Citizen Report

Citizen Report

Citizen's Report District Six Tentative Work Program Fiscal Year 2021 - 2025 Miami-Dade County Prepared by FDOT - District 6 - 10/10/2019 Data Reading the Citizen’sCounty: Miami Dade Report ( 87 ) FDOT HIGHWAY SYSTEM: 01 INTRASTATE INTERSTATE PROJECT MANAGER 251688.1 SR 836/I-395 FROM WE ST OF I-95 TO MACARTHUR C SWY BRIDGE PM: PERDOMO, MARIA City: MIAMI Work Mix: Bridge-Replace And Add Lanes Extra Description: SEE ALSO 6141902 & 6141919/ULTIMATE IMPROV. CONTRACT #E6J53 R/W EST=ALT. #E-2/PH32 IN 2011 FOR DESIGN BUILD PACKAGE 4B-02 = PROPERTY MGMT SERVICES/PH4302=BNIR IN 2011 FOR ADVANCE R/W PARCELS. 32-02=CAR CNT BDT36 32-03=GC STATE FUND SEE MORE NOTES Cont. Class: Design Build ON WP45 REGARDING PH 57 & FLAGGING. FHWA OVST (PODI). PROJECT IS P3 & LET W/429300-2, 423126-1 & 423126-2 Phase Fund Code FY 2021 FY 2022 5 Year Total Construction ACID $92,340 $92,340 CEI ACNP $513,000 $513,000 ACSU $3,872,138 $3,872,138 SA $18,468 $619,408 $637,876 Total For Project 251688.1 $4,495,946 $619,408 $5,115,354 TYPE OF WORK 414964.1 SR 9A/I-95 FROM S OF MIAMI GARDENSIdentifies DRIVE the TO major B ROWARD COUNTY LINE PM: WANG, BAOYING PROJECT COST PROJECTWork Mix: Pd&E/Emo Study categoryExtra Description: of work effort SEE 95 EXPRESS UNDER 4154561 PD & E STUDY TO SUPPORT MULTIMODAL EFFORTS REMINDER: REQUEST A PH 57 TO BE ADDED IN THE AMOUNT OF $1MFunded IN THE SAME in the YR (ORTWP B4) PH 52 IS ALLOCATED PER H. HARTMANN ON 9/8/16. PHASECont. Class: Misc - No Letting on a particular item segment. BEING Phase Fund Code FY 2021 FY 2024 5 Year Total FUNDEDPDE ACNP $4,000,000 $4,000,000 P.E. ACFP $20,130,000 $20,130,000 DESCRIPTION SA $10,000 $10,000 ProvidesTotal theFor Project from 414964.1 and to $4,000,000 $20,140,000 $24,140,000 as well as the name of the road, bridge, transit operation,414964.7 airport,SR etc. 9A/I-95 FROM US-1 /SOUTH DIXIE HIGHWAY TO S OUTH OF NW 62ND STREET PM: WANG, BAOYING City: MIAMI Work Mix: Pd&E/Emo Study Extra Description: PD&E STUDY SWAT PROJECT MPO PRIORITY ID# 25/FY 21 MPO PRIORITY PROJECTS LISTING MPO RESOLUTION #17-14/LRTP PRIORITY #2 REFER TO 432639-6 FOR LIMIT SPLIT Cont. Class: Misc - No Letting Phase Fund Code FY 2022 FY 2024 5 Year Total PDE ACFP $6,700,000 $6,700,000 P.E. ACFP $10,340,000 $10,340,000 Total For Project 414964.7 $6,700,000 $10,340,000 $17,040,000 October. 10 2019 Page 2 of 151 County: Miami Dade ( 87 ) HIGHWAY SYSTEM: 01 INTRASTATE INTERSTATE 251688.1 SR 836/I-395 FROM WE ST OF I-95 TO MACARTHUR C SWY BRIDGE PM: PERDOMO, MARIA City: MIAMI Work Mix: Bridge-Replace And Add Lanes Extra Description: SEE ALSO 6141902 & 6141919/ULTIMATE IMPROV. CONTRACT #E6J53 R/W EST=ALT. #E-2/PH32 IN 2011 FOR DESIGN BUILD PACKAGE 4B-02 = PROPERTY MGMT SERVICES/PH4302=BNIR IN 2011 FOR ADVANCE R/W PARCELS. 32-02=CAR CNT BDT36 32-03=GC STATE FUND SEE MORE NOTES Cont. Class: Design Build ON WP45 REGARDING PH 57 & FLAGGING. FHWA OVST (PODI). PROJECT IS P3 & LET W/429300-2, 423126-1 & 423126-2 Phase Fund Code FY 2021 FY 2022 5 Year Total Construction ACID $92,340 $92,340 CEI ACNP $513,000 $513,000 ACSU $3,872,138 $3,872,138 SA $18,468 $619,408 $637,876 Total For Project 251688.1 $4,495,946 $619,408 $5,115,354 414964.1 SR 9A/I-95 FROM S OF MIAMI GARDENS DRIVE TO B ROWARD COUNTY LINE PM: WANG, BAOYING Work Mix: Pd&E/Emo Study Extra Description: SEE 95 EXPRESS UNDER 4154561 PD & E STUDY TO SUPPORT MULTIMODAL EFFORTS REMINDER: REQUEST A PH 57 TO BE ADDED IN THE AMOUNT OF $1M IN THE SAME YR (OR B4) PH 52 IS ALLOCATED PER H. HARTMANN ON 9/8/16. Cont. Class: Misc - No Letting Phase Fund Code FY 2021 FY 2024 5 Year Total PDE ACNP $4,000,000 $4,000,000 P.E. ACFP $20,130,000 $20,130,000 SA $10,000 $10,000 Total For Project 414964.1 $4,000,000 $20,140,000 $24,140,000 414964.7 SR 9A/I-95 FROM US-1 /SOUTH DIXIE HIGHWAY TO S OUTH OF NW 62ND STREET PM: WANG, BAOYING City: MIAMI Work Mix: Pd&E/Emo Study Extra Description: PD&E STUDY SWAT PROJECT MPO PRIORITY ID# 25/FY 21 MPO PRIORITY PROJECTS LISTING MPO RESOLUTION #17-14/LRTP PRIORITY #2 REFER TO 432639-6 FOR LIMIT SPLIT Cont. Class: Misc - No Letting Phase Fund Code FY 2022 FY 2024 5 Year Total PDE ACFP $6,700,000 $6,700,000 P.E. ACFP $10,340,000 $10,340,000 Total For Project 414964.7 $6,700,000 $10,340,000 $17,040,000 October. 10 2019 Page 2 of 151 HIGHWAY SYSTEM: 01 INTRASTATE INTERSTATE 414964.8 SR 9A/I-95 FROM SOUT H OF NW 62ND STREET TO NO RTH OF NW 151 STREET PM: WANG, BAOYING City: MIAMI - NORTH MIAMI Work Mix: Pd&E/Emo Study Extra Description: PD&E STUDY MPO PRIORITY ID# 25/FY 21 MPO PRIORITY PROJECTS LISTING MPO RESOLUTION #17-14/LRTP PRIORITY #2 REFER TO 432639- 6 FOR LIMIT SPLIT Cont. Class: Misc - No Letting Phase Fund Code FY 2022 FY 2024 5 Year Total PDE ACFP $3,700,000 $3,700,000 P.E. ACFP $5,720,000 $5,720,000 Total For Project 414964.8 $3,700,000 $5,720,000 $9,420,000 415456.7 SR 9A/I-95 EXPRESS L ANES ITS OPERATIONS CONSU LTANT CONTRACT PM: MOTTA, ALEJANDRO City: MIAMI - NORTH MIAMI Work Mix: Technical Assistance Extra Description: Cont. Class: Misc - No Letting Phase Fund Code FY 2021 5 Year Total Capital Improvement/Operating TOBD $3,528,565 $3,528,565 Total For Project 415456.7 $3,528,565 $3,528,565 415456.9 SR 9A/I-95 EXPRESS F HP ENHANCED ENFORCEMENT PM: RODRIGUEZ, JAVIER Work Mix: Other Its Extra Description: Cont. Class: Misc - No Letting Phase Fund Code FY 2021 FY 2022 FY 2023 5 Year Total Capital Improvement/Operating TOBD $625,000 $380,000 $370,000 $1,375,000 Total For Project 415456.9 $625,000 $380,000 $370,000 $1,375,000 423126.2 SR 9A/I-95 SOUTHBOUN D RAMP TO WESTBOUND SR 83 6 PM: PERDOMO, MARIA City: MIAMI Work Mix: Interchange Improvement Extra Description: CNT# E6J53; P3 & LET W/251688-1, 423126-1 & 423126-2 FHWA OVERSIGHT (PODI). Cont. Class: Design Build Phase Fund Code FY 2021 5 Year Total CEI STED $2,220,004 $2,220,004 Total For Project 423126.2 $2,220,004 $2,220,004 October. 10 2019 Page 3 of 151 HIGHWAY SYSTEM: 01 INTRASTATE INTERSTATE 423452.3 SR 9A/I-95 FROM N.W. 155TH STREET TO N.W. 170 TH STREET PM: SCHOT, KEVIN Work Mix: Landscaping Extra Description: THIS REQUEST IS FOR A NEW LANDSCAPE PROJECT WHOSE FUNDING HAS BEEN REQUESTED PREVIOUSLY BUT HAS NOT BEEN AVAILABLE. PROJECT LIMITS INCLUDE A MAJOR INTERCHANGE AT I-95, SR 826, SR-7, AND FL TPK. THIS MAJOR INTERSECTION IS ONE OF THREE IN THE I-95 CORRIDOR Cont. Class: District Let THAT, WHEN COMPLETED, WILL FINISH ALL SIGNIFICANT LANDSCAPING ON I-95. G/W 428358-1;251684-6 Phase Fund Code FY 2023 5 Year Total P.E. DDR $500,000 $500,000 DIH $30,000 $30,000 Total For Project 423452.3 $530,000 $530,000 428358.5 SR 9A/I-95 FROM N. O F BISCAYNE CANAL TO SR 86 0/MIAMI GARDEN DR PM: GARGANTA, NATALIE Work Mix: Widen/Resurface Exist Lanes Extra Description: I-95 WIDENING TO PROVIDE AUXILARY LANES FROM BISCAYNE RIVER CANAL TO MIAMI GARDENS DRIVE MPO PRIORITY ID# 13/FY 21 MPO PRIORITY PROJECTS LISTING PHASE 32-01 = GEOTECH, 32-02 = INHOUSE SUPPORT AECOM ($300K) PHASE 32-03 = DRAINAGE AECOM ($150K) Cont. Class: Tallahassee Let CONTRACT C9J68 FHWA IDENTIFIED AS OVERSIGHT (PODI) 6/15/2018 FY19. Phase Fund Code FY 2021 5 Year Total P.E. DS $220,000 $220,000 Total For Project 428358.5 $220,000 $220,000 429047.1 SR 93/I-75 FROM NW 1 78 STREET TO NW 202 STREE T PM: SCHOT, KEVIN Work Mix: Landscaping Extra Description: STAND ALONE LANDSCAPING CONTRACT#: E6M81 (LEAD) LET W/4290472 NOTE: MEGA MALL INFLUENCE FOLLOW CST OF D6 FM 4326871 & D4 FM 4307637. FM 4217078 (D6 IMPACTS) PER LANDSCAPE GAMING MTG HELD 10/10/16 NOTE: BDI CONTRACT PER LEIGH,APPR. BY ANGELA MATIYOW Cont. Class: District Let 1-11-18 Phase Fund Code FY 2021 5 Year Total Construction DDR $1,115,380 $1,115,380 CEI DDR $136,126 $136,126 DIH $44,118 $44,118 DS $108,062 $108,062 Total For Project 429047.1 $1,403,686 $1,403,686 October. 10 2019 Page 4 of 151 HIGHWAY SYSTEM: 01 INTRASTATE INTERSTATE 429047.2 SR 93/I-75 FROM NW 1 62 STREET TO NW 178 STREE T PM: SCHOT, KEVIN Work Mix: Landscaping Extra Description: NOTE: MEGA MALL INFLUENCE FOLLOW CST OF D6 FM 4326871 & D4 FM 4307637. FM 4217078 (D6 IMPACTS) PER LANDSCAPE GAMING MTG HELD 10/10/16 CNT# E6M81 LET W/4290471 (LEAD) Cont.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    204 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us