III. Checklist for Mkomani and Ziwa La Ng'ombo

III. Checklist for Mkomani and Ziwa La Ng'ombo

E2645 v8 ESIA Project Report for infrastructure Upgrading in Jomvu Kuu, Jomvu Mikanjuni, Mkomani and Ziwa la Ng’ombe informal Settlements within Mombasa Municipality Public Disclosure Authorized Ref. No. KE-103877 2013-04-16 Public Disclosure Authorized Public Disclosure Authorized Kenya Informal Settlements Improvement Program (KISIP) Public Disclosure Authorized Component 3: Infrastructure and Service Delivery Consultancy services for socio-economic surveys, infrastructure upgrading plans and detailed engineering designs in informal settlements Kenya Informal Settlements Improvement Program (KISIP) Pöyry, GA Consultants, Pamoja Trust Component 3: Infrastructure and Service Delivery Date 2013-04-16 ESIA Project Report for Infrastructure Upgrading in Informal Settlements - Mombasa Page 2 Contacts: Dr. Robert Zwahlen Sven Bolomey Environment and Civil / Environmental Engineer Social Development Specialist Pöyry Infra AG Pöyry Energy Ltd. Hardturmstrasse 161, P.O. Box Hardturmstrasse 161, P.O. Box CH-8037 Zurich/Switzerland CH-8037 Zurich/Switzerland Tel. +41 44 355 55 55 Tel. +41 44 355 55 54 Mobile +41 76 356 28 61 Mobile +41 76 356 21 13 Fax +41 44 355 55 12 Fax +41 44 355 55 56 e-mail [email protected] e-mail [email protected] http://www.poyry.com http://www.poyry.com Steve Ouma Elisha Akech Executive Director Chief Executive Officer (CEO) Pamoja Trust GA Consultants Ltd. Theta Lane off Lenana Road Standard Building, Standard Street P. O. Box 10269 – 00100 Nairobi, Kenya P.O. Box 2670 00100 Nairobi, Kenya Tel +254 20 3871504 Tel. +254 20 312 931 +254 72 0896025 Mobile +254 721 629 706 Fax +254 20 3865752 Fax +254 e-mail [email protected] e-mail [email protected] http://www.pamojatrust.org http://g-a-consultants.com/ Front cover photos: Top left: Improvised water storage and kiosk, Jomvu Kuu Settlement, Mombasa. Top right: Overall vue of Jomvu Mikanjuni Settlement, Mombasa Bottom left: Blocked vertical drainage infiltration pit in Ziwa la Ng’ombe Settlement, Mombasa. Bottom right: Mkomani settlement near central Mombasa, where multistory buildings are currently being constructed Kenya Informal Settlements Improvement Program (KISIP) Pöyry, GA Consultants, Pamoja Trust Component 3: Infrastructure and Service Delivery Date 2013-04-16 ESIA Project Report for Infrastructure Upgrading in Informal Settlements - Mombasa Page 3 FACT SHEET Project Name Kenya Informal Settlements Improvement Project (KISIP) Assignment Name Consultancy for socio-economic surveys, infrastructure upgrading plans and detailed engineering designs in informal settlements Lead Implementing Ministry of Housing Agency Funding Agencies Government of Kenya, World Bank, AFD, SIDA Consultants POYRY, GA Consultants, Pamoja Trust Start Date February 20, 2012 Completion Date July 5, 2013 Team Leader Robert Zwahlen, POYRY Deputy Team Leader Steve Ouma, Pamoja Trust Target settlements Mombasa Municipality – Jomvu Kuu, Jomvu Mikanjuni, Mkomani, Ziwa la Ng’ombe Kenya Informal Settlements Improvement Program (KISIP) Pöyry, GA Consultants, Pamoja Trust Component 3: Infrastructure and Service Delivery Date 2013-04-16 ESIA Project Report for Infrastructure Upgrading in Informal Settlements - Mombasa Page A DOCUMENT AUTHENTICATION This Environmental and Social Impact Assessment Project Report is prepared for: The Ministry of Housing P.O. Box Nairobi Signed by…………………………………………...........………… Position…………………………………….....……………………. Signature…………………………………………………………... Date…………………………………….....……………………….. I,…………….., a registered Lead EIA Expert by the National Environment Management Authority (License No. …), confirm that the contents of this report are a true representation of the Environmental and Social Impact Assessment Project Report of the proposed infrastructure upgrading in Jomvu Kuu, Jomvu Mikanjuni, Mkomani and Ziwa la Ng’ombe Informal Settlements within Mombasa Municipality. Signed by the Lead of EIA Expert: Name: ……… (License No….) Signature: …...………………………………………… Date: ……………………………………………..…….. Kenya Informal Settlements Improvement Program (KISIP) Pöyry, GA Consultants, Pamoja Trust Component 3: Infrastructure and Service Delivery Date 2013-04-16 ESIA Project Report for Infrastructure Upgrading in Informal Settlements - Mombasa Page B EXECUTIVE SUMMARY This document is the Environmental and Social Impact Assessment (ESIA) Report for the informal settlements in Mombasa Town selected for the KISIP program. It identifies adverse environmental and social impacts which might be caused by the projects selected for implementation in these settlements and develops, where required, suitable mitigation measures. Environmental measures are described in the present document, while social issues (physical or economic displacement of persons, compensation issues) are dealt with in the RAP, which is a separate document. The ESIA report is based upon the previously submitted and approved reports related to works carried out in Mombasa municipality: Socio-economic report: based on survey works carried out in each of the settlements. Conceptual design report: which includes a preliminary environmental and social screening report as well as a community consultation report. Draft Settlement Upgrading Plan report (Feasibility study): which includes a cost benefit analysis to the choice of variants in which environmental and social parameters are taken into account. Detailed Design report: which is being prepared simultaneously to this ESIA and includes the final design of the infrastructure components. The civil work components taken into account in this ESIA are presented in the following table. Settlement Scope of works 1. Jomvu Kuu 1.1 Construction of 150 m of Slope Stabilization and relevant landscape works 1.2 Construction of Footpath length total 1360 m 1.3 Construction of ablution blocks / Water Kiosk / Rainwater harvesting system linked to the communal hall equipped with storage 3 x. 24m3 – 1 unit block adjacent the Communal Hall 1.4 Construction of ablution blocks / Water Kiosk – 1 unit. block near the madras school which is not yet built 1.5 Provision of new sewer line (200mm UPCV) of length 400m along the eastern and northern settlement boundary to collect existing following sewerage water and connection to a septic tank treatment system 1.6 Provision of 1360 m of new water lines based upon the existing water supply network and following the footpath network 1.7 Water supply connections to 202 settlement plots 1.8 Construction of 1 No. high mast lighting structures 2. Jomvu Mikanjuni 2.1 Construction of 615 m of roads with 9m reserve width 2.2 Construction of Footpath length total 2500 m 2.3 Construction of 2050 m of major drainage works corresponding to the breakdown – 1100m slope stabilization, 550 Gully bed correction works and 400m drainage canal in the gully areas 2.4 Construction of ablution blocks – 3 units. ablution block 2.5 Provision of 3115 m of water lines for water supply within the settlement following the road and the footpath network Kenya Informal Settlements Improvement Program (KISIP) Pöyry, GA Consultants, Pamoja Trust Component 3: Infrastructure and Service Delivery Date 2013-04-16 ESIA Project Report for Infrastructure Upgrading in Informal Settlements - Mombasa Page C 2.6 Water supply connections to estimated 612 settlement plots 2.7 Rehabilitation of existing open spaces – lump sum provision for landscaping works 2.8 Construction of 1 No. high mast lighting structures 3. Mkomani 3.1 Construction of 155m of roads with 12m reserve width 3.2 Construction of 625 m of roads with 9m reserve width 3.3 Provision of 1000 m of new water supply lines for water supply within the settlement 3.3 Water supply connections to estimated 76 settlement plots 3.4 Construction of 1 No. high mast lighting structures 4. Ziwa la Ng’ombe 4.1 Construction of 6600 m of roads with 9m reserve width 4.2 Construction of Footpath length total 12500 m 4.3 Construction of 5 no. infiltration pits- bore hole type 4.4 Water supply connections to estimated 2186 settlement plots 4.5 Construction of 5 no. high mast lighting structures The (few and generally minor) negative environmental impacts that the selected projects can have will manifest themselves mainly or exclusively during construction. Likewise, mitigation measures will have to be implemented during this period. The following table summarises the key impacts (both positive and negative) identified. Environmental Current situation Project specific impacts aspect 1. Physical Environment 1.1 Climate All components: Projects not in any way related to or causing impacts on climate. 1.2 Air quality 1.2.1 Dust Many unpaved roads can lead to All components: high dust especially during the dry Possibility of slight increase during construction. season. Decrease once roads are upgraded due to improved surfacing. 1.2.2 Exhaust No high traffic concentrations, no All components: gases from traffic other major polluting sources nearby; Possibility of slight increase during construction. and industries no big concern. 1.2.3 Cooking fires Various fuels used for cooking. All components: (indoor pollution) The project has no impact on fuel use (or use of energy in general). 1.3 Noise Noise is generally not perceived as a All components: problem; any noise emission which Some noise will be caused by construction might exist is in no way related to the activities. project. Impact mainly on construction workers. Kenya Informal Settlements Improvement Program (KISIP) Pöyry, GA Consultants, Pamoja Trust Component 3: Infrastructure

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    143 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us