Leeds Skelton Lake Services

Leeds Skelton Lake Services

LEEDS SKELTON LAKE SERVICES Call with any queries or feedback on 01924 873 873 CLIENT Extra MSA Group SITE AREA 15.52 ha LOCATION Junction 45 of the M1, Leeds SECTOR COMMERCIAL Spawforths advise Extra MSA Group on planning and environmental matters on a number of their ‘new concept’ Motorway Service Area (MSA) sites across the north of England. On behalf of Extra, Spawforths secured planning permission for a £60m MSA at Junction 45 of the M1 Motorway in Leeds (Leeds Skelton Lake Services). This MSA is now in construction and Spawforths continue to work with Extra to advise on planning and environmental matters, including discharge of planning conditions. This MSA is located at the Gateway to the Leeds Enterprise Zone and Extra’s investment in the City Region will create over 700 new job opportunities throughout its construction and operation. The high-quality, innovative building design features sweeping architecture that will tie its ‘Living Green Roof’ into the landscape. The bright and spacious building interior also includes a new Visitor Centre, community space and an upper-floor viewing deck over Skelton Lake. By improving walking routes to and around Skelton Lake, the development will also form part of a ‘Green Corridor’ linking Temple Newsam to the north with Rothwell Country Park. These Motorway Services will address road safety deficiencies on sections of the Motorway Network, bringing with them significant investment and job creation. Extra’s proposals include an attractive Facilities Building which will provide a wide range of popular and high quality food and ancillary retail outlets, together with a Business Lounge, Fuel Filling Station and Hotel. Spawforths provided Planning, Masterplanning, Environmental Assessment and Landscape Architecture services and coordinated the outline planning application submissions. Spawforths continue to work with Extra to provide post determination planning advice Image courtesy of Extra MSA Group. Photograph by David Lindsay. Design by Architecture 519. Services provided by Spawforths: Development Plan Representations Development Strategies Planning Applications and Negotiations Environmental Assessment Masterplanning Landscape Architecture Stakeholder Engagement Project Management Spawforths, Junction 41 Business Court, East Ardsley, Leeds, WF3 2AB Tel: 01924 873 873 Fax: 01924 870 777 Email: [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us