Vlbbra ~Rabesb 3Oab Sector Project

Vlbbra ~Rabesb 3Oab Sector Project

Public Disclosure Authorized ~vlbbra~rabesb 3oab Sector Project Public Disclosure Authorized Pvepmatovg services fov Lo~gTern Pevfovwa~ce Baseb ~ai~te~a~ceCo~tvactSgstew Public Disclosure Authorized Public Disclosure Authorized " 4% "MEC Preparatory Services for LTPBMC ~n AP Table of Contents Page No. SECTION-1 INTREODUCTION 1.0 Project Background 1.1 Project Description 1.2 Objective of the LTPMBC SECTION3 APPLICABLE POLICY AND LEGAL REQUIREMENTS 2.0 Applicable Policy and Legal Requirements 2.1 Relevant National Policies and Plans 2.2 Legal Framework 2.3 Applicable Statutory Requirements 2.3.1 Environment Related Statutory Requirements 2.3.2 Forests Related Statutory Requirements 7 2.3.3 Coastal Regulation Zone (CRZ) Requirements 2.4 World Bank Safeguard Policies SECTION3 ENVIRONMENTAL & SOCIAL SCREENING AND SCOPING 3.0 Process adopted in preparation of Environmental & Social Management Framework (ESMF) 11 3.1 Identification of Valued Environmental Component (VEC) 13 3.2 Screening of Potential Environmental Impacts of Sub Projects 14 3.2.1 Screening Criteria 14 3.2.2 Screening of Subprojects as per Regulatory Requirements 14 3.2.3 Screening of Subprojects based on Impacts on VECs 14 SECTION -4 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.0 Environmental Impacts 4.1 Social Impacts 4.1.1 Pre construction Activities 23 4.1.2 Construction Activities 2 3 4.1.3 Post Maintenance Construction Activities 24 4.2 Mitigation Measmes 24 4.2.1 Exclusion Criteria 24 4.2.2 Environmental Management Action Plan (EMAP) 25 4.2.3 Social Management Framework Implementation Action Plan 26 Environmental and Social Management Framework (ESMF) I 41, SMEC Preparatory Services for LTPBMC in AP SECTION-5 INSTITUTIONAL REQUIREMENTS AND MONITORING 5.0 Institutional Requirements and Monitoring 36 5.1 Institutional Requirements 36 5.2 Public / Stakeholders Consultations 39 5.3 Environmental Monitoring Program 39 SECTION-6 IMPLEMENTATION ARRANGEMENT AND ENVIRONMENTAL BUDGET 6.0 Integration of EMP with Bidding Document 40 6.1 Environmental Budget 40 List of Tables Page No. Table 1: Road Network under RBD Maintenance Table 2.1 : Relevant National Policies and Plans Table 2.2: Summary of Applicable Regulations Table 2.3: Applicability of Safeguard Policies Table 3.1 : Specimen Screening of Environmental Impacts of Mydukuru-Nellore- Bellary-Bombay road from km 101.300 to km 153.000 Table 3.2: Screening of Environmental Impacts of project roads, Phase-1 under LTPBMC Table 4.1 : Maintenance Works and Environmental Impacts Table 4.2: Exclusion Criteria of the project road under LTPBMC Table 4.3: Environmental Management Action Plan (EMAP) of Phase-1 under LPTBMC Table 4.4: Social Management Framework Implementation Plan Table 5.1 : Roles and Responsibilities of PIU Personnel on EMP Implementation List of Appendixes Appendix 1: List of roads under Phase-1 of LTPBMC 4 1 Appendix 2: Project Road Map 48 Appendix 3: Applicable Statutory requirements during maintenance works 50 Appendix 4: Go11 GoAP Notification on Forestry Clearance for Road Maintenance works 52 Appendix 5: Project Road passing through Ecological Sensitive Area and Applicable Statutory requirements before commencement of maintenance works 67 Appendix 6: Environmental features of the project road under LTPBMC (Physical environment) Appendix 7: Ecological environment along the project road under LTPBMC 84 Environmental and Social Management Framework (ESMF) 1 i J9t6* ,,,,I, ,,,,I, SMEC Preparatory Services for LTPBMC in AP Appendix 8: Campsite Management 89 Appendix 9: Plant Management 99 Appendix 10: Quarry Area Management Appendix 1 1: Debris Disposal Appendix 12: Details of Training Program Appendix 13: Summary of Intuitional Consultation undertaken of LTPBMC 115 Appendix 14: Contractor's checklist on environmental and social issues 119 Appendix 15a: ESMF compliance checklist during Pre-Construction stages of LTPBMC implementation Appendix 15b: ESMF compliance checklist during Construction stages of LTPBMC implementation Appendix 15c: ESMF compliance checklist during Post- Construction stages of LTPBMC implementation Appendix 16: List of licensed quarryies for the project roads under LTPBMC 128 Appendix 17: List of Encroachments within Existing Road Formation under LTPBMC 141 Appendix 17a: Summary of List of Encroachments within Existing Road Formation 164 Appendix 18: Social Survey Questionnaire (To be filled up by PIU) 168 Appendix 19: Proposed Modifications in Andhra Pradesh R&R Poplicy for road sector projects 173 Environmental and Social Management Framework (ESMF) Preparatory Servlces for LTPBMC In AP ~ibSII'IEC Abbreviations I AP I Andhra Pradesh APSPCB Andhra Pradesh State Pollution Control Board APERP Andhra Pradesh Economic Restructuring Project CRN Core Road Network CRZ Coastal Regulatory Zone DFO Divisional Forest Officer DG EA Environmental Assessment EI A Environment Impact Assessment EMAP Environment Management Action Plan ) ESMF Environment and Social Management Framework 1 ESO Environmental and Safety Officer , GO1 1 Government of India HMP Hot Mix plant HTL High Tide Line LTL Low Tide Line LTPBMC Long Term Performance Based Maintenance Contract MoEF Ministry of Environment and Forest MOU Memorandum Of Understanding NP National Park OM Ordinary Maintenance OP -Operational policy PAF PAP Project Affected Person PIU Project Implementation Unit PMU Project Monitoring Unit R&R Resettlement and Rehabilitation RBD Roads and Building Department RDC Road Development Corporation RF Reserve Forest ROW Right Of Way SMAP Social Management Action Plan SMF Social Management Framework I TOR Terms of Reference VEC Valued Environmental Component 2 Environmental and Social Management Framework (ESMF) "2 Lib-SM E C Preparatory Services for LTPBMC ~nAP SECTION-1 : INTRODUCTION 1.0 Project Background The Roads and Building Department (RBD) has the mandate of maintaining a road network as mentioned in Table 1. Table 1: Road Network under RBD Maintenance , -- -- 1 ~atizal~i~hwa~s 4104 2 State Highways 820 1 1 3 Major District Roads 34605 4 Rural Roads (under R&B) 18988 Total length of roads (km) I 65898 The Roads and Buildings Department has identified 10260 km of road network as "core network". Out of which 1400 km were improved under Capital improvement in Andhra Pradesh State Highway Project. The other set of around 17 18 krn was improved under Andhra Pradesh Economic Restructuring Project (APERP) and 1772 km under maintenance component under heavy periodic maintenance. The Roads and Buildings Department have initiated innovative methods of asset management by taking up the Performance Based Maintenance Contract on a Pilot basis in the year 2000 in four Districts of Andhra Pradesh (AP) under loan assistance from The World Bank with MIS VIC Roads, Australia. This project was called the Andhra Pradesh Pilot Road Maintenance Project (APPRMP). Based on the outcome from the performance based contract system through the pilot basis, it is decided to extend these types of contracts in all the districts of AP covering part of the road network maintained by RBD. Accordingly, the RBDIRDC intends to maintain the recently developed roads under APSHP, APERP & other projects like CRF under Long Term Performance Based Maintenance Contract (LTPBMC) system as a part of AP Road Sector Project (APRSP) with assistance from the World Bank. Accordingly, the RBDIRDC has taken up the identification of roads in each district and a total length of roads identified is about 6266.15 km under this LTPBMC project. SMEC International Pty. Ltd., in association with SMEC (India) Pvt. Ltd. and Vic Roads International, Australia, have been engaged by the Andhra Pradesh Road Development Corporation (APRDC)/Roads and Buildings Department (RBD) on behalf of the Government of Andhra Pradesh for providing "Consultancy Services for Preparatory Services for Long Term Performance Based Maintenance Contract System" for about 6000 krn road network. The scope of services of this consultancy also includes undertaking preliminary environmental screening of subprojects and preparation of an Environmental and Social Management Framework (ESMF) to be adopted during project implementation based on the World Bank's Safeguard Policies, the country and state requirements. Environmental and Social Management Framework (ESMF) 1 Preparatory Serv~cesfor LTPBMC In AP 4% SMEC ppp 1.1 Project Description The project is designed to be implemented in 3 Phases. Preparatory work for Phase 1 is currently being undertaken. Project preparation for Phases 2 and 3 will occur in 2008. Each phase will have a 5 years maintenance period. The total length of the project road under Phase-1 of Long Term Performance Based Maintenance Contract (LTPBMC) is about 2051 km. The project roads are classified under three regions of the state, namely, Coastal, Rayalaseema and Telengana regions in Andhra Pradesh. Out of 205 1 km roads under Phase-1, 673 km, 535 km and 843 km fall under Coastal, Rayalaseema and Telengana region respectively. The identified roads under Phase-1 are given in Appendix -1. The location map of Phase Roads is shown in Appendix-2. The Project involves maintenance of Core Road Network for a minimum period of 5 years, essentially having 3 core maintenance activities as described below: 1. Routine or Ordinary Maintenance (OM) - where defects are minor and can be treated under OM activities. 2. Periodic Maintenance - where the surface only has sufficient defects to warrant resurfacing, either in the initial provisional works or as scheduled over the life of the

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    182 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us