150323 08F HIWP & FWP Appendix D

Total Page:16

File Type:pdf, Size:1020Kb

150323 08F HIWP & FWP Appendix D Changes Report - lists projects whose statuses have changed during the entire process Broxbourne ┌ count of other Divisions for project 2015-2016 County Council Division Drafts / Sub Area / Town Project Name IWP Number 1 2 3 Cabinet Current Reason for change 05 Hoddesdon South Broxbourne White Stubbs Lane/Baas Hill Surface CWY081157 W P C Brought forward from 16/17 to 15/16 due to Dress programme review Broxbourne Wentworth Cottages Localised CWY13741 I I Deferred from 13/14 to 15/16 due to mid Patching year programme review Broxbourne The Avenue Thin Surfacing CWY15438 SS S P (16/17) Deferred from 15/16 due to slower deteriration than expected Broxbourne Baas Lane Thin Surfacing MEM15066 M M Added due to 15/16 Member HLB funding Broxbourne New Road Footway Surface Treatment MEM15069 M M Added due to 15/16 Member HLB funding Broxbourne Winford Drive Thin Surfacing MEM15169 M M Added due to 15/16 Member HLB funding 06 Waltham Cross Cheshunt 1A10 Northbound from M25 Major ARP16086 S S S Reopened and brought from 16/17 to 15/16 Patching forward due to faster deterioration than expected 1A10 Northbound from M25 Major ARP16086 S S S Reopened and brought from 16/17 to 15/16 Patching forward due to faster deterioration than expected Cheshunt Mill Lane Thin Surfacing CWY15041 S S S Brought forward from 16/17 due to faster deterioration than expected Cheshunt RowlandsFieldsLocalisedPatching CWY15122 I I Deferred from 13/14 to 15/16 due to mid year programme review. Cheshunt Tanfield Close Thin Surfacing CWY16372 SS X X Removed from 15/16 due to work already completed in 13/14 under MEM13045 Cheshunt Turners Hill Drainage Works DRN13044 W P (16/17) Deferred from 15/16 to 16/17 due to Financial issues Cheshunt Flamstead End Road Resurfacing MEM15018 M M Added due to 15/16 Member HLB funding Flamstead End Road Resurfacing MEM15018 M M Added due to 15/16 Member HLB funding Cheshunt BewleyCloseThinSurfacing MEM15070 M M Added due to 15/16 Member HLB funding Cheshunt Hartland Road Thin Surfacing MEM15071 M M Added due to 15/16 Member HLB funding Cheshunt GaywoodAvenueThinSurfacing MEM15072 M M Added due to 15/16 Member HLB funding Cheshunt Harrison walk Thin Surfacing MEM15073 M M Added due to 15/16 Member HLB funding Data Generated: 6 March 2015 (Sort order is as for Index Report) Page 1 of 117 Changes Report - lists projects whose statuses have changed during the entire process Broxbourne ┌ count of other Divisions for project 2015-2016 County Council Division Drafts / Sub Area / Town Project Name IWP Number 1 2 3 Cabinet Current Reason for change 06 Waltham Cross Cheshunt Woodcote Close Thin Surfacing MEM15074 M M Added due to 15/16 Member HLB funding Cheshunt Littlebrook Gardens Thin Surfacing MEM15075 M M Added due to 15/16 Member HLB funding Cheshunt Elgin Road Thin Surfacing MEM15076 M M Added due to 15/16 Member HLB funding Cheshunt1 WalnutTreeCloseThinSurfacing MEM15077 M M Added due to 15/16 Member HLB funding 1Walnut Tree Close Thin Surfacing MEM15077 M M Added due to 15/16 Member HLB funding Cheshunt Manston Close Thin Surfacing MEM15078 M M Added due to 15/16 Member HLB funding Cheshunt Hartland Road Footway Works MEM15079 M M Added due to 15/16 Member HLB funding Cheshunt 1Walnut Tree Close Footway MEM15080 M M Added due to 15/16 Member HLB funding Reconstruction 1Walnut Tree Close Footway MEM15080 M M Added due to 15/16 Member HLB funding Reconstruction Cheshunt Cardinal Close Footway Surface MEM15083 M M Added due to 15/16 Member HLB funding Treatment Cheshunt Kingsley Avenue Footway MEM15100 M M Added due to 15/16 Member HLB funding Reconstruction Cheshunt Bromleigh Close Thin Surfacing MEM15101 M M Added due to 15/16 Member HLB funding Cheshunt Cordell Close Thin Surfacing MEM15102 M M Added due to 15/16 Member HLB funding Cheshunt VincentCloseThinSurfacing MEM15103 M M Added due to 15/16 Member HLB funding Cheshunt Lensbury Close Thin Surfacing MEM15104 M M Added due to 15/16 Member HLB funding Cheshunt AudwickCloseThinSurfacing MEM15105 M M Added due to 15/16 Member HLB funding Cheshunt Martins Drive Thin Surfacing MEM15106 M M Added due to 15/16 Member HLB funding Cheshunt AshdownCrescentThinSurfacing MEM15107 M M Added due to 15/16 Member HLB funding Cheshunt Stains Close Thin Surfacing MEM15108 M M Added due to 15/16 Member HLB funding Cheshunt Oldfield Drive Thin Surfacing MEM15109 M M Added due to 15/16 Member HLB funding Cheshunt Craigs Walk Footway Surface MEM15110 M M Added due to 15/16 Member HLB funding Treatment Cheshunt Oldfield Drive Footway Reconstruction MEM15111 M M Added due to 15/16 Member HLB funding Cheshunt Winton Drive Resurfacing MEM15112 M M Added due to 15/16 Member HLB funding Data Generated: 6 March 2015 (Sort order is as for Index Report) Page 2 of 117 Changes Report - lists projects whose statuses have changed during the entire process Broxbourne ┌ count of other Divisions for project 2015-2016 County Council Division Drafts / Sub Area / Town Project Name IWP Number 1 2 3 Cabinet Current Reason for change 06 Waltham Cross Cheshunt A10/A121 Roundabout Casualty SAR08041 C1 Deferred from 14/15 to 15/16 due to Reduction Proposals Phase 2 Financial issues A10/A121 Roundabout Casualty SAR08041 C1 Deferred from 14/15 to 15/16 due to Reduction Proposals Phase 2 Financial issues Cheshunt Winston Churchill Way S437 Signal TIS15041 S Added to 15/16 due to investigation Refurbishment 03 Goffs Oak And Bury Green Tudor Avenue Footway ReconstructionChurchgate,MEM15092 Cheshunt M M Added due to 15/16 Member HLB funding Temple Close Footway ReconstructionChurchgate,MEM15093 Cheshunt M M Added due to 15/16 Member HLB funding Churchgate, Cheshunt Primrose Path Footway MEM15094 M M Added due to 15/16 Member HLB funding Reconstruction Churchgate, Cheshunt Greenwood Close Footway MEM15095 M M Added due to 15/16 Member HLB funding Reconstruction Ermine Close Footway ReconstructionChurchgate,MEM15096 Cheshunt M M Added due to 15/16 Member HLB funding Churchgate, Cheshunt Hawthorne Avenue Footway MEM15097 M M Added due to 15/16 Member HLB funding Reconstruction Churchgate, Cheshunt Hawthorne Close Footway MEM15098 M M Added due to 15/16 Member HLB funding Reconstruction Churchgate, Cheshunt Hargreaves Avenue Footway MEM15099 M M Added due to 15/16 Member HLB funding Reconstruction 02 Flamstead End And Turnford a a i e Co e Ti u f c nFasedEnd, Cheshunt Paradise Close Thin SurfacingFlamstead MEM15086 M M Added due to 15/16 Member HLB funding 02 Flamstead End And Turnford Harkness Footway Surface TreatmentRosedale,MEM15084 Cheshunt M M1 Added due to 15/16 Member HLB funding Harkness Footway Surface Treatment MEM15084 M M1 Added due to 15/16 Member HLB funding Rosedale, Cheshunt Wellers Grove Footway Surface MEM15085 M M Added due to 15/16 Member HLB funding Treatment Data Generated: 6 March 2015 (Sort order is as for Index Report) Page 3 of 117 Changes Report - lists projects whose statuses have changed during the entire process Broxbourne ┌ count of other Divisions for project 2015-2016 County Council Division Drafts / Sub Area / Town Project Name IWP Number 1 2 3 Cabinet Current Reason for change 05 Hoddesdon South Hoddesdon RomanStreetLocalisedPatching CWY13688 I I Deferred from 13/14 to 15/16 due to mid year programme review Hoddesdon Middlefield Road/Stanstead Road CWY14465 C C Deferred from 14/15 to 15/16 due to mid- Resurfacing year programme review Hoddesdon1 CockLaneMajorPatching CWY14658 C C Deferred from 14/15 to 15/16 due to mid- year programme review Hoddesdon Laburnum Road Thin Surfacing CWY151531 SX X X Removed due to duplicate of another: MEM14037 Hoddesdon Pindar Road Ind Estate Localised CWY151863 SI S S Added to Maintenance Programme Patching/Crack Repair Hoddesdon1 Stanstead Road Footway Works FWY15002 SS X X Removed to combine with FWY15057 Hoddesdon1 EssexRoadAccessImprovements ITP13037 SD D D Study complete but no works planned at present 1Essex Road Access Improvements ITP13037 SD D D Study complete but no works planned at present Hoddesdon LEP Rye House Station Accessibility ITP14065 SS C Deferred from 14/15 due to political issues Improvements Hoddesdon Charlton Way Cycle Path ITP14067 S P (16/17) Deferred from 15/16 due to planning issues Hoddesdon Barclays Court Thin Surfacing MEM15067 M M Added due to 15/16 Member HLB funding Hoddesdon Chapel End Footway Surface MEM15068 M M Added due to 15/16 Member HLB funding Treatment Hoddesdon AylshamRoadResurfacing MEM15081 M M Added due to 15/16 Member HLB funding Hoddesdon Bridle Close Resurfacing MEM15082 M M Added due to 15/16 Member HLB funding Hoddesdon Rye Road Resurfacing MEM15314 M M Added due to 15/16 Member HLB funding Hoddesdon Bridleway North Thin Surfacing MEM15332 M Added due to 15/16 Member HLB funding 05 Hoddesdon South Turnford1 A10 Southbound Surface Dressing ARP16042 W W W Deferred from 14/15 as work in progress 1A10 Southbound Surface Dressing ARP16042 W W W Deferred from 14/15 as work in progress Turnford Mulberry Close Thin Surfacing CWY14527 C C Deferred from 14/15 to 15/16 due to mid- year programme review Data Generated: 6 March 2015 (Sort order is as for Index Report) Page 4 of 117 Changes Report - lists projects whose statuses have changed during the entire process Broxbourne ┌ count of other Divisions for project 2015-2016 County Council Division Drafts / Sub Area / Town Project Name IWP Number 1 2 3 Cabinet Current Reason for change 05 Hoddesdon South Turnford1 B176 Corridor Cycling Improvements ITP14068 S X (16/17) Removed as alternative scheme to be investigated 1B176 Corridor Cycling Improvements ITP14068 S X (16/17)
Recommended publications
  • Three Week Period Expires 15Th April 2016 (Councillor Call-In Period
    ST ALBANS DISTRICT COUNCIL PLANNING APPLICATIONS REGISTERED WEEK ENDING 25TH MARCH 2016 THREE WEEK PERIOD EXPIRES 15TH APRIL 2016 (COUNCILLOR CALL-IN PERIOD Information regarding Councillor call-in period and procedure for public consultation. Comments and call-ins may be made on any Advertisement Consent, Listed Building, Conservation Area, Householder, Certificate of Lawfulness (existing), Telecommunication and Planning Applications please e.mail: planapps@stalbans.gov.uk (Please include the Application No (e.g. "5/2009/1234") in the title of the e.mail) Application No 5/2016/0384 Ward: Ashley Area: C Proposal: Single storey side extension at 13 Elm Drive St Albans Hertfordshire AL4 0EE Applicant: Agent: Mr Clive Anstey 13 Elm Drive St Mr Clive Anstey 13 Elm Drive St Albans Albans Hertfordshire AL4 0EE Hertfordshire AL4 0EE http://planning.stalbans.gov.uk/Planning/lg/dialog.page?org.apache.shale.dialog.DIALOG_NAME=gfplanningsearch&Param=lg.Planning&ref_no=5/2016/0384 --------------------------------------------------------------------------------------------------------------- Application No 5/2016/0577 Ward: Ashley Area: C Proposal: Change of use of part of first floor from Class B8 (storage) to Class C3 (residential) to create one, two bedroom self contained flat with associated parking, landscaping and amenity space, insertion of new windows and rendering at 114 Ashley Road St Albans Hertfordshire AL1 5JR Applicant: Agent: L Bennet & Son Ltd C/o Agent DLA Town Planning Ltd 5 The Gavel Centre Porters Wood St Albans Hertfordshire AL3
    [Show full text]
  • Consultation Statement for the Sele Neighbourhood Area Plan
    CONSULTATION STATEMENT FOR THE SELE NEIGHBOURHOOD AREA PLAN INTRODUCTION 1. This Statement has been prepared to append the Draft version of the Sele Neighbourhood Area Plan (“The Plan”) for submission to the relevant local planning authority, East Herts District Council under the Neighbourhood Planning Regulations 2012 (“The Regulations”). 2. A consultation statement is a statutory document of the Neighbourhood Planning process. The Regulations of 2012, Part 5 Paragraph 15 (2) define a “consultation statement” as a document that: a) Details of the persons and bodies who were consulted about the proposed neighbourhood development plan; b) Explains how they were consulted; c) Summarises the main issues and concerns raised by the persons consulted; d) Describes how these issues and concerns have been considered and, where relevant, addressed in the Neighbourhood Development Plan. 3. The consultation process was necessary in order to: a) Publicise and explain the Neighbourhood Planning process among Sele ward residents; b) Seek the opinion of the public on the improvements needed in the area, and feedback on the proposed objectives and policies of the Plan. 4. The document sets out the steps taken to engage and consult with the community in Sele ward and presents how the opinion of the public has influenced the writing and amendment of the Sele Neighbourhood Plan. 5. Hertford Town Council would like to sincerely thank all those who have contributed to the production of the Sele Neighbourhood Area Plan. The volunteers for this project spent many hours gathering data and proposing objectives and solutions for the Neighbourhood Plan, under the guidance of the Planning Consultant, Jacqueline Veater.
    [Show full text]
  • Contents Pages
    P a g e | 1 AREA PROFILE CONTENTS PAGES Page 3 What is ‘Big Local’ and who is ‘Leecliffe’? Page 4 Where is the Leecliffe Big Local Area? Pages 4-5 History of Borehamwood Pages 5-7 Maps of Borehamwood and Leecliffe Big Local Boundary Pages 8-13 The Leecliffe Big Local Area – By The Numbers Page 8 – Population Page 9 – Ethnicity & Religion Pages 10-11 – Housing Page 11 – Lone Parent Families Page 12 – Income Page 12 – Employment Page 12 – Employment by Industry Page 13 – Unemployment Page 13 – Disability & Care Pages 13-14 – Health & Lifestyle Page 14 – Deprivation Page 15 – Schools & Education Page 26 – Crime Pages 17-35 What Community Assets Does the Leecliffe Big Local Area Have At Its Disposal? Pages 17-18 - Green Spaces Page 17 - Aberford Park Page 18 - Meadow Park Pages 19-31 – Community Assets Page 19 – Aberford Park Community Centre Pages 20-21 – Allum Manor House & Hall Page 22 – Fairway Hall Page 23 – Farriers Hall Community Centre Page 24 –Maxwell Park Community Centre Page 25 – Organ Hall Community Centre Page 26 – Three Ways Community Centre Page 27 – Windsor Hall Page 28 – Citizens Advice Page 29 – (The) Borehamwood & Elstree Children’s Centre (BECC) Page 30 – The Community Shop (Leeming Road) Page 31 – Denbigh Lodge (7th Borehamwood Scout Hut) Page 32 – The Ark Theatre Page 33 – 96 Shenley Road Leecliffe Big Local - Profile P a g e | 2 Page 34 – (The) Jewish Life Centre Page 35 – Other Community Assets & Religious Partners Pages 36-42 Community, Charity & Voluntary Organistaions Page 36 – Communities 1st Pages 36-37 – Carers in Hertfordshire Page 37 – Crossroads Care Pages 37-38 – Borehamwood Foodbank Page 38 – Gratitude Pages 38-40 – Guideposts Trust (@ ‘Number 10 Leeming Road’) Page 40 – Hospital & Community Navigation Service (@ ‘Number 10 Leeming Road’) Pages 40-41 – Livability Page 41 – MIND Pages 41-42 – The Royal British Legion Page 42 – The Society of St.
    [Show full text]
  • St Paul's Church of England Voluntary Aided Primary & Nursery School
    St Paul’s Church of England Voluntary Aided Primary & Nursery School St Paul’s Church of England VA Primary & Nursery School Langleybury Lane, Hunton Bridge, Kings Langley, Hertfordshire, WD4 8RJ Telephone: - 01923 263 641 Email:- admin@stpauls779.herts.sch.uk Welcome to St Paul’s C of E VA Nursery and Primary School. Our school is based on a strong sense of community and belonging – every member is valued and encouraged to fulfil their God-given potential; Christian values are at our core. We see ourselves as one big family where everyone is nurtured. We want children to enjoy their learning and to build memories that will last a lifetime. Working together in partnership with parents and the wider community is at our heart and we welcome opportunities for everyone to be involved. Respect and courtesy are evident throughout the life of the school and the behaviour of the children is exemplary. We are situated in idyllic grounds which provide many opportunities for exploration, reflection and self-discovery of the world in which we now live. Children flourish in this school. We have high expectations and an uncompromising ambition to improve outcomes for children. We want every child to reach their full potential and to see their confidence and self-esteem grow. We are committed to the safeguarding of children. Please take an opportunity to look at this website to get a flavour of what St Paul’s has to offer and if you would like to visit please do not hesitate to contact us – we would love to show you around.
    [Show full text]
  • Bishop John Taylor RIP 1929-2016
    July/August 2016 Issue 06 News The Diocese of St Albans in Bedfordshire, Hertfordshire, Luton & Barnet Bishop John Taylor RIP 1929-2016 Bishop John Taylor was In 1993 I wrote a guide to Bishop of St Albans from 1980 Church communications and to 1995, preceeding Bishop Bishop John contributed Christopher Herbert. the foreword.” It said: “The His appointment was a return Church’s communication to the county of his childhood, should be accessible, not having attended Watford Boys obscure, and human, not lost Grammar School and having in technicality. In these media- found faith at the youth group minded days, the Church in St Luke’s Church, Watford. needs to follow the example of Ordained in 1956, his early its Lord in taking infinite pains parish experienced was to get the message heard.” followed by a long and Peter reflects: “Bishop John’s distinguished teaching career advice is as relevant today as it at Oak Hill. Following that was more than 20 years ago.” he had 8 very happy years Bishop Alan took Bishop in Chelmsford Diocese as John’s funeral service in a DDO, some of that time packed cathedral. The notes being combined with parish to the service say: “In spite ministry in Woodford Wells. of his apprehensions, John There followed by 5 years was Bishop of St Albans for as Archdeacon of West Ham 15 deeply happy years, and before his consecration. loved ministering to the clergy He was troubled at the thought of leaving parish life and people of the St Albans diocese, with Linda always for Archdiaconal responsibilities, but was obedient to by his side.
    [Show full text]
  • Oaklands Lane Smallford, St. Albans, Hertfordshire, AL4
    Oaklands Lane Smallford, St. Albans, Hertfordshire, AL4 0HR Oaklands Lane For S ale Guide Price Smallford, St. Albans, Hertfordshire, AL4 0HR £550,000 Internal First Floor Ground Floor Landing Entrance Hall Staircase rising from the entrance hall. Double glazed window to the front aspect. Single glazed front door. Original parquet Loft access. Radiator. Fitted carpet. internal flooring. Under stairs cupboard. Internal doors doors leading to each bedroom and leading to the living room, dining room and bathroom. cloakroom. Staircase rising to the first floor landing. Master Bedroom 18' 5" max x 11' 2" ( 5.61m max x 3.40m ) Cloakroom Two radiators. Fitted carpet. Shower cubicle. Refitted cloakroom. Low level WC. Wash Double glazed window to the front and rear hand basin. Heated towel rail. Tiled walls and aspects. flooring. Double glazed window to the rear aspect. Second Bedroom 10' 5" x 10' 3" ( 3.18m x 3.12m ) Living Room 18' 5" x 11' 1" ( 5.61m x 3.38m ) Airing cupboard. Fitted carpet. Radiator. Double glazed window to the rear aspect. Wall lights. Two radiators. Original parquet flooring. Double glazed window to the front Third Bedroom aspect. Double glazed patio doors to the rear 10' 6" x 7' 10" ( 3.20m x 2.39m ) aspect. Radiator. Fitted carpet. Double glazed Dining Room window to the front aspect. 10' 5" x 10' 5" ( 3.18m x 3.18m ) Bathroom Fitted carpet. Radiator. Double glazed window to the front aspect. Opening leading Fully tiled bathroom with a double glazed to the kitchen. window to the rear aspect. Bath with mixer temperature taps and overhead shower Kitchen attachment.
    [Show full text]
  • Updated 29/06/2018 Excel / Pdf If So, Show Company Or Charity Reg No. Ref No Title of Agreement Department Service Area Contact
    Local Government Transparency Code 2014 CONTRACT REGISTER Updated 29/06/2018 Excel / pdf Local Authority Department Responsible and Contact Details Sum to be paid over the length of the contract or the Start, End and Review Dates If so, show company or estimated annual spending or budget for the contract charity reg no. Ref Title of Agreement Department Service Area Contact Description of the goods and / or Supplier Name and Contract Sum Estimated Budget for the VAT that Start End Review ITQ or SME / VCSO No services being provided Details annual spending Contract cannot be published recovered ITT Community & Environmental Services - Alan Gough Signs for Sites Project Community & Environmental Leisure & Community chris.fennell@watford.gov.uk Provision of new signs for Murrill Construction £9,000 01/02/2018 01/09/2018 01/06/2018 Services commissioned organisations. Ltd Generalist advice service provision Community & Environmental Advice services chris.fennell@watford.gov.uk Advice services Citizens Advice Bureau £204,190 31/03/2019 01/10/2016 Services Provision of mobility scooters Community & Environmental Advice services chris.fennell@watford.gov.uk support services for people with Shopmobility £36,459 31/03/2019 01/10/2016 Services mobility difficulties Support to voluntary sector Community & Environmental Advice services chris.fennell@watford.gov.uk Support to voluntary sector Watford and Three £79,173 31/03/2019 01/10/2016 organisations Services organisations Rivers Trust (formerly CVS) Entertainment venue management Community & Environmental
    [Show full text]
  • Parent Handbook
    Richard Hale School Parents’ Handbook September 2021 – July 2022 Richard Hale School Hale Road Hertford SG13 8EN Dear Parents, I would like to welcome you and your son to Richard Hale School for what I hope will be an enjoyable and exciting seven year experience. We know that, in a “normal year”, the transfer from primary to secondary school can be stressful for both students and parents. Clearly, this year the process has been disrupted and the boys will not have had the usual opportunities to come to the school and meet staff. We will, however, do all that we can to ensure that your son settles to school life at Richard Hale as quickly and smoothly as possible. We have now visited all of your sons at primary school and spoken to each of their teachers. We are also delighted that a very large number will be attending the Summer School in the first week of the holidays. In September, if conditions allow, there is the Parents’ Association Wine and Cheese evening, and the “Meet the Tutor” evening in October. This booklet is part of the transition process, so I hope the information contained in it will enable you and your son to become quickly familiar with daily life at Richard Hale School. The latest version can always be found on the school website. Please note that we have not made changes to all of this booklet to cover the current situation with Covid 19, as this is an ever changing situation. Much of the booklet refers to the operation of the school during “normal” times, to which we all hope to return soon.
    [Show full text]
  • Community and Business Guide
    FC_THR_307740.qxd 1/8/11 14:53 Page 3 FC_THR_307740.qxd 1/8/11 14:53 Page 4 ED_THR_307740.qxd 28/7/11 12:53 Page 1 SAVING MONEY FOR SW Hertfordshire’s Thrive Homes and its customers have BUSINESS CLIENTS longest established lots to celebrate. Created in March 2008, Thrive Homes received THROUGHOUT THE THREE theatre school resounding support with four out of RIVERS DISTRICT five tenants voting to transfer across A full programme of classes for from Three Rivers District Council. children (3 - 18 years), Adults and Students in Ballet, Jazz, Contemporary, Character, • 2,000 properties have already benefited I.S.T.D. Tap and Modern Dance, from our £43 million, 5 year Singing and Musical Theatre, Drama improvement programme. (including L.A.M.D.A. examinations), regular performances and much • Resident elections for Board more. Recognised examinations up membership – promised and • RENT REVIEWS delivered: a third of our Board to Major Level and Associate members are tenants and • LEASE RENEWALS Teacher Major examinations and leaseholders. • VALUATIONS teaching qualifications (I.S.T.D., • ACQUISITION OF OFFICE, RETAIL A.R.B.T.A. and L.A.M.D.A.) • Closer working with partner agencies AND FACTORY PREMISES such as the Citizens Advice Bureau to • DISPOSAL OF OFFICE, RETAIL AND better support our tenants and Courses for Students 16+ full or residents. FACTORY PREMISES part-time available. • ADVICE ON DEVELOPMENT • Greater understanding of our tenants • BUILDING CONDITION SURVEYS One year foundation course. and leaseholders so services can be AND PROJECT MANAGEMENT tailored to individual needs. • PLANNING ADVICE • Hundreds adaptations completed so people can live in their own homes HIGH QUALITY COMMERCIAL safely.
    [Show full text]
  • HERTFORDSHIRE. 11 Flower Arthur Esq
    DIRECTORY.] HERTFORDSHIRE. 11 Flower Arthur esq. 36 Princes gate, London SW Loraine Rear-Admiral Sir Lambton ba.rt. Bramford hall, Fordham Edward Snow esq. D.L. Elbrook house, Ash­ Ipswich, Suffolk; &; 7 Montagu square, London W well, Baldock S.O Loyd Edward Henry esq. D.L. Langleybury, King's Fordham Ernest Oswa1d esq. Odsey ho. Ashwell, Baldock Langley S.O.; & 36 Lowndes square, London SW S.O Loyd Frederic Edward esq. Albyns, Romford, Essex Fordham Francis John esq. D.L. Yew Tree house,Royston Lubbock Henry James esq. 74 Eaton place, London 8 W Fordham Henry John esq. Yew Tree house, Royston Lucas Col. Alfred Geo. C.B., M.V.O. Cliffside, Lowestoft Fordham Herbert George esq. Odsey, Ashwell, Baldock Lucae William esq. 'I'he Firs, Hitchin S.O Luc.as William Tindall esq. Foxholes, Hitchin Foster Professor Geo.Carey, Ladywalk ho.Rickmanswrth Lydekker Capt. Arthur, The Oottage, Harpenden S.O Francis Charles King esq. 7 Granville place, Portman L)'dekker Richard esq. The Lodge, Harpenden S.O square, London W McIlwraith Andrew esq. Campbellfield, St. Michael's, Garrett Edmund William esq. Ardeevin, Downs avenue, St. Albans Epsom, Surrey Macmillan Frederick Orridge esq. D.L. 22 Devonshire pl. Gaussen Casamaijor William esq. Howlands, Hatfield London W Gilbey Sir WaIter, bart. EIsenham hall, Harlow; & MaUl"er Edward esq. Lea side, Hertford Cambridge house, II St. Andrew's place, Regent's Marchand Isidore Henri.Alphonse esq.Orleans,NewBarnet park, London NW Marnham .Alfred esq. Boxm00r, Hemel Hempstead Gilbey Tresham esq. Whitehall, Bishop Stortford Marten George Ernest esq. The Bank, High st.St.Albans Gilliat Capt.
    [Show full text]
  • International Passenger Survey, 2008
    UK Data Archive Study Number 5993 - International Passenger Survey, 2008 Airline code Airline name Code 2L 2L Helvetic Airways 26099 2M 2M Moldavian Airlines (Dump 31999 2R 2R Star Airlines (Dump) 07099 2T 2T Canada 3000 Airln (Dump) 80099 3D 3D Denim Air (Dump) 11099 3M 3M Gulf Stream Interntnal (Dump) 81099 3W 3W Euro Manx 01699 4L 4L Air Astana 31599 4P 4P Polonia 30699 4R 4R Hamburg International 08099 4U 4U German Wings 08011 5A 5A Air Atlanta 01099 5D 5D Vbird 11099 5E 5E Base Airlines (Dump) 11099 5G 5G Skyservice Airlines 80099 5P 5P SkyEurope Airlines Hungary 30599 5Q 5Q EuroCeltic Airways 01099 5R 5R Karthago Airlines 35499 5W 5W Astraeus 01062 6B 6B Britannia Airways 20099 6H 6H Israir (Airlines and Tourism ltd) 57099 6N 6N Trans Travel Airlines (Dump) 11099 6Q 6Q Slovak Airlines 30499 6U 6U Air Ukraine 32201 7B 7B Kras Air (Dump) 30999 7G 7G MK Airlines (Dump) 01099 7L 7L Sun d'Or International 57099 7W 7W Air Sask 80099 7Y 7Y EAE European Air Express 08099 8A 8A Atlas Blue 35299 8F 8F Fischer Air 30399 8L 8L Newair (Dump) 12099 8Q 8Q Onur Air (Dump) 16099 8U 8U Afriqiyah Airways 35199 9C 9C Gill Aviation (Dump) 01099 9G 9G Galaxy Airways (Dump) 22099 9L 9L Colgan Air (Dump) 81099 9P 9P Pelangi Air (Dump) 60599 9R 9R Phuket Airlines 66499 9S 9S Blue Panorama Airlines 10099 9U 9U Air Moldova (Dump) 31999 9W 9W Jet Airways (Dump) 61099 9Y 9Y Air Kazakstan (Dump) 31599 A3 A3 Aegean Airlines 22099 A7 A7 Air Plus Comet 25099 AA AA American Airlines 81028 AAA1 AAA Ansett Air Australia (Dump) 50099 AAA2 AAA Ansett New Zealand (Dump)
    [Show full text]
  • The Transport System of Medieval England and Wales
    THE TRANSPORT SYSTEM OF MEDIEVAL ENGLAND AND WALES - A GEOGRAPHICAL SYNTHESIS by James Frederick Edwards M.Sc., Dip.Eng.,C.Eng.,M.I.Mech.E., LRCATS A Thesis presented for the Degree of Doctor of Philosophy University of Salford Department of Geography 1987 1. CONTENTS Page, List of Tables iv List of Figures A Note on References Acknowledgements ix Abstract xi PART ONE INTRODUCTION 1 Chapter One: Setting Out 2 Chapter Two: Previous Research 11 PART TWO THE MEDIEVAL ROAD NETWORK 28 Introduction 29 Chapter Three: Cartographic Evidence 31 Chapter Four: The Evidence of Royal Itineraries 47 Chapter Five: Premonstratensian Itineraries from 62 Titchfield Abbey Chapter Six: The Significance of the Titchfield 74 Abbey Itineraries Chapter Seven: Some Further Evidence 89 Chapter Eight: The Basic Medieval Road Network 99 Conclusions 11? Page PART THREE THr NAVIGABLE MEDIEVAL WATERWAYS 115 Introduction 116 Chapter Hine: The Rivers of Horth-Fastern England 122 Chapter Ten: The Rivers of Yorkshire 142 Chapter Eleven: The Trent and the other Rivers of 180 Central Eastern England Chapter Twelve: The Rivers of the Fens 212 Chapter Thirteen: The Rivers of the Coast of East Anglia 238 Chapter Fourteen: The River Thames and Its Tributaries 265 Chapter Fifteen: The Rivers of the South Coast of England 298 Chapter Sixteen: The Rivers of South-Western England 315 Chapter Seventeen: The River Severn and Its Tributaries 330 Chapter Eighteen: The Rivers of Wales 348 Chapter Nineteen: The Rivers of North-Western England 362 Chapter Twenty: The Navigable Rivers of
    [Show full text]