Application for a Permit to Operate a Class V Landfill Promontory Point Landfill

Application for a Permit to Operate a Class V Landfill Promontory Point Landfill

APPLICATION FOR A PERMIT TO OPERATE A CLASS V LANDFILL PROMONTORY POINT LANDFILL TABLE OF CONTENTS SECTION PAGE I. Facility General Information ............................................................................................ 1 I.a Information Required for All Class I and V Landfills ........................................................ 1 I.a.1 Completed Part I General Information Form ..................................................................... 1 I.a.2 General description of the facility (Utah Administrative Code (UAC) R315-310-3(1)(b)) 1 I.a.3 Legal description of property (R315-310-3(1)(c)) ............................................................. 2 I.a.4 Proof of ownership, lease agreement, or other mechanism (R315-310-3(1)(c)) ........... 8 I.a.5 Area served by the facility (R315-310-3(1)(d)) .................................................................. 8 I.a.6 If the permit application is for a Class I landfill a demonstration that the landfill is not a commercial facility ........................................................................................................... 8 I.a.7 Waste type and anticipated daily volume (R315-310-3(1)(d)) ......................................... 8 I.b Information Required for All New or Laterally Expanding Class I and V Landfills ........... 8 I.b.1 Intended schedule of construction (R315-302-2(2)(a)) ................................................... 9 Construction of the Class I PPL Phase IA was completed in 2017, and the final CQA reports were submitted in 2018. .................................................................................................... 9 I.b.2 Name and address of all property owners within 1000 feet of the facility boundary (R315-310-3(2)(a)(i)) .......................................................................................................... 9 I.b.3 Documentation that a notice of intent to apply for a permit was sent to all property owners listed above (R315-310-3(2)(ii)) ........................................................................... 9 I.b.4 Name of the local government with jurisdiction over the facility site (R315-310- 3(2)(iii)) ................................................................................................................................. 9 I.c Location Standards for All New or Laterally Expanding Class I and V Landfills (R315- 302-1) ......................................................................................................................... 9 I.c.1 Documentation that PPL has met the historical survey requirement of R315- 302- 1(2)(f) ................................................................................................................................ 10 I.c.2 Land use compatibility (R315-302-1(2)(a)) .................................................................... 10 I.c.3 Maps showing the existing land use, topography, residences, parks, monuments, recreation areas, or wilderness areas within 1000 feet of the site boundary ............. 11 I.c.4 Certifications that no ecologically or scientifically significant areas or endangered species are present in the site area ................................................................................ 11 I.c.5 List of airports within five miles of facility and distance to each .................................. 11 I.c.6 Geology (R315-302-1(2)(b)) ............................................................................................ 11 Application for a Permit to Operate a Class V Landfill Page i Promontory Point Landfill October 30, 2020 I.c.6.i Geologic maps showing significant geologic features, faults, and unstable areas 16 I.c.6.ii Maps showing site soils ........................................................................................... 16 I.c.7 Surface water (R315-302-1(2)(c))................................................................................... 16 I.c.7.i Magnitude of 24-hour 25 year and 100-year storm events ................................. 17 I.c.7.ii Average annual rainfall ............................................................................................ 17 I.c.7.iii Maximum elevation of flood waters proximate to the facility ............................... 17 I.c.7.iv Maximum elevation of flood water from 100-year flood for waters proximate to the facility 17 I.c.8 Wetlands (R315-302-1(2)(d)) .......................................................................................... 18 I.c.9 Groundwater (R315-302-1(2)(e)) .................................................................................... 18 I.d Plan of Operations Requirements for All Class I and V Landfills (R315-310- 3(1)(e) and R315-302-2(2)) ......................................................................................................... 18 I.d.1 Forms and other information as required in R315-302-2(3) including a description of on-site waste handling procedures and an example of the form that will be used to record the weights or volumes of waste received (R315-302-2(2)(b) and R315-310- 3(1)(f)) ............................................................................................................................... 18 I.d.2 Schedule for conducting inspections and monitoring, and examples of the forms that will be used to record the results of the inspections and monitoring (R315-302- 2(2)(c), R315-302-2(5)(a), and R315-310-3(1)(g)) ....................................................... 19 I.d.3 Contingency plans in the event of a fire or explosion (R315-302-2(2)(d)) ................... 19 I.d.4 Corrective action programs to be initiated if groundwater is contaminated (R315- 302- 2(2)(e)) .............................................................................................................................. 21 I.d.5 Contingency plans for other releases, e.g. explosive gases or failure of run-off collection system (R315-302-2(2)(f)) .............................................................................. 21 I.d.6 Plan to control fugitive dust generated from roads, construction, general operations, and covering the waste (R315-302-2(2)(g)) ................................................................... 22 I.d.7 Plan for litter control and collection (R315-302-2(2)(h)) ............................................... 22 I.d.8 Description of maintenance of installed equipment (R315-302-2(2)(i)) ..................... 23 I.d.9 Procedures for excluding the receipt of prohibited hazardous or PCB containing wastes (R315-302-2(2)(j)) ............................................................................................... 24 I.d.10 Procedures for controlling disease vectors (R315-302-2(2)(k)) ................................... 25 I.d.11 A plan for alternative waste handling (R315-302-2(2)(l)) ............................................. 25 I.d.12 A general training plan for site operations (R315-302-2(2)(o)) .................................... 25 I.d.13 Any recycling programs planned at the facility (R315-303-4(6)) .................................. 26 I.d.14 Closure and post-closure care Plan (R315-302-2(2)(m)) .............................................. 26 I.d.15 Procedures for the handling of special wastes (R315-315) ......................................... 27 I.d.16 Plans and operation procedures to minimize liquids (R315-303-3(1)) ........................ 28 I.d.17 Plans and procedures to address the requirements of R315-303-3(7)(c) through (i) and R315-303-4 ............................................................................................................... 28 Application for a Permit to Operate a Class V Landfill Page ii Promontory Point Landfill October 30, 2020 I.d.18 Any other site-specific information pertaining to the plan of operation required by the Director (R315-302-2(2)(p)) ............................................................................................ 32 I.e Special Requirements for New or Laterally Expanding Class V Landfill (R315-310-3(3)) .................................................................................................................................. 32 1.e.1 Submit information required by the Utah Solid and Hazardous Waste Act Subsections 19-6-108(9) and 19-6-108(10) (R315-310-3(2)(a)) ..................................................... 32 II. Facility Technical Information ....................................................................................... 33 II.a Maps for All Class I and V Landfills ................................................................................ 33 II.a.1 Topographic map drawn to the required scale with contours showing the boundaries of the landfill unit, groundwater monitoring well locations, gas monitoring points, and the borrow and fill areas (R315-310-4(2)(a)(i)).............................................................. 33 II.a.2 Most recent U.S. Geological Survey topographic map, 7-1/2 minute series, showing the waste facility boundary; the property boundary; surface drainage channels; any existing utilities and structures within one-fourth mile of PPL; and the direction of the prevailing winds (R315-310- 4(2)(a)(ii)) ......................................................................... 33 II.b Geohydrological Assessment for All Class I and V Landfills (R315-310-4(2)(b)) ........... 33 II.b.1 Local and regional geology and hydrology including faults, unstable slopes and subsidence areas on site (R315-310-4(2)(b)(i)) ...........................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    80 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us