Statement of Qualification and Specifications Invitation No. 059-21
Total Page:16
File Type:pdf, Size:1020Kb
Statement of Qualification and Specifications Invitation No. 059-21 Ohio Department of Transportation, Office of Contract Sales, Purchasing Services, 1st floor 1980 West Broad St. Mail Stop 4110 Columbus, OH 43223 (614) 644-7870 or (614) 752-9017 Main Office Line: 1-800-459-3778 Due: May 5, 1:00 pm (EST) Submitted By: GeoStabilization International 4475 E. 74th Ave. Commerce City, CO 80022 1 www.geostabilization.com TABLE OF CONTENTS 1. Supplemental Bidder Information a. Bidder’s Experience 3 b. Bidder’s Financial Condition 10 c. Bidder’s Conduct and Performance on Pervious Contracts 10 d. Bidder’s Facilities 10 e. Bidder’s Management Skills 10 f. Bidder’s Employees 13 g. Bidder’s Proposed Subcontractors 35 h. Bidder’s Ability to Execute a Contract 36 i. Review of Federal and Debarment Lists 37 j. Contracts of a Similar Size and Scope 37 k. Current or Impending Legal Actions Against a Bidder 37 2. Additional Items A1. Incidental Specifications A2. GSI MSA Example Table 2 www.geostabilization.com STATEMENTInvitation OF No.QUALIFICATION 059-21 1. Supplemental Bidder Information - Invitation No. 059-21 a. Bidder’s Experience GeoStabilization International® (GSI®) was founded in Colorado in 2002 and offers specialty contracting and design throughout the United States and Canada. We employ a minimum of sixty (60) 4-5-person crews and 36 registered Professional Engineers. Our expertise, tools & technologies, worldwide reach, and design / build / warranty approach allow us to repair virtually any slope stability problem in any kind of geologic setting. GeoStabilization’s comprehensive service capabilities include: slope stabilization; landslide remediation; rockfal mitigation; temporary shoring; GSIAbutments™; MSE & historic rock wall repair; micropiles, ground anchors & underpinning; grouting & foundations; and bridge rehabilitation. Our tools include patented Soil Nail Launchers™, SPIDER excavators/drills, and purpose-built limited access drill rigs. Our patented technologies include SuperNails™, Biowall® system, ScourMicropiles™, and Geosynthetically Confined Soil® (GCS®). Additionally, our complete equipment inventory includes SuperNailers™ (modified excavator-based rock drills), crane basket drills, compressors, grout plants, shotcrete pumps, welders, and a variety of support trucks, trailers, and other related equipment. Most of the equipment has been custom built or modified specifically for slope, rockfall, or landslide mitigation. Having all these competencies, tools, and technologies under one roof provides our customers the assurance that every geohazard emergency will be solved utilizing a solution designed specifically for that application as GeoStabilization International does not ascribe to the assumption that one solution fits all applications. More importantly, GeoStabilization can and oftentimes does utilize multiple technologies (compaction grouting, launching soil nails, rockfall scaling, etc.) on our projects to leverage their advantages into cost effective solutions for our customers – all without the time-consuming coordination and lost efficiencies encountered when multiple companies are involved. For more than eighteen years, GeoStabilization has provided more than 4,200 cost effective, technically superior solutions throughout the United States and Canada. Of these projects, approximately 75% were design & construction with many being completed under emergency declarations. GeoStabilization is decentralized and mobile, with a primary focus on supporting geohazard mitigation in emergency response scenarios. As a result of our organization’s focus, we can reliably commit to responding to geohazard events within twenty-four hours. GeoStabilization’s integrated engineering and construction offering provides each of our clients the fastest possible response time, ensures seamless integration of design and construction, and allows rapid assessment and implementation of design changes when unanticipated subsurface conditions are encountered during construction. GeoStabilization’s approach on every project is to provide an initial no-cost site visit and geohazard evaluation (with preliminary engineering). A key point of emphasis for our engineers is to evaluate each site objectively. We will recommend the best approach(es) for remediation, even if it doesn’t include our equipment and/or technologies. GSI credits its success to the founding philosophy of serving the client with the best technologies, the best solutions, and the fastest possible service. Through many years of training, experience, and this founding philosophy, GSI’s project managers and constructors are among the most qualified and most experienced in our industry. 3 www.geostabilization.com STATEMENTInvitation OF No.QUALIFICATION 059-21 6.4 Construction Details: Per Section 6.4 Construction Details we have provided 3 Soil Nail Project Managers/Superintendents. Overall GSI employees 28 Superintendents and 12 Project Managers that meet the requirements. "Provide a Soil Nail Project Manager/Superintendent who has successfully managed no less than ten (10) projects within the last five (5) years which successfully stabilized an active landslide and no less than three (3) projects using the specified soil nail type (Launched or Permanent)." Active Landslide ActiveTraffic Project Location Completed Date Project Description Project Manager Stabilization? Maintained On Road? 58 at Governors Lane VA 11/29/2017 Launched Soil Nails Yes Yes Noel Philippon Jennie Brick Road OH 10/23/2018 Launched Soil Nails Yes Yes Noel Philippon KY 1078 Site 1 KY 04/07/2015 Launched Soil Nails Yes Yes Noel Philippon KY 22 MP 0.30 KY 08/25/2017 Launched Soil Nails Yes Yes Noel Philippon Pulaski Grading Landfill Access Rd KY 01/11/2019 Launched Soil Nails Yes Yes Noel Philippon US 58 Slopes at Sediment Basin VA 08/04/2016 Launched Soil Nails Yes Yes Noel Philippon CR 3 over 9 Woodrow Hendricks WV 11/29/2015 Permanent Soil Nails Yes Yes Noel Philippon KY 194, MP 11.95 KY 08/31/2018 Permanent Soil Nails Yes Yes Noel Philippon KY 35, MP 6.89 KY 02/06/2018 Permanent Soil Nails Yes Yes Noel Philippon Doctor's Creek Road Slide WV 08/31/2016 Permanent Soil Nails Yes Yes Noel Philippon Island Branch Road WV 07/28/2017 Permanent Soil Nails Yes Yes Noel Philippon VA 795 Ira Owens Road Stabilization VA 08/23/2017 Permanent Soil Nails Yes Yes Noel Philippon Active Landslide ActiveTraffic Project Location Completed Date Project Description Project Manager Stabilization? Maintained On Road? Cooper’s Bottom Road Site #1 KY 12/20/2019 Launched Soil Nails Yes Yes Jason Heatherly KY 330, MP 0.65 KY 03/05/2019 Launched Soil Nails Yes Yes Jason Heatherly KY 330, MP 10.94 KY 02/22/2019 Launched Soil Nails Yes Yes Jason Heatherly KY 355, MP 15.96 KY 03/18/2019 Launched Soil Nails Yes Yes Jason Heatherly KY 455, MP 6.76 KY 12/19/2018 Launched Soil Nails Yes Yes Jason Heatherly Roller Knob Road KY 09/20/2018 Launched Soil Nails Yes Yes Jason Heatherly 18 - 5000 Woolper Rd KY 03/08/2019 Permanent Soil Nails Yes Yes Jason Heatherly KY 11, MP 12.0 KY 05/29/2020 Permanent Soil Nails Yes Yes Jason Heatherly KY 2381, MP 0.71 KY 04/10/2020 Permanent Soil Nails Yes Yes Jason Heatherly KY 3187, MP 0.26 KY 02/26/2020 Permanent Soil Nails Yes Yes Jason Heatherly KY 3318, MP 4.39 KY 03/06/2019 Permanent Soil Nails Yes Yes Jason Heatherly KY 8, MP 0.595 KY 12/14/2018 Permanent Soil Nails Yes Yes Jason Heatherly Active Landslide ActiveTraffic General Project Location Completed Date Project Description Stabilization? Maintained On Road? Superintendent US 58 Slopes at Sediment Basin VA 08/04/2016 Launched Soil Nails Yes Yes Joseph Waycaster KY 1103, MP 1.13 KY 04/11/2019 Launched Soil Nails Yes Yes Joseph Waycaster KY 227 MP 12.2 KY 05/16/2018 Launched Soil Nails Yes Yes Joseph Waycaster KY 2885, MP 5.31 KY 08/09/2019 Launched Soil Nails Yes Yes Joseph Waycaster NS MP 258.8 Harriman TN 02/20/2019 Launched Soil Nails Yes Yes Joseph Waycaster Almond Drive #2 KY 11/06/2019 Launched Soil Nails Yes Yes Joseph Waycaster Greenville Highway Slide, US 276 NC 12/05/2017 Permanent Soil Nails Yes Yes Joseph Waycaster KY 851 MP 10.2 KY 08/28/2018 Permanent Soil Nails Yes Yes Joseph Waycaster KY 194, MP 12.03 KY 10/23/2018 Permanent Soil Nails Yes Yes Joseph Waycaster KY 194, MP 11.95 KY 11/12/2018 Permanent Soil Nails Yes Yes Joseph Waycaster US 62, MP 0.10 KY 01/15/2019 Permanent Soil Nails Yes Yes Joseph Waycaster KY 2381 MP 0.70 KY 04/02/2020 Permanent Soil Nails Yes Yes Joseph Waycaster 4 www.geostabilization.com STATEMENTInvitation OF No.QUALIFICATION 059-21 6.4 Construction Details: Per Section 6.4 Construction Details we have provided 2 Soil Nail Rig Operators. GSI has 60 crews, each containing at-least one qualified Soil Nail Rig Operator that meets the required experience. "Provide Soil Nail Rig Operators who have successfully operated rigs on no less than five (5) projects within the last five (5) years which successfully stabilized an active landslide/rock slope using soil nails on an active, public roadway while maintaining traffic on the impacted roadway." Active Landslide ActiveTraffic Soil Nail Rig Operator Project Location Completed Date Stabilization? Maintained On Road? #1 CO 12/2 Rockcrest Road, Site 2 WV 06/14/2018 Yes Yes Tim Woods CR 1 Spruce Fork WV 01/18/2018 Yes Yes Tim Woods CR 43/16, Beckett Branch Road WV 07/16/2018 Yes Yes Tim Woods CR 10, 18 Mile Creek Road WV 07/26/2018 Yes Yes Tim Woods KY 2885, MP 3.85 KY 02/01/2019 Yes Yes Tim Woods NC HWY 88 Site 5 NC 03/13/2020 Yes Yes Tim Woods WV 36 MP