IDP Project IDP project name Scheme details Economic Social Biodiveristy Population & Soil Water Air Climatic Material Cultural Landscape reference Factors Factors Health Factors Assets Heritage CR (a) SHS 1 Canal upgrade Potential upgrade of surface to accommodate increase of usage. +?+ +-+---++ CR (b) Canal Bridge 18 Access to the canal +?+ +-+---++ CR (c) ECO 2 canal upgrade Potential upgrade of surface to accommodate increase of usage. +?+ +-+---++ CR (d) Comprehensive enhancement Potential restoration of the Griff Arm +?+ +-+---++ of the canal EA (a) Sustainable Drainage Incorporate a sustainable drainage system within the systems development plans for each site including urban wetlands and +?+ ? +++-++-+ street rain gardens FC (a) Football/sporting facility on Potential for development of grass sports field, 3 g pitch and ++- ++------- Eastboro Way sporting facility. FC (b) Accessibility to the stadium improve accessibility to the stadium through new pedestrian routes and public transport ++- ++------- GEH (a) Development of George Eliot Development of the site to increase the bed capacity +++ - ++ ---- - - - Site GEH (b) Extra care housing and There is a current lack of elderly accommodation and there is a Nursing home schemes need for investment in extra care housing and nursing homes schemes to support care in the community. +++ - ++ ---- - - - GEH (c) Work with other agencies Working with other agencies to address life expectancy and deprivation issues within the borough. To reduce reliance on the health services to free up growth areas within the plan. +++ - ++ ---- - - - GEH (d) Implications on maternity and Dependant on the population in the development areas there paediatric services maybe increased pressures on paediatric and maternity +++ - ++ ---- - - - services. Further information will be required to identify the implications. GEH (e) Increase to GP services Development of GP primary health care services within the borough, require extensions to facilities. +++ - ++ ---- - - - GEH (f) Additional car parking on Additional car parking on George Eliot sites to support the George Eliot site increase in users. ++- +------- Improvements to A444 junction to prevent blocking of this area GEH (g) Improvements to A444 ++- +------? and emergency access to the hospital site. GI (a) SHS1/ECO2 Community Park New Community Park with Ballcourt + older children's and younger children’s equipped play provision 0+++ + ++-- --+ GI (aa) Community park New Community Parks by extending existing open spaces 0+++ + ++-- --+ GI (ab) Allotments New allotment site 0+++ + ++-- --+ GI (ac) A5 Woodland Belt A5 woodland belt with crushed stone pathways 0++ + + ++- - - - ++ GI (ad) Link to Change brook Open Link to Changebrook Open Space - may require culvert + new 0++0 + ------? Space play area GI (ae) Play Area, MUGA and Local Play facilities provision of a playing pitch 0++0 + 00-- --? (inc. drainage) Improvements to existing sports pitch GI (af) Improvements to existing 0++0 + 00-- --? sports pitch GI (ag) Strategic cycle route 50% Contribution to strategic cycle links 0++0 + 00-- --? GI (ah) Existing allotments and sports Contributions to existing allotments and sports provision 0+0 +00----0 provision GI (ai) Site securing (inc. gates, trip Site securing (inc. gates, trip rail, kissing gates) 0+- +------- rail, kissing gates) GI (aj) Signage (large & small) Signage (large) 0+- -------- GI (ak) Amenity Lighting Amenity lighting 0+- -------- GI (al) Small span pedestrian bridge Small span pedestrian bridge ++- +------? GI (am) Small span pedestrian bridge Small span pedestrian bridge ++- +------? GI (an) Large span pedestrian bridge Large span pedestrian bridge ++- +------? GI (ao) Provision of 0.58 allotment Provision of 0.58 allotment site (not including land value) ++- +------? site IDP Project IDP project name Scheme details Economic Social Biodiveristy Population & Soil Water Air Climatic Material Cultural Landscape reference Factors Factors Health Factors Assets Heritage GI (ap) Upgrade existing Allotment Upgrade existing Allotment sites (expressed as cost per +++ +++----? sites dwelling) GI (aq) Creation of wildlife habitat Creation of wildlife habitat 0++ +++----+ GI (ar) Creation of wildlife habitat Creation of wildlife habitat 0++ +++----+ GI (as) Provision of Outdoor Gym Provision of Outdoor Gym 0++- + ------? GI (at) Street furniture street furniture (benches & seats and litter bins) 0+- +------? GI (au) Provision of all weather Provision of all weather informal sports area 0++0 + 00-- --? informal sports area GI (av) Provision of tarmacadum Provision of tarmacadum footway (nominal width 1.8m) 0+0 +00----? footway GI (aw) Provision of crushed stone Provision of crushed stone footway (nominal width 1.8m) 0+- +-0----0 footway GI (ax) Upgrade existing pavilion Upgrade existing pavilion 0+- -------- GI (ay) Provision of car park - Provision of car park - tarmacadum (nominal 30 spaces) 0+- +??----? tarmacadum GI (az) Provision of equipped play Provision of equipped play area 0+- +------? area GI (b) Culvert to open + renaturalise Culvert to open + renaturalise 00- -++----? GI (ba) Provision of large scale tree Provision of large scale tree planting 00++ + ++-- --+ planting GI (bb) Provision of amenity Provision of amenity grassland 0+++ + ++-- --+ grassland GI (bc) Provision of landscape buffer Provision of landscape buffer 0 0 ++ + ++- - - - ++ GI (c) Green Gym Green Gym for workforce + local resident health 0++0 + 00-- --? GI (d) Wildflower Meadow & Wildflower Meadow & Wetland Creation 0 0 ++ + ++- - - - ++ Wetland Creation GI (e) New foot and cycle bridge to New foot and cycle bridge to Bermuda Lake - creating urban Bermuda Lake circular route and GI link to new ‘Arbury’ Country Park 0+- +??----? GI (h) Access to Country Park Structure planting, grassland and stone pathways to be fully retained as POS allowing Keresley residential areas to access 0+- +?-----? the Country Park GI (i) New Car Park for Country New Car Park to serve Country Park as ‘destination’ site 0+- +??----? Park GI (j) Path to Country Park Key path and land link to be secured as part of development allowing much more direct resident access to Country Park via 0+- +??----? Blackberry lane POS GI (k) Path Prologis-Country Park New link path to Prologis Country Park and supplementary path loop in Country Park 0+- +??----? Play area New equipped Play Area and informal all-weather ball court GI (l) 0+- +??----? GI (m) Enhancing Country Park Retain and enhance existing Country Park – already effectively a destination park in terms of NBBC POS Strategy - also 0+- +?+----+ create additional habitat in Country Park GI (n) Younger children’s equipped Younger children’s equipped play 0+- +??----? play GI (o) Contribution to cycle paths Contribution to Cyclepath to Stockingford and Whittleford via Montana Walk Park, Cyclepath to Town Centre via Cat 0+- +??----? Gallows Bridge, Cyclepath to Bermuda Station and Contribution GI (p) Community park New community park type facilities within ‘Country Park’ including Older Childrens equipped play, artificial turf ball court 0+- +++----+ + Green Gym and car park GI (q) Wildflower & Wetland Habitat Wildflower & Wetland Habitat Creation 0?++ ? ++-- --+ Creation GI (r) New fishing pool New fishing pool to help divert unauthorised fishing from Ensors Pool 0+++ + 0+-- --+ Crushed Stone Pathways Crushed Stone Pathways in Arbury Estate Woodland extension GI (s) 0+- +??----? GI (t) Cyclepath Network Cyclepath Network within Site 0+- +??----? GI (u) Off Site Investment Off Site Investment at Newdigate Recreation Ground (Sports Facilities) 0+- +??----? IDP Project IDP project name Scheme details Economic Social Biodiveristy Population & Soil Water Air Climatic Material Cultural Landscape reference Factors Factors Health Factors Assets Heritage GI (v) Cyclepath Network Cyclepath Network within the extended site 0+- +??----? GI (w) Wildflower Meadow Creation Wildflower Meadow Creation 0 ? ++ ? ++- - - - ++ GI (x) Green Gym Green Gym 0++- + ??----? GI (y) Equipped older and younger Equipped older and younger children's play 0+- +??----? children's play GI (z) Structural Tree Planting Structural Tree Planting 0 ? ++ + ++- - - - ++ GP (a) SHS1 & Abbey & Wem Brook, Extension to Chaucers Surgery & Whitestone surgery. A Whitestone and Bulkington requirement for 0.82 GPs. 0++ - ++ ---- - - - GP expansion GP (b) School Lane & Bede and Extension to Bedworth Health Centre, Leicester Road Surgery, Poplar GP expansion Old Coal House. A requirement for 0.82 GPs. 0++ - ++ ---- - - - GP (c) SHS3, Woodlands & New build surgery (a site will need to be identified). A Bedworth North & West GP requirement for 3.01 GPs. 0++ - ++ ---- - - - expansion GP (d) SHS4 & Weddington & St New build surgery (a site will need to be identified). A Nicolas GP expansion requirement for 4.02 GPs 0++ - ++ ---- - - - JS & IS (a) Whitestone infants and Altering priority areas for Whitestone infants and Chetwynd Chetwynd junior expansion junior school and subsequent expansion of both schools to 0++- + ------- meet demand P (a) Additional personnel required Setting-up and equipping police officers and staff entails to serve the proposed providing IT, radios, protective equipment, uniforms and additional housing growth bespoke training in the use of these. However, additional staff will require additional equipment. There are practical limits to 0++- - ------- the extent to which existing equipment can be re-used e.g. with uniforms or where technology has moved on. P (b) Additional
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages10 Page
-
File Size-