Public Information Open House Meeting

Public Information Open House Meeting

PUBLIC INFORMATION OPEN HOUSE MEETING NIOBRARA Niobrara High School - Gymnasium, 247 North Highway 12, Niobrara, NE EAST AND WEST Tuesday, September 18, 2018; 5:00 – 7:00 P.M. HIGHWAY N-12 S-12-5(1011) NIOBRARA EAST & WEST; C.N. 31674 PURPOSE OF PUBLIC MEETING Present a project update and receive public input on the preferred alternative to gauge acceptance prior to Nebraska Department of Transportation (NDOT) preparing and submitting a permit application. Charles Mix County, South Dakota LOCATION AND SCOPE Springfield The0 proposed4,000 8,000 project includes two segments of the existing Nebraska Highway 12 (N-12) roadway east and west of the Village of XW Niobrara, in Knox County, Nebraska. The highway experiences flooding and damage due to high water levels associated with the Feet MissouriXW River. The U.S. Army Corps of Engineers (Corps) and NDOT are proposing to improve N-12 and provide a reliable and stable roadway85 for4 the region. The ultimate configuration will be a two-lane roadway with paved shoulders. Bridges and culverts will be 852 constructed where853 appropriate.85 Right-of-way,1 wetland, and stream impacts are anticipated to occur with the proposed project. 850 eek Cr 37 835 Ponca Preferred Alternative 849 Verdel 848 Bon Homme County, South Dakota 836 847 N 837 846 845 M Medicine iss 838 ou Creek Ri ri ver 839 54D 844 tate Spur 841 840 S PREFERRED ALTERNATIVE 843 842 Preferred Alternative APPROX. WETLAND TOTAL BRIDGE N-14 Connection k e e COST IMPACTS r LENGTH C r Niobrara e l l $160 Million* 68 Acres i 1,600 Feet M y r r a B H a z i le * Present dollars Creek B Santee Sioux Nation Knox County, urge ss re PROJECT UPDATE Nebraska C ek Previously, NDOT had identified a variety of alternatives ranging from constructing a new roadway near or adjacent to the current roadway to optionsLege nfurtherd south closer to or up in the bluffs.N-14 Conn ecThesetion options were presented to the public at separate public meetings in 2015 and in 2016 to gauge public opinion and receive comments to evaluateAlterna thosetives alternativesCarried Fo beyondrward an Roads River Mile Alternative Alignments (Presented at Public Meeting) engineering or environmentalMajo rscreening Roads process.County Bo undary Parallel Alignment Bin Nebraska State Highway 12 gh City Limits Waterway Base of Bluffs Alignment am Niob Knox County, Nebraska Based on several factors including the input receivedra r River from land owners, the PoncaC rTribe, Santee Sioux Nation and the general Study Area Santeea Sioux Nation eek Environmental Impact Statement public and reviewing agencies responsible for permitting the project, it was decided to re-evaluate the project objectives and alternatives being considered. NDOT, working with the Corps, developed a new project purpose and need and re-evaluated the proposed design criteria that resulted in new alternatives being identified. PURPOSE & NEED SUMMARY The purpose of the proposed project is to rehabilitate the existing roadway to maximize utilization, improve the safety and reliability, and bring the roadway up to current NDOT design standards for a major arterial highway between Verdel, Nebraska and Santee Spur (S-54D). The project is needed due to ongoing risk of flooding, unreliable operations, and interruptions to regional connectivity. TYPICAL SECTION OF ALTERNATIVE CONSIDERED The following illustrates the alternatives considered that satisfy the purpose and need for the project. Alternative R-1 was identified as NDOT’s preferred alternative based upon an evaluation of impacts and is being refined in the design process to further minimize impacts and provide for efficiencies where possible. It is anticipated sections of N-12 will be closed during construction with through traffic detoured along existing highways and local traffic maintained using a combination of the existing roadway and other local roads. Access to existing or proposed future driveways may be limited during construction due to construction sequencing. R-1 PREFERRED ALIGNMENT | ALONG EXISTING ALIGNMENT 525-1520 Annual Average Daily Traffic (AADT) 2016 Levels OTHER ALTERNATIVES CONSIDERED R2 | SOUTH OF EXISTING ALIGNMENT R3 | NORTH OF EXISTING ALIGNMENT 12’ 12’ 12’ 12’ TRAVEL LANES TRAVEL LANES CURRENT CONDITIONS CURRENT CONDITIONS 100 YR FLOOD 100 YR FLOOD ELEVATION ELEVATION EXISTING ROADWAY EXISTING GROUND EXISTING GROUND EXISTING ROADWAY RIGHT-OF-WAY This project would require the acquisition of additional property rights, which could include new right-of-way (ROW), control of access (CA), permanent easements (PE), and/or temporary easements (TE). If your property is impacted by this project, you will be contacted by a representative of NDOT’s Right-of-Way Division to discuss the impacts and next steps once the design footprint has been established. HISTORY & NEXT STEPS PROJECT CONTACTS • Alternatives presented to the public at Corps Public Hearing. The DIRECT COMMENTS TO: 2015 Corps application was withdrawn. Sarah Soula, NDOT Public Involvement P.O. Box 94759; 1500 Hwy 2 • Revised alternative presented to the public at NDOT Open House Lincoln, NE 68509-4759 2016 Public Meeting. 402-479-4871 [email protected] • Continued coordinating with Corps, National Parks Service and FOR MORE INFORMATION: 2017 other environmental agencies. Kevin Domogalla, NDOT District 3 Engineer • Public Information Open House Meeting with presentation of 408 N. 13th Street new alignment. Norfolk, NE 68701-3714 2018 • Submit permit application to the Corps and continue project 402-370-3470 design efforts. [email protected] https://dot.nebraska.gov/projects/future-projects Click on the Niobrara East & West link.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us