A DETAILS of CONTRACTS PLACED by OPEN TENDER (For Civil Engg

A DETAILS of CONTRACTS PLACED by OPEN TENDER (For Civil Engg

Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month of APRIL 2017 - AUGUST 2017) Works Awarded : APRIL 2017 Quantity Rate Scheduled S. Tender Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of Description of Item/ Work Estimated Cost (For Tendered Cost (For completion N. No. opening and date and address Contract Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ date etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/ME 15.12.2016 Design, Supply, Installation IRCON/MECH/10 M/s J S Industries 875 Nos Flat `1,99,27,646/- `1,99,27,646/- From the CH/1029/RE and Commissioning of 875 29/RE/MCF RBL- 16/2 Mathura Road, /MCF RBL- Pallets GAD II/ Flat Nos Flat Pallets at Modern II/ Flat Pallet/302 (Karkhana Bagh), approval- Pallet/302 Coach Factory at Lalganj, Rae /7578 Faridabad-121002 04 Month Dated Bareli, U.P. Dated 06.04.2017 Ph : 0129-2296606, 23.11.2016 4100510, Telefax : (for first 440 0129-2282345: Nos Pallets [email protected], 02 month [email protected] and balance 435 within 04 month) 2 IRCON/ 12.04.2017 Construction of Retaining IRCON/ 3017/ M/s. PMNR ` 587.62 Lakh At par ` 587.62 Lakh 06 months 3017/ Wall for PUP approach at SGTL/ Tender/ Constructions, House from the SGTL/ Tender/ Badarwa Byepass on NH-3 Retaining No. 7-58/2, Subhash date of Retaining for IRCON SGTL (Agreement Wall/339 Nagar IDA Jeedamatla issue of Wall/339 No. ISGTL/ CO/ SG/ IRCON/ Dated 12.04.2017 Hyderabad – 500 055 LOA Dated CORRES/ 02 dtd.02.09.2015) Telangana. 01.04.2017 in connection with “4-Laning Mob.+919550571711 of Shivpuri-Guna section of NH-3 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 3 IRCON/ 17.03.2017 Supply of 500KVA 3PH Silent IRCON/3017/ M/s. Deccan Sales & ` 8.62 Lakh 14.67% ` 7.36 Lakh 05 months 3017/ SGTL/ D.G. Set on monthly hire basis SGTL/MECH. Service (P) Ltd., 276/3, Below from the MECH./Hiring /500KVA for operation of Metso make /Hiring/500K GIDL Industrial Estate, Estimate date of D.G./NIT- 200TPH Crushing Plant at VA D.G./NIT- Makarpura – 390010, issue of 2126, Date Shivpuri-Guna Highway Project 2106/W.O., Vadodara. LOA 17.03.17 Dated Ph. 9327406915 06.04.2017 4 IRCON/207 07.03.2017 Execution Of 25kv Ohe Works IRCON/2070/ M/s KAMY India, `1,59,96,599/- 18.99% ` 1,90,34,353/- 06 Months 0/NMDC/- For The Proposed Block Station NMDC/-PKG 66 1st Floor Above from the PKG IV/OHE Yard In Connection With IV/OHE Sushma Building, date of WORKS/2A Construction Of Private Railway WORKS/2A, Jaripatka Nagpur-14, issue of , 02.02.17 Siding For The Proposed 3 MTPA Dated Ph:0712-2593227, LOA Integrated Steel Plant For NMDC 13.04.2017 [email protected] At Nagarnar, Chhattisgarh State m 5 IRCON/2050/ 08.02.2017 Design, supply, installation, IRCON/2050/ M/s SS Rail Works Private ` 6.85 Crores 3.58 % ` 7,10,36,385.35 06 months BGL.JBB/S& testing and commissioning of BGL.JBB/S& Limited, H.No. 8-3- Above from the T/TENDER/0 4 Electronic Interlocking based T/TENDER/0 318/6/13/5 Flat No. 203, date of Dated signalling system at Jaynagar 4/217, Crystal Residency, Jaya issue of 10.01.2017 (Indian Custom Yard) station and Dated Prakash Nagar, Yellareddy LOA existing Jaynagar Station of ECR 26.04.2017 Guda, Hyderabad-500073 alongwith modificayion work in existing Jaynagar station and provision of 6-Quad +OFC Communication system between Inarwa - and Jaynagar 6 IRCON/ME 08.02.2017 Design, Supply, Installation and IRCON/MECH/ M/s Science tech ( India) 01 No Heating ` 1237600 ` 12,37,600/- 02 Month CH/1029/R Commissioning of 01 No Heating 1029/RE/MCF 278/39/2 ( Below Aishbagh E/MCF Oven for PVC form issue Oven for PVC Roll and 03 Nos RBL-II/ Flyover) Aishbagh, RBL-II/ Heating Oven Roll and 03 of LOA. Heating Heating Oven for SIKA at Lucknow -226004(u.p.) Oven for for PVC & Nos Heating Modern Coach Factory at Lalganj SIKA/311/RET/ Ph 0522-4113193, PVC & Rae Bareli, U.P. [email protected] Oven for SIKA SIKA/311/R 7619, ET Dated Dated 18.01.2017 26.04.2017 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 7 IRCON/301 12.04.2017 Construction of civil works for double IRCON/3018 Jalaram Projects Private `40.94 Crores ` 36.85 ` 36.66 Crores 15 Months 8/DFCCIL- line railway involving formation in /DFCCIL- Limited 401 Vitthal Villa , Crores from the CTP-12/e- Tender/ Embankments/ Cuttings, Bridges CTP-12/08- Near Satadhar Circle date of Infra work / and Structures. Project Chainage: 35/914 dated Thaltej, Ahmedabad issue of Package:SS 216/(23-25) to Chainage :229/(9-11), 28.04.2017 Gujarat LOA 4-B rev (Length=13.341KM)for Infra work package -SS 4 – B. 8 IRCON/301 12.04.2017 Construction of civil works for double IRCON/3018 Jalaram Projects Private ` 68.28 Crores ` 62.37 ` 62.05 Crores 15 Months 8/DFCCIL- line railway involving formation in /DFCCIL- Limited 401 Vitthal Villa , Crores from the CTP-12/e- Tender/ Embankments/ Cuttings, Bridges CTP-12/08- Near Satadhar Circle date of Infra work / and Structures. Project Chainage : 35/915 dated Thaltej, Ahmedabad issue of Package:SS 196/(15-17) to Chainage:216/(23- 28.04.2017 Gujarat LOA 4-A/rev 25), (Length=20.268KM) for Infra work package -SS 4 – A. 9 IRCON/301 22.04.2017 Hiring of Light Vehicles for Gujarat IRCON3018/ M/s Shree Sai Travels. ` 0.36 Crores ` 0.36 ` 0.39 Crores 12 Months 8/DFCCIL- Section of Western Dedicated DFCCIL- 68-75/4, Ranchhod Park Crores from the CTP-12/ST- TDR/ Freight Corridor, Phase II (Vaitarana CTP12/ST- Society,Ramnagar, Rander date of LV- – Sachin Section). TDR/218, Road,Surat 395 005 issue of HIRE/218 Dt:28.04.17 LOA Dated 31.03.2017 10 IRCON/301 12.04.2017 Construction of civil works for double IRCON/3018 Jalaram Projects Private `68.85 Crores ` 61.11 ` 60.80 Crores 15 Months 8/DFCCIL- line railway involving formation in /DFCCIL- Limited 401 Vitthal Villa , Crores from the CTP-12/e- Tender/ Embankments/ Cuttings, Bridges CTP-12/08- Near Satadhar Circle date of Infra work / and Structures. Project Chainage: 35/916 dated Thaltej, Ahmedabad issue of Package:SS 229/(9-11) to Chainage :252/(25-27), 28.04.2017 Gujarat LOA 4-C rev (Length=21.859KM) for Infra work package -SS 4 – C Works Awarded : MAY 2017 Quantity Rate Scheduled S. Tender Date of LOA No. Contractor’s Name and (for supply contract)/ (for supply contract)/ Value of Description of Item/ Work Estimated Cost (For Tendered Cost (For completion N. No. opening and date address Contract Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ date etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/CC/e 24.03.2017 Assembling, Laying and linking IRCON/CC/e- M/s Pee Pee Manda - - ` 17,70,97,296/- 09 months -TN/JBRLP of Broad gauge railway track TN/JBRLP/2050/1 Projects Pvt. Ltd, Kh no. from the /2050/17/15/ 2 for main line & loop line with 60 7/15/2/719 219 GF, Prahalad Vihar, date of Dated Kg rails & PSC sleepers with Dated 01.05.2017 Ext. Phase-z, Gupta issue of 03.03.2017 contractor's own P. Way Colony, Vill- Prahladpur LOA material (except 60 Kg rails & Banger, Delhi-110042. PSC 60 Kg sleepers) and other Tel :- 011-65825861, allied works in Nepal side Email:peepeemandal@y between Km 2+975 Jaynagar ahoo.com to Km 34+900 Kurtha in connection with New BG Rail line from Jayanagar (India) to Bardibas (Nepal). 2 IRCON/3017 04.05.2017 Supply of crushed WMM & IRCON/3017/SGT M/s. Anil Construction ` 113.13 Lakh Item Rate ` 137.50 Lakh 60 days /SGTL/eTen Asphalt aggregates as per L/eTenders Company, from the ders /Works/WMM Required Gradation & /Works/WMM & Krishan Puram, Shivpuri, date of & Asphalt Specifications Including Asphalt M.P.– 473 551, issue of Aggregates- Transportation and unloading Aggregates-2/342 Ph. +919425136466 LOA 2/342 of aggregate at IRCON’s main Dated 09.05.2017 Dated 20.04.2017 camp near Village Bamaur, A B Road (Km 276 of NH3) in connection with “4-Laning of Shivpuri - Guna section of NH- 3 Cont/- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 3 IRCON/3018 26.04.2017 Construction of civil works for IRCON/3018/DFC Raghuvir Buildcon ` 69.74 Crores ` 62.77 Crores ` 58.98 Crores 15 Months /DFCCIL- double line railway involving CIL-CTP-12/08- Private Limited from the CTP-12/e- Tender/ Infra formation in Embankments/ 35/956 201 Jalaram House date of nd work / Cuttings, Bridges and Dated 11.05.2017 2 Floor issue of Package:SS Structures. Project Near Atmajyoti LOA S3 A/08-37, Chainage:176+240 to Ashram Ellorapark, Dated 24.03.2017 Chainage195+420 for Infra Vadodara Gujarat work package -SS 3 – A 390023. 4 IRCON/3018 26.04.2017 Construction of civil works for IRCON/3018/DFC Raghuvir Buildcon ` 53.85 Crores ` 48.47 Crores ` 45.54 Crores 15 Months /DFCCIL- double line railway involving CIL-CTP-12/08- Private Limited 201 from the CTP-12/e- nd Tender/ Infra formation in Embankments/ 35/955 Jalaram House 2 date of work / Cuttings, Bridges and Dated 11.05.2017 floor Near Atmajyoti issue of Package:SS Structures.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us