National Electric Power Regulatory Authority Islamic Republic of

NEPRA Tower, Ataturk Avenue (East) G-511, Ph: +92-51-9206500, Fax: +92-51-2600021 Registrar Web: www.nepra.org.pk, E-mail: [email protected]

No. NEPRA/R/LAG-247/ 5-9 7 - Li June 11, 2014 Mr. Abid Rasool Awan Manager Corporate Affairs Power Limited 55-K, Model Town,

Subject: Generation Licence No. IGSPL/41/2014 Licence Application No. LAG-247 Chiniot Power Limited

Reference: Your letter No. nil, dated March 03, 2014.

Enclosed please find herewith Determination of the Authority in the matter of Generation Licence Application of Chiniot Power Limited (CPL) along with Generation Licence No. IGSPL/41/2014 annexed to this determination granted by the National Electric Power Regulatory Authority to CPL, pursuant to Section 15 of the Regulation of Generation, Transmission and Distribution of Electric Power Act (XL of 1997).

2. Please quote above mentioned Generation Licence No. for future correspondence.

Enclosure: Generation Licence (IGSPL/41/2014)

(Syed Safeer Hussain) Copy to:

1. Chief Executive Officer, Alternative Energy Development Board (AEDB), 2nd Floor, OPF Building, G-5/2, Islamabad. 2. Chief Executive Officer, NTDC, 4 I4-WAPDA House, Lahore 3. Chief Operating Officer, CPPA, 107-WAPDA House, Lahore 4. Chief Executive Officer, Electric Supply Company (FESCO), Abdullahpur, Canal Bank Road, Faisalabad 5. Director General, Pakistan Environmental Protection Agency, Plot No. 41, Street No. 6, H-8/2, Islamabad. National Electric Power Regulatory Authority NEPRA

Determination of the Authority in the Matter of Generation Licence Application of Chiniot Power Limited

June 10, 2014 Application/Case No. LAG-247

(A). Background

(i). (GoP) has set up Alternative Energy Development Board (AEDB) for development of Renewable Energy (RE) resources in the Country. Further, GoP through AEDB formulated "the Policy for Development of Renewable Energy (RE) for Power Generation 2006" (hereafter the Policy) for the development of Small Hydro, Wind, and Solar Technologies.

(ii). Later on, the GoP amended the scope of the Policy to include Power Projects based on Bagasse, Biomass, Waste-to-Energy and Bio-Energy, using High-Pressure (minimum 60 bar) Boiler Technology. Further, GoP also extended the applicability of the Policy to be continued for an additional five years w.e.f. March 06, 2013. In accordance with the said amendments, AEDB has issued Letter of Intent (Lol) to different entrepreneurs/ Power Developers including Chiniot Power Limited (CPL), for setting up a Bagasse based Power Project at 26 KM, Chiniot - Road District Chiniot, in the Province of Punjab on Fast Track Basis.

(iii). According to the terms and conditions of the Lol and being a Fast Track Project, sponsors of the project were not required to carry out any Feasibility Study (FS) for the project but were directed to approach NEPRA for issuance of Generation Licence and acceptance of the Authority determined Up- front Tariff.

(B). Filing of Generation Licence Application

(i). CPL in accordance with the Section 15 of Regulation of Generation, Transmission and Distribution of Electric Power Act 1997 (the NEPRA Act), filed an application on March 03, 2014 requesting for grant of a Generation Licence. Registrar examined the submitted application and found the same non-compliant with the NEPRA Licensing (Application and Modification Procedure) Regulations, 1999 ("the Regulations").

(ii). In view of the above, Registrar directed CPL for submitting the required missing information/documents as stipulated in the Regulations. CPL completed the submission of the said information/documentation on March 25, 2014. After completion of the required information, the Authority admitted the application under Regulation 7 of the Regulations on April 22, 2014 for consideration of grant of a Generation Licence. The Authority approved the draft of the Advertisement/Notice of Admission (NoA) to be published in daily newspapers, for informing and seeking comments of the general public as stipulated in Regulation 8 of the Regulations. The Authority also approved the list of interested/affected parties for inviting comments or otherwise assisting the Authority in the matter as stipulated in Regulation 9 (2) of the Regulations.

(iii). Accordingly, Advertisement/NoA was published in one and one English National Newspaper on April 30, 2014. Further, separate notices were also sent to Individual Experts/Government Ministries/Representative Organizations etc. on May 02, 2014 for submitting their views/comments in the matter, for the assistance of the Authority. (C). Comments of Stakeholders

(i). In reply to the above, the Authority received comments from four (04) stakeholders. These included Central Power Purchasing Agency (CPPA) of National Transmission and Despatch Company Limited (NTDC), Alternative Energy Development Board (AEDB), Faisalabad Electric Supply Company Limited (FESCO) and Ministry of Petroleum and Natural Resources (MoP&NR). The salient points of the comments offered by the said stakeholders are summarized in the following paragraphs: -

(a). CPPA in its comments confirmed that AEDB had issued an Lol under the Policy. CPPA clarified that FESCO being the respective DISCO would be responsible to incur cost of interconnection, grid station upgrades etc. as per the Policy. CPPA also confirmed that FESCO had been requested to arrange construction of Interconnection and Transmission Facilities in accordance with approved Interconnection Study Report so that power from the generation facilities of CPL is evacuated well in time. CPPA also stated that it had already filed Power Acquisition Request (PAR) with the Authority. CPPA confirmed that it had no reservation for grant of Generation Licence to CPL subject to meeting of all the conditions laid down in the NEPRA Licensing (Generation) Rules-2000 (the Rules);

(b). AEDB confirmed that it issued an Lol to CPL under the Policy for setting up a 57.00 MW (Net Capacity), Co-generation Power Plant at Chiniot, in the Province of Punjab. AEDB supported the request of CPL for issuance of Generation Licence;

Page 3 of 8 (c). FESCO in its comments remarked that CPL would be a source of low cost power generation with the use of indigenous fuel. Keeping in view the countrywide shortage of power, FESCO has no objection to the grant of Generation Licence to CPL;

(d). MoP&NR remarked that CPL intends to install a Bagasse based Thermal Power Plant for which no Natural Gas is required. Therefore, MoP&NR has no objection to the grant of Generation Licence to CPL.

(ii). In view of the favorable comments of the above mentioned stakeholders, the Authority considered it appropriate to process the Generation Licence application of CPL expeditiously as stipulated in the Regulations and Rules.

(D). Grant of Generation Licence

(i). Energy is fundamental input to economic activity, and thus to human welfare and progress. The importance of electricity in the development of the economy of any country is beyond any doubt. The Economic Growth of any country is directly linked with the availability of safe, secure, reliable and cheaper supply of electricity. In view of the said reasons, the Authority is of the considered opinion that for sustainable development all indigenous power generation resources including Coal, Hydel, Wind, Solar and other RE resources must be developed on priority basis in the public and private sector.

(ii). The existing energy mix of the country is heavily skewed towards the costlier thermal power plants, mainly operating on imported furnace oil. The continuously increasing trend in fuel prices is not only creating pressure on the precious foreign exchange reserves of the country but is also an environmental concern. Therefore, in order to achieve sustainable development it is imperative that indigenous RE resources are given priority for power generation and their development is encouraged. The Energy Security Action Plan 2005 (ESAP) of GoP, also recognizes this very aspect of power generation through RE and envisages that at least 5% of total national power generation capacity (i.e. 9700 MW) to be met through RE resources by 2030. The Authority considers that the proposed project of CPL is consistent with the provisions of ESAP. The project will help in diversifying the energy portfolio of the country. Further, it will not only enhance the energy security of the country by reducing the dependence on imported furnace oil but will also help reduction in carbon emission by generating clean electricity, thus improving the environment.

(iii). CPL is setting up a Co-Generation Facility/Thermal Power Plant at 26 KM, Chiniot-Jhang Road, District Chiniot, in the Province of Punjab. The said facility would be utilizing Bagasse/Biomass as the main fuel during the cane crushing season or till the time Bagasse/Biomass lasts. According to the provided information, CPL would supply to Ramzan Sugar Mills Limited (RSML) around 15.00 MW in the Crushing Season. Whereas in the Off-Season time the supply of electric power would be restricted to 3.00 MW. Accordingly, CPL during the Crushing Season would be supplying to NTDC around 39.50 MW whereas in the non-Crushing Season it would be providing around 54.10 MW. It is clarified that pursuant to provisions of Section 22 of the NEPRA Act, the Authority may permit a Generation Company selling to a Bulk Power Consumer (BPC). Whereas, BPC is a consumer which purchases or receives electric power at one premises, in an amount of 1.00 MW or more. As explained above, the load level for RSML is above the Minimum Level (1.00 MW), therefore for the purpose of supply of electric power, the Authority has considered RSML as a BPC of CPL as stipulated in the NEPRA Act. The Section 2(v) of the NEPRA Act, wherein the ownership, operation, management and control of distribution facilities located on private property and used solely to move or deliver electric power to the person owning, operating, managing and controlling those facilities or to tenants thereof is not included in the definition of "distribution". The distribution facilities [two (02) Underground XLPE 11 KV cables, measuring about 500 meters, 2R-1 C x 500 sqmm/phase) to be used for delivery of electric power to RSML are located on private property (without involving any public property or any third party) would be owned, operated, managed and controlled by RSML. Therefore, the supply of electric power to RSML by CPL does not constitute a distribution activity under the Act, and a Distribution Licence would not be required by RSML. The Authority has observed that RSML is an existing B-2(b) consumer (with Sanctioned Load of 498.00 KW) of FESCO. In this particular case, RSML has confirmed that despite purchasing from CPL it would continue to be a consumer of FESCO and would not stop purchasing electric power from FESCO, at least for the time being. The Authority hereby clarifies that in terms of Section 22(2) of the NEPRA Act, RSML is required to give three (03) years notice to FESCO, if it stops purchasing power from it.

(iv). The Term of a Generation Licence under the Rules is to be commensurate with the maximum expected life of the units comprised in a generating facility. According to the information provided by CPL, the proposed Generation Facility would be achieving the Commercial Operation Date (COD) by July 01, 2015 and would have a useful life of more than thirty (30) years from its COD. CPL has requested that the term of the proposed Generation Licence may be fixed to thirty (30) years in consistent with the term of the proposed Energy Purchase Agreement (EPA) to be signed with CPPA. The Authority considers that information provided by CPL about the useful life of the Steam Turbine and the subsequent request of CPL to fix the term of the Generation Licence is rational. Therefore, the Authority sets the term of the Generation Licence to thirty (30) years from COD of the Co-Generation/Generation Facility.

(v). Regarding the Tariff, it is clarified that in terms of Rule 6 of the Rules, for the provision of electric power, the Licensee is allowed to charge only such ,_, tariff as may be determined, approved or specified by the Authority. CPL has already applied for the acceptance of the Up-front Tariff in accordance with the Determination of the Authority No. NEPRA/R/TRF-UTB-2013/5152-5154, dated May 29, 2013. The Authority in its Regulatory Meeting held on April 22, 2014 admitted the request of CPL. The final decision in this regard is expected to be issued soon. Accordingly, the Authority directs CPL to strictly adhere to the terms and conditions of the Generation Licence and that of Up-front Tariff. The matter of rates, charges and terms and conditions of tariff between CPL and its BPC- RSML(collectively called the Parties) is required to be approved by the Authority, as stipulated in Rule 6 of the Rules. Therefore, for the purpose of tariff for the electric power to be supplied to RSML by CPL, the parties may enter into a Bi- Lateral Contract and submit the same for the consideration and approval of the Authority. Accordingly, CPL is advised to submit the Bi-Lateral Contract/Power Purchase Agreement to be executed with RSML for approval.

(vi). The proposed Co-Generation Power Plant/Generation Facility of CPL would be using RE Resource for Generation of electric Power. Therefore, the project may qualify for the Carbon Credit under the Koyoto Protocol (for RE projects coming into operation upto 2020). In view of the said, the Authority directs CPL to initiate the process in this regard at the earliest so that proceeds for the Carbon Credits are materialized. CPL shall be required to shares the proceeds of the Carbon Credits with the Power Purchaser as stipulated in Article 13 of its Generation Licence.

(vii). The proposed Co-Generation Power Plant/Generation Facility of CPL for which Licence has been sought, is a Conventional Steam Turbine Power Plant using Bagasse/Biomass as fuel to be burned in the High Pressure boilers. Bagasse is a RE source which does not cause pollution however, the operation of the generation facility may cause some other type of pollution including Soil Pollution, Water Pollution and Noise Pollution. The Authority has considered these aspects and has made CPL obligatory to comply with the required rules and regulation on environment. Further, the Authority directs CPL to submit a quarterly

report confirming that its operation is compliant with required Environmental Standards of the Environmental Protection Agency of Govt. of Punjab.

(viii),In view of the above, the Authority hereby decides to approve the grant of Generation Licence to CPL on the terms set out in the Generation Licence annexed to this determination. The grant of Generation Licence will be subject to the provisions contained in the NEPRA Act, relevant rules and regulations framed there under including the Grid Code.

Authorit 4 Maj. Retd Haroon RasCx-ii Member

1

Khawaja Muhammad Naeem Member

Habibullah Khilji Member/Vice Chairman

Page 8 of 8 National Electric Power Regulatory Authority (NEPRA) Islamabad Pakistan

GENERATION LICENCE No. IGSPL/41/2014

In exercise of the Powers conferred upon the National Electric Power Regulatory Authority (NEPRA) under Section 15 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, the Authority hereby grants a Generation Licence to:

CHINIOT POWER LIMITED

Incorporated under the Companies Ordinance, 1984 Under Corporate Universal Identification No. 0084890, dated August 26, 2013 for its Bagasse based Co-Generation Facility Located at 26-KM Chiniot-Jhanq Road, Tehsil and District Chiniot in the Province of Punjab

(Installed Capacity: 62.40 MW Gross)

to engage in generation business subject to and in accordance with the Articles of this Licence. Given under my hand this 1144 day of June Two Thousand & Fourteen and expires on 30th day of June Two Thousand & Forty Five. ..- Q( tneLk ,-- REGISI-RA Registrar \ -,.-,.._.. N'.../. Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road Tehsil & District Chiniot Punjab Article-1 Definitions 1.1 In this Licence

(a). "Act" means "the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 ";

(b). "Authority" means "the National Electric Power Regulatory Authority constituted under section 3 of the Act";

(c). "Bulk Power Consumer" means a consumer which purchases or receives electric power, at one premises, in an amount of 1.00 MW or more or in such other amount, voltage level and with such other characteristics as the Authority may determine;

(d). "Bus Bar" means a system of conductors in the generation facility of the Licensee on which the electric power of all the generators is collected for supplying to the Power Purchaser;

(e). "Carbon Credits" mean the amount of carbon dioxide (CO2) and other greenhouse gases not produced as a result of generation of energy by the generation facility and other environmental air quality credits and related emissions reduction credits or benefits (economic or otherwise) related to the generation of energy by the generation facility, which are available or can be obtained in relation to the generation facility after the COD;

(f). "Commercial Operations Date (COD)" means the day immediately following the date on which the generation facility of the Licensee is Commissioned;

(g). "CPPA" means the Central Power Purchasing Agency of NTDC or any other entity creat urpose;

REGISTRAR

Page 2 of 7 Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road Tehsil & District Chiniot Punjab

(h). "Energy Purchase Agreement" means the energy purchase agreement, entered or to be entered into by and between the Power Purchaser and the Licensee, for the purchase and sale of electric energy generated by the generation facility, as may be amended by the parties thereto from time to time;

(i). "FESCO" means Faisalabad Electric Supply Company Limited and its successors or permitted assigns;

(j). "Grid Code" means the grid code prepared by NTDC and approved by the Authority, as it may be revised from time to time by NTDC with any necessary approval by the Authority;

(k). "IEC" means "the International Electro-technical Commission and its successors or permitted assigns;

(I). "IEEE" means the Institute of Electrical and Electronics Engineers and its successors or permitted assigns;

(m). "Licensee" means Chiniot Power Limited and its successors or permitted assigns;

(n). "NTDC" means National Transmission and Despatch Company Limited and its successors or permitted assigns;

(o). "Policy" means "the Policy for Development of Renewable Energy for Power Generation, 2006" of Government of Pakistan as amended from time to time;

(p). "Power Purchaser" means NTDC (through CPPA) on behalf of XW- DISCOs or any_ CO which purchases electricity from the Licensee, Energy Purchase Agreement for

Page 3 of 7 Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road Tehsil & District Chiniot Punjab (q). "Power Purchase Agreement" means the power purchase agreement, entered or to be entered into by and between the Bulk Power Consumer and the Licensee, for the purchase of electric power/energy generated by the generation facility of the Licensee, as may be amended by the parties thereto from time to time

(r). "Rules" mean "the National Electric Power Regulatory Authority Licensing (Generation) Rules, 2000";

(s). "XW DISCO" means "an Ex-WAPDA distribution company engaged in the distribution of electric power"

1.2 Words and expressions used but not defined herein bear the meaning given thereto in the Act or in the Rules.

Article-2 Application of Rules

This Licence is issued subject to the provisions of the Rules, as amended from time to time.

Article-3 Generation Facilities

3.1 The location, size (capacity in MW), technology, interconnection arrangements, technical limits, technical and functional specifications and other details specific to the generation facility of the Licensee are set out in Schedule-I of this Licence.

3.2 The net capacity of the generation facility of the Licensee is set out in Schedule-II hereto.

3.3 The Licensee shall provide th ngement, technical and financial specifications and other sp fining to its generation facility before its COD.

Page 4 of 7

Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road Tehsil & District Chiniot Punjab

Article-4 Term of Licence

4.1 The Licence is granted for a term of thirty (30) years from the COD of the generation facility.

4.2 Unless suspended or revoked earlier, the Licensee may apply for renewal of this Licence under the National Electric Power Regulatory Authority Licensing (Application & Modification Procedure) Regulations, 1999 (as amended or replaced from time to time), within ninety days (90) days prior to the expiry of the term of this Licence.

Article-5 Licence fee

After the grant of the Generation Licence, the Licensee shall pay to the Authority the Licence fee, in the amount, manner and at the time set out in the National Electric Power Regulatory Authority (Fees) Rules, 2002.

Article-6 Tariff

The Licensee shall charge only such tariff which has been determined, approved or specified by the Authority in terms of Rule-6 of the Rules.

Article-7 Competitive Trading Arrangement

7.1 The Licensee shall participate in such manner as may be directed by the Authority from time to time for development of a Competitive Trading Arrangement. The Licensee shall in good faith work towards implementation and operation of the aforesaid Competitive Trading Arrangement in the manner and time period specified by the Authority. Provided that any such participation shall be subject to any contract entered into between the Licensee and another party with the approval of the Authority.

Page 5 of 7 Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road Tehsil & District Chiniot Punjab

7.2 Any variation or modification in the above-mentioned contracts for allowing the parties thereto to participate wholly or partially in the Competitive Trading Arrangement shall be subject to mutual agreement of the parties thereto and such terms and conditions as may be approved by the Authority.

Article-8 Maintenance of Records

For the purpose of sub-rule (1) of Rule 19 of the Rules, copies of records and data shall be retained in standard and electronic form and all such records and data shall, subject to just claims of confidentiality, be accessible by authorized officers of the Authority.

Article-9 Compliance with Performance Standards

The Licensee shall comply with the relevant provisions of the National Electric Power Regulatory Authority Performance Standards (Generation) Rules 2009 as amended from time to time.

Article-10 Compliance with Environmental Standards

The Licensee shall comply with the environmental standards as may be prescribed by the relevant competent authority from time to time.

Article-11 Power off take Point and Voltage

The Licensee shall deliver electric power to the Power Purchaser at the outgoing Bus Bar of its generation facility. The up-gradation (step up) of generation voltage up to 132 KV will be the re be Licensee.

(.) I

''111 Page 6 of 7 Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road Tehsil & District Chiniot Punjab

Article-12 Provision of Information

12.1 The obligation of the Licensee to provide information to the Authority shall be in accordance with Section 44 of the Act.

12.2 The Licensee shall be subject to such penalties as may be specified in the relevant rules made by the Authority for failure to furnish such information as may be required from time to time by the Authority and which is or ought to be or has been in the control or possession of the Licensee.

Article-13 Carbon Credits

The Licensee shall process and obtain Carbon Credits expeditiously and credit the proceeds to the Power Purchaser as per the Policy.

Article-14 Design & Manufacturing Standards

The generation facilities of the Licensee shall be designed, manufactured and tested according to the latest IEC standards or other equivalent standards. All plant and equipment shall be un-used/brand new and of relevant IEC/IEEE standard.

Page 7 of 7 Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab

SCHEDULE-I

The Location, Size (i.e. Capacity in MW), Type of Technology, Interconnection Arrangements, Technical Limits, Technical/Functional Specifications and other details specific to the Generation Facilities of the Licensee are described in this Schedule

huj t kilEGISTRAR c."

Page 1 of 13 of Schedule -1 Generation Licence Chiniot Power Limited 26-KM Chinic4-Jhang Road, Tehsil & District Chiniot Province of Punjab

Page 2 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punish

O 0 0

Page 3 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, TehsN & District Chiniot Province of Punjab

I C 111 ■••

MOM

111111111

' $1111111011113

Page 4 of 13 of Schedule -1

R7GISTRAR T 6 10 1321741AWAHA S/S

LINE-I LINE-2 I -

■3■1-. le du he f Sc woo-WT-4:0p

riZI"s >,( f 13 o -Na roo

LE_GINIT.T o 1324V BUS-1 WITH HAWD66014 ABC CONDUCTOR 5 e 132kV BUS-2 WITH RANTITIRON ABC CONDUCTOR (C) CV Pag -001,0 It57mt 70Rt1,20

'"AYPTI"lin?

iso trwr INA , 10=-. GENERATOR TRAI-0 -I GENERATOR 30/401NA TRAF0.-2 30/40WICA

co:rVot :' O004,07,7410 CLIC :7 11.17.ivet y cum 60-1C,O0 O075",7°. (u). Art AL uwr 0-

1167 COACH SWITCHBOARD REFERE■KE__5R/ABINS: Thffir I MOO wroww • cooro, X 31500, 1157. 445A FOR 35E0. 5011r BUS-I 3150A 1157 zo, /OR 3TEC 50Hr BUS-2 X X sw.nom. IX X 7<:x

N rcesna sor-r• _J NTHAILI IIr r CARLI 1 00 G41S Oar V--‘10■7 NIX At WI r--,01V crzu nwar 1.07701 IL/ 3333 A St*, 31.2TAW 31.24W

To c N morTHANT- roAos tO CO7SEN AUX01.1. 03■05 TING. Aso w co

114V SWAB 5VATCHBOARD

20CTOr. II kV 1450 10? 3510. 50Hz BUS- 20000, 115, 141, FOR 3SEC 50Hr BUS-2 X

„,; >< x n: '"zx X ",r■X I'm'f; X X ": X CONTROLLED COPY U riCO-NtTRO-E-LEt -- CORY

CHINIOT POWER COMPANY 04C 2 X 30 MW COGENERATION PROJECT

1110/0 ft sorre-2 SCO 7711/0. ----AVANT — GARDE ENGINEERS & CONSULTANTS (F7C.,),SHARJAH,UAE R H./ It/0.690/'"" 4:1 77T'AO.Tor —;°0 Oil) ENGINEERING CONTRACTOR: NA ME STUN PGA F-F;T Uj AVANT-GARDE CHAV04,2 BASIC. ENGINEERS AND CONSULTANTS ;P) LID ,C7116 OTIREMOOF NT TX Of, 14 CHENNAI 600 116, INDIA. IAPHI2u S DAT ACAPDT MADE CC ADTPI T (Ng' TREE Ov. off NO DEPT EL 'c'LE CODE 900 C/V/F I IZE: A2 THIS IS A CAD FILE - DO NOT MAKE ANY CORRECTIONS MANUALLY REV. S NO DATE DESCRIPTION ate. I CHO. APPD LE DRAWN, ,./o PI KEY SINGLE LINE DIAGRAM FOR HON5111111110000111771011115 DODumENT ,TIlF PROPERTY OF AVANT -GARDE ENGINEERS AND CONSULTANTS (P) LTD 2-12340-900-0522 II Tao, NOT III USED DIRECTLY OR INDIRECT, IN ANY WAY DC TRIMENTAL TO THE INTEREST OF THE COMPANY REVISIONS 11 kV & 132kV SYSTEM 1 GAL ITRAcor, NO 1234C-., Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Pun*

0

z• ,

Page 6 of 13 of Schedule -I

7G1STRAR •:•,\ • 1 Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab Interconnection Facilities/ Transmission Arrangements for Dispersal of Power from the Generation Facility/Co-Generation Power Plant

The electric power from the bagasse based co-generation power plant/generation facility of Chiniot Power Limited (CPL) will not only be supplied to a Bulk Power Consumer/BPC* (i.e. Ramzan Sugar Mills Limited as enumerated in the this Schedule-I) but also to the load center of FESCO.

(2). The Interconnection Facilities (IF)/Transmission Arrangements (TA) for supplying to FESCO from the above mentioned generation facility shall be at 132 kV level. The dispersal/interconnection arrangement for supplying to FESCO will be consisting of a 132 KV Double Circuit (D/C) Transmission Line (on ACSR LYNX Conductor) measuring about twelve (12) Kilo-meter connecting the generation facility/co-generation power plant with 132 KV Grid Station.

(3). Any change in the above mentioned IF/TA for dispersal of electric power as agreed by the Licensee and the Power Purchaser shall be communicated to the Authority in due course of time.

--r-tcvi3 -rRAR ca

The details of the pertaining to BPC, supply arrangement an sting ovided in the subsequent description of this Schedule-I.

Page 7 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab Detail of Generation Facility/Co-Generation Power Plant

(A). General Information

(i). Name of Applicant Chiniot Power Limited.

Registered (ii). /Business Office 55-K, Model Town, Lahore.

(iii). Plant Location 26-KM Chiniot-Jhang Road, Tehsil and District Chiniot in the Province of Punjab

Type of (iv). Bagasse based, high-pressure Co-Generation Generation Facility Thermal power Plant.

(B). Plant Configuration

Plant Size 62.40 MW. (i)' Installed Capacity

Type of Conventional Steam Turbine based Power Plant (6)' Technology (with Extraction cum condensing Steam Turbine with 110 bar (kg/cm) boiler.

Number of (iii). Units/Size (MW) Steam Turbine 2 x 31.20 MW

Hangzhou Steam Turbine Co. Steam Turbine Limited (Model — EHNK Unit 50/71) Make/Model/Type (iv). & Year of Manufacture Etc. Travelling grate type of ,-----, Wuxi, China \: R R6 r' '' Boiler of 155 TPH Capacity /, ' C- ' er and 110 Bar (kg/cm2) V/.. pressure/Wuxi Huag uang t REGIsMAR T t 1 REGIS Electric Power Engineering

Page 8 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Co. Ltd

Commissioning/ Commercial (v). Operation Date of July 01, 2015 the Generation Facility

Expected Useful Life of the Generation Facility (vi). from Commercial 30 Years (Minimum) Operation/ Commissioning Date

(C). Fuel/Raw Material Details

(i). Primary Fuel Bagasse

(ii). Alternate Fuel Biomass (i.e. Corn Cobs and Cane Trash)

Primary Alternate Fuel Fuel Fuel Source (iii). (Imported/Indige nous) Indigenous Indigenous

Primary Alternate Fuel Fuel

Ramzan Sugar Mills Limited- (iv). Fuel Supplier Biomass suppliers RSML(primary)/Other (if available in the bagasse / biomass nearby area of the suppliers (if available in Generation Facility) the nearby area)

.,---7T-----r.r32:---

Page 9 of 13 of Schedule -I

Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab

Primary Alternate Fuel Fuel Supply (v). Through Conveyor Through Conveyor Arrangement Belts/Loading Belts/Loading Trucks/Tractor Trolleys Trucks/Tractor etc Trolleys etc

Sugarcane Crushing (vi). 8500 Ton Crushing Per Day (Existing)/12,000 Ton Capacity of Crushing Per Day (after extension in pipeline) RSML

Bagasse 2550 Tonsper Generation day (as per Existing (vii). Capacity)/3600 Ton Crushing Capacity of Per Day (after extension in pipeline) RSML Primary Alternate Fuel Storage Fuel Fuel (viii). facilities Bulk Storage Bulk Storage

Primary Alternate Fuel Fuel Capacity of (ix). Storage facilities 28,000 Metric Tons Included as part of the bulk storage Primary Fuel Storage

Primary Alternate Fuel Fuel Gross Storage (x). Capacity 28,000 Metric Tons Included as part of the Bulk Storage Primary Fuel Storage

(D). Emission Values

Alternative Primary Fuel Fuel (i). Sax 361.9 kg/hour 361.9 kg/hour

(ii). NOx --::*78ti • . <80 p.p.m. ,./..;'— '-'.(' •,-, ' (iii). CO2 -''' 11% to 13 " 11% to 13% .4,..) EGIS, racReAsR :i ,, (iv). CO Traces

Page 10 of 13 of Schedule -I

Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot

(v). PM10 50 mg /n.cu.m 50 mg /n.cu.m

(E). Coolinq System

RCC Cooling tower of induced draft counter flow Cooling Water type. Make up water will be drawn from the bore Source/Cycle wells/Closed Loop.

(F). Plant Characteristics

Generation (i). 11.00 KV Voltage

50 Hz (ii). Frequency

(iii). Power Factor 0.80 lagging - 0.95 leading

Automatic (iv). Generation Yes Control (AGC)

(v). Ramping Rate To be Provided Later

370 Minutes 260 Minutes 90 Minutes

During cold During warm During Hot Time required to start (i.e. when start (i.e. when start (i.e. when (vi). Synchronize to plant is started plant is started plant is started Grid later than 72 at less 36 at less than 12 hours after hours after hours after shutdown) shutdown) shutdown)

L

Page 11 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab

Information Regarding Distribution Network for Supply of Power to Bulk Power Consumer fin the Name of Ramzan Sugar Mills Limited/RSML of the Licensee (i.e. Chiniot Power Limited-CPL) 1

(i). No. of Feeders 02 (Two)

(ii). Length of Each Feeder (Meter) 500 Meter (each)

(iii). Length of Each Feeder to each Consumer 500 Meter (both Feeder to RSML)

In respect of all the Feeders, describe the property (streets, The 11 KV cable supplying power to farms, Agri land, etc.) through, RSML is located on private property (iv). under or over which they pass owned by RSML, without crossing of right up to the premises of any Public or third party Private customer, whether they cross- Property etc. over.

Whether owned by CPL, Consumer or FESCO-(deal with each Feeder Separately) - If owned by FESCO, (v). please furnish particulars of N/A contractual arrangement - Operation and The Operation and Maintenance is the maintenance responsibility for each feeder responsibility of RSML.

Whether connection with network of FESCO exists Yes/RSML is B-2(b) Consumer of (vi). (whether active or not)- If yes, provide details of connection FESCO arrangements (both technical and contractual)

Any other network information (vii). deemed relevant for disclosure N/A to or consideration by NEPRA.

,,„„)•-•;„.----- ----:--- L• L,, /, , ' 0

Page 12 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab

Information Pertaining to the Bulk Power Consumer Fin the name RSML of the Licensee (i.e. CPL)1

(i). No. of Consumers One (01)

26-KM Chiniot-Jhang Road, Tehsil (ii). Location of consumers (distance and/or identity of premises) and District Chiniot Province of Punjab During Off During Crushing Crushing (iii). Contracted Capacity and Load Season Factor for consumer Season 15.00 MW 03.00 MW Specify Whether

The consumer is an . Associate undertaking of RSML () the CPL-If yes, specify and CPL are group percentage ownership of companies of the Sharif Group (iv). equity; (ii) There are common directorships: No

.. Either can exercise (iii) influence or control over No the other.

Specify nature of contractual Relationship RSML and CPL are group (i) Between each consumer companies of the Sharif Group/ (v). and CPL. Supply of Electricity on Continuous basis RSML is B-2(b) (ii) Consumer and FESCO. Consumer of FESCO

Any other network information (vi) deemed relevant for disclosure N/A to or consideration by NEPRA.

Lu(- REGISTRAR ,s'

Page 13 of 13 of Schedule -I Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab

SCHEDULE-II

The Installed/ISO Capacity (MW), De-Rated Capacity At Mean Site Conditions (MW), Auxiliary Consumption (MW) and the Net Capacity At Mean Site Conditions (MW) of the Generation Facilities of Licensee is given in this Schedule

Cjr)

Ca t ( REGISCRAP.

Page 1 of 2 of Schedule-II Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab

SCHEDULE-II

During, Durin• Off Crushin • Crushing Season Season 0 •eration 0 •eration Total Gross Installed (1). Capacity of the 62.40 MW 62.40 MW Generation Facility

De-rated Capacity of (2). Generation Facility at 59.80 MW 62.40 MW Reference Site Conditions

Auxiliary Consumption of 05.30 MW 05.30 MW (3). the Generation Facility

Total Installed Net Capacity of Generation (4). 54.50 MW 57.10 MW Facility at Reference Site Condition

Note

All the above figures are indicative as provided by the Licensee. The Net Capacity available to Power Purchaser or Bulk Power Consumer for dispatch will be determined through procedure(s) contained in the Energy Purchase Agreement, any Bi-lateral Agreement (s) or any other applicable document(s).

REGISTRAR R„.„.4,

.21

Page 2 of 2 of Schedule-II Generation Licence Chiniot Power Limited 26-KM Chiniot-Jhang Road, Tehsil & District Chiniot Province of Punjab Authorization by National Electric Power Regulatory Authority (NEPRA) to Chiniot Power Limited

Incorporated under the Companies Ordinance, 1984 Under Corporate Universal Identification No. 0084890, dated August 26, 2013

NEPRA GENERATION LICNCE No. IGSPL/41/2014, Dated June ii , 2014 For Sale to Bulk Power Consumer(s)

Pursuant to Section 22 of the Act and Rule 7 of the NEPRA Licensing (Generation) Rules-2000, the Authority hereby authorize Chiniot Power Limited-CPL (the Licensee) to engage in second-tier supply business, limited to the following consumer:-

(a). Ramzan SugarMills Limited.

I

t( C 41) (Khawaja Muhammad Naeem) Maj (R) Haroon Rashid Member Member

/0/6/2-0/4

(Habibullah Khilji) MemberNice Chairman

..„...- c-3. ------_,6,2 RE:::.-.. i ..s.,(<- 1-,

REGIS RAR

ll • mre• kM Page 1 of 1