C43 West Basin Storage Reservoir Bid Package 4 Civil Works

C43 West Basin Storage Reservoir Bid Package 4 Civil Works

DRAFT C43 West Basin Storage Reservoir Bid Package 4 Civil Works Alan Shirkey, P.E. Engineering & Construction Bureau Chief South Florida Water Management District Governing Board February 14, 2019 DRAFT Location 2 DRAFT C43 Reservoir Major Features S473 S483 S474 S480 S471 S482 Canals Dam Pumps S470 S472 S475 S481A S479 S479-PS S481B Reservoir S481C Structures Perimeter Canal S476 S478 Structures S477 3 DRAFT Package 1 – Preload & Demolition S-473 Preload Mound Looking West S-471 S-474 S-473 S-470 Embankment S-472 S-475 Constructed earthen Preload Mounds at 7 locations. ~285,000 CY each (2M CY Total) Demolition of all agricultural facilities including small irrigation pump stations $11 M NTP – Nov 2015 COMPLETED - June 2018 4 DRAFT Package 2 – Irrigation PS S-476 LPDD Header Canal LPDD PS#1 PS#2 S-476 Looking East (3) 65 CFS Vertical Electric Pumps (195 CFS Total) S-476 Replaces the need for Header Canal to provide Perimeter Canal irrigation water to the east. $13M NTP - June 2016 Final Completion – April 2019 ~ 94% Complete 5 DRAFT Package 3 – Inflow Pump Station S-470 S-470 S-470 Looking Southeast (4) 375 CFS Vertical Electric Pumps (1,500 CFS Total) 300’ Microwave Tower & Control Bldg SR-80 Bridge Armoring Townsend Canal Improvements $58.5 M NTP – March 2018 Final Completion – May 2022 ~11% Complete 6 Site Preparation Package 1 DRAFT Tree Clearing Progress 10,000 acres $3.7M NTP – November 2017 Final Completion – June 2019 ~99% complete 7 Site Preparation Package 2 DRAFT Access Roads Construction of approximately 16 Miles of Shell Rock Rd. Installation of approximately 2,500 LF of culverts Design and installation of road crossing over the Roberts/Banana Branch Canal Removal of existing culverts and temporary canal plugs $3.0 M NTP – April 2018 Final Completion – March 2019 ~99% complete 8 DRAFT Package 4 – Civil Works . 2-Cell Reservoir • 10,500 Acres • 170,000 ac-ft of storage • Depth ranging from 15’ – 25’ . 19 Miles of Dam Embankment . 15 Miles of Perimeter Canal . 14 Major Water Control Structures . Recreation Features . Townsend Canal Improvements . Local & Site Access Bridges 9 DRAFT Solicitation Summary Solicitation Part 1 Advertised: June 25, 2018 Prequalification Shortlist Approved: October 11, 2018 Solicitation Part 2 Issued: November 16, 2018 Bid Opening: January 30, 2019 Number of Bids Received: 4 Bid Range: $523,871,000 – $879,900,657 Engineer’s Estimate: $660,262,174 10 DRAFT Bid Summary C-43 Water Management Builders JV $523,871,000 P&J Morgan JV $691,559,143 RJB Constructors JV $820,519,000 Barnard Construction Company, Inc. $879,900,657 11 DRAFT C43 Water Management Builders JV Lane Construction Corporation - Salini Impregilompregilo, S.p.A. (Italy) Project Location Period Value Mazar Hydroelectric Power Project Ecuador 2005 - 2010 $ 285,805,700 Angostura Hydroelectric Chile 2010 - 2014 $ 304,515,838 Gilgel Give III Hydroelectric Power Ethiopia 2006 - 2016 $ 1,507,328,877 Project Gurara Water Transfer Nigeria 2001 - 2016 $ 580,962,920 Grand Ethiopian Renaissance Dam Ethopia 2005 - 2010 $ 4,508,928,539 Panama Canal – 3rd Set of Locks Panama 2009 - 2016 $ 1,413,504,000 Total $ 8,601,045,874 12 DRAFT Resolution A Resolution of the Governing Board of the South Florida Water Management District to enter into a contract with C-43 Water Management Builders Joint Venture for the C-43 West Basin Storage Reservoir Bid Package 4 Civil Works in the amount of $523,871,000 of which non-ad valorem funds (Save Our Everglades Trust Fund and Land Acquisition Trust Fund) and ad valorem funds are budgeted in the Fiscal Year 2018- 2019 budget and the remainder is subject to Governing Board approval of future year budgets; providing an effective date. (Contract No. 4600003973) 13 DRAFT Questions?.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us