Zhongshan Hotel, Nanjing, China

September 2013 doc.: IEEE 802.11-13/1011r0

IEEE P802.11
Wireless LANs

Minutes of the IEEE P802.11 Full Working Group
Date: 2013-09-16
Author(s):
Name / Company / Address / Phone / email
Stephen McCann / BlackBerry Ltd / 200 Bath Road, Slough, Berkshire, SL1 3XE, UK / +44 1753 667099 /


IEEE 802.11 Interim Meeting – Session #141

Zhongshan Hotel, Nanjing, China

September 16th – 20th, 2013

IEEE 802 Wireless Opening Plenary, Monday, 16th September 2013

Monday, 16 September 2013

10:31 802.11, 802.15, 802.18, 802.19, 802.21, 802.22, and 802.24 Chairs called the joint meeting to order. IEEE 802.15 attendance is included as Annex A.

General announcements:

· No photography, no audio recording

· Social – will be in ZiJing Hall

· Straw Poll of new attendees: 6

10:43 IEEE patent policy

802.15 WG chair read the IEEE-SA instructions and displayed the four slides explaining patent policy and informed the attendees that additional information could be found on the PatCom web site.

802.15 WG chair read IEEE anti-trust policy.

10:47 Financial report by Jon Rosdahl (CSR Technologies Inc) docs 11-13-1063-00, 15-13-0526-00

Net Worth

May 1, 2013 - $569,314.79

· IEEE account: $385,728.64 +76.93+88.47 +82.47 = $385,976.51

· Face-to-Face: $64,848.90 – 14,223.07+57150-25,537.56+101,100 = $183,338.28

June 30, 2013 – $386,061.74

· IEEE account: $385,976.51 + 85.23 = $386,061.74

· Face-to-Face: $183,338.28 + $71,400.00 - $61,737.97 = $193,000.31 (as of May 29)

Sept 1, 2013 – $409,424.40

· IEEE account: $386,061.74 +85.67-$21,515.00+88.07+83.64 = $364,804.12

· Face-to-Face: $193,000.31 -$1,982.86 - $39.00 = $44,620.25

Nanjing, China – Sept 2013

• Registration Income: $168,625

− Registrations 279 (+34 Students)

− Meeting Expense Estimate $173,692

− Estimated Loss ($ 5,067)

• Expense Estimates

− Electronic Facilities $ 7,700

− Networking & Shipping $62,300

− Special Services on site $22,655

− On site setup $ 7,000

− Staffing on site $ 18,100

− Disbursements $ 4,500

− Accounting and Legal $ 19,045

− Management $ 29,609

− Delegate Materials $ 2,783

• Estimated Sponsor Contribution: $116,000

− Meeting facilities $32,000

− AV $45,000

− Special Event (social) $39,000

10:52 Wireless and IMAT announcements by Rick Alfvin (15-13-027-04)

· Secure SSID: VeriLAN-secure (WPA2 PSK: ieeeieee)

10:57 Review future sessions

· November 10-15, 2013, Hyatt Regency Reunion, Dallas, TX, USA, 802 Plenary Session

· January 19-24, 2014, Hyatt Century Plaza, Los Angeles, CA, USA, 802 Wireless Interim Session*

· March 16-21, 2014, China World Hotel, Beijing PRC, 802 Plenary Session. (pending)

· May 11-16, 2014, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session*

· July 13-18, 2014, Grand Hyatt Manchester, San Diego, CA, USA, 802 Plenary Session.

· September 14-19, 2014, TBD (Hilton in Athens?), 802 Wireless Interim Session*

· November 2-7, 2014, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session.

· January 19 - 25, 2015, Hyatt Regency, Atlanta, Georgia, USA, 802 Wireless Interim

11:02 Working Group Updates

· 802.11 by B Kraemer (Marvell): 334 voters, 36 potential voters

TGREVmc - Revision

TGac - VHT <6GHz – in Sponsor Ballot

TGaf- TVWS - in Letter Ballot

TGah- Sub 1GHz

TGai – Fast Initial Link Setup (FILS)

TGaj – China 45& 60 GHz bands (CMMW)

TGak – General Link, i.e. Bridging w/802.1(GLK)

TGaq – Pre-Association Discovery (PAD)

Standing Committee

WNG - WIRELESS NEXT GENERATION

ARCHITECTURE

JTC1

REGULATORY

Study Group

High efficiency Wireless LAN (HEW)

802.15 by B Heile (132 voters, 20 nearly voters)

TG4m: TVWS (in Sponsor, ~300 comments)

TG4n: CMB (draft development)

TG4p: RCC (in Sponsor, ~300 comments)

TG4q: ULP (Ultra Low Power amendment) - drafting TRD

TG8: PAC (Peer Aware Communications) requesting proposals

TG9: KMP (Key Management Protocol) draft development

TG10-L2R: Layer 2 Routing (just started)

SG-SRU - Spectrum Resource Utilization

SG-100G – 100 Gb/s THz

IG – 15.7 LED enhancements

IG - Dependability

802.18 by Michael Lynch

· 7 items concerning European regulatory matters

802.19 Filin

· TG1 TV whitespace coexistence finishing comment resolution

802.21 Subir Das (21-13-0161)

· TG21c – single radio handover – Sponsor ballot

· TG21d –group management – resolving WG ballot comments

· TG21m – revision project

· TG21.1 -

802.22 Pyo

· TGa MIBS

· TGb Enhanced Broadband Services and Monitoring Applications

· 802.22.1 rev – advanced beaconing

802.24 Gilb

· White Paper

11:23 Joint meeting adjourned


IEEE 802.11 Opening Plenary, Monday 16th September 2013

The chair Bruce Kraemer (Marvell) opened the meeting at 11:31 China Standard Time (CST). The other officers are:

1st Vice-chair (VC1): Jon Rosdahl CSR Technologies Inc

2nd Vice-chair (VC2): Adrian Stephens Intel

Secretary: Stephen McCann BlackBerry Ltd

There are 334 voting members of IEEE 802.11

There were 153 people in the room.

1.  Approve/modify joint opening agenda (11-13-0931r2)

1.1.  Chair: I’ve re-arranged some of the meeting slots from the version posted 30 days ago.

1.2.  So are there any more modifications required at this moment?

1.3.  TGaq chair: I would like to request an extra slot on Tuesday PM1.

1.4.  Chair: This is accepted, but is subject to room availability.

1.5.  JTC1 chair: I would like an extra JTC1 slot please on Wednesday PM2.

1.6.  Chair: Ok, but again this is subject to room availability. The agenda r3 will be uploaded shortly.

1.7.  No objection to the approval of the r3 agenda.

2.  July 2013 Minutes

2.1.  Review and approve joint minutes from the Geneva, July 2013 meeting.

2.2.  Any objection to approving the July 2013 minutes 11-13-0750r1 by unanimous consent

2.3.  Moved: Stephen McCann, 2nd: Jon Rosdahl

2.4.  Following neither discussion nor dissent these minutes were approved by unanimous consent.

3.  Notices

3.1.  No photographs at this meeting and please turn your mobiles to vibrate.

3.2.  Comment(C): Please can the secretary note that IEEE does not allow recording of any meetings.

4.  Attendance

4.1.  Welcome to the 3 new participants in this meeting.

4.2.  Chair: Please note that Stephen McCann (Secretary) will be holding a newcomer’s session at 13:30 this afternoon, presenting the document 11-13-0049r3.

4.3.  Chair: Please note that there is also a help desk outside in the foyer area and a networking desk.

5.  Treasurers report (11-13-1063r0)

5.1.  VC1: This is the current budget status, which is shared with IEEE 802.15.

5.2.  There will be an update on meeting attendance later in the week.

5.3.  As this is a sponsored meeting, any surplus will be returned to the sponsor.

6.  Call for essential Patents (11-13-1107r0)

6.1.  VC1: read out the current PatCom rules and then called for essential patents information, as shown by:

6.2.  http://standards.ieee.org/board/pat/pat-slideset.ppt

6.3.  There were no issues raised regarding the call for essential patents.

6.4.  Chair: There has been a request for LoAs from TGai, which I will address later.

6.5.  Comment (C): There are additional patents within TGai that have now been discovered.

6.6.  Chair: Please can you send me a private email identifying those patents.

6.7.  VC1: So, in summary, there were essential patents identified within TGai which the chair is now pursuing. In addition, there is now a new request for additional LoAs.

6.8.  VC1: read out other policies and procedures for the meeting.

6.9.  Also please remember the documentation guidelines and please update all changes to those documents presented.

6.10.  Please note our guidelines for all IEEE 802.11 documents including agendas and minutes.

7.  Status of all groups (11-13-0932r0)

7.1.  Open Positions (slide #8)

7.1.1.  There are three open positions for officers as shown in this slide.

7.2.  Missing Officers (slide #9)

7.2.1.  There are a couple of missing people this week, as shown in grey on this slide.

8.  Announcements (11-13-0933r0)

8.1.  LoA database

8.1.1.  There are 32 entries for 2013 and some pending, as mentioned earlier.

8.2.  Room Assignments

8.2.1.  No changes at this point.

8.3.  IEEE 802 items

8.3.1.  Other IEEE 802 groups are meeting in other rooms and their agendas are on the mentor document server.

8.3.2.  IEEE 802.16 is not meeting this week.

8.4.  IEEE 802 Badges

8.4.1.  Please note the different colored badges for this meeting as shown in Slide #13.

8.5.  November 2013 Plenary

8.5.1.  Please note that he early bird cut off for the November 2013 plenary registrations is on 4th October 2013.

8.6.  IEEE-SA Staff

8.6.1.  There is 1 person from IEEE-SA staff here this week Meng Zhao, so please welcome her.

8.7.  Wednesday Social

8.7.1.  Please note this is on Wednesday evening in the ZiJing Hall (where lunch is served) and we are expecting up to 100 local guests.

8.8.  Wednesday Mid-Week Plenary Topics (slide #25)

8.8.1.  There will be discussions about:

8.8.1.1.  TGak proposal for TAG stacking change” (11-13-1055r0)

8.8.1.2.  IEEE 1900.1 (DySpan)

8.8.1.3.  Exec Comm November 2013 workshop agenda

8.9.  IEEE 802.1 Architecture Document (slide #26)

8.9.1.  This will be discussed during the IEEE 802.11 ARC meeting this week.

8.10.  November 2013 Plenary topics (slide #27)

8.10.1.  This is a list of potential topics for the November 2013 meeting. Note: Monday evening will be a 40th Anniversary celebration for Ethernet, so tutorials will be moved to the Tuesday evening.

9.  Voting status, attendance, meeting network & documentation (11-13-0096r5)

9.1.  VC2: This document provides all the information about attendance, documentation and other news about the group.

9.2.  The latest ANA database is 11-11-270r17 and was updated in July 2013.

9.3.  Please use the IMAT system for attendance. If you have problems please send VC2 an email.

9.4.  There are 18 normal slots this week although there are extra evening and early morning slots.

9.5.  Please note that there is online calendar suitable for downloading to smart phone and tablets.

9.6.  If you wish to synchronize with the local document server, please do so, rather than using the external bandwidth from the hotel meeting venue.

10.  Publicity & timelines

10.1.  Publicity

10.1.1.  None at the moment, but press releases for TGac and TGaf will be considered between this meeting and the November 2013 meeting.

10.2.  Timelines

10.2.1.  No recent changes, but please can all chairs send the secretary any required updates prior to this weekend.

11.  Group Summaries (11-13-0932r0)

11.1.  Editor’s meeting

11.1.1.  Tomorrow morning at 7.00am in room 311, including the ANA status, style guides and numbering situation.

11.2.  Extra notes for the following groups were made:

11.3.  WNG

11.3.1.  1 presentation is currently scheduled for Thursday morning AM2.

12.  Recent Ballots (11-13-0932r0 slide #32)

12.1.  Chair: There have been a few recently as shown on the slide.

13.  Any Other Business

13.1.  Chair: TGaq can meet on Tuesday AM2 in room 201 and JTC1 Wednesday AM1 in room 308.

13.2.  Chair: Is this change to the schedule acceptable to everyone?

13.3.  No objections to the changes.

13.4.  VC1: The lunch time has now been extended from 11:45 to 14:00.

13.5.  VC1: There will be an r1 of the expense report, as someone noticed a typo. Thank you for noticing this error.

14.  Recess

14.1.  Meeting recessed at 12:33 CST.


Wednesday, 18th September 2013

IEEE 802.11 Mid Week Plenary

Presiding chair: Bruce Kraemer (Marvell) opened the meeting at 10:30 CST.

150 people present.

15.  Approve/modify joint opening agenda (11-13-0931r4)

15.1.  Chair: Are there any proposed changes?

15.2.  Any objection to approving this agenda?

15.3.  No objection, so moved and approved.

16.  Call for Essential Patents

16.1.  The call for essential patents from Monday still applies

16.2.  Chair: On Monday, I did indicate that some LoAs need to be sent out. I am in the process of doing this at the moment.

16.3.  No statements

17.  CAC

17.1.  Reminder about the 19.30 CST meeting on Thursday.

18.  Social (ZiJing Hall)

18.1.  Please note that the room for the social this evening is open at 5.30pm. This is the same room as breakfast and lunch. There will be up to 100 locals and officials from Nanjing.

18.2.  Q: I see the social is on the attendance server.

18.3.  VC2: It’s there to remind you where the location is. However, it has zero credit.

19.  Liaisons

19.1.  IEEE 802.19: Co-existence (11-13-1195r0)

19.1.1.  Various issues arising from the IEEE 802.19 meetings this week.

19.1.2.  Q: Any idea of attendance in this group this week?

19.1.3.  Chair: The registration said 6, but I’m not sure of actual numbers.

19.2.  Bluetooth SIG

19.2.1.  Chair: there is still no official liaison for this group.

19.3.  Wi-Fi alliance (WFA)

19.3.1.  Last meeting was in June 2013 in Seattle, so I have already reported progress in the Geneva July 2013.

19.3.2.  Of main interest, there is a new temporary group that has been created within WFA to consider the HEW SG liaison.

19.3.3.  There are about 24 projects, covering aspects of 11v, 11ac, 11ad and other 802.11 amendments

19.3.4.  The next WFA meeting is in Brussels in October 2013.

19.3.5.  No questions

19.4.  IETF (11-13-1161r0)

19.4.1.  Q: regarding slide #14, do you have any feeling for when this will occur.

19.4.2.  A: Possibly in November 2013.

19.4.3.  Q: There are some activities regarding IPv6.

19.4.4.  A: Yes, there are some listed on slide #3. If anyone wishes to submit IEEE 802.11 input, then please contact the IETF liaison or the IEEE 802.11 chair.

19.5.  3GPP (11-13-1060r1)

19.5.1.  Q: I think your version number is incorrect, based on the version on the server

19.5.2.  A: yes, I believe you are correct. I apologize and I’ll create a revised version.

19.5.3.  Chair: Are there any specific action items for IEEE 802.11 at the moment.

19.5.4.  A: No, none that I know of.

19.6.  IEEE 802.24

19.6.1.  Chair: this is a request for a liaison to this group. This person needs to attend the IEEE 802.24 meeting and then report back.

19.7.  IEEE 802 OmniRan (11-13-1196r0)

19.7.1.  Chair: are the PAR and 5C in a suitable state for consideration by IEEE 802.11?

19.7.2.  A: I would wait until the end of October first.

19.7.3.  Chair: did the OmniRAN teleconference go ok?

19.7.4.  A: Yes.

20.  TGak update (11-13-1055r1)

20.1.1.  C: I would just like to state that Norman Finn who is not here this week is in favor of this presentation.