Northglenn City Council Meeting May 22, 2018 RTD Presentation - Page 1 of 19 N Line • 18.5 miles, 13 under construction • Electrified commuter rail • 8 stations, 6 under construction • Frequency • 20-minute peak • 30-minute off-peak • 27 minutes — Union Station to Eastlake•124th • Single track with multiple passing tracks • Serves Denver, Commerce City, Thornton, Northglenn, Adams County RTD Presentation - Page 2 of 19 N Line - Background • N Line funded from DUS to 124th with completion to Highway 7 as funds become available • RTD awarded Regional Rail Partners (RRP) a contract in December 2013 to design and build • Denver Union Station to Eastlake-124th Station • Substantial completion of construction and integrated testing contractually scheduled for 2018 • Planned opening scheduled in 2018 • RRP provided RTD with a design and construction outline that contains sequencing and other timeline conflicts, resulting in construction impacts to the overall schedule RTD Presentation - Page 3 of 19 N Line - Background • RTD’s role in a design-build project is to provide oversight regarding • Monitoring slippage in construction schedule • Monitor the quality of work and point out any construction issues that need to be corrected (quality control) • Contractually, RTD cannot micromanage RRP and direct how to achieve the agreed-to-milestones • Contractually, RRP is responsible for managing their design and construction schedule and quality of the work RTD Presentation - Page 4 of 19 N Line – Moving forward • In a design-build contract, RTD cannot formally direct RRP on the means and methods of completing the project without exposing itself to change orders (i.e. risk) • RTD is working with RRP to determine a timeframe for project completion • Determining steps to develop new schedule • Providing greater level of guidance to RRP on how to best deliver a new schedule • Continue quality control measures without micromanaging • Holding RRP accountable for their contractual responsibilities RTD Presentation - Page 5 of 19 N Line – Moving forward • Design and construction impacts effecting the overall schedule for N Line are not directly related to the waiver extensions of the University of Colorado A Line and B Line • Operational systems on the University of Colorado A Line (as well as the B and G Lines) will operate the N Line • RTD staff is committed to identifying lessons learned and are implementing them on N Line RTD Presentation - Page 6 of 19 N Line – differences from EAGLE project • Lessons learned • No quad gates • Do not have adjacent freight lines, except in Denver • Do not have as complex roadway geometry and associated traffic signals as EAGLE project RTD Presentation - Page 7 of 19 University of Colo. A Line – Monaco crossing RTD Presentation - Page 8 of 19 University of Colo. A Line – Monaco crossing RTD Presentation - Page 9 of 19 N Line – 112th Avenue Crossing RTD Presentation - Page 10 of 19 N Line – 112th Avenue Crossing RTD Presentation - Page 11 of 19 N Line – Construction Progress Eastlake-124th Station January 2017 May 2017 RTD Presentation - Page 12 of 19 N Line – Construction Progress 120th Ave. Bridge looking south to 112th Ave. March 2017 May 2017 RTD Presentation - Page 13 of 19 N Line – Construction Progress Looking north from Northglenn-112th Station May 2017 RTD Presentation - Page 14 of 19 N Line – Construction Progress Northglenn-112th Station December 2016 March 2017 RTD Presentation - Page 15 of 19 N Line – Construction Progress Northglenn-112th Station: skeleton track and guideway fencing May 2017 RTD Presentation - Page 16 of 19 N Line – Construction Progress Grange Hall RTD Presentation - Page 17 of 19 N Line – Construction Progress 104th Ave. Bridge January 2017 February 2017 March 2017 RTD Presentation - Page 18 of 19 Contact Info • Ballasted track 112th to 124th Avenues • OCS installation between 72nd and 104th Avenue • School Tributary drainage pipe N Line/RTD General Questions: • ContinuedLindsey work Smith:at Grange 303- 299Hall-2895 – [email protected] • 46th Avenue Bridge; 70th Avenue Bridge – girder sets and deck poursConstruction Questions: Kathy Berumen: 720-456-5279 – [email protected] • Girder sets and plinth pour on Skyway Bridge RTD Presentation - Page 19 of 19.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us