DOCSLIB.ORG
Explore
Sign Up
Log In
Upload
Search
Home
» Tags
» Pit (nuclear weapon)
Pit (nuclear weapon)
Weapons Summary Final 5.30.Indd
CMRR Backgrounder 4 25 12.P65
The Plutonium Challenge-Stockpile Stewardship
The Benefits of Moving to an All-W87 ICBM Force the NNSA Is Proposing
JASON Letter Report on Pit Aging
The Reliable Replacement Warhead Program and the Life Extension Program
Weapon Physics Division
NUCLEAR WEAPONS Action Needed to Address the W80-4 Warhead Program’S Schedule Constraints
'Pit-Stuffing': How to Disable Thousands of Warheads and Easily Verify Their Dismantlement
Gao-20-703, Nuclear Weapons
GAO-20-703 Highlights, NUCLEAR WEAPONS
US Nuclear Weapon "Pit"
Press-Conference-Slides.Pdf
The Actinide Research Quarterly Highlights Recent Achievements and Ongoing Programs of the Nuclear Materials Technology (NMT) Division
FY 2021 Congressional Budget Request
NSS JUL2014 Bottom.Pdf
The Smithsonian and the Enola Gay: the Atomic Bomb
Nuclear Weapons Activities
Top View
UCRL-LR-107454: Assessment of the Safety of US Nuclear Weapons And
The Reliable Replacement Warhead Program: Background and Current Developments
Refurbishment of the W80 – Weapon Type
Plutonium Pit: Unnecessary, Provocative, Behind Schedule and Over Budget
The Physics of Nuclear Weapons
The U.S. Nuclear Weapons Complex: Overview of Department of Energy Sites
New Nuclear Weapons: the RRW Program May 2007
Manhattan District History Project Y: the Los Alamos Project
Disarming Trident Is Not an Impossible Task and Outlines How This Process Can Be Achieved in Eight Specific Phases Over Four Years
"Pit" Production: Options to Help Meet a Congressional Requirement
Gao-06-83, Stand-Down of Los
Manufacturing Nuclear Weapon "Pits": a Decisionmaking Approach
Rethinking the Trident Force
Nuclear Warh Ead Safety
THE MODERN PIT FACILITY (MPF) Affairs No Urgency for a MPF
US Pit Production
W78 Replacement Program (W87-1): Cost Estimates and Use of Insensitive High Explosives
Frequently Asked Questions (FAQ) on Pit Manufacturing Capacity
Not for Publication Until Released by the House Armed Services Committee Strategic Forces Subcommittee
United States Nuclear Tests July 1945 Through September 1992
Nuclear Weapons Databook
Nuclear Warhead "Pit" Production: Background and Issues for Congress
LULA Commercial Elevator Specifications
Proposed Plutonium Pit Production At
The Reliable Replacement Warhead Program
2021 Stockpile Stewardship and Management Plan – Biennial Plan Summary
Nuclear Weapons Safety: the Case of Trident
The United States Nuclear Weapons Program
Appendix 10A. World Nuclear Forces
The Reliable Replacement Warhead Program: Background and Current Developments
NNSA) to Provide Quarterly Reports on the Progress of Plutonium Pit Production at Los Alamos National Laboratory
The US Nuclear Weapons Complex: Overview of Department
Mission: Produce No Fewer Than 80 Plutonium Pits Per Year by 2030 to Meet Department of Defense Requirements Overview Driving Factors
Final Environmental Impact Statement for Plutonium Pit Production at the Savannah River Site in South Carolina (SRS Pit Production EIS) (DOE/EIS-0541)
Assessment of the Safety of US Nuclear Weapons and Related
Dismantlement of Nuclear Weapons Matthew Bunn
NNSA Pit Production Strategy
Energy and Water Development Appropriations: Nuclear Weapons Activities
No Rush to Rebuild
1.0 General 1.1 1.2
Known Weights of Plutonium and U235 in A-Bomb & H- Bomb
Summary Draft EIS for Plutonium Pit Production at Savannah River Site
Nuclear Weapons Material