WWW.NASAWATCH.COM SSP 54016 Baseline Increment Definition and Requirements Document for Increment 16 International Space Station Program Baseline March 2007 National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas Contract Number: NNJ04AA02C WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline REVISION AND HISTORY PAGE REV. DESCRIPTION PUB. DATE - Initial Release (Reference per SSCD XXXXXX, EFF. XX-XX-XX) XX-XX-XX WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 CHANGE SHEET Month XX, XXXX Baseline Space Station Control Board Directive XXXXXX/(X-X), dated XX-XX-XX. (X) CHANGE INSTRUCTIONS SSP 54016, Increment Definition and Requirements Document for Increment 16, has been baselined by the authority of SSCD XXXXXX. All future updates to this document will be identified on this change sheet. WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 Baseline (Reference SSCD XXXXXX, dated XX-XX-XX) LIST OF EFFECTIVE PAGES Month XX, XXXX The current status of all pages in this document is as shown below: Page Change No. SSCD No. Date i - xiv Baseline XXXXXX Month XX, XXXX 1-1 - 1-2 Baseline XXXXXX Month XX, XXXX 2-1 - 2-4 Baseline XXXXXX Month XX, XXXX 3-1 - 3-10 Baseline XXXXXX Month XX, XXXX 4-1 - 4-9 Baseline XXXXXX Month XX, XXXX 5-1 - 5-6 Baseline XXXXXX Month XX, XXXX 6-1 - 6-48 Baseline XXXXXX Month XX, XXXX A-1 - A-8 Baseline XXXXXX Month XX, XXXX B-1 - B-6 Baseline XXXXXX Month XX, XXXX C-1 - C-6 Baseline XXXXXX Month XX, XXXX D-1 - D-11 Baseline XXXXXX Month XX, XXXX E-1 - E-2 Baseline XXXXXX Month XX, XXXX F-1 - F-2 Baseline XXXXXX Month XX, XXXX G-1 - G-2 Baseline XXXXXX Month XX, XXXX H-1 - H-34 Baseline XXXXXX Month XX, XXXX I-1 - I-4 Baseline XXXXXX Month XX, XXXX J-1 - J-2 Baseline XXXXXX Month XX, XXXX K-1 - K-2 Baseline XXXXXX Month XX, XXXX WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 MARCH 2007 i WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline PREFACE INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 This document is the Increment Definition and Requirements Document for Increment 16. Official delivery of this document is under control of the Space Station Control Board (SSCB). Any changes or revisions will be jointly agreed to and signed by the National Aeronautics and Space Administration (NASA) and the affected International Partners (IPs). ii WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline NASA/ROSCOSMOS INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 MARCH 2007 Michael T. Suffredini Alexi Krasnov National Aeronautics and Space Roscosmos Administration Director, Manned Flight Program Manager, International Space Station Program Date Date iii WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline NASA/CSA INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 MARCH 2007 Michael T. Suffredini Benoit Marcotte National Aeronautics and Space CSA Program Manager Administration Manager, International Space Station Program Date Date iv WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline NASA/ESA INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 MARCH 2007 Michael T. Suffredini Alan Thirkettle National Aeronautics and Space ESA Program Manager Administration Manager, International Space Station Program Date Date v WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline NASA/JAXA INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 MARCH 2007 Michael T. Suffredini Kuniaki Shiraki National Aeronautics and Space JAXA ISS Program Manager Administration Manager, International Space Station Program Date Date vi WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 CONCURRENCE MARCH 2007 Concurred by: Valeri Ryumin RSC-E ISS PROGRAM DIRECTOR ORG SIGNATURE DATE Developer Concurrence: Nikolai Bryukhanov RSC-E HEAD OF CENTER FOR DESIGN AND DEVELOPMENT ORG OF ISS AND FUTURE PROGRAMS SIGNATURE DATE Developer Concurrence: Igor Khamits RSC-E RUSSIAN SEGMENT INTEGRATION ORG SIGNATURE DATE Developer Concurrence: Mikhail Shutikov RSC-E RUSSIAN MODULES MANAGER ORG SIGNATURE DATE Developer Concurrence: Marina Sycheva RSC-E PLANNING AND MANIFEST MANAGER ORG SIGNATURE DATE vii WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 CONCURRENCE MARCH 2007 Developer Concurrence: Iliya Filippov RSC-E VEHICLE INTEGRATED PERFORMANCE RESOURCES ORG REPRESENTATIVE SIGNATURE DATE Developer Concurrence: Galina Kaportseva RSC-E PROGRAM MANAGER ORG SIGNATURE DATE Developer Concurrence: Nadezhda Gorbova RSC-E MANIFEST AND CREW PROVISIONING ORG REPRESENTATIVE SIGNATURE DATE Developer Concurrence: Ludmila Chaykina RSC-E FLIGHT MECHANICS REPRESENTATIVE ORG SIGNATURE DATE viii WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 CONCURRENCE MARCH 2007 Prepared by: Kelly Mallini OC BOOK MANAGER ORG SIGNATURE DATE Concurred by: Pete Hasbrook OC INCREMENT 16 MANAGER ORG SIGNATURE DATE Concurred by: Melissa Gard OC REQUIREMENTS AND INCREMENT INTEGRATION ORG MANAGER SIGNATURE DATE Concurred by: Kenneth O. Todd OC MISSION INTEGRATION AND OPERATIONS OFFICE ORG MANAGER SIGNATURE DATE MIC DQA: Delegated Representative OH DATA MANAGEMENT ORG SIGNATURE DATE ix WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline x WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline INTERNATIONAL SPACE STATION PROGRAM INCREMENT DEFINITION AND REQUIREMENTS DOCUMENT FOR INCREMENT 16 LIST OF CHANGES MARCH 2007 All changes to paragraphs, tables, and figures in this document are shown below: SSCB Entry Date Change Paragraph(s) March 2007 Baseline All xi WWW.NASAWATCH.COM SSP 54016 WWW.NASAWATCH.COM Baseline TABLE OF CONTENTS PARAGRAPH PAGE The table of contents is empty because none of the paragraph styles selected in the Document Inspector are used in the document. APPENDIX The table of contents is empty because none of the paragraph styles selected in the Document Inspector are used in the document. TABLE The table of contents is empty because none of the paragraph styles selected in the Document Inspector are used in the document. FIGURE INTRODUCTION................................................................................................................................................ 1 PURPOSE.......................................................................................................................................................... 1 SCOPE............................................................................................................................................................... 1 PRECEDENCE.................................................................................................................................................. 1 DELEGATION OF AUTHORITY......................................................................................................................... 2 DEVIATION........................................................................................................................................................ 2 DOCUMENTS.................................................................................................................................................... 1 APPLICABLE DOCUMENTS............................................................................................................................. 1 REFERENCE DOCUMENTS............................................................................................................................. 3 INCREMENT DEFINITION................................................................................................................................. 1 INCREMENT OVERVIEW................................................................................................................................. 1 INCREMENT FLIGHT SUMMARY..................................................................................................................... 3 INCREMENT SUMMARY AND OBJECTIVES................................................................................................... 5 DEVIATIONS TO THE GENERIC GROUNDRULES, REQUIREMENTS, AND CONSTRAINTS DOCUMENT. 9 ON-ORBIT RESOURCE ASSUMPTIONS AND ALLOCATIONS....................................................................... 1 POWER BALANCE AND ALLOCATIONS.......................................................................................................... 1 CREW TIME....................................................................................................................................................... 5 ACCOMMODATIONS......................................................................................................................................... 6 <RESERVED>..................................................................................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages175 Page
-
File Size-