DATE: July 2020

Wyntersley Road, Hastingwood, . CM17 9JX

TECHNICAL NOTE

TRANSPORT STATEMENT

1. Introduction

1.1 Background

1.1.1 This Technical Note (TN) has been produced to outline the proposed development for a sub- division of an existing residential plot and for the erection of a three-bedroom bungalow with associated parking. 1.1.2 It is to be noted that the proposed development is in a rural Village location with great links to A414 local highway network and the M11 motorway network. 1.1.3 Throughout this process this TS has sought to reference both National and Local Policy and Plan Documents including:  Travel plans, transport assessments and statements in decision making (2014);  NPPF 2019;  DfT- GTA (2007);  Manual for Streets; and  Essex CC Design Guide.  Essex CC SPD- Parking Standards, Design and Good Practice – 2009  Harlow Design Guide Supplementary Planning Document - Adopted October 2011 1.1.4 No discussion has been held to date with the Harlow Council.

1.2 Structure of Technical Note 1.2.1 This report provides details of the traffic and transportation issues associated with the development proposals and is structured as follows:

 Section 1 - Introduction;

 Section 2 - Existing development site and highway conditions;

 Section 3 - Development proposals; and

 Section 4 - Conclusion.

1

DATE: July 2020

2. EXISTING DEVELOPMENT SITE AND HIGHWAY CONDITIONS

2.1 Introduction

2.1.1 The development site is known as Wyntersley, Hastingwood Road, Hastingwood, Harlow, Essex CM17 9JX. 2.1.2 The existing site comprises a detached dwelling to the front of the plot with parking currently available to the front. 2.1.3 Hastingwood Road can be described as a primary distributor road providing a primary route through the Village of Hastingwood running east to west. 2.1.4 Hastingwood Road forms a priority junction with Canes Road to the west and connects to the A414 and the M11 to the west at Junction 7. 2.1.5 From the M11 the M25 can be connected to from J27. 2.1.6 From the M25 all major routes can be connected. 2.1.7 The sites location and the existing site layout are illustrated in Figures 2.1 and 2.2 below:

Figure 2.1 – Site Location Plan

2

DATE: July 2020

Figure 2.2 – Existing Site Layout

2.1.8 The site can be described as a rural Village location and currently benefits from onsite parking.

3

DATE: July 2020

2.2 Walking and Cycling

2.2.1 There are footways available however, they are not continuous. Wide grass verges are available to accommodate pedestrians if necessary and in the vicinity of the development site street lighting is available. 2.2.2 All footways that are present within close proximity to the site are at least 2m in width. 2.2.3 It is also noted that Hastingwood Road has a posted speed limit of 40mph. 2.2.4 Within a 5-10 minute walk the following local facilities can be accessed, including but not exhaustive of:

 Beauty Salon (Serenity);

 Pub/restaurant;

 Food Takeaway;

 Holistic Medical Spa;

 Village Hall;

 Garden Centre;

2.2.5 The nearest Convenience Stores, general retail is approximately 1.4km to the west (approximately a 15 minute walk). The nearest Supermarket (Tesco) is approximately 4.4km and a 7 minute drive. 2.2.6 Whilst there are no cycle routes on or around Hastingwood Road, there are wide carriageway widths to accommodate cyclists. 2.2.7 In this regard therefore, it is considered that there are no obstacles for those choosing to travel by bike for any purpose.

2.3 Public Transport

2.3.1 The nearest bus stops to the development site are located on the B1393 west of the M11 junction 7 at McDonalds approximately 950m (10 minute walk). 2.3.2 Both east and westbound bus stops benefit from bus cages and flags as a minimum and service routes 420 Central, 420A Central and 418B can be accessed from these stops providing services to Harlow Town Centre with a peak frequency of approximately 18 mins. 2.3.3 The nearest Overground Train Station is Harlow Town approximately 7km to the north and the nearest Underground Station is Epping approximately 7km to the south. 2.3.4 In summary, the development benefits from adequate pedestrian, cycle and public transport facilities to anyone choosing to travel by any mode.

4

DATE: July 2020

3. DEVELOPMENT PROPOSALS

3.1 Development Proposals 3.1.1 The development proposals are to sub-divide the existing single residential plot and to construct a new 3 bed bungalow together with parking and landscaping. 3.1.2 The residential development will consist of the following:  1No. 3 bed;  2 parking spaces with onsite turning available for entry and exit in a forward gear;  Refuse collection from Hastingwood Road;  Delivery and servicing available from the kerbside;  Existing access to be retained for the existing dwelling;  New access to be provided for sub-divided dwelling conforming to DMRB and MfS guidance.

3.1.3 Development proposals are illustrated in Figures 3.1 and 3.2 below and attached to scale as Appendix A:

5

DATE: July 2020

Figure 3.1 – Proposed Site Layout

6

DATE: July 2020

Figure 3.2 – Proposed Site Layout

7

DATE: July 2020

3.2 Trip Generation

Proposed Use –Trip Generation

3.2.1 The redevelopment proposals consist of constructing 1No. 3 bed bungalow with 2No. parking spaces. 3.2.2 In order to calculate the potential trips generated from the proposed single dwelling a robust first principles approach has been taken and, in this regard, the following has been derived; AM Peak - 2 two-way trips PM Peak – 2 two-way trips Daily - 4 two-way trips

3.2.3 In this regard therefore, further analysis into the impact that the proposed development might have on the local highway network is considered to be unnecessary as it represents an increase of less than that of daily variation on the highway network during the sensitive peak hours.

3.3 Car Parking

3.3.1 In accordance with the both Harlow Council and Essex CC parking standards the proposed development proposes 2 parking spaces.

3.3.2 In this regard, the level of parking proposed is acceptable.

Cycle Parking

3.3.3 Cycle parking will be provided either internal to house or external in the garden and will be covered and secure inline with the Essex CC parking standards. 3.3.4 A total of 6No. cycle spaces will be provided using Sheffield cycle standards or similar and are to be secure and covered.

Emergency vehicles 3.3.5 A Fire Tender can access the proposed new dwelling and will be able to reach within 45m of the building in accordance with MfS.

Delivery and Refuse Collection 3.3.6 Deliveries will take place as per the existing dwelling from the kerbside. 3.3.7 Refuse collection will also take place from the kerbside with bins being located within 25m of the public highway for collection on collection day.

Summary 3.3.8 On this basis, and in accordance with ECC parking standards, this development is acceptable on highways and transport grounds.

8

DATE: July 2020

4. CONCLUSIONS

4.1.1 Based on the data and analysis presented in this report, the following conclusions are drawn:

 The design of the transport provisions within the site accord with Harlow Council and ECC prevailing standards and guidelines;

 The development is to provide 2No. parking spaces;

 Potential Trip generation is very low, and no further analysis is necessary. Furthermore, there will be negligible to no impact in terms of air quality because of the proposed development;

 Refuse collection and delivery and servicing will operate like the adjacent building from the kerb side;

 Emergency vehicles can enter and exit the site.

4.1.2 Based on these conclusions the impact of the development proposals on the surrounding transportation network should be considered beneficial and sustainable, and that no further work is to be carried out. 4.1.3 On this basis, it is recommended that the proposed development be recommended for approval on highway and transportation grounds.

9

DATE: July 2020

Appendix A

10

By

0 5 10 15 20m 202_01 Wyntersly, Client CM17 9JX. DP IK Feb 2020 Essex, Proposed Site Plan Hastingwood Road, Hastingwood, 1:200@A2 ARCHITECTS Brewery Road 25 Tudor Hall EN11 8FP PARTY WALL SURVEYORS PLANNING CONSULTANTS Office Hoddesdon, Herts INTERIOR DESIGNERS 9 Devonshire square www.dpa-architects.co.uk Office London 01992 469001 EC2M 4YF [email protected] 1:200 Date Scale Drawn Revision details Issued for Site address Drawing No. Checked by Drawing Title Date RIBA Project Description Rev Client Ownership Boundary of Property in Development Site KEY P1 P3 P2 P1 15000 P2 16000 HASTINGWOOD ROAD Proposed Site Plan 1:200 1 DPA (London) Ltd. retain copyright of the design, scheme & ownership of the drawings. Drawings should be read in conjunction with structural engineer's drawings and information. Any omission to be reported to and clarified with client prior to commencement. Verify dimensions, levels and existing structure, etc, on site prior to commencement. All works to comply with current regulations, British and European Standards. Please note that before building works commences it is the responsibility of the DPA (London) Ltd. retain copyright of the design, scheme & ownership of the drawings. Drawings should be read in conjunction with structural engineer's drawings and information. Any omission to be reported to and clarified with client prior to commencement. Verify dimensions, levels and existing structure, etc, on site prior to commencement. All works own risk. builder or owner to serve party wall notices to all neighbours. Initial drawings submitted to Building Control are subject to additional information required by Building Control / NHBC, which could have significant cost or additional works to be done on site. All works commenced on site prior to obtaining full building control approval will be carried out at your DPA (London)Ltd.retain copyrightofthedesign,scheme&ownership ofthedrawings.Drawingsshouldbereadin conjunctionwithstructuralengineer'sdrawings andinformation.Anyomissiontobereported toandclarifiedwithclientpriorcommencement. Verifydimensions,levelsandexisting structure,etc,onsitepriortocommencement.All workstocomplywithcurrentregulations, BritishandEuropeanStandards.Pleasenote thatbeforebuildingworkscommencesitisthe responsibilityofthebuilder or ownertoserveparty wallnoticestoallneighbours.Initialdrawings submittedtoBuildingControlaresubjectadditional informationrequiredbyBuildingControl /NHBC,whichcouldhavesignificantcost oradditionalworkstobedoneonsite.All commencedonsitepriortoobtainingfullbuilding controlapprovalwillbecarriedoutat your ownrisk.

1 Glovers Lane Glovers

1:1250 Location Plan The Laurels The

Hastingwood Road

The Leas The

Dudley Lodge Dudley

Wyntersley Hastingwood Village Hastingwood

Scrap Village

Mallards Place Mallards Willow Cottage Willow Project Description RIBA Drawing Title Checked by Drawing No. Site address Issued for Revisions Drawn Scale Date Essex, Hastingwood, Hastingwood Road, CM17 9JX. 1473_300 1:1250@A4 Wyntersly, Mar 2020 Planning DP KM Location Plan Erection ofthreebedbungalow EC2M 4YF [email protected] 01992 469001 London London Office www.dpa-architects.co.uk 9 Devonshiresquare Hoddesdon, Herts Hertfordshire Office INTERIOR DESIGNERS PLANNING CONSULTANTS PARTY WALLSURVEYORS EN11 8FP 25 TudorHall Brewery Road ARCHITECTS 0 10 20 30 40 50m 1:1250 DPA (London)Ltd. retaincopyrightofthedesign, scheme&ownershipofthedrawings. Drawingsshouldberead inconjunctionwithstructuralengineer's drawingsandinformation. Anyomissiontobereported toandclarifiedwithclientprior tocommencement.Verifydimensions, levelsandexistingstructure, etc,onsitepriortocommencement.All workstocomplywith currentregulations,Britishand EuropeanStandards.Pleasenote thatbeforebuildingworkscommences itistheresponsibility ofthebuilderorownerto serve partywall notices toallneighbours.Initial drawings submittedtoBuildingControl aresubjecttoadditional information requiredbyBuilding Control/NHBC,whichcouldhave significantcostoradditional works tobedoneonsite.All commencedonsitepriortoobtaining fullbuildingcontrolapproval willbecarriedoutatyour own risk. 1

Hastingwood Road

1:500 Existing SitePlan

The Leas The

Wyntersley Hastingwood Village Hastingwood

Scrap Village 2

Hastingwood Road

1:500 Proposed SitePlan

The Leas The

Wyntersley Hastingwood Village Hastingwood

Scrap Village

0 10 20 30 40 50m 1:500 Project Description RIBA KEY Development Site Boundary ofPropertyin Client Ownership Drawing Title Checked by Drawing No. Site address Issued for Revisions Drawn Scale Date Essex, Hastingwood, Hastingwood Road, 1473_302 1:500@A3 CM17 9JX. Erection ofthreebed Mar 2020 Planning DP KM bungalow Wyntersly, Site Plans [email protected] 01992 469001 London Office www.dpa-architects.co.uk 9 Devonshiresquare INTERIOR DESIGNERS Hoddesdon, Herts Hertfordshire Office PLANNING CONSULTANTS PARTY WALLSURVEYORS 25 TudorHall ARCHITECTS DPA (London)Ltd. retaincopyrightofthedesign, scheme&ownershipofthedrawings. Drawingsshouldberead inconjunctionwithstructuralengineer's drawingsandinformation. Anyomissiontobereported toandclarifiedwithclientprior tocommencement.Verifydimensions, levelsandexistingstructure, etc,onsitepriortocommencement.All workstocomplywith currentregulations,Britishand EuropeanStandards.Pleasenote thatbeforebuildingworkscommences itistheresponsibility ofthebuilderorownerto serve partywall notices toallneighbours.Initial drawings submittedtoBuildingControl aresubjecttoadditional information requiredbyBuilding Control/NHBC,whichcouldhave significantcostoradditional works tobedoneonsite.All commencedonsitepriortoobtaining fullbuildingcontrolapproval willbecarriedoutatyour own risk. 1

Hastingwood Road

1:500 Existing BlockPlan

The Leas The

Wyntersley Hastingwood Village Hastingwood

Scrap Village 2

Hastingwood Road

1:500 Proposed BlockPlan

The Leas The

Wyntersley Hastingwood Village Hastingwood

Scrap Village

0 10 20 30 40 50m 1:500 Project Description RIBA KEY Drawing Title Development Site Boundary ofPropertyin Client Ownership Checked by Drawing No. Site address Issued for Revisions Drawn Scale Date Essex, Hastingwood, Hastingwood Road, 1473_301 1:500@A3 CM17 9JX. Erection ofthreebed Mar 2020 Planning DP KM Block Plans bungalow Wyntersly, [email protected] 01992 469001 London Office www.dpa-architects.co.uk 9 Devonshiresquare INTERIOR DESIGNERS Hoddesdon, Herts Hertfordshire Office PLANNING CONSULTANTS PARTY WALLSURVEYORS 25 TudorHall ARCHITECTS