APPENDIX-I Form-9 Abstract of Eligible Assignments of Key

APPENDIX-I Form-9 Abstract of Eligible Assignments of Key

Applicant: Anil Verma Associates, Inc. APPENDIX-I Form-9 Abstract of Eligible Assignments of Key Personnel (Refer Clause 3.1) Name of Key Personnel: Anil Verma, AIA Designation: Chief Architect/Team Leader S. Name of Project Name of Estimated Name of Designatio Date of Mandays No. Client capital cost firm for n of the completion of spent of project (in which the Key the Rs crore./ Key Personnel assignment US$ million) Personnel on the worked assignmen t (1) (2) (3) (4) (5) (6) (7) (8) 1. Regional Connector Los Angeles $1.76 billion Anil Verma Chief July 2017 384 Transit Corridor, County (life of Associates, Urban (design Design-Build, LA Metropolitan Project Inc. Designer/ complete & Metro, Transportation Budget) Planner construction in Los Angeles, CA Authority Team progress) Leader 2. Kamehameha Honolulu $120 million Anil Verma Chief August 2015 288 Highway Stations Authority for (approx.) Associates, Architect Group, Honolulu Rapid Inc. Design Authority for Rapid Transportation complete & Transit (HART), (HART) Construction Honolulu, HI in progress- June 2019 3. California High California $1.6 billion Anil Verma October 2016 192 Stations Speed Rail High Speed (estimated) Associates, Team Downtown Los Rail Authority Inc. Leader/ Angeles to Palmdale Segment, CA Principal Architect 4. Crenshaw EXPO Los Angeles Cost: USD Anil Verma Stations Design Phase 192 Line Station County $2.7 billion Associates, Team & Metropolitan Inc. Leader/ Construction Crenshaw - LAX Transportation USD $290 Principal in progress – Transit Corridor- Authority million Architect June 2020 Light Rail Transit (LACMTA) (Station Cost) (LRT) Project, Los Angeles, CA 5. Crenshaw/ Martin Los Angeles Cost: USD Anil Verma 192 Stations Design Phase Luther King (MLK) County $2.7 billion Associates, Team & Station Metropolitan Inc. Leader/ Construction Transportation USD $300 in progress – Crenshaw - LAX Authority million Principal June 2020 Airport Transit (Station Cost) Architect Corridor-Light Rail Transit (LRT) Project, Los Angeles, CA RFE for Empanelment of Architect and Technical Consultant Signature of Applicant Applicant: Anil Verma Associates, Inc. 6. Crenshaw Los Angeles Cost: USD Anil Verma Stations Design Phase 192 Vernon/Station County $2.7 billion Associates, Team & Metropolitan Inc. Leader/Prin Construction LAX Airport Transit Transportation USD $250 cipal in progress – Corridor-Light Rail Authority million Architect June 2020 Transit (LRT) (Station Cost) Project, Los Angeles, CA 7. Crenshaw/ Slauson, Los Angeles Cost: USD Anil Verma Stations Design Phase 192 Florence/West, County $2.7 billion Associates, Team & Florence, LA Brea, Metropolitan Inc. Leader/ Construction Florence/Hindry Transportation USD $60 Principal in progress – Stations Authority million Architect June 2020 CRENSHAW/SLA (Station Cost) USON; Crenshaw - LAX Airport Transit Corridor-Light Rail Transit (LRT) Project, Los Angeles, CA 8. Aviation Century Los Angeles Cost: USD Anil Verma Stations Design Phase 192 Station County $2.7 billion Associates, Team & Metropolitan Inc. Leader/ Construction Crenshaw - LAX Transportation USD $110 Principal in progress – Airport Transit Authority million Architect June 2020 Corridor-Light Rail (Station Cost) Transit (LRT) Project, Los Angeles, CA 9. BART – Extension Santa Clara US$5.6 Anil Verma Team February2007 384 Conceptual Valley billion Associates, Leader/ Engineering Transportation dollars. Inc. Architect (EIS/EIR PHASE) Authority of Record – and Preliminary Undergrou Engineering Phases nd Stations SVRT, San Jose, CA Stations were: Alum Rock Station Civic Center Station Market Street Station Amtrak Diridon Station 10. Diridon Arena Santa Clara US$310 Anil Verma Design April 2010 480 BART Underground Valley million Associates, Manager Station, SVRT, San Transportation dollars. Inc. /Architect Jose, CA Authority of Record (VTA) RFE for Empanelment of Architect and Technical Consultant Signature of Applicant Applicant: Anil Verma Associates, Inc. 11. Downtown San Jose Santa Clara US$420 Anil Verma Design April 2010 480 BART Underground Valley million Associates, Manager Station, SVRT, San Transportation dollars. Inc. /Architect Jose, CA Authority of Record (VTA) 12. Silicon Valley Santa Clara US$4.46 Anil Verma Principal December 208 Rapid Transit Valley billion Associates, Architect/ 2017 (SVRT) BART Transportation dollars. Inc. Design Heavy Rail Authority Manager Extension to San (VTA) Jose – Tunnel, Cross Passages, Portals, Station Ventilation Structures, & Ancillary Equipment Structures, San Jose, CA Alum Rock Station Downtown San Jose Station Diridon Station 13. Berryessa & Santa Clara USD $26 Anil Verma Principal February 50 Milpitas Station Valley Transit million Associates, Architect/ 2018 Campus roadway & Authority Inc. Design Parking Structures (VTA) Manager Design and Engineering Services for SVBX Project, D720 BART/SVRT, San Jose, CA 14. Milpitas Station Santa Clara Anil Verma Principal 360 Project Cost: June 2016 Valley Transit Associates, Architect/ US$840 (Underground Authority Inc. Design Design Phase million Station) (VTA) Manager Construction dollars Silicon Valley Phase – July Rapid Transit Station 2018 (SVRT) BART Cost:US$280 Extension Project- million C700 Line Track, dollars Stations and Systems, A Design- Build Contract BART/SVRT, San Jose, CA RFE for Empanelment of Architect and Technical Consultant Signature of Applicant Applicant: Anil Verma Associates, Inc. 15. Berryessa Station Santa Clara Estimated Anil Verma Principal 280 June 2016 Valley Transit Cost $840 Associates, Architect/ Silicon Valley Authority million Inc. Design Design Phase Rapid Transit (VTA) dollars Manager Construction (SVRT) BART Phase – July Extension Project- Station Cost: 2018 C700 Line Track, $220 million Stations and dollars Systems, A Design- Build Contract, BART/SVRT, San Jose, CA 16. BART-General Bay Area Estimated Anil Verma Principal February2019 360 Engineering Rapid Transit Cost: $20 Associates, Architect/ Services for BART District million (fee) Inc. Design Projects-Operations (BART) dollars for Manager Control Facility, multiple Livermore Heavy projects Rail Expansion,, Oakland, CA 17. Rio Piedras Heavy Puerto Rico US$574 Anil Verma Design October 2009 270 Rail Underground Highways & million Associates, Manager/ Station, Tren Transportation dollars. Inc. Architect of Urbano, San Juan, Authority Record/ Puerto Rico Urban Designer/Ins pector of Record 18. University of Puerto Puerto Rico US$448 Anil Verma Design October 2009 240 Rico Heavy Rail Highways & million Associates, Manager/ Underground Transportation dollars. Inc. Architect of Station, Tren Authority Record/Urba Urbano, San Juan, n Puerto Rico Designer/Ins pector of Record 19. PMOC Project USD $22 Anil Verma Project February2007 125 US Management billion dollars Associates, Manager/ Department of Oversight, Inc. Planner Transportation New York, NY (estimate of Federal Transit all projects) Administration East Side Access- (FTA) Grand Central Terminal Station – Extension of Long Island Railroad into Manhattan’s Grand Central Station in deep tunnel and cavern configurations; Fulton Street Underground Station – Connecting multiple rail lines, including the World Trade Center; Staten RFE for Empanelment of Architect and Technical Consultant Signature of Applicant Applicant: Anil Verma Associates, Inc. Island Ferry Intermodal Terminal Station ; Atlantic Avenue Intermodal Station & Line Segment – Connecting (4) MTA subway lines, and the Long Island Commuter line.; South Ferry Intermodal Terminal Station 20. San Fernando Los Angeles US$ 461.9 Anil Verma Chief December 350 Valley Rail Transit County million Associates, Architect/ 2006 with 14 Stations Metropolitan dollars. Inc. Team later converted to Transportation Leader Bus Rapid Transit Authority Corridor (ORANGE LINE) Los Angeles, CA 21. Ramona Boulevard Alameda USD $60.32 Anil Verma Principal-in- May 2008 30 Grade Separation Corridor East million Associates, Charge Project, Construction Inc. Alameda Corridor Authority East Construction (ACE) Authority, El Monte, CA 22. Brea Canyon Road Alameda USD $61.8 Anil Verma Principal-in- March2007 30 Grade Separation Corridor East million Associates, Charge Project, Construction Inc. Alameda Corridor Authority East Construction (ACE) Authority , Irwindale, CA 23. Nogales Grade Alameda USD $73.63 Anil Verma Principal-in- December 30 Separation Project, Corridor East million Associates, Charge 2006 Alameda Corridor Construction Inc. East Construction Authority Authority , (ACE) Irwindale, CA 24. Auburn Commuter Central Puget USD $29.7 Anil Verma Project July2006 320 Rail Station and Sound million Associates, Manager/ Transit Center, Regional dollars. Inc. Principal Auburn, WA Transit Architect Authority (Sound Transit) 25. Inspection of Los Angeles USD $9.4 Anil Verma Principal-in- March2017 150 Structures– County million Associates, Charge PS39241892 Metropolitan Inc. LACMTA, Los Transportation Angeles, CA Authority (LACMTA) RFE for Empanelment of Architect and Technical Consultant Signature of Applicant Applicant: Anil Verma Associates, Inc. 26. Metro, MQ055, Los Angeles USD $13.89 Anil Verma Principal-in- March2006 125 Architectural and County million Associates, Charge/ Structural Inspection Metropolitan dollars. Inc. Project Project, Tunnels, Transportation Manager Stations, and Authority Bridges, Los (LACMTA) Angeles, CA 27. Totem Lake Mixed Fairfield USD $85 Anil Verma Principal-in- November 350+on Use Development, Development Million Associates, Charge 2020 going Kirkland,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    233 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us