Consultants Ltd 5.0 HAMILTON SPECIAL HOUSING AREAS POLICY The proposed SHA has been assessed against the evaluation standards/criteria of the Policy below: Demand for an SHA The purpose of the Hamilton Housing Accord is to bring land and development forward to increase the supply of housing in the City. It is a proactive approach to address not only housing supply but also to arrest increasing housing prices by increasing supply and the variety of housing on market. The supply of large volumes of housing is dependent on greenfield locations. While urban infill and brownfields development is part of the solution, these outcomes are dependent on developers acquiring existing housing and redeveloping these areas.
Recommended publications
  • Cultural Impact Assessment Report Te Awa Lakes Development
    Cultural Impact Assessment Report Te Awa Lakes Development 9 October 2017 Document Quality Assurance Bibliographic reference for citation: Boffa Miskell Limited 2017. Cultural Impact Assessment Report: Te Awa Lakes Development. Report prepared by Boffa Miskell Limited for Perry Group Limited. Prepared by: Norm Hill Kaiarataki - Te Hihiri / Strategic Advisor Boffa Miskell Limited Status: [Status] Revision / version: [1] Issue date: 9 October 2017 Use and Reliance This report has been prepared by Boffa Miskell Limited on the specific instructions of our Client. It is solely for our Client’s use for the purpose for which it is intended in accordance with the agreed scope of work. Boffa Miskell does not accept any liability or responsibility in relation to the use of this report contrary to the above, or to any person other than the Client. Any use or reliance by a third party is at that party's own risk. Where information has been supplied by the Client or obtained from other external sources, it has been assumed that it is accurate, without independent verification, unless otherwise indicated. No liability or responsibility is accepted by Boffa Miskell Limited for any errors or omissions to the extent that they arise from inaccurate information provided by the Client or any external source. Template revision: 20171010 0000 File ref: H17023_Te_Awa_Lakes_Cultural_Impact_.docx Protection of Sensitive Information The Tangata Whenua Working Group acknowledges and supports s42 of the Resource Management Act 1991, which effectively protects intellectual property and sensitive information. As a result, the Tangata Whenua Working Group may request that evidence provided at a subsequent hearing be held in confidence by the Council.
    [Show full text]
  • 2019 Asset Management Plan Update
    WEL Networks 2019 Asset Management Plan Update 0800 800 935 | wel.co.nz 02 2017 WEL Networks | Asset Management Plan ENABLING OUR OUR COMMUNITIES TO THRIVE WEL Networks | 2019 Asset Management Plan Update 1 CONTENTS 1 EXECUTIVE SUMMARY 2 2 OVERVIEW OF WEL NETWORK 4 3 ASSET MANAGEMENT PLAN UPDATE MATERIAL CHANGES 7 3.1 - Material Changes to the Network Development 8 3.2 - Material Changes to Lifecycle Asset Management 11 3.3 - Material Changes in Customer Initiated Works 14 3.4 - Material Changes in Report on Expenditure 15 3.4.1 Material Changes in Schedule 11a Capital Expenditure 15 3.4.2 Material Change in Schedule 11b Operational Expenditure 16 3.5 - Material Changes in Schedule 12 17 3.5.1 Schedule 12a – Asset Condition 17 3.5.2 Schedule 12b – Forecast Capacity 17 3.5.3 Schedule 12c - Forecast Network Demand 17 3.5.4 Schedule 12d - Forecast Interruptions and Duration 17 3.6 - Schedule 14a Mandatory Explanatory Notes on Forecast Information 17 3.6.1 Commentary on difference between nominal and constant price capital expenditure forecasts (Schedule 11a) 17 3.6.2 Commentary on difference between nominal and constant price operational expenditure forecasts (Schedule 11b) 17 3.7 - Material Changes to Asset Management Practice 18 3.7.1 Changes in Network Development Strategy 18 3.7.2 Changes in Asset Replacement and Renewal Strategy 19 3.7.3 Adaption of AMP Web Tool 19 3.7.4 Discussion with the Councils 19 4 INFORMATION DISCLOSURE SCHEDULES 11 TO 12 21 5 DIRECTORS’ CERTIFICATE 41 wel.co.nz 2 WEL Networks | 2019 Asset Management Plan Update 1 EXECUTIVE SUMMARY WEL Networks | 2019 Asset Management Plan Update 3 1 EXECUTIVE SUMMARY The 2019 Asset Management Plan (AMP) Update communicates to our stakeholders the material changes in asset management from the 2018 AMP.
    [Show full text]
  • Zone Extents Te Kowhai - Addendum
    SECTION 42A REPORT Report on submissions and further submissions on the Proposed Waikato District Plan Hearing 25: Zone Extents Te Kowhai - Addendum Report prepared by: Jonathan Clease Date: 21 April 2021 1 Supplementary Statement 1.1 Hounsell Holdings Ltd [832] 1. In my s42a report on zone extents in Te Kowhai, I assessed the submission by Hounsell Holdings Ltd who sought to rezone some 142 hectares of land in the Rotokauri area west of Hamilton from Rural Zone to Residential Zone1. The subject site has the address of 268 Te Kowhai Road and 284 Onion Road. 2. In my s42a report I stated that no evidence had been received in support of the submissions2. This was incorrect. A planning statement provided by Mr Craig Batchelor, along with a s32AA assessment, was inadvertently overlooked. The s32AA assessment also included a ‘desk-top’ review of transport matters provided by Ms Judith Makinson who is the Transport Engineering Manager at consulting firm CKL Ltd. 3. This addendum builds on the assessment of Rotokauri contained in my s42a report, and reflects a review of the submitter’s evidence. 4. For ease of reference, the submitters and further submitters on the Rotokauri area are set out in the table below: Submission Submitter Decision requested point 832.1 Hounsell Holdings Ltd Amend the zoning of the property at 268 Te Kowhai Road, Te Kowhai from Rural Zone to Residential Zone; AND Amend the Proposed District Plan to make any consequential amendments as necessary to address the matters raised in the submission. FS1277.55 Waikato Regional Council Oppose FS1108.201 Te Whakakitenga o Oppose Waikato Incorporated (Waikato-Tainui) FS1202.129 New Zealand Transport Oppose Agency FS1379.343 Hamilton City Council Oppose FS1387.1351 Mercury NZ Ltd for Oppose Mercury D 832.4 Hounsell Holdings Ltd Amend the zoning of the property at 284 Onion Road, Te Kowhai from Rural Zone to Residential Zone; AND Amend the Proposed District Plan to make any consequential amendments as necessary to address the matters raised in the submission.
    [Show full text]
  • Discussion Papers
    DISCUSSION PAPERS Population Studies Centre No 66 December 2007 End-user Informed Demographic Projections for Hamilton up to 2041 M. Cameron W. Cochrane J. Poot The University of Waikato Te Whare Wānanga ō Waikato HAMILTON NEW ZEALAND The Population Studies Centre (PSC) was established at the University of Waikato in 1982. POPULATIONS STUDIES CENTRE DISCUSSION PAPERS are intended as a forum for the publication of selected papers on research within the Centre, for the discussion and comment within the research community and among policy analysts prior to more formal refereeing and publication. Discussion Papers can be obtained in pdf form from the centre’s website at http://www.waikato.ac.nz/wfass/populationstudiescentre Any queries regarding this report should be addressed to Bill Cochrane, Research Fellow, Population Studies Centre University of Waikato, Private Bag 3105, Hamilton, e-mail [email protected] or Ph +64 7 838 4023 The views expressed in this report are those of the authors and do not reflect any official position on the part of the Centre. Disclaimer The projections discussed in this report are based on historical data and assumptions made by the authors. While the authors believe that the projections can provide plausible and indicative inputs into planning and policy formulation, the reported numbers can not be relied upon as providing precise forecasts of future population levels. The University of Waikato will not be held liable for any loss suffered through the use, directly or indirectly, of the information contained in this report. © Population Studies Centre The University of Waikato Private Bag 3105 Hamilton New Zealand www.waikato.ac.nz/wfass/populationstudiescentre [email protected] ISBN:-1-877149-69-1 End-user Informed Demographic Projections for Hamilton up to 2041 M.
    [Show full text]
  • Te-Kowhai---Community-Plan.Pdf
    2011-2021 TeCOMMUNITYCOMMUNITY Kowhai PLANPLAN 1 “To realise a lifestyle potential” Vision 2 Map of Te Kowhai area 3 History of the plan In 2004 the Te Kowhai Community Group Committee and the residents put together a community plan to provide direction for the area’s future development. The plan is monitored regularly and feeds into the Waikato District Council work programmes for Te Kowhai. Review of the plan The original Te Kowhai Community Plan was created following an extensive community consultation process. It was reviewed in October 2011. The review provided an opportunity for the community and the council to reflect on projects that have been achieved and to consider new issues and projects facing Te Kowhai now and in the future. Some of the key projects identified in the 2004 community plan that have been achieved include: Installation of flashing lights for use when school pupils are crossing the road Undergrounding power and telephone lines in the village Community hall extension and modernisation Native trees planted at the Bedford Road reserve area and gully Establishment of a cricket ground School bus pick-up for Ngaruawahia High School, Hamilton Fraser High School, St Peter’s School The first kilometre of the Te Otamanui Lagoon walkway completed. 4 Snapshot of Te Kowhai Close to Hamilton City, Te Kowhai is a small but close-knit peri-urban community north-west of Hamilton that attracts people wanting a rural lifestyle and vista. The area around the village formerly consisted of dairy and pastoral farms. Now it is dispersed with lifestyle blocks. The village itself includes a primary/intermediate school, small dairy/takeaway, mechanic’s shop and a fresh vegetable and fruit store.
    [Show full text]
  • Waikato Regional Active Spaces Plan SUMMARY Document – December 2020 1
    Waikato Regional Active Spaces Plan SUMMARY Document – December 2020 1 1 INFORMATION Document Reference 2021 Waikato Regional Active Spaces Plan Sport Waikato (Lead), Members of Waikato Local Authorities (including Mayors, Chief Executives and Technical Managers), Sport New Zealand, Waikato Regional Sports Organisations, Waikato Education Providers Contributing Parties Steering Group; Lance Vervoort, Garry Dyet, Gavin Ion and Don McLeod representing Local Authorities, Jamie Delich, Sport New Zealand, Matthew Cooper, Amy Marfell, Leanne Stewart and Rebecca Thorby, Sport Waikato. 2014 Plan: Craig Jones, Gordon Cessford, Visitor Solutions Contributing Authors 2018 Plan: Robyn Cockburn, Lumin 2021 Plan: Robyn Cockburn, Lumin Sign off Waikato Regional Active Spaces Plan Advisory Group Version Draft 2021 Document Date February 2021 Special Thanks: To stakeholders across Local Authorities, Education, Iwi, Regional and National Sports Organisations, Recreation and Funding partners who were actively involved in the review of the 2021 Waikato Regional Active Spaces Plan. To Sport Waikato, who have led the development of this 2021 plan and Robyn Cockburn, Lumin, who has provided expert guidance and insight, facilitating the development of this plan. Disclaimer: Information, data and general assumptions used in the compilation of this report have been obtained from sources believed to be reliable. The contributing parties, led by Sport Waikato, have used this information in good faith and make no warranties or representations, express or implied, concerning the accuracy or completeness of this information. Interested parties should perform their own investigations, analysis and projections on all issues prior to acting in any way with regard to this project. All proposed facility approaches made within this document are developed in consultation with the contributing parties.
    [Show full text]
  • Waikato District Council 13 May 2019 Hamilton to Auckland Corridor Plan Hei Awarua Ki Te Oranga
    Waikato District Council 13 May 2019 Hamilton to Auckland Corridor Plan Hei Awarua ki te Oranga 1. Drivers , objectives and deliverables 2. Partnership: The proposed ongoing growth management partnership 3. Plan: The summary of shared spatial intent 4. Programme: The proposed draft programme of transformative and enabling initiatives 5. Hamilton-Waikato Metropolitan Spatial Plan: Terms of Reference Note: The proposed partnership, the summary statement of shared spatial intent; the draft programme of transformative projects and the Hamilton-Waikato Metropolitan Spatial Plan Terms of Reference were presented to the Hamilton to Auckland Corridor Plan Leadership Group on 15 February 2019. Objectives and principles To better support growth and increase connectivity in a way that realises its social, economic, cultural and environmental potential by: 1. Improving housing affordability and choices 2. Enhancing the quality of the natural and built environments, creating vital communities 3. Improving access to employment, public services and amenities. 4. Creating employment opportunities. Underpinned by these principles: • Create a platform for the future that will change lives • Efficient use of existing infrastructure and future infrastructure funding, design and delivery • Protect high quality soils for growing food • Contribute to the restoration and protection of the Waikato and Waipā Rivers and indigenous biodiversity within the corridor • Anticipate the transition to a low-carbon future, build climate resilience, and avoid increasing the impacts and residual risks of natural hazards. 2 14/05/2019 Why focus on this corridor? It’s significant and unique: In terms of size, volume and value, this is New Zealand’s most significant water, road and rail corridor.
    [Show full text]
  • SECTION 42A REPORT Hearing 25: Zone Extents Te Kowhai
    SECTION 42A REPORT Report on submissions and further submissions on the Proposed Waikato District Plan Hearing 25: Zone Extents Te Kowhai Report prepared by: Jonathan Clease Date: 16 April 2021 2 TABLE OF CONTENTS 1 Introduction ........................................................................................................................................................ 4 2 Scope of Report ................................................................................................................................................. 5 3 Statutory framework ...................................................................................................................................... 13 4 Overview and area north of the village ...................................................................................................... 25 5 Te Kowhai Airfield and adjacent blocks ..................................................................................................... 44 6 Rotokauri (between Te Kowhai and Horotiu) ......................................................................................... 47 7 Section 32AA evaluation and Conclusion .................................................................................................. 50 Appendix 1: Table of submission points ............................................................................................................ 52 Appendix 2: Recommended amendments .........................................................................................................
    [Show full text]
  • Attachment 21
    Attachment 21 To: Hamilton City Council – Paula Rolfe From: Tollemache Consultants Limited (Renee Fraser-Smith & Mark Tollemache) Date April 2019 Subject: Rotokauri North: Notification Planning Assessment 1.0 Overview 1.1 Under clause 25(2)(a)(i) of Schedule 1 of the RMA, Plan Changes may be limited notified. 1.2 The test for notification is being able to identify all persons directly affected by the plan change. Following the guidance from Berry Simons, the following assessment of effects draws on the draft Assessment of Effects (dated April 2019 prepared by Tollemache Consultants) and includes headings which correspond to sections (6.1- 6.10 of that document) to summarise potential for effects and determining persons that would be considered an affected person: Alternatives / General Effects of Land use Change 1.3 The Council’s own structure planning and growth evaluation has identified Rotokauri as an area suitable for growth, as anticipated by the existing Future Urban Zone (“FIZ”) and inclusion in the RSP. The release of land under the RSP is premised on the basis that appropriate infrastructure be provided to service the development/portion of land to be release. 1.4 Effects on infrastructure are dealt with separately below, however, from a perspective of whether the land is suitable for urban development, as the Rotokauri area was already earmarked for growth the wider regional or Hamilton wide issues about its suitability to accommodate growth in the future instance is not applicable. Therefore, this is not an issue that requires full notification to the general public. 1.5 However, it is acknowledged that landowners falling within the Plan Change boundary (which are not affiliated to the applicant) are directly affected by the request for re-zoning.
    [Show full text]
  • Check List for Respondents
    Check list for Respondents Task 1. Complete all sections of the Response Form. 2. Delete all ‘supplier tip’ boxes from the Response Form. 3. Remove all yellow highlight from the Response Form. 4. Arrange for the declaration to be signed. 5. Prepare your Registration for electronic submission by creating a final soft copy file. 6. Arrange for the Registration to be submitted electronically before the Deadline for ROIs. 7. Submit your digital plan in the form of the attached Digital X (to be Enablement Plan template, or other existing plan. done by Sept.18) Page 1 of 140 Registration Response Form In response to the Registrations of Interest – Support Seeking information and commitments from local authorities in support of: • Ultra-Fast Broadband 2 • Rural Broadband Initiative 2 • Mobile Black Spot Fund Date of this Registration: June 30, 2015 Page 2 of 140 1. About the Respondent Our profile This is a Registration of interest by Waikato District Council (the Respondent) alone to supply the Requirements. Item Detail Local authority name: Waikato District Council Physical address: 15 Galileo St, Ngaruawahia 3720 Postal address: Private Bag 544, Ngaruawahia 3742 Website: www.waikatodistrict.govt.nz Our Point of Contact Item Detail Contact person: Clive Morgan Position: Economic Development Manager Phone number: 07 824 8633 Mobile number: +64272179221 Email address: [email protected] 2. Response to the Requirements Questions relating to the ROI Requirements 1. Programme(s) you are interested/able to support • Ultra-Fast Broadband 2 • Rural Broadband Initiative 2 • Mobile Black Spot Fund Overview of the Waikato District Waikato District is uniquely placed between the two large urban masses of Auckland and Hamilton.
    [Show full text]
  • SECTION 42A REPORT Hearing 25: Rezoning – Te Kowhai
    SECTION 42A REPORT Rebuttal Evidence Hearing 25: Rezoning – Te Kowhai Report prepared by: Jonathan Clease Date: 10/05/21 Proposed Waikato District Plan Hearing 25: Rezoning – Te Kowhai Section 42A Hearing Report TABLE OF CONTENTS 1 Introduction .................................................................................................................................... 3 1.1 Background ............................................................................................................................. 3 2 Purpose of the report ..................................................................................................................... 3 3 Response to submitter evidence ................................................................................................... 3 Hamilton City Council [535] ................................................................................................................ 3 Waikato Regional Council [81] – ......................................................................................................... 4 Greig Metcalfe [602] ........................................................................................................................... 7 Hounsell Holdings Ltd [832] ................................................................................................................ 8 Submission points not explicitly addressed in earlier s42a report ..................................................... 9 Appendix 1. Recommendations ...........................................................................................................
    [Show full text]
  • 15 July 2019 Gavin Ion Chief Executive Waikato District Council
    15 July 2019 Gavin Ion Chief Executive Waikato District Council Private Bag 544 Ngaruawahia 3742 Dear Gavin Further Submissions on the Submissions to the 2018 Waikato Proposed District Plan (Stage 1) Please find attached Hamilton City Council’s (HCC’s) further submissions on the Proposed Waikato District Plan submissions. We confirm that under the Resource Management Act Schedule 1, Clause 8, HCC is entitled to make further submissions as we represent a relevant aspect of the public interest and have a greater interest than the general public. In line with our original submission, our further submissions focus on HCC’s area of interest around Hamilton. HCC is not entirely opposed to the idea of changes that might provide opportunities for urban growth near Hamilton, particularly for some of the large‐scale zone change requests. However, we believe that it would be premature to make determinations on possible future growth areas in isolation from the collaborative sub‐regional growth management processes currently underway. We consider that the Hamilton to Auckland (H2A) Corridor and associated Metropolitan Spatial Plan projects are crucial to shaping the future of the sub‐region. This work is currently investigating opportunities for growth. It is expected to take shape over the latter half of 2019, with outcomes of the Metropolitan Spatial Plan expected in early 2020; the wider H2A corridor programme continues over several years and contains a range of other initiatives. We support the decision that your District Plan hearings will be timed to allow for the Metropolitan Spatial Plan outcomes to be available during the preparation for District Plan hearings and subsequent decisions.