Camden UDP Deposit Draft 2003 – Section 12 - Transport Proposals Section 12 - Transport Proposals TP1 - Schedule of Transport Proposals The Council will not grant planning permission for development that would compromise the implementation of transport schemes included in the Schedule of Transport Proposals. 12.1 The Schedule of Transport Proposals below sets out the major transport schemes likely to affect land use in the Borough during the plan period. It includes schemes promoted by the Strategic Rail Authority, Network Rail and Transport for London (TfL). It does not contain traffic management schemes, which are put forward to TfL each year through the Borough [Transport] Spending Plan. 12.2 Many of the schemes involve underground works and, in these cases, consultation with Strategic Rail Authority and Transport for London is needed before foundations or piles can be permitted. Most schemes also require the use of land at ground level for access, facilities and parts of the network. The land needed for both surface and underground schemes is safeguarded to ensure they are not compromised. 151 152 Schedule of Transport Proposals Camden UDPDepositDraft 2003– * indicates schemes which are shown on the Proposals Map. Scheme Location/ Scheme outline Promoter Comments number description TP1* Channel Tunnel New high-speed link from London and Continental The route has been safeguarded since February 1994 and Rail Link Channel Tunnel to St. Railways/Union Railways Parliamentary approval, including line of new highways, was Pancras Station (North) Ltd. given by the Channel Tunnel Rail Link Act 1996. The works Re-alignment of Pancras began in 2001. Road, Goods Way and York Way and widening of Euston Road. Proposals Section 12-Transport TP2* Crossrail Line 1 Construction of a new Cross London Rail Links Safeguarding orders are in place. The Greater London east-west rail link (Crossrail)/Greater London Authority, Transport for London and the Strategic Rail through London, running Authority/Transport for Authority have decided to take this scheme forward, and underground from Liverpool London/Strategic Rail are aiming to proceed by placing a Hybrid Bill before Street to Paddington. Authority. Parliament in 2003 or 2004. TP3* Crossrail Line 2 Construction of a new Cross London Rail Links Safeguarding orders are in place for a Chelsea-Hackney line, south-west to north-east (Crossrail)/Greater London now known as Crossrail 2, but there is no date for lodging of rail link through London, Authority/Transport for the Transport and Works Act Draft Order or placing a Hybrid running underground from London/Strategic Rail Bill before parliament. The Greater London Authority, Victoria to King's Cross. Authority. Transport for London and the Strategic Rail Authority will decide whether and when to take this scheme forward. TP4* King’s Cross Construction of new London Underground Ltd Construction of the Western Ticket Hall for the Metropolitan Underground interchange between Line, enlargement of the existing ticket hall/concourse and Station Metropolitan & Circle Lines link between the two began in 2001. The Northern Ticket and deep level underground Hall will be constructed as part of the Channel Tunnel Rail lines, and expanded and Link works at St. Pancras. new ticket halls/subways. Camden UDPDepositDraft 2003– Scheme Location/ Scheme outline Promoter Comments number description TP5* Thameslink 2000 Increase in capacity to Strategic Rail Authority New station at Midland Road was approved by the Channel (serving King's enable Thameslink trains to Tunnel Rail Link Act 1996. The Thameslink Transport and Cross, West connect with service from Works Draft Order 2000 has not been approved by the Hampstead and new Midland Road Station. ODPM and, therefore, completion will be delayed to Kentish Town) 2011 or later. TP6 Cross River Tram A surface tram scheme Greater London Authority/ The Cross River Tram is a scheme contained within the Mayor running to/from Camden Transport for London of London’s Transport Strategy and the draft London Plan. Town/King’s Cross/Waterloo/ The Mayor announced his intention to pursue implementation Brixton/Peckham. of the scheme in 2002. The scheme would have a significant impact on transport in Camden. Map 5 indicates the indicative route of Cross River Tram. Proposals Section 12-Transport TP7 Re-opening Indicative proposals to work London Borough of These are indicative proposals only. Camden Council would and construction with partners to improve Camden and partners like to develop these ideas further with the relevant rail of new ‘overground’ railway lines organisations. ‘overground’ running through Camden. railway stations at: The station proposals would complement the Orbirail scheme > Primrose Hill; that is part of the Mayor of London’s Transport Strategy and > Maiden Lane; is promoted by the Greater London Authority, Transport > new station for London and the Strategic Rail Authority. Orbirail is a stop on the continuation of the East London Line Extension through Chiltern Line Camden and beyond to create an orbital rail route around at West inner London with ‘metro-type’ service frequencies. Hampstead Station. 153 154 Camden UDPDepositDraft 2003– Scheme Location/ Scheme outline Promoter Comments number description TP8 Improvements to Indicative proposals to work London Borough of These are indicative proposals only. Camden Council would ‘overground’ with partners to improve Camden and partners like to develop these ideas further with the relevant rail railway lines London Underground organisations. running through stations in Camden. Camden Proposals include the Orbirail scheme that is part of the including: Mayor of London’s Transport Strategy and is promoted by > North London the Greater London Authority, Transport for London and the Line; Strategic Rail Authority. Orbirail is a continuation of the East > Gospel Oak- London Line Extension through Camden and beyond to Barking Line; create an orbital rail route around inner London with and ‘metro-type’ service frequencies. > other lines. Proposals Section 12-Transport TP9 Improvements to Indicative proposals to work London Borough of These are indicative proposals only. Camden Council would existing London with partners to improve Camden and partners like to develop these ideas further with the Greater London Underground London Underground Authority, Transport for London and London Underground stations in stations in Camden. Ltd. Station enhancements should improve access for Camden. people with disabilities. TP10 Road Hierarchy The Road Hierarchy has three London Borough of Local Roads are subdivided into Borough Distributors and main tiers: a) Transport for Camden and partners Access Roads. London Road Network, b) London Distributor Roads and c) Local Roads. TP11 London Bus Various measures including London Borough of Details of proposals and the bus priority network are given in Priority Network bus lanes and priority for Camden and partners the Local Implementation Plan and Borough [Transport] buses at signals. Spending Plan. TP12 London Cycle Provision of cycle routes and London Borough of Implementation to be combined with other traffic Network Plus related facilities. Camden and partners management measures in appropriate locations. Camden UDPDepositDraft 2003– Scheme Location/ Scheme outline Promoter Comments number description TP13 Controlled To regulate parking in London Borough of Programme of selected controls throughout the Borough Parking Zones congested areas, restricting Camden based on need, and subject to consultation. commuter parking and giving priority to residents. TP14 Central London A levy based scheme aimed Greater London Authority/ The funds raised from the Central London Congestion Area Congestion at reducing road traffic levels Transport for London scheme will be used to improve London’s public transport Charging Area by up to 15% within the system. The area south of Euston Road within Camden falls scheme Central London Congestion within the Central London Congestion Charging Area. Charging Area. Section 12 - Transport Proposals Section 12-Transport 155.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-