World Bank Document

World Bank Document

Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review MA-Oum Er Rbia Sanitation (P098459) Report Number : ICRR0021485 1. Project Data Public Disclosure Authorized Project ID Project Name P098459 MA-Oum Er Rbia Sanitation Country Practice Area(Lead) Morocco Water L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD-79250 31-Dec-2015 36,374,818.29 Bank Approval Date Closing Date (Actual) Public Disclosure Authorized 15-Jun-2010 31-May-2018 IBRD/IDA (USD) Grants (USD) Original Commitment 43,000,000.00 0.00 Revised Commitment 43,000,000.00 0.00 Actual 37,511,568.81 0.00 Public Disclosure Authorized Prepared by Reviewed by ICR Review Coordinator Group Cynthia Nunez-Ollero J. W. van Holst Christopher David Nelson IEGSD (Unit 4) Pellekaan 2. Project Objectives and Components a. Objectives According to the Loan Agreement (Schedule 1), the Project Development Objectives (PDOs) were: (i) to increase access to sewerage services and reduce wastewater related pollution in selected small and medium towns in the project provinces; and (ii) to pilot non-conventional technologies for wastewater systems in Public Disclosure Authorized selected locations. The Project Appraisal Document (PAD, page ii) identified the project provinces of Azilal, Benimellal, Khourigba, Safi, Yousoufia, and Settat. Page 1 of 21 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review MA-Oum Er Rbia Sanitation (P098459) Restructuring in 2014 revised the PDOs to (I) increase access to sanitation services; and (ii) reduce wastewater related pollution in selected small and medium towns in the project provinces which divided the first element of the original PDO into two parts. The piloting of non-conventional technologies for wastewater systems in selected locations was dropped to simplify the project and consolidate the infrastructure component following the recommendations of the 2014 Mid Term Review (MTR). At the time of restructuring in June 2014, or four years into the project, only 5% of project funds were disbursed (Restructuring Paper, page 1). This review has assessed the achievement of the two revised objectives and the piloting of non-conventional technologies for wastewater systems until that objective was dropped at restructuring in June 2014. These three objectives were to: (I) Increase access to sanitation services in selected small and medium towns in the project provinces (ii) Reduce wastewater related pollution in selected small and medium towns in the project provinces (iii) Pilot non-conventional technologies for wastewater systems in selected locations IEG concurred that a split evaluation of the project's achievements was necessary because the PDO was changed by reducing the scope of the project (removal of the piloting of non-conventional technologies for waste water systems in selected locations) while other project objectives remained the same. b. Were the project objectives/key associated outcome targets revised during implementation? Yes Did the Board approve the revised objectives/key associated outcome targets? Yes Date of Board Approval 13-Jun-2014 PHEVALUNDERTAKENLBL c. Will a split evaluation be undertaken? Yes d. Components 1. Wastewater Collection and Treatment: (US$64.1 million at appraisal, revised to US$66.8 million at restructuring, and US$63.7 million actual). This component financed the rehabilitation and expansion of existing sewerage systems including collection network and treatment plants, equipment for the maintenance and operations of the systems for 11 selected small and medium towns in the six project provinces in the Oum Er Rbia river basin. The 2014 restructuring added the provision of odor-controlling technologies for these towns. These 11 towns included Afourer, Beni Ayat, Boujinaba, Boulanouare, Chemaia, Demnate, El Brouj, El Ksiba, Hattane, Ouaouizeght, and Youssoufia. These towns were selected based on population, current impact of raw wastewater discharges on human health and the environment, availability of feasibility studies, and provision of potable water by the implementing agency. Page 2 of 21 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review MA-Oum Er Rbia Sanitation (P098459) 2. Piloting Wastewater Technologies and Implementation Support: (US$5.7 million at appraisal, revised to US$4.0 million at restructuring, and US$3.3 million actual). This component financed: (i) strengthening the capacity of the implementing agency through a twinning arrangement to pilot low-cost, non-conventional technologies for wastewater treatment in small towns (US$0.4 million at appraisal, removed at restructuring, US$0 million actual). This subcomponent was supposed to finance a twinning partner selected under a South-South exchange to provide expertise in low-cost and non-conventional wastewater treatment technologies. The implementing agency would disseminate the knowledge through workshops and conferences. This sub component was dropped at the 2014 Restructuring. (ii) piloting odor-control and methane-capture technology at two selected treatment plants (US$1.8 million at appraisal, removed at restructuring, US$0 million actual). This subcomponent was supposed to finance anaerobic ponds in two pilot cities to reduce odor and capture methane. This sub component was dropped at the 2014 Restructuring. (iii) implementation support for project management (US$3.5 million at appraisal, revised to US$4 million at restructuring, US$3.3 million actual). This component financed construction supervision, monitoring and reporting, monitoring of environmental management plans, community awareness campaigns, promotion of wastewater reuse, and a strategic plan for sanitation activities. The 2014 Restructuring removed (i) and (ii) from this second component, adopted piloting as an implementation strategy in the first component, and changed "sewerage" to "sanitation" in line with Millennium Development Goals. e. Comments on Project Cost, Financing, Borrower Contribution, and Dates Project Cost: The total project cost, inclusive of borrower contribution (see below) reached US$75.1 million but the actual total cost was US$67.05 million. Financing: The International Bank for Reconstruction and Development provided an Investment Project Financing for this project in the amount of US$43 million. The amount actually used was US$34.95 million. Unused funds were returned to the Bank. Borrower Contribution: The Borrower committed and disbursed US$32.1 million in counterpart financing. Dates: The project became effective on February 15, 2011 and was completed by May 31, 2018 following two extensions that added 29 months to the project period. A Mid Term Review was conducted from January 27, 2014 to February 5, 2014, which led to one of four restructurings: Page 3 of 21 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review MA-Oum Er Rbia Sanitation (P098459) • On May 9, 2013, a level 2 restructuring acknowledged the government's reorganization of the sector and a change in implementing agency; • On June 13, 2014, a level 1 restructuring revised the PDOs, results framework, components, costs, and reallocated funds among disbursement categories; • On September 30, 2014, a level 2 restructuring extended the closing date for the first time from December 31, 2015 to June 30, 2017 • On May 23, 2017, a level 2 restructuring extended the closing date a second time to May 31, 2018, changed the implementation schedule, revised the results framework a second time, and reallocated resources between disbursement categories. The extension allowed the completion of the remaining contracted activities (completing the sewage collection and treatment works, and reducing the wastewater related pollution in 13 project towns). 3. Relevance of Objectives Rationale The PDOs remained relevant to the World Bank's Country Partnership Strategy (CPS, 2014-2017). The PDOs supported two of the three results areas in the strategy - building a green and resilient future, and strengthening governance and institutions for improved service delivery to all citizens. Under Results Area 2 - the first strategic outcome was to "strengthen management of soil, coastal and water resources", and the Bank's support served to expand access to improved sanitation, wastewater treatment, and reuse. Under Results Area 3 - Strengthening Governance and Institutions for Improved Service, the PDOs directly contributed to Strategic Outcome 3.4 Expand Access to Basic Services - such as sanitation (CPS, Figure 3, p. 19). A new Country Partnership Framework (CPF 2019-2024) was under consultation when the project closed. The focus areas for the new CPF were: (i) Promoting Job Creation and Private Sector Growth; (ii) Transforming Human Capital; and (iii) Promoting Inclusive and Resilient Territorial Development. Governance and Citizen Engagement formed the foundation of the CPF, while Digital Economy and Gender were cross cutting themes. The PDOs would remain relevant and contribute to the third focus area - promoting inclusive and resilient territorial development - because this focus would increase access to basic sanitation services, water resources planning, and reliance on wastewater reuse. The PDOs also remained relevant to the country's Programme National d'Assainissement (PNA or national sanitation program). The Government's PNA aimed to meet the sanitation needs of 80 percent of households and treat 60 percent of wastewater by 2020. This project was designed to finance PNA's

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us