
At Chandni Chowk, New Delhi For Client- North Delhi Municipal Corporation (with Concessionaire M/s Ansh Builders Pvt. Ltd) JUNE, 2019 Schedule: 8 (a), Category: B Built Up Area –1,05,346.49 SQM QCI Certificate no. NABET/EIA/1619/RA 0064 PREPARED BY GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (Accredited by QCI/NABET, Approved by MoEFCC, GoI, ISO 9001:2008 Certified Co.) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Accredited by NABL, Recognized by MoEF&CC, GoI) A unit of GRC India MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI FORM- I (I) Basic Information S. No. Item Details 1. Name of the project/s Multilevel Car Parking Complex Project 2. S. No. in the schedule 8 (a): Building and Construction Projects 3. Capacity/area/length/tonnage to be Total Plot Area = 18,524 (4.57 acres) handled/command area/lease Built Up Area = 1,05,346.49 m2 area/number of wells to be drilled 4. New/Expansion/Modernization Modernization 5. Existing Capacity/Area etc. Nil 6. Category of Project i.e. ‘A’ or ‘B’ Category B 7. Does it attract the general condition? No If yes, please specify. 8. Does it attract the specific No condition? If yes, please specify. 9. Location Latitude: 28°39'28.02" N Plot/Survey/Khasra No. Longitude: 77° 13'51.11"E Village Chandni Chowk Tehsil District Central Delhi State New Delhi 10. Nearest railway station/airport along Nearest Railway Station: Old Delhi Railway Station with distance in kms. (approx. 0.3 km, North) Nearest Airport: IGI Airport (Approx. 14.9 km, SW) (Source of information: - Google Earth Image). 11. Nearest Town, city, District Old Delhi (approx. 0.36 km, S) Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body Chandni Chowk, New Delhi. NORTH DELHI MUNICIPAL CORPORATION Page 1 (WITH CONCESSIONAIRE M/s ANSH BUILDERS PVT LTD) MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI (complete postal addresses with telephone nos. to be given) 13. Name of applicant Shri. J P Verma, (Executive Engineer) North Delhi Municipal Corporation (With Concessionaire M/s Ansh Builders Pvt. Ltd.) 14. Registered Address Office of the Executive Engineer (Spl. Pr.) City SP Zone, 2nd Floor, Old Hindu College Building, Kashmiri Gate, Delhi-110006 15. Address for correspondence : Name Shri. J P Verma, North Delhi Municipal Corporation (With Concessionaire M/s Ansh Builders Pvt. Ltd.) Designation (Owner/Partner/CEO) Executive Engineer Address North Delhi Municipal Corporation Office of the Executive Engineer (Spl. Pr.) City SP Zone, 2nd Floor, Old Hindu College Building, Kashmiri Gate, Delhi Pin Code 110006 Telephone No. 011-23988845, 9717788322 Fax No. -- E-mail [email protected] 16. Details of Alternative Sites No examined, if any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves NORTH DELHI MUNICIPAL CORPORATION Page 2 (WITH CONCESSIONAIRE M/s ANSH BUILDERS PVT LTD) MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI approval/ clearance under: if yes, details of the same and their status to be given. (a)The forest (Conservation) act, No 1980? (b) The wildlife (Protection) act, No 1972? (C) The C.R.Z Notification, 1991? No 22. Whether there is any Government 1. NBC Guidelines, 2016 Order/Policy relevant/relating to the 2. MPD 2021 site? 3. Unified Building Bye Laws for Delhi 2016 23. Forest land involved (hectares) No Forest Land 24. Whether there is any litigation There is no litigation on the project. However it is a pending against the project and /or Hon’ble Delhi High court monitored project in WP (c) land in which the project is propose No. 4572/2007 in Manushi Sangthan case. To oversee to be set up? the development and timely completion being a (a) Name of the Court parking infrastructure project. (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S. No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Land is allotted to M/s Ansh Builders Pvt use, land cover or topography including Ltd by North Delhi Municipal NORTH DELHI MUNICIPAL CORPORATION Page 3 (WITH CONCESSIONAIRE M/s ANSH BUILDERS PVT LTD) MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI increase in intensity of land use (with Corporation for Multilevel Car Parking respect to local land use plan) Project. Land has been entitled for Commercial purposes as per land use “Transportation” of Multilevel Car Parking (Master Plan of Delhi -2021). 1.2 Clearance of existing land, vegetation No The construction of project does not and buildings? require any clearance of existing Land, Vegetation & Building. 1.3 Creation of new land uses? No No new creation of land uses 1.4 Pre-construction investigations e.g. bore Yes Soil investigation has been done during houses, soil testing? the study. 1.5 Construction works? Yes All construction activities will be confined within the project premises; there will be no physical changes outside the project boundary. 1.6 Demolition works? Yes Demolition of the existing parking structure (earlier operated by North Delhi Municipal Corporation) is planned in the proposed Multilevel Car Parking Project. A copy of permission for demolition has been obtained. 1.7 Temporary sites used for construction Yes All the construction activity including works or housing of construction stocking of raw materials will be confined workers? within the project site only. No temporary labor hutments are proposed. Local labors from nearby area will be hired. Sanitation facilities will be developed at site. 1.8 Above ground buildings, structures or Yes The earthwork included soil excavation earthworks including linear structures, and cutting of the earth will be moved. NORTH DELHI MUNICIPAL CORPORATION Page 4 (WITH CONCESSIONAIRE M/s ANSH BUILDERS PVT LTD) MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI cut and fill or excavations The quantity of excavated soil will be approx. 1, 56,000 m3. The cut and fill material in the project site is nearly at par and hence the need for movement of soil to and from the site will not be anticipated. 1.9 Underground works including mining No No underground works including mining/ or tunneling? tunneling will be undertaken except excavation of earth. 1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No No dredging required. 1.12 Offshore structures? No No offshore structures required. 1.13 Production and manufacturing No No production/manufacturing process processes? involved as the project is Multilevel Car Parking Complex Project 1.14 Facilities for storage of goods or Yes Raw material will be stored at site in a materials? covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. 1.15 Facilities for treatment or disposal of Yes Solid Waste: solid waste or liquid effluents? The solid waste generated from the project will be in the form of: Construction Waste: Left over cement and mortars, cement concrete blocks, aggregate, sand and other inorganic material were recycled and reused as granular subbase (GSB) layer of pavement. Earth rendered NORTH DELHI MUNICIPAL CORPORATION Page 5 (WITH CONCESSIONAIRE M/s ANSH BUILDERS PVT LTD) MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI surplus from the excavation will be utilized in the embankment works. Operational Phase: The total solid waste generated from Multilevel Car Parking Complex project is estimated to be approx. 1038 kg per day (@ 0.15 kg per capita per day for the visitor, @ 0.25 kg per capita per day for office staff, operation/maintenance staff/security staff and workers, and Landscape waste (@ 0.2 kg/acre/day). Solid wastes generated will be segregated into biodegradable (waste vegetables and foods etc.) and non-biodegradable (papers, cartons, thermocol, plastics, glass etc.) components and collected in separate bins. The biodegradable organic wastes will be disposed by local vendors. Recyclable and non-recyclable wastes will be disposed through Govt. approved agency. Liquid Effluents: Construction Phase: During construction phase, sewage will be treated and disposed through septic tanks with soak pits. Operational Phase: NORTH DELHI MUNICIPAL CORPORATION Page 6 (WITH CONCESSIONAIRE M/s ANSH BUILDERS PVT LTD) MODIFICATION IN MULTILEVEL CAR PARKING COMPLEX, FORM I CHANDNI CHOWK, NEW DELHI The waste water in operation phase will be treated in an onsite STP and treated effluent will be reused for flushing, horticulture etc. 1.16 Facilities for long term housing of No Local laborers will be hired from nearby operational workers? areas during construction phase. So, there will be no facilities for long-term housing of operational workers. 1.17 New road, rail or sea traffic during No The project site is well connected through construction or operation? NH-24 & NH-10 which are approx. 6.9 km & 8 km towards SE & WNW direction from project site. Only internal roads; paths will be developed for vehicular movements for transportation of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages22 Page
-
File Size-