FORM 1M FOR ROAD METAL 2018

FORM 1M

For Proposed Road Metal Quarry Lease area over an extent of 2.5 Ha., In Sy.no.90(Govt Land) of Tirupatammapeta(V),Rowthulapudi (M), East Godavaari District. .

Submitted To District Expert Appraisal Committee (DEAC), District Environmental Impact Assessment Authority, East Godavari.

Submitted by M/s Sai Rama Stone Crusher Prop: Sri Tummalapalli Manikyam D.No.12-49,Challavari street,Chebrolu , Gollaprolu Mandal,, Andhrapradesh

Prepared by V.C.N.Rangaswamy Consultant Geologist & RQP Mobile: 9963774884

M/s Sai Rama Stone Crusher P a g e | 1

FORM 1M FOR ROAD METAL 2018

FORM 1M

(I) Basic Information

Sl.No. Item Details 1. Name of the Mining Lease site Road Metal Mining of M/s. Sai Rama Stone Crusher,Prop:Sri Tummalapalli Manikyam 2. S.No. in the schedule Item- 1(a), Mining of Minerals 3. Proposedcapacity/area/length/tonnage 30,000 Cu.m per annum; tobe handled/command area/lease QL area:2.5 Ha; area/number of wells to be drilled. 4. New/Expansion/Modernization The proposal is for the Environmental Clearance. 5. Existing Capacity/Area etc. The Area of Extent of the Quarry Lease Area is 2.5 Hectares. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ [B2] 7. Does it attract the general condition? If No General Conditions apply to this project. yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Latitude Longitude 17° 25' 03.62" N 82° 21' 44.62" E 17° 25' 00.10" N 82° 21' 47.09" E 17° 24' 58.44" N 82° 21' 41.92" E 17° 25' 03.78" N 82° 21' 37.99" E 17° 25' 04.53" N 82° 21' 39.88" E 17° 25' 02.73" N 82° 21' 41.35" E

Plot/Survey/Khasra No. Sy. No’s.90(Govt.,Land) Village Tirupatammapeta Village, Rowthulapudi Mandal, District East Godavari District and State Andhrapradesh 10. Infrastructural Facilities Railway Line RS -31 km Port - 50 km National Highway NH 16 -15 kms,NH216-19 kms State Highway SH-38 at a distance of 21 kms Major District Road Access Road-0.1 kms due North,Balarampuram- Mullagudi Rosd-2kms Due East,Mallampeta- Santapaidiapala Road -1 kms Due South Electric transmission lie pole or tower None with in lease area Canal or check dam or reservoirs or Gavariah Koneru-17.4 km Due SE lake or ponds Erra Koneru-16.3 km Due SE Pampa Reservoir – 15 kms Due South

M/s Sai Rama Stone Crusher P a g e | 2

FORM 1M FOR ROAD METAL 2018

Yeleru Reservoir – 30 kms Due West 11. NearestHabitation/Village, , , Habitation Mallampeta– 0.9 km due NE district Headquarters along with Town- Routhulapudi at 4.4 km due SE; distance in kms. District Headquarters-East Godavari 12. Village Panchayats, Zilla Parishad, Village Panchayat- Tirupatammapeta Village, Municipal Corporation, Local body Zilla Parishad- Routhulapudi Mandal (complete postal addresses with Municipal Corporation- East Godavari District telephone nos. to be given) and Andhrapradesh. 13. Name of the applicant Applicant-M/s.Sai Rama Stone Crusher Prop:Sri Tummalapalli Manikyam 14. Registered Address D.No.12-49,Challavari Street,Chebrolu Village,Gollaprolu Mandal,East Godavari District, Andhra Pradesh 15. Address for correspondence: Name Sri Tummalapalli Manikyam Designation (Owner/Partner /CEO) Proprietor, Pin code E-mail ------Telephone No. 9573257074 Fax No. ------

16. Details of Alternative Sites examined, if Not Applicable any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects NIL 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Not applicable Act, 1980? ii. The Wildlife (Protection) Act, 1972? iii. The C.R.Z. Notification, 1991? 22. Whether there is any Government G.O Copy submitted along with Mining scheme Order/Policy relevant /relating to the site? 23. Forest land involved (hectares) No Forest land is involved at the Quarry Lease Area. 24. Whether there is any litigation pending No litigation or court case is pending against the

M/s Sai Rama Stone Crusher P a g e | 3

FORM 1M FOR ROAD METAL 2018

against the project and/or land in which proposed project. the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project.

(II). Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Proposed mining will be done in the use, land cover or topography lease area by Opencast Semi including increase in intensity of Mechanized method. land use (with respect to local land use The subject area is an hilly terrain plan) land. Because of mining except degradation of height from existing level, no land use and land cover will be changed. 1.2 Clearance of existing land, vegetation Yes The quarry lease area is a land and buildings? comprising of mineral deposit Road Metal, along with bushy and thorny vegetation. Hence, clearance of this little vegetation occurs. No major clearances of buildings occur at the Quarry Lease Area. 1.3 Creation of new land uses? Yes No creation of new land occurs at the QL area. In future, once the economically viable Road Metal is excavated from the area, back filling process occurs. 1.4 Pre-construction investigations e.g. bore Yes Preliminary investigations have been houses, soil testing? carried out at the Quarry Lease and the Mining Plan has been prepared. 1.5 Construction works? Yes Rest rooms, First Aid room, Shelters, Lavatory, Bore Well for Drinking water are the construction works that occurred at the Quarry Lease Area. 1.6 Demolition works? No There are no buildings in the quarry

M/s Sai Rama Stone Crusher P a g e | 4

FORM 1M FOR ROAD METAL 2018

lease area. Hence, demolition works are not envisaged. 1.7 Temporary sites used for construction No Not envisaged. works orhousing of construction workers? 1.8 Above ground buildings, structures or No Not envisaged. Earthworks including linear structures, cut andfill or excavations. 1.9 Underground works including mining or No Not Applicable tunneling? 1.10 Reclamation works? No Phase-wise reclamation of mined out blocks will be practiced. 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing Yes 30,000 Cu.m per annum of Road processes? Metal is the proposed production from the QL area. However, no beneficiation including processing is done at the lease area. 1.14 Facilities for storage of goods or Yes Waste dump yard facilities are materials? proposed for the storage of goods and materials located to the North side of the QL area. 1.15 Facilities for treatment or disposal of Yes Waste generated during production solid waste or liquid effluents? and development work is transported to the dumping yard located towards the North side from the working pit at the QL area. 1.16 Facilities for long term housing of No Not envisaged. operational workers? 1.17 New road, rail or sea traffic during No Haul roads exist at the Quarry Lease construction or operation? area for the transportation of Road Metal. No new rail network or sea route is proposed for the mining project. 1.18 New road, rail, air waterborne or other No Non-metalled approach road from the transport infrastructure including new or mine lease area has been laid. altered routes and stations, ports, No other major road, rail, transport airports etc? network is envisaged for the mining project. 1.19 Closure or diversion of existing No Not envisaged. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not envisaged.

M/s Sai Rama Stone Crusher P a g e | 5

FORM 1M FOR ROAD METAL 2018

pipelines? 1.21 Impoundment, damming, culvert, No Not envisaged. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not envisaged 1.23 Abstraction or transfers of water from No Drinking water is provided to the ground or surface waters? mine workers from the borewell situated at the site. Hence, abstraction or transfers of water from ground or surface waters at the mine lease area does not occur. 1.24 Changes in water bodies or the land No The rain water flows through the surface affecting drainage or run-off? slopes and joins to the seasonal nalas. 1.25 Transport of personnel or materials for No Not envisaged.Transportation of construction, operation or ROM to the crushing plant decommissioning? 1.26 Long-term dismantling or No Not envisaged. decommissioning or restorationworks? 1.27 Ongoing activity during No Not Envisaged. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No The total man power required during temporarily or permanently? the Quarrying Operations is -16 and is made available from the nearby . Hence, no major influx of people is envisaged at the mine. 1.29 Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic No Not envisaged diversity? 1.31 Any other actions? No Not Envisaged

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The Quarry Lease Area is a Govt., agricultural land (ha) Land is consisting of Road Metal made available for Mining. 2.2 Water (expected source & competing Yes 3.0 KL/day of water is used during

M/s Sai Rama Stone Crusher P a g e | 6

FORM 1M FOR ROAD METAL 2018

users) unit: KLD the quarrying operations. Source – Bore well nearby 2.3 Minerals (MT) No Not applicable

2.4 Construction material–stone, Yes Requirement of small quantities of aggregates, sand/soil construction materials are sourced (expected source – MT) from the nearby areas for construction of office and rest shelter. 2.5 Forests and timber (source – MT) No Not applicable 2.6 Energy including electricity and fuels Yes Open-Cast Semi-Mechanized (source, competing users) Unit: fuel Method of Mining is being (MT), energy (MW) undertaken at the QL area. Hence, fuels and energy consumption is required. 2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No Not envisaged. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No Not envisaged. affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes Quarrying Operations provide income changing living conditions? thereby improving the economic condition of the people at the area. 3.4 Vulnerable groups of people who No Not envisaged. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not envisaged.

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

M/s Sai Rama Stone Crusher P a g e | 7

FORM 1M FOR ROAD METAL 2018

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Yes Soil and waste rock pieces are generated during mining and dimensional blocks dressing. Such waste is stacked at waste dumping yard situated at North side of the QL area. 4.2 Municipal waste (domestic and or No No major municipal waste occurs at commercial wastes) the Quarry Lease Area. 4.3 Hazardous wastes (as per Hazardous No Not envisaged. Waste Management Rules) 4.4 Other industrial process wastes No Not envisaged 4.5 Surplus product No Not envisaged 4.6 Sewage sludge or other sludge from No Not envisaged effluent treatment 4.7 Construction or demolition wastes No Not envisaged

4.8 Redundant machinery or equipment No Not envisaged

4.9 Contaminated soils or other No Not envisaged materials 4.10 Agricultural wastes No Not envisaged 4.11 Other solid wastes No Not envisaged

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes Emissions will be generated from - fossil fuels from stationary or HEMM during mining operations and mobile sources from trucks during transportation

5.2 Emissions from production Yes Mining Operations generate fugitive processes dust emissions. The control measures will be water spraying at loading, unloading points and haul road through mobile water sprinklers. 5.3 Emissions from materials handling Yes Dust is generated during transportation including storage or transport of Road Metal from non-metalled roads to the processing units.

M/s Sai Rama Stone Crusher P a g e | 8

FORM 1M FOR ROAD METAL 2018

5.4 Emissions from construction No No major construction activities are activities including plant and envisaged at the Quarry Lease Area. equipment 5.5 Dust or odors from handling of Yes Dust is generated during drilling, materials including construction hauling on roads, and places of materials, sewage and waste. excavation. Wet drilling and dust extractor arrangements are provided to drilling units so as to control raising of the dust from the site. 5.6 Emissions from incineration of No Not envisaged waste 5.7 Emissions from burning of waste in No Not envisaged open air(e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not envisaged

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Noise will be generated from vehicles engines, ventilation plant, crushers and machinery and blasting activities. 6.2 From industrial or similar processes No Not envisaged. 6.3 From construction or demolition No No major construction/ demolitions are envisaged. 6.4 From blasting or piling Yes Noise is generated during blasting operation, which is instantaneous in nature. 6.5 From construction or operational No Not envisaged traffic 6.6 From lighting or cooling systems No No lighting or cooling systems are involved 6.7 From any other sources No There are no other sources to generate Noise and Vibrations.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data

M/s Sai Rama Stone Crusher P a g e | 9

FORM 1M FOR ROAD METAL 2018

7.1 From handling, storage, use or No There will be no handling,storage,use or spillage of hazardous materials spilage of hazardous materials. 7.2 From discharge of sewage or other No No effluent and sewage will be effluents to water or the land generated from the proposed project (expected mode and place of site. discharge) 7.3 By deposition of pollutants emitted No Dust emissions will be limited to the to air into the land or into water site itself which will be suppressed by regular water sprinkling.

7.4 From any other sources No Not applicable 7.5 Is there a risk of long term buildup No There is no risk of long term build up of of pollutants in the environment pollutants in the environment from the from these sources? proposed project operations, as frequent dust suppressions would be taken up in quarry lease area and connecting roads.

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires No Not applicable etc. from storage, handling, use or production of hazardous substances 8.2 From any other causes No Not applicable 8.3 Could the project be affected by No Not applicable. natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc.)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting Yes facilities, ancillary development or

M/s Sai Rama Stone Crusher P a g e | 10

FORM 1M FOR ROAD METAL 2018

development stimulated by the project which could have impact on the environment e.g.: Generation of employment and • Supporting infrastructure (roads, improved standard of living. power supply, waste or wastewater treatment, etc.) • housing development Increased revenue to the state by way • extractive industries of Royalty ,Taxes and Duties. • supply industries • other 9.2 Lead to after-use of the site, which Yes There would be minor impact on the could havean impact on the environment as quarry pits will be environment converted in to water reservoirs, which recharge the ground water levels in the area. 9.3 Set a precedent for later Yes A better after use scenario, which is developments likely to increase aesthetic beauty of the area by converting the excavated region into water reservoirs and green cover. 9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

(II) Environmental Sensitivity Areas Name/ Aerial distance (within 15 S.No. Identity km) Proposed project location boundary 1. Areas protected under international None Not applicable conventions, national or local legislat ion for their ecological, landscape, cultural or other related value 2. Areas which are important or sensitive Water Gavariah Koneru-17.4 km Due SE for ecological reasons - Wetlands, Bodies Erra Koneru-16.3 km Due SE watercourses or other Pampa Reservoir – 15 kms Due waterbodies, coastal zone,biospheres, South mountains, forests Yeleru Reservoir – 30 kms Due West

Reserved Santapaidipala Reserved Forest- Forest 2.5kms Due West,Raghavapatnam Reserved Forest-2.1 kms Due North

M/s Sai Rama Stone Crusher P a g e | 11

FORM 1M FOR ROAD METAL 2018

3. Areas used by protected, importantor No Not applicable sensitive species of flora or fauna for Breeding, nesting, foraging, resting, over wintering, migration. 4. Inland, coastal, marine or No Not applicable underground waters 5. State, National boundaries No Not applicable 6. Routes or facilities used by the public No Not applicable for access to recreation or other tourist, pilgrim areas 7. Defense installations No Not applicable 8. Densely populated or built-up area No Not applicable 9. Areas occupied by sensitive man-made Hospital Rowthulapudi – 4.4 km due SE land uses (hospitals, schools, places of worship, community facilities) 10. Areas containing important, high Reserved ---- quality or scarce resources( ground Forests water resources, surface resources, with in 10 forestry, agriculture, fisheries, tourism, km radius minerals) 11. Areas already subjected to pollution No Not applicable or environmental damage. (those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural hazard No Not applicable which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or adverse climatic conditions)

M/s Sai Rama Stone Crusher P a g e | 12