Armenian Social Investment Fund Procurement Plan for the Third Additional Financing 11-Sep-12 Expected Status (1 Expected Contract No Estimated price in Post/prior Bid active, 5- Level of Completeness Contract ID Description Type Method Invitation signing Contract price Contractor Ranking . AMD review Opening complet damege status Date date Public Disclosure Authorized Date ed) Overhaul of Vanand second school Complete 1 AR-029 building with placement of kindergarten, W NCB 107,994,056 post 23.05.12 22.06.12 Aug-12 AMD 100,916,460 1 "Baghramyanshin" OJSC 40-60% 2 phase 2 Marz of Armavir Installation of the heating system, completion of renovation of the Cultural Complete 2 AR-030 W Shopping 27,640,796 prior 20.08.12 03.09.12 Sep-12 20-40% - House in the village of Voskehat., marz phase 2 of Armavir Completion of construction of the 3 AT-070 kindergarten's second building and W NCB 129,374,620 post 12.04.12 12.05.12 Jul-12 AMD 118,703,686 1 "Araratshin" LLC 0-20% - Complete Public Disclosure Authorized warm passage in Ayntap, Marz of Ararat Reinforcement, overhaul of the music Complete 4 GQ-050 W NCB 129,846,221 post 28.07.12 29.08.12 Sep-12 20-40% 3 school in Martuni, Marz of Gegharqunik Construction of the daily run-off pond 5 GQ-052 and external water-pipe in Artsvanist, W NCB 57,716,442 post 01.09.12 02.10.12 Oct-12 20-40% - Complete Marz of Gegharqunik Overhaul of two buildings and the warm passages of the kindergarten in the Complete 6 GQ-053 village of Geghamavan, installation of W NCB 104,423,483 post 24.09.12 24.10.12 Nov-12 20-40% 2 phase 1 the heating system, Marz of Public Disclosure Authorized Gegharqunik Completion of cultural center’s renovation and installation of its heating 7 GQ-055 W Shopping 23,135,112 post 25.09.12 09.10.12 Oct-12 0-20% - Complete system in the village of Vaghashen, Marz of Gegharqunik Installation of the heating system of 8 GQ-056 school in the village of Tsovazard, Marz W Shopping 30,658,068 post 25.09.12 09.10.12 Oct-12 20-40% 1 Complete of Gegharqunik Construction of a kindergarten in Artavaz 9 KQ-035 W NCB 128,618,280 post 05.09.12 05.10.12 Oct-12 40-60% - Complete community, Marz of Kotayq Completion of construction works for 10 LR-043 community center of Arevashogh, Marz W NCB 129,997,543 prior 28.07.12 27.08.12 Sep-12 20-40% ` Complete Public Disclosure Authorized of Lori Completion of construction works for 11 LR-044 community center of Hartagyugh, Marz W NCB 125,605,805 prior 28.07.12 27.08.12 Sep-12 40-60% Complete of Lori Installation of the heating system termo/water insulation works of the 12 LR-045 W Shopping 9,965,250 post 14.09.12 28.09.12 Oct-12 20-40% - Complete museum after H.Toumanyan in the village of Dsegh, Marz of Lori Overhaul of the kindergarten building in 13 SH-044 Ashotsk community, installation of the W NCB 83,372,149 post 24.08.12 24.09.12 Oct-12 20-40% 2 Complete heating system, Marz of Shirak 14 SH-045 Reconstruction of the kindergarten W NCB 70,311,326 post 06.09.12 05.10.12 Oct-12 20-40% 2 Complete building in Pemzashen, Marz of Shirak Reconstruction of the Art school in 15 SQ-038 Agarak, installation of the heating W NCB 129,702,233 post 26.09.12 26.10.12 Nov-12 40-60% 3 Complete system, Marz of Syuniq Overhaul of the school in Gorayq, Marz 16 SQ-039 W NCB 129,783,125 post 30.08.12 01.10.12 Oct-12 20-40% 2 Complete of Syuniq Construction completion of the school in 17 SQ-040 the village of Shamb, Darpas community, W NCB 129,427,200 post 30.08.12 01.10.12 Oct-12 20-40% - Complete Marz of Syuniq Overhaul of the school in the village of 18 SQ-041 Tsghuk, installation of the heating W NCB 129,880,195 post 30.08.12 01.10.12 Oct-12 40-60% 2 Complete system, Marz of Syuniq Reconstruction of the museum after H. 19 SQ-042 Sahyan in the village of Lor, Marz of W Shopping 28,559,730 post 18.09.12 02.10.12 Oct-12 40-60% 2 Complete Syuniq School furniture for Shirak marz of 20 TAFG-01 G NCB 45,000,000 prior 24.09.12 24.10.12 Nov-12 Armenia 21 TAFG-02 Computer equipment for ASIF G Shopping 10,262,500 prior 18.09.12 02.10.12 Oct-12 Completion of renovation in Baghanis Complete 22 TV-030 W NCB 97,858,288 post 18.05.12 18.06.12 Jul-12 AMD 79,145,076 1 "Jean Shean" LLC 40-60% 1 school, Marz of Tavoush phase 3 Construction of the community center in 23 TV-031 W NCB 62,691,300 post 10.07.12 10.08.12 Aug-12 AMD 63,428,192 1 "Bazalt M" LLC 40-60% - Complete Voskepar, Marz of Tavoush Construction of a kindergarten in 24 TV-032 W NCB 125,382,600 post 28.07.12 28.08.12 Sep-12 40-60% - Complete Voskevan, Marz of Tavoush Overhaul of N2 kindergarten in Berd, Complete 25 TV-033 installation of the heating system, Marz W NCB 129,726,500 post 26.09.12 26.10.12 Nov-12 20-40% 2 phase 1 of Tavoush Construction of the community center in 26 TV-034 the village of Nerqin Karmiraghbyur, W NCB 112,844,340 post 05.09.12 04.10.12 Oct-12 40-60% - Complete Marz of Tavoush Overhaul of the secondary school building in the village of Berkaber, 27 TV-035 W NCB 115,272,718 post 15.09.12 15.10.12 Nov-12 40-60% 2 Complete installation of the heating system, Marz of Tavoush Placement of kindergarten in community 28 TV-036 center’s building in the village of Teghut, W NCB 75,951,926 post 10.10.12 09.11.12 Nov-12 20-40% 2 Comlpete Marz of Tavoush Technical Supervision of Construction, 29 TAFTS-001 Shirak,Lori,Aragatsotn,Tavush, CS CQ 25,000,000 prior 01.03.12 15.03.12 Jun-12 AMD 5,611,950 1 "Alternative" LLC Gegharqunik. Technical Supervision of 30 TAFTS-002 Construction,Syuniq,Vayoc CS CQ 25,000,000 prior 01.03.12 15.03.12 Jul-12 AMD 3,258,000 1 "Durgabshin" Ltd. Dzor,Ararat,Armavir, Kotayq Design & Author Supervision of Potable Hayjrnakhagits institute" 31 TPD-001 Water, Sewerage & Irrigation Systems CS CQ 12,000,000 prior 01.03.12 15.03.12 Jul-12 AMD 4,820,000 1 CJSC throughout RoA Design & Author Supervision for 32 TPD-002 Construction & Reconstruction of CS CQ 25,000,000 prior 01.03.12 15.03.12 May-12 AMD 23,186,000 1 "Glomma" CooP Buildings Tavush,Lori,Gegharqunik Design & Author Supervision of Capital Renovation & Reconstruction of 33 TPD-003 CS CQ 40,000,000 prior 01.03.12 15.03.12 Apr-12 AMD 28,743,824 1 "Engineering Evros" LLC Buildings & Constructions Aragatsotn,Shirak,Kotayq Design and Author supervision for 34 TPD-004 Construction & Rehabilitation of CS CQ 20,000,000 prior 01.03.12 15.03.12 Jun-12 AMD 11,061,600 1 "Mara ev Dustrer" LLC buildings, Armavir,Ararat. Design and Author supervision for 35 TPD-005 Construction & Renovation of CS CQ 20,000,000 prior 01.03.12 15.03.12 May-12 AMD 20,625,750 1 "Jean Shean" LLC buildings,Vayoc Dzor,Syuniq. Design and Author supervision for 36 TPD-006 CS CQ 20,000,000 post 19.07.12 06.08.12 Aug-12 AMD 6,325,800 1 "Ratman" LLC Construction & Renovation of buildings "HH Nakhagtseri Petakan 37 TEX-01 Expertise of Architectural Design CS CQ 12,000,000 prior 01.03.12 15.03.12 May-12 AMD 9,232,000 1 Artagerateschakan Pordzaqnnutyun" CJSC Expertise of buildings stability, "ARSEA" Gitaartadrakan 38 TEX-02 ventilation, power and water supplies CS CQ 8,000,000 prior 01.03.12 15.03.12 Jun-12 AMD 1,976,400 1 LLC and drainage systems Reconstruction of the kindergarten in 39 VZ-019 the village of Gladzor, installation of the W NCB 126,466,553 post 30.08.12 02.10.12 Oct-12 0-20% 2(3) Complete heating system, Marz of Vayots Dzor Reconstruction of the kindergarten in 40 VZ-020 the village of Getap, installation of the W NCB 129,713,558 post 30.08.12 02.10.12 Oct-12 0-20% 2(3) Complete heating system, Marz of Vayots Dzor Reconstruction of the potable water 41 VZ-021 system in the village of Rind, Marz of W NCB 128,666,815 post 06.09.12 04.10.12 Oct-12 20-40% - Complete Vayots Dzor.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us