44212-013: Coastal Towns Environmental Infrastructure Project

44212-013: Coastal Towns Environmental Infrastructure Project

Semi-annual Environmental Monitoring Report Project No. 44212-013 December 2020 Coastal Towns Environmental Infrastructure Project (CTEIP) This Semi-annual Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. LOCAL GOVERNMENT ENGINEERING DEPARTMENT (Ministry of Local Government and Rural Development Cooperatives) Twelfth Environmental Safeguard Monitoring Report (July to December 2020) ADB ODA Loan Project Loan/ Grant Nos.: L3133-BAN (SF)/L8284-BAN(SCF)/G0394-BAN(SCF) Project No.: BAN 44212 COASTAL TOWNS ENVIRONMENTAL INFRASTRUCTURE PROJECT (CTEIP) TWELFTH ENVIRONMENTAL SAFEGUARDS MONITORING REPORT (ESMR-12) JULY TO DECEMBER 2020 Project Management and Supervision Consultants (PMSC) COASTAL TOWNS ENVIRONMENTAL INFRASTRUCTURE PROJECT (CTEIP) TWELFTH ENVIRONMENTAL SAFEGUARD MONITORING REPORT (JULY TO DECEMBER 2020) TWELFTH ENVIRONMENTAL SAFEGUARDS MONITORING REPORT (ESMR-12) Issue and Revision Record Check/ Rev Date Originator Contribution Description Approver 00 December PDH Field Kushal Roy PDH Field Draft Environmental 2020 Matiur Rahman Safeguards CSEs Monitoring Report (ESMR-12) PROJECT MANAGEMENT AND SUPERVISION CONSULTANT (PMSC) Page i COASTAL TOWNS ENVIRONMENTAL INFRASTRUCTURE PROJECT (CTEIP) TWELFTH ENVIRONMENTAL SAFEGUARD MONITORING REPORT (JULY TO DECEMBER 2020) PROJECT MANAGEMENT AND SUPERVISION CONSULTANT (PMSC) Page ii COASTAL TOWNS ENVIRONMENTAL INFRASTRUCTURE PROJECT (CTEIP) TWELFTH ENVIRONMENTAL SAFEGUARD MONITORING REPORT (JULY TO DECEMBER 2020) CONTENTS 1 INTRODUCTION 2 1.1 BACKGROUND ............................................................................................................................................................................... 2 1.2 PROJECT OBJECTIVES ................................................................................................................................................................... 2 1.3 OBJECTIVES OF THE PMSC ............................................................................................................................................................ 3 1.4 CLIMATE CHANGE ADAPTATION MEASURES .................................................................................................................................... 4 1.4.1 Cyclone Shelter Component .............................................................................................................. 9 1.4.2 Roads and Bridges Component ......................................................................................................... 9 1.4.3 Drainage and Flood Control Component ........................................................................................... 9 1.4.4 Water Supply Component ................................................................................................................ 10 1.4.5 Integrated Environmental Sanitation Component ............................................................................ 10 1.4.5.1 Sanitation Component ........................................................................................................................ 11 1.4.5.2 Solid Waste Management (SWM) Component................................................................................... 11 1.5 PROJECT SCOPE AND IMPLEMENTATION ........................................................................................................................................ 12 2 ENVIRONMENTAL RESPONSIBILITIES AND INSTITUTIONAL SETUP 9 2.1 ENVIRONMENTAL RESPONSIBILITIES................................................................................................................................................ 9 2.2 INSTITUTIONAL ARRANGEMENTS ..................................................................................................................................................... 9 2.3 IMPLEMENTATION, MONITORING AND REPORTING COMPLIANCE ........................................................................................................ 9 2.4 GRIEVANCE REDRESSAL STATUS .................................................................................................................................................... 9 3 PROJECT STATUS OF ONGOING CONTRACT PACKAGES 13 3.1 RECENT UPDATE AND COVID-19 RESPONSE ................................................................................................................................. 13 3.2 BATCH 1 TOWN PROGRESS ........................................................................................................................................................... 13 3.3 BATCH 2 TOWN PROGRESS ........................................................................................................................................................... 13 3.4 BATCH 3 TOWN PROGRESS ........................................................................................................................................................... 13 3.5 PROJECT STATUS OF ONGOING BATCH 1, STAGE I CONTRACT PACKAGES ................................................................. 14 3.5.1 Package no. CTEIP/AMT/CS/01 ...................................................................................................... 15 3.5.2 Package no. CTEIP/AMT/RD/01 ...................................................................................................... 15 3.5.3 Package no. CTEIP/AMT/RD/02 ...................................................................................................... 16 3.5.4 Package no. CTEIP/AMT/DR/01 ...................................................................................................... 17 3.5.5 Package no. CTEIP/AMT/WS/01 ..................................................................................................... 18 3.5.6 Package no. CTEIP/AMT/PT/01 ...................................................................................................... 18 3.5.7 Package no. CTEIP/GAL/CS/01 ...................................................................................................... 19 3.5.8 Package no. CTEIP/GAL/RD/01 ...................................................................................................... 19 3.5.9 Package no. CTEIP/GAL/RD/02 ...................................................................................................... 20 3.5.10 Package no. CTEIP/GAL/DR/01 ...................................................................................................... 21 3.5.11 Package no. CTEIP/GAL/WS/01...................................................................................................... 22 3.5.12 Package no. CTEIP/GAL/PT/01 ....................................................................................................... 22 3.5.13 Package no. CTEIP/MAT/CS/01 ...................................................................................................... 23 3.5.14 Package no. CTEIP/MAT/RD/01 ...................................................................................................... 23 3.5.15 Package no. CTEIP/MAT/DR/01 ...................................................................................................... 24 3.5.16 Package no. CTEIP/MAT/PT/01 ...................................................................................................... 25 PROJECT MANAGEMENT AND SUPERVISION CONSULTANT (PMSC) Page iii COASTAL TOWNS ENVIRONMENTAL INFRASTRUCTURE PROJECT (CTEIP) TWELFTH ENVIRONMENTAL SAFEGUARD MONITORING REPORT (JULY TO DECEMBER 2020) 3.5.17 Package no. CTEIP/MAT/WS/01 ..................................................................................................... 26 3.5.18 Package no. CTEIP/PIR/CS/01 ........................................................................................................ 27 3.5.19 Package no. CTEIP/PIR/CS/02 ........................................................................................................ 27 3.5.20 Package no. CTEIP/PIR/DR/01 ....................................................................................................... 28 3.5.21 Package no. CTEIP/PIR/RD/01 ....................................................................................................... 30 3.5.22 Package no. CTEIP/PIR/RD/02 ....................................................................................................... 31 3.5.23 Package no. CTEIP/PIR/PT/01 ........................................................................................................ 32 3.5.24 Package no. CTEIP/PIR/IES/01 ....................................................................................................... 32 3.6 PROJECT STATUS OF ONGOING BATCH 1, STAGE II CONTRACT PACKAGES .................................................................................... 33 3.6.1 Package no. CTEIP/AMT/RD/03 ...................................................................................................... 33 3.6.2 Package no. CTEIP/AMT/MM/01 ..................................................................................................... 34 3.6.3 Package no. CTEIP/AMT/BR/01

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    272 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us