Location Property Type Proposed Works Notes Financial Year

Location Property Type Proposed Works Notes Financial Year

Appendix A - Complete or Committed Property Financial Location Proposed Works Notes Type Year Aberdeen Grammar School School- Pool filtration tanks and chemical Complete 2018/19 Secondary control replacement. Beach Ballroom Leisure Replacement fire alarm system. Complete 2019/20 Facility Bramble Brae Primary School School- Replacement windows to original Complete 2019/20 Primary building. Include external decoration to be funded from R&M. Bridge Of Don Academy School- Refurbish toilet blocks. Phase 2 Committed 2019/20 Secondary and 3. Cornhill Primary School School- Reconfiguration of entrance area Committed 2019/20 Primary and new office door required to create secure entrance. Culter School School- Reconfiguration of Reception to Committed 2019/20 Primary improve security at entrance. Cults Primary School School- Remaining felt flat roof Committed 2019/20 Primary replacements. David Welch Winter Gardens Leisure Visitors toilet refurbishment. Complete 2018/19 Facility Duthie Park Park Installation of water pump/storage Committed 2019/20 to comply with water byelaw’s. Dyce Academy School- Flat roof replacement to sports Committed 2019/21 Secondary wing, including widening of gully outlets. Greenbrae Primary School School- Sprinkler booster pump installation Complete 2018/19 Primary to prevent false alarm activations. Harlaw Academy School- Concrete repairs to stairwell celling. Complete 2018/19 Secondary Hazlewood School School- Refurbishment to support set up of Complete 2018/19 Primary Countesswells Primary School. Kincorth Academy School- Demolition. Committed 2019/20 Secondary Kincorth Children's Home Childrens Electrical Upgrade. Complete 2018/19 Home Kincorth Children's Home Childrens Kitchen replacement and minor Complete 2018/19 Home refurbishment. Kittybrewster School School- Toilet refurbishments. Committed 2019/20 Primary Muirfield School School- Windows to non teaching block. Committed 2019/20 Primary Include external decoration to be funded from R&M. Northfield Academy School- Replacement windows and external Complete 2019/20 Secondary doors to gymnasium/music block. Sheddocksley Sports Centre Sports Car park resurfacing and relining. Complete 2018/19 Centre Appendix A - Complete or Committed Webster Park Community Community MUGA (Multi Use Games Area) Complete 2018/19 Facility Centre contribution. Community Centre (Leased) Management Committee funding majority of work. Westburn Park Resurface access road and car Complete 2019/20 Park park. Mark out spaces. Westburn Park Park Replacement railings. Complete 2019/20 Westpark School School- Production kitchen refurbishment. Committed 2019/20 Primary Woodside School School- Pitched roof refurbishment. Committed 2019/20 Primary Projects Various Complete completed/committed before 2018 committee but have legacy costs Total £ 3,879,000 Appendix B - Currently Approved Revised Financial Asset Proposed Works Notes Budget Cost Budget Year 1 Dominies Road Group Home Kitchen and toilet 2020/21 refurbishment. 116 Westburn Road Window and external Windows are in C (Poor) 2019/20 door replacements condition. throughout. 26A Rowan Road Group Home Window replacement. 2020/21 Abbotswell Primary Roof replacements to Roof is in C (Poor) 2019/20 School ground floor (lower) and condition. link corridor. Abbotswell Primary Window replacement. 2020/21 School Aberdeen Grammar Kitchen refurbishment Ongoing kitchen/servery 2020/21 School including ventilation and refurbishment heating improvements. programme. R&M contribution. Aberdeen Grammar Refurbishment of Changing facilities are in 2020/21 School swimming pool changing C (Poor) condition. facilities. Budget Change Existing mechanical and electrical installations are entirely inadequate. New installation Reason: required to ensure appropriate environmental conditions for use and improved longevity of fittings/finishes. Aberdeen Grammar Toilet refurbishments. 2020/21 School Aberdeen Grammar Upgrade of fire alarm To address fire risk 2019/20 School system. assessment recommendations. Airyhall Library Window replacements Windows are in C (Poor) 2019/20 throughout. Consider condition. funding of external decoration from R&M. Airyhall Library Car park resurfacing and Include relining of 2021/22 relining. Community Centre car park. Budget Change Current estimate less than budget allocation. Reason: Ashgrove Nursery Infant Access improvements 2019/20 School including platform lift. Ashgrove Nursery Infant Heating replacement. Heating is in C (Poor) 2019/20 School conditions. B & W Depot (North) Refurbish toilets and 2020/21 Sillerton Lane replace windows in toilets/welfare areas. Balnagask Community Boiler replacement 2019/20 Centre burner bars. Balnagask House Phase 1 of ensuite and 2020/21 communal toilet refurbishments. Appendix B - Currently Approved Revised Financial Asset Proposed Works Notes Budget Cost Budget Year Beach Ballroom Access issues, ceiling, 2019/20 safety issues, electrics all associated with main ballroom ceiling/roof. Beach Ballroom Extended intruder alarm 2020/21 and improve security to rear of building. Beach Ballroom Re-rendering works final 2020/21 phase. Beach Leisure Centre Air handling unit Covers flume tower. 2019/20 replacement. Beach Leisure Centre Atrium roof 2019/20 improvements. (former) Braeside School Demolition of asset that 2019/20 will become surplus to requirements. Bramble Brae Primary Refurbishment of toilet 2019/20 School blocks. Phase 1. Bramble Brae Primary Refurbishment of two 2019/20 School toilet blocks. Phase 2. Bramble Brae Primary Kitchen refurbishment. 2020/21 School Bridge Of Don Academy Heating plant 2019/20 replacement - boiler and gas supply booster. Budget Change Replacement work required extends beyond heating plant. Including new flues, control panel Reason: and expansion vessel. Allowance for temporary boiler plant hire & fuel for duration of contract also required. Bridge of Don Refurbishment of 2020/21 Community Centre community centre servery. Broomhill Primary School Repointing to external 2019/20 walls and lead work to parapets. Broomhill Primary School Replacement of atrium 2020/21 roof. Broomhill Primary School Improve external/internal Urgent works to front 2020/21 door security. entrance were completed in 2018 - further work still required to pupil entrances at rear. (former) Bucksburn Demolition of surplus 2019/20 Primary School asset. Bucksburn Swimming Boiler & domestic hot Boiler & domestic hot 2019/20 Pool water services calorifier water services calorifier replacement. replacement. Building & Works Depot Window replacements. 2021/22 Hilton Appendix B - Currently Approved Revised Financial Asset Proposed Works Notes Budget Cost Budget Year Building & Works Depot Window replacements. 2021/22 Northfield Catherine Street Windows and external 2020/21 Community Centre door replacements. Central Library Staff toilet refurbishment. Toilets are in C (Poor) 2019/20 condition. Central Library Renew damaged ceilings 2019/20 and replace associated lighting. Charleston Primary Replacement modular 2020/21 School accommodation. Cove Library Issues with curtain Ongoing issues with 2019/20 walling to be resolved. vandalism and prohibitive repair costs. Culter Sports Centre Air handling unit 2019/20 replacement. Culter Sports Centre Building management 2019/20 system & controls replacement. Budget Change Pre-tender estimate greater than budget available. Replacement requirements more Reason: extensive than anticipated, with many elements being identified as obsolete. Cults Library Roof replacement. Roof 2021/22 is in C-Poor condition. Cults Primary School Replace slabbed areas 2019/20 surrounding school with wheelchair friendly surface. Cults Primary School Sports hall flooring 2020/21 replacement. Cummings Park Replacement of poor Flooring and ceiling are 2019/20 Learning Centre condition flooring and in C (Poor) condition. ceilings. Danestone Primary Car park and access Assessed as C (Poor) 2019/20 School road resurfacing. condition. Budget Change Current estimate less than budget allocation. Reason: Danestone Primary Install secondary secure 2020/21 School door at main Reception. Deeside Family Centre Car park and access Assessed as C (Poor) 2019/20 road resurfacing. condition. Denmore Depot Refurbishment of Asset is C (Poor) 2019/20 Denmore Gardens external areas and condition overall. welfare facilities. C condition. Rationalise buildings on site. Depot Bucksburn Window replacements. 2020/21 Bankhead Avenue Depot Cairnwell Drive Refurbishment. 2021/22 Appendix B - Currently Approved Revised Financial Asset Proposed Works Notes Budget Cost Budget Year Duthie Park Workshops Replacement windows to Assessed as C (Poor) 2019/20 welfare block. condition. Duthie Park Workshops Block E - 2020/21 Replacement/repair to sills and render. Replacement of roof drainage. Dyce Academy Toilet refurbishment. Reconfiguration of 2020/21 accessible toilets to be included. Dyce Primary School Replace air handling 2020/21 units and carry out associated asbestos works. Dyce Primary School Toilet refurbishment. 2020/21 Ferryhill Library Windows and blinds Both in D-Bad condition. 2020/21 replacement. Ferryhill Primary School Improve security and 2021/22 accessibility. Forehill School Car park and access Assessed as C (Poor) 2019/20 road resurfacing. condition. Budget Change Current estimate less than budget allocation. Reason: Gilcomstoun School Staff and pupil toilet 2020/21 refurbishment (excluding disabled and blue boys toilet). Glashieburn School Car park and access Assessed as C (Poor) 2019/20

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us