Paul Foley Director & Manager Geotechnical and Pavements

Paul Foley Director & Manager Geotechnical and Pavements

PAUL FOLEY DIRECTOR & MANAGER GEOTECHNICAL AND PAVEMENTS SPECIAL FIELDS OF COMPETENCE • PAVEMENT INVESTIGATION AND DESIGN • GEOTECHNICAL INVESTIGATION AND DESIGN • ROAD AND DRAINAGE DESIGN • CONTRACT ADMINISTRATION KEY SKILLS AND EXPERIENCE Paul has more than 40 years of professional engineering experience. His initial experience was gained in a 20-year career with Main Roads Western Australia. During that period projects were undertaken relating to road construction and design, geotechnical and pavement investigation and design (for new and existing works), pavement management and contract development (long term outcome based contracts). The projects were undertaken in regional Western Australia and the Perth Metropolitan area. Since 2000 Paul has continued to work in road related fields as well as on broader geotechnical and other projects. He has provided pavement, surfacings and geotechnical tender design and design verification services for some major metropolitan and rural Main Roads projects. He has managed contracts for the construction of large compensation basins and a wood chip mill, project managed water supply projects, and undertaken geotechnical investigations and designs for buildings, a small power station, dams, pipelines, roads, bridges and tanks, and undertaken various pavement and bituminous seal investigation and design projects. He has undertaken the investigation and design of water storage dams and provided technical review of waste facilities design and of embankment stability at tailings facilities. He has undertaken tender pavement designs, and investigation and pavement designs for several regional airports. QUALIFICATIONS • Bachelor of Engineering, University of Western Australia, 1980 • Master of Engineering Studies, University of Western Australia, 1995 • Graduate Certificate of Management (Technology Management), Deakin University, 1998 PROFESSIONAL AFFILIATIONS • MIEAust, CPEng, National Engineering Register • Member, Australian Geomechanics Society SELECTED EXPERIENCE PAVEMENT INVESTIGATION AND DESIGN Armadale Road North Lake Road – Tender pavement design for granular and full depth asphalt pavements. Brockman 1 Haul Road – Review of seal performance. Page 1 of 6 Nicholson Road Grade Separation – Tender pavement design for granular pavement. Tonkin Highway Grade Separation Project (Railway Parade to Tonkin Highway) – Tender design for granular and full depth asphalt pavements for 5km dual carriageway and associated bridge ramps and road connections. Albany Rotary Review – Review of pavement performance. Reid Highway Duplication (Carine Section) and Reid/Malaga Interchange – Tender design for granular and full depth asphalt pavements. Wheatstone Construction Village – Review of seal performance. Great Eastern Highway, Bullabulling to Coolgardie – Geotechnical and pavement design for 36km of national highway. Vasse Newtown Village Centre – Design for granular, brick paved and concrete pavements. Linfox Facility, Bullsbrook – Design of heavy duty block pavement and granular pavement for container handling and storage facility. Kewdale Freight Terminal – Investigation and design of heavy duty pavement. Rocky Gully Reseal Bitumen Catchment – Design and specification of 4.5ha Water Corporation facility. Perth Arena Bus Bridge – Pavement Design. Great Northern Highway, Muchea to Wubin – Pavement, materials and seal design for 90km project. Gnangara Road, Hartman Drive to Alexander Drive – Pavement investigation and design for overlay and widening. Mowen Road, Sues Road to Vasse Highway – Pavement design. Great Eastern Highway, Tammin to Walgoolan Section – Geotechnical, pavement and materials design for 60km project in an Alliance with Main Roads Western Australia and BG&E. Worsley Alumina Pty Ltd – Inspection of sealed road network and preparation of a five-year maintenance strategy. Wesfarmers Coal – Review of heavy-duty haul road pavements. Main Roads Term Network Contracts – Various advice relating to pavement matters, typically related to pavement and seal design, and methods for predicting pavement performance. Rural Roads (various) – Investigation and design services for new and existing pavements. Provided expert witness services for a project in the Mid West. Highways and Freeways in Perth Metropolitan area (various) – Design of new pavements and design of pavement rehabilitation. EXPERT ADVICE Alcoa Huntly Mine – Expert advice on haul road matters. Coolalinga, NT – Expert advice on the performance of a car park and associated works. Coalfields Highway 16 to 24 SLK- Expert advice on pavement contractual matter. Kalbarri National Park – expert advice on pavements matters. AIRFIELD PROJECTS Odysseus Mine Leinster (Bellevue) – Investigation and design of airstrip pavement. Norseman Aerodrome – Design of airstrip pavement Wiluna Airport – Determination of Pavement Classification Number. Leonora Airport – Taxiway and apron pavement design. Busselton-Margaret River Airport – Tender design of runway widening and extension to accommodate B737 aircraft. Karratha Heliport – Pavement design. Busselton-Margaret River Airport Apron Extension – Investigation and tender pavement design. Cosmos Airport, Leinster – Review of airfield seal performance. Page 2 of 6 PAVEMENT AND GEOTECHNICAL DESIGN VERIFICATION AND CERTIFICATION Joondalup Drive/Wanneroo Road interchange – Verification of granular and full depth asphalt pavement designs. Marble Bar Road, Coongan Gorge Section – Verification of granular pavements design. Tonkin Great Separation (North Link Stage 1) – Certification of full depth asphalt and granular pavements. North Link Stage 2 - Certification of full depth asphalt and granular pavements. North Link Stage 3 - Certification of granular pavements. New Lord Street - Certification of granular pavements. Great Northern Highway Kimberley (Maggies Jump-Up Section) – verification of granular pavement design. Nicholson Road Grade Separation – Verification of granular pavements and bridge foundations. Great Eastern Highway Passing Lanes, Southern Cross to Kalgoorlie – Granular pavements, surfacing and geotechnical design. Russell Road Upgrade – Full depth asphalt and granular pavements. Pad foot foundation and MSE walls. Kwinana Freeway, Armadale Road to Russell Road – Full depth asphalt pavement design. Mitchell Freeway, Graham Farmer Freeway to Hutton Street – Full depth asphalt pavement design. Kwinana Freeway, Leach Highway to Roe Highway – Full depth asphalt pavements design. Esperance Port Access Corridor – The geotechnical scope included shallow and deep bridge foundations, a railway tunnel and MSE walls. The pavement types included granular with thin asphalt surfacings and full depth asphalt. Also undertook temporary works design. Bunbury Port Access Project – Pavements and bituminous surfacing design. The pavements were granular with a sprayed seal, and full depth asphalt. Also undertook some temporary works design. Dampier Highway Duplication – Geotechnical, pavements and bituminous surfacing verification. The geotechnical scope included bridge footings/piles, and earthworks in general and across a causeway. Great Eastern Highway / Roe Highway Interchange – Geotechnical, pavements and bituminous surfacing verification. he geotechnical scope included bridge footings/piles, noise and retaining wall footings, earthworks and drainage. The pavements were full depth asphalt. Reid Highway / Alexander Drive Interchange – Geotechnical, pavements and bituminous surfacing verification. Inc lud ed bridge footings, MSE walls, noise and retaining wall footings, earthworks and drainage. The pavements included full depth asphalt and composite pavements. Reid Highway / Mirrabooka Avenue Interchange – Geotechnical, pavements and bituminous surfacing verification. The geotechnical scope included bridge footings, earthworks and drainage. The pavement was full depth asphalt. Geraldton Southern Transport Corridor Stage 2 – Pavements and bituminous surfacing design verification. The pavements included full depth asphalt, granular and composite pavements. Great Northern Highway Kimberley (Elvire Creek to Sandy Creek section, Fletchers Creek bridge, Big Mabel Creek bridge, Telegraph Creek bridge and the Bow River realignment section) - Pavement and bituminous surfacing design verification, including fill and pavement materials. GEOTECHNICAL INVESTIGATION AND DESIGN Nicholson Grade Separation – Tender design for bored pile bridge foundations. Charles Street Bus Bridge and Bus Way – Tender design for bridge foundations (options included driven and bored piles), and ground improvement. Tonkin Highway Grade Separation Project (Railway Parade to Tonkin Highway) – Tender design for bridge foundations. Pilbara Rail Network, Deepdale line – Design of temporary works for excavations, pile driving and heavy crane lifting. Bussell Highway Capel to Hutton Road Duplication – Geotechnical investigation. Page 3 of 6 Margaret River Bypass – Geotechnical advice for sections of rock cutting, including interpretation of seismic data. Bunbury Port Access Road and Bunbury Outer Ring Road – Preliminary geotechnical investigation for roads and bridges. Power pole relocation investigation. Design of temporary works for pile driving and heavy crane lifting. Coalfields Highway 0-9SLK – Design and documentation of geogrid reinforced embankments incorporating (variously) geotextile/geogrid facing and steel mesh/aggregate facing. Hester to Boyup Brook Water Main Upgrade – Geotechnical investigation of proposed pipeline route (9km). Harvey

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us