Annexure-II National Mission for Clean Ganga Submission of Monthly Progress Report for September, 2020 by State (Hon’ble NGT in the matter of O.A No. 673/2018 dated 06.12.2019)

Sl. No. Activity to be monitored Timeline Submission of Progress by State/UT-Compliance Status Ensure 100% treatment of 31.03.2020 NEERI site visit at drains was done from 03.03.2020 to 07.03.2020. 1 sewage at least in-situ remediation Proposal to go ahead for adoption of in-situ remediation at drains is received from NEERI.

Regular consultation with NEERI is in progress.

Proposal for DPR Preparation and Support in Implementation is Received on 25.09.2020

Allocation of state fund for this project and Approval on selection of CSIR- NEERI on nomination basis for preparation of DPR to adopt in-situ remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for complete implementing including tendering is under process from competent authority from approx. 98 MLD of waste water will be treated.

15 MLD STP Plant at is under process of Approval at NMGC.

50 MLD STP is under operational at Jamshedpur which is operated by JUSCO.

31.5 MLD Lagoon Based STP is under operation by Steel Limited.

There are two schemes at Chottagovindpur – 46 MLD and Bagera – 37 MLD for Water Treatment Plant designed with sludge drying pit along the banks of River Subarnarekha.( Annexure -1)

2 Commencement of setting up of 31.03.2020 Detailed status of various ongoing projects related to Sewerage STPs and connecting all the drains /Septage Treatment at these 8 ULBs are enclosed as Annexure -2 and other sources of generation of sewage to the STPs must be ensured 3 Timeline for completing all steps of 31.03.2021 Detailed status of various ongoing projects related to Sewerage action plans including completion of /Septage Treatment at these 8 ULBs are enclosed as Annexure -2 setting up STPs and their commissioning 5 Chief Secretaries may set up 22.01.2020 appropriate monitoring mechanism at State level • Specifying accountability of nodal authorities not below the Secretary level • Chief Secretaries may have an 22.01.2020 accountable person attached in their office for this purpose. • Monitoring at State level Fortnightly Fortnight monitoring of 7 polluted river stretches will initiated must take place Commencing from Sept’2020. 21.12.2019

Sr. No. Activity to be monitored Timeline Submission of Progress by State/UT-Compliance Status

Progress report may be furnished by Monthly (preferably the States / UTs to before 20th of every 6 • Secretary, Ministry of Jal month) Shakti • Member Secretary, CPCB Progress report may be comprised of 6.1 details along with completion timelines on: NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.

Proposal to go ahead for adoption of in-situ remediation at drains is received from NEERI.

Regular consultation with NEERI is in progress.

Proposal for DPR Preparation and Support in Implementation is Identification of polluting sources Received on 25.09.2020 including drains contributing to river 6.1(i) pollution and action as per NGT Allocation of state fund for this project and Approval on selection of order on in-situ treatment CSIR-NEERI on nomination basis for preparation of DPR to adopt in- situ remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for complete implementing including tendering is under process from competent authority from approx. 98 MLD of waste water will be treated.

15 MLD STP Plant at Phusro is under process of Approval at NMGC.

50 MLD STP is under operational at Jamshedpur which is operated by JUSCO.

31.5 MLD Lagoon Based STP is under operation by Bokaro Steel Limited.

Status of STPs, I&D and Sewerage networks: Details of existing Detailed status of various ongoing projects of STP, Sewerage 6.1(ii) infrastructure, Gap Analysis, network, gap analysis, timeline etc. at the identified 6 ULBs are proposed along with completion enclosed as Annexure -2 timeline (iii)Status of CETPs Details of Existing CETP and ETP Infrastructure, Gap Analysis, Details pertaining to the Status of compliance of ETPs are enclosed 6.1(iii) Proposed along with completion as Annexure - 4. timeline, No. of industries and complying status Status of Solid waste management & details of processing facilities: 6.1(iv) Details of Existing Infrastructure, Details attached as Annexure - 3(a&b) Gap Analysis, Proposed along with completion timeline 6.1(v) Latest water quality of polluted Details attached as Annexure - 5 river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; 6.1(vi) Preventing dumping of waste and District Magistrate has been directed to ensure that illegal dumping of scientific waste management waste and to promote scientific waste management practices including including bio-medical wastes, bio-medical wastes, plastic wastes and decentralizing waste processing. plastic wastes and decentralizing Action has been taken against the violators at the district level and waste processing, including Seminars/awareness programs are organized on Waste Management Rules. 6.1(vii) Ground water regulation Drinking water & Sanitation Dept. have identified the contaminated hand pumps and sealed those hand pumps whose water is not fit for drinking (Annexure - 6).

Portable water is supplied to the Communities in the identified critical blocks through water tanker owned by local bodies and log book is maintained.

List of polluted blocks in Jharkhand have been identified and details is annexed as Annexure - 7

Periodic assessment of 24 districts and 260 blocks of Jharkhand for ground water resources was conducted by Jharkhand in 2009, 2011, 2013 & 2017 which also covers the area related to 7 polluted stretches and based on which a comparative statement of dynamic ground water resource is prepared which is annexed as Annexure -8.

As per report of CGWA, Dhanbad and are among the overexploited blocks, Patratu, Silli and Bermo are among semi critical blocks along the seven polluted river stretches.

CGWA is also preparing a policy for conservation of ground water with a robust institutional mechanism for surveillance and monitoring with a view to enhance the access to ground water for drinking purpose. Water Resource Department, Govt. of Jharkhand is framing Ground Water Development and Management (Control/ Regulation) Act which is under progress which shall be completed by 6monthsandthereafterdepartmentswillcompletetheformalities for enactment of Ground Water Development and Management Control/Regulation) Act within One Year. 6.1(viii) Adopting good irrigation practices Details of the Irrigation Projects taken by Water Resource Department along the polluted river stretches is attached as Annexure-8

Department of Agriculture is promoting and conducting workshops for the use of organic fertilizers. Promoting micro irrigation (drip & mini irrigation) system to save the quantity of water used during agriculture.

6.1(ix) Protection and management of District Magistrate has been directed to ensure that no encroachments Flood Plain Zones (FPZ) in the FPZ and necessary actions are taken.

Apparently, no area under seven river stretches have issues related to flood plain zone.

But, for protection and management of flood plain zone - RFP Circulated on 17.06.2019 consultant have been appointed by 15.09.2019 and complete assignment along with the action plan (if required) which is to be submitted by them up to 30.06.2020 but the is pending due to COVID-19 Situation and will be submitted by 31.12.2020. 6.1(x) Rain water harvesting 144 nos. of RWH structure has been sanctioned for Rs. 5.89 Cr. which is under progress and targeted to be completed by June,2020.

Agreement with consultant PKS Infra Engineer Pvt. Ltd. Ghaziabad, has been deputed to preparation of DPR regarding Geophysical survey for Ground Water recharging/ Rain Water harvesting along the sevn polluted river stretches. Based on the DPR submitted and an Action Plan has been prepared and to be submitted by 30.04.2020 but due to COVID-19 it is likely to be submitted by 31.12.2020.

Jharkhand Rain Water harvesting Regulation, 2017 Notified on 23.01.17. and implementation is ongoing. 54 nos. of RWH/ground water recharging structure have been constructed at Dhanbad by CGWB and 75 nos. of RGH structures have been constructed by the State Ground Water Directorate, Jharkhand. 214 nos. of water bodies has been sanctioned for Rs. 185.08 Cr. for restoration which is under progress and targeted to be completed by March, 2021. 6.1(xi) Maintaining minimum A study in this regard is to be done by the consultant PKS Infra under environmental flow of river agreement no.- 03F2/19-20. And as per action plan suggested in the DPR flow up action will be taken up in the structures constructed along the polluted stretches. It is be noted that mandatorily min. 10% of Non-monsoon flow is to be maintained as e-flow in the river D/S of the structures like Dam & Barrage during Non-Monsoon period.

Study has been carried out for one of the seven different river stretches. The D/S of Kanke Dam upto Kadal Bridge & has found requirement during fair weather to be 1.6 Cumecs for rest 06 stretches studies are being done by the consultant.

The details are annexed as Annexure 9

6.1(xii) Plantation on both sides of the river

6.1(xiii) Setting up biodiversity parks on flood plains by removing encroachment

TABLE -2 Details on Municipal Drains which are dischaging into the identified river stretches Details on Current Method No. of adotped to No. of Villages/ Quantity Municipal Appro Approx No. of prevent Details on Action Taken Nam Towns/ Cities along of Drains Tentati Ser x. Population Estimated Municipal Water discharge Timeline as for Utilization of e of the river ( Approx. Sewage divereted Existing ve ial River Length (as per Population Drains Quality of of Funding per the order Treated Sewage the 10 Kms. from the Discharg or Treatment Gap Analysis Propsed Treatment Budget Status Curent Status Remarks No Stretch of the Census after 15 yrs. falling into Each untreated Agency of Hon'ble Quantity to minimise the Rive center of the ed form intercepted Facility Require . Stretch 2011) (for year the main Darin sewage NGT abstraction of Ground r identified river each before d (Kms) 2035) stream prior to the Water stretch length) drain falling into completion the river of proposed project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Approx 41.50 Cr. of 41.50 State NEERI site visit at drains was done 31.03.2021 At Present, under Revised UD&HD, GoJ has budget is proposed from Cr Fund from 03.03.2020 to 07.03.2020. AMRUT Scheme, timeline of already issued a policy State Fund for adoption Proposal to goahead for adoption of Septage 31.03.2022 is for utilization of treated of insitu remediation at insitu remediation at drains is Management proposed for waste water from STPs drains for treatment of 29 received from NEERI. scheme of Chas, in adoption of called as Jharkhand Regular consultantion with NEERI MLD waste water as per which septage insitu Waste Water Policy is in progress. NEERI Site visit report. Proposal for DPR Prepartion and treatment plant of remediation at 2017. (Budget include capex + 5 Support in Implemnetaion is Recived 89 KLD is under drains The utilizaiton will be years of O&M) on 25.09.2020 construction and done as per the policy Allocation of state fund for this expected to be document. project and Approval on selection of completed by Dec CSIR-NEERI on nomination basis 2021 for preparation of DPR to adopt insitu remediation at drains at ALON Please Please identified ULBs viz. Chas, GAR G Chas Municipal refer refer Ranchi,Mangao and involvement of 1 8 156888 243675 NA NA NA 28.2 MLD NA GA TALM Corporation Annexure - Annexure CSIR – NEERI for complete UCHU 1 -1 implementing including tendering is under process from competent authority. TABLE -2 Details on Municipal Drains which are dischaging into the identified river stretches Details on Current Method No. of adotped to No. of Villages/ Quantity Municipal Appro Approx No. of prevent Details on Action Taken Nam Towns/ Cities along of Drains Tentati Ser x. Population Estimated Municipal Water discharge Timeline as for Utilization of e of the river ( Approx. Sewage divereted Existing ve ial River Length (as per Population Drains Quality of of Funding per the order Treated Sewage the 10 Kms. from the Discharg or Treatment Gap Analysis Propsed Treatment Budget Status Curent Status Remarks No Stretch of the Census after 15 yrs. falling into Each untreated Agency of Hon'ble Quantity to minimise the Rive center of the ed form intercepted Facility Require . Stretch 2011) (for year the main Darin sewage NGT abstraction of Ground r identified river each before d (Kms) 2035) stream prior to the Water stretch length) drain falling into completion the river of proposed project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

KONG SERAB No ULB falls under SAN ASAR 2 10 the identified stretch - - KH TO of River BOLB A

NEERI site visit at drains was done 16 MLD of STP of Revised UD&HD, GoJ has already from 03.03.2020 to 07.03.2020. SBR Technology is timeline of issued a policy for Proposal to goahead for adoption of under construction 31.03.2022 is utilization of treated waste insitu remediation at drains is under Ranchi Smart proposed for water from STPs called as received from NEERI. City Mission. adoption of Jharkhand Waste Water Regular consultantion with NEERI Tentative timline of insitu Policy 2017. is in progress. completion of remediation at The utilizaiton will be Proposal for DPR Prepartion and project is December drains done as per the policy Support in Implemnetaion is Recived 2021. document. 10 MLD of Approx 20 Cr. of budget is on 25.09.2020 nature proposed from State Fund Allocation of state fund for this based STP for adoption of insitu project and Approval on selection of is remediation at drains for CSIR-NEERI on nomination basis operational treatment of 36 MLD waste for preparation of DPR to adopt Please Please at Harmu Phytorid water as per NEERI Site insitu remediation at drains at Ranchi Municipal refer refer State 1073427 3348023 NA NA River i.e. 26 MLD Technology visit report. (Budget 20 Cr. identified ULBs viz. Chas, 31.03.2021 Corporation Annexure - Annexure Fund one of the based STP include capex + 5 years of Ranchi,Mangao and involvement of 1 -1 Tributary O&M). CSIR – NEERI for complete of 16 MLD of STP of SBR implementing including tendering is Subarnare Technology STP work is in under process from competent kha River progress under Ranchi authority. at Ranchi. Smart City Mission

HATIA SUB DAM ARN TO 3 120 ARE JAMS KHA HEDP UR TABLE -2 Details on Municipal Drains which are dischaging into the identified river stretches Details on Current Method No. of adotped to No. of Villages/ Quantity Municipal Appro Approx No. of prevent Details on Action Taken Nam Towns/ Cities along of Drains Tentati Ser x. Population Estimated Municipal Water discharge Timeline as for Utilization of e of the river ( Approx. Sewage divereted Existing ve ial River Length (as per Population Drains Quality of of Funding per the order Treated Sewage the 10 Kms. from the Discharg or Treatment Gap Analysis Propsed Treatment Budget Status Curent Status Remarks No Stretch of the Census after 15 yrs. falling into Each untreated Agency of Hon'ble Quantity to minimise the Rive center of the ed form intercepted Facility Require . Stretch 2011) (for year the main Darin sewage NGT abstraction of Ground r identified river each before d (Kms) 2035) stream prior to the Water stretch length) drain falling into completion the river of proposed project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Tentative Policy 2017. Please Please Total STP of 36 MLD Work under timeline for The utilizaiton will be Adityapur Municipal refer refer capacity is under 255.15 Work under progress. Till date 55 progress. Till date 174355 326578 NA NA NA 36 MLD NA AMRUT 31.03.2021 completion of done as per the policy Corporation Annexure - Annexure construction with SBR Cr % of work completed at site. 55 % of work projct is document. 1 -1 Technology completed at site. December 2021 HATIA SUB DAM ARN TO 3 120 ARE JAMS KHA HEDP UR NEERI site visit at drains was done Revised UD&HD, GoJ has already from 03.03.2020 to 07.03.2020. timeline of issued a policy for Proposal to goahead for adoption of 31.03.2022 is utilization of treated waste insitu remediation at drains is proposed for water from STPs called as received from NEERI. adoption of Jharkhand Waste Water insitu Policy 2017. Regular consultantion with NEERI remediation at The utilizaiton will be is in progress. drains done as per the policy Around 50 document. MLD of Approval for taking funds from STP is Approx 35.20 Cr. of budget TATA group under CSR fund for Physiochemi operational is required for adoption of treatmaent of remaining 32 MLD is Please Please Please cal under insitu remediation at drains under progress. refer refer refer treatment CSR Jamshedpur NAC 677350 1317852 NA JUSCO, 32 MLD for treatment of 32 MLD as 35.20 Cr 31.03.2021 - Annexure - Annexure - Annexure and Fund STP for per NEERI Site visit 1 1 -1 Biological rest 32 report. (Budget include treatment MLD capex + 5 years of O&M) treatment required.

Approx 30 Cr. of budget is 31.03.2021 Revised UD&HD, GoJ has already proposed from State Fund timeline of issued a policy for for adoption of insitu 31.03.2022 is utilization of treated waste remediation at drains for proposed for water from STPs called as treatment of 33 MLD waste adoption of Jharkhand Waste Water water as per NEERI Site insitu Policy 2017. Please Please Please visit report. (Budget remediation at The utilizaiton will be Mango Municipal refer refer refer State 223805 388730 NA NA 33 MLD NA include capex + 5 years of 30 Cr. - drains done as per the policy Corporation Annexure - Annexure - Annexure O&M) Fund document. 1 1 -1 TABLE -2 Details on Municipal Drains which are dischaging into the identified river stretches Details on Current Method No. of adotped to No. of Villages/ Quantity Municipal Appro Approx No. of prevent Details on Action Taken Nam Towns/ Cities along of Drains Tentati Ser x. Population Estimated Municipal Water discharge Timeline as for Utilization of e of the river ( Approx. Sewage divereted Existing ve ial River Length (as per Population Drains Quality of of Funding per the order Treated Sewage the 10 Kms. from the Discharg or Treatment Gap Analysis Propsed Treatment Budget Status Curent Status Remarks No Stretch of the Census after 15 yrs. falling into Each untreated Agency of Hon'ble Quantity to minimise the Rive center of the ed form intercepted Facility Require . Stretch 2011) (for year the main Darin sewage NGT abstraction of Ground r identified river each before d (Kms) 2035) stream prior to the Water stretch length) drain falling into completion the river of proposed project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 STP of 15 MLD capacity 64 Cr. NMCG DPR to provide I&D structure and STP 31.03.2021 29 Exective 18 months UD&HD, GoJ has already proposed with SBR (14 for drains is prepared and sent to Committee (EC) of timeline is issued a policy for MLD) and Phytorid National Mission for Clean Ganga NMCG held on proposed for utilization of treated waste Technology (1 MLD) (NMCG) New Delhi for approval on may 28.08.2020 through Tendering , water from STPs called as 2019. NMCG send the DPR To IIT Video Conferncing construction of Jharkhand Waste Water Roorkee for Third Party Appraisal on Executive STP and I&D Policy 2017. Jan 2020. DPR appraised by the IIT Please Please Please Committee (EC) Scheme after The utilizaiton will be Phusro Nagar refer refer refer Roorkee on April 2020. 89178 118350 NA NA 15 MLD NA resolved to defer aporoval from done as per the policy Parisahd Annexure - Annexure - Annexure the Proposal and NMCG document. 1 1 -1 take up the same in the next EC meeting due to paucity of time.

DPR to provide I&D structure and STP 31.03.2021 Approval awaided 26 months UD&HD, GoJ has already for drains is prepared and sent to from NMCG timeline is issued a policy for National Mission for Clean Ganga proposed for utilization of treated waste (NMCG) New Delhi for approval on July Tendering , water from STPs called as 2019. NMCG send the DPR To IIT construction of Jharkhand Waste Water Roorkee for Third Party Appraisal on PHUSR STP and I&D Policy 2017. O Please Please 50 KLD of Jan 2020. DPR appraised by the IIT DA Scheme after The utilizaiton will be ROAD Dhanbad Municipal refer refer treatment STP of 144 MLD capacity Roorkee is under progress. 4 MO 12 1162472 1484520 NA NA 143 MLD NA 381 Cr NMCG aporoval from done as per the policy BDG Corporation Annexure - Annexure facility required DAR NMCG document. TO 1 -1 existing TURIO

DPR to provide I&D structure and Approval awaided 26 months UD&HD, GoJ has already STP for drains is prepared and sent from NMCG timeline is issued a policy for to National Mission for Clean Ganga proposed for utilization of treated waste (NMCG) New Delhi for approval on Tendering , water from STPs called as August 2020. construction of Jharkhand Waste Water STP and I&D Policy 2017. Please Please Scheme after The utilizaiton will be Ramgarh Nagar refer refer STP of 40 MLD capacity 123875 141886 NA NA NA 40 MLD NA 252 Cr NMCG 31.03.2020 aporoval from done as per the policy Parishad Annexure - Annexure required NMCG document. 1 -1

37 MLD 37 MLD capacity STP State Sewerage Scheme for Zone-1 31.03.2021 Tender for the 24 months UD&HD, GoJ has already capacity STP construction work was Fund Ranchi, under Ranchi Municipal construction of timeline is issued a policy for construction under progress for Zone-1 Corporation (in which river Jumar remaining work has proposed for utilization of treated waste work was (in which River Juamr falls) was started but due to the poor been floated by the construction of water from STPs called as under progress falls) with SBR Technology performance of the executing agency RMC. Date of STP and laying Jharkhand Waste Water KANK 1 no. of for Zone-1 (in the agreement has been terminated opening of Tender is of sewer Policy 2017. E DAM drains which River on dated 14.10.2019, 01.10.2020 network under The utilizaiton will be JUM Ranchi Municipal 5 TO 10 1073427 3348023 having NA NA NA NA Jumar falls) NA 209.05 Cr. Zone-I done as per the policy AR Corporation KADA negiligible and 42% of the document. L discharge work completed TABLE -2 Details on Municipal Drains which are dischaging into the identified river stretches Details on Current Method No. of adotped to No. of Villages/ Quantity Municipal Appro Approx No. of prevent Details on Action Taken Nam Towns/ Cities along of Drains Tentati Ser x. Population Estimated Municipal Water discharge Timeline as for Utilization of e of the river ( Approx. Sewage divereted Existing ve ial River Length (as per Population Drains Quality of of Funding per the order Treated Sewage the 10 Kms. from the Discharg or Treatment Gap Analysis Propsed Treatment Budget Status Curent Status Remarks No Stretch of the Census after 15 yrs. falling into Each untreated Agency of Hon'ble Quantity to minimise the Rive center of the ed form intercepted Facility Require . Stretch 2011) (for year the main Darin sewage NGT abstraction of Ground r identified river each before d (Kms) 2035) stream prior to the Water stretch length) drain falling into completion the river of proposed project 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

ALON G No ULB falls under KON TILAY 6 - the identified stretch - AR A AND of River KONA R

ALON NAL No ULB falls under G 7 KAR - the identified stretch - PATR I of River ATU Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLE -3 Deatials on Municipal Drains which are dischaging into the identified river stretches

Current Status No. of on Villages/ Appro Networking/ Towns/ Cities x. Approximate Propsed Treatment Channelizatio along the Estimated Timeline as Proposal for Networking/ Lengt Quantity of Facility based on n including Name River river ( Populatio Population per the Channelization including diversion of Serial h of Sewage estimation of Tentative Budget Funding diversion of Timeline of the Stretc Approx. 10 n (as per after 15 Status order of Curent Status sewage generated from No. the Generated population after 15 yrs. Required Agency sewage required River h Kms. from Census yrs. (for Hon'ble household/town ships/villages to Stretc (City/Town/Vil (Numbers and generated the center of 2011) year 2035) NGT sewer lines h lage wise) Capacity) from the identified (Kms) household/tow river stretch n ships/villages length) to sewer lines

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23 NEERI site visit at drains was done from At Present, under Approx 41.50 Cr. of budget is Revised 03.03.2020 to 07.03.2020. AMRUT Scheme, proposed from State Fund for timeline of Proposal to goahead for adoption of insitu Septage adoption of insitu remediation at 31.03.2022 is remediation at drains is received from Management drains for treatment of 29 MLD proposed for NEERI. scheme of Chas, in waste water as per NEERI Site adoption of which septage visit report. (Budget include capex insitu Regular consultantion with NEERI is in treatment plant of + 5 years of O&M) remediation 1 progress. 89 KLD is under NEERI site visit at drains was at drains construction and done from 03.03.2020 to Allocation of state fund for this project and expected to be 07.03.2020. Approval on selection of CSIR-NEERI on completed by Dec Proposal to goahead for adoption 41.50 Cr. for Phytorid nomination basis for preparation of DPR to 2021 of insitu remediation at drains is Technology and RENEU adopt insitu remediation at drains at awaited from NEERI. State Fund ALO Technology of NEERI. identified ULBs viz. Chas, Ranchi, Mango NG Chas and involvement of CSIR – NEERI for Regular consultantion with GAR TAL 8 Municipal 156888 243675 29 MLD 29 MLD 89 KLD Septage complete implementing including tendering 31.03.2021 NA NEERI is in progress. GA State+ MUC Corporation treatment plant under is under process from competent authority. Central HU construction under Allocation of state fund for this AMRUT Scheme project is in progress.

2

NEERI site visit at drains was done from 16 MLD of STP of Approx 20 Cr. of budget is proposed Revised 03.03.2020 to 07.03.2020. SBR Technology is from State Fund for adoption of timeline of Proposal to goahead for adoption of insitu under construction insitu remediation at drains for 31.03.2022 is remediation at drains is received from NEERI. treatment of 36 MLD waste water as 20 Cr. for Phytorid State Fund under Ranchi proposed for Regular consultantion with NEERI is in Smart City per NEERI Site visit report. (Budget adoption of 26 MLD :- Phytorid Technology and RENEU progress. include capex + 5 years of O&M). Mission. Tentative insitu Technology and Technology of NEERI. Allocation of state fund for this project and 16 MLD of STP of SBR Technology Ranchi RENEU Technology Ranchi Approval on selection of CSIR-NEERI on timline of Sewerage STP work is in progress under remediation Municipal 1073427 3348023 36 MLD of NEERI. 16 MLD plant under Smart city nomination basis for preparation of DPR to 31.03.2021 completion of scheme under Ranchi Smart City Mission at drains Corporation construction under Mission adopt insitu remediation at drains at identified project is construction NEERI site visit at drains was done 16 MLD:- 1 unit SBR Ranchi Smart City (State + ULBs viz. Chas, Ranchi, Jamshedpur and December 2021. from 03.03.2020 to 07.03.2020. technology ' Mission Central) involvement of CSIR – NEERI for complete Proposal to goahead for adoption of implementing including tendering is under insitu remediation at drains is process from competent authority. awaited from NEERI. 16 MLD plant is under construction, and to be completed by Dec 2021 Regular consultantion with NEERI is in progress.

HATI A SUB DAM ARN TO 3 120 ARE JAM KHA SHE DPU R Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLE -3 Deatials on Municipal Drains which are dischaging into the identified river stretches

Current Status No. of on Villages/ Appro Networking/ Towns/ Cities x. Approximate Propsed Treatment Channelizatio along the Estimated Timeline as Proposal for Networking/ Lengt Quantity of Facility based on n including Name River river ( Populatio Population per the Channelization including diversion of Serial h of Sewage estimation of Tentative Budget Funding diversion of Timeline of the Stretc Approx. 10 n (as per after 15 Status order of Curent Status sewage generated from No. the Generated population after 15 yrs. Required Agency sewage required River h Kms. from Census yrs. (for Hon'ble household/town ships/villages to Stretc (City/Town/Vil (Numbers and generated the center of 2011) year 2035) NGT sewer lines h lage wise) Capacity) from the identified (Kms) household/tow river stretch n ships/villages length) to sewer lines

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23 Work under progress. Till date 55 % of Tentative work completed at site. timeline for completion of projct is December 2021 Work under Adityapur 36 MLD STP under Sewerage State + progress. Till date Sewerage scheme under Municipal 174355 326578 36 MLD 4 units of 36 MLD construction under 31.03.2021 scheme under Central 55 % of work construction Corporation AMRUT scheme construction completed at site.

HATI A SUB DAM ARN TO 3 120 ARE JAM NEERI site visit at drains was done from Approx 35.20 Cr. of budget is Revised KHA SHE 03.03.2020 to 07.03.2020. required for adoption of insitu timeline of DPU Proposal to goahead for adoption of insitu remediation at drains for 31.03.2022 is R remediation at drains is recived from treatment of 32 MLD as per proposed for NEERI. NEERI Site visit report. (Budget adoption of include capex + 5 years of O&M) insitu Regular consultantion with NEERI is in 50 MLD of NEERI site visit at drains was remediation Jamshedpur CSR waste water 677350 1317852 82 MLD 32 MLD 35.20 Cr progress. 31.03.2021 done from 03.03.2020 to at drains NAC FUND is currently 07.03.2020. Approval for taking funds from TATA treated. Proposal to goahead for adoption group under CSR fund for treatmaent of of insitu remediation at drains is remaining 32 MLD is under progress. awaited from NEERI.

Regular consultantion with NEERI is in progress. NEERI site visit at drains was done from Approx 30 Cr. of budget is Revised 03.03.2020 to 07.03.2020. proposed from State Fund for timeline of Proposal to goahead for adoption of insitu adoption of insitu remediation at 31.03.2022 is remediation at drains is received from drains for treatment of 33 MLD proposed for NEERI. waste water as per NEERI Site adoption of visit report. (Budget include capex insitu Mango Regular consultantion with NEERI is in + 5 years of O&M) remediation Municipal 223805 388730 33 MLD 33 MLD 30 Cr. State Fund progress. 31.03.2021 NA NEERI site visit at drains was at drains Corporation done from 03.03.2020 to Allocation of state fund for this project is in 07.03.2020. progress. Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.

Regular consultantion with NEERI is in progress. Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLE -3 Deatials on Municipal Drains which are dischaging into the identified river stretches

Current Status No. of on Villages/ Appro Networking/ Towns/ Cities x. Approximate Propsed Treatment Channelizatio along the Estimated Timeline as Proposal for Networking/ Lengt Quantity of Facility based on n including Name River river ( Populatio Population per the Channelization including diversion of Serial h of Sewage estimation of Tentative Budget Funding diversion of Timeline of the Stretc Approx. 10 n (as per after 15 Status order of Curent Status sewage generated from No. the Generated population after 15 yrs. Required Agency sewage required River h Kms. from Census yrs. (for Hon'ble household/town ships/villages to Stretc (City/Town/Vil (Numbers and generated the center of 2011) year 2035) NGT sewer lines h lage wise) Capacity) from the identified (Kms) household/tow river stretch n ships/villages length) to sewer lines

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23 DPR to provide I&D structure and STP for DPR to provide I&D structure 18 months drains is prepared and sent to National and STP for drains is prepared timeline is Mission for Clean Ganga (NMCG) New and sent to National Mission for proposed for Delhi for approval on may 2019. NMCG Clean Ganga (NMCG) New Delhi Tendering , send the DPR To IIT Roorkee for Third for approval on may 2019. NMCG construction Party Appraisal on Jan 2020. DPR send the DPR To IIT Roorkee for of STP and appraised by the IIT Roorkee on April Third Party Appraisal on Jan I&D Scheme 2020. 29 Exective 2020. DPR appraised by the IIT after Committee (EC) Roorkee on April 2020. aporoval of NMCG held on from NMCG 28.08.2020 through Video Conferncing 2 Unit: SBR Namami Phusro Executive Technology 14 MLD 64 Cr for Phusro I&D Gange Nagar 89178 118350 15 MLD 31.03.2021 Committee (EC) NA 1 unit: Phytorid Scheme (Central Parisahd resolved to defer Technology 1 MLD fund) the Proposal and take up the same in the next EC meeting due to paucity of time.

4

DPR to provide I&D structure and STP for DPR to provide I&D structure 26 months drains is prepared and sent to National and STP for drains is prepared timeline is Mission for Clean Ganga (NMCG) New and sent to National Mission for proposed for Delhi for approval on July 2019. NMCG Clean Ganga (NMCG) New Delhi Tendering , send the DPR To IIT Roorkee for Third for approval on July 2019. NMCG construction Party Appraisal on Jan 2020. DPR send the DPR To IIT Roorkee for of STP and appraised by the IIT Roorkee is under Third Party Appraisal on Jan I&D Scheme progress. 2020. DPR appraised by the IIT after Roorkee is under progress. aporoval from NMCG

PHU Namami Dhanbad SRO 3 units of total 144 381 Cr for Dhanbad Gange Approval awaided ROA Municipal 1162472 1484520 144 MLD 31.03.2021 NA DAM MLD I&D Scheme (Central from NMCG D Corporation ODA 12 fund) BDG R TO TURI O Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLEDPR -3to provide I&D structure and STP for DPR to provide I&D structure 26 months Deatials on Municipal Drains which are dischagingdrains is prepared into the and identified sent to river National stretches and STP for drains is prepared timeline is Mission for Clean Ganga (NMCG) New and sent to National Mission for proposed for Delhi for approval on July 2019. NMCG Current Status Clean Ganga (NMCG) New Delhi Tendering , No. of on Villages/ send the DPR To IIT Roorkee for Third for approval on July 2019. NMCG construction Appro Networking/ Towns/ Cities Party Appraisal on Jan 2020. DPR send the DPR To IIT Roorkee for of STP and x. Approximate Propsed Treatment Channelizatio along the Estimated appraised by the IIT Roorkee is under Timeline as ThirdProposal Party Appraisal for Networking/ on Jan I&D Scheme Lengt Quantity of Facility based on n including Name River river ( Populatio Population progress. per the 2020.Channelization DPR appraised including by diversion the IIT of after Serial h of Sewage estimation of Tentative Budget Funding diversion of Timeline of the Stretc Approx. 10 n (as per after 15 Status order of Curent Status Roorkeesewage is under generated progress. from aporoval No. the Generated population after 15 yrs. Required Agency sewage required River h Kms. from Census yrs. (for Hon'ble household/town ships/villages to from NMCG Stretc (City/Town/Vil (Numbers and generated the center of 2011) year 2035) NGT sewer lines h lage wise) Capacity) from the identified (Kms) household/tow river stretch n ships/villages length) PHU Namami to sewer lines Dhanbad 1 2 SRO3 4 5 6 7 8 3 units of15 total 144 381 Cr for16 Dhanbad Gange17 18 19 Approval20 awaided 21 22 23 ROA Municipal 1162472 1484520 144 MLD 31.03.2021 NA DAM MLD I&D Scheme (Central from NMCG D Corporation ODA 12 fund) BDG R TO TURI O

DPR to provide I&D structure and STP for DPR to provide I&D structure 26 months drains is prepared and sent to National and STP for drains is prepared timeline is Mission for Clean Ganga (NMCG) New and sent to National Mission for proposed for Delhi for approval on August 2020. Clean Ganga (NMCG) New Delhi Tendering , for approval on August 2020. construction of STP and I&D Scheme after aporoval from NMCG

Namami Ramgarh 2 units of total 40 252 Cr. for Ramgarh Gange Approval awaided Nagar 123875 141886 40 MLD 31.03.2021 NA MLD I&D Scheme (Central from NMCG Parishad fund) Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLE -3 Deatials on Municipal Drains which are dischaging into the identified river stretches

Current Status No. of on Villages/ Appro Networking/ Towns/ Cities x. Approximate Propsed Treatment Channelizatio along the Estimated Timeline as Proposal for Networking/ Lengt Quantity of Facility based on n including Name River river ( Populatio Population per the Channelization including diversion of Serial h of Sewage estimation of Tentative Budget Funding diversion of Timeline of the Stretc Approx. 10 n (as per after 15 Status order of Curent Status sewage generated from No. the Generated population after 15 yrs. Required Agency sewage required River h Kms. from Census yrs. (for Hon'ble household/town ships/villages to Stretc (City/Town/Vil (Numbers and generated the center of 2011) year 2035) NGT sewer lines h lage wise) Capacity) from the identified (Kms) household/tow river stretch n ships/villages length) to sewer lines

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

209.05 Cr project cost Sewerage Scheme for Zone-1 Ranchi, under Tender for the Sewerage Scheme for Zone-1 24 months for the Ranchi sewage Ranchi Municipal Corporation (in which construction of Ranchi, under Ranchi Municipal timeline is scheme under Zone -1 , river Jumar falls) was started but due to the remaining work Corporation (in which river proposed for Tender has been poor performance of the executing agency has been floated by Jumar falls) was started but due to construction floated. Date of opening the agreement has been terminated on dated the RMC. Date of the poor performance of the of STP and KAN of Tender is 01.10.2020 14.10.2019. opening of Tender executing agency the agreement laying of KE Ranchi is 01.10.2020 has been terminated on dated sewer JUM DAM 5 10 Municipal 1073427 3348023 37 MLD 1 unit of 37 MLD State Fund 209.05 Cr project cost for the Ranchi 31.03.2021 NA 14.10.2019. network AR TO Corporation sewage scheme under Zone -1. under Zone-I KAD 209.05 Cr project cost for the from the date AL Tender has been floated. Date of opening of Ranchi sewage scheme under Zone of agreement. Tender is 01.10.2020 -1.

Tender has been floated. Date of opening of Tender is 01.10.2020

ALO NG No ULB falls TILA under the KON 6 YA - identified - AR AND stretch of KON River AR Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLE -3 Deatials on Municipal Drains which are dischaging into the identified river stretches

Current Status No. of on Villages/ Appro Networking/ Towns/ Cities x. Approximate Propsed Treatment Channelizatio along the Estimated Timeline as Proposal for Networking/ Lengt Quantity of Facility based on n including Name River river ( Populatio Population per the Channelization including diversion of Serial h of Sewage estimation of Tentative Budget Funding diversion of Timeline of the Stretc Approx. 10 n (as per after 15 Status order of Curent Status sewage generated from No. the Generated population after 15 yrs. Required Agency sewage required River h Kms. from Census yrs. (for Hon'ble household/town ships/villages to Stretc (City/Town/Vil (Numbers and generated the center of 2011) year 2035) NGT sewer lines h lage wise) Capacity) from the identified (Kms) household/tow river stretch n ships/villages length) to sewer lines

1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23

ALO No ULB falls NAL NG under the 7 KAR PAT - identified - I RAT stretch of U River Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019 TABLE - 4 Deatials on Municipal Solid Waste Dumped along the identified river stretches

No. of Villages/ Details on Current Appro Total Quantity Total Quantity Towns/ Cities Method adotped to x. of MSW Waste of MSW Waste Name along the river ( Population Estimated Gap prevent improper Serial River Length Generated in Treated (In Approx. Current of the Approx. 10 Kms. (as per Population Quantity of MSW Treated Type of the treatment facility Present Analysi disposal of untreated Proposed Project for remaining untreated waste Funding Agency No. Stretch of the the town TPD)( Budget Status River from the center of Census 2011) after 15 yrs. s waste prior to the Stretch /city/village(in City/Town/Vill the identified river completion of (Kms) TPD) age Wise) stretch length) proposed project

Recyled/ Rused/ Landfilable door to door Composting/Biomining Segerated Others RDF Quantity and Quantity and Others Number Capacity Technology Other collection Quantity and Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

Material recovery Material recovery facility (MRF) for facility (MRF) for segregation of Further Concession segregation of With intrgrated ALO waste 1 nos. processing aire has waste 1 nos. MSW solutions NG Chas 100% D2D Wet Waste: facility of the Capex: PPP+State+Ce been GAR Wet Waste: 1 no waste to (Processing 1 TAL 8 Municipal 156888 243675 47 p collection at 91.4% - 18.8 TPD 28.2 28.2 Windrow 50 MT waste will be 21.26 ntral + ULB selected. GA Windrow compost technology - MUC Corporation all 35 wards composting : 2 increased Crore Share Agreement composting : 2 nos. waste to HU nos. through has been Dry waste: compost) Dry waste: concessionaire. done. recycled through recycled through recycler recycler

KON GSE No ULB falls RAB under the SAN 2 ASA 10 identified - - KH R TO stretch of BOL River BA

Material recovery Material recovery facility (MRF) for facility (MRF) for Separate segregation of segregation of Further Collection, waste: 9 nos. waste: 9 nos. processing Transportation Ranchi 100% D2D Wet Waste: Pit Wet Waste: Pit Biomethanation facility of the State+Central Under & Processing Capex: 64 Municipal 1073427 3348023 536 270 collection at 100% - 110 TPD Compost: 40 nos. 266 266 Compost: 40 nos. Plant is under - waste will be +ULB+PSU approval (Waste to Crore Corporation all 53 wards Dry waste: Dry waste: approval. increased Share Stage Biomethanation recycled through recycled through through Technology) recycler recycler PSU/CSR solution C&D Recycle : 1 C&D Recycle : 1 nos. nos.

HATI A SUB DAM ARN TO 3 ARE JAM KHA SHE DPU R TABLE - 4 Deatials on Municipal Solid Waste Dumped along the identified river stretches

No. of Villages/ Details on Current Appro Total Quantity Total Quantity Towns/ Cities Method adotped to x. of MSW Waste of MSW Waste Name along the river ( Population Estimated Gap prevent improper Serial River Length Generated in Treated (In Approx. Current of the Approx. 10 Kms. (as per Population Quantity of MSW Treated Type of the treatment facility Present Analysi disposal of untreated Proposed Project for remaining untreated waste Funding Agency No. Stretch of the the town TPD)( Budget Status River from the center of Census 2011) after 15 yrs. s waste prior to the Stretch /city/village(in City/Town/Vill the identified river completion of (Kms) TPD) age Wise) stretch length) proposed project

Recyled/ Rused/ Landfilable door to door Composting/Biomining Segerated Others RDF Quantity and Quantity and Others Number Capacity Technology Other collection Quantity and Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

Material recovery Material recovery facility (MRF) for facility (MRF) for segregation of segregation of waste: 1 nos waste: 1 nos Adityapur 100% D2D Wet Waste: Pit Wet Waste: Pit Municipal 174355 326578 59.95 34 collection at 100% - 6 25.95 25.95 composting - 11 composting - 11 Corporation all 35 wards nos. nos. Dry waste: Dry waste: HATI recycled through recycled through A recycler recycler SUB DAM ARN TO 3 ARE JAM Material recovery Material recovery KHA SHE facility (MRF) for facility (MRF) for DPU Capex: segregation of segregation of R Further 78.63 waste: 4 nos waste: 4 nos With intrgrated processing Crore In Wet Waste: Pit Wet Waste: Pit MSW solutions 100% D2D facility of the cluster PPP+State+Ce DPR Jamshedpur composting - 8 composting - 8 1 no waste to (Processing 677350 1317852 214 48 collection at 100% - 6 166 166 300 MT waste will be (Adityapu ntral + ULB under NAC nos. nos. compost technology - all 4 zones increased r+Jamshe Share Revision Dry waste: Dry waste: waste to through dpur+Man recycled through recycled through compost) concessionaire go+jugsala recycler recycler i+kapali) Biomethaneation Biomethaneation Plant - 9 nos. Plant - 9 nos.

Material recovery Material recovery facility (MRF) for facility (MRF) for segregation of segregation of waste: 1 nos waste: 1 nos Wet Waste: Pit Wet Waste: Pit Mango 100% D2D composting - 20 composting - 20 120 Municipal 223805 388730 77.81 33.1 collection at 100% - 22.5 44.71 44.71 nos. nos. Corporation all 3 wards Dry waste: Dry waste: recycled through recycled through recycler recycler C&D Recycling C&D Recycling unit -1 nos. unit -1 nos. TABLE - 4 Deatials on Municipal Solid Waste Dumped along the identified river stretches

No. of Villages/ Details on Current Appro Total Quantity Total Quantity Towns/ Cities Method adotped to x. of MSW Waste of MSW Waste Name along the river ( Population Estimated Gap prevent improper Serial River Length Generated in Treated (In Approx. Current of the Approx. 10 Kms. (as per Population Quantity of MSW Treated Type of the treatment facility Present Analysi disposal of untreated Proposed Project for remaining untreated waste Funding Agency No. Stretch of the the town TPD)( Budget Status River from the center of Census 2011) after 15 yrs. s waste prior to the Stretch /city/village(in City/Town/Vill the identified river completion of (Kms) TPD) age Wise) stretch length) proposed project

Recyled/ Rused/ Landfilable door to door Composting/Biomining Segerated Others RDF Quantity and Quantity and Others Number Capacity Technology Other collection Quantity and Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

Further Concession With intrgrated processing aire has Wet Waste: Pit Wet Waste: Pit MSW solutions 100% D2D facility of the Capex: PPP+State+Ce been Phusro Nagar composting - 2 composting - 2 1 no waste to (Processing 89178 118350 41.89 17.5 (16.5+1) collection at 100% - 0 24.39 24.39 50 MT waste will be 13.45 ntral+ULB selected. Parisahd nos. nos. compost technology - all 28 wards increased Crore Share Agreement waste to through has been compost) concessionaire done.

PHU Material recovery Material recovery SRO facility (MRF) for facility (MRF) for ROA segregation of segregation of DAM Further Concession D waste: 55 nos waste: 55 nos With intrgrated 4 ODA 12 processing aire has BDG Wet Waste: Pit Wet Waste: Pit MSW solutions R Dhanbad 100% D2D facility of the PPP+State+Ce been TO composting - 143 composting - 143 1 no waste to (Processing Capex: 84 Municipal 1162472 1484520 540 290 collection at 100% 110 250 250 500 MT waste will be ntral+ULB selected. TURI nos. nos. compost technology - Crore Corporation all 55 wards increased Share Agreement O Dry waste: Dry waste: waste to through has been recycled through recycled through compost) concessionaire done. recycler recycler C&D Recycling C&D Recycling unit -5 nos. unit -5 nos.

Wet Waste: Pit Wet Waste: Pit composting - 32 composting - 32 PPP+State+Ce DPR Ramgarh 100% D2D nos. Tentative nos. ntral+ULB+ under Nagar 123875 141886 30 24 collection at 100% 0 Dry waste: 6 6 Capex: 31 Dry waste: Cantonment preparatio Parishad all 32 wards recycled through Crore recycled through Board Share n recycler recycler C&D collection C&D unit -1 nos. unit -1 nos.

Material recovery Material recovery facility (MRF) for facility (MRF) for Separate segregation of segregation of Further KAN Collection, waste: 9 nos. waste: 9 nos. processing KE Transportation Ranchi 100% D2D Wet Waste: Pit Wet Waste: Pit Biomethanation facility of the State+Central Under JUM DAM & Processing Capex: 64 5 10 Municipal 1073427 3348023 536 270 collection at 100% 110 TPD Compost: 40 nos. 266 266 Compost: 40 nos. Plant is under - waste will be +ULB+PSU approval AR TO (Waste to Crore Corporation all 53 wards Dry waste: Dry waste: approval. increased Share Stage KAD Biomethanation recycled through recycled through through AL Technology) recycler recycler PSU/CSR solution C&D Recycle : 1 C&D Recycle : 1 nos. nos. TABLE - 4 Deatials on Municipal Solid Waste Dumped along the identified river stretches

No. of Villages/ Details on Current Appro Total Quantity Total Quantity Towns/ Cities Method adotped to x. of MSW Waste of MSW Waste Name along the river ( Population Estimated Gap prevent improper Serial River Length Generated in Treated (In Approx. Current of the Approx. 10 Kms. (as per Population Quantity of MSW Treated Type of the treatment facility Present Analysi disposal of untreated Proposed Project for remaining untreated waste Funding Agency No. Stretch of the the town TPD)( Budget Status River from the center of Census 2011) after 15 yrs. s waste prior to the Stretch /city/village(in City/Town/Vill the identified river completion of (Kms) TPD) age Wise) stretch length) proposed project

Recyled/ Rused/ Landfilable door to door Composting/Biomining Segerated Others RDF Quantity and Quantity and Others Number Capacity Technology Other collection Quantity and Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26

ALO NG No ULB falls TILA under the KON 6 YA - identified - AR AND stretch of KON River AR ALO No ULB falls NG under the NAL 7 PAT - identified - KARI RAT stretch of U River TABLE - 4

Deatials on Plastic Waste Dumped along the identified river stretches

Appr No. of Villages/ ox. Total Total Details on Current Towns/ Cities Nam Leng Quantity of Quantity of Method adotped to along the river ( Population e of th of Estimated Plastic Waste Plastic Waste Gap prevent improper Seria River Approx. 10 (as per the the Population Generated in Treated (In Type of the treatment facility Present Analy disposal of untreated Proposed Project for remaining untreated waste l No. Stretch Kms. from the Census Rive Stret after 15 yrs. the TPD)( sis waste prior to the center of the 2011) r ch town/cily/villa City/Town/Vil completion of identified river (Kms ge (in TPD) lage Wise) proposed project stretch length) )

Recyled/ Rused Landfilable RDF Quantity and Quantity and Quantity and Others Number Capacity Technology Other Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1 GA ALON 8 Chas 156888 243675 3.46 0 3.46 0 0 Through local 0 All the Plastic waste - - - Further, RG G Municipal Scrap vendors it is recycled through Treatment Plant A TAL Corporation is send to local scrap dealer for plastic waste MUC recycler will be installed HU through concessionaire

2 SAN KON 10 No ULB falls - - KH GSER under the ABAS identified AR stretch of TO River 3 SUB BOLBHATI 120 Ranchi 1073427 3348023 70 0 70 0 0 Through local 0 All the Plastic waste - - - - ARN A Municipal Scrap vendors it is recycled through ARE DAM Corporation is send to local scrap dealer KH TO recycler A JAMS HEDP UR

Adityapur 174355 326578 5 0 4 0 1 Through local 1 All the Plastic waste - - - - Municipal Scrap vendors it is recycled through Corporation is send to local scrap dealer recycler 3 SUB HATI 120 ARN A TABLE - 4 ARE DAM KH TO Deatials on Plastic Waste Dumped along the identified river stretches A JAMS HEDP Appr UR No. of Villages/ ox. Total Total Details on Current Towns/ Cities Nam Leng Quantity of Quantity of Method adotped to along the river ( Population e of th of Estimated Plastic Waste Plastic Waste Gap prevent improper Seria River Approx. 10 (as per the the Population Generated in Treated (In Type of the treatment facility Present Analy disposal of untreated Proposed Project for remaining untreated waste l No. Stretch Kms. from the Census Rive Stret after 15 yrs. the TPD)( sis waste prior to the center of the 2011) r ch town/cily/villa City/Town/Vil completion of identified river (Kms ge (in TPD) lage Wise) proposed project stretch length) )

Recyled/ Rused Landfilable RDF Quantity and Quantity and Quantity and Others Number Capacity Technology Other Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Jamshedpur 677350 1317852 17.12 0 6 0 11.12 ( Through the 11.12 All the Plastic waste - - - - NAC local Scrap is recycled through vendors it is local scrap dealer send to recycler and also used for road construction)

Mango 223805 388730 2 0 2 0 0 Through local 0 All the Plastic waste - - - - Municipal Scrap vendors it is recycled through Corporation is send to local scrap dealer recycler

4 DA PHUS 12 Phusro Nagar 89178 118350 4.6 0 1.2 0 4.6 Through local 3.4 All the Plastic waste - - - - MO RO Parisahd Scrap vendors it is recycled through DAR ROA is send to local scrap dealer D recycler BDG TO TURI O Dhanbad 1162472 1484520 43.2 0 43.2 0 0 Through local 0 All the Plastic waste - - - - Municipal Scrap vendors it is recycled through Corporation is send to local scrap dealer recycler

Ramgarh 123875 141886 0.8 0 0.8 0 0 Through local 0 All the Plastic waste - - - - Nagar Scrap vendors it is recycled through Parishad is send to local scrap dealer recycler TABLE - 4

Deatials on Plastic Waste Dumped along the identified river stretches

Appr No. of Villages/ ox. Total Total Details on Current Towns/ Cities Nam Leng Quantity of Quantity of Method adotped to along the river ( Population e of th of Estimated Plastic Waste Plastic Waste Gap prevent improper Seria River Approx. 10 (as per the the Population Generated in Treated (In Type of the treatment facility Present Analy disposal of untreated Proposed Project for remaining untreated waste l No. Stretch Kms. from the Census Rive Stret after 15 yrs. the TPD)( sis waste prior to the center of the 2011) r ch town/cily/villa City/Town/Vil completion of identified river (Kms ge (in TPD) lage Wise) proposed project stretch length) )

Recyled/ Rused Landfilable RDF Quantity and Quantity and Quantity and Others Number Capacity Technology Other Numbers Numbers Numbers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

5 JUM KAN 10 Ranchi 1073427 3348023 70 0 70 0 0 Through local 0 All the Plastic waste - AR KE Municipal Scrap vendors it is recycled through DAM Corporation is send to local scrap dealer TO recycler KAD 6 KO ALON - No ULB falls - NAR G under the TILA identified YA stretch of AND River KON AR 7 NAL ALON - No ULB falls - KA G under the RI PATR identified ATU stretch of River TABLE - 4 Deatials on Construction & Demoliation (C&D) Waste Dumped along the identified river stretches

No. of Villages/ Total Details on Current Towns/ Cities Total Quantity Approx. Quantity of Method adotped to along the river ( Population of C&DWaste Length Estimated C&D Waste Gap prevent improper Seria Name of River Approx. 10 (as per Generated in of the Population Treated (In Type of the treatment facility Present Anal disposal of untreated Proposed Project for remaining untreated waste l No. the River Stretch Kms. from the Census the Stretch after 15 yrs. TPD)( ysis waste prior to the center of the 2011) town/cily/villa (Kms) City/Town/Vil completion of identified river ge (in TPD) lage Wise) proposed project stretch length)

Recyled/ Rused Quantity and Landfilable Quantity and NumbersOthers Number Capacity Technology Other Numbers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 GARGA ALONG 8 Chas Municipal 156888 243675 5 - 5 0 - 0 Land filling of low - ` - - TALMUC Corporation lying area HU Construction site for Construction of PCC road

2 SANKH KONGSE 10 No ULB falls - - RABASA under the R TO identified stretch 3 SUBARN HATIA 120 Ranchi 1073427 3348023 20 - 20 0 For treatment of 0 Land filling of low 1 50 TPD (Projected C&D waste For treatment of AREKHA DAM TO Municipal C&D waste, Tender lying area as per next 15 Recycling Plant C&D waste, JAMSHE Corporation was floated but due Construction site years) Tender was DPUR to single bidder for Construction of floated but due to found responsive in PCC road single bidder 1st call, tender was found responsive cancelled and in 1st call, tender Adityapur 174355 326578 1.75 1.75 0 retendering- is under Land filling of low - ` - was cancelled- and Municipal lying area Corporation Construction site for Construction of Jamshedpur 677350 1317852 17.5 - 17.5 0 - LandPCC filling road of low - ` - - NAC lying area Construction site Mango 223805 388730 2 - 2 0 - Land filling of low - ` - - Municipal lying area Corporation 4 DAMOD PHUSRO 12 Phusro Nagar 89178 118350 7 - 7 0 - Land filling of low - ` - - AR ROAD Parisahd lying area BDG TO TURIO Dhanbad 1162472 1484520 24 - 24 0 - Land filling of low - ` - - Municipal lying area Corporation Construction site Ramgarh Nagar 123875 141886 0.5 - 0.5 0 - forLand Construction filling of low of - ` - - Parishad lying area Construction site for Construction of PCC road 5 JUMAR KANKE 10 Ranchi 1073427 3348023 20 - 20 0 For treatment of 0 Land filling of low 1 50 TPD (Projected C&D waste For treatment of DAM TO Municipal C&D waste, Tender lying area as per next 15 Recycling Plant C&D waste, KADAL Corporation was floated but due Construction site years) Tender was to single bidder for Construction of floated but due to found responsive in PCC road single bidder 1st call, tender was found responsive cancelled and in 1st call, tender retendering is under was cancelled and process. retendering is under process.

6 KONAR ALONG - TILAYA AND KONAR 7 NALKAR ALONG - I PATRAT U

List of Industries present along Subarnarekha river stretch with their Name, Type/Category and Status of E.T.P. installed.

Status of E.T.P. Treatment Name of Industries with respect to the Capacity of ETP Sl. present along the Type/Category industries present no. catchment basin of of Industries along the river the defined stretches stretches 01 M/s. Heavy Red/ Foundry E.T.P. Installed Adequate Engineering Forge Plant Corporation Ltd., Foundry Forge Plant, Dhurwa, Ranchi. 02 M/s. Hindalco Red/Alumina E.T.P. Installed Adequate Industries Ltd, Muri Plant without works. Po-Chhotamuri, smelter Dist.-Ranchi. 03 M/s. Usha Martin Ltd., Red/Wire & E.T.P. Installed Adequate Wire rope and Wire Rope specialty Division, Captive Power Plant, At.-Tatisilway, Dist.- Ranchi. 04 M/s Samridhi Rice Orange/ Rice E.T.P. Installed Adequate Mill Pvt. LTD. At.- Mill Malar, Bero, Ranchi 05 M/s Hemraj Rice Orange/ Rice E.T.P. Installed Adequate Products Pvt. Ltd., At.- Mill At-Saher, Po-Nagari, Dist.-Ranchi 06 M/s Sri Krishna Orange/ Rice E.T.P. Installed Adequate Metcom, At. -Nagari, Mill Dist.-Ranchi 07 M/s Prateek Agro Orange/ Rice E.T.P. Installed Unit is not Experts (P) Ltd., Mill operational Futkaltoli Simalia Ratu, Kanke Ranchi 08 M/s Narmada Agro Orange/ Rice E.T.P. Installed Adequate Foods (P) Ltd. At.- Mill Bandhtoli, Piska Nagari, Ranchi 09 M/s Bihariji Rice Mill, Orange/ Rice E.T.P. Installed Adequate At.-Tikratoli, Nagari, Mill Ranchi. 10 M/s Sri Krishna Rice Orange/ Rice E.T.P. Installed Adequate Mill, At. Bandhtoli, Mill Piska Nagari, Dist.- Ranchi 11 M/s Baba rice mill, Orange/ Rice E.T.P. Installed Adequate At.-Bandhtoli, Piska Mill Nagari, Ranchi 12 M/s Sharvi Rice Mill Orange/ Rice E.T.P. Installed Adequate (P) Ltd., At.-Nagri, Po- Mill Piska Nagri, Dist.- Ranchi 13 M/s Satnarayan Agro Orange/ Rice E.T.P. Installed Unit is not Pvt. Ltd. At-Agrawal, Mill operational At-Bandhtoli, Nagri, Ranchi 14 M/s Balajee Agrotech Orange/ Rice E.T.P. Installed Adequate Industries, At- Mill Tikratoli, Po-Piska, Nagari, Dist.-Ranchi 15 M/S Chorus Agro Pvt. Orange/ Rice E.T.P. Installed Adequate Ltd., At.-Tupudana Mill Industrial Area, Dist.- Ranchi 16 M/S Shree Shakambari Orange/ Rice E.T.P. Installed Adequate Rice Mill Pvt. Ltd., Mill At.-Industrial Area Tupudana, Dist.- Ranchi 17 M/s Bihar State Milk Red/ Dairy E.T.P. Installed Adequate Co-Operative Federation Ltd., (Ranchi Dairy) At+Mauza-Sector-2, HEC, Po-Dhurwa, Ranchi 18 M/s Hotel Raddison Red/ Hotel E.T.P. Installed Adequate Blu, Kadru, Bypass Road, Ranchi 19 M/s Hotel BNR Red/ Hotel E.T.P. Installed Adequate Chanakya, Railway Station Road, Ranchi 20 M/s S.M.V. Agro Orange/ Rice E.T.P. Installed Adequate Products Pvt. Ltd., At.- Mill Ara Gate, Mahilong, Angara, Ranchi 21 M/s Tulsyan Rice Mill Orange/ Rice E.T.P. Installed Adequate Pvt.Ltd., Tatisilway, Mill I/A, Phase-II, Ranchi 22 M/s KGVK Agro Red/ Dairy E.T.P. Installed Adequate Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi

23 M/s. Balaji food & Orange/ Rice E.T.P. Installed Adequate Grains (P) Ltd. At.- Mill Lotwa, Po- Sandi, Dist- Ranchi 24 M/s Rani Sati Food Orange/ Rice E.T.P. Installed Adequate Grains, Mill Rukka,Ormanjhi, Dist- Ranchi

(R.N. Kashyap) Regional Officer Ranchi

List of Industries present along Jumar river stretch with their Name, Type/Category and Status of E.T.P. installed.

Status of E.T.P. Treatment Name of Industries with respect to the Capacity of ETP Sl. present along the Type/Category industries present no. catchment basin of of Industries along the river the defined stretches stretches 01 M/s KGVK Agro Red/ Dairy E.T.P. Installed Adequate Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi

02 M/s. Balaji food & Orange/ Rice E.T.P. Installed Adequate Grains (P) Ltd. At.- Mill Lotwa, Po- Sandi, Dist- Ranchi 03 M/s Rani Sati Food Orange/ Rice E.T.P. Installed Adequate Grains, Mill Rukka,Ormanjhi, Dist- Ranchi

(R.N. Kashyap) Regional Officer Ranchi

List of Industries present along Jumar river stretch with their Name, Type/Category and Status of E.T.P. installed.

Status of E.T.P. Treatment Name of Industries with respect to the Capacity of ETP Sl. present along the Type/Category industries present no. catchment basin of of Industries along the river the defined stretches stretches 01 M/s KGVK Agro Red/ Dairy E.T.P. Installed Adequate Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi

02 M/s. Balaji food & Orange/ Rice E.T.P. Installed Adequate Grains (P) Ltd. At.- Mill Lotwa, Po- Sandi, Dist- Ranchi 03 M/s Rani Sati Food Orange/ Rice E.T.P. Installed Adequate Grains, Mill Rukka,Ormanjhi, Dist- Ranchi

(R.N. Kashyap) Regional Officer Ranchi $11'<~O\S ~I\iiI >t~ol Ptli?t 01 m, ~ ¢1<:jlC'1<:j-W-q

Ref . Datc .

Details of the drain meeting in the river in R.O. Hazaribag area in the respect of writ petition(s)(Civil) no(s) 13029/1985, in the matter of M.C. Mehta Vrs. Union of India &Ors.

I SL. No. Name of Unit & Address _\J~jv~!__ j~~~TOvaliditY __ 1 Treated/Untreated River I Till 15.02.2021 I Treated through 1 Mis Urimari Project, CCL, \ Damodar At+PO- Urimari, Hazaribag 1 i. settling tank & , discharge. TiI130.06.2023 : Treated through 2 Mis Birsa Project, CCL, .At+PO- Urimari, Hazaribag ! settling tank & I discharge. 1------~------~------~------Tilj-jT:Oi20io-~j l~~~ated II 3 Mis Giddi A, Colliery. CCL, Damodar River Ih~;~gI~ At+PO- Giddi. Hazaribag i settling tank & ! discharge. '1-- ---~------~~------~~-~-----~------~------1 ------~~ 4 ! Mis New Giddi C, Colliery, CCL, Damodar : Treated through I AtWO- Giddi, Hazaribag , settling tank & discharue. I ---.- -_'-' . r- ---5~---1-M/s Giddi Co~I\Vashery, CCL, Zero liquid discharge ~. ._~ __l_I~_t2f(~_C_Jiddi,!?~t::~:

------~-- ._ .._-- _._- - __ .-_---_- ..--_" Till 31. J 2.2006 Treated through 12 Mis Argadda Colliery, CCL, At+PO- Argadda, Ramgarh settling tank & discharge . ... _.---__ .. - - Mis Sirka Colliery(Sirka U/G & Sirka rill 3 J .03.20 19 Treated through Oep) CCL settling lank & At-Sirka. PO- Argadda, Distk.amgarh discharge. 14 Mis Religarha Colliery. CCL Damodar River I rill 31.03.2022 Treated through At- Rei igarha, Dis- I!azari bag settling tank & , , discharge. I--~- I__- ~ - _ - Damodar River Till 3 J .12.2020 lrcatcd through r 15 1 Mis Purnadih Open Cast Project, CCL I I At-Purnadih, Dist- Chatra settling tank & discharge. i~ I:

OmlOffice Worklpage no. - 1266 Till 31.03.2020 Treated through I 1~~~M/S Ashoka Project, CCL, III Damodar River PO-Bachra, Dist- Chatra settling tank & disc_~,!rge. _ --17 Mi,Pip,';';"-O';;;; C,;; Project, CCL, I Damcdar River Till 31.03.2020 Treated through settling tank &

. _. ~_!. _~~0arg':.: ... 118----j-:;:::;;~;;;~~h'"'D'''-Chatra -1-f:5am;;-d-arRiver Till 31. I2.2007 1 Zero liquid discharge i I At-Piparwar, PO-Bachra, Dist- Chatra ! I I t,··;· ~-.-" --)' .._-_.._--\ -~;;-;-- ..---- lL, --. ,L II 19 I Mis Pali Hills Breweries(p) I:td,~--~- -1-Nafk:;i River , nu _,1.03._017 I P Installed, ! At- Industrial Area, PO-Patratu, Ramgarh I i ' Treated effluent goes I out side thc....E!_cmises. --1 .. ---- E·Tp-II~stalled,- .- i- 20 - -\ Mis i-i.R. r:·ood-Proeessi·l~g(p) Ltd., \1\lalkari Ri~~~ i At- Industrial Area, PO-Patratu, Ramgarh Treated effluent goes ______I OL~l~idethy premises. 1---21- MTsS~u-n-daDCOlii~~y,(:(=1., -hNalkari River Till 31.12.2006 I Not operative I At-Sounda, Dist-Ramgarh

1--22 ~/~tS:y:~a~i~e~lliery, C-C-L~---··~----·-· --i-)-a-m-o-d~~I{i~;-~1-·-I'-ill-jJ:03-.-20-04--1-N(rtope;a-tl-·v-e--. At-+ po- Sayal, Dist-Ramgarh I!

; 23 T~:;~:~:'~~~~::~~;:::'i;~~~;;hNalkari Ri~;;--I,ITJj U22004 -i-:~oi;;p,~~tiv<--

. __._.I(~.~~~)?_el:atiVe) . , 24 i Mis Bhurkunda Colliery, CCL, Nalkari Rivcr Till 31.12.2019 Treated through I I At·, PO- Bhurkunda, Ramgarh settiing tank &

L- "-- --- discharge ...

(A.K. Yadav) } Regional Officer

OmlOffice Worklpage no. - 1267 List of Industries present along GARGA river stretch with their Name, Type/Category and Status of E.T.P. installed.

Status of E.T.P. Treatment Name of Industries with respect to the Capacity of ETP Sl. present along the Type/Category industries present no. catchment basin of of Industries along the river the defined stretches stretches 1 M/s. Bokaro Steel Ltd., Red/Integrated E.T.P. Installed Adequate Bokaro Steel

2 M/s. Bokaro Dairy, Red/ Dairy E.T.P. Installed Adequate BIHAR STATE MILK Product ( Not functioning) COOPERATIVE FEDERATION LTD,At- SECTOR12F , PO-Chas, Dist- Bokaro

3 M/s. Bokaro Power Red/Thermal E.T.P. Installed Adequate Supply Co. Ltd.At- B.S. Power Plant City. Bokaro

Total Name Of Tempe Total Total Total Fixed Total Sampling Sampling Name Of Dissolved BOD Turbidity Chlorides COD Calcium Magnesium Sulphate Dissolved STN Code Monitoring Sub Basin District rature pH Alkalinity Hardness Solids Suspended Date Time WaterBody O2 (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) Solids Location © (mg/l) (mg/l) (mg/l) Solids (mg/l) (mg/l) 2382 10/08/20 11:30 AM DAMODAR AT DAMODAR DAMODAR BOKARO 34 7.6 7.5 1.6 Not 98 48 92 70 13.6 8.78 Not 536 Not 102 PHUSRO ROAD Analysed Analysed Analysed BRIDGE 3557 10/08/20 12:05 PM DAMODAR DAMODAR DAMODAR BOKARO 35.5 7.7 7.5 1.4 Not 112 54 88 66 12 8.74 Not 534 Not 88 RIVER NEAR Analysed Analysed Analysed BERMO RAILWAY STATION, BOKARO 3555 10/08/20 1:20 AM DAMODAR DAMODAR DAMODAR BOKARO 36 7.9 7.6 1.3 Not 100 54 80 86 13.6 11.95 Not 532 Not 84 RIVER NEAR Analysed Analysed Analysed ZARANGDIH BRIDGE, BOKARO 3556 10/08/20 2:00 AM CONFLUENCE DAMODAR DAMODAR BOKARO 35.5 7.8 7.5 1.8 Not 112 64 96 90 15.2 12.68 Not 514 Not 112 OF BOKARO & Analysed Analysed Analysed DAMODAR RIVER NEAR ZARANGDIH BRIDGE, BOKARO 3554 10/08/20 2:50 AM KONAR RIVER KONAR DAMODAR BOKARO 35 7.6 7.5 1.5 Not 122 66 100 88 14.4 12.68 Not 544 Not 104 NEAR SWANG Analysed Analysed Analysed COAL WASHERY, BOKARO 2390 10/08/20 5:15 AM KONAR AT KONAR DAMODAR BOKARO 25 7.4 7.6 1.1 Not 94 38 76 70 14.4 8.29 Not 454 Not 74 TENUGHAT Analysed Analysed Analysed DAM 23 18/08/20 2:30 AM SUBARNAREKH SUBARNARE SUBARNARE RANCHI 21 6.8 7.5 2.6 Not 86 16 44 110 28.8 9.27 Not 388 430 42 A AT RANCHI, KHA KHA Analysed Analysed (TATISILWAI)

2385 18/08/20 12:40 PM SUBARNAREKH SUBARNARE SUBARNARE RANCHI 22 6.4 6.5 2.4 Not 82 16 32 122 33.6 9.27 Not Not 398 472 A AT KHA KHA Analysed Analysed Analysed NAMKUM ROAD BRIDGE 2386 19/08/20 11:30 AM SUBARNAREKH SUBARNARE SUBARNARE RANCHI 22 7.8 7.5 2.4 Not 86 22 28 124 36.8 7.8 Not 388 428 40 A AT MURI KHA KHA Analysed Analysed ROAD BRIDGE 2395 18/08/20 8:40 AM SUBARNAREKH SUBARNARE SUBARNARE RANCHI 18 8.5 7.3 1.1 Not 84 18 24 118 32.4 9.03 Not 404 456 52 A AT HATIA KHA KHA Analysed Analysed DAM 2396 18/08/20 10:35 AM JUMAR AT JUMAR DAMODAR RANCHI 20 6.9 7.5 2.1 Not 74 16 28 122 33.6 9.27 Not 384 424 40 KANKE DAM Analysed Analysed 2397 18/08/20 4:30 AM SUBARNAREKH SUBARNARE SUBARNARE RANCHI 20 8.4 7.4 2 Not 82 22 32 120 30.4 10.74 Not 334 384 50 A AT KHA KHA Analysed Analysed GATALSUD DAM 48 29/08/20 10:15 AM SUBARNAREKH SUBARNARE SUBARNARE EAST 25.5 7.8 7.4 0.7 5 16 12 4 18 4.8 1.46 4.64 111 Not 18 A AT CHANDIL KHA KHA SINGHBHU Analysed BRIDGE M

4744 29/08/20 7:30 AM ON SWARNREKH SUBARNARE EAST 24 7.5 7.4 1 5 18 14 4 20 4.8 1.95 6.3 112 Not 24 SWARNREKHA A KHA SINGHBHU Analysed BEFORE M MEETING KHARKAI RIVER 4746 29/08/20 7:45 AM ON SWARNREKH SUBARNARE EAST 24 6.8 7.4 2.3 7 28 18 8 38 9.6 3.41 8.63 114 Not 34 SWARNREKHA A KHA SINGHBHU Analysed RIVER AFTER M CONFLUENCE OF KHARKAI RIVER 49 29/08/20 8:30 AM SUBARNAREKH SUBARNARE SUBARNARE EAST 24.5 5.8 7.6 4 17 52 42 16 76 18.4 7.32 15.05 143 Not 76 A AT D/S KHA KHA SINGHBHU Analysed JAMSHEDPUR, M (TATA NAGAR)

4743 29/08/20 1:20 AM SWARNREKHA SWARNREKH SUBARNARE EAST 28.2 7.2 7.4 1.1 6 20 14 4 30 7.2 2.92 5.64 110 Not 24 U/S HCL A KHA SINGHBHU Analysed GHATSHILA, M E.S 24 29/08/20 3:40 AM SUBARNAREKH SUBARNARE SUBARNARE EAST 27.3 6 7.4 3.2 13 38 32 12 56 13.6 5.36 11.73 128 Not 64 A AT KHA KHA SINGHBHU Analysed JAMSHEDPUR M 4748 29/08/20 5:30 AM SWARNKEKHA SWARNREKH SUBARNARE EAST 26.2 7 7.4 1.2 6 28 18 8 36 8.8 3.41 5.86 116 Not 36 RIVER AT A KHA SINGHBHU Analysed BAHARAGORA M ROAD BRIDGE, P.O- BAHARAGORA, E.S 2399 29/08/20 9:45 AM SUBARNAREKH SUBARNARE SUBARNARE SERAIKELA 25 7.6 7.5 0.8 5 14 10 4 16 4 1.46 3.98 107 Not 19 A AT CHANDIL KHA KHA KHARSAW Analysed DAM AN

2387 29/08/20 1:40 AM SUBAREKHA SUBARNARE SUBARNARE RANCHI 28 7.3 7.4 1 6 20 12 4 28 7.2 2.44 5.42 106 Not 24 AT GHATISLA KHA KHA Analysed ROAD BRIDGE 4749 13/08/20 2:00 AM ON SWARNREKH SUBARNARE RANCHI 23 8 7.5 2.8 Not 80 16 44 110 28.8 9.27 Not 424 506 82 SWARNREKHA A KHA Analysed Analysed RIVER , NEAR RING ROAD BRIDGE SEMBO, NAGRI, RANCHI 4750 13/08/20 11:00 AM ON SWARNREKH SUBARNARE RANCHI 23 7.8 7.4 2.2 Not 84 18 40 112 24.8 12.2 Not 30.2 362 60 SWARNREKHA A KHA Analysed Analysed RIVER NEAR INTAKE WELL HATIA RAILWAY 4752 13/08/20 10:05 AM SWARNREKHA SWARNREKH SUBARNARE RANCHI 22 6 6.6 2.8 Not 88 24 44 124 36.8 7.8 Not 318 370 52 RIVER, NEAR A KHA Analysed Analysed OBERIA ROAD BRIDGE, HATIA RANCH 4084 18/08/20 8:00 AM SURBARNREKH DAMODAR DAMODAR RANCHI 17 5.8 6.5 2.5 Not 72 22 48 116 32.4 9.03 Not 342 382 40 A RIVER AT Analysed Analysed HATIA ROAD BRIDGE, RANCHI 4085 18/08/20 3:20 AM JUMAR RIVER DAMODAR DAMODAR RANCHI 20 5.6 6.6 2.6 Not Not Not 44 120 30.4 10.74 Not 400 452 52 AT BIT MESRA, Analysed Analysed Analysed Analysed RANCHI

2391 08/08/20 1:55 AM DAMODAR AT DAMODAR DAMODAR DHANBAD 36 7.5 7.7 1.1 Not 102 48 76 82 14.4 11.22 Not 538 Not 90 PANCHET Analysed Analysed Analysed DAM 4086 19/08/20 12:40 PM SWARNREKHA DAMODAR DAMODAR RANCHI 23 8.4 7.4 2.2 Not 70 24 28 122 33.6 9.27 Not 328 378 50 RIVER U/S Analysed Analysed HINDALCO IND LTD, MURLI WORKS, CHHOTAMURI, RANCHI

2384 08/08/20 1:30 AM DAMODAR AT DAMODAR DAMODAR DHANBAD 32 7.6 7.4 1.3 Not 106 48 80 92 15.2 13.17 Not 530 Not 88 DOMGARH Analysed Analysed Analysed WATER WORKS D/S SINDRI 2383 08/08/20 3:00 AM DAMODAR DAMODAR DAMODAR DHANBAD 30 7.5 7.6 1.4 Not 106 46 84 80 12.6 11.83 Not 530 Not 94 U/S Analysed Analysed Analysed JAMADOBA WATER WORKS 4000 08/08/20 5:05 AM GARGA RIVER GARGA DAMODAR DHANBAD 24 6.8 6.7 4.6 Not 136 86 92 120 20.8 16.59 Not 526 Not 98 NEAR Analysed Analysed Analysed TELMUCHO BRIDGE 3553 08/08/20 5:35 AM DAMODAR DAMODAR DAMODAR DHANBAD 23 7.5 7.4 1.7 Not 116 52 88 118 18.4 17.56 Not 536 Not 104 RIVER NEAR Analysed Analysed Analysed TELMUCHO BRIDGE