Xeneca Power Development Inc. Project Description Report Kapuskasing River Hydroelectric Project 336542-0000-07-124-0001 Rev. A November 2010 Xeneca Power Development Inc. - Kapuskasing River Hydroelectric Project Project Description Report Disclaimer This report has been prepared by Hatch Ltd. for the sole and exclusive use of Xeneca Power Development Inc. (hereinafter referred to as “Xeneca” or the “Proponent”) for the purpose of assisting the management of Xeneca in making decisions with respect to the proposed development of a waterpower project and shall not be (a) used for any other purpose, or (b) provided to, relied upon or used by any third party. This report contains opinions, conclusions and recommendations made by Hatch Ltd. (Hatch), using its professional judgment and reasonable care. Any use of or reliance upon this report and estimate by the Proponent is subject to the following conditions: • the report being read in the context of and subject to the terms of the agreement between Hatch and Xeneca including any methodologies, procedures, techniques, assumptions and other relevant terms or conditions that were specified or agreed therein; • the report being read as a whole, with sections or parts hereof read or relied upon in context; • the conditions of the site may change over time (or may have already changed) due to natural forces or human intervention, and Hatch takes no responsibility for the impact that such changes may have on the accuracy or validity of the observations, conclusions and recommendations set out in this report; and • the report is based on information made available to Hatch by Xeneca and/or by certain third parties; and unless stated otherwise in the Agreement, Hatch has not verified the accuracy, completeness or validity of such information, makes no representation regarding its accuracy and hereby disclaims any liability in connection therewith. 336542-0000-07-124-0001, Rev. A, Page i © Hatch 2010/11 Xeneca Power Development Inc. - Kapuskasing River Hydroelectric Project Project Description Report Blank back 336542-0000-07-124-0001, Rev. A, Page ii © Hatch 2010/11 Xeneca Power Development Inc. - Kapuskasing River Hydroelectric Project Project Description Report Project Report November 3, 2010 Xeneca Power Development Inc. Kapuskasing River Hydroelectric Project DISTRIBUTION Canadian Environmental Assessment Agency Ministry of Aboriginal Affairs Environment Canada Ministry of Culture Fisheries and Oceans Canada (DFO) Ministry of Energy and Infrastructure Health Canada Ministry of the Environment (MOE) Indian and Northern Affairs Canada Ministry of Natural Resources (MNR) Transport Canada (TC) Ministry of Transportation Infrastructure Canada Ministry of Northern Development, Mines and Forestry Corporation of the Town of Kapuskasing Ontario Waterpower Association Corporation of the Township of Chapleau Project Description Report Table of Contents 1. General Information ............................................................................................................................ 1-1 1.1 General....................................................................................................................................... 1-1 1.1.1 Name and Proposed Location of Project............................................................................ 1-1 1.1.2 Nature of the Project ......................................................................................................... 1-1 1.1.3 Purpose of the Project ....................................................................................................... 1-1 1.1.4 Economic Benefits of Project ............................................................................................. 1-2 1.1.5 Parties who Received the Project Description.................................................................... 1-2 1.1.6 Federal, Provincial and Municipal Agency and Stakeholder Consultations......................... 1-5 1.1.7 Other Environmental Assessment Processes....................................................................... 1-5 1.2 Contacts...................................................................................................................................... 1-6 1.2.1 Proponent and Contact Information................................................................................... 1-6 1.2.2 Proponent’s Consultant ..................................................................................................... 1-6 1.3 Land Ownership ......................................................................................................................... 1-7 1.4 Authorizations Required.............................................................................................................. 1-7 2. Project Information.............................................................................................................................. 2-1 2.1 Kapuskasing Lake Outlet ............................................................................................................. 2-1 2.1.1 Description of Proposed Project ........................................................................................ 2-1 2.1.1.1 General ................................................................................................................... 2-1 2.1.1.2 Summary of Hydraulic Characteristics ..................................................................... 2-1 2.1.1.3 Installed Capacity .................................................................................................... 2-1 2.1.1.4 Site Access .............................................................................................................. 2-1 2.1.1.5 Headworks Structures.............................................................................................. 2-1 2.1.1.6 Conveyance System................................................................................................. 2-2 2.1.1.7 Powerhouse............................................................................................................. 2-2 336542-0000-07-124-0001, Rev. A, Page iii © Hatch 2010/11 Xeneca Power Development Inc. - Kapuskasing River Hydroelectric Project Project Description Report 2.1.1.8 Transmission ........................................................................................................... 2-2 2.1.1.9 Area of Inundation................................................................................................... 2-2 2.1.2 Operating Strategy for Project............................................................................................ 2-2 2.1.2.1 Type of Proposed Project......................................................................................... 2-2 2.1.2.2 Operating Strategy................................................................................................... 2-2 2.1.2.3 Water Management Plan ......................................................................................... 2-5 2.2 Lapinigam Rapids GS .................................................................................................................. 2-5 2.2.1 Description of Proposed Project ........................................................................................ 2-5 2.2.1.1 General ................................................................................................................... 2-5 2.2.1.2 Summary of Hydraulic Characteristics ..................................................................... 2-5 2.2.1.3 Installed Capacity .................................................................................................... 2-5 2.2.1.4 Site Access .............................................................................................................. 2-6 2.2.1.5 Headworks Structures.............................................................................................. 2-6 2.2.1.6 Conveyance System................................................................................................. 2-6 2.2.1.7 Powerhouse............................................................................................................. 2-6 2.2.1.8 Transmission ........................................................................................................... 2-6 2.2.1.9 Area of Inundation................................................................................................... 2-6 2.2.2 Operating Strategy for Project............................................................................................ 2-6 2.2.2.1 Type of Proposed Project......................................................................................... 2-6 2.2.2.2 Operating Strategy................................................................................................... 2-6 2.2.2.3 Water Management Plan ......................................................................................... 2-9 2.3 Middle Township Buchan ........................................................................................................... 2-9 2.3.1 Description of Proposed Project ........................................................................................ 2-9 2.3.1.1 General ................................................................................................................... 2-9 2.3.1.2 Summary of Hydraulic Characteristics ..................................................................... 2-9 2.3.1.3 Installed Capacity
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages53 Page
-
File Size-