Agenda of the 37th Meeting of State Environment Impact Assessment Authority (SEIAA), , held on 16.10.2020 and 21.10.2020 at 11.30 AM

1. Forty two (42) nos. of Minor Mineral Proposals (B-2) received by SEIAA (Lease area upto 5 ha). (Offline Cases) Sl. Date a) Date of sending E- Proposal Treasure Categ Proj Name of the Name of District / Gist of appraisal report / Observations / No. of mail to PP for File No. Challan ory of ect / proposal the Tahasil Communication received from Minutes of seeking additional Online information, if any (auto Particular the Activ project SEAC / Present Status SEIAA meeting receip after preliminary generate s propo ity propon (To be uploaded t of scrutiny by MS/ Env. d in (Scrutiny sal appli ent to relevant the Engr. / MoEF & fees) ed along website of b) Date of asking for propo submission of hard CC for with MoEF&CC, and sal copy of the proposal website) contact communicated / details to concerned c) Date of receipt of quarters by post) hard copy of the proposal for TOR / for EC. d)Date of dispatch of acceptance letter 1 2 3 4 5 6 7 8 9 10 11 12 1. 05.10. Manual SEIAA- Bank Non- 1(a) Proposal for Sri Keonjhar / This is a category B2 project as the 2020 692/10- Transactio Coal B2 Sasanga Sand Rajesh Champua lease area is equal to 5 ha. 2020 n No. Mining Quarry over an Kumar The PP have submitted the cluster IK0ASGIS area of 6.10 Singh certificate and other required X6 / acres or 2.47 documents such as Checklist, 25.09.202 ha at village Form-1, PFR, EMP, Approved 0 of Sasanga Mining Plan, DSR and DLC. Rs.2000/- Tahasil The lease area is not included Champua in forest land. the district of The proposal is complete in all Keonjhar respect with regard environmental setting. 2. 05.10. Manual SEIAA- Bank Non- 1(a) Proposal for Sri Keonjhar / This is a category B2 project as the 2020 693/10- Transactio Coal B2 Bhimpur Sand Soumya Champua lease area is equal to 5 ha. 2020 n No. Mining Quarry over an Ranjan The PP have submitted the cluster 70610117 area of 0.50 Pahi certificate and other required 1 / acres or 0.20 (P.K documents such as Checklist, 24.09.202 ha at village Minerals Form-1, PFR, EMP, Approved 0 of Bhimpur ) Mining Plan, DSR and DLC. Rs.2000/- Tahasil The lease area is not included Champua in forest land.

1

the district of The proposal is complete in all Keonjhar respect with regard environmental setting. 3. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 694/10- Applicant. Coal B2 Talmenda ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry-A Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 6.00 acres or documents such as Checklist, 2.428 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Talmenda The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 4. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 695/10- Applicant. Coal B2 Sankirda Sand ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry-B over Bheden The PP have submitted the cluster Fee is not an area of 6.00 certificate and other required required acres or documents such as Checklist, 2.4281 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Sankirda The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 5. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 696/10- Applicant. Coal B2 Sankirda Sand ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry-C over Bheden The PP have submitted the cluster Fee is not an area of 6.00 certificate and other required required acres or 2.428 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Sankirda Mining Plan, DSR and DLC. Tahasil The lease area is not included Bheden in the forest land. district of The proposal is complete in all Bargarh respect with regard environmental setting. 6. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 697/10- Applicant. Coal B2 Talmenda ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry-B Bheden The PP have submitted the cluster over an area of certificate and other required 2

Fee is not 6.00 acres or documents such as Checklist, required 2.428 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Talmenda The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 7. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 698/10- Applicant. Coal B2 Bargaon Sand ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry over an Bheden The PP have submitted the cluster Fee is not area of 12.00 certificate and other required required acres or 4.856 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Bargaon Mining Plan, DSR and DLC. Tahasil The lease area is not included Bheden in the forest land. district of The proposal is complete in all Bargarh respect with regard environmental setting. 8. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 699/10- Applicant. Coal B2 Kutpali Sand ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry over an Bheden The PP have submitted the cluster Fee is not area of 11.80 certificate and other required required acres or 4.775 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Kutpali Tahasil Mining Plan, DSR and DLC. Bheden in the The lease area is not included district of forest land. Bargarh The concerned Tahasildar may be asked to clarify the distance from road bridge over river to quarry boundary 9. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 700/10- Applicant. Coal B2 Bheden (New) ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Bheden Mining Plan, DSR and DLC. Tahasil The lease area is not included Bheden in the forest land.

3

district of The proposal is complete in all Bargarh respect with regard environmental setting. 10. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 701/10- Applicant. Coal B2 Salna (New) ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 9.54 acres or documents such as Checklist, 3.860 ha at Form-1, PFR, EMP, Approved village Salna Mining Plan, DSR and DLC. Tahasil The lease area is not included Bheden in the forest land. district of The proposal is complete in all Bargarh respect with regard environmental setting. 11. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 702/10- Applicant. Coal B2 Dhubenpali-A ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Dhubenpali The lease area is not included Tahasil forest land. Bheden in the The concerned Tahasildar may district of clarify the exact distance between Bargarh Dhubenpali-A & B Sand Bed. 12. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 703/10- Applicant. Coal B2 Apamara ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 5.10 acres or documents such as Checklist, 2.064 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Apamara The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 13. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 704/10- Applicant. Coal B2 Jharapali ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Bheden The PP have submitted the cluster over an area of certificate and other required 4

Fee is not 12.00 acres or documents such as Checklist, required 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Jharapali The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 14. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 705/10- Applicant. Coal B2 Barpadar Sand ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry over an Bheden The PP have submitted the cluster Fee is not area of 12.00 certificate and other required required acres or 4.856 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Barpadar Mining Plan, DSR and DLC. Tahasil The lease area is not included Bheden in the forest land. district of The proposal is complete in all Bargarh respect with regard environmental setting. 15. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 706/10- Applicant. Coal B2 Luhakhandi ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Luhakhandi The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 16. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 707/10- Applicant. Coal B2 Achhandapali ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry-A Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Achhandapali The lease area is not included Tahasil forest land. Bheden in the Exact distance of Achhandapali-B sand quarry from proposed quarry 5

district of may be ascertained from Bargarh tahasildar in regard to cluster. 17. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 708/10- Applicant. Coal B2 Achhandapali ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry-B Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Achhandapali The lease area is not included Tahasil forest land. Bheden in the Exact distance of Achhandapali-A district of sand quarry from proposed quarry Bargarh may be ascertained from tahasildar in regard to cluster. 18. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Bargarh / This is a category B2 project as the 2020 709/10- Applicant. Coal B2 Deshbhatli ar, Bheden lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry-B Bheden The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Deshbhatli The lease area is not included Tahasil forest land. Bheden in the The proposal is complete in all district of respect with regard environmental Bargarh setting. 19. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Rayagada / This is a category B2 project as the 2020 710/10- Applicant. Coal B2 Khairaguda ar, Gudari lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Gudari The PP have submitted the cluster Fee is not over an area of certificate and other required required 12.00 acres or documents such as Checklist, 4.856 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Khairaguda The lease area is not included Tahasil Gudari forest land. in the district of The proposal is complete in all Rayagada respect with regard environmental setting. 20. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Rayagada / This is a category B2 project as the 2020 711/10- Applicant. Coal B2 Silimi Morrum ar, Gudari lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry over an Gudari The PP have submitted the cluster area of 8.00 certificate and other required 6

Fee is not acres or 3.237 documents such as Checklist, required ha at village Form-1, PFR, EMP, Approved Silimi Tahasil Mining Plan, DSR and DLC. Gudari in the The lease area is not included district of forest land. Rayagada The proposal is complete in all respect with regard environmental setting. 21. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Rayagada / This is a category B2 project as the 2020 712/10- Applicant. Coal B2 Gudari Sand ar, Gudari lease area is equal to 5 ha. 2020 Scrutiny Mining Bed-II over an Gudari The PP have submitted the cluster Fee is not area of 11.64 certificate and other required required acres or 4.71 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Gudari Tahasil Mining Plan, DSR and DLC. Gudari in the The lease area is not included district of forest land. Rayagada Exact distance of Gudari Sand Quarry-I from proposed quarry along with latitude & longitude may be ascertained from tahasildar in regard to cluster 22. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Malkangiri This is a category B2 project as the 2020 713/10- Applicant. Coal B2 Balimela Sand ar, / lease area is equal to 5 ha. 2020 Scrutiny Mining Bed over an Chitrako Chitrakond The PP have submitted the cluster Fee is not area of 12.355 nda a certificate and other required required acres or 5.00 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Balimela Mining Plan, DSR and DLC. Tahasil The lease area is not included Chitrakonda in forest land. the district of Clarification may be asked from Malkangiri concerned Tahasiladar about the different name of the quarry mentioned in both lease order/mining plan and DSR and also submit EC compliance report if EC has been obtained earlier. 23. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Kalahandi / This is a category B2 project as the 2020 714/10- Applicant. Coal B2 Bairikupuli ar, Lanjigarh lease area is equal to 5 ha. 2020 Scrutiny Mining Granite Lanjigar The PP have submitted the cluster Fee is not (Ordinary h certificate and other required required Stone) Quarry documents such as Checklist, 7

over an area of Form-1, PFR, EMP, Approved 4.10 acres or Mining Plan, DSR and DLC. 1.656 ha at The lease area is not included village forest land. Bairikupuli The proposal is complete in all Tahasil respect with regard environmental Lanjigarh in the setting. district of Kalahandi 24. 06.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Kalahandi / This is a category B2 project as the 2020 715/10- Applicant. Coal B2 Talipada ar, Lanjigarh lease area is equal to 5 ha. 2020 Scrutiny Mining Granite Lanjigar The PP have submitted the cluster Fee is not (Ordinary h certificate and other required required Stone) Quarry documents such as Checklist, over an area of Form-1, PFR, EMP, Approved 2.27 acres or Mining Plan, DSR and DLC. 0.918 ha at The lease area is not included village forest land. Talipada The proposal is complete in all Tahasil respect with regard environmental Lanjigarh in the setting. district of Kalahandi 25. 07.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Sundargarh This is a category B2 project as the 2020 716/10- Applicant. Coal B2 Jaharitoli Sand ar, / lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry over an Biramitr Biramitrapu The PP have submitted the cluster Fee is not area of 11.78 apur r certificate and other required required acres or 4.767 documents such as Checklist, ha at village Form-1, PFR, EMP, Approved Jaharitoli Mining Plan, DSR and DLC. Tahasil The lease area is not included Biramitrapur in forest land. the district of The proposal is complete in all Sundargarh respect with regard environmental setting. 26. 07.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Sundargarh This is a category B2 project as the 2020 717/10- Applicant. Coal B2 Chitabhanga ar, / Sadar lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Sadar Sundergarh The PP have submitted the cluster Fee is not over an area of Sunderg certificate and other required required 10.20 acres or arh documents such as Checklist, 4.127 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Chitabhanga 8

Tahasil Sadar The lease area is not included Sundergarh in forest land. the district of The proposal is complete in all Sundargarh respect with regard environmental setting. 27. 07.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Sundargarh This is a category B2 project as the 2020 718/10- Applicant. Coal B2 Nua-Amlipali ar, / Sadar lease area is equal to 5 ha. 2020 Scrutiny Mining Sand Quarry Sadar Sundergarh The PP have submitted the cluster Fee is not over an area of Sunderg certificate and other required required 12.00 acres or arh documents such as Checklist, 4.85 ha at Form-1, PFR, EMP, Approved village Nua- Mining Plan, DSR and DLC. Amlipali The lease area is not included Tahasil Sadar forest land. Sundergarh in Clarification on exact distance of the district of road bridge from proposed quarry Sundargarh may be ascertained from tahasildar. 28. 09.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Ganjam / This is a category B2 project as the 2020 719/10- Applicant. Coal B2 Mahaguda ar, Ghumusur lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Ghumus Bhanjanag The PP have submitted the cluster Fee is not over an area of ur ar certificate and other required required 9.355 acres or Bhanjan documents such as Checklist, 3.785 ha at agar Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Mahaguda The lease area is not included Tahasil forest land. Ghumusur The proposal is complete in all Bhanjanagar in respect with regard environmental the district of setting. Ganjam 29. 09.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Ganjam / This is a category B2 project as the 2020 720/10- Applicant. Coal B2 Kullada Sand ar, Ghumusur lease area is equal to 5 ha. 2020 Scrutiny Mining Quarry over an Ghumus Bhanjanag The PP have submitted the cluster Fee is not area of 12.00 ur ar certificate and other required required acres or 4.856 Bhanjan documents such as Checklist, ha at village agar Form-1, PFR, EMP, Approved Kullada Mining Plan, DSR and DLC. Tahasil The lease area is not included Ghumusur forest land. Bhanjanagar in The proposal is complete in all the district of respect with regard environmental Ganjam setting. 9

30. 09.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Ganjam / This is a category B2 project as the 2020 721/10- Applicant. Coal B2 Dhamanajholi ar, Ghumusur lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Ghumus Bhanjanag The PP have submitted the cluster Fee is not over an area of ur ar certificate and other required required 12.00 acres or Bhanjan documents such as Checklist, 4.856 ha at agar Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Dhamanajholi The lease area is not included Tahasil forest land. Ghumusur The proposal is complete in all Bhanjanagar in respect with regard environmental the district of setting. Ganjam 31. 09.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Ganjam / This is a category B2 project as the 2020 722/10- Applicant. Coal B2 Gohiribadi ar, Ghumusur lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Ghumus Bhanjanag The PP have submitted the cluster Fee is not over an area of ur ar certificate and other required required 11.00 acres or Bhanjan documents such as Checklist, 4.451 ha at agar Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Gohiribadi The lease area is not included Tahasil forest land. Ghumusur The proposal is complete in all Bhanjanagar in respect with regard environmental the district of setting. Ganjam 32. 09.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Ganjam / This is a category B2 project as the 2020 723/10- Applicant. Coal B2 Indagada ar, Ghumusur lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Ghumus Bhanjanag The PP have submitted the cluster Fee is not over an area of ur ar certificate and other required required 1.986 acres or Bhanjan documents such as Checklist, 0.803 ha at agar Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Indagada The lease area is not included Tahasil forest land. Ghumusur The proposal is complete in all Bhanjanagar in respect with regard environmental the district of setting. Ganjam 33. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Koraput / This is a category B2 project as the 2020 724/10- Applicant. Coal B2 Malipeta-3 ar, Machhkund lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Machhk a The PP have submitted the cluster over an area of unda certificate and other required 10

Fee is not 2.50 acres or documents such as Checklist, required 1.012 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Malipeta The lease area is not included Tahasil forest land. Machhkund in Exact distance of all Malipeta - the district of 1,2,3 stone quarries to each other Koraput may be ascertained from Tahasildar in regard to cluster along with latitude and longitude.

34. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Koraput / This is a category B2 project as the 2020 725/10- Applicant. Coal B2 Chickenput-I ar, Machhkund lease area is equal to 5 ha. 2020 Scrutiny Mining Morrum Quarry Machhk a The PP have submitted the cluster Fee is not over an area of unda certificate and other required required 2.00 acres or documents such as Checklist, 0.809 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Chickenput The lease area is not included Tahasil forest land. Machhkund in Exact distance of nearest other the district of mines from proposed quarry may Koraput be ascertained from tahasildar in regard to cluster 35. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Koraput / This is a category B2 project as the 2020 726/10- Applicant. Coal B2 Malipeta-2 ar, Machhkund lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Machhk a The PP have submitted the cluster Fee is not over an area of unda certificate and other required required 2.50 acres or documents such as Checklist, 1.012 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Malipeta The lease area is not included Tahasil forest land. Machhkund in Exact distance of nearest other the district of mines from proposed quarry may Koraput be ascertained from tahasildar in regard to cluster 36. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Koraput / This is a category B2 project as the 2020 727/10- Applicant. Coal B2 Tusuba ar, Machhkund lease area is equal to 5 ha. 2020 Scrutiny Mining Morrum Quarry Machhk a The PP have submitted the cluster Fee is not over an area of unda certificate and other required required 2.00 acres or documents such as Checklist, 0.809 ha at 11

village Tusuba Form-1, PFR, EMP, Approved Tahasil Mining Plan, DSR and DLC. Machhkund in The lease area is not included the district of forest land. Koraput Exact Distance of Jolaput reservoir from proposed quarry may be ascertained from tahasidar.

37. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Malkangiri / This is a category B2 project as the 2020 728/10- Applicant. Coal B2 Chitapari ar, Chitrakond lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Chitrako a The PP have submitted the cluster Fee is not No.1 over an nda certificate and other required required area of 11.76 documents such as Checklist, acres or 4.760 Form-1, PFR, EMP, Approved ha at village Mining Plan, DSR and DLC. Chitapari The lease area is not included Tahasil forest land. Chitrakonda in The proposal is complete in all the district of respect with regard environmental Malkangiri setting. 38. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Cuttack / This is a category B2 project as the 2020 729/10- Applicant. Coal B2 Tamara ar, Narasinghp lease area is equal to 5 ha. 2020 Scrutiny Mining Narasin ur The PP have submitted the cluster Fee is not Sand Bed over ghpur certificate and other required required an area of documents such as Checklist, 12.20 acres or Form-1, PFR, EMP, Approved 4.93 ha at Mining Plan, DSR and DLC. village Tamara The lease area is not included Tahasil forest land. Narasinghpur The proposal is complete in all in the district of respect with regard environmental Cuttack setting. 39. 12.10. Manual SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Cuttack / This is a category B2 project as the 2020 730/10- Applicant. Coal B2 Manapur ar, Narasinghp lease area is equal to 5 ha. 2020 Scrutiny Mining Mahanadi Narasin ur The PP have submitted the cluster Fee is not Sand Bed over ghpur certificate and other required required an area of documents such as Checklist, 12.20 acres or Form-1, PFR, EMP, Approved 4.93 ha at Mining Plan, DSR and DLC. village The lease area is not included Manapur forest land. Tahasil 12

Narasinghpur The proposal is complete in all in the district of respect with regard environmental Cuttack setting. 40. 14.10. Manual SEIAA- Bank Non- 1(a) Proposal for Sri Nuapada / This is a category B2 project as the 2020 731/10- Transactio Coal B2 Jugarajpur-B Maham Boden lease area is equal to 5 ha. 2020 n No. Mining Stone Quarry mad Arif The PP have submitted the cluster IK0ATHB over an area of certificate and other required BA9 / 12.20 acres or documents such as Checklist, 14.10.202 4.937 ha at Form-1, PFR, EMP, Approved 0 of village Mining Plan, DSR and DLC. Rs.1000/- Jugarajpur The lease area is not included Tahasil Boden forest land. in the district of The proposal is complete in all Nuapada respect with regard environmental setting. 41. 14.10. Manual SEIAA- Bank Non- 1(a) Proposal for Sri Nuapada / This is a category B2 project as the 2020 732/10- Transactio Coal B2 Babebir Stone Lochan Boden lease area is equal to 5 ha. 2020 n No. Mining Quarry over an Sagadia The PP have submitted the cluster IK0ATHB area of 12.00 certificate and other required WJ3 / acres or 4.856 documents such as Checklist, 14.10.202 ha at village Form-1, PFR, EMP, Approved 0 of Babebir Mining Plan, DSR and DLC. Rs.1000/- Tahasil Boden The lease area is not included in the district of forest land. Nuapada The proposal is complete in all respect with regard environmental setting. 42. 14.10. Manual SEIAA- Bank Non- 1(a) Proposal for Sri Nuapada / This is a category B2 project as the 2020 733/10- Transactio Coal B2 Rokal Stone Santosh Boden lease area is equal to 5 ha. 2020 n No. Mining Quarry over an Kumar The PP have submitted the cluster IK0ATHB area of 5.34 Meher certificate and other required OY1 / acres or 2.161 documents such as Checklist, 14.10.202 ha at village Form-1, PFR, EMP, Approved 0 of Rokal Tahasil Mining Plan, DSR and DLC. Rs.1000/- Boden in the The lease area is not included district of forest land. Nuapada The proposal is complete in all respect with regard environmental setting.

13

2. Proceeding of SEAC meeting held on 06.10.2020 forwarded through offline. Sl. Date of a) Date of sending E- Propo Categ Proj Name of the Name District Date of Gist of appraisal report / Communication Observations / No. online mail to PP for sal ory of ect / proposal of the / Send to received from SEAC / Present Status Minutes of receipt seeking additional File the Activ projec Tahasil SEAC SEIAA meeting of the information, if any No. propo ity t (To be after preliminary proposa (auto sal appli propo uploaded to scrutiny by MS/ Env. l Engr. / gener ed nent relevant b) Date of asking for ated in for along website of submission of hard MoEF with MoEF & CC, copy of the proposal & CC conta and / websit ct communicated c) Date of receipt of e) details to concerned hard copy of the quarters by proposal for TOR / post) for EC. d)Date of dispatch of acceptance letter 1 2 3 4 5 6 7 8 9 10 11 12 1. 07.02.20 Manual SEIAA Non 1(a) Proposal for Sri N. Sundarg 8833 / This is a Category B2 proposal as the lease 20 - Coal San- Suresh arh 31.08.2 area is less than 5ha and the PP has & 47/02- Mining Musaposh /Gurundi 020 submitted all the required information for the 16.07.20 2020 Stone Quarry a project as per the provision of EIA 20 over an area Notification,2006. The lease area is not of 10.00 included in forest land. The SEAC have acres or submitted their appraisal report. 4.046 ha at village San- The SEAC recommended to grant EC valid Musaposh from the date of EC accorded upto the lease Tahasil period. Gurundia in the district of The proposal is complete in all respect and Sundargarh the SEIAA may consider for issuance of EC. 2. 07.03.20 Manual SEIAA Non 1(a) Proposal for Smt. Ganjam 7997 / This is a Category B2 proposal as the lease 20 - Coal B. Nuagam M. / 18.03.2 area is less than 5ha and the PP has 91/03- Mining Brick Earth Srilaks Patrapur 020 submitted all the required information for the 2020 Quarry over hmi project as per the provision of EIA an area of Notification,2006. The SEAC have 1.02 acres or submitted their appraisal report. 0.415 ha. in The SEAC recommended to grant EC valid village B. from the date of EC accorded upto the lease Nuagam, period. However, EC may be issued after Tahasil receipt of the following from the concerned Patrapur in Tahasildar.

14

the district of a) Revised checklist incorporating the Ganjam information in Table 11 as per the clarification submitted by the Tahasildar reveals that B. Nuagam Brick earth quarry (owner) Y. Malakondaiah situated at B. Nuagam and B. Nuagam Brick earth quarry (owner) D. Srinivas Rao situated at B. Nuagam both these mines are located within 500 meters (around 250 meters) from the periphery of the proposed mine lease area of Smt. M. Srilakshmi owner of B. Nuagam Brick earth quarry. The clarification on remaining point may be submitted directly to SEIAA for EC. The proposal is put up for consideration for submission of information as recommended by SEAC. 3. 07.03.20 Manual SEIAA Non 1(a) Proposal for Sri D. Ganjam 7997 / This is a Category B2 proposal as the lease 20 - Coal B. Nuagam Sriniva / 18.03.2 area is less than 5ha and the PP has 93/03- Mining Brick Earth s Rao Patrapur 020 submitted all the required information for the 2020 Quarry over project as per the provision of EIA an area of Notification,2006. The SEAC have 0.860 acres submitted their appraisal report. or 0.348 ha. The SEAC recommended to grant EC valid in village B. from the date of EC accorded upto the lease Nuagam, period. However, EC may be issued after Tahasil receipt of the following from the concerned Patrapur in Tahasildar. the district of Revised checklist incorporating the Ganjam information in Table 11 as per the clarification submitted by the Tahasildar reveals that B. Nuagam Brick earth quarry (owner) Y. Malakondaiah situated at B. Nuagam and B. Nuagam Brick earth quarry (owner) D. Srinivas Rao situated at B. Nuagam both these mines are located within 500 meters (around 250 meters) from the periphery of the proposed mine lease area of Smt. M. Srilakshmi owner of B. Nuagam Brick earth quarry.

15

The proposal is put up for consideration for submission of information as recommended by SEAC. 4. 18.03.20 Manual SEIAA Non 1(a) Proposal for D. Digapah 8081 / This is a Category B2 proposal as the lease 20 - Coal Jakameripali Danda andi / 12.05.2 area is less than 5ha and the PP has 125/03 Mining Sand Quarry pani Ganjam 020 submitted all the required information for the -2020 over an area Dora project as per the provision of EIA of 8.125 Notification,2006. The SEAC have acres or submitted their appraisal report. 3.288 ha. at village The SEAC recommended to grant EC valid Jakameripali from the date of EC accorded upto the lease Tahasil period. Digapahandi in the district The proposal is complete in all respect and of Ganjam the SEIAA may consider for issuance of EC 5. 05.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Balasor 8459 / This is a Category B2 proposal as the lease 20 - Coal Kadarayan ldar, e /Basta 22.06.2 area is less than 5ha and the PP has 184/06 Mining Sand Quarry Basta 020 submitted all the required information for the -2020 over an area project as per the provision of EIA of 12.35 Notification,2006. The SEAC have acres or 5.00 submitted their appraisal report.

ha. at village The SEAC recommended to grant EC valid Kadarayan from the date of EC accorded upto the lease Tahasil period. Basta in the district of The proposal is complete in all respect and Balasore the SEIAA may consider for issuance of EC 6. 05.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Balasor 8459 / This is a Category B2 proposal as the lease 20 - Coal Dhitpura ldar, e /Basta 22.06.2 area is less than 5ha and the PP has 185/06 Mining Sand Quarry Basta 020 submitted all the required information for the -2020 over an area project as per the provision of EIA of 12.35 Notification,2006. The SEAC have acres or 5.00 submitted their appraisal report. ha. at village Dhitpura The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Basta in the period. district of The proposal is complete in all respect and Balasore the SEIAA may consider for issuance of EC 7. 05.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Balasor 8459 / This is a Category B2 proposal as the lease 20 - Coal Ambakuruchi ldar, e /Basta 22.06.2 area is less than 5ha and the PP has Mining Sand Quarry Basta 020 submitted all the required information for the 16

186/06 over an area project as per the provision of EIA -2020 of 7.40 acres Notification,2006. The SEAC have or 2.99 ha. at submitted their appraisal report. village Ambakuruchi The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Basta in the period. district of The proposal is complete in all respect and Balasore the SEIAA may consider for issuance of EC 8. 05.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Balasor 8459 / This is a Category B2 proposal as the lease 20 - Coal Devog Sand ldar, e /Basta 22.06.2 area is less than 5ha and the PP has 187/06 Mining Quarry over Basta 020 submitted all the required information for the -2020 an area of project as per the provision of EIA 12.35 acres Notification,2006. The SEAC have or 5.00 ha. at submitted their appraisal report. village Devog The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Basta in the period. district of Balasore The proposal is complete in all respect and the SEIAA may consider for issuance of EC 9. 17.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Keonjha 8505 / This is a Category B2 proposal as the lease 20 - Coal Kandara-II ldar r / 30.06.2 area is less than 5ha and the PP has 212/06 Mining Stone Quarry Barbil Barbil 020 submitted all the required information for the -2020 over an area project as per the provision of EIA of 3.38 acres Notification,2006. The SEAC have or 1.37 ha. at submitted their appraisal report.

village The SEAC recommended to grant EC valid Kandara from the date of EC accorded upto the lease Tahasil period. However, EC may be granted after Barbil in the receipt of the following: district of Detailed compliance report to the conditions Keonjhar stipulated in earlier EC.

The proposal is put up for consideration for submission of information as recommended by SEAC. 10. 17.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Keonjha 8505 / This is a Category B2 proposal as the lease 20 - Coal Kandara-I ldar r / 30.06.2 area is less than 5ha and the PP has 214/06 Mining Stone Quarry Barbil Barbil 020 submitted all the required information for the -2020 over an area project as per the provision of EIA of 1.92 acres Notification,2006. The SEAC have or 0.78 ha. at submitted their appraisal report. 17

village The SEAC recommended to grant EC valid Kandara from the date of EC accorded upto the lease Tahasil period. However, EC may be granted after Barbil in the receipt of the following: district of Detailed compliance report to the conditions Keonjhar stipulated in earlier EC.

The proposal is put up for consideration for submission of information as recommended by SEAC. 11. 22.06.20 Manual SEIAA Non 1(a) Proposal for Tahasi Mayurb 8647 / This is a Category B2 proposal as the lease 20 - Coal Bhanra Sand ldar, hanj / 06.08.2 area is less than 5ha and the PP has 254/06 Mining Bed over an Karanji Karanjia 020 submitted all the required information for the -2020 area of 12.35 a project as per the provision of EIA acres or 5.0 Notification,2006. The SEAC have ha. at village submitted their appraisal report. Bhanra Tahasil The SEAC recommended to grant EC valid Karanjia in from the date of EC accorded upto the lease the district of period.

Mayurbhanj The proposal is complete in all respect and the SEIAA may consider for issuance of EC 12. 22.06.20 Manual SEIAA Non 1(a) Proposal for Sri Bolangir 8647 / This is a Category B2 proposal as the lease 20 - Coal Kutasinga Riksh / 06.08.2 area is less than 5ha and the PP has 256/06 Mining Sand Bed Kumar Agalpur 020 submitted all the required information for the -2020 over an area Agraw project as per the provision of EIA of 12.355 al Notification,2006. The SEAC have acres or 5.0 submitted their appraisal report. ha. at village Kutasinga The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Agalpur in period. the district of The proposal is complete in all respect and Bolangir the SEIAA may consider for issuance of EC 13. 03.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Bhadrak 8710 / This is a Category B2 proposal as the lease 20 - Coal Maninathpur ldar / 17.08.2 area is less than 5ha and the PP has 286/06 Mining Sand Bed Bhand Bhandar 020 submitted all the required information for the -2020 over an area aripok ipokhari project as per the provision of EIA of 12.35 hari Notification,2006. The SEAC have acres or 4.99 submitted their appraisal report. ha. at village Maninathpur Tahasil 18

Bhandaripok The SEAC recommended to grant EC valid hari in the from the date of EC accorded upto the lease district of period. Bhadrak The proposal is complete in all respect and the SEIAA may consider for issuance of EC 14. 03.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Balasor 8710 / This is a Category B2 proposal as the lease 20 - Coal Sahupada & ldar e / 17.08.2 area is less than 5ha and the PP has 287/06 Mining Dumuda Remu Remuna 020 submitted all the required information for the -2020 Sand Bed na project as per the provision of EIA over an area Notification,2006. The SEAC have of 12.35 submitted their appraisal report. acres or 5.00 ha. at village The SEAC recommended to grant EC valid Sahupada & from the date of EC accorded upto the lease Dumuda period. Tahasil Remuna in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Balasore 15. 06.07.20 Manual SEIAA Non 1(a) Proposal for Sri Bolangir 8710 / This is a Category B2 proposal as the lease 20 - Coal Fatamunda Rikash / 17.08.2 area is less than 5ha and the PP has 291/07 Mining Sand Bed Kumar Agalpur 020 submitted all the required information for the -2020 over an area Agraw project as per the provision of EIA of 12.355 al Notification,2006. The SEAC have acres or 5.00 submitted their appraisal report.

ha. at village The SEAC recommended to grant EC valid Fatamunda from the date of EC accorded upto the lease Tahasil period. Agalpur in the district of The proposal is complete in all respect and Bolangir the SEIAA may consider for issuance of EC. 16. 06.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Bolangir 8710 / This is a Category B2 proposal as the lease 20 - Coal Kukedmal ldar / Tusura 17.08.2 area is less than 5ha and the PP has 294/07 Mining Sand Quarry Tusura 020 submitted all the required information for the -2020 over an area project as per the provision of EIA of 8.00 acres Notification,2006. The lease area is not or 3.23 ha. at included in forest land. The SEAC have village submitted their appraisal report. Kukedmal The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Tusura in the period.

19

district of The proposal is complete in all respect and Bolangir the SEIAA may consider for issuance of EC

17. 06.07.20 Manual SEIAA Non 1(a) Proposal for Sri Bolangir 8710 / This is a Category B2 proposal as the lease 20 - Coal Bhatasar Sand Jaldha / 17.08.2 area is less than 5ha and the PP has 296/07 Mining Quarry over an r Bangom 020 submitted all the required information for the -2020 area of 7.49 Meher unda project as per the provision of EIA acres or 3.03 Notification,2006. The SEAC have ha. at village submitted their appraisal report. Bhatasar Tahasil The SEAC recommended to grant EC valid Bangomunda from the date of EC accorded upto the lease in the district of period. Bolangir The proposal is complete in all respect and the SEIAA may consider for issuance of EC 18. 10.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Dhenka 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Ekagharia ldar nal / 26.08.2 area is less than 5ha and the PP has 320/07 Mining Brahmani Odapa Odapad 020 submitted all the required information for the -2020 Sand Quarry da a project as per the provision of EIA over an area of Notification,2006. The SEAC have 11.80 acres or submitted their appraisal report. 4.775 ha. at village The SEAC recommended to grant EC valid Ekagharia from the date of EC accorded upto the lease Tahasil period. Odapada in the district of The proposal is complete in all respect and Dhenkanal the SEIAA may consider for issuance of EC 19. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bolangir 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Nunhad ldar / 26.08.2 area is less than 5ha and the PP has 355/07 Mining Sand Quarry Belpar Belpara 020 submitted all the required information for the -2020 over an area a project as per the provision of EIA of 12.355 Notification,2006. The SEAC have acres or 5.00 submitted their appraisal report.

ha. at village The SEAC recommended to grant EC valid Nunhad from the date of EC accorded upto the lease Tahasil period. However, EC may be issued after Belpara in receipt of compliance report to the the district of conditions stipulated in earlier EC certified / Bolangir authenticated by Regional Office of MoEF & CC as requested and by SEIAA vide letter no. 8821/SEIAA, Dated 26-08-2020 from the concerned Tahasildar.

20

The proposal is put up for consideration for submission of information as recommended by SEAC.

3. Letter received for five nos. of Country liquor proposals requesting to SEIAA to consider the proposals under Category-B2. (File No. SIA/OR/IND2/48450/2019, SIA/OR/IND2/48407/2019, SIA/OR/IND2/48406/2019, SIA/OR/IND2/48354/2019 and SIA/OR/IND2/48446/2019).

4. Seven (7) nos. of Minor Mineral Proposals (B-2) received by SEIAA (Lease area upto 5 ha). (Offline Cases) Sl. Date a) Date of sending E- Proposal Treasure Categ Proj Name of the Name of District / Gist of appraisal report / Observations / No. of mail to PP for File No. Challan ory of ect / proposal the Tahasil Communication received from Minutes of seeking additional Online information, if any (auto Particular the Activ project SEAC / Present Status SEIAA meeting receip after preliminary generate s propo ity propon (To be uploaded t of scrutiny by MS/ Env. d in (Scrutiny sal appli ent to relevant the Engr. / MoEF & fees) ed along website of b) Date of asking for propo submission of hard CC for with MoEF&CC, and sal copy of the proposal website) contact communicated / details to concerned c) Date of receipt of quarters by post) hard copy of the proposal for TOR / for EC. d)Date of dispatch of acceptance letter 1 2 3 4 5 6 7 8 9 10 11 12 1. 14.10. SEIAA- Bank Non- 1(a) Proposal for Sri Sundargarh This is a category B2 project as the 2020 734/10- Transactio Coal B2 Tangarpali Ramesh / Rourkela lease area is equal to 5 ha. 2020 n No. Mining Stone Quarry-I Chandra The PP have submitted the cluster CKO1230 over an area of Haricha certificate and other required 756 / 4.00 acres or ndan documents such as Checklist, 14.10.202 1.618 ha at Form-1, PFR, EMP, Approved 0 of village Mining Plan, DSR and DLC. Rs.1000/- Tangarpali The lease area is not included Tahasil forest land. Rourkela in the The concerned Tahasildar may be district of asked to clarify the exact distance Sundargarh of nearest mine with latitude and longitude may be ascertained from Tahasildar in regard to cluster

21

2. 14.10. SEIAA- Bank Non- 1(a) Proposal for Sri Nayagarh / This is a category B2 project as the 2020 735/10- Transactio Coal B2 Gobardhanpra Rajesh Bhapur lease area is equal to 5 ha. 2020 n No. Mining sad Stone Kumar The PP have submitted the cluster IK0ATGP Quarry over an Pradhan certificate and other required RS9 / area of 4.03 documents such as Checklist, 14.10.202 acres or 1.630 Form-1, PFR, EMP, Approved 0 of ha at village Mining Plan, DSR and DLC. Rs.1000/- Gobardhanpra The lease area is not included sad Tahasil forest land. Bhapur in the The proposal is complete in all district of respect with regard environmental Nayagarh setting. 3. 14.10. SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Angul / This is a category B2 project as the 2020 736/10- Applicant. Coal B2 Sanarohila ar, Kishorenag lease area is equal to 5 ha. 2020 Scrutiny Mining Stone Quarry Kishore ar The PP have submitted the cluster Fee is not over an area of nagar certificate and other required required 5.49 acres or documents such as Checklist, 2.22 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Sanarohila The lease area is not included Tahasil forest land. Kishorenagar The proposal is complete in all in the district of respect with regard environmental Angul setting. 4. 14.10. SEIAA- Tahasildar Non- 1(a) Proposal for Tahasild Angul / This is a category B2 project as the 2020 737/10- Applicant. Coal B2 Ambapal ar, Kishorenag lease area is equal to 5 ha. 2020 Scrutiny Mining Morrum Quarry Kishore ar The PP have submitted the cluster Fee is not over an area of nagar certificate and other required required 4.59 acres or documents such as Checklist, 1.86 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. Ambapal The lease area is not included Tahasil forest land. Kishorenagar The proposal is complete in all in the district of respect with regard environmental Angul setting. 5. 15.10. SEIAA- Bank Non- 1(a) Proposal for Sri Nayagarh / This is a category B2 project as the 2020 738/10- Transactio Coal B2 Bhokilapada Biswa Bhapur lease area is equal to 5 ha. 2020 n No. Mining Stone Quarry Ranjan The PP have submitted the cluster IK0AQQJ over an area of Pradhan certificate and other required ZR5 / 0.76 acres or documents such as Checklist, 19.08.202 0.308 ha at Form-1, PFR, EMP, Approved village Mining Plan, DSR and DLC. 22

0 of Bhokilapada The lease area is not included Rs.1000/- Tahasil Bhapur forest land. in the district of The proposal is complete in all Nayagarh respect with regard environmental setting. 6. 16.10. SEIAA- Bank Non- 1(a) Proposal for Sri Nabarangp This is a category B2 project as the 2020 739/10- Transactio Coal B2 Boragam Sand Padman ur / lease area is equal to 5 ha. 2020 n No. Mining Quarry over an Kumar Kodinga The PP have submitted the cluster IK0ATHL area of 3.65 Bisoi certificate and other required YG9 / acres or 1.477 documents such as Checklist, 15.10.202 ha at village Form-1, PFR, EMP, Approved 0 of Boragam Mining Plan, DSR. Rs.2000/- Tahasil The proposal is complete in all Kodinga in the respect with regard environmental district of setting. Nabarangpur 7. 19.10. SEIAA- Bank Non- 1(a) Proposal for Sri Jharsuguda This is a category B2 project as the 2020 740/10- Transactio Coal B2 Sukhasoda Rabindr / Lakhanpur lease area is equal to 5 ha. 2020 n No. Mining Sand Quarry a The PP have submitted the cluster IK0ARAJ over an area of Behera certificate and other required RW0 / 7.00 acres or documents such as Checklist, 28.08.202 2.832 ha at Form-1, PFR, EMP, Approved 0 of village Mining Plan, DSR. Rs.2000/- Sukhasoda The proposal is complete in all Tahasil respect with regard environmental Lakhanpur in setting. the district of Jharsuguda

5. One no. of New ‘B’ category project received online by SEIAA (Scrutiny prior to sending to SEAC). Sl. Date of a) Date of sending E- Propos Bank Draft File Categ Proj Name of the Name of Distr Gist of appraisal Observations / No. online mail to PP for al File Particulars no. ory of ect / proposal the ict / report / Minutes of seeking additional receipt information, if any No. (Scrutiny assign the Activ project Taha Communication SEIAA meeting of the after preliminary (auto fees) ed by propo ity propon sil received from (To be uploaded proposa scrutiny by MS/ Env. generat SEIAA sal appli ent SEAC /Present to relevant l Engr. / ed in ed along Status website of MoEF b) Date of asking for submission of hard MoEF & for with & CC, and copy of the proposal CC contact communicated / website details to concerned c) Date of receipt of ) quarters by post) hard copy of the proposal for TOR / for EC.

23

d)Date of dispatch of acceptance letter 1 2 3 4 5 6 7 8 9 10 11 12 13 1. 19.09.20 EDS-16.07.2020/ SIA/OR/ Bank SEIAA Non- 1(a) Pandiapathar Sri.Ajay Ganj This is a category 20 HC-28.09.2020 MIN/546 Transaction File Coal B-1 Decorative Stone Kumar am B1 project as the 06.10.2020 85/2020 No. no. yet Mining (For (Granite Gneiss) Agrawal /Ask lease area more 0510200900 to be issue Mines deposit over ;Prop- a than 5ha. 01675 assign of an area of 20.566 Jay The PP has /03.10.2020 ed ToR) hectares located in Minerals submitted Form-I, of village PFR & Approved Rs.100000/- Pandiapathar, Mining Plan for the tahasil: Aska, project. district: Ganjam The proposal is put (Lease period- up for consideration 30years) of ToR.

6. Proceeding of SEAC meeting held on 30.09.2020 forwarded through online. Sl. Date of a) Date of sending E- Propo Categ Proj Name of the Name of District / Date Gist of appraisal report / Observations / No online mail to PP for seeking sal ory of ect / proposal the Tahasil of Communication received from SEAC Minutes of SEIAA additional information, . receipt if any after preliminary File the Activ project Send / Present Status meeting (To be of the scrutiny by MS/ Env. No. propo ity propon to uploaded to proposa Engr. / (auto sal appli ent SEA relevant website l b) Date of asking for gener ed along C of MoEF & CC, and submission of hard copy of the proposal / ated in for with communicated to c) Date of receipt of MoEF contact concerned hard copy of the & CC details quarters by post) proposal for TOR / for websit EC. d)Date of dispatch of e) acceptance letter 1 2 3 4 7 8 9 10 11 12 13 14 1. 13.07.20 EDS-Nil/ 54671/ Bio- 7(da) Establishment Western Dhenkana 8936 The SEAC in its meeting held on 20 HC-16.07.2020 04- medica of Common Integrat l /Parjang / 30.09.2020 has prescribed the specific 20.08.2020 MIS/0 l waste Hazardous ed 08.0 ToRs in addition to standard ToRs for 7-2020 Treatm Waste Waste 9.20 conducting detailed EIA study for the ent Treatment, Manage 20 project. Facility Storage and ment Specific ToR: Disposal Facility 1. Land details/ kissam. Facility Pvt Ltd; 2. Certificate from concerned DFO that no DLC land involve in the land area. (CHWTSDF) Sri. 3. Exact distance from Brahmini river duly at Village- Swayam certified by Tahasildar. Patrapada, Prakash 4. Elevation of site and elevation of high flood Teshil- Jena, line of river Brahmini. Parjang, Dist- MD 24

Dhenkanal – 5. Specific measures to prevent leaching in regarding case of heavy rain fall, high flood and earth quake with justification with Complete consideration scientific leachate management be of ToR. submitted. 6. Water sampling and soil sampling monitoring points taking gradient into consideration 7. List of measure industries out of total 200 industries projected be indicated with their main products, production capacity with corresponding hazardous wastes being generated and the quantity there of. 8. Basis of estimation of hazardous waste as indicated i.e 50000 TPA. 9. Water balance with ETP details. 10. Status of NOC From CGWA and permission of WR department, Govt. of Odisha for use of ground water. 11. Inputs to STP, pusrpose of STP, STP capacity, septic tank and soak pits details be submitted. 12. Since Katabahal village is only 1.2 km from the site, odour prevention management be submitted. 13. When decommissioning is expected and the basis? 2. 21.05.20 EDS-Nil/ 53208/ Non 1(a) Badakuchulu M/s. R.V Sunderga 8936 The SEAC in its meeting held on 20 HC-26.05.2020 25- Coal B-1 Limestone & Enterpri rh / / 30.09.2020 has prescribed the specific 27.05.2020 MINB1 Mining Dolomite Mine sers Biramitrap 08.0 ToRs in addition to standard ToRs for /05- over an area of Pvt. Ltd; ur 9.20 conducting detailed EIA study for the 2020 64.993Ha in Biswana 20 project. village th Specific ToR: Badakuchul, Agrawal (i) NOC from Irrigation Division, Sundergarh under a and Rourkela Steel plant for use of water from including an undertaking Biramitrapur in form of a legal affidavit from the proponent tahasil, to ensure safety of the said Dam. Sundergarh (ii) Details of Waste Management and Erosion district– Management. (iii) Plantation of trees within first year in safety regarding zone to prevent air pollution consideration (iv) Storm and surface runoff water management of ToR. during monsoon be submitted. (v) Mitigation measures to be taken so that water bodies nearby is not polluted. (vi) Certificate from the concerned Mining Officer indicating that no mining activity carried out since 2014 i.e. the year of execution of the mining lease deed. (vii) Approved mining scheme for current plan period.

25

(viii) Gochar land 30.182 ha. Details of conversion of Gochar land is to be submitted. (ix) Details of mine drainage water and its management practice. (x) Distance of Mandira Dam from the mining lease area. Detailed measures to be taken so that mining activity will not affect Mandira Dam. (xi) Details of safety zone planting and maintenance. Planting in first two year and maintenance after. (xii) Certificate from the concerned DFO that no DLC land is involved in the lease area. (xiii) Since there is a reservoir there must be avian species. A specific inventory for avian species and their migratory path must be provided. A conservation plan if required on the basis of above inventory be prepared. (xiv) The groundwater table will vary seasonally in this region and could be linked to the FRL of the reservoir. This is very important because limestone and dolomites are often well jointed and in this region the attitude of the beds is perpendicular to the river channel. Seasonal data on Ground Water table and FRL must be provided and flow directions of Ground Water in different time be assessed. (xv) Size, design and adequacy of garland drain and retaining wall. (xvi) Size and adequacy of settling pond including silt management so that no silt is escaped. (xvii) Exact distance from water bodies duly certified by Tahasildar. (xviii) Kissam of land duly certified by Tahasildar. (xix) Details of Waste Management plan. (xx) Slope study of mines as well as dump / OB.

7. Proceeding of SEAC meeting held on 09.10.2020 forwarded through offline. Sl. Date of a) Date of sending E- Propo Categ Proj Name of the Name Distr Date of Gist of appraisal report / Observations / No. online mail to PP for seeking sal ory of ect / proposal of the ict / Send to Communication received from SEAC / Minutes of SEIAA additional information, receipt if any after preliminary File the Activ projec Taha SEAC Present Status meeting (To be of the scrutiny by MS/ Env. No. propo ity t sil uploaded to relevant proposa Engr. / (auto sal appli propo website of MoEF & l b) Date of asking for gener ed nent CC, and submission of hard copy of the proposal / ated in for along communicated to c) Date of receipt of MoEF with concerned quarters hard copy of the & CC conta by post) proposal for TOR / for websit ct EC. e) details 26

d)Date of dispatch of acceptance letter 1 2 3 4 5 6 7 8 9 10 11 12 1. 11.03.20 Manual SEIAA Non 1(a) Proposal for Sri Sund 7997 / This is a Category B2 proposal as the lease 20 - Coal B2 Badnuagaon Kalyan argar 18.03.2 area is less than 5ha and the PP has 103/03 Mining Brick Earth Aind h / 020 submitted all the required information for the -2020 Quarry over (M/s Rajg project as per the provision of EIA Notification,2006. The lease area is not an area of S.R. angp included in forest land. The SEAC have 6.11 acres or Bricks ur submitted their appraisal report. 2.472 ha. in village The SEAC recommended to grant EC valid Badnuagaon from the date of EC accorded upto the lease , Tahasil period. Rajgangpur in the district The proposal is complete in all respect and of the SEIAA may consider for issuance of EC Sundargarh 2. 16.03.20 Manual SEIAA Non 1(a) Proposal for Sri Ganj 8209 / The SEAC recommended to grant EC valid 20 - Coal B2 Rankuda Susha am / 18.05.2 from the date of EC accorded upto the lease 117/03 Mining Stone Quarry nta Aska 020 & period with conditions as suggested by the -2020 over an area Kumar 8990 / DFO, Ghumsur, South Division, Ganjam vide letter no. 6503, dated 11.09.2020. Conditions of 4.00 acres Rout 16.09.2 of DFO need to be compiled by the project or 1.619 ha. 020 proponent and strictly monitored/regulated by at village DFO. Rankuda However, EC may be issued after receipt of Tahasil Aska copy of EC granted by DEIAA /SEIAA if any in the district earlier and compliance to EC conditions from of Ganjam the concerned Tahasildar. 3. 01.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg This is a Category B2 proposal as the lease 20 - Coal B2 Deogaon ldar arh / area is less than 5ha and the PP has 279/06 Mining Zeera River Bargar Barg submitted all the required information for the -2020 Sand Bed h arh project as per the provision of EIA Notification,2006. The lease area is not over an area included in forest land. The SEAC have of 12.02 submitted their appraisal report. acres or 4.864 ha. at The SEAC recommended to grant EC valid village from the date of EC accorded upto the lease Deogaon period. Tahasil The proposal is complete in all respect and Bargarh in the SEIAA may consider for issuance of EC the district of Bargarh

27

4. 01.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Bageibira ldar arh / 17.08.2 area is less than 5ha and the PP has 281/06 Mining Zeera River Bargar Barg 020 submitted all the required information for the -2020 Sand Bed h arh project as per the provision of EIA Notification,2006. The lease area is not over an area included in forest land. The SEAC have of 12.06 submitted their appraisal report. acres or 4.880 ha. at The SEAC recommended to grant EC valid village from the date of EC accorded upto the lease Bageibira period. Tahasil The proposal is complete in all respect and Bargarh in the SEIAA may consider for issuance of EC the district of Bargarh 5. 01.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Girsul River ldar arh / 17.08.2 area is less than 5ha and the PP has 282/06 Mining Sand Bed Bargar Barg 020 submitted all the required information for the -2020 over an area h arh project as per the provision of EIA Notification,2006. The lease area is not of 6.02 acres included in forest land. The SEAC have or 2.436 ha. submitted their appraisal report. at village Girsul The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Bargarh in period. the district of The proposal is complete in all respect and Bargarh the SEIAA may consider for issuance of EC 6. 01.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Balitikra ldar arh / 17.08.2 area is less than 5ha and the PP has 283/06 Mining Zeera Nadi Bargar Barg 020 submitted all the required information for the -2020 Sand Bed-2 h arh project as per the provision of EIA Notification,2006. The lease area is not over an area included in forest land. The SEAC have of 12.35 submitted their appraisal report. acres or 4.997 ha. at The SEAC recommended to grant EC valid village from the date of EC accorded upto the lease Balitikra period. Tahasil The proposal is complete in all respect and Bargarh in the SEIAA may consider for issuance of EC the district of Bargarh 7. 06.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Bola 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Sargada ldar ngir / 17.08.2 area is less than 5ha and the PP has Mining Sand Quarry Tusura 020 submitted all the required information for the 28

295/07 over an area Tusu project as per the provision of EIA -2020 of 12.00 ra Notification,2006. The lease area is not acres or included in forest land. The SEAC have 4.856 ha. at submitted their appraisal report.

village The SEAC recommended to grant EC valid Sargada from the date of EC accorded upto the lease Tahasil period. Tusura in the The proposal is complete in all respect and district of the SEIAA may consider for issuance of EC Bolangir 8. 06.07.20 Manual SEIAA Non 1(a) Proposal for Ms Bola 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Turekela Sujata ngir / 17.08.2 area is less than 5ha and the PP has 297/07 Mining Sand Quarry Mohan Bang 020 submitted all the required information for the -2020 over an area ty omu project as per the provision of EIA Notification,2006. The lease area is not of 7.49 acres nda included in forest land. The SEAC have or 3.03 ha. at submitted their appraisal report. village Turekela The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Bangomund period. a in the The proposal is complete in all respect and district of the SEIAA may consider for issuance of EC Bolangir 9. 07.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Khuntpali ldar arh / 17.08.2 area is less than 5ha and the PP has 305/07 Mining Pudhiatikra Bargar Barg 020 submitted all the required information for the -2020 Stone h arh project as per the provision of EIA Notification,2006. The SEAC have submitted Quarry-E their appraisal report. over an area of 5.33 acres The SEAC recommended to grant EC valid or 2.157 ha. from the date of EC accorded upto the lease at village period. However, EC may be issued after Khuntpali receipt of compliance to EC conditions from Tahasil the concerned Tahasildar. Bargarh in the district of Bargarh 10. 07.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Khuntpali ldar arh / 17.08.2 area is less than 5ha and the PP has 306/07 Mining Ganjhiaatikir Bargar Barg 020 submitted all the required information for the -2020 a Stone h arh project as per the provision of EIA Notification,2006. The SEAC have submitted Quarry over their appraisal report. an area of 29

3.37 acres or 1.364 ha. at The SEAC recommended to grant EC valid village from the date of EC accorded upto the lease Khuntpali period. However, EC may be issued after receipt of compliance to EC conditions from Tahasil the concerned Tahasildar. Bargarh in the district of Bargarh 11. 07.07.20 Manual SEIAA Non 1(a) Proposal for Tahasi Barg 8710 / This is a Category B2 proposal as the lease 20 - Coal B2 Dhanger ldar arh / 17.08.2 area is less than 5ha and the PP has 307/07 Mining Stone Bargar Barg 020 submitted all the required information for the -2020 Quarry-A h arh project as per the provision of EIA Notification,2006. The lease area is not over an area included in forest land. The SEAC have of 8.54 acres submitted their appraisal report. or 3.456 ha. at village The SEAC recommended to grant EC valid Dhanger from the date of EC accorded upto the lease Tahasil period. Bargarh in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Bargarh 12. 10.07.20 Manual SEIAA Non- 1(a) Proposal for Sri Kala 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Turlakhaman Hema handi 26.08.2 area is less than 5ha and the PP has 327/07 Mining Sand Quarry nta / 020 submitted all the required information for the -2020 over an area Sahu Kesi project as per the provision of EIA Notification,2006. The lease area is not of 5.00 acres nga included in forest land. The SEAC have or 2.023 ha. submitted their appraisal report. at village Turlakhaman The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease in period. However, EC may be granted after the district of receipt of Kalahandi a) Copy of Environmental Clearance, if granted by DEIAA/SEIAA earlier and compliance status of EC conditions if granted. b) No. of Barrage proposal is under construction form by Water Resources Department across Tel river. This may be verified freshly by Water Resources Department and shall be submitted. 13. 10.07.20 Manual SEIAA Non- 1(a) Proposal for Sri Kala 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Bisod Nadi Brahm handi 26.08.2 area is less than 5ha and the PP has 328/07 Mining Ghat over an a / 020 submitted all the required information for the -2020 area of 11.16 project as per the provision of EIA 30

acres or Kumar Kesi Notification,2006. The lease area is not 4.516 ha. at Goel nga included in forest land. The SEAC have village Bisodi submitted their appraisal report. & Matia The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Kesinga in period. However, EC may be granted after the district of receipt of Kalahandi a) Copy of Environmental Clearance, if granted by DEIAA/SEIAA earlier and compliance status of EC conditions if granted. b) A Dam is under construction across river Ret. A certificate from irrigation authority shall be submitted on the issue. 14. 10.07.20 Manual SEIAA Non- 1(a) Proposal for Sri Kala 8823 / The SEAC recommended to grant EC valid 20 - Coal B2 Boria Sand Saroj handi 26.08.2 from the date of EC accorded upto the lease 331/07 Mining Quarry over Prasad / 020 period. However, EC may be issued after -2020 an area of Nayak Kesi receipt of compliance to EC conditions from the concerned Tahasildar. 7.00 acres or nga

2.833 ha. at village Boria Tahasil Kesinga in the district of Kalahandi 15. 13.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Bhuslad ldar ngir / 26.08.2 area is less than 5ha and the PP has 340/07 Mining Sand Quarry Bango Bang 020 submitted all the required information for the -2020 over an area munda omu project as per the provision of EIA Notification,2006. The SEAC have submitted of 12.355 nda their appraisal report. acres or 5.00 ha. at village The SEAC recommended to grant EC valid Bhuslad from the date of EC accorded upto the lease Tahasil period. Bangomund The proposal is complete in all respect and a in the the SEIAA may consider for issuance of EC district of Bolangir 16. 13.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Sanmula ldar ngir / 26.08.2 area is less than 5ha and the PP has 341/07 Mining Sand Quarry Bango Bang 020 submitted all the required information for the -2020 over an area munda omu project as per the provision of EIA Notification,2006. The SEAC have submitted of 12.355 nda their appraisal report. acres or 5.00 31

ha. at village The SEAC recommended to grant EC valid Sanmula from the date of EC accorded upto the lease Tahasil period. Bangomund The proposal is complete in all respect and the SEIAA may consider for issuance of EC a in the district of Bolangir 17. 13.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Sriram Sand ldar ngir / 26.08.2 area is less than 5ha and the PP has 342/07 Mining Quarry over Bango Bang 020 submitted all the required information for the -2020 an area of munda omu project as per the provision of EIA Notification,2006. The SEAC have submitted 12.355 acres nda their appraisal report. or 5.00 ha. at village The SEAC recommended to grant EC valid Sriram from the date of EC accorded upto the lease Tahasil period. Bangomund The proposal is complete in all respect and a in the the SEIAA may consider for issuance of EC district of Bolangir 18. 13.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Palaskhanda ldar ngir / 26.08.2 area is less than 5ha and the PP has 344/07 Mining Sand Quarry Bango Bang 020 submitted all the required information for the -2020 over an area munda omu project as per the provision of EIA Notification,2006. The SEAC have submitted of 12.355 nda their appraisal report. acres or 5.00 ha. at village The SEAC recommended to grant EC valid Palaskhanda from the date of EC accorded upto the lease Tahasil period. Bangomund The proposal is complete in all respect and a in the the SEIAA may consider for issuance of EC district of Bolangir 19. 13.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Bandhapada ldar ngir / 26.08.2 area is less than 5ha and the PP has 345/07 Mining Sand Quarry Deoga Deog 020 submitted all the required information for the -2020 over an area on aon project as per the provision of EIA Notification,2006. The SEAC have submitted of 12.355 their appraisal report. acres or 5.00 ha. at village The SEAC recommended to grant EC valid Bandhapada from the date of EC accorded upto the lease Tahasil period. Deogaon in 32

the district of The proposal is complete in all respect and Bolangir the SEIAA may consider for issuance of EC

20. 13.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Kaindapali ldar ngir / 26.08.2 area is less than 5ha and the PP has 349/07 Mining Sand Quarry Loising Loisi 020 submitted all the required information for the -2020 over an area ha ngha project as per the provision of EIA Notification,2006. The lease area is not of 12.355 included in forest land. The SEAC have acres or 5.00 submitted their appraisal report. ha. at village Kaindapali The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Loisingha in period. However, EC may be issued after the district of receipt of compliance to EC conditions from Bolangir the concerned Tahasildar. 21. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bhad 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Charigan ldar rak / 26.08.2 area is less than 5ha and the PP has 357/07 Mining Sand Quarry Bonth Bont 020 submitted all the required information for the -2020 over an area h project as per the provision of EIA Notification,2006. The SEAC have submitted of 5.40 acres their appraisal report. or 2.185 ha. at village The SEAC recommended to grant EC valid Charigan from the date of EC accorded upto the lease Tahasil period. Bonth in the The proposal is complete in all respect and district of the SEIAA may consider for issuance of EC Bhadrak 22. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bhad 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Gopinathpur ldar rak / 26.08.2 area is less than 5ha and the PP has 359/07 Mining Sand Quarry Bonth Bont 020 submitted all the required information for the -2020 over an area h project as per the provision of EIA Notification,2006. The SEAC have submitted of 7.00 acres their appraisal report. or 2.832 ha. at village The SEAC recommended to grant EC valid Gopinathpur from the date of EC accorded upto the lease Tahasil period. Bonth in the The proposal is complete in all respect and district of the SEIAA may consider for issuance of EC Bhadrak 23. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bhad 8823 / This is a Category B2 proposal as the lease 20 - Coal B2 Sahupada ldar rak / 26.08.2 area is less than 5ha and the PP has 360/07 Mining Sand Quarry Bonth Bont 020 submitted all the required information for the -2020 over an area h project as per the provision of EIA 33

of 9.68 acres Notification,2006. The SEAC have submitted or 3.917 ha. their appraisal report. at village Sahupada The SEAC recommended to grant EC valid from the date of EC accorded upto the lease Tahasil period. Bonth in the The proposal is complete in all respect and district of the SEIAA may consider for issuance of EC Bhadrak 24. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bhad 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Chakarapad ldar rak / 31.08.2 area is less than 5ha and the PP has 361/07 Mining hi Sand Bonth Bont 020 submitted all the required information for the -2020 Quarry over h project as per the provision of EIA Notification,2006. The SEAC have submitted an area of their appraisal report. 8.70 acres or 3.520 ha. at The SEAC recommended to grant EC valid village from the date of EC accorded upto the lease Chakarapad period. hi Tahasil The proposal is complete in all respect and Bonth in the the SEIAA may consider for issuance of EC district of Bhadrak 25. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Belgaon ldar ngir / 31.08.2 area is less than 5ha and the PP has 363/07 Mining Sand Quarry Saintal Saint 020 submitted all the required information for the -2020 over an area a ala project as per the provision of EIA Notification,2006. The SEAC have submitted of 9.50 acres their appraisal report. or 3.844 ha. at village The SEAC recommended to grant EC valid Belgaon from the date of EC accorded upto the lease Tahasil period. Saintala in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Bolangir 26. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Ampalli Sand ldar ngir / 31.08.2 area is less than 5ha and the PP has 364/07 Mining Quarry over Saintal Saint 020 submitted all the required information for the -2020 an area of a ala project as per the provision of EIA Notification,2006. The SEAC have submitted 7.10 acres or their appraisal report. 2.873 ha. at village The SEAC recommended to grant EC valid Ampalli from the date of EC accorded upto the lease Tahasil period. Saintala in 34

the district of The proposal is complete in all respect and Bolangir the SEIAA may consider for issuance of EC

27. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Kamarlaga ldar ngir / 31.08.2 area is less than 5ha and the PP has 368/07 Mining Sand Quarry Saintal Saint 020 submitted all the required information for the -2020 over an area a ala project as per the provision of EIA Notification,2006. The SEAC have submitted of 8.10 acres their appraisal report. or 3.278 ha. at village The SEAC recommended to grant EC valid Kamarlaga from the date of EC accorded upto the lease Tahasil period. Saintala in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Bolangir 28. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Chhanchhad ldar ngir / 31.08.2 area is less than 5ha and the PP has 373/07 Mining a Sand Saintal Saint 020 submitted all the required information for the -2020 Quarry over a ala project as per the provision of EIA Notification,2006. The SEAC have submitted an area of their appraisal report. 12.00 acres or 4.85 ha. at The SEAC recommended to grant EC valid village from the date of EC accorded upto the lease Chhanchhad period. a Tahasil The proposal is complete in all respect and Saintala in the SEIAA may consider for issuance of EC the district of Bolangir 29. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Mahagaon ldar ngir / 31.08.2 area is less than 5ha and the PP has 374/07 Mining Sand Quarry Saintal Saint 020 submitted all the required information for the -2020 over an area a ala project as per the provision of EIA Notification,2006. The SEAC have submitted of 12.00 their appraisal report. acres or 4.85 ha. at village The SEAC recommended to grant EC valid Mahagaon from the date of EC accorded upto the lease Tahasil period. Saintala in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Bolangir 30. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Tikrapada ldar ngir / 31.08.2 area is less than 5ha and the PP has Mining Sand Quarry 020 submitted all the required information for the 35

377/07 over an area Saintal Saint project as per the provision of EIA -2020 of 12.00 a ala Notification,2006. The SEAC have submitted acres or 4.85 their appraisal report. ha. at village The SEAC recommended to grant EC valid Tikrapada from the date of EC accorded upto the lease Tahasil period. Saintala in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Bolangir 31. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Saintala ldar ngir / 31.08.2 area is less than 5ha and the PP has 378/07 Mining Sand Quarry Saintal Saint 020 submitted all the required information for the -2020 over an area a ala project as per the provision of EIA Notification,2006. The lease area is not of 12.35 included in forest land. The SEAC have acres or 4.99 submitted their appraisal report. ha. at village Saintala The SEAC recommended to grant EC valid Tahasil from the date of EC accorded upto the lease Saintala in period. However, EC may be issued after the district of receipt of copy of Environmental Clearance, if Bolangir granted by DEIAA/SEIAA earlier and compliance to the EC conditions if granted from the concerned Tahasildar. 32. 14.07.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Bola 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Kuikeda ldar ngir / 31.08.2 area is less than 5ha and the PP has 381/07 Mining Sand Quarry Saintal Saint 020 submitted all the required information for the -2020 over an area a ala project as per the provision of EIA Notification,2006. The SEAC have submitted of 8.15 acres their appraisal report. or 3.298 ha. at village The SEAC recommended to grant EC valid Kuikeda from the date of EC accorded upto the lease Tahasil period. Saintala in The proposal is complete in all respect and the district of the SEIAA may consider for issuance of EC Bolangir 33. 14.08.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Puri / 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Kanti ldar, Pipili 31.08.2 area is less than 5ha and the PP has 425/08 Mining Kothbad Puri 020 submitted all the required information for the -2020 Sand Bed project as per the provision of EIA Notification,2006. The lease area is not over an area included in forest land. The SEAC have of 3.50 acres submitted their appraisal report. or 1.418 ha. at village

36

Kanti The SEAC recommended to grant EC valid Kothbad from the date of EC accorded upto the lease Tahasil Pipili period. However, EC may be issued after in the district receipt of copy of final DSR from the concerned Tahasildar. of Puri. 34. 14.08.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Puri / 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Kakudia ldar, Pipili 31.08.2 area is less than 5ha and the PP has 426/08 Mining Sand Bed Puri 020 submitted all the required information for the -2020 over an area project as per the provision of EIA Notification,2006. The lease area is not of 4.00 acres included in forest land. The SEAC have or 1.62 ha. at submitted their appraisal report. village Kakudia The SEAC recommended to grant EC valid Tahasil Pipili from the date of EC accorded upto the lease in the district period. However, EC may be issued after of Puri. receipt of copy of final DSR from the concerned Tahasildar. 35. 14.08.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Puri / 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Totapada ldar, Pipili 31.08.2 area is less than 5ha and the PP has 427/08 Mining Sand Bed Puri 020 submitted all the required information for the -2020 over an area project as per the provision of EIA Notification,2006. The lease area is not of 4.00 acres included in forest land. The SEAC have or 1.62 ha. at submitted their appraisal report. village Totapada The SEAC recommended to grant EC valid Tahasil Pipili from the date of EC accorded upto the lease in the district period. However, EC may be issued after of Puri receipt of copy of final DSR from the concerned Tahasildar. 36. 14.08.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Puri / 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Patelikuda ldar, Pipili 31.08.2 area is less than 5ha and the PP has 428/08 Mining Sand Bed Puri 020 submitted all the required information for the -2020 over an area project as per the provision of EIA Notification,2006. The lease area is not of 4.00 acres included in forest land. The SEAC have or 1.62 ha. at submitted their appraisal report. village Patelikuda The SEAC recommended to grant EC valid Tahasil Pipili from the date of EC accorded up to the lease in the district period. However, EC may be issued after of Puri receipt of following documents: a) Copy of final DSR from the concerned Tahasildar. b) Clarification from the irrigation authority of Puri / Nimapada with regard to river 37

embankment in the lease area with distance from the boundary of mine.

37. 14.08.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Puri / 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Gangapada ldar, Pipili 31.08.2 area is less than 5ha and the PP has 429/08 Mining Sand Bed Puri 020 submitted all the required information for the -2020 over an area project as per the provision of EIA Notification,2006. The lease area is not of 3.50 acres included in forest land. The SEAC have or 1.418 ha. submitted their appraisal report. at village Gangapada The SEAC recommended to grant EC valid Tahasil Pipili from the date of EC accorded upto the lease in the district period. However, EC may be issued after of Puri receipt of copy of final DSR from the concerned Tahasildar. 38. 14.08.20 Manual SEIAA Non- 1(a) Proposal for Tahasi Puri / 8833 / This is a Category B2 proposal as the lease 20 - Coal B2 Gobardhanp ldar, Pipili 31.08.2 area is less than 5ha and the PP has 430/08 Mining ur Sultnnagar Puri 020 submitted all the required information for the -2020 Sand Bed project as per the provision of EIA Notification,2006. The lease area is not over an area included in forest land. The SEAC have of 4.50 acres submitted their appraisal report. or 1.823 ha. at village The SEAC recommended to grant EC valid Gobardhanp from the date of EC accorded up to the lease ur Sultnnagar period. However, EC may be issued after Tahasil Pipili receipt following document: in the district a) Copy of final DSR from the concerned of Puri. Tahasildar. b) Letter from irrigation authority Puri / Nimapada with regard to presence of river embankment along with distance.

38