Form 1M for Road Metal 2018
Total Page:16
File Type:pdf, Size:1020Kb
FORM 1M FOR ROAD METAL 2018 FORM 1M For Proposed Road Metal Quarry Lease area over an extent of 2.5 Ha., In Sy.no.90(Govt Land) of Tirupatammapeta(V),Rowthulapudi (M), East Godavaari District. Andhra Pradesh. Submitted To District Expert Appraisal Committee (DEAC), District Environmental Impact Assessment Authority, East Godavari. Submitted by M/s Sai Rama Stone Crusher Prop: Sri Tummalapalli Manikyam D.No.12-49,Challavari street,Chebrolu village, Gollaprolu Mandal,East Godavari District, Andhrapradesh Prepared by V.C.N.Rangaswamy Consultant Geologist & RQP Mobile: 9963774884 M/s Sai Rama Stone Crusher P a g e | 1 FORM 1M FOR ROAD METAL 2018 FORM 1M (I) Basic Information Sl.No. Item Details 1. Name of the Mining Lease site Road Metal Mining of M/s. Sai Rama Stone Crusher,Prop:Sri Tummalapalli Manikyam 2. S.No. in the schedule Item- 1(a), Mining of Minerals 3. Proposedcapacity/area/length/tonnage 30,000 Cu.m per annum; tobe handled/command area/lease QL area:2.5 Ha; area/number of wells to be drilled. 4. New/Expansion/Modernization The proposal is for the Environmental Clearance. 5. Existing Capacity/Area etc. The Area of Extent of the Quarry Lease Area is 2.5 Hectares. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ [B2] 7. Does it attract the general condition? If No General Conditions apply to this project. yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Latitude Longitude 17° 25' 03.62" N 82° 21' 44.62" E 17° 25' 00.10" N 82° 21' 47.09" E 17° 24' 58.44" N 82° 21' 41.92" E 17° 25' 03.78" N 82° 21' 37.99" E 17° 25' 04.53" N 82° 21' 39.88" E 17° 25' 02.73" N 82° 21' 41.35" E Plot/Survey/Khasra No. Sy. No’s.90(Govt.,Land) Village Tirupatammapeta Village, Tehsil Rowthulapudi Mandal, District East Godavari District and State Andhrapradesh 10. Infrastructural Facilities Railway Line Tuni RS -31 km Port Kakinada - 50 km National Highway NH 16 -15 kms,NH216-19 kms State Highway SH-38 at a distance of 21 kms Major District Road Access Road-0.1 kms due North,Balarampuram- Mullagudi Rosd-2kms Due East,Mallampeta- Santapaidiapala Road -1 kms Due South Electric transmission lie pole or tower None with in lease area Canal or check dam or reservoirs or Gavariah Koneru-17.4 km Due SE lake or ponds Erra Koneru-16.3 km Due SE Pampa Reservoir – 15 kms Due South M/s Sai Rama Stone Crusher P a g e | 2 FORM 1M FOR ROAD METAL 2018 Yeleru Reservoir – 30 kms Due West 11. NearestHabitation/Village, Town, city, Habitation Mallampeta– 0.9 km due NE district Headquarters along with Town- Routhulapudi at 4.4 km due SE; distance in kms. District Headquarters-East Godavari 12. Village Panchayats, Zilla Parishad, Village Panchayat- Tirupatammapeta Village, Municipal Corporation, Local body Zilla Parishad- Routhulapudi Mandal (complete postal addresses with Municipal Corporation- East Godavari District telephone nos. to be given) and Andhrapradesh. 13. Name of the applicant Applicant-M/s.Sai Rama Stone Crusher Prop:Sri Tummalapalli Manikyam 14. Registered Address D.No.12-49,Challavari Street,Chebrolu Village,Gollaprolu Mandal,East Godavari District, Andhra Pradesh 15. Address for correspondence: Name Sri Tummalapalli Manikyam Designation (Owner/Partner /CEO) Proprietor, Pin code E-mail ------------- Telephone No. 9573257074 Fax No. ------- 16. Details of Alternative Sites examined, if Not Applicable any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects NIL 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Not applicable Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. Notification, 1991? 22. Whether there is any Government G.O Copy submitted along with Mining scheme Order/Policy relevant /relating to the site? 23. Forest land involved (hectares) No Forest land is involved at the Quarry Lease Area. 24. Whether there is any litigation pending No litigation or court case is pending against the M/s Sai Rama Stone Crusher P a g e | 3 FORM 1M FOR ROAD METAL 2018 against the project and/or land in which proposed project. the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II). Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Proposed mining will be done in the use, land cover or topography lease area by Opencast Semi including increase in intensity of Mechanized method. land use (with respect to local land use The subject area is an hilly terrain plan) land. Because of mining except degradation of height from existing level, no land use and land cover will be changed. 1.2 Clearance of existing land, vegetation Yes The quarry lease area is a land and buildings? comprising of mineral deposit Road Metal, along with bushy and thorny vegetation. Hence, clearance of this little vegetation occurs. No major clearances of buildings occur at the Quarry Lease Area. 1.3 Creation of new land uses? Yes No creation of new land occurs at the QL area. In future, once the economically viable Road Metal is excavated from the area, back filling process occurs. 1.4 Pre-construction investigations e.g. bore Yes Preliminary investigations have been houses, soil testing? carried out at the Quarry Lease and the Mining Plan has been prepared. 1.5 Construction works? Yes Rest rooms, First Aid room, Shelters, Lavatory, Bore Well for Drinking water are the construction works that occurred at the Quarry Lease Area. 1.6 Demolition works? No There are no buildings in the quarry M/s Sai Rama Stone Crusher P a g e | 4 FORM 1M FOR ROAD METAL 2018 lease area. Hence, demolition works are not envisaged. 1.7 Temporary sites used for construction No Not envisaged. works orhousing of construction workers? 1.8 Above ground buildings, structures or No Not envisaged. Earthworks including linear structures, cut andfill or excavations. 1.9 Underground works including mining or No Not Applicable tunneling? 1.10 Reclamation works? No Phase-wise reclamation of mined out blocks will be practiced. 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing Yes 30,000 Cu.m per annum of Road processes? Metal is the proposed production from the QL area. However, no beneficiation including processing is done at the lease area. 1.14 Facilities for storage of goods or Yes Waste dump yard facilities are materials? proposed for the storage of goods and materials located to the North side of the QL area. 1.15 Facilities for treatment or disposal of Yes Waste generated during production solid waste or liquid effluents? and development work is transported to the dumping yard located towards the North side from the working pit at the QL area. 1.16 Facilities for long term housing of No Not envisaged. operational workers? 1.17 New road, rail or sea traffic during No Haul roads exist at the Quarry Lease construction or operation? area for the transportation of Road Metal. No new rail network or sea route is proposed for the mining project. 1.18 New road, rail, air waterborne or other No Non-metalled approach road from the transport infrastructure including new or mine lease area has been laid. altered routes and stations, ports, No other major road, rail, transport airports etc? network is envisaged for the mining project. 1.19 Closure or diversion of existing No Not envisaged. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not envisaged. M/s Sai Rama Stone Crusher P a g e | 5 FORM 1M FOR ROAD METAL 2018 pipelines? 1.21 Impoundment, damming, culvert, No Not envisaged. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not envisaged 1.23 Abstraction or transfers of water from No Drinking water is provided to the ground or surface waters? mine workers from the borewell situated at the site. Hence, abstraction or transfers of water from ground or surface waters at the mine lease area does not occur. 1.24 Changes in water bodies or the land No The rain water flows through the surface affecting drainage or run-off? slopes and joins to the seasonal nalas. 1.25 Transport of personnel or materials for No Not envisaged.Transportation of construction, operation or ROM to the crushing plant decommissioning? 1.26 Long-term dismantling or No Not envisaged. decommissioning or restorationworks? 1.27 Ongoing activity during No Not Envisaged. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No The total man power required during temporarily or permanently? the Quarrying Operations is -16 and is made available from the nearby villages. Hence, no major influx of people is envisaged at the mine. 1.29 Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic No Not envisaged diversity? 1.31 Any other actions? No Not Envisaged 2.