WELCOME

Welcome to our online consultation on the proposals for the retention and improvement of the Building, 4 Maguire Street, SE1 2NQ. Following initial discussions with near neighbours we would like to share our proposals with the wider community in and around Shad Thames.

We hope that our plans for the site will bring a new lease of life to the building, making it a more attractive workplace and lessening its environmental impact.

We know that Shad Thames has a unique character, and we know that no-one understands this better than its residents. That is why we are keen to hear your feedback that will help us to better respond to this character, to ensure that it complements its surroundings and considers the wider context of the site.

The existing Clove Building 1.1 SITE HISTORY1.1 SITE HISTORY 2.0 1.0 SITE LOCATION SITE LOCATION

Cayenne Court The Shad Thames area takes it’s name from the historic riverside street, The site is located on the south bank of the , in the London boroughCayenne of Southwark, Court approximately 300 metres south east of Tower TOWER HILL 2 now running from TheTower Shad Bridge Thames road area to Jamaicatakes it’s Street.name from the historic riverside street, Bridge. It adjoins the former to the north east and STATION court, a residential block, and the Warehouse to the 1 south west. now running from road to Jamaica Street. 28 TOWER OF Apartments and Court LONDON SITE CONTEXT The main Entrance is at 4Vanilla Maguire Street, facing north west. The During the 17th century riveside wharves extended eastward along entrance to the car park is located on Shad Thames facing south east. ST KATHERINE DOCKS The37 To area 48 is served by many bus routes along Tower Bridge Road and 26 During the 17th century riveside wharves extended eastward along Wolfson India Pumping the south bank of the river Thames. Industries in the area began TooleyCourt Street. The ST nearest House train stations are TowerStation Hill, London Bridge

45 Tea Trade and .Butler's Wharf CURLEW the south bank of the river Thames. Industries in the area began Business Wharf to grow due to the favourable location and by the end of the 17th Centre CITY 4 GAINSFORD STREET 15 to HALL 23 The site is located within the Tower Bridge Conservation Area. Clove to grow due to the favourable location and by the end of the 17th STREET Building TOWER BRIDGE 32 16a MAGUIRE century the frontages of Shad Thames were developed. The wharves 16b 9 LONDON 1 to 68 BRIDGE 46 Court to century the frontages of Shad Thames were developed. The wharvesThe site is located on the south bank of the river Thames, in 50 STATION 5 29 18 and warehouses in the area flourished in the 18th century and by the the London Borough of Southwark, approximately 300 metres 24 Multi Car PK and warehouses in the area flourished in the 18th century and by the 6 802 to Wharf 19th century Shad Thames was an industrial hub made up of many south-east of Tower Bridge. It adjoins the former Design 1 to 25 101 20 Coriander 13 19th century Shad Thames was an industrial hub made up of many Court 22 Museum to the north-east as well as Coriander Court, a 51 warehouses. A dominant force in the area for over 100 years was to 122 84 to warehouses. A dominant force in the area for over 100 years was 1 residential block, and the Anise Warehouse to the south-west. El Sub Sta

50 New Concordia Wharf 49 Butlers Butler’s Wharf Ltd. and Colonial 20 Dock Butler’s Wharf Ltd. The site is located within the Tower Bridge Conservation Area, Wharf 48 18 Saffron Saviour's Wharf St which is defined by historic wharves and warehouse buildings. BERMONDSEY 22 to 44 43 STATION 6 to 54 SOUTHWARK THAMES Java Wharf 1 to 50 Map of the site 10 Location Map PARK During the 20th centuryDuring the the area 20th wentcentury into the decline, area went as intoshipping decline, as shipping 197 to 361 16 St Saviour's Wharf The Circle SHAD 1 to 21 SHADSHAD THAMES THAMES HISTORICAL HISTORICAL MAP,MAP, 16681668 companies were forcedcompanies to unload were goodsforced furtherto unload east goods in orderfurther to east reduce in order to reduce Ordnance Survey, (c) Crown Copyright 2020. All rights reserved. Licence number 100022432 congestion along thecongestion river Thames. along the The river area Thames. was significantly The area was dasignificantlymaged damaged in WWII and manyin of WWII the wharves and many and of thewarehouse wharves andfell intowarehouse dereliction, fell into dereliction,Built in the 1930s as a warehouse, The Clove building was

General Notes Revisions Key Plan Client Drawing Status Purpose Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc PRELIMINARY until the redevelopment of the area in the 1980s. Check drawing on receipt and immediately report any discrepancies converted into offices in the late 1980s. Dorringtonto the Architect. purchased until the redevelopment of the area in the 1980s. Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale11 @ A1 Scale @ A3 The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building 17/07/20 1:500 1:1000 the site in 1997 and have refurbished and maintainedcopyright and shall not be itre-used withoutas their written permission. Drawing Title Drawing No. Revision offices ever since. LOCATION PLAN A-00-100

The Clove Building provides an important source of employment and commercial activity in Butlers Wharf, with the majority of other former warehouse buildings having been converted to residential and the relocation of the Design

Museum from Shad Thames to Kensington High Street in 2016. 4 With much of the building currently vacant, our plans to create a more attractive and functional office space are essential for Historic context images securing both existing and new tenants for the future.

ST SAVIOURS DOCK, AERIAL PHOTO, 1922 TOWER BRIDGE & BUTLER’S WHARF, AERIAL PHOTO, 1952 ST SAVIOURS DOCK, AERIAL PHOTO, 1922 TOWER BRIDGE & BUTLER’S WHARF, AERIAL PHOTO, 1952

BULTER’S WHARF & LOCATION OF THE OLD DESIGN MUSEUM

BULTER’S WHARF & LOCATION OF THE OLD DESIGN MUSEUM5

5 DESIGN AND CHARACTER CONTEXT

The dominant architectural character of the area is defined by the historic wharves and warehouse buildings, which generate a consistent townscape through their scale and street pattern.

Most the former warehouse buildings in the area have been converted to residential buildings. The Clove Building is one of a small number of office buildings in Butlers Wharf. These conversions have been undertaken while still retaining the historic, industrial aesthetic of robust brick, timber, and metalwork detailing. Since the redevelopment in the 1980s there are various examples of modernist and post- modernist architecture in the area.

The site sits within the Tower Bridge Conservation area and adjacent to the St Saviours Dock conservation area. The key feature of both areas is the acknowledgment and response to its rich industrial history and the sense of enclosure created by the tight frontages of the warehouses accessed by narrow streets. THE EXISTING BUILDING

The existing building sits between Maguire street and Shad Thames with the primary entrance on Maguire Street

The building line sits close to neighbouring buildings along Shad Thames with more generous separation on the Maguire street elevation.

The street scape is tightly knit with narrow footways along the building edges, particularly along Shad Thames.

A cobbled servicing area is located on Shad Thames at the northern end of the building.

Existing Site 2.3 EXISTING2.3 SECTION THE EXISTING BUILDING EXISTING

PROPOSED EXISTING SECTION EXISTING ADDITIONAL OFFICE SPACE PROPOSED PAVILION BB ADDITIONAL OFFICE SPACE EXISTING BUIDLING LINE PAVILION The existing building is ground, basement plus 5 storeys with BB EXISTING BUIDLING LINE STEEL SCREEN FENCE WITHresidential neighboursNEW WINDOWS TOto the eastPLANTING and IN RAISED west. BEDS CLIMBING PLANTS TO MATCH EXISTING REDUCE VISIBILITY TO NEIGHBOURING BUILDINGS STEEL SCREEN FENCE WITH NEW WINDOWS TO PLANTING IN RAISED BEDS CLIMBING PLANTS TO MATCH EXISTING The buildingREDUCE VISIBILITY TOis entirely office with the exception of a car park on partNEIGHBOURING of the BUILDINGS ground floor and storage within the basement. Roof 30120

Roof

301203200

Seventh 26920 3200

Seventh

269203200 Roof 24010 Sixth 23720 3200 Roof

240103490 Sixth OFFICE OFFICE

237203200 Fifth Fifth 20520 3490 20520 OFFICE OFFICE 3200

Fifth

2890 OFFICE OFFICE Fifth 20520 205202890 Fourth Fourth 17630

17630 2890 OFFICE OFFICE 2890 Fourth

2730 OFFICE OFFICE Fourth 17630 2730 Third17630 Third 14900 22888 14900 2730 OFFICE OFFICE 2730 Third

2700 OFFICE OFFICE Third 19688 22888

2700 14900 Second14900 Second 12200 12200 2700 OFFICE OFFICE 19688 2700 Second

Second 122003260 OFFICE

122003260 First First 8940 8940 3260 OFFICE 3260

First First 8940 3550 OFFICE CAR PARK / BIKE STORE OFFICE 8940 3550

Ground Ground

5390 3550 OFFICE CAR PARK / BIKE STORE OFFICE SHAD THAMES 5390 3550 MAGUIRE STREET SHAD THAMES MAGUIRE STREET Ground STORE PLANT CIRCULATION PLANT STREET LEVEL Ground 2710

2710 5390 SHAD THAMES Basement5390 MAGUIRE STREET Basement 2680 SHAD THAMES MAGUIRE STREET 2680 STORE PLANT CIRCULATION PLANT STREET LEVEL 2710 2710 Basement Basement 2680

2680 2680 2680 Datum 0 2680 2680

Datum Section drawing of the0 existing building

0 2 4 6 8 10 M

0 2 4 6 8 10 M

General Notes Revisions Key Plan Client Drawing Status Purpose General Notes Revisions Key Plan Client Drawing Status Purpose Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Do not scale from this drawing. Rev. Date Note Approved Check drawing on receipt and immediately report any discrepancies Dorrington Plc PRELIMINARY Check drawing on receipt and immediately report any discrepanciesto the Architect. to the Architect. General Notes Revisions Key Plan Client Drawing Status Purpose Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 General Notes Revisions DRAFT Key Plan Client Drawing Status Purpose Verify all dimensions and levels on site prior to construction. Do not scale from this drawing. Rev. Date Note Approved Project No. Project DorringtonDate Plc Scale @ A1 Scale @ A3 EXISTING The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 151:100 1:200 Do not scale from this drawing. copyright and shall not be re-used without their writtenRev permission. Date . Note Approved Dorrington Plc PRELIMINARY The contents of this drawing are Stiff + Trevillion Architects LLP Check drawing on receipt and immediately report any discrepancies 4549 Clove Building JUN 2020 1:100 1:200 copyright and shall not Checkbe re-used drawing without on receipt their written and immediately permission .report any discrepanciesto the Architect. to the Architect. Verify all dimensions and levels on site prior to construction. DRAFT Project No. Project Date Scale @ A1 Scale @ A3 Drawing Title Drawing No. Revision Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 The contents of this drawing are Stiff + Trevillion Architects LLP Drawing Title 4549Drawing No. Clove Building Revision JUN 2020 151:100 1:200 The contents of this drawing are Stiff + Trevillion Architects LLP copyright and shall not be re-used without their written permission. SECTION BB EXISTING copyright and shall not be re-used without their written permission. 4549 Clove Building JUN 2020 EX-04-1011:100 1:200 SECTION BB PROPOSED A-04-101 Drawing Title Drawing No. Revision Drawing Title SECTION BB EXISTINGDrawing No. EX-04-101Revision SECTION BB PROPOSED A-04-101 2.2 EXISTING ELEVATIONS

2.2 EXISTING ELEVATIONS These images show the existing elevations of the building including those along Maguire street and Shad Thames

28 SHAD THAMES

SHAD THAMES MAGUIRE STREET

MAGUIRE STREET

NORTH ELEVATION 28 SHAD THAMES EAST ELEVATION

0 2 4 6 8 10 M 0 2 4 6 8 10 M

General Notes Revisions Key Plan Client Drawing Status Purpose General Notes Revisions Key Plan Client Drawing Status Purpose Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Check drawing on receipt and immediately report any discrepancies Check drawing on receipt and immediately report any discrepancies to the Architect. to the Architect.

Verify all dimensions and levels on site prior to construction. SHAD THAMES Project No. Project MAGUIRE STREETDate Scale @ A1 Scale @ A3 Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 1:100 1:200 The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 1:100 1:200 copyright and shall not be re-used without their written permission. copyright and shall not be re-used without their written permission.

Drawing Title Drawing No. Revision MAGUIRE STREET Drawing Title Drawing No. Revision NORTH ELEVATION EXISTING EX-03-103 EAST ELEVATION EXISTING EX-03-102 NORTH ELEVATION EAST ELEVATION

0 2 4 6 8 10 M 0 2 4 6 8 10 M

General Notes Revisions Key Plan Client Drawing Status Purpose General Notes Revisions Key Plan Client Drawing Status Purpose Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Check drawing on receipt and immediately report any discrepancies Check drawing on receipt and immediately report any discrepancies to the Architect. to the Architect.

Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 1:100 1:200 The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 1:100 1:200 copyright and shall not be re-used without their written permission. copyright and shall not be re-used without their written permission.

Drawing Title Drawing No. Revision Drawing Title Drawing No. Revision NORTH ELEVATION EXISTING EX-03-103 EAST ELEVATION EXISTING EX-03-102

ANISE BUILDING

SHAD THAMES MAGUIRE STREET

SHAD THAMES SOUTH ELEVATION WEST ELEVATION

ANISE BUILDING

0 2 4 6 8 10 M A view of the existing elevations of the building 0 2 4 6 8 10 M

General Notes Revisions Key Plan Client Drawing Status Purpose Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING General Notes Revisions Key Plan Client Drawing Status Purpose Check drawing on receipt and immediately report any discrepancies 14 to the Architect. Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Verify all dimensions and levels on site prior to construction. SHADProject THAMES No. Project Date Scale @Check A1 drawing Scaleon receipt @ A3 and immediately report any discrepancies MAGUIRE STREET to the Architect. The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 1:100 1:200 copyright and shall not be re-used without their written permission. Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 The contents of this drawing are Stiff + Trevillion Architects LLP copyright and shall not be re-used without their written permission. 4549 Clove Building JUN 2020 1:100 1:200 Drawing Title Drawing No. Revision SOUTH ELEVATION EXISTING EX-03-101 SHAD THAMES Drawing Title Drawing No. Revision SOUTH ELEVATION WEST ELEVATION WEST ELEVATION EXISTING EX-03-100

0 2 4 6 8 10 M

0 2 4 6 8 10 M

General Notes Revisions Key Plan Client Drawing Status Purpose Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING General Notes Revisions Key Plan Client Drawing Status Purpose Check drawing on receipt and immediately report any discrepancies 14 to the Architect. Do not scale from this drawing. Rev. Date Note Approved Dorrington Plc EXISTING Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @Check A1 drawing Scaleon receipt @ A3 and immediately report any discrepancies to the Architect. The contents of this drawing are Stiff + Trevillion Architects LLP 4549 Clove Building JUN 2020 1:100 1:200 copyright and shall not be re-used without their written permission. Verify all dimensions and levels on site prior to construction. Project No. Project Date Scale @ A1 Scale @ A3 The contents of this drawing are Stiff + Trevillion Architects LLP copyright and shall not be re-used without their written permission. 4549 Clove Building JUN 2020 1:100 1:200 Drawing Title Drawing No. Revision SOUTH ELEVATION EXISTING EX-03-101 Drawing Title Drawing No. Revision WEST ELEVATION EXISTING EX-03-100 THE PREVIOUS APPLICATION

This application:

Proposed extending the existing 5th floor, pushing Offered no greening or changes to the building at Proposed an additional two full storeys to the the massing of the building closer to Cinnamon ground level while adding significant massing with little current building Wharf than the current proposal articulation or response to the architectural character of the the conservation area and host building This application was withdrawn in 2011.

The eastern elevation of the 2011 scheme THE DESIGN BRIEF

Our design approach has been underpinned by these core principles:

Update and improve the building and office space to bring it up to a modern standard to ensure any changes to the building sit comfortably within the conservation area and with due respect to neighbouring properties

Enhance the work environment and the health and wellbeing for office occupiers using the building by creating high quality amenity spaces

Improve occupier facilities such as cycle storage and showers

Improve the sustainability and reduce the environmental impact of the building THE PROPOSALS

Our proposals for The Clove Building aim to bring a new lease of life to the building, making it a more attractive workplace while improving its environmental impact. Adding new end-of-trip facilities including showers and Introducing a landscaped green roof, improving cycle parking, to encourage sustainable methods of biodiversity in the local area. We will also explore This would be achieved through the provision transport to and from the site. This would include the opportunities to introduce greening at street level of an additional 6th floor, which replicates the removal of the existing on site carparking existing 5th floor footprint, a small extension to the Maguire Street side of the 5th floor and a new rooftop pavilion for offices, with associated landscaping and greening interventions.

Our plans would improve the existing building by:

Providing amenity space for the building’s occupiers. Reducing embodied carbon by using modern methods of construction, improving the existing building’s thermal efficiency, and using lightweight, sustainable materials 3.2 MASSING PRINCIPLES

5TH FLOOR COLLONADE WING INFILL

+ MAGUIRE STREET 5TH FLOOR COLLONADE WING TERRACE INFILLED TO CREATE ADDITIONAL OFFICE SPACE + SHAD THAMES 5TH FLOOR COLLONADE WING TERRACE REMAINS FULLY OPENED TO REDUCE IMPACT ON NEIGHBOURING BUILDING + WINDOW DESIGN REPLICATED AT 5TH FLOOR TO SEAMLESSLY BLEND WITH THE ORIGINAL BUILDING + INFILL AREAS RENDERED WHITE TO MATCH EXISTING

3.2

MASSING PRINCIPLES 6TH FLOOR ROOF EXTENSION

+ 6TH FLOOR FOOTPRINT MATCHES THE 5TH WHICH IS SET BACK FROM THE MAIN BUILDING 5TH FLOOR COLLONADE WING INFILL + NEW FACADE RENDERED WHITE TO MATCH EXISTING + MAGUIRE STREET 5TH FLOOR COLLONADE WING+ TERRACEWINDOW INFILLED DESIGN TO REPLICATEDCREATE ADDITIONAL AT 6TH FLOOR TO SEAMLESSLY BLEND WITH THE ELEVATION OFFICE SPACE BELOW + SHAD THAMES 5TH FLOOR COLLONADE WING+ TERRACENEW REMAINS TERRACES FULLY CREATED OPENED ABOVE TO REDUCE 5TH FLOOR WING ON MAGUIRE STREET IMPACT ON NEIGHBOURING BUILDING + NEW FOLDING ACCESS DOORS TO TERRACES + WINDOW DESIGN REPLICATED AT 5TH FLOOR+ TO SEAMLESSLYSTAIR & LIFT BLEND CORES WITH EXTENDED THE ORIGINAL UPWARD TO PROVIDE SERVICING AND ACCESS BUILDING THE APPROACH + INFILL AREAS RENDERED WHITE TO MATCH EXISTING TO DESIGN AND MASSING

The proposed changes have sought to respond to the surrounding area and are intended to ensure that the building remains respectful to neighbours and blends harmoniously into the existing streetscape. Key changes include: CGI image of proposed 5th floor extension CGI image of proposed 6th floor extension

Infilling the collenade terrace facing Maguire Street to create additional office space

6TH FLOOR ROOF EXTENSION 21 The fifth-floor colonnade terrace on the Shad Thames elevation remains fully open + 6TH FLOOR FOOTPRINT MATCHES THE 5TH WHICH IS SET BACK FROM THE MAIN BUILDING + NEW FACADE RENDERED WHITE TO MATCH EXISTING + WINDOW DESIGN REPLICATED AT 6TH FLOOR TO SEAMLESSLY BLEND WITH THE ELEVATION The addition of a sixth floor in line with the existing BELOW 5th floor + NEW TERRACES CREATED ABOVE 5TH FLOOR WING ON MAGUIRE STREET + NEW FOLDING ACCESS DOORS TO TERRACES Maintaining an opened-up terrace along the Shad + STAIR & LIFT CORES EXTENDED UPWARD TO PROVIDE SERVICING AND ACCESS Thames side of the building to reduce obstructions to neighbouring residents’ views.

The layout of the sixth floor will match the setback fifth floor, with the rendered façade and window design delivering a seamless replication of the existing massing.

CGI image of proposed 7th floor pavilion

21 ROOF TERRACE

In addition to the new recessed sixth floor, the roof top includes a new pavilion and landscaped roof terrace.

The pavilion would serve as a dedicated office space and the terrace would deliver a new attractive green feature for the office occupiers.

The design of this element has been carefully considered to ensure it minimises any impact on our existing neighbours. These considerations include:

The massing of the pavilion is pushed away from the edges of the building as has the new floor, lessening the townscape impact at street level

Additions of a buffer zone of sedum roof between the terrace and surrounding residential buildings

High planting will create screening along the eastern edge of the terrace, maintaining privacy for residents in Cinnamon Wharf

Low barriers along the western and northern edges to create outlooks orientated away from neighbouring buildings.

CGI image of proposed roof terrace SUSTAINABILITY

While refurbishing and improving the building, Refurbishing and extending The Clove Building will New elements of the façade and roof will be thermally there are a number of opportunities to preserve a significant amount of the embodied carbon of efficient and low maintenance, incorporating robust increase its sustainability and reduce its the new development by retaining the existing structure, detailing and material specifications impact on the environment. rather than demolishing and building a new structure

Modern construction methods for the new upper The new landscaped roof terrace and sedum roof will floors, including modular façade elements and enhance biodiversity, creating an attractive, green prefabricated panels, will decrease construction waste environment in place of the existing hard artificial roof top and accelerate construction times Roof Terrace Precedent Images CONSTRUCTION

Ordnance Survey, (c) Crown Copyright 2021. All rights reserved. Licence number 100022432 Rev Details Drawn Checked Date MANAGEMENT ......

BANKSMAN AVAILABLE MINIMUM 1.2m MINIMUM 3M TO ASSIST WITH ALL We are aware that due to the constrained nature of Shad Thames, construction work K E Y : PEDESTRIAN ROUTE CARRIAGEWAY CONSTRUCTION GAINSFORD STREET has the potential to be disruptive to neighbours if not carefully managed. MAINTAINED WIDTH MAINTAINED VEHICLE MOVEMENTS SITE BOUNDARY Tamarind Court THROUGHOUT

18 1 to 68 CONSTRUCTION EXISTING SINGLE YELLOW LINES Pumping As a result we are committed to ensuring works on the Clove Building are approached Station EXISTING DOUBLE BANKSMAN AVAILABLE TO ASSIST YELLOW LINES in a fashion that minimises construction time and impact on our neighbours. WITH ALL CONSTRUCTION VEHICLE MOVEMENTS RESIDENTS PERMIT 9 TCB HOLDERS ONLY PARKING

Posts We are not proposing structural demolition of the existing building, which will DISABLED PARKING BAY MAGUIRE STREET . and Colonial 6.50m

significantly reduce the overall build time and period of any heavy works on site. Our Butlers CAR CLUB PARKING BAY 51 to 122 to 51

13.80m . LOADING ONLY BAY 6 5 approach will also minimise dust and noise impact as major structural breaking of the 4 building, typical of a demolition and rebuild approach, will not be needed here. PROPOSED LOADING AREA PROPOSED COVERED 2.5 x 12m WALKWAY

PROPOSED 28 Typically the majority of vehicle movements relate to the clearing of materials resulting 20 LOADING AREA SITE HOARDING BuildingClove Coriander SITE PARKING SUSPENSION from demolition. Our approach in preserving the existing building will see this kept to a 1 to 25 Court PROPOSED CONVEYOR Client minimum. TO EXIT BUILDING AND OVER A COVERED ... WALKWAY TO THE 13 LOADING BAY Project We are also exploring a range of solutions including the potential of off-site

. The Clove Building construction to shorten the time needed on site. ALL MATERIALS TO BE STORED

ON-SITE 26 Drawing Title A significant proportion of the works will be internal as a part of the building Ordnance Survey, (c) Crown Copyright 2021. All rights reserved. Licence number 10002243222 Rev Details Drawn Checked Date

......

SHAD THAMES 20 Site Setup Plan

24 refurbishment and will be managed within the existing building to minimise external 18

noise. 16 Java Wharf Scale Size Saffron Tea Trade Wharf 6 to 54 1:500 A3 Wharf BANKSMAN AVAILABLE Drawn AS 15.03.2021 MINIMUM 1.2m MINIMUM 3M TO ASSIST WITH ALL Materials will be delivered to site and then stored within the building and the deliveries K E Y : Checked PEDESTRIAN ROUTE CARRIAGEWAY CONSTRUCTION KM 15.03.2021 GAINSFORD STREET MAINTAINED WIDTH MAINTAINED VEHICLE MOVEMENTS SITE BOUNDARY will be managed to ensure both pedestrian and vehicle routes along Maguire street Tamarind Court THROUGHOUT 18 1 to 68 CONSTRUCTION EXISTING SINGLE 101 to 802 YELLOW LINES remain open. Pumping Station EXISTING DOUBLE BANKSMAN AVAILABLE TO ASSIST YELLOW LINES WITH ALL CONSTRUCTION Bollard 111 - 113 Great Portland Street VEHICLE MOVEMENTS RESIDENTS PERMIT 9 TCB HOLDERS ONLY PARKING London We are committed to working with the local community to ensure any on site works Posts N O T E S : W1W 6QQ Bollard DISABLED PARKING BAY Tel. No. 0207 1000 753 MAGUIRE STREET . 6.50m and Colonial 1. Do not scale from this drawing. are coordinated with our neighbours and communicated clearly. We will work with local Butlers CAR CLUB PARKING BAY Drawing Number Rev

51 to 122 to 51 2. This drawing to be read & printed in colour.

13.80m . LOADING ONLY BAY

6 5 Bollard stakeholders to finalise a detailed construction management plan for the site that takes 4 3. This drawing is for illustrative purposes only. 2020-4060-002 ... PROPOSED LOADING AREA C:\USERS\ANDREW\BOX\DATA\002504-TTP4060 THE CLOVE BLDG\2021-4060-002 - SITE SETUP PLAN.DWG NOTE: THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN TTP CONSULTING LTD. IT MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THEIR PRIOR WRITTEN CONSENT. © TTP Consulting. All rights reserved. into account the unique nature of Shad Thames. PROPOSED COVERED 2.5 x 12m WALKWAY

PROPOSED 28 20 LOADING AREA SITE HOARDING BuildingClove Coriander SITE PARKING SUSPENSION The image outlines our indicative proposals for management of the materials arriving to 1 to 25 Court PROPOSED CONVEYOR Client TO EXIT BUILDING AND site. This will continue to be developed in the coming months. OVER A COVERED ... WALKWAY TO THE 13 LOADING BAY Project

. The Clove Building ALL MATERIALS TO BE STORED

ON-SITE 26 Drawing Title

22

SHAD THAMES 20 Site Setup Plan

24

18 16 Java Wharf Scale Size Saffron Tea Trade Wharf 6 to 54 1:500 A3 Wharf Drawn AS 15.03.2021 Checked KM 15.03.2021

101 to 802

Bollard 111 - 113 Great Portland Street London Bollard N O T E S : W1W 6QQ Tel. No. 0207 1000 753 1. Do not scale from this drawing. Drawing Number Rev 2. This drawing to be read & printed in colour. Bollard 3. This drawing is for illustrative purposes only. 2020-4060-002 ... C:\USERS\ANDREW\BOX\DATA\002504-TTP4060 THE CLOVE BLDG\2021-4060-002 - SITE SETUP PLAN.DWG NOTE: THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN TTP CONSULTING LTD. IT MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THEIR PRIOR WRITTEN CONSENT. © TTP Consulting. All rights reserved. THANK YOU AND NEXT STEPS

Thank you for taking the time to look through our proposals for The Clove Building. We hope you found this information useful.

We would welcome your feedback. Please feel free to complete the survey or contact the team with your comments via the email below.

We will be submitting a full application for the site in the near future.

[email protected] 0203 900 3676

The existing Clove Building